EURISOL DS : Status and Future
Yorick Blumenfeld
IPN Orsay
We acknowledge the financial support of the European Community under the FP6 “Research Infrastructure Action - Structuring the European Research Area” EURISOL DS Project Contract no. 515768 RIDS . The EC is not liable for any use that can be made of the information contained herein.
![Page 2: EURISOL DS : Status and Future Yorick Blumenfeld IPN Orsay We acknowledge the financial support of the European Community under the FP6 Research Infrastructure](https://reader036.vdocuments.net/reader036/viewer/2022070305/5514cb78550346b0478b4cae/html5/thumbnails/2.jpg)
EURISOL DS
• Major Technical Achievements
• Managerial achievements
• Proposals for the Future
![Page 3: EURISOL DS : Status and Future Yorick Blumenfeld IPN Orsay We acknowledge the financial support of the European Community under the FP6 Research Infrastructure](https://reader036.vdocuments.net/reader036/viewer/2022070305/5514cb78550346b0478b4cae/html5/thumbnails/3.jpg)
![Page 4: EURISOL DS : Status and Future Yorick Blumenfeld IPN Orsay We acknowledge the financial support of the European Community under the FP6 Research Infrastructure](https://reader036.vdocuments.net/reader036/viewer/2022070305/5514cb78550346b0478b4cae/html5/thumbnails/4.jpg)
The Main Challenges• Design a 5MW; 1GeV proton driver with additional capability of 200 AMeV deuterons
and A/Q=2 Heavy Ions (Task7) ; build and test prototypes of the cavities (task 8).
• Design a liquid Hg converter which will accept 5 MW of beam power (task 2).
• Design a UCx target which will make the most efficient use of the neutrons produced (task 4).
• Evaluate the safety constraints of the above set up (task 5).
• Design an efficient multi-user beam distribution system (task 9).
• Design a superconducting HI LINAC capable of accelerating 132Sn up to 150 AMeV (task 6)
• Investigate technologies for the instrumentation of the future (task 10)
• Provide a conceptual study for a beta-beam neutrino facility (task 12).
![Page 5: EURISOL DS : Status and Future Yorick Blumenfeld IPN Orsay We acknowledge the financial support of the European Community under the FP6 Research Infrastructure](https://reader036.vdocuments.net/reader036/viewer/2022070305/5514cb78550346b0478b4cae/html5/thumbnails/5.jpg)
New baseline scheme with extended capabilities
• 2 injection lines for H,D, He and A/q=2 ions• SARAF scheme up to 60 MeV/q • IPNO scheme from 60 to 140 MeV/q• CEA scheme from 140 to 1000 MeV/u• cw beam splitting at 1 GeV (1 line 4 MW + 3 lines 100 kW)• Total length of the linac: ~240 m
H-,D-
H+,D+, 3He+
+
RFQ176 MHz
HWR176 MHz
3-SPOKE 352 MHz
Elliptical704 MHz
4 MWH-
100 kWH+, 3He2+
1.5 Me
V/u
60 MeV
/q
140 M
eV/q
1 GeV
/q
B stripper
foil stripper>200 MeV/q
D, A/q=2
=0.047=0.03=0.09=0.15
=0.65 =0.78
10 36 31 63 97
![Page 6: EURISOL DS : Status and Future Yorick Blumenfeld IPN Orsay We acknowledge the financial support of the European Community under the FP6 Research Infrastructure](https://reader036.vdocuments.net/reader036/viewer/2022070305/5514cb78550346b0478b4cae/html5/thumbnails/6.jpg)
1 GeV Multiple Extraction•3 splitting stations•4 simultaneous users for cw proton beams:
•1 4 MW•3 0100 kW (continuously adjustable)
•Unique ability of EURISOL at present
EURISOL parallel cw Proton extraction
![Page 7: EURISOL DS : Status and Future Yorick Blumenfeld IPN Orsay We acknowledge the financial support of the European Community under the FP6 Research Infrastructure](https://reader036.vdocuments.net/reader036/viewer/2022070305/5514cb78550346b0478b4cae/html5/thumbnails/7.jpg)
SPIRAL-2 philosophy : Smoothest beam dynamics (regular FDO lattice, low number of -sections), Modular solution and simple cryostats, Separated vacuum (safety with FP), Warm focusing (easier for alignement), Possibility to insert diagnostics at each period, ease of tuning
Main technical requirements:
Only 2-gap cavities (high q/A acceptance)
Max. accelerating fields 7.8 MV/m
Nominal operation for A/Q between 4 and 8
Design of the post-accelerator
![Page 8: EURISOL DS : Status and Future Yorick Blumenfeld IPN Orsay We acknowledge the financial support of the European Community under the FP6 Research Infrastructure](https://reader036.vdocuments.net/reader036/viewer/2022070305/5514cb78550346b0478b4cae/html5/thumbnails/8.jpg)
New Target Concept
![Page 9: EURISOL DS : Status and Future Yorick Blumenfeld IPN Orsay We acknowledge the financial support of the European Community under the FP6 Research Infrastructure](https://reader036.vdocuments.net/reader036/viewer/2022070305/5514cb78550346b0478b4cae/html5/thumbnails/9.jpg)
Reactor Type Target
Concept Validated by International Advisory Board
![Page 10: EURISOL DS : Status and Future Yorick Blumenfeld IPN Orsay We acknowledge the financial support of the European Community under the FP6 Research Infrastructure](https://reader036.vdocuments.net/reader036/viewer/2022070305/5514cb78550346b0478b4cae/html5/thumbnails/10.jpg)
Double effusion line prototype
(E. Bouquerel, L. Penescu)
Heat screen
Bellows
ISOLDE cold FEBIAD MK7Ion source
Cu body
2 pneumatic valves
RIB
1.4GeV protons
2xwater cooledtransfer lines2x20cm containers
![Page 11: EURISOL DS : Status and Future Yorick Blumenfeld IPN Orsay We acknowledge the financial support of the European Community under the FP6 Research Infrastructure](https://reader036.vdocuments.net/reader036/viewer/2022070305/5514cb78550346b0478b4cae/html5/thumbnails/11.jpg)
• Underground target position• Front-end retracts vertically • Hot-cell for target exchange• Separator in 3rd level• Neighboring hot-cell accessible during run
Eff
ect
ive d
ose
rate
E (S
v/h
)
Soil activation
!
Effective dose rate maps
Conceptual design of 100kW target station
![Page 12: EURISOL DS : Status and Future Yorick Blumenfeld IPN Orsay We acknowledge the financial support of the European Community under the FP6 Research Infrastructure](https://reader036.vdocuments.net/reader036/viewer/2022070305/5514cb78550346b0478b4cae/html5/thumbnails/12.jpg)
Fragmentation of 132Sn (Preliminary results)
Fragmentation of 132Sn on BeD. Perez and D. Dragosavac
![Page 13: EURISOL DS : Status and Future Yorick Blumenfeld IPN Orsay We acknowledge the financial support of the European Community under the FP6 Research Infrastructure](https://reader036.vdocuments.net/reader036/viewer/2022070305/5514cb78550346b0478b4cae/html5/thumbnails/13.jpg)
Management Achievements
• Organization of mid-term review (April 2007)• Organization of 3rd Town meeting in association with
EURONS • Link with EC concerning financial aspects of annual
report and extension of the contract to 31/07/2009• Start up of EURISOL User Group: Angela Bonaccorso, chair.
First workshop Jan. 2008; Charter established; election of executive committee (UEC) in progress
• Start-up of Site Investigation Panel : A. Shotter, G. Cuttone, D. Geesaman, A. Mueller, S. Myers. First Meeting Jan. 2008. Mandate Written
• Production of brochure for General Public• Defining strategy for the future of EURISOL
![Page 14: EURISOL DS : Status and Future Yorick Blumenfeld IPN Orsay We acknowledge the financial support of the European Community under the FP6 Research Infrastructure](https://reader036.vdocuments.net/reader036/viewer/2022070305/5514cb78550346b0478b4cae/html5/thumbnails/14.jpg)
Financial Situation
• Second Pre-Financing has been received and distributed. Third expected next year (no auditing for 3rd year).
• Extension will allow the timely use of all resources• Spending in-line with expectations (95%)• Slight overspending in Personnel compensated by
under spending in T&S and Consumables
![Page 15: EURISOL DS : Status and Future Yorick Blumenfeld IPN Orsay We acknowledge the financial support of the European Community under the FP6 Research Infrastructure](https://reader036.vdocuments.net/reader036/viewer/2022070305/5514cb78550346b0478b4cae/html5/thumbnails/15.jpg)
Proposal for the Future of EURISOL
• EURISOL has made use of EC instruments: 5th framework RTD and 6th framework DS.
• Major advances have been achieved and a large community with varied technical expertise has developed and must continue to be nurtured
• Full engineering report necessary before Pre-construction phase: No (evident) EC instrument for funding.
• We (the EURISOL DS MB) propose to form a EURISOL collaboration consisting of laboratories interested in participating in the continuing effort.
![Page 16: EURISOL DS : Status and Future Yorick Blumenfeld IPN Orsay We acknowledge the financial support of the European Community under the FP6 Research Infrastructure](https://reader036.vdocuments.net/reader036/viewer/2022070305/5514cb78550346b0478b4cae/html5/thumbnails/16.jpg)
Role of the EURISOL Collaboration
• Follow the scientific and policy recommendations of NuPECC
• Promote and Coordinate the R&D to further EURISOL
• Solicit support of the funding agencies, in particular through the NuPNET Eranet, and explore other funding opportunities (EC, intercontinental…)
• Interact with the EC >> entry on the ESFRI list.• Goal : Produce a full engineering report for the
facility
![Page 17: EURISOL DS : Status and Future Yorick Blumenfeld IPN Orsay We acknowledge the financial support of the European Community under the FP6 Research Infrastructure](https://reader036.vdocuments.net/reader036/viewer/2022070305/5514cb78550346b0478b4cae/html5/thumbnails/17.jpg)
Organization of the EURISOL Collaboration
• Collaboration board representing participants >> Elects collaboration chairperson and appoints project leader.
• Project office supported by collaboration fee.
• Engineering work coordinated by project leader and funded by funding agencies (+ other), preferably coordinated by NuPNET.
• Work divided into work packages
![Page 18: EURISOL DS : Status and Future Yorick Blumenfeld IPN Orsay We acknowledge the financial support of the European Community under the FP6 Research Infrastructure](https://reader036.vdocuments.net/reader036/viewer/2022070305/5514cb78550346b0478b4cae/html5/thumbnails/18.jpg)
EURISOL Work Packages (3-5 years)
• Management (Project Office)• RIB production: Specific prototyping and tests
– Neutron converter in beam– Fission target in n flux– New target materials; liquid metal direct target– Novel beam splitter system…
• Prototyping at “intermediate” facilities; linked to EUR-ISOL Net in ENSAR
• Documentation and licensing• Infrastructure• Updating the science case : coordinated by EURISOL
User group
![Page 19: EURISOL DS : Status and Future Yorick Blumenfeld IPN Orsay We acknowledge the financial support of the European Community under the FP6 Research Infrastructure](https://reader036.vdocuments.net/reader036/viewer/2022070305/5514cb78550346b0478b4cae/html5/thumbnails/19.jpg)
Requests
• Very approximate price tag: 2M€/year for 4 years.
• We would like the support of NuPECC to implement this plan (and welcome your suggestions).
• Collaboration launched by the EURISOL Steering Committee in Nov. 2008
• Startup should be in fall 2009