europan 7_ deggendorf

5
 T heme Ideas for a general new reorganisation of the whole area are sought. The qualities which result from the interplay of park and buildings should be taken on board and reinforced. Proposals are expected which will make the quality of the ensemble once again recognisable and where new spatial qualities can come into being. In this respect, utilisations should not be separated from one another, but should be interlinke d, in order to create a new relationship between inside and outside. europan 7 t heme conurb at i on / si te programme / i ssues screens 1 / 2 / 3 / 4 Deggendorf, Deutschland Population 34 000 Location Alte Kaserne (Old Barracks) Study area 13.4 ha Site area 2.6 h a

Upload: massaco

Post on 14-Apr-2018

227 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Europan 7_ Deggendorf

7/29/2019 Europan 7_ Deggendorf

http://slidepdf.com/reader/full/europan-7-deggendorf 1/7

 ThemeIdeas for a general new reorganisation of the wholearea are sought. The qualities which result from the

interplay of park and buildings should be taken onboard and reinforced. Proposals are expected which

will make the quality of the ensemble once again

recognisable and where new spatial qualities cancome into being.

In this respect, utilisations should not be separated

from one another, but should be interlinked, in order

to create a new relationship between inside andoutside.

europan7

theme conurbation / site programme / issues screens 1

Deggendorf,

Population

34 000

Location

Alte Kaserne (Old Barracks)

Study area

13.4 ha

Site area2.6 ha

Page 2: Europan 7_ Deggendorf

7/29/2019 Europan 7_ Deggendorf

http://slidepdf.com/reader/full/europan-7-deggendorf 2/7

europan7

theme conurbation / site programme / issues screens 1

Deggendorf,

Conurbation The town of Deggendorf, together with theneighbouring town of Plattling, forms the

regional centre and, as the "Gate to the Bavarian

Forest", fulfils excellent central performances fora large area of eastern Bavaria. The favourable

traffic link to the motorway junction in thedirections of Munich, Passau and Regensburg,

the railway intersection, the direct route to

Prague, the Donau Harbour with the only inland

free harbour in southern Germany as well as theFurther Education College for Economics and Technology all go to make Deggendorf an

interesting location for industry and commercial

enterprises.

Site The area of the old barracks (formerly a hospitalfor the mentally ill) with a surface of approx. 13

hectares lies to the north of the Deggendorf 

town centre. The core area of the premiseswhich were built in 1860 consist of several

wings more or less intacts. Most of theconstructional changes were carried out in the

1930ies. The flats do not meet modern

requirements. A special role is assigned to the

patients' garden situated to the west and southof the site. This has been used for years as apublic park and should once again be included

in the ensemble.

Page 3: Europan 7_ Deggendorf

7/29/2019 Europan 7_ Deggendorf

http://slidepdf.com/reader/full/europan-7-deggendorf 3/7

europan7

theme conurbation / site programme / issues screens 1

Deggendorf,

Programme The core of the site should be kept in onevisual style. The utilisation qualities which

result from the interplay of park and buildingsshould be reinforced. In future, the area

should also serve as a residential area which

should be complemented and enriched by thevariety of other types of utilisation. A special

challenge is provided by the fact that thebuildings are listed and the constructional

measures must offer attractive spaces for acontemporary utilisation of the ensemble.

Issuesfunctional : The variety of living should be realised through new residential

typologies. The aim is to use complementary utilisations to create a lively townwithin the town. The developmental structure should be reorganised in order tokeep the public park free of traffic.

social : Attractive and manifold residential offers and complementary

utilisations should prevent a one-sided social structure from coming into beingand should work against the development towards a slum which has alreadybegun on the site.

perceptual : Of special importance is an interlinking of the public park with

the bordering utilisations and especially with the Bogenbach stream, which runsthrough the entire inner city in a north-south direction as a green space.

Page 4: Europan 7_ Deggendorf

7/29/2019 Europan 7_ Deggendorf

http://slidepdf.com/reader/full/europan-7-deggendorf 4/7

europan7

theme conurbation / site programme / issues screens 1

Deggendorf,

Page 5: Europan 7_ Deggendorf

7/29/2019 Europan 7_ Deggendorf

http://slidepdf.com/reader/full/europan-7-deggendorf 5/7

europan7

theme conurbation / site programme / issues screens 1

Deggendorf,

Page 6: Europan 7_ Deggendorf

7/29/2019 Europan 7_ Deggendorf

http://slidepdf.com/reader/full/europan-7-deggendorf 6/7

europan7

theme conurbation / site programme / issues screens 1

Deggendorf,

Page 7: Europan 7_ Deggendorf

7/29/2019 Europan 7_ Deggendorf

http://slidepdf.com/reader/full/europan-7-deggendorf 7/7

europan7

theme conurbation / site programme / issues screens 1

Deggendorf,