Network Managernominated by the European Commission

Edition May 2015European Network Operations Plan 2015-2019

European Route Network Improvement Plan

PART 2 European ATS Route Network - Version 2015-2019

Page 2: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan

- Part 2 -

ATS Route Network

ARN Version 2015 - 2019

Catalogue of Airspace Projects

Edition Number : 1.0

Edition Date : 29.05.2015

Status : Released Issue

Intended for : General Public

Page 3: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

ii 29 May 2015 Edition: 1.0

Left blank intentionally

Page 4: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

iii 29 May 2015 Edition: 1.0

DOCUMENT CHARACTERISTICS

TITLE

European Route Network Improvement Plan ARN Version 2015 - 2019

Catalogue of Airspace Projects

Publications Reference:

Document Identifier Edition Number: 1.0

Edition Date: 29.05.2015

Abstract This document contains the ATS Route Network ARN Version 2015 - 2019 Catalogue of Airspace Projects as Part 2 of the European Route Network Improvement Plan (ERNIP). It is in response to the COMMISSION REGULATION (EU) No 677/2011 of 7 July 2011 (laying down the detailed rules for the implementation of air traffic management (ATM) network functions and amending Regulation (EU) No 691/2010). The ERNIP Part 2 - ARN Version 2015 - 2019 provides a consolidated picture of the European airspace structure aimed to deliver a safe and operationally efficient operation of air traffic. It responds to the operational performance targets set for the European ATM network for both RP1 and RP2. It facilitates the development of an airspace structure offering the required level of safety, capacity, flexibility, responsiveness, environmental performance and seamless provision of expeditious air navigation services, with due regard to security and defence needs; ensures regional interconnectivity and interoperability of the European Route Network within the ICAO EUR Region and with adjacent ICAO Regions.

Keywords

Network Manager Route Network Route Network Plan Efficiency Plan

Airspace Design Airspace Utilisation Airspace Functional Blocks

Sectors Traffic flow

Authors

EUROCONTROL NMD/NOM/OPL

Contact Person(s) Tel Division

Razvan Bucuroiu + 32 2 729 36 48 NMD / NOM / OPL

STATUS, AUDIENCE AND ACCESSIBILITY

Status Intended for Accessible via

Working Draft General Public Intranet

Draft Operational Stakeholders Extranet

Proposed Issue Restricted Audience Internet (www.eurocontrol.int)

Released Issue Printed and electronic copies of the document can be obtained from the Publications Infocentre (see page iv)

Page 5: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

iv 29 May 2015 Edition: 1.0

DOCUMENT CHANGE RECORD

The following table records the complete history of the successive editions of the present document.

EDITION

NUMBER EDITION DATE REASON FOR CHANGE PAGES AFFECTED

0.1 06.05.2015 Proposed Issue

RNDSG/85 for agreement All

1.0 08.05.2015 Released Issue

NETOPS/85 for approval

Chapter 1.8 Chapter 3.2, Chapter 7.1,

Annex B, Annex C, Annex D

1.0 29.05.2015 Final Version

NMB/10 for approval

Chapter 1.8 Chapter 3.5

Annex D

Publications

EUROCONTROL Headquarters

96 Rue de la Fusée

B-1130 BRUSSELS

Tel: +32 (0)2 729 1152

Fax: +32 (0)2 729 5149

E-mail: [email protected]

Page 6: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

v 29 May 2015 Edition: 1.0

TABLE OF CONTENT DOCUMENT CHARACTERISTICS ............................................................................................... iii

DOCUMENT CHANGE RECORD ................................................................................................. iv

TABLE OF CONTENT .................................................................................................................... v

EXECUTIVE SUMMARY .............................................................................................................. vii

ORGANISATION AND CONTENTS .............................................................................................. ix

1. A CONSOLIDATED EUROPEAN AIRSPACE DEVELOPMENT ...................................... 1

1.1. OBJECTIVE, SCOPE AND TIMEFRAME...................................................................... 1

1.2. DEMANDING PERFORMANCE TARGETS .................................................................. 2

1.2.1. PERFORMANCE SCHEME - SECOND REFERENCE PERIOD (RP2) - 2015 - 2019 . 2

1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES .................... 4

1.4. THE AIRSPACE ACTION PLAN ................................................................................... 5

1.5. THE FLIGHT EFFICIENCY PLAN ................................................................................. 5

1.6. PREPARATION OF THE ERNIP Part 2 - ARN VERSION 2015 - 2019 ......................... 6

1.7. FUNCTIONAL AIRSPACE BLOCKS INTEGRATION INTO THE ERNIP Part 2 - ARN VERSION 2015 - 2019 .................................................................................................. 7

1.7.1. FAB Performance Plans and their Relation to the European Route Network Improvement Plan .................................................................................................................... 7

1.7.2. Functional Airspace Blocks/ FABs Main Projects and Performance Evaluations.......... 9

1.8. BENEFITS OF ERNIP Part 2 - ARN VERSION 2015 - 2019 ....................................... 18

2. ARN VERSION 2015 - 2019 BENEFITS ......................................................................... 20

2.1. TOTAL EXPECTED BENEFITS - ERNIP Part 2 - ARN VERSION 2015 - 2019 .......... 20

2.2. CAPACITY ENHANCEMENT BENEFITS OF ERNIP Part 2 - ARN VERSION 2015 - 2019 .................................................................................................................................... 20

3. EUROPEAN ROUTE NETWORK DESIGN FUNCTION AND FLIGHT EFFICIENCY ACTION PLANS ........................................................................................................................... 22

3.1. EUROPEAN ROUTE NETWORK DESIGN FUNCTION .............................................. 22

3.2. FREE ROUTE AIRSPACE .......................................................................................... 22

3.3. ASM Solutions ............................................................................................................ 23

3.4. SIMPLIFYING THE RAD ............................................................................................. 24

3.5. IMPROVING TMA STRUCTURES .............................................................................. 24

3.6. THE FLIGHT EFFICIENCY PLAN ............................................................................... 25

3.7. THE NETWORK MANAGER FLIGHT EFFICIENCY INITIATIVE ................................ 25

4. CONCEPT OF OPERATIONS FOR EUROPEAN AIRSPACE DESIGN ......................... 28

4.1. MAIN PRINCIPLES ..................................................................................................... 28

4.2. ERNIP Part 2 - ARN VERSION 2015 - 2019 IMPROVEMENTS HIGHLIGHTS ........... 29

4.2.1. Introduction ................................................................................................................ 29

4.2.2. Basic Concept ........................................................................................................... 29

4.2.3. European Network Consistency ................................................................................. 29

4.2.4. Airspace Continuum .................................................................................................. 30

4.2.5. ARN Version 2015 - 2019 Components ..................................................................... 30

4.2.6. Airspace Classification ............................................................................................... 30

4.2.7. Airspace Organisation ............................................................................................... 31

4.2.8. Airspace Development Approach .............................................................................. 31

4.2.9. Operating the ERNIP Part 2 - ARN Version 2015 - 2019 ........................................... 33

Page 7: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

vi 29 May 2015 Edition: 1.0

4.2.10. Military Operations ..................................................................................................... 34

4.2.11. Airspace Management (ASM) Solutions .................................................................... 34

4.2.12. Network Enablers ...................................................................................................... 36

4.2.13. Impact on Adjacent Areas .......................................................................................... 36

5. A NETWORK COOPERATIVE DECISION MAKING PROCESS .................................... 38

5.1. A NETWORK ORIENTATED APPROACH .................................................................. 40

5.2. AIRSPACE UTILISATION AND MANAGEMENT ........................................................ 41

5.3. MILITARY REQUIREMENTS ...................................................................................... 41

6. TRAFFIC DEMAND EVOLUTION AND ASSESSMENT ................................................. 42

6.1. GENERAL ................................................................................................................... 42

6.2. TRAFFIC DEMAND VARIATION - COMPARISON 2008/2014 .................................... 42

6.3. WEEK AND WEEK-END DISTRIBUTION ................................................................... 43

6.4. DISTRIBUTION AND EVOLUTION - SHORT HAUL AND MEDIUM/LONG HAUL ...... 45

6.5. VERTICAL DISTRIBUTION (EVOLVING AND CRUISING TRAFFIC) ......................... 46

6.6. FLIGHT LEVEL DISTRIBUTION ................................................................................. 47

6.7. AIRPORT TRAFFIC INCREASE ................................................................................. 47

6.8. TOP 50 AIRPORTS ..................................................................................................... 48

6.9. BUSIEST CITY PAIRS ................................................................................................ 49

6.10. AIRSPACE USERS ..................................................................................................... 51

6.11. AIRCRAFT TYPES ...................................................................................................... 52

7. MAIN PROJECTS INCLUDED IN ERNIP PART 2 - ARN VERSION 2015 - 2019 .......... 54

7.1. FREE ROUTE AIRSPACE .......................................................................................... 54

ANNEXES .................................................................................................................................... 58

Annex A. Reference Documents ............................................................................................. 60

Annex B. Acronyms and Abbreviations ................................................................................. 62

Annex C. Summary of ERNIP PART 2 - ARN VERSION 2015 - 2019 Proposals ................... 64

Annex D. List of ERNIP PART 2 - ARN VERSION 2015 - 2019 Proposals ............................. 73

Page 8: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

vii 29 May 2015 Edition: 1.0

EXECUTIVE SUMMARY

In accordance with the COMMISSION REGULATION (EU) No 677/2011 of 7 July 2011 (laying down the detailed rules for the implementation of air traffic management (ATM) network functions and amending Regulation (EU) No 691/2010) the European Route Network Improvement Plan (ERNIP) is a plan developed by the Network Manager in coordination with the operational stakeholders. It includes the result of Network Manager’s operational activities with respect to short and medium term route network design in accordance with the Network Strategy Plan.

In response to the same COMMISSION REGULATION (EU) and the EUROCONTROL Provisional Council Airspace Action Plan, the objective of the ERNIP Part 2 - ARN Version 2015 - 2019 is the enhancement of European ATM capacity, flight efficiency and environmental performance through the development and implementation of an improved ATS route network, Free Route Airspace and TMA systems structures supported by corresponding improvements to the airspace structure and the optimal utilisation rules.

The ERNIP Part 2 - ARN Version 2015 - 2019 also responds to the COMMISSION REGULATION (EU) No 390/2013 of 3 May 2013 (laying down a performance scheme for air navigation services and network functions). It provides a network consolidated picture of network and local/FAB projects and the evaluation of their expected performance in response to the European network performance targets and local environment reference values. As a result of those evaluations it can be derived that the performance targets of the 2nd Reference Period of the Single European Sky Performance Scheme (RP2) will not be met unless the proposed NM measures will be implemented.

The ERNIP Part 2 - ARN Version 2015 - 2019 will ensure the implementation, in cooperation with the ANSPs and the FABs, of the Airspace Vision agreed by the Network Management Board:

a comprehensive cross-border implementation of Free Route Airspace, at least at and above FL310, in the European airspace;

an optimised route structure below FL310 ensuring efficient connectivity in/out terminal airspace;

a simplification of the RAD;

a harmonisation of the airspace publications;

more efficient Flexible Use of Airspace procedures and the associated system support to enable a better utilisation of the civil/military airspace structures;

a closer cooperation between the Network Manager, the airspace users and the computer flight plan service providers aimed at ensuring a better utilisation of the available airspace structures.

The ERNIP Part 2 - ARN Version 2015 - 2019:

achieves an European Route Network for the safe and efficient operation of air traffic, taking due account of the environmental impact;

keeps operational consistency of the European airspace organisation;

consolidates into a network approach the Functional Airspace Blocks developments, the wide implementation of airspace projects from Free Route Airspace to TMA developments;

facilitates the development of an airspace structure offering the required level of safety, capacity, flexibility, responsiveness, environmental performance and seamless provision of expeditious air navigation services, with due regard to security and defence needs;

ensures regional interconnectivity and interoperability of the European route network within the ICAO EUR Region and with adjacent ICAO Regions.

As from the full implementation of ERNIP Part 2 - ARN Version 2015 - 2019 in 2019, flying distances would be reduced by 20 to 25 million NMs, this representing the equivalent of 120 000 to 150 000 tons of fuel saved, or reduced emissions of 400 000 to 500 000 tons, or 100 to 125 million Euros.

Page 9: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

viii 29 May 2015 Edition: 1.0

Left blank intentionally

Page 10: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

ix 29 May 2015 Edition: 1.0

ORGANISATION AND CONTENTS

This document is identified as European Route Network Improvement Plan - ARN Version 2015 - 2019 Catalogue of Airspace Projects.

Structure of the Document

Chapter 1 Provides an overview of the consolidated European approach to airspace design.

Chapter 2 Provides an overview of ARN Version 2015 - 2019 benefits.

Chapter 3 Commences with the Airspace Action Plan and depicts its implementation.

Chapter 4 Focuses on the consolidated Concept of Operations.

Chapter 5 Focuses on the Network Collaborative Decision Making Process.

Chapter 6 Provides an assessment of the demand between 2007/2008 and 2013/2014.

Chapter 7 Provides a description of the ARN Version 2015 - 2019 layers.

Annexes

Annex A Reference Documents

Annex B Acronyms and Abbreviations

Annex C Summary of ARN Version 2015 - 2019 Proposals

Annex D List of ARN Version 2015 - 2019 Proposals

Page 11: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

x 29 May 2015 Edition: 1.0

Left blank intentionally

Page 12: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

1 29 May 2015 Edition: 1.0

1. A CONSOLIDATED EUROPEAN AIRSPACE DEVELOPMENT

1.1. OBJECTIVE, SCOPE AND TIMEFRAME

In response to the COMMISSION REGULATION (EU) No 677/2011 of 7 July 2011 (laying down the detailed rules for the implementation of air traffic management (ATM) network functions and amending Regulation (EU) No 691/2010) and the EUROCONTROL Provisional Council Airspace Action Plan, the objective of the ERNIP Part 2 - ARN Version 2015 - 2019 is the enhancement of European ATM capacity, flight efficiency and environmental performance through the development and implementation of an improved ATS route network, Free Route Airspace and TMA systems structures supported by corresponding improvements to the airspace structure and the optimal utilisation rules of both in the European airspace. In response to the COMMISSION REGULATION (EU) No 390/2013 of 3 May 2013 (laying down a performance scheme for air navigation services and network functions) the Network Manager shall support the Commission by providing relevant input for the preparation of Union-wide performance targets before the reference periods and for monitoring the achievement of the performance targets during the reference period. This regulation requires that, the Network Manager

shall support functional airspace blocks and their air navigation service providers in reaching their performance targets during reference periods by ensuring consistency between performance plans, the Network Strategy Plan and the Network Operations Plan. In that respect, a close cooperation and synchronisation was ensured between the Network Manager and all the FABs in the preparation of their Performance Plans, of the Network Strategy Plan, of the Network Operations Plan and the ERNIP - Part 2 - ARN Version 2015 - 2019.

The ERNIP Part 2 - ARN Version 2015 - 2019 will contribute to the achievement of the performance targets of the 2nd Reference Period of the Single European Sky Performance Scheme (RP2).

The ERNIP Part 2 - ARN Version 2015 - 2019 will ensure the implementation, in cooperation with the ANSPs and the FABs, of the Airspace Vision agreed by the Network Management Board that includes:

a comprehensive cross-border implementation of Free Route Airspace, at least at and above FL310, in the European airspace;

an optimised route structure below FL310 ensuring efficient connectivity in/out terminal airspace;

a simplification of the RAD;

a harmonisation of the airspace publications;

more efficient Flexible Use of Airspace procedures and the associated system support to enable a better utilisation of the civil/military airspace structures;

a closer cooperation between the Network Manager, the airspace users and the computer flight plan service providers aimed at ensuring a better utilisation of the available airspace structures.

The ERNIP Part 2 - ARN Version 2015 - 2019:

achieves an European Route Network for the safe and efficient operation of air traffic, taking due account of the environmental impact;

keeps operational consistency of the European airspace organisation;

consolidates into a network approach the Functional Airspace Blocks developments, the wide implementation of airspace projects from Free Route Airspace to TMA developments;

facilitates the development of an airspace structure offering the required level of safety, capacity, flexibility, responsiveness, environmental performance and seamless provision of expeditious air navigation services, with due regard to security and defence needs;

ensures regional interconnectivity and interoperability of the European route network within the ICAO EUR Region and with adjacent ICAO Regions.

Page 13: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

2 29 May 2015 Edition: 1.0

The ERNIP Part 2 - ARN Version 2015 - 2019 combines airspace design projects developed in a cooperative manner between the Network Manager and its operational stakeholders aimed for implementation over the period Autumn 2014 - end of 2019. The full development phase including the validation covers the period from Summer 2012 until Summer 2014. The implementation started in Autumn 2014 and continues in stages until the end of 2019. Further updates will be brought through subsequent versions of the ERNIP Part 2. The ERNIP Part 2 - ARN Version 2015 - 2019 includes details on:

Implementation of Free Route Airspace projects;

ATS route network developments;

Re-sectorisation actions;

Actions aimed at simplifying the usage of the ATS route network;

Civil/military airspace structures;

Deployment of the night route network. The ERNIP Part 2 - ARN Version 2015 - 2019 is derived from the following sources:

Proposals covering a cohesive development of the European Airspace Structure;

Solutions developed inside various FAB initiatives;

Proposals originating at national or sub-regional level;

Aircraft operators proposals.

The European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 covers a similar geographical area like the Network Operations Plan:

EU member States (Austria, Belgium, Bulgaria, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, United Kingdom).

EUROCONTROL member States that are not EU members (Albania, Armenia, Bosnia and Herzegovina, Georgia, Moldova, Montenegro, Norway, Serbia, Switzerland, The Former Yugoslav Republic of Macedonia, Turkey, Ukraine).

In addition, the European Route Network Improvement Plan ensures full coherency of the airspace structure at the interface areas, covering many of the States that have an interface with those mentioned above. These include, amongst other States, Azerbaijan, Belarus, Egypt, Iceland, Israel, Jordan, Kazakhstan, Lebanon, Lybia, Morocco, Russian Federation and Tunisia.

The latest situation of the European route network structure is available and updated at each AIRAC cycle through the publication of EUROCONTROL Regional Charts that could be found at the following link: http://www.eurocontrol.int/articles/eurocontrol-regional-charts

1.2. DEMANDING PERFORMANCE TARGETS

1.2.1. PERFORMANCE SCHEME - SECOND REFERENCE PERIOD (RP2) - 2015 - 2019

In response to the COMMISSION REGULATION (EU) No 390/2013 of 3 May 2013 (laying down a performance scheme for air navigation services and network functions), a new set of Key Performance Indicators and associated targets have been set for the 2nd Reference Period (RP2). It includes two important key performance areas and associated indicators, related to the operational performance of the European ATM network for the period 2015 - 2019.

Page 14: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

3 29 May 2015 Edition: 1.0

Environment o average horizontal en-route flight efficiency of the actual trajectory, defined as

follows: - the indicator is the comparison between the length of the en-route part of

the actual trajectory derived from surveillance data and the corresponding portion of the great circle distance, summed over all IFR flights within or traversing the European airspace;

- “en-route” refers to the distance flown outside a circle of 40 NM around the airports;

- where a flight departs from or arrives at a place outside the European airspace, only the part inside the European airspace is considered;

This KPI is applicable at both network and Functional Airspace Block level.

o average horizontal en-route flight efficiency of the last filed flight plan

trajectory, defined as follows: - the difference between the length of the en-route part of the last filed

flight plan trajectory and the corresponding portion of the great circle distance, summed over all IFR flights within or traversing the European airspace;

- “en-route” refers to the distance flown outside a circle of 40 NM around the airports;

- where a flight departs from or arrives at a place outside the European airspace, only the part inside the European airspace is considered;

This KPI is only applicable at network level.

Capacity o minutes of en-route ATFM delay per flight, calculated for the full year and

including all IFR flights within European airspace and all ATFM delay causes, excluding exceptional events.

For the second performance Reference Period starting on 1st January 2015 and ending on 31st December 2019, the European Union-wide performance targets will be as follows:

Environment target:

Actual trajectory (KEA) - an average of 2.6% route extension by 2019, decreasing from 3.17% in 2012 (based on PRB measurements)

Last filed flight plan trajectory (KEP) - an average of 4.1% route extension by 2019, decreasing from 5.15% in 2012 (based on PRB measurements)

Capacity target: average en route Air Traffic Flow Management (ATFM) delay of 0.5 minutes per flight for each year of the second Reference Period.

The ERNIP Part 2 - ARN Version 2015 - 2019 also responds to the targets included in the Network Performance Plan (NPP) 2015 - 2019 as described below:

o Route extension - airspace design

Targets:

o achieve an improvement of the DES indicator by 0.57 percentage points between the baseline year of 2012 and 2019

o Route extension - last filed flight plan

Page 15: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

4 29 May 2015 Edition: 1.0

Targets:

o This is a European-wide indicator in RP2 and the NM target for RP2 is to achieve 4.1% value for KEP indicator by 2019 for the entire SES area and 3.82% for the NM area, fully consistent with the EU-wide target, i.e. a reduction by 1.05 pp (percentage points) between the baseline year of 2012 and 2019

o Route extension - actual trajectory

Targets:

o The NM target for RP2 is to achieve 2.6% value for KEA indicator by 2019 for both the SES and NM areas, fully consistent with the EU-wide target

o NM direct contributions to flight efficiency savings

o The NM objectives is that these FE direct savings will amount to 10% (2015 - 2016) and 5% (2017 - 2019) of the savings required to achieve the annual 0.15 pp reduction (or alternatively 5% of the actual KEP reduction) each year

o Increase the CDR1/2 usage

o NM objective is to increase the CDR availability (CD-RAI) and CDR usage (CDR-RAU) by 5% between 2015 and 2019

1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES

With the development of the ERNIP Part 2 - ARN Version 2015 - 2019 of the European Route Network Improvement Plan the Network Manager, States, air navigation service providers as part of functional airspace blocks or individually, applied, within the cooperative decision-making process, the following airspace design principles:

the establishment and configuration of airspace structures was based on operational requirements, irrespective of national or functional airspace block borders or FIR boundaries, and was not bound by the division level between upper and lower airspace;

the design of airspace structures was a transparent process showing decisions made and their justification through taking into account the requirements of all users whilst reconciling safety, capacity, environmental aspects and with due regard to military and national security needs;

the present and forecast traffic demand, at network and local level, and the performance targets were used as an input for the ERNIP Part 2 - ARN Version 2015 - 2019 of the European Route Network Improvement Plan with a view to satisfying the needs of the main traffic flows and airports;

vertical and horizontal connectivity, including terminal airspace and the airspace structure at the interface was ensured;

the possibility for flights to operate along, or as near as possible to, user required routes and flight profiles in the en route phase of flight;

the development and inclusion of the vast majority of airspace structures proposals, including Free Route Airspace, multiple route options and CDRs, received from stakeholders having an operational requirement in the European airspace;

the design of airspace structures including Free Route Airspace and ATC sectors took into account existing or proposed airspace structures designated for activities which require airspace reservation or restriction. To that end only such structures that are in accordance with

Page 16: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

5 29 May 2015 Edition: 1.0

the application of FUA are included. Such structures were harmonised and made consistent to the largest possible extent across the entire European network;

ATC sector design development was based on the required route or traffic flow alignments within an iterative process that ensured compatibility between routes or flows and sectors;

ATC sectors were designed to enable the construction of sector configurations that satisfy traffic flows and are adaptable and commensurate with variable traffic demand;

agreements on service provision are considered in cases where ATC sectors require, for operational reasons, to be designed across national or functional airspace block borders or FIR boundaries.

With respect to airspace utilisation and capacity management, the following principles apply:

airspace structures shall be planned to facilitate flexible and timely airspace use and management with regard to routing options, traffic flows, sector configuration schemes and the configuration of other airspace structures;

airspace structures should accommodate the establishment of additional route options while ensuring their compatibility (capacity considerations and sector design limitations).

All principles above were fully considered in the development of the ERNIP Part 2 - ARN Version 2015 - 2019 of the European Route Network Improvement Plan.

1.4. THE AIRSPACE ACTION PLAN

The Airspace Action Plan was adopted by the EUROCONTROL PC at its 28th Session, in November 2007. The Airspace Action Plan covers the need for a continued pan-European approach and concrete actions to improve network efficiency and capacity through airspace planning, design and management at network level. This Airspace Action Plan helps in eliminating fragmentation and identifying best options that respond to the recommendations and strategic objectives agreed by the EUROCONTROL Provisional Council (PC) and the high level objectives of the Single European Sky.

The development of ERNIP Part 2 - ARN Version 2015 - 2019 fully responds to the actions set by the EUROCONTROL Provisional Council in the context of the Airspace Action Plan.

1.5. THE FLIGHT EFFICIENCY PLAN

IATA, CANSO and EUROCONTROL worked in a close partnership along with airlines, airports and ANSPs to identify solutions and launch operational actions that lead to fuel and emissions savings. The Flight Efficiency Plan was commonly agreed in September 2008. The Flight Efficiency Plan builds on the accelerated implementation of the measures already approved by the EUROCONTROL Provisional Council, currently put in place by all ATM actors, and included in the Airspace Action Plan, the Airspace Management Improvement Initiative, the Terminal Airspace Improvement Initiative and the Airport Programme.

The adoption and the gradual deployment of the Flight Efficiency Plan proved the benefits expected. Since its adoption, in September 2008, in terms of airspace design efficiency (if all flights would have used the route network without any route restrictions and with all CDRs permanently available), the route extension decreased from 3.52% to 2.69% in the Autumn 2013.

These achievements came as a result of the implementation of ARN Version-6, ARN Version-7 and ARN Version-8, ERNIP Part 2 - ARN Version 2013 - 2015 as well as from the initial steps of ERNIP Part 2 - ARN Version 2014 - 2018/19.

Page 17: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

6 29 May 2015 Edition: 1.0

1.6. PREPARATION OF THE ERNIP PART 2 - ARN VERSION 2015 - 2019

The following steps were followed for the preparation of the ERNIP Part 2 – ARN Version 2015-2019:

The development of the next European Route Network Improvement Plan - Part 2 edition will cover, as per the requirements of the NMF IR, a 5-years period (2015 - 2019).

All ANSPs and FABs will be required to provide their airspace plans until 2019.

The Network Manager will provide the list of all known plans until 2019 to all ANSPs and FABs.

The Network Manager will provide the environment/flight efficiency reference values per FAB for the period 2015 - 2019, as per the requirement of the Performance Scheme IR.

The following preparation calendar was followed:

Action Date Who

Distribution of all known airspace design plans until 2019 to all ANSPs

and FABs

October 2014 NM

Distribution of 2015 - 2019 environment/flight efficiency reference

values per FAB

October 2014 NM

Comments and updates received from all ANSPs/FABs on the initial list of

airspace projects

December 2014 NM/ANSPs/

FABs

Preparation of the first version of the European Route Network Improvement

Plan - Part 2 - ARN Version 2015 - 2019

January 2015 NM/Ops Stakeholders

Initial performance indications per FAB based on the first version of the

European Route Network Improvement Plan - Part 2 - ARN Version 2015 -

2019

February - March 2015

NM to all ANSPs

Further updates and synchronisation actions between NM, ANSPs and FABs

to ensure the achievement of RP2 targets

March - April 2015

NM/ANSPs/

FABs

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 consolidation and approval

through the CDM process

May - June 2015 NM/Ops Stakeholders

Publication of European Route Network Improvement Plan - Part 2 -

ARN Version 2015 - 2019

June 2015 NM

Page 18: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

7 29 May 2015 Edition: 1.0

1.7. FUNCTIONAL AIRSPACE BLOCKS INTEGRATION INTO THE ERNIP PART 2 - ARN VERSION 2015 - 2019

Since 2007, as part of an overall network development approach, the RNDSG Secretariat worked in close cooperation with all FAB initiatives to provide support to FAB airspace design.

Part of SES II, the establishment of FABs has started several years ahead of the nomination of the Network Manager. The Network Manager started a close cooperation with all the FABs from the start of the development of their Feasibility Studies. This close cooperation enabled the development of a number of harmonised operational projects that have the potential to contribute to future network performance, when implemented. They respond to the requirements set for the FABs, set forth in the Article 9a of the (EC) Reg. No 550/2004. Namely, those requirements are:

enable optimum use of airspace, taking into account air traffic flows;

ensure consistency with the European route network established in accordance with Article 6 of the airspace Regulation;

ensure compatibility between the different airspace configurations, optimising, inter alia, the current flight information regions;

facilitate consistency with Community-wide performance targets.

Throughout 2012, and before 04/12/2012, nine FABs have submitted the documentation required for their establishment.

The Regulation (EC) No 677/2011, in particular Articles 6, 8 and 10, sets a framework for an alignment of FAB operation plans with the Network Operations Plan by ensuring the compatibility of the FAB - level measures with those adopted, through the cooperative decision making process, at the Network level.

The Network Manager has established cooperation with most of the FABs to facilitate harmonised developments, operational interconnectivity between the FABs and within the FABs and at European network level.

The NM has included FAB perspective in the operational improvements planning processes even before the due date set for the Member States to implement FABs (December 2012).

The NM supported a co-ordinated development and, in some cases, deployment of the FAB improvements. This ensured an overall pan-European network consistency, and a uniform application of ASM/ATFCM procedures, a synchronized implementation of new airspace projects or operational concepts and a cohesive view of the performance improvements in relation to the EU-wide targets.

The ERNIP Part 2 - ARN Version 2015 - 2019 includes contributions from a large number of FABs. This consolidated view responds to the Single European Sky requirements for the FABs: to enable optimum use of airspace, taking into account traffic flows and to ensure consistency with the European route network.

1.7.1. FAB Performance Plans and their Relation to the European Route Network Improvement Plan

It is important to note that the COMMISSION REGULATION (EU) No 390/2013 of 3 May 2013 (laying down a performance scheme for air navigation services and network functions) defines also the principles for assessing the FAB Performance Plans and targets. In this new framework, FABs will be asked to provide the evidence that they will meet the performance targets. In that respect, the following assessment criteria have been defined in the IR:

ENVIRONMENT

Average horizontal en route flight efficiency of the actual trajectory:

Page 19: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

8 29 May 2015 Edition: 1.0

(a) comparison with historical performance achieved in previous years;

(b) comparison with a reference value based on information provided by the Network Manager;

(c) consistency with the European Route Network Improvement Plan developed by the Network Manager.

CAPACITY

En route delay level. Comparison of the expected level of en route ATFM delay used in the performance plans with:

(a) a reference value based on information from the Network Operations Plan of the Network Manager;

(b) the capacity plan established by the en route air navigation service provider(s) as reflected in the Network Operations Plan of the Network Manager.

The KEA reference values based on the European-wide target, for each of the Functional Airspace Blocks, are as follows:

2012 Achievement Improvement 2012-2019 2015 2016 2017 2018 2019

SW FAB 4.27% 0.99% 3.85% 3.71% 3.57% 3.43% 3.28%

UK-Ireland FAB 3.64% 0.65% 3.36% 3.27% 3.18% 3.09% 2.99%

FABEC 3.56% 0.60% 3.30% 3.22% 3.14% 3.05% 2.96%

BLUE MED FAB 3.02% 0.57% 2.78% 2.70% 2.62% 2.54% 2.45%

FAB CE 2.13% 0.32% 1.99% 1.94% 1.90% 1.85% 1.81%

DANUBE FAB 1.69% 0.32% 1.55% 1.50% 1.46% 1.41% 1.37%

Baltic FAB 1.61% 0.25% 1.50% 1.47% 1.44% 1.40% 1.36%

NEFAB 1.44% 0.22% 1.35% 1.32% 1.29% 1.26% 1.22%

DK-SE FAB 1.20% 0.01% 1.20% 1.20% 1.20% 1.20% 1.19%

The evaluations of the expected performance improvements in this document have used the year 2014 as the baseline year. They are based on assigned flight plan situation. By considering 2014 as a baseline year and a macroscopic evaluation not including all flights, they are considered to be conservative. They provide a good estimation of the potential of a FAB to deliver the expected performance to meet European targets. It also shows that the interfaces between FABs will require a very particular attention.

Page 20: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

9 29 May 2015 Edition: 1.0

1.7.2. Functional Airspace Blocks/ FABs Main Projects and Performance Evaluations

FAB Europe Central (FAB EC)

The main projects taken into consideration in the context of the FABEC are:

The South-East and Central West projects;

The FRA FABEC X-BORDER 365+.

Additional more detailed projects are also in course of deployment and they are included in the ERNIP Part 2 - ARN Version 2015 - 2019.

The Scenarios are considered in the chronological order of their implementation. The impacts are calculated to the baseline end 2014 scenario. The evaluation made for the scenarios above shows the following achievements:

Route Length Extension Analysis (V2.1)

SAAM/NEST Airport-circle radix (NM):

40.00 Filter used : Europe plus mediterranean countries and part of the Russian

federation

REF

Reduction of route extension percentage

points to reference

ECAC changes with SE and CW Projects

-0.22 pp

All network projects including FRA FABEC X-BORDER 365+

-0.58 pp

pp = percentage point

FABEC

2019

Reference Value

(pp reduction

vs 2012)

2019

NM evaluation

(pp reduction

vs 2014)

0.60 pp 0.58 pp

NM evaluation The reduction of 0.58pp is not sufficient to fully

achieve the network RP2 target

NM proposed measures

The results of the FABEC projects for the KPA Environment are considered to be close to the

RP2 reference values for horizontal flight efficiency indicator. A lower flight level for

FABEC cross-border FRA shall be considered, in line with the NSP and the PCP, to ensure the

achievement of the European targets. The interface between FABEC and BlueMed FAB and SW FAB needs to be addressed with due

required priority.

Page 21: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

10 29 May 2015 Edition: 1.0

Blue Med FAB

The main projects taken into consideration in the context of the Blue Med FAB are:

FRAIT - IT Phase 3 (FRA FL365+).

Malta FRA FL105+.

Greece FRA FL315+.

Italy FRA FL305+.

Additional more detailed projects are also in course of deployment and they are included in the ERNIP Part 2 - ARN Version 2015 - 2019.

The Scenarios are considered in the chronological order of their implementation. The impacts are calculated to the baseline end 2014 scenario. The evaluation made for the scenarios above shows the following achievements:

Route Length Extension Analysis (V2.1)

SAAM/NEST Airport-circle radix (NM):

40.00 Filter used : Europe plus mediterranean countries and part of the Russian

federation

REF

Reduction of route extension percentage

points to reference

Malta FRA FL105+

FRA IT - Phase 3

Greece FRA FL315+

Italy FRA FL305+

-0.57 pp

pp = percentage point

Blue Med FAB

2019

Reference Value

(pp reduction

vs 2012)

2019

NM evaluation

(pp reduction

vs 2014)

0.57 pp 0.57 pp

NM evaluation Reference values will be met with deployment of FRA in Italy initially FL365+ and FL305+, Malta

FL105+ and Greece FL315+

NM proposed measures

Cross-border FRA projects implementation must be considered for the entire Blue Med FAB. The

interface between BlueMed FAB and FABEC and SW FAB needs to be addressed with

priority. Timely implementation of projects in line with the ERNIP Part 2.

Page 22: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

11 29 May 2015 Edition: 1.0

FAB Central Europe (FAB CE)

The main project taken into consideration in the context of the FABCE is the implementation of the FABCE Concept of Seamless operations. This includes the following projects:

Implementation of Free Route Airspace in gradual steps between 2014 and 2020;

Implementation of seamless operations by ensuring: o horizontal connectivity with adjacent FABs; o vertical connectivity through enhanced route network, CDO and CCDs with

lower airspace and TMAs.

Appropriate interoperability through gradual ATM systems evolutions to respond to the operational requirements resulting from the implementation of the Concept of Seamless Operations.

FABCE ASM/ATFCM project.

Additional more detailed projects are also in course of deployment and they are included in the ERNIP Part 2 - ARN Version 2015 - 2019.

The FRA Implementation steps are described in the detailed projects included in the ERNIP Part 2 - ARN Version 2015 – 2019.

Route Length Extension Analysis (V2.1)

SAAM/NEST Airport-circle radix (NM):

40.00 Filter used : Europe plus mediterranean countries and part of the Russian

federation

REF

Reduction of route extension percentage

points to reference

ECAC changes with FRA Projects -0.54pp

pp = percentage point

FABCE

2019

Reference Value

(pp reduction

vs 2012)

2019

NM evaluation

(pp reduction

vs 2014)

0.32 pp 0.54 pp

NM evaluation Plans in line with the expected European

targets

NM proposed measures

Maintain current implementation plans in FABCE, including cross-border FABCE

implementation of FRA

Page 23: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

12 29 May 2015 Edition: 1.0

UK-Ireland FAB

The projects taken into consideration in the context of the UK/IE FAB are the ones included in the ERNIP Part 2 - ARN Version 2015 - 2019, including:

Phase 3 FRA Prestwick ACC FL255+

The Scenarios are considered in the chronological order of their implementation. The impacts are calculated to the baseline end 2014 scenario. The evaluation made for the scenarios above shows the following achievements:

Route Length Extension Analysis (V2.1)

SAAM/NEST Airport-circle radix (NM):

40.00 Filter used : Europe plus mediterranean countries and part of the Russian

federation

REF

Reduction of route extension percentage

points to reference

ERNIP Part 2 - ARN Version 2015 - 2019 Projects

Phase 3 - FRA Prestwick ACC FL255+

-0.09 pp

pp = percentage point

UK/IE FAB

2019

Reference Value

(pp reduction

vs 2012)

2019

NM evaluation

(pp reduction

vs 2014)

0.65 pp 0.09 pp

NM evaluation

Full FRA already implemented in Ireland FRA in Scottish UIR FL255+ has been included in the evaluation. Only the current projects are not

sufficient.

NM proposed measures

In order to meet the European target, cross-border FRA projects implementation must be considered for the entire UK/IE FAB. In addition to consider cross-border operations with neighbouring FABs (FABEC, DK/SWE FAB and NEFAB). The BOREALIS project is included in the NM work programme and will be included in future editions of the ERNIP Part 2. BOREALIS is expected to deliver the fully required performance immediately after RP2.

Page 24: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

13 29 May 2015 Edition: 1.0

Danube FAB

The main projects taken into consideration in the context of the Danube FAB are:

All proposals included in the ERNIP Part 2 - ARN Version 2015 - 2019, including cross border night FRA.

Danube FAB cross-border FRA FL105+

The Scenarios are considered in the chronological order of their implementation. The impacts are calculated to the baseline end 2014 scenario. The evaluation made for the scenarios above shows the following achievements:

Route Length Extension Analysis (V2.1)

SAAM/NEST Airport-circle radix (NM):

40.00 Filter used : Europe plus mediterranean countries and part of the Russian

federation

REF

Reduction of route extension percentage

points to reference

Proposals included in the ERNIP Part 2 - ARN Version 2015 - 2019, including cross border night FRA and DANUBE FAB cross-border

FRA FL105, 24 hours

-1.25 pp

pp = percentage point

Danube FAB

2019

Reference Value

(pp reduction

vs 2012)

2019

NM evaluation

(pp reduction

vs 2014)

0.32 pp 1.25 pp

NM evaluation

A significant proportion of the reduction is based on impacts from other changes in the network.

It is essential that DANUBE FAB ensures implementation above FL105 to ensure the

contribution to the achievement of the overall European target

NM proposed measures

Implementation of cross-border FRA H24 above FL105 is recommended in order not to make

dependencies on other airspace developments. Such project needs to be included in the ERNIP

Part 2, in line with the NSP and the PCP.

Page 25: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

14 29 May 2015 Edition: 1.0

North European (NE) FAB

The main projects taken into consideration in the context of the NE FAB are:

NEFRA Project.

Additional more detailed projects are also in course of deployment and they are included in the ERNIP Part 2 - ARN Version 2015 - 2019.

The Scenarios are considered in the chronological order of their implementation. The impacts are calculated to the baseline end 2014 scenario. The evaluation made for the scenarios above shows the following achievements:

Route Length Extension Analysis (V2.1)

SAAM/NEST Airport-circle radix (NM):

40.00 Filter used : Europe plus mediterranean countries and part of the Russian

federation

REF

Reduction of route extension percentage

points to reference

Finish airspace re-organisation

NEFRA -0.55 pp

pp = percentage point

NE FAB

2019

Reference Value

(pp reduction

vs 2012)

2019

NM evaluation

(pp reduction

vs 2014)

0.22 pp 0.55 pp

NM evaluation 2019 European target will be achieved

NM proposed measures

To implement all projects as planned

Page 26: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

15 29 May 2015 Edition: 1.0

Denmark/Sweden FAB

The main projects taken into consideration in the context of the DK/SE FAB are:

The cross border FRA implementation in the DK/SE FAB that was already achieved;

The cross-border between DK/SE FAB, NE FAB and NEFRA Project.

NM considers that the further adaptations planned by DK/SE FAB will fully respond to the European targets.

DK/SE FAB

2019

Reference Value

(pp reduction)

2019

NM evaluation

(pp reduction)

0.01 pp More than 0.1 pp

NM evaluation 2019 European target will be achieved

NM proposed measures

Ensure cross-border FRA implementation with NEFAB and with other neighbouring FABs

Page 27: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

16 29 May 2015 Edition: 1.0

Baltic FAB

The main projects taken into consideration in the context of the Baltic FAB are:

Baltic FAB FRA FL245+.

Additional more detailed projects are also in course of deployment and they are included in the ERNIP Part 2 - ARN Version 2015 - 2019.

The Scenarios are considered in the chronological order of their implementation. The impacts are calculated to the baseline end 2014 scenario. The evaluation made for the scenarios above shows the following achievements:

Route Length Extension Analysis (V2.1)

SAAM/NEST Airport-circle radix (NM):

40.00 Filter used : Europe plus mediterranean countries and part of the Russian

federation

REF

Reduction of route extension percentage

points to reference

Baltic FRA FL 245+ -0.69 pp

pp = percentage point

Baltic FAB

2019

Reference Value

(pp reduction

vs 2012)

2019

NM evaluation

(pp reduction

vs 2014)

0.25 pp 0.69 pp

NM evaluation Target will be achieved with implementation of

FRA FL245+ in Baltic FAB

NM proposed measures

Initiate cross-border projects with neighbouring FABs

Page 28: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

17 29 May 2015 Edition: 1.0

South West Portugal Spain FAB

The main projects taken into consideration in the context of the SW FAB are:

Partial implementation of DCTs.

Additional more detailed projects are also in course of deployment and they are included in the ERNIP Part 2 - ARN Version 2015 - 2019.

The Scenarios are considered in the chronological order of their implementation. The impacts are calculated to the baseline end 2014 scenario. The evaluation made for the scenarios above shows the following achievements:

Route Length Extension Analysis (V2.1)

SAAM/NEST Airport-circle radix (NM):

40.00 Filter used : Europe plus mediterranean countries and part of the Russian

federation

REF

Reduction of route extension percentage

points to reference

Partial implementation of DCTs

Together with all Network Improvements

-0.18 pp

pp = percentage point

SW FAB

2019

Reference Value

(pp reduction)

2019

NM evaluation

(pp reduction)

0.99 pp 0.18 pp

NM evaluation Full FRA already implemented in Portugal.

Additional FRA projects definition required in Spain

NM proposed measures

In order to meet the European target, cross-border FRA projects implementation must be considered for the entire SW FAB, in line with

the NSP and the PCP.

Evolution of operational procedures should be also considered in Spain.

The interface between SW FAB, FABEC and BlueMed FAB needs to be addressed with

priority.

Page 29: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

18 29 May 2015 Edition: 1.0

1.8. BENEFITS OF ERNIP PART 2 - ARN VERSION 2015 - 2019

The ERNIP Part 2 - ARN Version 2015 - 2019 contains, at this stage, 552 (five hundred fifty two) packages of airspace proposals scheduled for implementation for the Summer seasons 2015 – 2019, out of which 208 are implemented by 28 May 2015.

These proposals include more than 500 route changes, around 40 re-sectorisation plans, more than 40 TMA projects, more than 50 Free Route Airspace projects, around 10 civil/military airspace developments as well as more than 30 improvement measures eliminating unnecessary RAD restrictions or improving flight efficiency. They were or will be implemented as follows:

approximately 260 proposals for the Summer season 2015;

approximately 220 proposals for the Summer season 2016;

approximately 40 proposals for the Summer season 2017;

approximately 30 proposals for the Summer seasons 2018 and 2019, until the end of 2019.

As from the full implementation of ERNIP Part 2 - ARN Version 2015 - 2019 in 2019, flying distances would be reduced by 20 to 25 million NMs, this representing the equivalent of 120 000 to 150 000 tons of fuel saved, or reduced emissions of 400 000 to 500 000 tons, or 100 to 125 million Euros.

As a result of these improvements, the European ATS route network will become approximately 2.35% longer than the great circle distances (from TMA exit to TMA entry points).

Page 30: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

19 29 May 2015 Edition: 1.0

Left blank intentionally

Page 31: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

20 29 May 2015 Edition: 1.0

2. ARN VERSION 2015 - 2019 BENEFITS

2.1. TOTAL EXPECTED BENEFITS - ERNIP PART 2 - ARN VERSION 2015 - 2019

The implementation of ERNIP Part 2 - ARN Version 2015 - 2019 has the potential to significantly improve flight efficiency if all projects are fully implemented. The route extension due to airspace design (if all flights would have used the route network without any route restrictions and with all CDRs permanently available) is expected to decrease from 2.69% in the Autumn 2014 to approximately 2.35% by the end of 2019. The graph below shows the expected evolution of flight efficiency between 2008 and the end of 2019 in terms of extension compared to the great circle.

2008

2010

2012

2014

2009

2011

2013

0

0,1

0,2

0,3

0,4

0,5

0,6

0,7

0,8

0,9

1

2,0%

2,5%

3,0%

3,5%

4,0%

4,5%

5,0%

5,5%

71

380

180

280

380

480

580

680

780

880

981

081

181

281

390

190

290

390

490

590

690

790

890

991

091

191

291

310

01

10

02

10

03

10

04

10

05

10

06

10

07

10

08

10

09

10

10

10

11

10

12

10

13

11

01

11

02

11

03

11

04

11

05

11

06

11

07

11

08

11

09

11

10

11

11

11

12

11

13

12

01

12

02

12

03

12

04

12

05

12

06

12

07

12

08

12

09

12

10

12

11

12

12

12

13

13

01

13

02

13

03

13

04

13

05

13

06

13

07

13

08

13

09

13

10

13

11

13

12

13

13

14

01

14

02

14

03

14

04

14

05

14

06

14

07

14

08

14

09

14

10

14

11

14

12

14

13

15

01

15

02

Ro

ute

Ex

ten

sio

n

AIRAC

Route Efficiency KPI per AIRAC cycle RTE-DES

RTE-FPL

3.65% Jan 2008

3.13% Sept 2010 3.05%

Sept 2011 2.95% Sept 2012 2.69%

Nov 20132.54%

End 2014

3.65% Jan 2008

3.13% Sept 2010 3.05%

Sept 2011 2.95% Sept 2012 2.69%

Nov 20132.54%

End 2014

3.65% Jan 2008

3.13% Sept 2010 3.05%

Sept 2011 2.95% Sept 2012 2.69%

Nov 20132.54%

End 2014

3.40% Sept 2009

between 2.30-2.35% end 2019

As from the full implementation of ERNIP Part 2 - ARN Version 2015 - 2019 in 2019, flying distances would be reduced by 20 to 25 million NMs, this representing the equivalent of 120 000 to 150 000 tons of fuel saved, or reduced emissions of 400 000 to 500 000 tons, or 100 to 125 million Euros.

2.2. CAPACITY ENHANCEMENT BENEFITS OF ERNIP PART 2 - ARN VERSION 2015 - 2019

The ERNIP Part 2 - ARN Version 2015 - 2019 Catalogue contains more than 40 re-sectorisation projects in addition to route network solutions that are aiming at reducing the complexity of the airspace structure. Based on fast time simulations of a number of projects, it is expected that the ARN Version 2015 - 2019 would bring an additional 5-7% capacity to the European ATM network when fully implemented.

Page 32: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

21 29 May 2015 Edition: 1.0

Left blank intentionally

Page 33: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

22 29 May 2015 Edition: 1.0

3. EUROPEAN ROUTE NETWORK DESIGN FUNCTION AND FLIGHT EFFICIENCY ACTION PLANS

3.1. EUROPEAN ROUTE NETWORK DESIGN FUNCTION

The ERNIP Part 2 - ARN Version 2015 - 2019 responds to the obligations put in accordance with the COMMISSION REGULATION (EU) No 677/2011 of 7th July 2011 (laying down the detailed rules for the implementation of air traffic management (ATM) network functions and amending Regulation (EU) No 691/2010) on the European Route Network Design Function:

The production of the European Route Network Improvement Plan;

Delivering airspace solutions and interfaces required to facilitate operational interconnectivity between FABs;

monitoring and improvement of the overall capacity and environment/flight efficiency performance of the network from an airspace design and utilisation perspective; and

supporting the different operational stakeholders within the obligations that are put to them in the development and deployment of the European Route Network Improvement Plan and in deploying relevant actions in accordance with the European ATM Master Plan.

3.2. FREE ROUTE AIRSPACE

Until 30 April 2015 Free Route Airspace has been partially and/or fully implemented in the following ACCs: Beograd ACC, Brest ACC, Brindisi ACC, Bordeaux ACC, Bucuresti ACC, Budapest ACC, Chisinau ACC, Karlsruhe UAC, Kobenhavn ACC, Lisboa ACC, London ACC, Ljubljana ACC, Maastricht UAC, Madrid ACC (SAN and ASI sectors), Malmo ACC, Malta ACC, Marseille ACC, Milano ACC, Moldova ACC, Padova ACC, Praha ACC, Prestwick ACC, Reims ACC, Roma ACC, Shannon ACC, Skopje ACC, Sofia ACC, Stockholm ACC, Tampere ACC, Ukraine (individual UTAs), Warsaw ACC, Wien ACC and Zagreb ACC (see map below).

Page 34: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

23 29 May 2015 Edition: 1.0

The following map shows the Free Route Airspace implementation plans proposed until the end of RP2 in 2019.

The Free Route Airspace development year by year is presented in chapter 7.2 of this document.

3.3. ASM SOLUTIONS

The implementation of ASM solutions are particularly important in the context of the ERNIP Part 2 - ARN Version 2015 - 2019 that will include further solutions to improve network performance for the most penalised city pairs, through further deployment of the European night direct route network, solutions offering to the airspace users several and/or shorter routing options, etc.

The ERNIP Part 2 - ARN Version 2015 - 2019 will require also to accommodate both civil and military requirements, the ASM solutions will need therefore to be fully exploited.

In this context a number of ASM solutions have been tested in 2014. Additional activities are planned this year in the frame of FREE solutions to evaluate the application of ASM solutions in a FRA environment. A number of DCTs have been identified in order to promote a better utilisation of airspace based on co-ordination among civil and military.

Page 35: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

24 29 May 2015 Edition: 1.0

Based on the outcomes of Free solutions project, a revision of the ASM handbook is expected to define a process to be applied in future for any feasible scenario.

3.4. SIMPLIFYING THE RAD

A number of RAD restrictions have successfully been tackled and clear flight efficiency improvements achieved with no impact on safety or on capacity. An elimination of further restrictions impacting Bulgaria, Croatia, Czech Republic, France, Germany, Italy, Netherlands, Poland, Spain, Turkey and UK is planned until end 2019.

There is a clear need to further review the RAD restrictions with the participation of all the interested parties. It is expected the Agency to run a Network impact assessment of the RAD restrictions implemented in the States. States will be requested to study if some of the RAD restrictions where put in place to balance capacity during a specific period of the year and therefore can be deactivated during the rest.

Furthermore the Agency provided input to the ANSPs on the inconsistencies identified in regard to the current allowed DCTs in RAD Appendix 4 and 5.

All the required improvements for many areas will be implemented within the context of ERNIP Part 2 - ARN Version 2015 - 2019.

3.5. IMPROVING TMA STRUCTURES

Improved Terminal Airspace design projects are or will be implemented in the context of the ARN Version 2015 - 2019 at:

- Barcelona TMA,

- Batumi TMA,

- Budapest TMA,

- Beograd TMA,

- Canarias TMA,

- Hoceima TMA,

- Larnaca TMA,

- Ljubljana TMA,

- London TMA (London Airspace Management Program - LAMP),

- Manchester TMA,

- Milano TMA,

- Nador El Atoui TMA,

- Northern Terminal Control Area/ NTCA of Prestwick ACC (former Manchester TMA),

- Oslo TMA (HOPE - Harmonisation of Oslo Procedures and Environment),

- Paris TMA (Point Merge TE),

- Praha TMA

- Poznan TMA,

- Roma TMA,

- Vienna TMA,

- Santorini TMA

- Tetouan TMA,

- Tibilisi TMA.

In the time frame of ERNIP Part 2 - ARN Version 2015 - 2019 additionally a third runway at Munich airport is considered as well as a new runway at Dublin airport and a new International airport planned for Istanbul.

Page 36: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

25 29 May 2015 Edition: 1.0

3.6. THE FLIGHT EFFICIENCY PLAN

IATA, CANSO and EUROCONTROL worked in a close partnership along with airlines, airports and ANSPs to identify solutions and launch operational actions that will lead to fuel and emissions savings in the short term to develop a Flight Efficiency Plan that was commonly agreed in September 2008.

The Flight Efficiency Plan builds on the accelerated implementation of the measures already approved by the EUROCONTROL Provisional Council, currently put in place by all ATM actors, and included in DMEAN, the Airspace Action Plan, the Airspace Management Improvement Initiative, the Terminal Airspace Improvement Initiative and the Airport Programme.

The action points of the Flight Efficiency Plan, relevant for the ERNIP Part 2 - ARN Version 2015 - 2019, are:

1. Enhancing European en-route airspace design through annual improvements of European ATS route network, high priority being given to:

o Implementation of a coherent package of annual improvements and of shorter routes;

o Improving efficiency for the most penalised city pairs;

o Implementation of additional Conditional Routes for main traffic flows;

o Supporting initial implementation of free route airspace.

2. Improving airspace utilisation and route network availability through:

o Actively support and involve aircraft operators and the computer flight plan service providers in flight plan quality improvements;

o Gradually applying route availability restrictions only where and when required;

o Improving the utilisation of civil/military airspace structures.

3. Efficient TMA design and utilisation, through:

o Implementing advanced navigation capabilities

o Implementing Continuous Descent Approaches (CDAs), improved arrival/departure routes, optimised departure profiles, etc.

The vast majority of the improvements considered in the context of the ERNIP Part 2 - ARN Version 2015 - 2019 contribute to the deployment of the Flight Efficiency Plan.

3.7. THE NETWORK MANAGER FLIGHT EFFICIENCY INITIATIVE

A closer cooperation with the airspace users to ensure a better flight planning is essential to ensure the achievement of the RP2 targets. The good progress made over the past years in the airspace design resulted in a European airspace offering, in a dynamic manner, a high number of options for the airspace users.

In order to achieve a better utilisation of the European airspace by the airspace users, the network manager launched a Flight Efficiency Initiative that covers the following aspects:

Flight Planning Improvements in the Strategic Phase

An interactive tool was developed to allow all AOs and CFSPs to compare their

flight plans with the best filed flight plan accepted by IFPS during the last AIRAC cycle;

The airspace users and the CFSPs will have the possibility to detect new implemented routes, CDRs available during similar periods of time, etc.;

It is expected that the airspace users and the CFSPs will use this interface to improve their flight planning for the “next” AIRAC cycle;

Page 37: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

26 29 May 2015 Edition: 1.0

This tool could also be used to assess individual airline flight plans or to detect possible network performance evolutions.

Enhanced utilisation of CDRs through the deployment of ASM solutions

Assessment of traffic demand, ATFM measures, sector configurations and CDRs

availability; Existence of CDRs segments in the FPL; Route extension compared with the “best option”; flight extension mostly for en-

route section (avoid extensive arrival/departure situations); Search for the flights with the shortest planned route for each city pair having at

least one CDR in their planned route; For each city pair assess the CDR availability requirements if all the flights on that

city pair would plan the shortest route; Proposals to AO’s for better routes including CDR’s; Possible coordination with military partners, when required, for coordinated

availability of CDR’s.

Flight Planning improvements in the Pre-Tactical/Tactical Phases

Enhance the visibility for aircraft operators on other route network utilisation options,

post IFPS flight planning with proposals being displayed to the users; the final choice in accepting a more optimised proposal remains with the airspace users. Those actions are based on: The Group Rerouting Tool (opportunity tool) - an ETFMS feature allowing a

recomputation of the profile considering the wind, the last ATFCM situation, simulated operating costs;

Proposals for flight efficiency improvements for invalid flight plans that require manual corrections;

Network impact assessments resulting in re-routing proposals based on CDR2 routes with the direct involvement of MILO/AOLO;

Repetitive Flight Plans (RPLs) Proposals for RPL changes that need to be maintained by the airlines for each

AIRAC cycle. Most Penalised City Pairs

Further developments to address the Most Penalised City Pairs Daily monitoring of the utilisation of the new airspace changes; Detect improvements based on the latest airspace design or airspace utilisation

changes. Tactical RAD relaxations

Based on existing Crisis Procedures; Similar procedures could be implemented during normal operations as

comparisons between actual trajectories and flight plans show that the RAD is not systematically followed during tactical operations;

Tactical relaxation of RAD could be also envisaged during the night or during period of low demand.

The implementation of this initiative is based on:

• A close and continuous cooperation between NM and the airspace users; • A close and continuous cooperation with the computer flight plan service providers; • Appropriate evolutions of the flight planning systems to take into account the past

and future evolutions of the airspace concepts.

Page 38: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

27 29 May 2015 Edition: 1.0

This initiative will require the strong support and participation of the entire airspace users community. This support is critical for ensuring the achievement of the RP2 environment/flight efficiency target. Without such a support, the positive evolutions made with respect to the European airspace design through co-operative efforts between NM, ANSPs and FABs will not provide their full potential.

Page 39: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

28 29 May 2015 Edition: 1.0

4. CONCEPT OF OPERATIONS FOR EUROPEAN AIRSPACE DESIGN

4.1. MAIN PRINCIPLES

Successful European airspace design is achieved through:

o The implementation of an advanced and consolidated concept of operations;

o A pan-European view treating the European airspace as a continuum and a strategic vision of the European ATS Route Network, designed following main traffic flows and airspace users preferred routes and profiles with optimised supporting ATC sectors unconstrained by national or FIR boundaries;

o Gradual elimination of bottlenecks and reasons for flight inefficiency;

o Optimised procedures for an enhanced use of airspace;

o A balanced approach between European network, regional and local requirements;

o A co-ordinated and integrated partnership approach for the collective benefit of airspace users, Member States, Air Navigation Service Providers, civil and military authorities deployed through a collaborative planning process.

The diagram below describes the European Route Network Improvement Plan/ ERNIP development.

Page 40: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

29 29 May 2015 Edition: 1.0

4.2. ERNIP PART 2 - ARN VERSION 2015 - 2019 IMPROVEMENTS HIGHLIGHTS

4.2.1. Introduction

The performance targets place more demands on the need to enhance the organisation and use of the European ATM network. Additional capacity will need to be delivered, flight efficiency improved and environmental impact reduced, while maintaining or improving safety of operations. Air traffic diversity is expected to become more complex with the emergence of additional civil and military requirements, which will alter the mix and flight profiles of the airspace users. This will lead to additional diversity in the airspace user requirements

The solution for meeting the safety, capacity, flight efficiency/cost effectiveness and environmental requirements is the strategic planning and design of “packages” of ATS routes of the ARN, Free Route operations airspace, Terminal Routes, airspace reservations and ATC sectors, to respond to the requirements of different strategic objectives. These packages are called Airspace Configurations.

The solution for meeting the diversity of user requirements is the effective and dynamic management of airspace configurations through a highly flexible and integrated Cooperative Decision Making (CDM) process at network, regional, national and local level management of the pre-designed airspace configurations through a highly flexible and integrated CDM process at network, regional, national and local level.

4.2.2. Basic Concept

In both en-route and terminal airspace, an Airspace Configuration refers to the pre-defined and co-ordinated organisation of ATS Routes of the ARN and/or Terminal Routes, Free Route Operations airspace and their associated airspace structures (including temporary airspace reservations, if appropriate) and ATC sectorisation.

In the en-route airspace, airspace configurations are to be comprised of pre-defined fixed and flexible routing options or optimised trajectories and optimum ATC sectorisation capable of being dynamically adapted to traffic demand. Airspace configurations will be activated, through a CDM process, depending upon the driving Strategic Objective(s) for a particular geographic area and/or time period.

In terminal airspace, airspace configurations are contained primarily within terminal airspace structures. Airspace configurations may be activated depending upon the runway configuration in use at one or more airports and the driving Strategic Objective(s) of a particular time period.

The above is based on a coordinated and systematic approach to selecting and changing airspace configurations across the European ATM System.

The ARN Version 2015 - 2019 is built on a close co-operation between airspace design, ATFCM and ASM. It supports a close link between airspace design and airspace utilisation.

4.2.3. European Network Consistency

The overall European Network Consistency is assured across through the consolidated development of the ERNIP Part 2 - ARN Version 2015 - 2019. Co-ordination and consolidation of airspace design, planning and implementation is achieved through Cooperative Decision Making (CDM) at European network level.

The ERNIP Part 2 - ARN Version 2015 - 2019 is based on a European wide collaborative process by which the major traffic flows, combined with major airspace constraints (airports, military areas etc.) are translated into a basic route structure. Built upon agreed planning principles, the resultant structure provides the basis for more detailed development by States and ANSPs at national or regional/FAB level. The scheme will consider the European airspace in its totality, independent of FIR boundaries.

Page 41: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

30 29 May 2015 Edition: 1.0

4.2.4. Airspace Continuum

An airspace continuum was envisaged in the development of the ERNIP Part 2 - ARN Version 2015 - 2019. This means that there is no intended division within en-route airspace or between en-route and terminal airspace. However, the different attributes of en-route and terminal airspace drove specific requirements resulted in changes to various interfaces to improve efficiency.

A lateral airspace continuum is ensured through regional airspace configurations in both en-route and Terminal Airspace (e.g. FAB or TAS), where application of various the rules associated with airspace utilisation will be harmonised.

A network continuum was ensured through the development of the overall ERNIP Part 2 - ARN Version 2015 - 2019 where all aspects related to lateral and vertical interconnectivity, including interconnectivity within and between regional airspace configurations, were thoroughly addressed.

4.2.5. ARN Version 2015 - 2019 Components

ATS routes continue to characterise the airspace for the most part in the context of the ERNIP Part 2 - ARN Version 2015 - 2019, while Free Route Operations will be used in selected airspaces and/or at selected times.

The main characteristic of the ATS Routes of the ERNIP Part 2 - ARN Version 2015 - 2019 is to offer more routeing options to the airspace users. These routes will be based on principles of route network design and sectorisation independent from national boundaries, adapted to main traffic flows.

An airspace structure built on the basis of an ATS route network and Free Route Operations is capable of being managed more flexibly to permit operators to choose from several strategically designed airspace structures (ATS routes and Free Route operations) of the ERNIP Part 2 - ARN Version 2015 - 2019.

Improvements in the strategic design, planning and management of these 2 components will improve the predictability of the route options. This flexibility is based on principles of the Flexible Use of Airspace Concept.

The requirements of GAT and OAT are accommodated by integrating these into the strategic ARN developments.

ATC sectors of ERNIP Part 2 - ARN Version 2015 - 2019 are adapted to main traffic flows and to an optimum route network and are, when required, independent from national boundaries. More ATC sectors are developed and made available, where required (including vertical divisions), in response to variations in demand and airspace availability. This work was conducted with the full involvement of States and ANSPs as it is their direct responsibility for the final design of ATC sectors supporting the route network structure and Free Route Operations.

To improve the design and management of terminal routes and ATC sectorisation servicing several airports in close proximity, the fusion of two or more terminal airspace structures is envisaged where required. This amalgam is described as a Terminal Airspace System (TAS). These TAS could extend across national borders if necessitated by operational requirements.

4.2.6. Airspace Classification

Above FL195, ATS Routes, Free Route operations airspace and Terminal Routes will be contained within Class C airspace. At and below FL195, ATS Routes of the ARN as well as Terminal routes will be contained within airspace where, for safety reasons, there is to be a uniform application of the rules associated with the 7 ICAO airspace classes.

At or below FL195, where supplemental rules to the 7 ICAO airspace classes are required to respond to operational and safety requirements, additional rules will be created and applied in a safe manner.

Page 42: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

31 29 May 2015 Edition: 1.0

4.2.7. Airspace Organisation

The practical airspace organisation features of ERNIP Part 2 - ARN Version 2015 - 2019 are:

Multi-option route choice: New route segments and Free Route operations airspace were added to the network. These additional airspace structures are compatible with the overall airspace structure. They include 24 hours choices, but also time limited choices (e.g. the European Night Direct Route Network or time-limited application of Free Route operations). In the event of airspace restrictions caused by traffic density and/or ACCs/sector configuration or activation of segregated airspace, suitable alternative options are available. The dynamic capacity/route use will be brought about by collaborative decision-making based on the pre-determined set of routing options.

Modular sectorisation: To the largest possible extent and where required, sectors are established across national borders and in accordance with main traffic flows. They will support the pre-defined airspace structures. Reconfiguration of pre-defined modules of airspace (sector modularity) help to adapt the sector configurations to specific traffic flows.

Efficient Terminal/En-route interface: Efficient structures based on segregated arrival/departure routes extending beyond the Terminal Airspace are part of the ERNIP Part 2 - ARN Version 2015 - 2019. Where incompatibilities arise, priorities were discussed and given depending on operational requirements to the en-route part or to the terminal structure.

4.2.8. Airspace Development Approach

The process for developing an airspace structure was based, in most of the cases on the following sequence:

Determine the Route Network or the Free Route Operations Airspace - improvement of the route network or implementation of Free Route Operations airspace took into account the users’ preferred routes and inclusion of direct route segments on the largest possible extent whilst meeting the requirements of the military;

Define the Sector Families - areas containing specific air traffic flows and conflict areas which will consist of strongly interdependent sectors;

Define Sectors - definition of the minimum operational elementary volume;

Define Sector configurations - a combination of sectors best placed to satisfy the operational requirements (traffic demand, traffic pattern, staff) and airspace availability;

Define the Modus Operandi

4.2.8.1. Route Network

The objective of ERNIP Part 2 - ARN Version 2015 - 2019 is to provide Aircraft Operators with their preferred trajectories selected from within the route network, whilst ensuring that the capacity and safety targets defined by the sectorisation are met.

The ERNIP Part 2 - ARN Version 2015 - 2019 delivers more route choices to the operators when planning a flight. This involves improved access to the existing route network and the creation of new routes, including predefined direct routes available subject to time limitations or ASM conditions.

The Route Network design criteria took into account the need to create additional routes that did not exist in the previous network as they caused capacity problems at certain times. The ERNIP Part 2 - ARN Version 2015 - 2019 introduced these new routes and made them available for use under specific pre-defined conditions that are made known to all airspace users. As a result, the most direct of the routes choices could be planned at certain times.

In other cases, choices will need to be made by the airspace users between the shortest route but with capacity constraints, a slightly longer route will be made

Page 43: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

32 29 May 2015 Edition: 1.0

available with no capacity constraints, but involving ASM solutions, or a longer route available with no airspace constraint.

The airspace users will, at a pre-determined time, make the decision on the choice of route based on up to date data on the sector constraint and segregated airspace availability.

The creation of pre-defined direct routes subject to ASM conditions, should provide benefit to the military users as well as it will be possible to better respond to their requirements when the preferred route is available. This in turn lead to the implementation of a larger number of CDRs 1 or 2.

4.2.8.2. Free Route Operations

The ERNIP Part 2 - ARN Version 2015 - 2019 provides an enabling framework for the harmonised implementation of Free Route Operations in Europe. It is based on the Free Route Concept of Operations developed in the context of the ARN Version-7 and included in ERNIP Part 1.

4.2.8.3. Sectorisation

The development of ERNIP Part 2 - ARN Version 2015 - 2019 took into account the need to gradually implement Sector Families of interdependent sectors that can be clustered into logical Family Groups. In all the development projects aspects related to areas of weak and strong interaction were considered through the utilisation of the supporting airspace design tools.

The criteria for determining Sector Families, Family Groups and elementary sectors were based on:

an optimised route network, integrating direct routes, Free Route Operations, multiple route options, associated alternatives and military operational requirements;

efficient connectivity with terminal airspace;

design of elementary sectors with strong/complex interaction that necessitate close co-ordination between controllers;

traffic density, conflict density and repartition, traffic profiles, nature of traffic (climbing/descending), crossing flows, close crossing points, etc.

operational considerations for lateral and vertical delineation;

determining variable sizes of sectors with small/specialised low level sectors, deep medium sectors (for evolving traffic) and wider upper sectors;

usage of modular techniques;

time of flying within a sector family;

several combinations of flexible sectors configuration were defined, depending on traffic flows;

enabling sufficient distance for conflict resolution in all routeing options;

maintaining route options, on the largest possible extent within the same sector family;

iterative process for sectorisation considering route network modifications to enable the best possible sectorisation.

the identification of zones of lesser complexity;

Page 44: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

33 29 May 2015 Edition: 1.0

4.2.8.4. Modus Operandi

The Modus Operandi of the ERNIP Part 2 - ARN Version 2015 - 2019 includes:

The availability, in terms of time and FL, of route segments (including the direct route segments) or Free Route Operations airspace in line with the constraints imposed by segregated airspace or by the need to better balance capacity and demand;

The links between-route network, Free Route Operations airspace and sectorisation including conditions for availability of certain route segments or Free Route Operations and their dependence on the configuration of ATC sectors to match traffic demand;

Routing scenarios - including all pre-planned alternate routeings to compensate for the temporary unavailability of a certain airspace structures;

Structural constraints - notified constraints, such as, the activation of segregated airspace, sector capacity restrictions, specialised routes for specific traffic flows, profile constraints to skip sectors in a given configuration and modifying capacity depending on the sector configuration;

Recommended practices - proposals derived from operational experience including the process for selecting sector configurations.

4.2.9. Operating the ERNIP Part 2 - ARN Version 2015 - 2019

The rationale for the ERNIP Part 2 - ARN Version 2015 - 2019 was to ensure that the ATS route network, the Free Route Operations airspace and the ATC sector planning allow for an improved balance between:

freedom for GAT to choose between-route options, and select their preferred one;

offering greater flexibility for OAT users through more efficient allocation of airspace;

capacity management - relying on fine tuning of route adaptation to optimise the use of available capacity where limitations of capacity occur.

Local and Regional/FAB documentation was or will be amended to include the updated rules and procedures. Amongst these are:

National AIPs;

National ATC Regulations;

LoAs;

National ATM Military Documents;

Airspace Management Handbook;

IFPS Users Manual;

ATFM Users Manual.

No change was made to the route description. However, specific description and usage was implemented to facilitate flight planning for the usage of direct segments within Free Route Operations airspace.

Flight planning procedures were further improved to take into account the flexibility of route selection offered by the ERNIP Part 2 - ARN Version 2015 - 2019. Further initiatives are under way to facilitate improved flight planning and route selection. Airspace users should expect more flexibility in the FPL handling based on planned IFPS system enhancements to allow for the dynamic choice of route and/or re-routeing process. The ERNIP Part 2 - ARN Version 2015 - 2019 supports the usage of DCT in the FPL within a consolidated concept and approach.

It is expected that operations within the ERNIP Part 2 - ARN Version 2015 - 2019 will be facilitated through the deployment of the Airspace Data Repository that will ensure gradually an automated distribution of airspace availability information in order to provide all interested parties with a clear and accurate picture of the airspace structure situation.

Page 45: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

34 29 May 2015 Edition: 1.0

The ERNIP Part 2 - ARN Version 2015 - 2019 enables a more flexible ATFCM system and will ensure the gradual move towards the creation of a system responsive to capacity management. The addition of an optimisation process able to provide routeing alternatives to solve capacity and flight efficiency constraints, while maintaining the balance with the airspace user costs, will enhance the current method of managing airspace capacity.

4.2.10. Military Operations

The ERNIP Part 2 - ARN Version 2015 - 2019 recognises and supports the responsibilities and requirements of Military airspace users. In order that all airspace users gain benefit from ERNIP Part 2 - ARN Version 2015 - 2019, military airspace planners were part of the planning process. An organised collection of military airspace requirements is one of the specific elements that the ERNIP Part 2 - ARN Version 2015 - 2019 took into consideration.

Through the solutions proposed in ERNIP Part 2 - ARN Version 2015 - 2019, the military should be able to have:

freedom to operate in all weather conditions in all areas of the European airspace;

special handling in particular for priority flights and for time-critical missions, but also for military aircraft not fully equipped to the civil standard;

the possibility of operating uncontrolled VFR flights;

temporary airspace reservations (TSAs), situated as close as practicable to the appropriate operating airfield;

airspace restrictions for non-flight related activities;

a more dynamic airspace allocation system with enhanced FUA application.

The ERNIP Part 2 - ARN Version 2015 - 2019 supports these requirements through greater flexibility in airspace use, the efficient allocation of segregated airspace and associated re-routeing of GAT users. With a route network and sectorisation that adapts to the variation in traffic flows there scope for better application of the Flexible Use of Airspace.

4.2.11. Airspace Management (ASM) Solutions

General Principles

The identification and development of the ASM Solutions is a part of the ASM Improvements Initiative. The ASM solutions form an integral part of the ERNIP Part 2 - ARN Version 2015 - 2019. They include:

Reviewing the different application of CDR categories at the different stages;

Addressing the potential incompatibility of different CDR categories on segments of the same route with the stakeholders concerned;

Reviewing and improving the design of CDRs in combination with modular TRA/TSA design;

Improving the definition of ASM Solutions to be used at ASM level 2 and 3.

The main objective of the ASM Solutions development is to identify hidden airspace capacity or flight efficiency directly related to the area of Airspace Management, i.e. civil-military requirement to use the same portion of airspace at the same time. This activity is aimed at improving the existing practices in order to overcome the capacity constraints and provide efficient flight operations of both, civil and military airspace users. It aims at identifying such airspace use scenarios, which will bring benefits to both - civil and military categories of airspace users. It will provide for a credible balance in meeting the requirements of all the partners in airspace use and its management.

To deliver extra capacity and flight efficiency, the current ASM processes and procedures related to a particular TRA/TSA are reconsidered, both in their design and associated airspace planning and allocation processes and procedures. The enhanced ASM processes will consider various

Page 46: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

35 29 May 2015 Edition: 1.0

levels of flexibility, either in time or in spatial location (vertical or horizontal), that are permissible by the planned civil or military flight operations.

The civil aircraft operators are to achieve more efficient, less costly and delay-free operations in some portions of airspace that today restrict meeting the demand, using different CDR options that are co-located to each sub-modular configuration of a particular temporary reserved or restricted airspace portion.

The military might need to request an enlarged airspace volume to meet the requirements of specific missions. To respond to this request a set of well planned airspace scenarios that are adapted to different mission requirements concerning the airspace size (lateral and vertical) and timing will be available, thus eliminating any requirement for airspace overbooking.

Air Navigation Service Providers participation in collaborative decision making on implementation of a particular scenario related to the specific TRA/TSA, will ensure that their needs of sectors’ capacity to accommodate the traffic demand are properly addressed.

The final objective of the ASM Solutions development is to identify concrete and consistent solutions for each identified hot-spot, i.e. an interactive civil-military solution. Next step is to extend the activity at the sub-regional level by coordinating interaction between adjacent local options. The process of final ASM Solutions development is expected to be carried out by the civil and military partners responsible for a particular TSA/TRA.

At the second stage the coordination is planned to be extended to all those concerned by the interaction in defining and deciding upon different scenarios, resulting in the most suitable sub-regional ASM Scenario.

Last but not least, with this optimised local and sub-regional network response, the task of Network Operations should be focused on the global network solutions that can lead, by judicious selection, to less ATFCM measures.

ASM Solutions Methodology

The traffic samples to be used in initial scoping and identification of the potential hot-spots, but equally later in developing concrete ASM Scenario(s) will be based on the historical traffic data. The data on TRA/TSA booking will be derived from AUP/UUP/e-AMI information available and their occupation from various sources like CIAM and PRISMIL, or from national ASM tools.

Future Data Collection and Planning The objective of this particular activity is to continually collect information and data on planned introduction and/or change in ASM-related airspace structures and arrangements, i.e. TRAs, TSAs, CBAs, manageability of D and R areas, cross-border airspace sharing arrangements. The information and data collected will enable the assessment and coordination of any planned introduction or change in collaborative manner, enabling consistent solutions planned among neighbouring States, but also at subregional (FABs) and, last but not least, at the European Regional level, thus enhancing the European Network performance. This approach was already agreed and put in place between the parties concerned.

Identification of areas of interest Identification of Hot-Spots that have a potential for capacity and/or flight efficiency improvements through an interactive civil-military solution will be constantly pursued in order to make use of the options made available through the ERNIP Part 2 - ARN Version 2015 - 2019.

For the purpose of initial scoping and identification of potential benefits the closest to the optimum ATS route traffic sample available will be considered as the reference, i.e. the least constrained by military activity or other events. It will then be put against the traffic sample of the most intense day of civil and military activity.

Aircraft Operators that may benefit from the ASM/ATFCM scenarios will be involved at an early stage, to ensure that benefits are realistic and ensure AO utilisation of the scenarios.

Page 47: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

36 29 May 2015 Edition: 1.0

Once the selected Hot-Spots are identified, the potential benefits will be scoped for different potential solutions based on variation and combination of different parameters:

Vertical A number of vertical configurations will be examined to identify any potential in dynamical managing of a TSA/TRA concerned. The main principle will be to assess if a vertical move of the military activity will contribute to the airspace capacity in particular area.

Lateral Similarly to vertical, a number of lateral configurations, based on current and possible future airspace more sub-modular design will be investigated. It will be based on the larger airspace allocated (as appropriate) through activating different set of sub-modules that are sufficient to accommodate military requirements. Through this assessment it will be confirmed that there is a potential to differently organise airspace planning and allocation in a particular TSA/TRA.

Time-related Possibility to increase the airspace capacity by accommodating both military and civil demand as close as possible to the planned use of airspace will be investigated.

Conditional Routes More conditional routes in a particular TSA/TRA will be simulated as a function of different lateral TSA/TRA configurations to increase capacity and to accommodate military and civil requirements at the same time. The main principle will be that, except when the military requirement is to use the whole TSA/TRA, different sub-module scenarios could accommodate both - military activity planned and the civil traffic demand to pass through the TSA/TRA concerned. The main principle being that there is theoretically at least one CDR along the main traffic flow and within a particular TSA/TRA that can accommodate civil traffic. Following the steps described above a comprehensive initial impact assessment will be performed per each identified Hot-Spot candidate. This assessment is to facilitate the decision that the Hot-Spot identified qualifies to be proposed to potential partners for further work on future ASM Solutions in the particular TSA/TRA.

4.2.12. Network Enablers

The main enablers for the efficient implementation of the ERNIP Part 2 - ARN Version 2015 - 2019 are:

System Support - Enhancement for the purposes of flight planning and ATFCM;

Procedures - Enhanced procedures where necessary for operations within Free Route airspace and at its interfaces;

Adaptations to airspace structures;

Adaptations to airspace management procedures.

There are no additional equipment requirements identified for aircraft operators. Nevertheless, modifications to the flight planning systems might be required to ensure that full benefit of the Free Route operations is achieved.

4.2.13. Impact on Adjacent Areas

The ERNIP Part 2 - ARN Version 2015 - 2019 addresses the interfaces with adjacent areas so that they remain coherent and compatible. Liaison with adjacent States was constantly made at the relevant ICAO groups where the work underway within the RNDSG is presented through working and information papers. Similarly, States, ANSPs and the ICAO secretariat are presenting updates to the RNDSG on the airspace evolutions at the interfaces. This good cooperation at the interfaces of the European airspace is ensuring a consistent airspace structure based on the continuum principle.

Page 48: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

37 29 May 2015 Edition: 1.0

Left blank intentionally

Page 49: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

38 29 May 2015 Edition: 1.0

5. A NETWORK COOPERATIVE DECISION MAKING PROCESS

The Network Cooperative Decision Making Process for the ERNIP Part 2 is described in the Network CDM Processes document approved by the Network Management Board. High level Process description

1. Preparation

Input from NSP, previous NOP, NM Annual Report;

Input from all operational stakeholders and ICAO;

NM(D) to prepare ERNIP proposals;

All operational stakeholders to agree on ERNIP proposals;

NetOps substructure to review proposals;

NM(D) to prepare draft ERNIP. 2. Consultation

Network DOP, for any unresolved issues (if required);

NETOPS to agree on draft ERNIP. 3. Approval

ERNIP Part 2 - ARN Version ARN Version 20xx - 20(xx+3/5) will follow the NOP approval process and goes to ICAO for inclusion in ICAO EANP.

ERND Process In the execution of the European Route Network Design Function, the Network Manager has to develop, through a cooperative decision making process, the European Route Network Improvement Plan. The European Route Network Improvement Plan will be part of the Network Operations Plan. The Part 2 of the ERNIP is updated on an annual basis. The following calendar and CDM process was and will be followed by the Network Manager in close cooperation with the operational stakeholders for every update of the ERNIP Part 2: October 20xx - Evaluation of the Summer 20xx situation and of the airspace design and utilisation related bottlenecks

October 20xx - Presentation of the first version of the ERNIP Part 2 - ARN Version 20xx-20(xx+3/5)

January 20xx+1 - distribution of the draft ERNIP Part 2 to RNDSG;

February 20xx+1 - discussion on the draft ERNIP Part 2 at RNDSG and NETOPS; further comments requested;

March 20xx+1 - comments received and incorporated in the ERNIP Part 2 and new versions distributed to RNDSG and NETOPS;

March 20xx+1 - progress report presented to NMB;

April-May 20xx+1 - agreement on final version for ERNIP Part 2 by RNDSG;

May-June 20xx+1 - seek approval by NETOPS and N-DOP for ERNIP Part 2;

June 20XX+1 - seek approval by NMB of ERNIP Part 2.

Page 50: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

39 29 May 2015 Edition: 1.0

The Route Network Development Sub-Group (RNDSG) is the co-ordination forum for European rolling airspace design and development, planning and implementation of improved European ATS route network, optimised civil and military airspace structures and ATC sectors. The members of the RNDSG work in a partnership approach and are civil and military experts in airspace design from EUROCONTROL, States, ANSPs, Functional Airspace Blocks, airspace users international organisations, flight planner organisations and other relevant international organisations. Its work is supplemented by other activities which, depending on their nature or complexity, may be either under the auspices of the RNDSG or independent, but bringing their results into the overall network picture through RNDSG processes. Examples are:

o Sub-Regional RNDSG Meetings;

o Regional co-ordination meetings between States;

o Working groups proposing various solutions for specific problem areas;

o Special projects (FABs, national re-organisation projects, sub-regional agreements, etc.).

Appropriate links are ensured with the Airspace Management Sub-Group to cover civil-military related aspects and with other specific ATFCM groups.

The consolidation of the entire development process was ensured through the Network Operations Team.

This cooperative planning process responds to the emerging requirements on the setting of cooperative planning and decision making processes on the development of the European route network.

Page 51: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

40 29 May 2015 Edition: 1.0

5.1. A NETWORK ORIENTATED APPROACH

The Network Orientated Approach takes an European-wide view and is based upon the need to enhance the overall European ATM capacity and flight efficiency. The process progresses from broad proposals towards specific solutions via a number of steps.

Step 1: Identify current and foreseen problems. The planning work highlights the capacity and flight efficiency problem areas and their causes in the airspace structure.

Step 2: Build generally improved airspace structure proposals (both route segments and ATC sectors) to accommodate major traffic flows and balance ATC workload.

Step 3: Within this defined framework, detailed proposals of airspace structure are elaborated with their “modus operandi”, consolidated and validated through regional expert groups.

The result of local studies feeds back into the initial proposals in a dialectical and iterative process.

Step 4: A phased implementation programme is agreed and carried out.

NETWORK ORIENTED

APPROACH

TRAFFIC FLOW

DEFINITION

MILITARY

REQUIREMENTS

CONNECTIVITY

TO TMA

ATS ROUTE

NETWORK

DESIGN

ATC SECTOR DESIGN

ATC SECTOR

CONFIGURATION

ROUTE NETWORK

AVAILABILITY

AIRSPACE

RESERVATION

REQUIREMENTS

DESIGN

MANAGEMENT

Adaptations of the route

network

‘MODUS OPERANDI’

(Airspace Structure Utilisation)

OPTIMAL USE OF

ROUTES AND

SECTORS

Page 52: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

41 29 May 2015 Edition: 1.0

5.2. AIRSPACE UTILISATION AND MANAGEMENT

The full potential of the European airspace structure, including supporting ATC Sectors, is often hindered by the restrictions that are imposed after the routes are implemented. In order to ensure that these airspace structures are used to their full potential, the way in which they are used should be an integral contributor to the rolling airspace design process.

The ERNIP Part 2 - ARN Version 2015 - 2019 offers a greater number of possible options for its use with airspace configurations combinations facilitating a balanced approach to capacity and flight efficiency. These options were taken into account in the airspace design planning stages. Nevertheless, in order to exploit their full potential, development of appropriate Flight Data Processing Systems, enhanced ATFCM processes, the charging scheme and an enhanced ASM Concept of Operation will need to be applied.

By bringing airspace design and airspace management closer together it will enhance the effectiveness of the overall ATM system. The target should be a structure that allows airspace users to fly their preferred routes and profiles, ANSPs to select the most efficient airspace organisation and ATFCM services to manage overall capacity at its optimum.

5.3. MILITARY REQUIREMENTS

To enable the military forces to carry out many of their tasks, airspace of appropriate size and convenient location needs to be readily available. New tasks and scenarios and a more varied operational repertoire are likely to require fewer but larger airspace training areas with more intensive activity at all flight levels. Airspace design processes should take into full account the need to conduct military operations and exercises ideally in close vicinity to the respective airbases.

Similar to the development of multiple route options within the ATS Route Network, there is also an equivalent military requirement to develop and implement a set of pre-defined multiple airspace options for temporary use, based on close and flexible co-ordination of the use of the airspace. Nevertheless, military operations and training needs have to be safeguarded to ensure unimpaired, safe and efficient performance.

Page 53: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

42 29 May 2015 Edition: 1.0

6. TRAFFIC DEMAND EVOLUTION AND ASSESSMENT

6.1. GENERAL

This section will assess the traffic demand changes between the start of implementation of ARN Version-6 and the start of implementation of ERNIP Part 2 - ARN Version 2015 - 2019. Significant changes of the traffic patterns could be noted between 2008 and 2014 as a result of the economic downturn. The most impacted areas are located in Western Europe, while traffic in Southern and South Eastern Europe continued to increase.

6.2. TRAFFIC DEMAND VARIATION - COMPARISON 2008/2014

The assessment was made for a busy week 25 in 2014 (16 - 22 June 2014) during which lower level of delays were recorded. Comparing the variation in traffic demand between 2008 and 2014 (see Figure 1 below), it can be seen that the Central and Western part of Europe recorded a significant traffic decrease, predominantly in Germany, UK and Spain. A continued traffic growth is recorded in the Southern and South Eastern part of Europe, predominantly on the South-West Axis, South-East Axis, North-South Axis, East-West Axis and in Turkey.

Figure 1: Traffic demand variation 2014 vs 2008

Traffic Demand Variation 2014 vs 2008 4 Weekdays of Traffic

> 80 Ac/day

60 to 80 Ac/day

40 to 60 Ac/day

20 to 40 Ac/day

10 to 20 Ac/day

Incr

De

cr

20 to 40 Ac/day

40 to 60 Ac/day

> 60 Ac/day

10 to 20 Ac/day

Cell size is 20nm x 20nm

Week 25 2014<>2008

Page 54: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

43 29 May 2015 Edition: 1.0

6.3. WEEK AND WEEK-END DISTRIBUTION

The assessment was made for a busy week in 2014 (16 - 22 June 2014). The European traffic distribution is similar, with the major part of the traffic concentrated in the North Western part of Europe, but the high density areas are gradually expanding to most of the European airspace whether it is week-days (Figure 2) or weekend traffic (Figure 3).

Figure 2: Week-days traffic density (4 days in June 2014)

Figure 3: Week-end traffic density (4 week-end days in June 2014)

Page 55: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

44 29 May 2015 Edition: 1.0

However the comparison between both (Figure 4) reveals a significant difference between Northern Europe and the South/South-Eastern Europe, as well as the Southern part of UK and the Western part of France and Spain.

Figure 4: Comparison Week/Week-end traffic Density in June 2014

The map above indicates the following:

o Areas where the traffic density is greater during the week are depicted in light to dark blue;

o More loaded during week days:

- UK, Germany, France, Norway, Sweden, Denmark;

- Barcelona - Madrid axis;

- Rome - Milan axis;

o Areas where the traffic density is greater during the weekends are depicted in green/ yellow to red;

o More loaded during weekends:

- The “South West Axis”, the “South East Axis” and the Mediterranean area.

Page 56: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

45 29 May 2015 Edition: 1.0

6.4. DISTRIBUTION AND EVOLUTION - SHORT HAUL AND MEDIUM/LONG HAUL

The assessment was made for the period 1 July 2007 - 30 June 2008 and 1 July 2013 - 30 June 2014. The short-haul traffic pattern (distances up to 400 NM - see Figure 5 below) shows a decrease of domestic and business traffic for short-haul flights in the core area, UK, for the city pair Barcelona-Madrid and Milano-Rome. Compared to 2007/08, a higher density of traffic is noted in southern Europe and predominantly in Turkey.

Figure 5: Short-Haul Flights (<400 NM)

The medium to long-haul traffic pattern (flight distances over 400 NM - see Figure 6 below) shows that the traffic further increases on the South-East Axis, South-West Axis, North-South Axis, East-West Axis, Turkey and parts of the Mediterranean area.

Figure 6: Medium-Haul Flights (>400 NM)

Traffic Density Comparison for Other Flights (> 400nM)

Cell size is 10nm x 10nm

365 Days of Traffic

Jul to Jun 13/14 <> 07/08

> 50 Ac/day

25 to 50 Ac/day

10 to 25 Ac/day

5 to 10 Ac/day

0 to 5 Ac/day

Incr

De

cr

0 to 5 Ac/day

5 to 10 Ac/day

> 10 Ac/day

Page 57: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

46 29 May 2015 Edition: 1.0

6.5. VERTICAL DISTRIBUTION (EVOLVING AND CRUISING TRAFFIC)

The assessment of the traffic was made for a busy Friday (20 June 2014). The concentration of climbing/descending traffic (see Figure 7 below) is high in the core area where many of the European airports are closely located and around other busy airports in Europe. The areas of evolving traffic are expanding indicating a continuous increase of traffic complexity across Europe.

Figure 7: Areas of High Density Evolving Traffic

The distribution of Cruising Traffic (see Figure 8 below) is more evenly distributed and increases are noted on the South East - North West axis.

Figure 8: Areas of High Density Cruising Traffic

Page 58: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

47 29 May 2015 Edition: 1.0

6.6. FLIGHT LEVEL DISTRIBUTION

With the implementation of RVSM combined with the performance of new generation aircraft, the vertical distribution of traffic has moved up significantly (FL360/FL420 instead of FL330/FL360) with the most popular flight levels at FL370/380. Higher traffic levels at FL180/FL190 and FL230/FL240 could also be noted.

Figure 9: Flight Level Distribution in EUROPE 2008 / 2013

0

2

4

6

8

10

12

14

Pe

rce

nta

ge

(%

)

Flight Levels

Flight Level Distribution in ECAC Week 25 - June 2008

Week 25 - June 2014

6.7. AIRPORT TRAFFIC INCREASE

The assessment was made for the period 1 July 2007 - 30 June 2008 and 1 July 2013 - 30 June 2014. Figure 10 below indicates that with the exception of airports in Belgium, Latvia, the Mediterranean area, Middle East, Moldova, North Africa, Norway, Portugal, Romania, Russian Federation, Turkey, Ukraine and some low cost operators airports, all the other airports in Europe and the Canaries recorded a significant traffic decrease, the largest was accounted to the UK.

Figure 10: Traffic Increase/Decrease for the 200 Busiest European Airports

200 Busiest Airports – Change in Number of Movements from 2014 to 2008

Increase

Decrease

Page 59: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

48 29 May 2015 Edition: 1.0

6.8. TOP 50 AIRPORTS

The table below indicates the Top 50 European airports in terms of movements for the period July 2013 - June 2014.

Page 60: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

49 29 May 2015 Edition: 1.0

6.9. BUSIEST CITY PAIRS

The following two tables show the Top 50 busiest city pairs/ CPs flown in Europe for the periods July 2007 - June 2008 and July 2013 - June 2014. The table below shows the Top 50 busiest city pairs/CPs in Europe for the period July 2007 - June 2008.

AP1 AP2 AD 07-08 % Tot

MADRID BARAJAS BARCELONA 44,913 0.4%

ROME FIUMICINO MILANO LINATE 27,542 0.3%

IZMIR-ADNAN-MENDERES ISTANBUL-ATATURK 19,723 0.2%

PALMA DE MALLORCA BARCELONA 19,105 0.2%

TOULOUSE BLAGNAC PARIS ORLY 18,905 0.2%

OSLO/GARDERMOEN BERGEN/FLESLAND 18,754 0.2%

JERSEY GUERNSEY 18,606 0.2%

TRONDHEIM/VAERNES OSLO/GARDERMOEN 17,705 0.2%

SCHIPHOL AMSTERDAM LONDON/HEATHROW 17,199 0.2%

PARIS ORLY NICE 17,123 0.2%

MUENCHEN 2 HAMBURG 16,805 0.2%

PALMA DE MALLORCA MADRID BARAJAS 16,248 0.2%

MAKEDONIA ATHINAI E. VENIZELOS 15,752 0.2%

MUENCHEN 2 DUESSELDORF 15,716 0.2%

STAVANGER/SOLA OSLO/GARDERMOEN 15,548 0.2%

MUENCHEN 2 KOELN-BONN 15,226 0.1%

ROME FIUMICINO CATANIA FONTANAROSSA 15,188 0.1%

VALENCIA MADRID BARAJAS 15,008 0.1%

TEGEL-BERLIN MUENCHEN 2 14,780 0.1%

PARIS CH DE GAULLE LONDON/HEATHROW 14,649 0.1%

ISTANBUL-ATATURK ANTALYA 14,628 0.1%

ISTANBUL-ATATURK ANKARA-ESENBOGA 14,515 0.1%

PARIS CH DE GAULLE FRANKFURT MAIN 14,438 0.1%

LONDON/HEATHROW DUBLIN 14,395 0.1%

LAS PALMAS FUERTEVENTURA 14,124 0.1%

OSLO/GARDERMOEN COPENHAGEN KASTRUP 14,033 0.1%

TENERIFE NORTE LAS PALMAS 14,011 0.1%

NEW YORK LONDON/HEATHROW 13,705 0.1%

LAS PALMAS ARRECIFE LANZAROTE 13,591 0.1%

TENERIFE NORTE LA PALMA 13,496 0.1%

ROME FIUMICINO PALERMO PUNTA RAISI 13,138 0.1%

MADRID BARAJAS LAS PALMAS 13,080 0.1%

ROME FIUMICINO PARIS CH DE GAULLE 12,663 0.1%

LONDON/HEATHROW EDINBURGH 12,656 0.1%

PARIS CH DE GAULLE MADRID BARAJAS 12,562 0.1%

TEGEL-BERLIN KOELN-BONN 12,542 0.1%

STOCKHOLM-ARLANDA COPENHAGEN KASTRUP 12,492 0.1%

TEGEL-BERLIN FRANKFURT MAIN 12,482 0.1%

MALAGA MADRID BARAJAS 12,373 0.1%

LONDON/HEATHROW FRANKFURT MAIN 12,341 0.1%

STOCKHOLM-ARLANDA HELSINKI-VANTAA 11,879 0.1%

MADRID BARAJAS LISBOA 11,831 0.1%

COPENHAGEN KASTRUP AALBORG 11,690 0.1%

LONDON/HEATHROW GLASGOW 11,592 0.1%

TEGEL-BERLIN STUTTGART 11,401 0.1%

PARIS ORLY MARSEILLE PROVENCE 11,392 0.1%

NIKOS/KAZANTZAKIS ATHINAI E. VENIZELOS 11,272 0.1%

SCHIPHOL AMSTERDAM PARIS CH DE GAULLE 11,101 0.1%

PARIS CH DE GAULLE MUENCHEN 2 10,941 0.1%

OSLO/GARDERMOEN STOCKHOLM-ARLANDA 10,887 0.1%

Page 61: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

50 29 May 2015 Edition: 1.0

The table below shows the Top 50 busiest city pairs/CPs flown in Europe for the period July 2013 - June 2014.

Page 62: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

51 29 May 2015 Edition: 1.0

6.10. AIRSPACE USERS

The table below indicates the Top 50 aircraft operators (AO) using the European airspace between July 2013 - June 2014.

Page 63: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

52 29 May 2015 Edition: 1.0

6.11. AIRCRAFT TYPES

The table below indicates the Top 50 aircraft types using the European airspace between July 2013 - June 2014.

Page 64: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

53 29 May 2015 Edition: 1.0

Left blank intentionally

Page 65: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

54 29 May 2015 Edition: 1.0

7. MAIN PROJECTS INCLUDED IN ERNIP PART 2 - ARN VERSION 2015 - 2019

The ERNIP Part 2 - ARN Version 2015 - 2019 is an integral package of airspace design and utilisation solutions. It was built on the development of new concepts that were transposed in several layers of airspace developments. These layers are properly interconnected at network level to ensure an appropriate and cohesive airspace utilisation:

between various concepts;

over a 24-hours period, and

over various period of the week or of the year.

The further development of the concept of airspace configurations at network level will ensure an enhanced utilisation of these various layers at local, sub-regional, FAB and network levels.

The main direction taken by the ERNIP Part 2 - ARN Version 2015 – 2019 is towards the implementation of Free Route Airspace.

The latest situation of the European route network structure is available and updated at each AIRAC cycle through the publication of EUROCONTROL Regional Charts that could be found at the following link: http://www.eurocontrol.int/articles/eurocontrol-regional-charts

7.1. FREE ROUTE AIRSPACE

The following maps are showing the layer containing the evolution of Free Route Airspace initiatives already in place or planned for implementation year by year, that are currently included in the ERNIP Part 2 - ARN Version 2015 - 2019. This layer is supported by a network operational concept for Free Route Airspace Operations.

The map below shows the Free Route Airspace implementation plans for summer 2015.

Page 66: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

55 29 May 2015 Edition: 1.0

The map below shows the Free Route Airspace implementation plans proposed for Summer 2016.

The map below shows the Free Route Airspace implementation plans proposed for Summer 2017.

Page 67: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

56 29 May 2015 Edition: 1.0

The map below shows the Free Route Airspace implementation plans proposed for Summer 2018.

The map below shows the Free Route Airspace implementation plans proposed until end of 2019.

Page 68: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

57 29 May 2015 Edition: 1.0

Left blank intentionally

Page 69: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

58 29 May 2015 Edition: 1.0

ANNEXES

Annex A Reference Documents

Annex B Acronyms and Abbreviations

Annex C Summary of ERNIP Part 2 - ARN Version 2015 - 2019 Proposals

Annex D List of ERNIP Part 2 - ARN Version 2015 - 2019 Proposals

Page 70: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

59 29 May 2015 Edition: 1.0

Left blank intentionally

Page 71: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

60 29 May 2015 Edition: 1.0

ANNEX A. REFERENCE DOCUMENTS

In the Development and Implementation of ARN Version 2015 - 2019 the following documents, inter alia, are used for reference and guidelines:

Single European Sky II Legislation

EUROCONTROL Airspace Strategy for the ECAC States

ERNIP Part 1

ERNIP Part 3

ERNIP Part 4

ICAO Standards, Recommended Practices and Procedures

Page 72: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

61 29 May 2015 Edition: 1.0

Left blank intentionally

Page 73: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

62 29 May 2015 Edition: 1.0

ANNEX B. ACRONYMS AND ABBREVIATIONS

ACC Area Control Centre AIP Aeronautical Information Publication AIRAC Aeronautical Information Regulation and Control ANSP Airspace Navigation Service Provider AO Aircraft Operator AoR Area of Responsibility ARN ATS Route Network ARR Arrival ASM Airspace Management ASMSG Airspace Management Sub-Group ATC Air Traffic Control, Air Traffic Control Domain ATFCM Air Traffic Flow and Capacity Management ATFM Air Traffic Flow Management ATM Air Traffic Management ATS Air Traffic Services AUP Airspace Use Plan CANSO Civil Air Navigation Services Organisation CBA Cross-border Area CDA Continuous Descent Approache

CDM Cooperative Decision Making CDR Conditional Route CIAM Central flow management unit Interface for Airspace Managers CRAM Conditional Route Availability Message D Danger Area DCT Direct DEP Departure DMEAN Dynamic Management of European Airspace Network e-AMI Electronic ASM Information ECAC European Civil Aviation Conference ERNIP European Route Network Improvement Plan ERND European Route Network Design EU European Union EUROCONTROL European Organisation for the Safety of Air Navigation FAB Functional Airspace Block FIR Flight Information region FL Flight Level FLAS Flight Level Allocation System FPL Flight-Plan FUA Flexible Use of Airspace FTS Fast Time Simulation GAT General Air Traffic IACA International Air Carrier Association IATA International Air Transport Association ICAO International Civil Aviation Organisation IFPS Initial Flight planning Processing System IFR Instrument Flight Rules Kg kilogram

Page 74: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001144 -- 22001188//1199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

63 29 May 2015 Edition: 1.0

KEA KEP

Key Performance Environment Indicator based on actual trajectory Key Performance Environment Indicator based on last filed flight plan

KPI Key Performance Indicators LoA Letter of Agreement min Minute/s NETOPS Network Operations Team NM / nm Nautical Mile NMD Network Manager Directorate NOP Network Operations Plan NSP Network Strategy Plan OAT Operational Air Traffic P Prohibited Area PC Provisional Council P-RNAV Precision Area Navigation

PRISMIL Pan-European Repository of Information Supporting Military Key Performance Indicators

R Restricted Area RAD Route Availability Document RNAV Area Navigation RNDSG Route Network Development Sub-Group RTS Real Time Simulation RVSM Reduced Vertical Separation Minimum SAAM System for traffic Assignment and Analysis at Macroscopic level

SES Single European Sky

SID Standard Instrumental Departure STAR Standard Arrival Route TAS Terminal Airspace System TMA Terminal Area TRA Temporary Reserved Area TSA Temporary Segregated Area VFR Visual Flight Rules WE Weekend UAC Upper Area Control Centre UIR Upper Flight Information region

Page 75: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

64 29 May 2015 Edition: 1.0

ANNEX C. SUMMARY OF ERNIP PART 2 - ARN VERSION 2015 - 2019 PROPOSALS

This Annex provides an overview of the major improvement projects implemented or planned for implementation summer 2015 until 2019:

Summer 2015: Projects implemented (until 30 April 2015)

Austria

- New Wien ACC sectors – AWARD

- Free Route Airspace Wien, FRAW, Stage 3b.

- Free Route Airspace Wien, FRAW, Stage 4a.

Bosnia-Herzegovina

- BH ATM-Phase 1.

Bulgaria/Romania

- SOMOV area re-organisation.

Croatia

- Central Sector Zagreb, Phase 2a.

Croatia/ Bosnia-Herzegovina

- Night Free Route Zagreb ACC AoR, Phase 5a - SEAFRA.

Czech Republic

- Free Route Airspace Praha/FRAPRA, Step 2.

France

- Marseille ACC re-organisation (DFL 245 instead of DFL 195).

- Paris ACC re-organisation - Phase 1.

France/United Kingdom

- UK – Brest Paris Interface/ IBP 2015.

Germany/FAB EC

- Free Route Airspace Karlsruhe.

Hungary

- Hungarian Free Route Airspace – HUFRA.

Italy

- FAIR-IT Free Route Airspace Italy Phase 2.

- Italian Airspace re-organisation, Phase 3.

- Roma TMA re-organisation.

Moldova

Page 76: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

65 29 May 2015 Edition: 1.0

- NIGHT Free Route Airspace within Chisinau FIR/ N FRAC, Phase 2.

Norway

- SNAP – Southern Norway Airspace Project.

Poland

- New civil-military airport Radom – EPRA.

Serbia/ Montenegro/ Bosnia-Herzegovina

- Night Free Route Beograd ACC AoR, Phase 5a - SEAFRA.

Slovenia

- Additional DCTs within FIR Ljubljana ACC AoR.

Spain/France

- Marseille ACC re-organisation.

Spain

- Re-organisation Madrid ACC ZMR sector.

Ukraine

- Free Route Airspace Ukraine, Step 1 (Sc 1b).

United Kingdom

- Direct Route Airspace Prestwick ACC, Phase 1.

Page 77: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

66 29 May 2015 Edition: 1.0

Summer 2015: Projects planned or proposed for implementation

Bulgaria

- Night Free Route Sofia FIR – FRAS expansion, Phase 2.

Bulgaria/Turkey

- UDROS / ODERO area re-organization.

- ADORU / VADEN / IBLAL area re-organization.

Bulgaria/Former Yugoslav Republic of Macedonia

- LETNI / VELBA dualisation.

Germany

- New Geis-line (Karlsruhe UAC, LAngen ACC, Munich ACC) .

Malta

- Free Route Airspace Malta (H24 DCTs) - Phase 2.

Spain

- Barcelona TMA re-organisation (TGR sector).

- CCC sector split - Barcelona ACC.

Page 78: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

67 29 May 2015 Edition: 1.0

Summer 2016: Projects planned or proposed for implementation

Austria

- Vienna TMA re-organisation.

- Free Route Airspace Wien, FRAW, Stage 4b.

Bulgaria/Greece

- EVIVI dualisation.

Bulgaria/Romania

- DANUBE FAB FRA – Phase 1.

Cyprus

- Free Route Airspace Cyprus (H24, FL195+).

Czech Republic

- Praha lower airspace re-organisation.

- Free Route Airspace Praha/ FRAPRA, Step 3 (DCT based).

Denmark/Estonia/Finland/Latvia/Norway/Sweden

- NEFAB and DK/SE FAB Free Route Airspace – NEFRA.

Estonia/Finland/Latvia/Norway

- NEFAB Free Route Airspace.

FABEC/Switzerland/France

- FABEC FRA Step 1 (Ref FABEC FRA RTS 1.1).

FABEC/Belgium/France/Germany/MUAC/Switzerland

- FAB EC SE - new Phase 2 (Full Swap UN852/UN853 and EUC 22 - Step1)

Former Yugoslav Republic of Macedonia

- Free Route Airspace Skopje ACC.

France

- Paris Point Merge TE.

- Paris ACC re-organisation – Phase 2.

- Marseille ACC re-organisation (sectors G - Y - A – B).

France/Switzerland

- Optimized cross border DCTs through DSNA/ Skyguide AoR.

Germany

- Point Merge arrival route system for Leipzig (EDDP).

- CDO approaches for Munich airport.

Greece

Page 79: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

68 29 May 2015 Edition: 1.0

- Night Free Route Airspace Greece.

Italy

- Milano TMA re-organisation, Phase 2.

Lithuania

- Free Route Airspace Vilnius (H24, above FL 285).

Norway

- Harmonisation of Oslo Procedures and Environment/ HOPE - Phase 2

Poland

- Polish Airspace Project 2010+ (vertical split), Phase 3a.

Portugal

- Free Route Airspace Santa Maria FIR.

Serbia

- Beograd TMA re-organisation.

Slovakia

- Free Route Airspace Bratislava.

Turkey

- Smart, Phases 1/2/3.

- Smart, Phase 4.

- Smart, Phase 5.

United Kingdom

- London Airspace Management Program, LAMP Phase 1a.

- Prestwick Upper Sectors (re-organisation).

Ukraine

- Free Route Airspace Ukraine, Step 1 (Sc 1b).

Page 80: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

69 29 May 2015 Edition: 1.0

Summer 2017: Projects planned or proposed for implementation

Austria

- Free Route Airspace Wien, FRAW, Stage 5.

Albania

- Free Route Airspace Albania.

Bulgaria

- Common Terminal Airspace System for Burgas (LBBG) and Varna (LBWN) airports.

Bulgaria/Romania

- DANUBE FAB FRA –Phase 2.

Croatia

- Central Sector Zagreb Phase 2b.

Croatia/Bosnia-Herzegovina

- Free Route Airspace Zagreb ACC AoR, Phase 5b - SEAFRA.

France

- Brest ACC re-organisation.

- Reims ACC re-organisation/ URMN/UL10 - Phase 1.

- Re-design TSA6 LF_R146B and TSA8 LF_R7B/ New TSA 6

France/Spain

- Barcelona, Madrid. Bordeaux Interface, BAMBI.

- Bordeaux ACC re-organisation/ ESSO-Espace Superieur du Sud Ouest.

- LUMAS, Phase 2b.

- LOTEE/KORUL area re-organisation.

Georgia

- Free Route Airspace Tbilisi ACC.

Italy

- Free Route Airspace Italy/ FAIR-IT Phase 3.

Malta

- Free Route Airspace Malta - Phase 3 (H24 FRA within Malta FIR).

Poland

- Free Route Airspace Warsaw FIR, Phase 3 (H24 FRA within Warsaw FIR, FL335+).

Serbia/Montenegro

- Beograd FIR Lower airspace re-organisation, Step2.

Page 81: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

70 29 May 2015 Edition: 1.0

- Lower airspace re-organisation Beograd FIR - Step 1.

Serbia/Montenegro/Bosnia-Herzegovina

- Free Route Airspace Beograd ACC AoR, Phase 5b - SEAFRA.

Slovenia

- Free Route Airspace Ljubljana ACC, Phase 2 (H24 FRA).

Spain/Portugal/Morocco

- Lisboa/Casablanca/Canarias Axis.

Turkey

- H24 Free Route Airspace Turkey.

United Kingdom

- London Airspace Management Program, LAMP Phase 1b.

- Free Route Airspace Prestwick Phase 2.

Page 82: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

71 29 May 2015 Edition: 1.0

Summer 2018: Projects planned or proposed for implementation

Bulgaria

- Common Terminal Airspace System for Sofia (LBSF), Plovdiv (LBPD) and Graf Ignatievo (LBGI)

airports.

Bulgaria/Romania

- DANUBE FAB FRA – Phase 3.

FABEC Belgium/Maastricht UAC/ Switzerland/France/Germany

- FAB EC SE – Phase 3 (Full cross-border EUC22).

- FAB EC FRA Step 3.

France

- Reims ACC re-organisation/ URMN/UL10 - Phase 2.

- Interface Aix Marseille re-organisation

Ireland

- New runway Dublin airport.

Morocco

- Free Route Airspace Casablanca (DCTs based), Phase 1, Phase 2, Phase 3.

Poland

- Free Route Airspace Warsaw FIR, Phase 4 (Full FRA in Warsaw FIR).

Spain

- Barcelona TMA, Phase 1 and Phase 2.

Spain/France

- Free Route Airspace Madrid/Brest (DCT based).

United Kingdom

- Northern Terminal Control Area – NTCA.

- London Airspace Management Program, LAMP Phase 2a.

Page 83: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

72 29 May 2015 Edition: 1.0

End 2019: Projects planned or proposed for implementation (until end 2019)

Bosnia-Herzegovina/Croatia/Montenegro/Serbia

- Sarajevo FIR re-organisation/ BH ATM, Phase 2.

Bulgaria/Romania

- DANUBE FAB FRA – Phase 4.

- DANUBE FAB FRA – Phase 5 (H24 FRA within DANUBE area).

Germany

- 3rd runway Munich airport.

Poland

- Polish Airspace Project 2010+, Phase 3b.

United Kingdom

- GBR - London Airspace Management Program, LAMP Phase 2b.

Ukraine

- Free Route Airspace Ukraine, Step 2 (Sc 2a) (H24 FRA Ukraine wide, FL275+).

- Free Route Airspace Ukraine, Step 2 (Sc 2b) (H24 FRA Ukraine wide and entire class C airspace).

Page 84: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

73 29 May 2015 Edition: 1.0

ANNEX D. LIST OF ERNIP PART 2 - ARN VERSION 2015 - 2019 PROPOSALS

The following pages present detailed information about each of the more than 500 improvement proposals developed within the RNDSG which are or will be implemented as part of ERNIP Part 2 - ARN Version 2014 - 2018/19. The description of the proposals is based on the information available from different sources (e.g. AOs, ANSPs and EUROCONTROL).

The table includes:

Proposal number:

A reference number to identify each proposal allowing to trace at which RNDSG it was initiated.

Description:

A detailed description of the planned improvement proposal.

Objective:

A brief description of the purpose of the enhancement measure.

Status:

The implementation status defined as Proposed, Planned, Confirmed or Implemented.

Project Group:

The Functional Airspace Block Group (FAB), Regional Focus Group (RFG), Sub-Group (SG) or any other Project Group(s) involved directly or indirectly by the proposed enhancement measure.

Project Category:

The nature of the proposed enhancement measure defined through Project Categories (e.g. ATC sectors, ATS Routes, CDRs, DCTs, Free Route Airspace, RAD, TMA, …).

States and Organisations:

The States and/or Organisations involved directly or indirectly by the proposed enhancement measure.

Originator(s):

The States, Organisations who have originated the proposal.

Comments:

The conditions and/or pre-requisites which have to be met in order to implement the proposal or any other relevant comment(s).

The Annex lists all ARN Version 2015 - 2019 proposals as they stood after RNDSG/85

(28th May 2015).

The latest situation of the European route network structure is available and updated at each AIRAC cycle through the publication of EUROCONTROL Regional Charts that could be found at

the following link: http://www.eurocontrol.int/articles/eurocontrol-regional-charts

Page 85: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

AARRNN VV--22001155 -- 22001199

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

74 29 May 2015 Edition: 1.0

Left blank intentionally

Page 86: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

General clarifications:

1. Due to the fully automated short-term airspace improvement process in States and Organisations box the following ISO-3 coding of States

is used:

ALB Albania IRQ Iraq

ARM Armenia ISL Iceland

AUT Austria ITA Italy

AZE Azerbaijan LBY Libyan Arab Jamahiriya

BEL Belgium LTU Lithuania

BGR Bulgaria LUX Luxembourg

BIH Bosnia and Herzegovina LVA Latvia

BLR Belarus MAR Morocco

CHE Switzerland MDA Moldova, Republic of

CYP Cyprus MKD The former Yugoslav Republic of Macedonia

CZE Czech Republic MLT Malta

DEU Germany MNE Montenegro

DNK Denmark NLD Netherlands

DZA Algeria NOR Norway

EGY Egypt POL Poland

ESP Spain PRT Portugal

EST Estonia ROU Romania

FIN Finland RUS Russian Federation

FRA France SRB Serbia

GBR United Kingdom SVK Slovakia

GEO Georgia SVN Slovenia

GRC Greece SWE Sweden

HRV Croatia SYR Syrian Arab Republic

HUN Hungary TUN Tunisia

IRL Ireland TUR Turkey

IRN Iran, Islamic Republic of UKR Ukraine

MUAC Maastricht UAC

Page 87: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

76 29 May 2015 Edition: 1.0

2. BLUMED FAB, DANUBE FAB and FAB CE proposals referenced in proposal number box are coded with a unique identification number

abbreviated as BM or DN or CE, respectively, following by four digits (XXXX) (example BM0001 or DN0001 or CE0001).

3. Content of each proposal is an indication of State’s intention to implement the relevant airspace improvement but don't represent a copy

of any official publication. For the correctness and verification of the relevant aeronautical information consult official State AIP publication. The data from this document should not be used for operational purposes.

Page 88: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

77 29 May 2015 Edition: 1.0

Proposal ID : 82.034 Impl. Status: State(s) & Org. Comments:

1.

Description: To geographically reorganise Paris ACC sectors 'UK' and 'UZ'.

Objective:

To further improve the airspace structure within Paris ACC.

Implemented 16 OCT 2014

Project Category:

ATC Sectors

FRA

Originator(s):

FRA

Proposal ID : 82.051 Impl. Status: State(s) & Org. Comments:

2.

Project Name: SID Truncation/Removal

Description: To remove EGLL DVR SIDs and use DET SID and L/UL6 to get to DVR.

Objective:

To reduce portion of flight planned route fuelled for SID Altitude.

Implemented 16 OCT 2014

Project Category:

Airspace Structure ATM System

GBR

Originator(s):

GBR

Proposal ID : 78.011 Impl. Status: State(s) & Org. Comments:

3.

Description: To further improve utilisation, during weekends, of the following RAD restrictions EG2094 (ALOTI - RIVOT), EG2085 (RIVOT - ROBEM), EG2160 (CUTEL - NATEB) and EG2161 (NATEB - BEGAM) to allow

flights between West coast of Norway (EN**) and the Canary Islands via NATEB.

Objective:

To further improve the airspace utilisation and flight planning options in UK.

Implemented 16 OCT 2014

Project Category:

RAD

GBR

Originator(s):

IATA

Four month trial evaluation to relax the RAD restriction on all routes via NATEB for traffic originating EN** destination GC** and via ARSAT for traffic originating GC** destination EN**.

Initial request for reconsideration send to UK NRC on 19 NOV 2012.

Current Operational Goal of EG2094 and EG2085 is to avoid complexity in NATEB area.

Current FPL option via UK airspace to the Canarias is via UPGAS with total distance of 2289 NM while in case of winds the option is via KLONN - ADN with total distance of 2305 NM.

Proposal ID : 83.014 Impl. Status: State(s) & Org. Comments:

4.

Description: To expand the time availability of existing “Direct” (DCT) options BEXAL DCT SAMAR and SAMAR DCT BEXAL from 20.00 - 06.00 to H24.

Objective:

To further improve flight planning options within Casablanca FIR.

Implemented 16 OCT 2014

Project Category:

DCTs

MAR PRT

Originator(s):

IACA

Improvement discussed previously on different meetings between the States as well as at SW Axis.

Page 89: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

78 29 May 2015 Edition: 1.0

Proposal ID : 83.017 Impl. Status: State(s) & Org. Comments:

5.

Project Name: ECAC States AIP en-route publication issues

Description:

To delete from AIP Austria the two “unnamed” significant points on ATS routes L173 and L604.

Objective:

To adapt in AIP the ATS route publication in accordance with Annex 11 and Annex 15.

Implemented 13 NOV 2014

Project Group:

RFG SE

Project Category:

AIP

AUT

Originator(s):

EUROCONTROL

Pan European project of replacement of “unnamed” significant points published in State AIPs in accordance with Annex 11 and Annex 15.

Proposal ID : 60.006a Impl. Status: State(s) & Org. Comments:

6.

Project Name: BH ATM - Phase 1

Description: To re-organise the airspace structure within Sarajevo FIR FL325 and below.

Objective:

To further improve the ATS route network and associated airspace structure in order to support the establishment of the new ACC within Sarajevo FIR (BH ATM Project, Phase 1).

Implemented 13 NOV 2014

Project Group:

RFG SE

Project Category:

Airspace Structure

BIH HRV MNE SRB

Originator(s):

BIH

Lower Sector for the Phase 1 from 9500 ft MSL to FL325, out of TMAs.

Project is subject to Transition Planning process.

Phase 2: above FL325 planned winter 2015/2016;

Re-sectorisation required within Croatia and Serbia.

Close coordination with the Network Manager and neighbouring ACCs.

Related proposals:

60.006b

Proposal ID : 77.067 Impl. Status: State(s) & Org. Comments:

7.

Project Name: ECAC States AIP en-route publication issues

Description:

To adapt the lower vertical limits of ATS routes within Sarajevo FIR by changing of IFR FL100 to FL105.

Objective:

To adapt in State AIP ATS routes vertical limits.

Implemented 13 NOV 2014

Project Group:

RFG SE

Project Category:

AIP ATS Routes

BIH

Originator(s):

EUROCONTROL

Proposal ID : 62.090 Impl. Status: State(s) & Org. Comments:

8.

Description: To implement Larnaca TMA (LCLK) and adjust the ATS route network

and sectorisation accordingly.

Objective:

To further improve the ATS route network and airspace structure within Nicosia FIR, to increase capacity within Larnaca TMA and the West en-route sector.

Implemented 13 NOV 2014

Project Category:

ATC Sectors ATS Routes TMA

CYP

Originator(s):

CYP

Operations of new Larnaca TMA will increase capacity of the West enroute sector.

Page 90: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

79 29 May 2015 Edition: 1.0

Proposal ID : 69.219 Impl. Status: State(s) & Org. Comments:

9.

Project Name: Dusseldorf overflow sector/DLAW

Description: To implement a new DusseLdorf Arrival West/ DLAW overflow sector

within Langen FIR (EBG01).

Objective:To further improve the airspace structure and increase

capacity within Langen FIR (EBG01) to meet current demand and expected traffic increase within EDDL AoR (EDLV with RYR, ETNG with unexpected military activities).

Implemented 13 NOV 2014

Project Category:

ATC Sectors

DEU

Originator(s):

DEU

Opening for several hours per day foreseen.

Proposal ID : 72.021 Impl. Status: State(s) & Org. Comments:

10.

Description:

To implement, as CDR FL095 - FL660, eastbound ATS route segment Z493 SIMEG - BIKRU - BILRA - XELOL.

Objective:To further improve the ATS route network between Sweden

FIR, Bremen FIR/ Rhein UIR and Warszawa FIR (mainly for dep EKCH)

Implemented 13 NOV 2014

Project Category:

ATS Routes

DEU POL SWE

Originator(s):

SWE

Proposal ID : 81.029 Impl. Status: State(s) & Org. Comments:

11.

Description: To replace 5LNC FRANK.

Objective:To avoid 5LNCs duplication within the ECAC area of the

ICAO EUR/NAT region, to improve the aeronautical information provided and be compliant with ICAO Annex 11.

Implemented 13 NOV 2014

Project Category:

5LNC

DEU

Originator(s):

EUROCONTROL ICAO

Annex 11 stated that the 5LNCs shall be unique.

FRANK is used 7 times worldwide and is created in ICARD for USA.

ICAO DM sent relevant message to DEU.

Proposal ID : 83.051 Impl. Status: State(s) & Org. Comments:

12.

Project Name: RAD Promulgation

Description:

To publish in AIP Denmark, ENR 1.10 FLIGHT PLANNING under paragraph 1. Procedures for the submission of a flight plan common text for Adherence to Airspace Utilization Rules and Availability - RAD inside Cobenhavn FIR.

Objective:

To harmonize the RAD promulgation via the AIP by the ECAC States.

Implemented 13 NOV 2014

Project Category:

AIP RAD

DNK

Originator(s):

EUROCONTROL

Proposal ID : 83.026 Impl. Status: State(s) & Org. Comments:

13.

Project Name: ECAC States AIP en-route publication issues

Description:

To change the PBN navigation specification of area navigation routes within Tallinn FIR from RNP 5 to RNAV 5.

Objective:To adapt in AIP the PBN navigation specification in

accordance with Doc 7030 and Doc 9613.

Implemented 13 NOV 2014

Project Category:

AIP PBN

EST

Originator(s):

EUROCONTROL

Page 91: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

80 29 May 2015 Edition: 1.0

Proposal ID : 80.084 Impl. Status: State(s) & Org. Comments:

14.

Description: 1. To implement new ATS route Y96 MAVIP – New 5LNC (crossing

with Z265) - DEGAL - EVLAN, bi-directional FL095 – 660. 2. Change ATS route N133 segment SOLKA – MAVIP to bi-

directional

Objective:

To further improve the ATS route network in Sweden FIR.

Implemented 13 NOV 2014

Project Category:

ATS Routes

FAB Denmark/Sweden

Originator(s):

FAB Denmark/Sweden

Linked to SNAP project

Related proposals:

65.060

Proposal ID : 81.074 / 19.049 Impl. Status: State(s) & Org. Comments:

15.

Description: To replace 5LNC RAMAN.

Objective:

To avoid 5LNCs duplication within the ICAO EUR/NAT region, to improve the aeronautical information provided and be compliant with ICAO Annex 11.

Implemented 13 NOV 2014

Project Group:

SG BALTIC

Project Category:

5LNC

FIN

Originator(s):

EUROCONTROL ICAO

Annex 11 stated that the 5LNCs shall be unique.

RAMAN is used by Iran and Tajikistan although allocated in ICARD to Finland. Shared code prioritized.

ICAO DM to send relevant message to FIN.

Proposal ID : 79.017 / 19.058 Impl. Status: State(s) & Org. Comments:

16.

Project Name: EFIN FIR/UIR airspace reorganisation

Description: To reorganise EFIN FIR/UIR airspace - re-alignment of most of the ATS

routes, TRAs/TSAs, TMAs and Tampere ACC sectors will be realigned with no changes to the existing FIR boundary points.

Objective:

Further improvement of the airspace structures in Finland.

Implemented 13 NOV 2014

Project Group:

SG BALTIC

Project Category:

Airspace Structure

FIN

Originator(s):

FIN

New airspace will be NEFAB and Free Route Airspace compatible.

Related proposals:

81.078

Proposal ID : 81.032 Impl. Status: State(s) & Org. Comments:

17.

Description: To replace 5LNC LORKO.

Objective:

To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region, to improve the aeronautical information provided and be compliant with ICAO Annex 11.

Implemented 13 NOV 2014

Project Category:

5LNC

FRA

Originator(s):

EUROCONTROL ICAO

Annex 11 stated that the 5LNCs shall be unique.

LORKO is used by and is allocated in ICARD to Turkey.

ICAO DM sent relevant message to FRA. LORKO will be replaced by LODKO

Proposal ID : 62.073 Impl. Status: State(s) & Org. Comments:

18.

Project Name: Class F Advisory Routes

Description: Remove Class F Advisory Routes or upgrade the existing Advisory Routes from Class F to a Class C/ G Airway.

Objective: To improve safety provision to aircraft while upgrading airspace

Implemented 13 NOV 2014

Project Category:

Airspace Structure

GBR

Originator(s):

GBR

With the loss of several ADR’s a significant number of RAD Appendix 4 allowed DCT pairs will need to be established to allow operators to continue to flight plan through Class G airspace where these DCT’s are in excess of 50nm.

The first of a number of proposed upgrades

Page 92: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

81 29 May 2015 Edition: 1.0

classification on this increasingly busy route. to airspace classification of some lower ATS routes in UK to improve service provision and reduce safety related incidents.

A long term potential development, but proposal superseded by a full review of rules for ATS outside CAS. Would generate opposition by other airspace users.

On going discussions with Regulator/ Military/ AOs/ and ANSPs.

Proposal ID : 81.005 Impl. Status: State(s) & Org. Comments:

19.

Description:

To implement the following ATS Routes: a. Z278 LARGA - PENUN - UNBUD northbound; b. M185 RUMOG - ATNAK - TIPAN southbound

Objective:

To further improve the airspace structure at the interface between Scottish FIR/UIR, Copenhagen FIR and Norway FIR.

Implemented 13 NOV 2014

Project Group:

RFG NW

Project Category:

ATS Routes

GBR DNK NOR

Originator(s):

NOR

In connection with SNAP project

Related proposals:

65.060

Proposal ID : 79.045 Impl. Status: State(s) & Org. Comments:

20.

Description: To replace 5LNC TIMUS by the new designator TILVO.

Objective:

To avoid 5LNCs duplication within ECAC area of ICAO EUR/NAT region, improve aeronautical information provided and be compliant with ICAO Annex 11.

Implemented 13 NOV 2014

Project Group:

RFG SE

Project Category:

5LNC

HRV

Originator(s):

EUROCONTROL

Annex 11 stated that the 5LNCs shall be unique.

TIMUS is used by and is allocated in ICARD to the Russian Federation.

Proposal ID : 82.036 Impl. Status: State(s) & Org. Comments:

21.

Description: To replace the 5LNC designator of existing waypoint LAPAD by the new

5LNC designator AMUGO.

Objective:

To avoid confusion with like-sounding waypoint LAPAB in Italy.

Implemented 13 NOV 2014

Project Group:

RFG SE

Project Category:

5LNC

HRV

Originator(s):

IATA IACA

Distance between the two sound-like waypoints LAPAB and LAPAD is 381NM.

Proposal ID : 83.044 Impl. Status: State(s) & Org. Comments:

22.

Project Name: ECAC States AIP en-route publication issues

Description: To adapt the lower vertical limit of RNAV route L863 and upper vertical limit of RNAV route P28, expressed in FL by changing the IFR FL to VFR FL.

Objective:To adapt in State AIP ATS routes vertical limits.

Implemented 13 NOV 2014

Project Category:

AIP ATS Routes

HRV

Originator(s):

EUROCONTROL

Currently lower limit of L863 is set as FL260 while upper limit of P28 as FL130.

Page 93: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

82 29 May 2015 Edition: 1.0

Proposal ID : 65.054 Impl. Status: State(s) & Org. Comments:

23.

Description: To extend the existing Brescia (LIPO) airport MISPO SID to PAR and delete RAD restriction LI2157.

Objective:

To further improve the utilisation of the ATS route network within Roma UIR.

Implemented 13 NOV 2014

Project Category:

RAD

ITA

Originator(s):

EUROCONTROL

Currently L/UL995 MISPO - PAR is only available for traffic Dep. LIPO.

Ongoing study in the framework of Milano TMA reorganisation.

Related proposals:

75.037a

Proposal ID : 69.173 / BM0105 Impl. Status: State(s) & Org. Comments:

24.

Description:

To realign the existing ATS routes as follows: 1. UZ905 (northbound only) via VIC - LOBSI - ARBIP - EMILY adding

new segment EMILY-ODETO (new COP LIRR - LIBB) - AKAM. 2. UQ48 (northbound only - NGT/WE) via ARBIP - KASTU - ASKOT.

Objective:

To further improve the ATS route network while offering a shorter route option in the central/eastern part of Italian airspace.

Implemented 13 NOV 2014

Project Group:

FAB BLUE MED

Project Category:

ATS Routes

ITA

Originator(s):

FAB BLUE MED

Original proposal TEA-CHI (northbound only)

modified and adapted in the framework of Italian ACC reorganisation (79.034c).

Proposal ID : 75.037a Impl. Status: State(s) & Org. Comments:

25.

Project Name: Milano TMA, Phase 1

Description:

To re-organise Milano TMA.

Objective:

To further improve airspace organisation within Italy.

Implemented 13 NOV 2014

Project Category:

TMA

ITA

Originator(s):

ITA

Implementation together with the re-organisation of Roma TMA, Milano ACC, Roma ACC, Padova ACC and Brindisi ACC.

Phase 2 planned for winter 2015/16.

Related proposals:

65.054

66.071c

75.037b

79.034b

79.034c

Proposal ID : 78.003 Impl. Status: State(s) & Org. Comments:

26.

Description:

To change to bi-directional existing eastbound ATS route segment UQ920 ABADI - GOKEL.

Objective:

To further improve ATS route network within Brindisi FIR.

Implemented 13 NOV 2014

Project Group:

RFG SE

Project Category:

ATS Routes

ITA

Originator(s):

EUROCONTROL

Main part of UQ920 VIE - ENOXA - ABADI is bidirectional while the last segment is one way only.

Currently for westbound traffic 6NM longer option exists via GOKEL - GONOT - LUMAR - VIE.

Page 94: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

83 29 May 2015 Edition: 1.0

Proposal ID : 79.034c Impl. Status: State(s) & Org. Comments:

27.

Project Name: Italian Airspace reorganisation, Phase 3

Description:

To reorganise the Italian ACCs lines of responsibility in the northern-central part of Italy.

Objective:

To further improve the airspace structure within Italy while enhancing flight efficiency, reducing airspace complexity, simplifying inter-sector coordination and increasing ACC capacity.

Implemented 13 NOV 2014

Project Category:

Airspace Structure ATC Sectors

ITA

Originator(s):

ITA

Part of Padova airspace transferred to Roma ACC.

Part of Padova airspace transferred to Milano ACC.

Part of Milano airspace transferred to Roma ACC.

New DFL for Roma sectors (195, 285, 305, 335, 365).

106 elementary sectors, maximum configuration 28 sectors.

ATS route re-alignments according to the new LoR/sectorisation.

TMA modifications and SIDs/STARs re-alignments according to the new LoR/sectorisation.

Phase 3 will be detailed in the transition planning process for the 2014/15 season.

Related proposals:

66.071c

75.037a

79.034a

79.034b

81.009

Proposal ID : 65.060 Impl. Status: State(s) & Org. Comments:

28.

Project Name: SNAP - Southern Norway Airspace Project

Description: To establish a new airspace structure within Stavanger AoR and southern part of Bodø AoR compatible with Oslo ASAP project,

including P-RNAV SIDs/STARs for the airports and Terminal Areas (TMA) herein, considering environmental requirements and noise abatement procedures and prepare for CDAs/CCDs at airports within Stavanger AoR and Bodø AoR (Southern Norway Airspace Project/ SNAP).

Objective:

To further improve the airspace structure in Stavanger AoR and southern part of Bodo AoR to optimise flight profiles, ensure adequate capacity in terminal areas and adjacent ACC sectors to meet expected traffic growth up to 2030.

Implemented 13 NOV 2014

Project Category:

Airspace Structure PBN TMA

NOR

Originator(s):

NOR

For detailed description of the SNAP ATS route changes please see attached document.

Related proposals:

68.067a

68.067b

68.067c

80.084

81.005

81.008

83.041

83.042

Page 95: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

84 29 May 2015 Edition: 1.0

Proposal ID : 74.036 / 15.014 Impl. Status: State(s) & Org. Comments:

29.

Description: To implement bi-directional ATS route Y41 KARTI - LARMA - KELIN -

XENTA.

Objective:

To further improve airspace organisation within Warszawa FIR, Sweden FIR and Norway FIR.

Implemented 13 NOV 2014

Project Group:

SG BALTIC

Project Category:

ATS Routes

POL SWE NOR

Originator(s):

IATA

Will serve traffic Turkey/Egypt and further north to Oslo/ Southern Norway.

LARMA - KELIN CDR 1.

Proposal ID : 79.076a Impl. Status: State(s) & Org. Comments:

30.

Project Name: RNAV procedures for EPWR

Description:

1. To implement RNAV (GNSS) SID and STAR procedures for Wrozlaw (EPWR) airport.

2. To implement the following ATS routes: a. Z349 TOMTI - EKSEK bi-directional; b. Z419 LASIS - VAGNI eastbound.

Objective:

To further improve the airspace organisation within Warszawa FIR.

Implemented 13 NOV 2014

Project Category:

PBN TMA

POL

Originator(s):

POL

Related proposals:

79.076b

79.076c

Proposal ID : 81.014 Impl. Status: State(s) & Org. Comments:

31.

Description:

To re-designate the following existing ATS routes: a. T268 JED - LUKOX as T709 (release of T268); b. Y225 BODLA - OSKUD as Q316 (extension of RD used by DEU

and release of Y225).

Objective:

To further simplify the existing RDs within Poland.

Implemented 13 NOV 2014

Project Category:

Route Redesignation

POL

Originator(s):

EUROCONTROL

Proposal ID : 79.076b Impl. Status: State(s) & Org. Comments:

32.

Project Name: RNAV procedures for EPGD

Description: 1. To implement RNAV procedures for TMA Gdansk as well as RNAV

(GNSS) SID and STAR procedures for Gdansk (EPGD) airport.

2. To implement the following ATS routes: a. T270 OLILA - MEBIV - RILAB - OSLOG; b. T240 OGDAV - DOMAG.

Objective:

To further improve the airspace organisation within Warszawa FIR.

Implemented 13 NOV 2014

Project Category:

PBN TMA

POL

Originator(s):

POL

Related proposals:

79.076a

79.076c

Page 96: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

85 29 May 2015 Edition: 1.0

Proposal ID : 81.066 Impl. Status: State(s) & Org. Comments:

33.

Description: To change to bi-directional existing northbound ATS route segment T720

MOLIL - REGLI.

Objective:

To further improve ATS route options within Warszawa FIR.

Implemented 13 NOV 2014

Project Category:

ATS Routes

POL

Originator(s):

IATA

Despite that REGLI is used as bi-directional T720 is only northbound.

Initially southbound stream will be limited, most probably only LOWW arrivals.

Related proposals:

81.064a

81.064b

81.064c

81.067

81.068b

Proposal ID : 83.003a / 20.038a Impl. Status: State(s) & Org. Comments:

34.

Description: To change the upper vertical limit of ATS route segment L996 CHO - GOSOT from FL245 to FL660.

Objective:

To further improve ATS route options via Warszawa FIR.

Implemented 13 NOV 2014

Project Group:

SG BALTIC

Project Category:

ATS Routes

POL

Originator(s):

IATA

Required in case of military exercise in northern Poland or when L617 is closed for various destinations in Denmark and Sweden.

The shortest re-routing option, only 2 NM longer than optimum routing via L617, is via CZE L619 DENKO L996 GOSOT while existing option via GRUDA is 52 NM longer than optimum routing.

Current problem is that L996 CHO - GOSOT is with upper vertical limit of FL245 and due to the low level segment AOs burn 275 kg more fuel per flight compared to L996 in optimum FL.

Change of upper vertical limit of ATS route segment L996 GOSOT - ROE by Sweden is expected in Spring 2015.

Related proposals:

83.003b / 20.038b

83.056 / 21.015

Proposal ID : 81.094 Impl. Status: State(s) & Org. Comments:

35.

Description:

To implement/ change the following ATS routes: a. Z131 BANUB - GOSOT - ETRUS bi-directional; b. Z212 BANUB - POKEN - ROE bi-directional.

Objective:

To further improve airspace organisation within Warszawa FIR and Sweden FIR.

Implemented 13 NOV 2014

Project Category:

ATS Routes

SWE POL

Originator(s):

SWE

The relevant DCTs in Warszawa FIR as per RAD Appendix 4 will be withdrawn.

Page 97: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

86 29 May 2015 Edition: 1.0

Proposal ID : 81.008 Impl. Status: State(s) & Org. Comments:

36.

Description:

To implement the following ATS Routes in support of the SNAP project in Norway: a. Z255 KOGAV - UMSAK (new 5LNC, crossing with L77) OSKOK -

westbound FL095 - FL660; b. Z265 TOGMI - OXOTI (new 5LNC, crossing with Y96) - TIGBA, bi-

directional FL285 - FL660; c. Y96 MAVIP - OXOTI (New 5LNC, crossing with Z265) - DEGAL -

EVLAN, bi-directional FL095 - FL660; d. L77 to insert UMSAK (crossing with Z255) between BOR and

OVDAL.

Objective:

To further improve the airspace structure between Norway FIR and Sweden FIR.

Implemented 13 NOV 2014

Project Category:

ATS Routes

SWE NOR

Originator(s):

SWE NOR

Linked to SNAP project - Norway

Related proposals:

65.060

Proposal ID : 82.057 Impl. Status: State(s) & Org. Comments:

37.

Description: To insert point MOVIS on N133 at the crossing with L87 and lowering

lower limit of N133 segment MOVIS - PENOR to FL095.

Objective:

To further improve the ATS route network within Sweden FIR.

Implemented 13 NOV 2014

Project Category:

ATS Routes

SWE

Originator(s):

SWE

To enable new connection mainly for dep ESKN towards EPWW FIR

Proposal ID : 81.078 Impl. Status: State(s) & Org. Comments:

38.

Project Name: Tallinn FIR ATS route improvements 13.NOV.2014

Description:

To implement Tallinn FIR ATS route improvements as follows: 1. Re-designate P854 as Y267.

2. Implement the following ATS route segments: a. Y269 EKLON - ULKOX - TITOV b. Q92 NEREN - DOLEX - LUXEM c. Y147 LONSA - TEVNA as CDR2

3. Re-align the following ATS route segments: a. P854 as LEMLA - BALTI b. L56 as SUMIM - ULKOX - BIRSI - LEMLA - GEPTA - INTOR c. L734 as NEBSI - DOLEX - RITRA - TEVNA - ERMEX - NITSO -

RIPEX - TOMPA d. L870 as RANVA - LUKUN - DOPIK - TLL - OSMUR - LUXEM -

NEBSI e. M854 as MOHNI - LEMLA - REGVI - OSKAV - GATVA f. M985 as VALGA - OSLIK - ULKOX - TOMPA g. L77 as PETOT - TLL - REGVI - BIRSI - TUXUV - TOMPA h. Y119 MOHNI - SOKVA as bi-directional

Implemented 13 NOV 2014

Project Group:

SG BALTIC

Project Category:

ATS Routes Route Redesignation

SWE EST FIN RUS LVA

Originator(s):

EST

Related proposals:

79.017 / 19.058

Page 98: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

87 29 May 2015 Edition: 1.0

i. P863 RANVA - RESMO - TUXUV - GONOS - NITSO - KEMET -

KRS - MOLOK - TODNA 4. Segment INTOR - BALTI double designated as M611 and M857 5. Extend P733 unidirectional, eastbound from SORPA to MOHNI. 6. Extend Q22 bi-directional from TLL to MOHNI.

Objective:

To further improve the ATS route structure within Tallinn FIR while providing a re-routing option to avaoid EE-TSA-1, EE TSA-4, EE TSA-7 and harmonize ATS route structure with Tampere FIR.

Proposal ID : 81.093 Impl. Status: State(s) & Org. Comments:

39.

Description: 1. To re-categorized L617 REPKU - SABAK and Y440 BOMGU -

SABAK from CDR1 to CDR2 FL095 - FL285 during its CDR hours. 2. To change existing westbound ATS route segment Y41 XENTA -

REPKU to bi-directional.

Objective:To further improve the CDR network within Sweden FIR.

Implemented 13 NOV 2014

Project Category:

CDRs

SWE NOR

Originator(s):

SWE

Due to penetration of military training area

Proposal ID : 83.039 Impl. Status: State(s) & Org. Comments:

40.

Project Name: RAD Promulgation

Description:

To publish in AIP Sweden, ENR 1.10 FLIGHT PLANNING under paragraph 1. Procedures for the submission of a flight plan common text for Adherence to Airspace Utilization Rules and Availability - RAD inside Sweden FIR.

Objective:

To harmonize the RAD promulgation via the AIP by the ECAC States.

Implemented 13 NOV 2014

Project Category:

AIP RAD

SWE

Originator(s):

EUROCONTROL

Proposal ID : 82.040 Impl. Status: State(s) & Org. Comments:

41.

Description:

1. To implement Upper flight information region (UIR Kyiv) in the airspace of Ukraine as follows: a. Lateral limits: Airspace within 5 FIRs of Ukraine (L’viv FIR, Kyiv

FIR, Dnipropetrovs’k FIR, Odesa FIR, Simferopol’ FIR); b. Vertical limits: FL275 - UNL.

2. To implement within UIR Kyiv 6 Upper control areas - UTA L’viv, UTA Kyiv, UTA Dnipropetrovs’k North, UTA Dnipropetrovs’k South, UTA Odesa North, UTA Odesa South.

Objective:

To further simplify the Ukrainian airspace organisation due to operational reasons, especially for effective and harmonized Free Route Airspace of Ukraine (FRAU) implementation.

Implemented 13 NOV 2014

Project Group:

RFG SE

Project Category:

Airspace Structure

UKR

Originator(s):

UKR

The lateral boundaries of 5 existing FIRs of Ukraine (L’viv FIR, Kyiv FIR, Dnipropetrovs’k FIR, Odesa FIR, Simferopol’ FIR) are retaining in the published boundaries in accordance with relevant International Agreements and current edition of ICAO European Air Navigation Plan (Doc ICAO 7754) with vertical limits from surface up to FL275.

Page 99: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

88 29 May 2015 Edition: 1.0

Proposal ID : 77.072c Impl. Status: State(s) & Org. Comments:

42.

Project Name: Free Route Airspace Wien, FRAW, Stage 3b

Description:

1. To implement new DCTs. 2. To delete the following Night ATS Routes - substituted by DCTs -

UQ233, UQ250, UQ254, UQ863, UQ985. 3. To adapt DCTs time of availability. 4. To lower the limits of DCTs, where feasible.

Objective:

To further improve the flight planning options within Wien FIR as a third step for FRAW (Free Route Airspace Wien) implementation.

Implemented 11 DEC 2014

Project Group:

FAB CE

Project Category:

50 MPCPEs DCTs Free Route Airspace

AUT

Originator(s):

AUT

Phased implementation: Stage 1 implemented 18 October 2012 (37

DCTs). Stage 2 implemented 7 MAR 2013. Stage 3a/b implemented 6 MAR 2014 - 11

DEC 2014. Stage 4 planned 2015. Stage 5 planned Q1 2016.

Related proposals:

75.029

76.047

77.066a

77.072a

77.072b

77.072d

77.072e

Proposal ID : 82.056 Impl. Status: State(s) & Org. Comments:

43.

Description: To create a new intersection ABRIB between ATS routes L173 and M19.

Objective:

To further improve the ATS route newtork while providing low level traffic a shorter route option to ERKIR, in case those flights are not entitled to use the most direct way via GIMIX L608 due to terrain (today those flights have to file the longer way via SBG).

Implemented 11 DEC 2014

Project Category:

ATS Routes

AUT

Originator(s):

AUT

Proposal ID : 76.017 Impl. Status: State(s) & Org. Comments:

44.

Project Name: SOMOV area re-organisation

Description: To reorganise ATS routes around SOMOV due to establishment of new LRD area.

Objective:

To further improve ATS route network between Sofia FIR and Bucuresti FIR.

Implemented 11 DEC 2014

Project Group:

RFG SE

Project Category:

ATS Routes

BGR ROU

Originator(s):

ROU

The proposed location of the new Danger area (planned JAN 2015) will infringe existing ATS routes N/UN618 and Y/UY553 North West of SOMOV.

Page 100: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

89 29 May 2015 Edition: 1.0

Proposal ID : 83.004 / 20.039 Impl. Status: State(s) & Org. Comments:

45.

Description:

1. To re-designation the following existing ATS routes: a. UL620 REBLA - ADINA as UM977; b. M977 REBLA - RIVOS as L620; c. UM977 REBLA - RIVOS - DINRO as UL620.

2. To re-designate the existing ATS route segment N616 DINRO - RIXEN also as L620.

Objective:

To adapt the existing ATS route designators and avoid ATC system flight plan processing problems.

Implemented 11 DEC 2014

Project Group:

RFG SE SG BLACK

Project Category:

Route Redesignation

BGR ROU

Originator(s):

EUROCONTROL

Proposal 69.072 / 13.046 / DN0016 covered implementation of new eastbound ATS route UM977 REBLA - ADINA.

On the time of proposal RD UL620 was till DINRO, it was withdrawn by Bulgaria along DINRO - RIXEN but then continuing in Turkey, Cyprus and Lebanon down to Beirut (KAD).

The new ATS route REBLA - ADINA was implemented on 5 MAY 2011 and was designated as UL620 while existing, on that time UL620 was re-designated as UM977.

This issue with designation of ATS routes and negative influence on automated ATC system flight planning process was reported by Bulgaria. The ATC systems experience severe difficulties close to crashing when processing flight plans with “broken” RDs.

Proposal ID : 81.058 Impl. Status: State(s) & Org. Comments:

46.

Description:

To re-designate the following existing ATS routes: a. P184 ABRED - OSTOV - GOL as M748; b. P184 GOL - NIKTI as N181.

Objective:

To further improve the ATS route network within Sofia FIR in order to adapt existing route designators with major traffic flows and facilitate flight planning.

Implemented 11 DEC 2014

Project Group:

RFG SE

Project Category:

Route Redesignation

BGR ROU

Originator(s):

ROU

Proposed at DANUBE FAB ADODEG/24.

Proposal ID : 83.054 Impl. Status: State(s) & Org. Comments:

47.

Project Name: Introduction of RNAV1 Transitions for LSZH RWYs 28 & 34

Description:

To introduce RNAV Transitions to final approach for runways 28 & 34 at LSZH airport.

Objective:

To replace radar vectoring by pre-defined flight tracks.

Implemented 11 DEC 2014

Project Category:

TMA

CHE DEU

Originator(s):

CHE

RNAV Transitions for other runways are planned for a later stage

Page 101: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

90 29 May 2015 Edition: 1.0

Proposal ID : 81.083 Impl. Status: State(s) & Org. Comments:

48.

Description: To implement a new H24 eastbound ATS route option UZ205 for arrivals

to LOWW, LZIB and LHBP via OSBIT- EKSOS - LULAR _ ABUDO.

Objective:To further improve the ATS route network between Munich

FIR/ Karlsruhe UIR and Praha FIR while providing an additional shorter route option.

Implemented 11 DEC 2014

Project Category:

ATS Routes

CZE DEU

Originator(s):

CZE

Proposal ID : 81.080 Impl. Status: State(s) & Org. Comments:

49.

Description: To re-align/ straighten the airspace boundary between RAPET and

ENITA along the border of Czech Republic (ANS CZ) and Germany (DFS).

Objective:To further improve the airspace structure between Praha FIR

and Munich FIR/ Karlsruhe UIR enabling better DCTs northbound after point ARMUT within EDUU/ EDMM.

Implemented 11 DEC 2014

Project Category:

Airspace Structure

DEU CZE

Originator(s):

CZE

Proposal ID : 83.067 Impl. Status: State(s) & Org. Comments:

50.

Project Name: Free Route Airspace Karlsruhe

Description:

To implement the following airspace changes: 1. New South East-bound Direct Route Options for flows: DEP EG**, EH**, North Atlantic, Düsseldorf area to SE Europe or beyond Turkey e.g. OM** 2. New H24/Weekend North East Bound DCTs and new Seasonal Weekend Direct Route Option ARR LFP* 3. New Night Options DEP LFP*and ARR EGKK via LUPEN 4. New Options for late evening DEP EDDF avoiding RWY 18 5. New / Amended Direct Route Options DEP EDDW via LARET 6. New Direct Route Options in North East Germany (area of Roenne) 7. Withdrawal of Flight Level Cap for departures EDDF via UZ650 VEMUT / UL984 OKG

Objective:To further expand implementation of Free Route Airspace

Concept within Karlsruhe UAC.

Implemented 11 DEC 2014

Project Group:

FAB EC

Project Category:

Free Route Airspace

DEU FAB EC

Originator(s):

DEU

1. Including (forced) routing UZ205 for ARR LOWW/LHBP/LZIB (flows: listed ARR coming from North Atlantik, EG**, EI**, EH**, EB**, LF**, ED** e.g. Düsseldorf Area) 2.(e.g. LI** to EDDL, EH**, EG**) and (e.g. SE Europe or beyond Turkey -such as OM**- to LFP*, MIN FL380) 3. (Interface France/Germany) 4. (towards LKAA airspace e.g. with ARR OM**)

Proposal ID : 81.057 Impl. Status: State(s) & Org. Comments:

51.

Description: To replace 5LNC TURBO.

Objective:

To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region, to improve the aeronautical information provided and be compliant with ICAO Annex 11.

Implemented 11 DEC 2014

Project Category:

5LNC

ESP

Originator(s):

EUROCONTROL ICAO

Annex 11 stated that the 5LNCs shall be unique.

TURBO is used 2 times worldwide and in ICARD is created by USA in 2006.

ICAO DM sent relevant message to ESP. ESP will co-ordinate through planning unit.

Page 102: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

91 29 May 2015 Edition: 1.0

Proposal ID : 81.025 Impl. Status: State(s) & Org. Comments:

52.

Description: To replace 5LNC BARAX.

Objective:

To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region, to improve the aeronautical information provided and be compliant with ICAO Annex 11.

Implemented 11 DEC 2014

Project Category:

5LNC

ESP

Originator(s):

EUROCONTROL ICAO

Annex 11 stated that the 5LNCs shall be unique.

BARAX is used by and is allocated in ICARD to France.

ICAO DM sent relevant message to ESP.

Proposal ID : 81.049 Impl. Status: State(s) & Org. Comments:

53.

Description: To replace 5LNC AGNES.

Objective:

To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region, to improve the aeronautical information provided and be compliant with ICAO Annex 11.

Implemented 11 DEC 2014

Project Category:

5LNC

ESP

Originator(s):

EUROCONTROL ICAO

Annex 11 stated that the 5LNCs shall be unique.

AGNES is used by Japan but is allocated in ICARD to Russian Federation and USA.

ICAO DM sent relevant message to ESP. ESP will co-ordinate through planning unit.

Proposal ID : 81.054 Impl. Status: State(s) & Org. Comments:

54.

Description: To replace 5LNC SOFIA.

Objective:

To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region, to improve the aeronautical information provided and be compliant with ICAO Annex 11.

Implemented 11 DEC 2014

Project Category:

5LNC

ESP

Originator(s):

EUROCONTROL ICAO

Annex 11 stated that the 5LNCs shall be unique.

SOFIA is used 3 times worldwide with no record in ICARD.Name retained by the ICAO SAM Office.

ICAO DM sent relevant message to ESP. ESP will co-ordinate through planning unit.

Proposal ID : 81.051 Impl. Status: State(s) & Org. Comments:

55.

Description: To replace 5LNC LANDA.

Objective:

To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region, to improve the aeronautical information provided and be compliant with ICAO Annex 11.

Implemented 11 DEC 2014

Project Category:

5LNC

ESP

Originator(s):

EUROCONTROL ICAO

Annex 11 stated that the 5LNCs shall be unique.

LANDA is used 6 times worldwide and is allocated in ICARD to Central American FIR, Colombia and Argentina.

ICAO DM sent relevant message to ESP. ESP will co-ordinate through planning unit.

Proposal ID : 61.005b Impl. Status: State(s) & Org. Comments:

56.

Description:

1. To implement the following southbound ATS route segments: a. Y/UY59 XXXXX - DCS; b. T/UT256 NGY - DCS;

2. To re-align ATS route N615 as GOW - FENIK - DCS; 3. To re-designate N515 GOW - FENIK - DCS as L612.

Objective:To implement changes to UK ATS route structure in order to

further facilitate the flight planning and simplify the UK SRD and RAD.

Implemented 11 DEC 2014

Project Category:

ATS Routes

GBR

Originator(s):

EUROCONTROL GBR

Page 103: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

92 29 May 2015 Edition: 1.0

Proposal ID : 71.081 Impl. Status: State(s) & Org. Comments:

57.

Description:

To implement the following bi-directional ATS routes as CDRs: a. UN96 NEXUS - ROKAN; b. UN610 NATEB - LONAM.

Objective:

To further improve the ATS structure within Scottish UIR and provide shorter route options for North Atlantic traffic.

Implemented 11 DEC 2014

Project Group:

RFG NW

Project Category:

ATS Routes

GBR MUAC

Originator(s):

GBR

Possible re-alignment of the routes at the interface between the London FIR/UIR and the Netherlands FIR along TOPPA - GODOS - MIMVA to be revised by MUAC and in line with proposal 50.014 RKN - ROKAN or RKN - LONAM.

Facilitates iTEC (interoperability Through European Collaboration).

Related proposals:

50.014

Proposal ID : 80.064 Impl. Status: State(s) & Org. Comments:

58.

Project Name: Midlands improvements

Description: To amend CHASE STARs via MCT to route MCT - VEGAR - CHASE

(save 5NM)

Objective:

To amend the STAR to reflect what is routinely tactically provided.

Implemented 11 DEC 2014

Project Category:

ATS Routes

GBR

Originator(s):

GBR

Proposal ID : 82.053 Impl. Status: State(s) & Org. Comments:

59.

Project Name: SID Truncation

Description: To truncate EGCC SIDs as follows:

a. DESIG 1Y/1R to be truncated at SONEX and become SONEX 1/1R; b. WAL 1Y/1R to be truncated at new waypoint LIVSU (intersection of

Y53) and become LIVSU 1Y/1R; c. NOKIN 1Y/1R to be truncated at new waypoint KUXEM (intersection

of P17) and become KUXEM 1Y/1R; d. WAL 1S/1Z & NOKIN1S/1Z to be truncated at new waypoint

ASMIM and become ASMIM 1S/1Z.

Objective:To reduce portion of flight plan route fuelled at SID Altitude.

Implemented 11 DEC 2014

Project Category:

Airspace Structure ATM System

GBR

Originator(s):

GBR

Proposal ID : 80.068 Impl. Status: State(s) & Org. Comments:

60.

Project Name: Midlands Improvements

Description: To remove EGNX ASNIP & WAL SIDs and have all traffic to north-west

file a TNT SID then Q4.

Objective:

To reduce flight plannable track mileage at SID altitude by significantly shortening the portion of of the route flight planned (and on occasions fuelled for but never actually flown) at 6000ft.

Implemented 11 DEC 2014

Project Category:

ATS Routes

GBR

Originator(s):

GBR

Page 104: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

93 29 May 2015 Edition: 1.0

Proposal ID : 81.056 Impl. Status: State(s) & Org. Comments:

61.

Description: To replace 5LNC TROUT.

Objective:

To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region, to improve the aeronautical information provided and be compliant with ICAO Annex 11.

Implemented 11 DEC 2014

Project Category:

5LNC

GBR

Originator(s):

EUROCONTROL ICAO

Annex 11 stated that the 5LNCs shall be unique.

TROUT is used 4 times worldwide and in ICARD is created by USA in 2005.

ICAO DM sent relevant message to GBR.

Proposal ID : 81.038 Impl. Status: State(s) & Org. Comments:

62.

Description: To replace 5LNC BEREK.

Objective:

To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region, to improve the aeronautical information provided and be compliant with ICAO Annex 11.

Implemented 11 DEC 2014

Project Category:

5LNC

GBR

Originator(s):

EUROCONTROL ICAO

Annex 11 stated that the 5LNCs shall be unique.

BEREK is currently shared code prioritized for Algeria.

ICAO DM sent relevant message to GBR.

Proposal ID : 83.018 Impl. Status: State(s) & Org. Comments:

63.

Project Name: ECAC States AIP en-route publication issues

Description:

To change the PBN navigation specification of area navigation routes within Vilnius FIR from RNP 5 to RNAV 5 (ENR 3.3 publication).

Objective:

To adapt in AIP the PBN navigation specification in accordance with Doc 7030 and Doc 9613.

Implemented 11 DEC 2014

Project Category:

AIP PBN

LTU

Originator(s):

EUROCONTROL

Proposal ID : 80.093 Impl. Status: State(s) & Org. Comments:

64.

Project Name: Variable DFL MUAC DECO sector group

Description: To create a variable division level in the Maastricht UAC DECO sector group depending on planned traffic prediction.

Objective:

To further improve workload balance within the sector group in order to improve capacity.

Implemented 11 DEC 2014

Project Category:

ATC Sectors

MUAC NLD DNK GBR

Originator(s):

MUAC

Proposal ID : 83.038 Impl. Status: State(s) & Org. Comments:

65.

Project Name: ECAC States AIP en-route publication issues

Description:

To publish in ENR 3.3 all name-code designators when point is FIR BDRY outside of brackets and insertion there the term FIR BDRY.

Objective:

To resolve airspace data publication inconsistencies in State AIP.

Implemented 11 DEC 2014

Project Category:

AIP

NOR

Originator(s):

EUROCONTROL

Page 105: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

94 29 May 2015 Edition: 1.0

Proposal ID : 82.029 / 20.031 Impl. Status: State(s) & Org. Comments:

66.

Project Name: Night Free Route Bucuresti FIR - N-FRAB

Description:

Phase 2: To expand the time application of the N - FRAB.

Objective:

To further improve the Free Route Airspace operations within Bucuresti FIR.

Implemented 11 DEC 2014

Project Group:

FAB DANUBE RFG SE SG BLACK

Project Category:

Free Route Airspace

ROU

Originator(s):

ROU

Currently Night FRA period is 22.00 - 03.00 (23.00 - 04.00).

Possible expansion by 1h to 22.00 - 04.00 (23.00 - 05.00).

Related proposals:

69.096 / 16.007

Proposal ID : 83.024 Impl. Status: State(s) & Org. Comments:

67.

Project Name: ECAC States AIP en-route publication issues

Description:

To change the PBN navigation specification of area navigation routes within Sweden from RNP 5 to RNAV 5.

Objective:

To adapt in AIP the PBN navigation specification in accordance with Doc 7030 and Doc 9613.

Implemented 11 DEC 2014

Project Category:

AIP PBN

SWE

Originator(s):

EUROCONTROL

Proposal ID : 83.011 Impl. Status: State(s) & Org. Comments:

68.

Description: 1. To introduce PBN SIDs/STARs (RNP1, based on GNSS)

procedures for Cardak (LTAY) airport. 2. To implement the following westbound ATS routes to accommodate

the procedures: a. T/UT30 ATGIT - KARGI; b. T/UT58 ATGIT - KFK.

Objective:

To further improve airspace organization in Turkey.

Implemented 11 DEC 2014

Project Group:

RFG SE

Project Category:

ATS Routes PBN

TUR

Originator(s):

TUR

ATGIT 381205N 0294457E will be new waypoint in Turkey.

Proposal ID : 81.043 Impl. Status: State(s) & Org. Comments:

69.

Description: To replace 5LNC LIPSI.

Objective:

To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region, to improve the aeronautical information provided and be compliant with ICAO Annex 11.

Implemented 08 JAN 2015

Project Category:

5LNC

DNK

Originator(s):

EUROCONTROL ICAO

Annex 11 stated that the 5LNCs shall be unique.

LIPSI is used by and is allocated in ICARD to Kazakhstan.

Page 106: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

95 29 May 2015 Edition: 1.0

Proposal ID : 81.055 Impl. Status: State(s) & Org. Comments:

70.

Description: To replace 5LNC NARKA.

Objective:To avoid 5LNCs duplication within the ECAC area of the

ICAO EUR/NAT region, to improve the aeronautical information provided and be compliant with ICAO Annex 11.

Implemented 08 JAN 2015

Project Category:

5LNC

DNK

Originator(s):

EUROCONTROL ICAO

Annex 11 stated that the 5LNCs shall be unique.

NARKA is used by and is allocated in ICARD to Hungary and Romania.

Proposal ID : 69.119 / BM0031 Impl. Status: State(s) & Org. Comments:

71.

Description: To implement bidirectional ATS route segment MEDAM - GIANO.

Objective:

To further improve the ATS route network at the interface between France and Italy.

Implemented 08 JAN 2015

Project Group:

FAB BLUE MED

Project Category:

ATS Routes

FRA ITA

Originator(s):

FAB BLUE MED

Solved by Italian ACC reorganisation and new Night DCTs. Implemented as DCT with similar alignment.

New possible routings: Northbound ADEXI - BETEN - PIMOT; Southbound KUMIN - KONER - BAKRO - BATBO - POKAV - PAL.

Proposal ID : 82.052 Impl. Status: State(s) & Org. Comments:

72.

Project Name: SID Truncation

Description: To truncate EGKK DVR SIDs at new waypoints 33NM before DVR and

use new ATS Routes Y/UY311 and Y/UY312 to get to DVR.

Objective:To reduce portion of light plan route fuelled at SID Altitude.

Implemented 08 JAN 2015

Project Category:

Airspace Structure ATM System

GBR

Originator(s):

GBR

Proposal ID : 71.085b Impl. Status: State(s) & Org. Comments:

73.

Project Name: FAIR-IT Free Route Airspace Italy, Phase 2

Description: To lower the Night/ Weekend DCTs and Night/ Weekend routes from FL365 to FL315, where needed.

Objective:

To further expand and harmonise the implementation of Free Route Airspace within Milano, Roma and Brindisi UIR.

Implemented 08 JAN 2015

Project Group:

FAB BLUE MED

Project Category:

50 MPCPEs Free Route Airspace

ITA

Originator(s):

ITA

Co-operation inside BLUE MED with all the partners involved, to extend FAIR-IT at FAB level, starting from 2015.

Phase 3 foreseen for winter 2015/16.

Related proposals:

71.085a

71.085c

71.089b

Proposal ID : 84.089 / BM5054 Impl. Status: State(s) & Org. Comments:

74.

Project Name: FAIR-IT Free Route Airspace Italy, Phase 2

Description: To re-align existing westbound ATS route UQ984 as DETSA - ASVUT -

IXOGU - LEVSI - VOG - VAMTU and transform from Night / Weekend to H24.

Objective:To better utilise the ATS route network by extension of

availability from NGT-WE to H24 (CDR during activation periods of relevant military areas).

Implemented 08 JAN 2015

Project Group:

FAB BLUE MED

Project Category:

ATS Routes

ITA

Originator(s):

ITA

Modified in the framework of FAIR-IT Free Route Airspace Italy (Phase 2) and as a consequence of Italian Airspace reorganisation (Phase 3)

Related proposals:

71.085b

79.034c

Page 107: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

96 29 May 2015 Edition: 1.0

Proposal ID : 84.091 / BM5056 Impl. Status: State(s) & Org. Comments:

75.

Project Name: Italian Airspace reorganisation, Phase 3

Description: 1. To implement soutbound ATS route Y/UY345 GAVRA - RITEB

(FL115 - FL460).

2. To introduce STARs from RITEB for traffic ARR LIRF (Roma Fiumicino).

Objective:

To offer a shorter routing to traffic dest LIRF from GAVRA.

Implemented 08 JAN 2015

Project Group:

FAB BLUE MED

Project Category:

ATS Routes

ITA

Originator(s):

ITA

Implemented after Italian Airspace reorganisation (Phase 3)

Related proposals:

79.034c

Proposal ID : 69.120 / BM0032 Impl. Status: State(s) & Org. Comments:

76.

Description: To implement bidirectional ATS route segment RONAB - IXITO.

Objective:

To further improve the ATS route network in the Italian airspace.

Implemented 08 JAN 2015

Project Group:

FAB BLUE MED

Project Category:

ATS Routes

ITA

Originator(s):

FAB BLUE MED

Solved by Italian ACC reorganisation and new Night DCTs. Implemented as DCT with similar alignment.

New possible routings: Northbound ADEXI - BETEN - PIMOT; Southbound KUMIN - KONER - BAKRO - BATBO - POKAV - PAL.

Proposal ID : 84.088 / BM5053 Impl. Status: State(s) & Org. Comments:

77.

Project Name: FAIR-IT Free Route Airspace Italy, Phase 2

Description: To realign existing northbound ATS route UT102 as UNIMI - TISAX - NESTI - ABN and transform from Night / Weekend to H24.

Objective:

To better utilise the ATS route network by extension of availability from NGT-WE to H24 (CDR during activation periods of relevant military areas).

Implemented 08 JAN 2015

Project Group:

FAB BLUE MED

Project Category:

ATS Routes

ITA

Originator(s):

ITA

Modified in the framework of FAIR-IT Free Route Airspace Italy (Phase 2) and as a consequence of Italian Airspace reorganisation (Phase 3).

FL195 - FL460 segment UNIMI - NESTI; FL255 - FL460 segment NESTI - ABN.

Related proposals:

71.085b

79.034c

Proposal ID : 84.090 / BM5055 Impl. Status: State(s) & Org. Comments:

78.

Project Name: FAIR-IT Free Route Airspace Italy, Phase 2

Description: To re-align existing eastbound ATS route UQ985 as MALUG - ETPUB - ABN and transform from Night / Weekend to H24.

Objective:

To better utilise the ATS route network by extension of availability from NGT-WE to H24 (CDR during activation periods of relevant military areas)

Implemented 08 JAN 2015

Project Group:

FAB BLUE MED

Project Category:

ATS Routes

ITA

Originator(s):

ITA

Modified in the framework of FAIR-IT Free Route Airspace Italy (Phase 2) and as a consequence of Italian Airspace reorganisation (Phase 3).

FL295 - FL460 segment MALUG - ETPUB; FL195 - FL460 segment ETPUB - ABN.

Related proposals:

71.085b

79.034c

Page 108: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

97 29 May 2015 Edition: 1.0

Proposal ID : 75.018b / 15.039b Impl. Status: State(s) & Org. Comments:

79.

Description: To establish a DCT option for ARR/DEP EYVI via SOGBI and new

STARs/SIDs.

Objective:

To further improve airspace organisation between Vilnius FIR and Minsk FIR.

Implemented 08 JAN 2015

Project Group:

SG BALTIC

Project Category:

Airspace Structure

LTU BLR

Originator(s):

EUROCONTROL

Currently there is only dog-leg option between EYVI and TADUN on Minsk FIR / L’viv FIR border.

Proposal was provoked by RAD Appendix 5 allowance for ARR EYVI via BUSIN. This option is only short-cutting existing DUKAT option.

Current possibilities for ARR/DEP EYVI from/to South are either via Poland - BOKSU/VABER or Belarus - DUKAT. Via Poland all flights are flying W-S while via Belarus SE-S.

ATS route M/UM983 exists bidirectional as VNO - SOGBI - TADUN.

Depending on week day benefited flights might reach 15 per day.

Proposal ID : 82.020 / 20.027 Impl. Status: State(s) & Org. Comments:

80.

Description: To allow “Direct” flight planning option BALIT DCT VALUV and vice-

versa for traffic to/from EYPA.

Objective:

To further improve flight planning options within Vilnius FIR.

Implemented 08 JAN 2015

Project Group:

SG BALTIC

Project Category:

ATS Routes DCTs

LVA LTU

Originator(s):

IATA

Proposal ID : 71.056 Impl. Status: State(s) & Org. Comments:

81.

Description:

1. To restructure Oujda TMA - establishment of new ATS routes and new waypoints.

2. To introduce radar approach (MSSR mode S and Primary radar approach).

Objective: To further improve airspace organisation around Oujda (GMFO) Angads

airport.

Implemented 08 JAN 2015

Project Category:

Airspace Structure

MAR

Originator(s):

MAR

Page 109: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

98 29 May 2015 Edition: 1.0

Proposal ID : 83.066 Impl. Status: State(s) & Org. Comments:

82.

Project Name: DCTs for trial period

Description: To implement the following DCTs in Polish airspace for a thre month trial

period: 3. ENOBI - SUI 4. SUI - ENOBI 5. ENOBI - GRUDA 6. GRUDA - ENOBI

Objective:To further improve flight efficiency while offering shorter route

options within Warsaw FIR.

Implemented 08 JAN 2015

Project Category:

DCTs

POL BLR

Originator(s):

BLR POL

Permanent Implementation planned for AIRAC 02 APR 2015/ 30 APR 2015, depending on the outcome of the trial.

DCTs are available since 1st of January 2015 until 1st of April 2015.

Proposal ID : 83.052 / 21.014 Impl. Status: State(s) & Org. Comments:

83.

Description: 1. To implement bi-directional ATS route T925 ADANO - REBLO. 2. To realign existing ATS route N449 as INDUR - GOGOL - DEKIT.

Objective:

To further improve ATS route network within Yerevan FIR.

Implemented 05 FEB 2015

Project Group:

SG BLACK

Project Category:

ATS Routes

ARM

Originator(s):

ARM

Proposal ID : 81.079 Impl. Status: State(s) & Org. Comments:

84.

Description: To allow new westbound H24 DCT ASTEL- IPRUX, FL245+ (even).

Objective:To further improve the ATS route network within Praha FIR

while providing an additional shorter route option.

Implemented 05 FEB 2015

Project Category:

DCTs

CZE

Originator(s):

CZE

Proposal ID : 69.097b Impl. Status: State(s) & Org. Comments:

85.

Project Name: Free Route Airspace Praha/ FRAPRA, Step 2

Description: To transfer specified existing Night DCTs into H24/7 DCTs as well as

tactical DCTs to be flight planable.

Objective:

To further improve the flight planning options within Praha FIR as a second step towards FRAPRA (Free Route Airspace Praha) implementation.

Implemented 05 FEB 2015

Project Group:

FAB CE

Project Category:

Free Route Airspace

CZE

Originator(s):

CZE

December 2014: Initial package of 20-30 DCTs to be introduced.

FRAPRA Step 3: Full Free Route Concept - depending on agreement of conditions and pre-requisites (system support) - proposed 2016.

All Airways above FL 165 remain available for flight planning.

Departing/Arriving within FRA shall file via airways.

Looking for expansion with adjacent States (e.g. FRAMaK).

Related proposals:

69.097a

69.097c

Page 110: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

99 29 May 2015 Edition: 1.0

Proposal ID : 81.016 Impl. Status: State(s) & Org. Comments:

86.

Description:

To adapt "lower" and "upper" RDs within Praha FIR by re-alignment, re-designation and withdrawal of exisiting ATS routes.

Objective:

To further simplify the existing RDs within Czech Republic.

Implemented 05 FEB 2015

Project Category:

ATS Routes Route Redesignation

CZE

Originator(s):

EUROCONTROL

The full list of adaptation is presented by RNDSG/81, WP/3.

Currently in most of the cases „lower“ and „upper“ RDs are different due to lack of alignment coherence.

The alignments of lower to upper route overlap each other but any swap between them is not possible. Adaptation might not lead to RAD restrictions as inventive turns are limited and most of FL limitations are already in place. Also all intermediate waypoints are “on-request”.

Proposal ID : 81.015 Impl. Status: State(s) & Org. Comments:

87.

Description:

To re-designate the following existing ATS routes: a. UZ346 BEPAS - BODAL as UT709; b. UT45 BODAL - TBV - SOPAV as UT709; c. T/UT45 VOZ - BODAL as P/UP27 (release of T45).

Objective:

To further simplify the existing RDs within Czech Republic.

Implemented 05 FEB 2015

Project Category:

Route Redesignation

CZE

Originator(s):

CZE EUROCONTROL

Partially RDs proposal is based on RNDSG Action List, Annex 2, paragraph e).

Lower part of BODAL - SOPAV is designated as L984.

Further adaptation of lower and upper RDs within Czech Republic is also required.

Proposal ID : 83.063 Impl. Status: State(s) & Org. Comments:

88.

Project Name: ECAC States AIP en-route publication issues

Description:

To include in ENR 3.3 RNAV 5 as navigation specification(s) applicable to a specified ATS route segment(s).

Objective:

To adapt in AIP the PBN navigation specification in accordance with Doc 7030 and Doc 9613.

Implemented 05 FEB 2015

Project Category:

AIP PBN

CZE

Originator(s):

EUROCONTROL

Proposal ID : 84.067a Impl. Status: State(s) & Org. Comments:

89.

Project Name: ECAC States AIP en-route publication issues

Description:

Phase 1: To adapt the upper vertical limits, expressed in FL, of lower ATS routes within Germany - change of IFR FL to VFR FL - FL240 to FL245.

Objective:

To adapt in State AIP ATS routes vertical limits.

Implemented 05 FEB 2015

Project Category:

AIP ATS Routes

DEU

Originator(s):

EUROCONTROL

Page 111: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

100 29 May 2015 Edition: 1.0

Proposal ID : 83.045 Impl. Status: State(s) & Org. Comments:

90.

Project Name: Marseille ACC re-organisation

Description: To change the DFL from FL335 to FL355 in “D” and “Z” ATC sectors of

Marseille ACC.

Objective:

To further improve the airspace structure and capacity within Marseille ACC.

Implemented 05 FEB 2015

Project Group:

RFG SW

Project Category:

ATC Sectors

ESP FRA

Originator(s):

FRA

Proposal ID : 83.049 Impl. Status: State(s) & Org. Comments:

91.

Description: To create ELVOP - as new 5LNC point on UM601.

Objective:

To further improve the airspace structure for arrivals from Marseille ACC to Barcelona ACC.

Implemented 05 FEB 2015

Project Group:

FAB SW

Project Category:

5LNC ATS Routes

ESP FRA

Originator(s):

ESP FRA

The new 5LNC point ELVOP will be 5NM from MUREN point.

A RAD restriction will be implemented on ELVOP point to secure the FL of transfer between Marseille and Barcelona ACC.

Proposal ID : 74.017 / 16.025 / CE0035 Impl. Status: State(s) & Org. Comments:

92.

Project Name: Hungarian Free Route Airspace - HUFRA

Description: To implement Hungarian Free Route Airspace/ HUFRA in Budapest

ACC H24 FL105 - FL660 (except TMAs).

Objective:

To further improve airspace organisation within Budapest FIR.

Implemented 05 FEB 2015

Project Group:

FAB CE RFG SE SG BLACK

Project Category:

50 MPCPEs Free Route Airspace

HUN

Originator(s):

HUN

Looking for expansion with adjacent States.

Related proposals:

70.019c

Proposal ID : 84.053 Impl. Status: State(s) & Org. Comments:

93.

Description:

To introduce new DFLs of Budapest ACC Sectors by lowering existing ones with 1000FT.

Objective:

To further improve airspace organization in support of HUFRA implementation.

Implemented 05 FEB 2015

Project Category:

Airspace Structure ATC Sectors

HUN

Originator(s):

HUN

Part of developments connected to HUFRA. New DFLs between Sectors L / M / U / H / T

are FL325 / FL345 / FL365 / FL385 respectively.

Page 112: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

101 29 May 2015 Edition: 1.0

Proposal ID : 83.070 Impl. Status: State(s) & Org. Comments:

94.

Project Name: RAD Promulgation

Description:

To publish in AIP Hungary, ENR 1.10 FLIGHT PLANNING under paragraph 1. Procedures for the submission of a flight plan common text for Adherence to Airspace Utilization Rules and Availability - RAD inside Budapest FIR.

Objective:

To harmonize the RAD promulgation via the AIP by the ECAC States.

Implemented 05 FEB 2015

Project Group:

RFG SE

Project Category:

AIP RAD

HUN

Originator(s):

EUROCONTROL

Proposal ID : 80.007 Impl. Status: State(s) & Org. Comments:

95.

Description: To design and introduce SIDs and STARs for EPLL (Lodz airport).

Objective:

To further improve airspace organisation within Waeszawa FIR.

Implemented 05 FEB 2015

Project Category:

Airspace Structure TMA

POL

Originator(s):

EUROCONTROL POL

Currently there is a contradiction in airspace design due to missing SIDs / STARs, lower limit of most of the ATS routes over LDZ and IAP for arrivals with entry over LDZ. Only one SID DERAM designed and published in AIP Poland. No other SIDs or STARs.

Gap of 1500 FT between ATS routes lower limit of FL095 and MAX ALT 2450M (FL080) to start ARR procedure over LDZ exists.

Theoretically all ATS routes via LDZ are unusable for ARR EPLL because of the MEA which is either FL095 or FL195 or higher.

All ARR/DEP EPLL currently are managed via RAD Appendix 5 connecting points.

Currently some issues regarding new DVOR at the airport; no impl. date available.

Proposal ID : 84.054 Impl. Status: State(s) & Org. Comments:

96.

Project Name: Lisboa ACC West sector

Description: To implement a vertical split Lisboa ACC West sector.

Objective:

To further improve the airspace structure within Lisboa UIR.

Implemented 05 FEB 2015

Project Category:

ATC Sectors

PRT

Originator(s):

PRT

Page 113: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

102 29 May 2015 Edition: 1.0

Proposal ID : 83.058 Impl. Status: State(s) & Org. Comments:

97.

Project Name: ECAC States AIP en-route publication issues

Description:

To change the PBN navigation specification of area navigation routes within Bratislava FIR from RNP 5 to RNAV 5.

Objective:

To adapt in AIP the PBN navigation specification in accordance with Doc 7030 and Doc 9613.

Implemented 05 FEB 2015

Project Category:

AIP PBN

SVK

Originator(s):

EUROCONTROL

Proposal ID : 84.003 Impl. Status: State(s) & Org. Comments:

98.

Project Name: New Route T625

Description: To implement ATS route T625 WIL - OSKUP - DEKAM.

Objective:

To improve the connection of LSGC aerodrome with the existing route network.

Implemented 05 MAR 2015

Project Category:

ATS Routes

CHE

Originator(s):

CHE

Proposal ID : 50.010b Impl. Status: State(s) & Org. Comments:

99.

Project Name: FAB EC SE - new Phase 1 (CBA25)

Description:

To reshape the CBA25 in preparation for the SWAP network changes: a. CBA 25 reshaped and restructured. b. New TMA5 created at Luxeuil. c. Basel TMA7 reshaped.

Objective:

To prepare for the SWAP route network changes and make best use of the CBA25 airspace based on civil and military demand.

Planned 05 MAR 2015

Project Group:

FAB EC

Project Category:

Civil/Military Airspace

DEU FRA CHE

Originator(s):

FAB EC

Related proposals:

51.004

80.079

81.023

Proposal ID : 79.047 Impl. Status: State(s) & Org. Comments:

100.

Project Name: TOLEY 2W DEP TRANSITION

Description:

To revise current ETAR departure routing as follows: FROM: TOLEY 2S TRANSITION VIA BADLI Y163 PABLA T715 DENEL

Y126 LUPEN/ N0398F180 V17 OBORN R112 MIRGU/N0423F360 UN852 GIRKU/N0423F370... TO: TOLEY 2W TRANSITION VIA SBN Z818 MAKOT G21

GTQ/N0423F360 UN852 GIRKU/N0423F370...

Objective: To further improve the DEP options from Ramstein (ETAR) airport for

USAF flights.

Implemented 05 MAR 2015

Project Category:

Civil/Military Airspace

DEU FRA

Originator(s):

U.S.A.F.E

Allow the use of the Saabrucken (SBN) transition via Z818 MAKOT G21 GTQ.

Will save AMC $319K per year. No problem for Langen ACC if transition at

lower Flight level referring to TRA-Lauter. Depending on OLDI message exchange

between the ACCs. Reims needs an ACT message at FL 150. ACT at FL 100 not accepted by DSNA (entry to Strasbourg area). In progress by DSNA.

First test flight will happen on 15 MAY 2015.

Page 114: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

103 29 May 2015 Edition: 1.0

Proposal ID : 62.021 Impl. Status: State(s) & Org. Comments:

101.

Description: To implement bidirectional ATS route W/UW279 GDV - LAY.

Objective:

To further improve the ATS route options within Canarias FIR/UIR for flights to West Africa with technical stops in the Canarias.

Implemented 05 MAR 2015

Project Category:

ATS Routes

ESP

Originator(s):

IACA

Related proposals:

60.034b

Proposal ID : 60.034b Impl. Status: State(s) & Org. Comments:

102.

Project Name: Canarias TMA development, Phase 1

Description:

To implement the following airspace changes and procedures in line with Canarias TMA development: a. new SID / STAR VIDRI to Grand Canaria (GCLP) airport; b. new STAR ODEGI (UN857) to Tenerife South (GCTS) and Grand

Canaria (GCLP) airports.

Objective:

To further improve the airspace organisation within Canarias UIR while providing specified routes to increase the capacity of the Canarias Terminal airspace.

Implemented 05 MAR 2015

Project Group:

RFG SW

Project Category:

Airspace Structure TMA

ESP

Originator(s):

IACA

Related proposals:

50.053b

62.021

73.052

75.022

Proposal ID : 84.005 Impl. Status: State(s) & Org. Comments:

103.

Project Name: New Castellon airport

Description: To create a new Castellon airport (LECH) and transfer a new airspace

volume from Barcelona sector DDS to Valencia TACC, including the LECH terminal procedures into LECL TMA and airspace changes to Barcelona ACC and Valencia ACC.

Objective:

To further improve the airspace structure at the interface between Barcelona ACC and Valencia ACC.

Implemented 05 MAR 2015

Project Category:

Airspace Structure ATC Sectors

ESP

Originator(s):

ESP

Proposal ID : 84.073 Impl. Status: State(s) & Org. Comments:

104.

Description: 1. To implement new ATS routes W/UW279, Z353, UY39, UY422,

UY611, UZ43, UZ526. 2. To realign existing ATS routes B/UB600, B623, G851, UN873.

3. To change the route availability from permanent to CDR or vice-versa of several ATS route segments.

4. To change in CDR remarks of the following ATS routes: UB623, UN728, UN729, UN857, UN871, UN873, UT770.

Objective: To further improve ATS route network within Spain.

Implemented 05 MAR 2015

Project Category:

ATS Routes

ESP

Originator(s):

ESP

Related proposals:

84.016

Page 115: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

104 29 May 2015 Edition: 1.0

Proposal ID : 81.050 Impl. Status: State(s) & Org. Comments:

105.

Description: To replace 5LNC EBONY.

Objective:

To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region, to improve the aeronautical information provided and be compliant with ICAO Annex 11.

Implemented 05 MAR 2015

Project Category:

5LNC

GBR

Originator(s):

EUROCONTROL ICAO

Annex 11 stated that the 5LNCs shall be unique.

EBONY is used 4 times worldwide and in ICARD is created by USA in 2001.

ICAO DM sent relevant message to GBR (DM24/01 MSG 14-034).

New name will be OSKOT.

Proposal ID : 81.076 Impl. Status: State(s) & Org. Comments:

106.

Description: To re-designate existing ATS route P/UP20 BKN - GORLO - LAPRA as M/UM20.

Objective:

To rationalise the existing ATS route designators between UK and Netherlands in order to comply with Annex 11 requirements.

Implemented 05 MAR 2015

Project Category:

Route Redesignation

GBR NLD

Originator(s):

EUROCONTROL

Proposal ID : 81.073a Impl. Status: State(s) & Org. Comments:

107.

Project Name: Direct Route Airspace Prestwick Phase 1

Description: To implement H24 Free Route Airspace FRA Operations (based on Direct Routings/ DCTs) above FL255 at Prestwick ACC within the

following ATC Sectors: a. Rathlin East Sector EGRAE b. Rathlin West Sector EGRAW c. Central Sector EGCEN

Objective:

To implement FRA Concept and further improve flight efficiency within a part of the Scottish UIR.

Implemented 05 MAR 2015

Project Group:

RFG NW

Project Category:

Free Route Airspace

GBR

Originator(s):

GBR

Airspace Change Proposal (ACP) sent to the UK CAA for approval.

FRA model of operations will be based on some 266 DCT (Direct Routings Available for flight planning purpose).

Related proposals:

81.073b

82.035

Proposal ID : 81.030 Impl. Status: State(s) & Org. Comments:

108.

Description: To replace 5LNC FRANK.

Objective:

To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region, to improve the aeronautical information provided and be compliant with ICAO Annex 11.

Implemented 05 MAR 2015

Project Category:

5LNC

GBR

Originator(s):

EUROCONTROL ICAO

Annex 11 stated that the 5LNCs shall be unique.

FRANK is used 7 times worldwide and is created in ICARD for USA.

ICAO DM sent relevant message to GBR.

Page 116: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

105 29 May 2015 Edition: 1.0

Proposal ID : 84.071 Impl. Status: State(s) & Org. Comments:

109.

Description:

To improve the category (swap from CDR 3 to CDR 2) and limit the conditional use (reduction of CDR 1 timing and vertical use) of several CDRs segments - UT416, UM872, L/UL612, Q865, UZ904, UM736, UN604, UY159, UT75, UL862.

Objective:

To further improve ATS route network within Italy.

Implemented 05 MAR 2015

Project Category:

ATS Routes CDRs

ITA

Originator(s):

ITA

Proposal ID : 84.092 / BM5057 Impl. Status: State(s) & Org. Comments:

110.

Project Name: CDR reclassification

Description:

To improve the categoty of the following CDRs: a. UN1 DIPEP - VIE: from CDR1 to PERM; b. M736 MAREP - CRN: from CDR3 to CDR1; c. UL862 BRD - LUPAL and UM872 MOKTO - LUPAL: from CDR3 to

CDR2; d. M/UM872 LUPAL - LATAN, UM736 MAREP - CRN and Z904 ALIXI -

GEMVI: from ATS permanent to CDR2; e. UZ904 ALIXI - GEMVI: from CDR1 to CDR2.

Objective:

To upgrade the availability of ATS routes affected by new configuration of military areas above Ionian sea.

Implemented 05 MAR 2015

Project Group:

FAB BLUE MED

Project Category:

CDRs

ITA

Originator(s):

ITA

Chnages are in the framework of implementation of new military areas over Ionian Sea classification of affected routes has been modified also introducing CDR2 for some segments/levels.

Related proposals:

84.093

Proposal ID : 84.030 Impl. Status: State(s) & Org. Comments:

111.

Description: To allow Night “Direct” flight planning option SAMAR DCT AKUDA.

Objective:

To allow additional shorter flight plannable option within Casablanca FIR.

Implemented 05 MAR 2015

Project Category:

DCTs RAD

MAR

Originator(s):

MAR

Availability is 22:00 - 06:00.

Proposal ID : 65.030c Impl. Status: State(s) & Org. Comments:

112.

Description: To design and introduce new SIDs/STARs for Krakow (EPKK) and Katowice (EPKT).

Objective:

To further improve the airspace organisation within Warszawa FIR in order to further reduce the existing RAD restrictions.

Implemented 05 MAR 2015

Project Category:

Airspace Structure

POL

Originator(s):

EUROCONTROL

Currently only arrival routes exist.

Related proposals:

62.091b

Page 117: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

106 29 May 2015 Edition: 1.0

Proposal ID : 83.071 Impl. Status: State(s) & Org. Comments:

113.

Project Name: RAD Promulgation

Description:

To publish in AIP Slovenia, ENR 1.10 FLIGHT PLANNING under paragraph 1. Procedures for the submission of a flight plan common text for Adherence to Airspace Utilization Rules and Availability - RAD inside Ljubljana FIR.

Objective:

To harmonize the RAD promulgation via the AIP by the ECAC States.

Implemented 05 MAR 2015

Project Group:

RFG SE

Project Category:

AIP RAD

SVN

Originator(s):

EUROCONTROL

Proposal ID : 84.068 / 21.022 Impl. Status: State(s) & Org. Comments:

114.

Description: To implement westbound ATS route UT888 ALRAM - ULKEM - BAYIR -

ETESU - SIV.

Objective:

To further improve ATS route network within Ankara FIR.

Implemented 05 MAR 2015

Project Group:

SG BLACK

Project Category:

ATS Routes

TUR IRN

Originator(s):

TUR IRN

Waypoint ALRAM changed from eastbound to bi-directional to allow westbound traffic flows from Gulf Area to aerodromes in Turkey and with destination southern Europe (Greece, Spain, Italy etc.), thus reducing the workload of the North East Sector of Ankara ACC.

Allowing coherence with agreement with Iran reflected in their TOS.

Proposal ID : 71.040a / 16.026a Impl. Status: State(s) & Org. Comments:

115.

Project Name: Free Route Airspace Ukraine, Step 1 (Sc 1a)

Description: To implement Free Route Airspace operations above FL275 within individual UTAs in Ukraine, Night from 20.00-05.00 (21.00-04.00).

Objective:

To implement FRA Concept and further improve flight efficiency within L'viv UTA, Kyiv UTA, Odesa UTA, Simferopol UTA and Dnipropetrovs'k UTA.

Implemented 05 MAR 2015

Project Group:

RFG SE SG BLACK

Project Category:

Free Route Airspace

UKR

Originator(s):

UKR

Free Route Airspace Ukraine - FRAU project

Related proposals:

71.040b / 16.026b

81.018a / 19.021a

81.018b / 19.021b

Proposal ID : 83.057 Impl. Status: State(s) & Org. Comments:

116.

Project Name: RAD Promulgation

Description:

To publish in AIP Ukraine, ENR 1.10 FLIGHT PLANNING under paragraph 1. Procedures for the submission of a flight plan common text for Adherence to Airspace Utilization Rules and Availability - RAD inside Ukrainian airspace.

Objective:

To harmonize the RAD promulgation via the AIP by the ECAC States.

Implemented 05 MAR 2015

Project Group:

RFG SE

Project Category:

AIP RAD

UKR

Originator(s):

EUROCONTROL

Page 118: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

107 29 May 2015 Edition: 1.0

Proposal ID : 75.029 Impl. Status: State(s) & Org. Comments:

117.

Project Name: New Wien ACC sectors - AWARD

Description: To introduce new additional sectors for Wien ACC and re-shape them

according to traffic flows.

Objective:

To further improve airspace organisation within Austria.

Implemented 02 APR 2015

Project Group:

FAB CE RFG SE

Project Category:

ATC Sectors

AUT

Originator(s):

AUT

ACC Wien Airspace Redesign - AWARD project.

Depending on traffic evolution and FRA assessment.

ATC delegation from Wien ACC to Karlsruhe UAC allowing shorter route options.

Related proposals:

77.072b

77.072c

82.041

Proposal ID : 84.009 Impl. Status: State(s) & Org. Comments:

118.

Project Name: Free Route Airspace Wien, FRAW, Stage 4a

Description:

a. To update Free Route Airspace Wien by providing additional DCTs available H24 within Wien ACC;

b. To update the usability of existing FRAW DCTs.

Objective:

To further improve the flight planning options within Wien FIR as a third step for FRAW (Free Route Airspace Wien) implementation while ensuring safety and enhance operational performance (capacity and flight efficiency) as well as reducing emissions.

Implemented 02 APR 2015

Project Group:

FAB CE

Project Category:

50 MPCPEs DCTs Free Route Airspace

AUT

Originator(s):

AUT

Phased implementation: Stage 1 implemented 18 October 2012 (37

DCTs). Stage 2 implemented 7 MAR 2013. Stage 3a/b implemented 6 MAR 2014 - 11

DEC 2014. Stage 4a implemented 2 April 2015, Stage

4b planned autumn 2015. Stage 5 planned 2016.

Related proposals:

76.047

77.072a, 77.072b, 77.072c, 77.072d

77.072e

Proposal ID : 81.092 Impl. Status: State(s) & Org. Comments:

119.

Description:

To implement the following new ATS routes (new waypoint): T110 as TBV – BAVRI, even, CDR1;

Objective:

To improve/shorten route options for flights to EDDM, EDM*, ETSI, LOWI/WS.

Implemented 02 APR 2015

Project Category:

ATS Routes DCTs

CZE DEU

Originator(s):

CZE

BAVRI 49 00 57N 013 30 46E new boundary point.

Germany initially will impose a RAD restriction for EPKK/EPKT to EDDM only.

Proposal ID : 83.012 Impl. Status: State(s) & Org. Comments:

120.

Description: To implement southbound ATS route UZ370 BAMTA - UNKEN - VAROB

- DETSA.

Objective:

To further improve ATS route network between Germany and Austria.

Implemented 02 APR 2015

Project Category:

ATS Routes

DEU AUT

Originator(s):

DEU AUT

BAMTA - UNKEN FL345 - FL660; UNKEN - VAROB - DETSA FL325 - FL660.

Page 119: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

108 29 May 2015 Edition: 1.0

Proposal ID : 84.067b Impl. Status: State(s) & Org. Comments:

121.

Project Name: ECAC States AIP en-route publication issues

Description:

Phase 2: To adapt the upper vertical limits, expressed in FL, of lower ATS routes within Germany - change of IFR FL to VFR FL - FL240 to FL245.

Objective:

To adapt in State AIP ATS routes vertical limits.

Implemented 02 APR 2015

Project Category:

AIP ATS Routes

DEU

Originator(s):

EUROCONTROL

Ongoing process estimated to be finished by end of 2016.

Proposal ID : 84.041 Impl. Status: State(s) & Org. Comments:

122.

Project Name: 5LNC

Description: To replace existing 5LNC VALDI.

Objective:

1. To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region;

2. To improve the aeronautical information provided; 3. To be compliant with ICAO Annex 11.

Implemented 02 APR 2015

Project Category:

5LNC

DEU

Originator(s):

EUROCONTROL ICAO

VALDI is with triple reservation in ICARD for Germany, Norway and Brazil.

Proposal for replacement is based on “Common criteria for replacement of duplicated 5LNCs” as VALDI is a common FIR boundary point between Norway and Island.

VALDI also on Tacan-Route and requires coordination with AFSBw.

OA/D to react accordingly.

Proposal ID : 75.076b Impl. Status: State(s) & Org. Comments:

123.

Project Name: IBP 2015

Description: To implement a new UK - Brest Paris interface after IBP 2013

implementaion.

Objective:

To improve the profiles for the London TMA departures via ETRAT and VEULE in the context of a PMS implementation for the DPE arrivals at the interface between Paris ACC and Brest ACC and London ACC.

Implemented 02 APR 2015

Project Category:

Airspace Structure Vertical FE

FRA GBR

Originator(s):

FRA

Re-organizing the sectorisation between Brest ACC and Paris ACC after having recoverd the current airspace "delegation" LAC had in the French UIR, north of ETRAT VEULE within the level band FL195/FL265 (IBP 2013, Step 1).

IBP2015 project replaces IBP2013 Step 2. The objectives remain the same but with a different solution to reach them.

Transfer of airspace from Brest ACC to Paris ACC as one of the solutions.

Proposal ID : 75.077b Impl. Status: State(s) & Org. Comments:

124.

Project Name: Marseille ACC re-organisation

Description: To implement a new upper level for Marseille ACC sectors 'LO' and

'LS' (DFL245 instead of DFL195 currently) for part of these sectors.

Objective:

To further improve the airspace structure within Marseille ACC and to enhance safety as well as capacity in the areas concerned.

Implemented 02 APR 2015

Project Category:

ATC Sectors

FRA

Originator(s):

FRA

Page 120: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

109 29 May 2015 Edition: 1.0

Proposal ID : 75.073a Impl. Status: State(s) & Org. Comments:

125.

Project Name: Paris ACC re-organisation - Phase 1

Description:

To re-organise the lower airspace and delegate ATS to APP units below FL145 for relevant airspace in Paris ACC.

Objective:

To further improve the airspace structure within France FIR.

Implemented 02 APR 2015

Project Category:

Airspace Structure

FRA

Originator(s):

FRA

Phase 2 planned summer 2016.

Related proposals:

69.089a

69.089c

69.089e

69.089f

75.073b

75.080

75.082

Proposal ID : 84.007 Impl. Status: State(s) & Org. Comments:

126.

Description: To activate the Olno-High sector as a stand-alone sector within the

Maastricht UAC Brussels Sector Group.

Objective:

To further improve the airspace structure within Maastricht UAC while providing an additional configuration enabling a better workload distribution between sectors in function of the traffic flows in the Brussels Sector Group

Implemented 02 APR 2015

Project Category:

ATC Sectors

MUAC

Originator(s):

MUAC

Activation of an existing (but until now “dormant”) sector configuration in Maastricht UAC’s Brussels Sector Group.

Proposal ID : 83.015 / 20.041 Impl. Status: State(s) & Org. Comments:

127.

Description: To implement bi-directional ATS route Z372 ELVOM - XIDMI.

Objective:

To further improve flight planning options between Norway and Sweden.

Implemented 02 APR 2015

Project Group:

SG BALTIC

Project Category:

DCTs

NOR SWE

Originator(s):

IATA

Z372 will be permanent ATS route (FL285 - FL660)

Proposal ID : 84.069 Impl. Status: State(s) & Org. Comments:

128.

Project Name: RAD Promulgation

Description:

To publish in AIP Norway, ENR 1.10 FLIGHT PLANNING under paragraph 1. Procedures for the submission of a flight plan common text for Adherence to Airspace Utilization Rules and Availability - RAD inside Norway.

Objective:

To harmonize the RAD promulgation via the AIP by the ECAC States.

Implemented 02 APR 2015

Project Category:

AIP RAD

NOR

Originator(s):

EUROCONTROL

Page 121: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

110 29 May 2015 Edition: 1.0

Proposal ID : 83.041 Impl. Status: State(s) & Org. Comments:

129.

Description: To re-align existing ATS route Z278 PENUN - PIXEG (new 5LNC) -

UNBUD and adjust the lower vertical limit.

Objective:

To adjust lower ATS route limit to harmonize with controlled airspace.

Implemented 02 APR 2015

Project Group:

RFG NW

Project Category:

ATS Routes

NOR FAB NEFAB

Originator(s):

NOR

Related proposals:

65.060

Proposal ID : 83.042 Impl. Status: State(s) & Org. Comments:

130.

Description:

To re-alignment the following existing ATS route: 1. P996 ROVPA - OLOLU - PEMOV - IPTON; 2. Z267 ROVPA - BATPA - INGAL.

Objective: To further improve the ATS route network in Norway FIR.

Implemented 02 APR 2015

Project Category:

ATS Routes

NOR FAB NEFAB

Originator(s):

NOR

Related proposals:

65.060

Proposal ID : 83.043 / 21.010 Impl. Status: State(s) & Org. Comments:

131.

Description:

To implement the follwoing bi-directional ATS routes to Svalbard island: 1. M604 …NONVU - OMEXA - ATSOT - ISD; 2. P600 … TRO - LOMVI - KOMUX - VAVAD - PITOL - LUNEV - ISD; 3. P853 RIXEM - TRO - LOMVI - BETMA - UVSAS - EDIKI - OTVIK -

AMPIS.

Objective: To further improve the airspace structure in Norway FIR /

Bodø OFIR by establishing segregated RNAV10 routes from continental Norway to Svalbard island

Implemented 02 APR 2015

Project Group:

SG BALTIC

Project Category:

ATS Routes

NOR FAB NEFAB ICAO

Originator(s):

NOR

Proposal ID : 83.064 Impl. Status: State(s) & Org. Comments:

132.

Project Name: ECAC States AIP en-route publication issues

Description:

To publish for all RNAV routes in ENR 3.3 the navigation accuracy requirement for each PBN (RNAV or RNP) route segment (new column).

Objective:

To resolve airspace data publication inconsistencies in State AIP.

Implemented 02 APR 2015

Project Category:

AIP

NOR

Originator(s):

EUROCONTROL

Proposal ID : 81.068a Impl. Status: State(s) & Org. Comments:

133.

Description: To implement southbound ATS routes UP974 TABIN - XOMBA.

Objective:

To further improve ATS route network within Bratislava FIR.

Implemented 02 APR 2015

Project Group:

RFG SE

Project Category:

ATS Routes

SVK HUN

Originator(s):

IATA

Currently P974 in Bratislava FIR is permanent bi-directional ATS route but segment TABIN - XOMBA is only available between 3600FT ALT - FL245.

Page 122: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

111 29 May 2015 Edition: 1.0

Proposal ID : 83.056 / 21.015 Impl. Status: State(s) & Org. Comments:

134.

Description:

To change the following ATS routes: a. L975: ALM inserted between ELVIX - NISLO. Segment ELVIX -

ALM becomes permanent all level; b. N150 as OGRIN – PEMAB – NOVRI; c. Z411 withdrawn; d. Z451 extended upper limit from FL245 to FL660.

Objective:

To further improve airspace structure within ESAA FIR.

Implemented 02 APR 2015

Project Group:

SG BALTIC

Project Category:

ATS Routes

SWE

Originator(s):

SWE

Related proposals:

83.003a / 20.038a

83.003b / 20.038b

Proposal ID : 83.003b / 20.038b Impl. Status: State(s) & Org. Comments:

135.

Description: To change the upper vertical limit of ATS route segment L996 GOSOT - ROE from FL245 to FL660.

Objective:

To further improve ATS route options via Sweden FIR.

Implemented 02 APR 2015

Project Group:

SG BALTIC

Project Category:

ATS Routes

SWE

Originator(s):

IATA

Related proposals:

83.003a / 20.038a

83.056 / 21.015

Proposal ID : 83.055 Impl. Status: State(s) & Org. Comments:

136.

Description: To implement bi-directoinal ATS route Z371 GEVRU - ARPIV - OSKOK.

Objective:

To further improve the airspace structure within ESAA FIR.

Implemented 02 APR 2015

Project Category:

ATS Routes

SWE

Originator(s):

SWE

Permanent ATS route FL115 (FL195) - FL660

Proposal ID : 71.014a Impl. Status: State(s) & Org. Comments:

137.

Project Name: New ARR/DEP LATI Phase 1

Description: To implement westbound ATS route T/UT2 DIRES - EBELA - KOFER.

Objective:

To further improve the airspace structure between Beograd FIR and Tirana FIR.

Implemented 30 APR 2015

Project Group:

RFG SE

Project Category:

Airspace Structure

ALB HRV SRB MNE

Originator(s):

HRV

To create circular flow for airports Tirana (LATI), Tivat (LYTV), Podgorica (LYPG) and Dubrovnik (LDDU) using Adriatic routes.

EBELA will be new FIR boundary point between Tirana FIR and Beograd FIR on straight line DIRES - KOFER allowing connection for DEP LATI via SID DIRES towards ATS route L/UL611.

Flights DEP LATI via RETRA to DBK will not be allowed. RAD restriction not required as ATS routes will be adapted not to allow such connection.

Related proposals:

71.014b

71.014c

71.014d

Page 123: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

112 29 May 2015 Edition: 1.0

Proposal ID : 84.079 Impl. Status: State(s) & Org. Comments:

138.

Project Name: Implementation of additional DCTs within FIR Ljubljana

Description: To allow additional set of new DCTs from FL165 and above within FIR /

AoR ACC Ljubljana.

Objective:

To offer shortest flight / flight planning option.

Implemented 30 APR 2015

Project Group:

RFG SE

Project Category:

DCTs Night Routes

AUT HRV FAB CE ITA SVN

Originator(s):

SVN

New DCTs are designed in line with neighbouring ACCs to offer shortest flight options.

Proposal ID : 83.028 / 21.001 Impl. Status: State(s) & Org. Comments:

139.

Description:

a. To withdraw the double designation of existing ATS route segments: i. RD M747 from M747 / N449 SULEL - DUKAN; ii. RD N92 from N92 / M747 LUSAL - SULEL.

b. To re-designate existing ATS routes segment N92 SULEL - BODKA as M747 (release of N92).

Objective:

To simplify the ATS route designation within Baku FIR and release RDs.

Implemented 30 APR 2015

Project Group:

SG BLACK

Project Category:

Route Redesignation

AZE

Originator(s):

EUROCONTROL

Proposal ID : 84.066 / 21.021 Impl. Status: State(s) & Org. Comments:

140.

Description:

a. To implement the following ATS routes: i. N70 BALUN - ROPKA; ii. T440 BAMAK - NASIL; iii. T444 XERBO - GILAB; iv. T447 PENOB - GOTUB - INSAN; v. T480 BAMAK - PIROG.

b. To re-align the following existing ATS routes: i. N35 RODAR - NAMAS; ii. N41 DUKAN - NAMAS; iii. L850 as SAGIL – GYD - BAKUV – ABROL; iv. M11 as MATAL – ED - EDATA – LUSAL – RITKO - ALUVO –

ERLEV; v. M747 as SULEL – DUKAN – BODKA; vi. N39 as EKRAM – GYD – BAKUV – MOSUM; vii. N55 as GYD - BAKUV – BETEK; viii. N60 as ROPKA - GYD - BAKUV – KUPAT; ix. N72 as NOBVA - GYD - BAKUV; x. N161 as PEMAN – ED - EDATA – LIMTI; xi. N199 as VETEN - ED - EDATA – LUSAL; …. ;GIVMO - GYD -

BAKUV .

Objective:

To further improve ATS route network within Baku FIR.

Implemented 30 APR 2015

Project Group:

SG BLACK

Project Category:

ATS Routes

AZE

Originator(s):

AZE

Page 124: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

113 29 May 2015 Edition: 1.0

Proposal ID : 68.005b Impl. Status: State(s) & Org. Comments:

141.

Description: To allow the use of GODEK for DEP LBSF with RFL below FL145 and to withdraw RAD restriction LYLB1000.

Objective:

To further improve the airspace structure and ATS route network between Sofia FIR and Beograd FIR.

Implemented 30 APR 2015

Project Group:

RFG SE

Project Category:

Airspace Structure RAD

BGR SRB

Originator(s):

EUROCONTROL

Might require further re-adaptation of Sofia TMA and ATS routes.

Upper limit of N188 segment GODEK –

OBLAK will be lowered to FL145.

Proposal ID : 82.007 Impl. Status: State(s) & Org. Comments:

142.

Description: To extend the availability of all CDRs1 by 1h from 04:00 (03:00) till 05:00 (04:00).

Objective:

To adapt the ATS routes time availability aligning it with Night FRA time.

Implemented 30 APR 2015

Project Group:

RFG SE

Project Category:

ATS Routes CDRs

BGR

Originator(s):

EUROCONTROL

The 1h difference still continues to create difficulties within the NMOC systems.

Night FRA is applicable 23:00 - 05:00 (22:00 - 04:00).

The CDRs1 are available MON - FRI 23:00 - 04:00 (22:00 - 03:00).

Proposal ID : 84.059 Impl. Status: State(s) & Org. Comments:

143.

Project Name: RAD Promulgation

Description:

To publish in AIP Bulgaria, ENR 1.10 FLIGHT PLANNING under paragraph 1. Procedures for the submission of a flight plan common text for Adherence to Airspace Utilization Rules and Availability - RAD inside Sofia FIR.

Objective:

To harmonize the RAD promulgation via the AIP by the ECAC States.

Implemented 30 APR 2015

Project Group:

RFG SE

Project Category:

AIP RAD

BGR

Originator(s):

EUROCONTROL

Proposal ID : 70.019m / CE0053 Impl. Status: State(s) & Org. Comments:

144.

Project Name: FRA DCT implementation package

Description: To allow westbound option OKANA DCT OBUTI ouside of FRA

operation.

Objective:

To further improve the ATS route network within the FAB CE area while providing additional shorter route options.

Implemented 30 APR 2015

Project Group:

FAB CE RFG SE

Project Category:

DCTs

BIH HRV SRB

Originator(s):

FAB CE

Availability 05.00 - 23.00 (04.00 - 22.00)

Page 125: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

114 29 May 2015 Edition: 1.0

Proposal ID : 83.033 / 21.005 Impl. Status: State(s) & Org. Comments:

145.

Description:

1. To implement bi-directional ATS routes: a. Y97 NIGBA - SOKVA; b. Z494 OKNOD - GATVA

2. To re-designate existing ATS route Y97 DUBIN - SOKVA as Y314.

Objective:

To further improve ATS route network between Riga FIR and Minsk FIR.

Implemented 30 APR 2015

Project Group:

SG BALTIC

Project Category:

ATS Routes

BLR LVA

Originator(s):

BLR LVA

NIGBA and OKNOD new boundary waypoints.

Y314 existing RD used by EST.

Proposal ID : 84.121 / 21.017 Impl. Status: State(s) & Org. Comments:

146.

Description: To implement bi-directional ATS route Z364 SOGBI - SOMAT.

Objective:

To further improve ATS route network between Vilnius FIR, Minsk FIR and L'viv FIR.

Implemented 30 APR 2015

Project Group:

SG BALTIC

Project Category:

ATS Routes

BLR LTU UKR

Originator(s):

BLR

Proposal ID : 84.002 Impl. Status: State(s) & Org. Comments:

147.

Project Name: New Transit Routes through TMA Zurich

Description:

To implement the following ATS routes through TMA Zurich for low-performance aircraft: 3. T625 WIL - SUBEX - ROMIR (CDR3); 4. T125 ROMIR - ENONO - EKTUM - WIL (CDR1).

Objective:

To shorten routings through TMA Zurich.

Implemented 30 APR 2015

Project Category:

TMA

CHE

Originator(s):

CHE

Proposal ID : 83.022 Impl. Status: State(s) & Org. Comments:

148.

Description:

To re-designate the following ATS routes: 1. N871 ABABI - DOMAL as Z39 (same segment with different RDs

N871/UZ39); 2. Z30 RODIS - AGNAV as P27.

Objective:

To adapt the ATS route designation in lower and upper airspace.

Implemented 30 APR 2015

Project Category:

Route Redesignation

DEU

Originator(s):

EUROCONTROL

Re-designation of N871 and Z30 within Praha FIR is planned for 5 FEB 2015.

Proposal ID : 83.027 Impl. Status: State(s) & Org. Comments:

149.

Description: To implement a new ATS route Y326 for departures Stuttgart/ EDDS.

Objective:

To further improve the ATS route network while providing an additional option for EDDS departures towards Austria and Italy.

Implemented 30 APR 2015

Project Category:

ATS Routes

DEU

Originator(s):

DEU

Only for EDDS departures. Not available for traffic via UNKEN, BIRGI

and LIZUM.

Page 126: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

115 29 May 2015 Edition: 1.0

Proposal ID : 83.068 Impl. Status: State(s) & Org. Comments:

150.

Description: To upgrade the following ATS route segments from CDR2 to CDR1: 5. T70 NOPNI - XEVAP - GODOB - SUTEV; 6. T94 OGTUD - SUTEV; 7. T320 NOPNI - OTVEM - EKMIK.

Objective:

To further improve ATS route network within Finland FIR.

Implemented 30 APR 2015

Project Category:

ATS Routes CDRs

FIN SWE

Originator(s):

FIN

Proposal ID : 84.112 Impl. Status: State(s) & Org. Comments:

151.

Project Name: RAD Promulgation

Description:

To publish in AIP Finland, ENR 1.10 FLIGHT PLANNING under paragraph 1. Procedures for the submission of a flight plan common text for Adherence to Airspace Utilization Rules and Availability - RAD inside Helsinki FIR.

Objective:

To harmonize the RAD promulgation via the AIP by the ECAC States.

Implemented 30 APR 2015

Project Category:

AIP RAD

FIN

Originator(s):

EUROCONTROL

Proposal ID : 84.021 Impl. Status: State(s) & Org. Comments:

152.

Description: To re-designate existing ATS route P184 NIKTI - OKTIM - ARNAS as N181.

Objective:

To rationalise the existing ATS route designators in Greece in order to further facilitate flight planning.

Implemented 30 APR 2015

Project Category:

Route Redesignation

GRC

Originator(s):

EUROCONTROL

As from 11 DEC 2014 Romania and Bulgaria re-designated P184 as M748 / N181.

Currently there is a RD break of P184 which might cause some processing problems to ATC systems as the same RD exists in both Romania and Greece.

Proposal ID : 74.016b Impl. Status: State(s) & Org. Comments:

153.

Project Name: Free Route Airspace Zagreb, Phase 5a - SEAFRA

Description: To introduce Night Free Route Airspace in Zagreb ACC AoR, FL325+.

Objective:

To further improve airspace organisation within Sarajevo FIR and Zagreb FIR.

Implemented 30 APR 2015

Project Group:

FAB CE RFG SE

Project Category:

Free Route Airspace

HRV BIH

Originator(s):

HRV

Zagreb ACC AoR, above FL325. In coordination with Free Route introduction

in the Area of responsibility of Beograd ACC - SEAFRA.

FRA cross border application in Zagreb ACC and Beograd ACC AoRs (Republic of Croatia, Bosnia and Herzegovina, Montenegro and Republic of Serbia).

Night period 23:00 - 05:00 (22:00 - 04:00).

Page 127: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

116 29 May 2015 Edition: 1.0

Proposal ID : 69.068b Impl. Status: State(s) & Org. Comments:

154.

Project Name: Central sector Zagreb Phase 2a

Description: Additional Sector Group Phase 2a: Lateral and vertical implementation of Central sector FL355 and above.

Objective:

To further improve the airspace structure within Zagreb FIR and increase capacity.

Implemented 30 APR 2015

Project Group:

RFG SE

Project Category:

ATC Sectors

HRV

Originator(s):

HRV

Depends on new ATC system and developments in Bosnia and Herzegovina.

Phase 2b: below FL355 proposed spring 2016

Related proposals:

69.001

74.051b

Proposal ID : 74.051b Impl. Status: State(s) & Org. Comments:

155.

Description: To withdraw RAD restriction LD2038.

Objective:

To further improve airspace utilisation between Ljubljana FIR, Zagreb FIR and Sarajevo FIR.

Implemented 30 APR 2015

Project Group:

RFG SE

Project Category:

RAD

HRV SVN BIH

Originator(s):

EUROCONTROL

Permanent rerouting of departing traffic Offloading LDZOLDN sector all DEP LJLJ

to LATI, LWSK, BKPR/ LYPR, Eastern Greek islands and Western Turkish resorts are pushed on dog-leg segment via ROKSA - GISER - PALEZ - SOLGU.

Restriction artificially blocks shortest option, permanently penalises all departures regardless of its necessity, connection with existing ACC sectorisation and sector configurations applied during H24 period.

Following additional analyses on positive and negative impact on ATC this RAD restriction could also be replaced by rerouting scenario, if required.

Also connected to Zagreb ACC Central Sector introduction.

Relieved during night (20:00 - 05:00 summer time) as of 31 MAY 2012.

SVN & Adria Airways support withdrawal.

Related proposals:

69.068b

74.051a

Proposal ID : 70.019j / CE0050 Impl. Status: State(s) & Org. Comments:

156.

Project Name: FRA DCT implementation package

Description: To allow eastbound option PODET DCT ETIDA ouside of FRA operation.

Objective:

To further improve the ATS route network within the FAB CE area while providing additional shorter route options.

Implemented 30 APR 2015

Project Group:

FAB CE RFG SE

Project Category:

DCTs

HRV SRB

Originator(s):

FAB CE

Availability 05.00 - 23.00 (04.00 - 22.00)

Page 128: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

117 29 May 2015 Edition: 1.0

Proposal ID : 66.071c Impl. Status: State(s) & Org. Comments:

157.

Project Name: Roma TMA

Description:

To re-organise existing Roma TMA.

Objective:

To further improve the airspace organisation within Italy FIR.

Implemented 30 APR 2015

Project Category:

TMA

ITA

Originator(s):

ITA

Changes in lateral and vertical (mainly lower) limits.

Implementation together with the re-organisation of Milano TMA, Milano ACC, Roma ACC, Padova ACC and Brindisi ACC.

Related proposals:

75.037a

79.034a

79.034b

79.034c

Proposal ID : 77.005 Impl. Status: State(s) & Org. Comments:

158.

Description: To implement bidirectional ATS route W/UW36 CRAYE - ENOXA - BAR

(FL095 - FL460).

Objective:

To further improve ATS route network within Brindisi FIR for arrivals to LIBD.

Implemented 30 APR 2015

Project Group:

RFG SE

Project Category:

ATS Routes

ITA

Originator(s):

EUROCONTROL

Swap of existing Night DCT options: DCT CRAYE - ENOXA, DCT ENOXA - CRAYE, DCT ENOXA - BAR, DCT BAR - ENOXA into Permanent bi-directional ATS route.

Related proposals:

78.030

Proposal ID : 84.061a Impl. Status: State(s) & Org. Comments:

159.

Project Name: RAD Promulgation

Description:

To publish in AIP Italy, ENR 1.10 FLIGHT PLANNING under paragraph 1. Procedures for the submission of a flight plan common text for Adherence to Airspace Utilization Rules and Availability - RAD inside Italian FIRs.

Objective:

To harmonize the RAD promulgation via the AIP by the ECAC States.

Implemented 30 APR 2015

Project Group:

RFG SE

Project Category:

AIP RAD

ITA

Originator(s):

EUROCONTROL

Proposal ID : 84.061b Impl. Status: State(s) & Org. Comments:

160.

Project Name: ECAC States AIP en-route publication issues

Description:

To withdraw from ENR 3.5 the RAD and properly re-name as "Other Routes".

Objective:

To resolve airspace data publication inconsistencies in State AIP.

Implemented 30 APR 2015

Project Group:

RFG SE

Project Category:

AIP

ITA

Originator(s):

EUROCONTROL

Related proposals:

84.061a

Page 129: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

118 29 May 2015 Edition: 1.0

Proposal ID : 84.013 Impl. Status: State(s) & Org. Comments:

161.

Description: To implement bi-directional ATS route Q/UQ81 PAPIZ - EKTOL.

Objective:

To further improve the availability of ATS routes within Brindisi FIR.

Implemented 30 APR 2015

Project Group:

FAB BLUE MED

Project Category:

ATS Routes

ITA

Originator(s):

ITA

Swap of existing Night DCT options DCT PAPIZ - EKTOL, DCT EKTOL - PAPIZ into permanent bi-directional ATS route.

Proposal ID : 84.087 Impl. Status: State(s) & Org. Comments:

162.

Project Name: Z/UZ242

Description: To implement northbound ATS route segment Z/UZ242 TIMOV - TAQ (FL095 - FL460).

Objective: To avoid convergence of traffic over GIKIN and shorten the

routing for traffic overflying TAQ northbound.

Implemented 30 APR 2015

Project Group:

FAB BLUE MED

Project Category:

ATS Routes

ITA

Originator(s):

ITA

Related proposals:

79.034c

Proposal ID : 84.084 Impl. Status: State(s) & Org. Comments:

163.

Project Name: DCT swapped in ATS routes

Description:

To swap the following existing Night DCT options: DCT PAPIZ - FASAN, DCT FASAN - LUXIL, DCT FASAN - PAPIZ, DCT LUXIL - FASAN into Permanent bi-directional ATS route M/UM742 PAPIZ - FASAN - LUXIL.

Objective:

To furrther improve the availability of ATS route network within Italy.

Implemented 30 APR 2015

Project Group:

FAB BLUE MED

Project Category:

ATS Routes DCTs

ITA

Originator(s):

ITA

Related proposals:

71.085b

Proposal ID : 84.085 Impl. Status: State(s) & Org. Comments:

164.

Project Name: Y/UY941

Description: To implement southbound ATS route segment of Y/UY941 AKADO -

BASOG (FL095 - FL460).

Objective: To allow the possibility for traffic departing southbound from

LIPZ toplan new SID to AKADO Y/UY941

Implemented 30 APR 2015

Project Group:

FAB BLUE MED

Project Category:

ATS Routes

ITA

Originator(s):

ITA

Related proposals:

79.034c

Proposal ID : 84.086 Impl. Status: State(s) & Org. Comments:

165.

Project Name: M/UM196

Description: To implement the following changes: 8. M196 new westbound segment AKADO - KOPER; 9. UM196 lowering of lower vertical limit of segment AKADO - KOPER

from FL245 to FL195.

Objective: To allow the possibility of planning via M/UM196 to traffic

departing westbound from LIPZ.

Implemented 30 APR 2015

Project Group:

FAB BLUE MED

Project Category:

ATS Routes

ITA

Originator(s):

ITA

Related proposals:

79.034c

Page 130: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

119 29 May 2015 Edition: 1.0

Proposal ID : 84.114 Impl. Status: State(s) & Org. Comments:

166.

Project Name: RAD Promulgation

Description:

To publish in AIP Lithuania, ENR 1.10 FLIGHT PLANNING under paragraph 1. Procedures for the submission of a flight plan common text for Adherence to Airspace Utilization Rules and Availability - RAD inside Vilnius FIR.

Objective:

To harmonize the RAD promulgation via the AIP by the ECAC States.

Implemented 30 APR 2015

Project Category:

AIP RAD

LTU

Originator(s):

EUROCONTROL

Proposal ID : 83.032 / 21.004 Impl. Status: State(s) & Org. Comments:

167.

Description: a. To change to bi-directional existing westbound ATS route L198

MILTA - DEREX. b. To change DEREX from FRA (E) Entry point to FRA (E / X) Entry /

Exit point.

Objective:

To further improve flight planning options within DS FRA and Riga FIR.

Implemented 30 APR 2015

Project Group:

SG BALTIC

Project Category:

ATS Routes

LVA SWE

Originator(s):

IATA

Proposal ID : 80.031 / 19.001 Impl. Status: State(s) & Org. Comments:

168.

Description:

To implement the following bi-directional ATS segments: 1. Z443 VEDEN - EKLIN; 2. Z442 GELDA - LEP.

Objective:

To further improve the airspace structure within Riga FIR.

Implemented 30 APR 2015

Project Group:

SG BALTIC

Project Category:

ATS Routes

LVA

Originator(s):

IATA

Latvia: further studies required on VEDEN - TIRIN.

Proposal ID : 83.034 / 21.006 Impl. Status: State(s) & Org. Comments:

169.

Description: a. To implement bi-directional ATS route N623 PODIL - URIDO -

NEKET. b. To re-designate the following existing ATS route segments:

i. N623 MILTA - NEKET as M870; ii. L199 RASEL - MILTA also as Y130 (double designation); iii. N623 MILTA - RIA - ERIVA - PODIL as Y130.

Objective:

To further improve ATS route network between Riga FIR and Vilnius FIR.

Implemented 30 APR 2015

Project Group:

SG BALTIC

Project Category:

ATS Routes

LVA LTU

Originator(s):

LVA LTU

URIDO new boundary waypoint. Y130 existing RD used by SWE.

Page 131: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

120 29 May 2015 Edition: 1.0

Proposal ID : 83.061 / 21.016 Impl. Status: State(s) & Org. Comments:

170.

Project Name: Free Route Airspace Moldova - Phase 2

Description: To extend time availability of NIGHT Free Route Airspace within Chisinau FIR (NFRAC).

Objective:

To further improve the airspace organisation within Chisinau FIR.

Implemented 30 APR 2015

Project Group:

RFG SE SG BLACK

Project Category:

Free Route Airspace

MDA

Originator(s):

MDA

Night period 20.00 - 05.00 (without specification winter/summer)

Related proposals:

72.052 / 14.015

85.027 / 22.029

Proposal ID : 82.039 Impl. Status: State(s) & Org. Comments:

171.

Project Name: New civil-military airport Radom - EPRA

Description:

1. To implement the following departure route segments: a. T353 KURAV- EVINA - IRBOS westbound; b. T354 OMAVA - SUMAM eastbound.

2. To implement the following arrival route segments: a. T355 POLON - AGAVA - KURAV eastbound; b. T356 LEGNO - ROMEG westbound; c. T357 NETAB - ROMEG westbound.

3. To create a new CTR, TMA Radom and to connect new SID and STAR procedures with the existing ATS route network in Poland.

Objective: To further improve the airspace structure within Warsawa FIR

while changing the current military airport Radom/ EPRA into a shared civil-military airport.

Implemented 30 APR 2015

Project Category:

Airspace Structure TMA

POL

Originator(s):

POL

Proposal ID : 84.060 Impl. Status: State(s) & Org. Comments:

172.

Project Name: RAD Promulgation

Description:

To publish in AIP Romania, ENR 1.10 FLIGHT PLANNING under paragraph 1. Procedures for the submission of a flight plan common text for Adherence to Airspace Utilization Rules and Availability - RAD inside Bucuresti FIR.

Objective:

To harmonize the RAD promulgation via the AIP by the ECAC States.

Implemented 30 APR 2015

Project Group:

RFG SE

Project Category:

AIP RAD

ROU

Originator(s):

EUROCONTROL

Proposal ID : 84.015 Impl. Status: State(s) & Org. Comments:

173.

Description: 1. To permanently withdraw the ATS route: P993; 2. To re-designate existing ATS route P993 OKLOP - DONIV - MAVIT

(- MOPUG) as N188 (release of P993).

Objective: To further adapt the ATS route network and release RD.

Implemented 30 APR 2015

Project Category:

ATS Routes

ROU SRB

Originator(s):

EUROCONTROL

MOPUG has become an entry point for Budapest FIR once with HUFRA implementation on 5 FEB 2015.

Page 132: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

121 29 May 2015 Edition: 1.0

Proposal ID : 82.009 / 20.019 Impl. Status: State(s) & Org. Comments:

174.

Description: To implement bi-directional ATS route B709 KUNER - TIGNU (FL095 -

FL490).

Objective:

To further improve ATS route network within Kaliningrad FIR.

Implemented 30 APR 2015

Project Group:

SG BALTIC

Project Category:

ATS Routes

RUS POL LTU

Originator(s):

RUS

Route segment is entirely within Kaliningrad FIR but might have an impact of ATS route network and traffic flows within Warszawa FIR and Vilnius FIR.

Route segment will be closed every WED and THU 08.00 - 15.00 UTC.

Proposal ID : 82.012 / 20.022 Impl. Status: State(s) & Org. Comments:

175.

Description: To implement bi-directional ATS route R239 / L733 RANOK - OTVOV -

ASKOR.

Objective:

To further improve ATS route network between Kaliningrad FIR and Vilnius FIR.

Implemented 30 APR 2015

Project Group:

SG BALTIC

Project Category:

ATS Routes

RUS POL LTU

Originator(s):

RUS

Route segment might have an impact of ATS route network and traffic flows within Warszawa FIR.

OTVOV new boundary point between RUS / LTU.

Route segment RANOK - OTVOV (FL095 - FL500) will be closed every WED and THU 08.00 - 15.00 UTC.

Proposal ID : 82.013 / 20.023 Impl. Status: State(s) & Org. Comments:

176.

Description: To implement bi-directional ATS route B810 / L134 KUNER - RONUN -

GARSO.

Objective:

To further improve ATS route network between Kaliningrad FIR and Vilnius FIR.

Implemented 30 APR 2015

Project Group:

SG BALTIC

Project Category:

ATS Routes

RUS POL LTU

Originator(s):

RUS

Route segment might have an impact of ATS route network and traffic flows within Warszawa FIR.

RONUN new boundary point between RUS / LTU.

Proposal ID : 82.010 / 20.020 Impl. Status: State(s) & Org. Comments:

177.

Description: To implement bi-directional ATS route B704 / Y343 GOMED - NERIG -

ASKOR.

Objective:

To further improve ATS route network between Kaliningrad FIR and Vilnius FIR.

Implemented 30 APR 2015

Project Group:

SG BALTIC

Project Category:

ATS Routes

RUS POL LTU

Originator(s):

RUS

Route segment might have an impact of ATS route network and traffic flows within Warszawa FIR.

Proposal ID : 82.011 / 20.021 Impl. Status: State(s) & Org. Comments:

178.

Description: To implement bi-directional ATS route B489 / Y344 LATMI - PELUG -

ITVUL - PODIL.

Objective:

To further improve ATS route network between Kaliningrad FIR and Vilnius FIR.

Implemented 30 APR 2015

Project Group:

SG BALTIC

Project Category:

ATS Routes

RUS POL LTU

Originator(s):

RUS

Route segment might have an impact of ATS route network and traffic flows within Warszawa FIR.

ITVUL new boundary point between RUS / LTU.

Page 133: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

122 29 May 2015 Edition: 1.0

Proposal ID : 70.019v / CE0062 Impl. Status: State(s) & Org. Comments:

179.

Project Name: FRA DCT implementation package

Description: To allow eastbound option ROLBA DCT NISVA ouside of FRA operation.

Objective:

To further improve the ATS route network within the FAB CE area while providing additional shorter route options.

Implemented 30 APR 2015

Project Group:

FAB CE RFG SE

Project Category:

DCTs

SRB BIH

Originator(s):

FAB CE

Availability 05.00 - 23.00 (04.00 - 22.00)

Proposal ID : 75.054b Impl. Status: State(s) & Org. Comments:

180.

Description: To change the H24 availability reducing it only during the day for RAD restriction LY2001.

Objective:

To further improve airspace utilisation within Beograd FIR/UIR.

Implemented 30 APR 2015

Project Group:

RFG SE

Project Category:

RAD

SRB

Originator(s):

SRB

Proposal ID : 74.059a Impl. Status: State(s) & Org. Comments:

181.

Project Name: Free Route Airspace Beograd, Phase 5a - SEAFRA

Description: To introduce Night Free Route Airspace in Beograd ACC AoR, FL325+.

Objective:

To further improve airspace organisation within Sarajevo FIR and Beograd FIR.

Implemented 30 APR 2015

Project Group:

FAB CE RFG SE

Project Category:

Free Route Airspace

SRB MNE BIH

Originator(s):

SRB

Beograd ACC AoR, above FL325. In coordination with Free Route introduction

in the Area of responsibility of Zagreb ACC - SEAFRA.

FRA cross border application in Zagreb ACC and Beograd ACC AoRs (Republic of Croatia, Bosnia and Herzegovina, Montenegro and Republic of Serbia).

Night period 23:00 - 05:00 (22:00 - 04:00).

Proposal ID : 83.013 Impl. Status: State(s) & Org. Comments:

182.

Description:

To allow “Direct” (DCT) cross-border flight planning options from / to KFOR Sector boundary points.

Objective:

To further improve flight planning options within the AoRs of Beograd ACC and Zagreb ACC.

Implemented 30 APR 2015

Project Group:

RFG SE

Project Category:

DCTs

SRB HRV BIH

Originator(s):

SRB

The aim is to balance the traffic flows in the region and contribute to safety.

Will be studied as part of DCTs reconsideration inside Beorgad ACC AoR and Zagreb ACC AoR.

Comment by Albania: Since Albania, due to opening of KFOR sector, has suffered loss of traffic more than anyone else in the region it would be appreciated if initiatives to deviate more flows from Albanian airspace are studied carefully in order not to deviate more flows and cause even more loses for Albania.

Page 134: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

123 29 May 2015 Edition: 1.0

Proposal ID : 76.042 Impl. Status: State(s) & Org. Comments:

183.

Description: To allow the flight planning of the following DCTs ouside of FRA

operation: 1. UTEKA - VANAX; 2. UTEKA - GORPA; 3. UTEKA - RASIN.

Objective:

To further improve flight plannable options within South East Europe.

Implemented 30 APR 2015

Project Group:

RFG SE

Project Category:

50 MPCPEs DCTs RAD

SRB HRV

Originator(s):

SRB HRV

Availability 05.00 - 23.00 (04.00 - 22.00)

Proposal ID : 84.113 Impl. Status: State(s) & Org. Comments:

184.

Project Name: RAD Promulgation

Description:

To publish in AIP Serbia / Montenegro, ENR 1.10 FLIGHT PLANNING under paragraph 1. Procedures for the submission of a flight plan common text for Adherence to Airspace Utilization Rules and Availability - RAD inside Beograd FIR.

Objective:

To harmonize the RAD promulgation via the AIP by the ECAC States.

Implemented 30 APR 2015

Project Group:

RFG SE

Project Category:

AIP RAD

SRB MNE

Originator(s):

EUROCONTROL

Proposal ID : 84.072 Impl. Status: State(s) & Org. Comments:

185.

Description:

To allow flight plannable DCT options to connect with ATS route network existing LJLJ SIDs LUPIX and MODRO.

Objective:

To further improve airspace organisation within Ljubljana TMA and facilitate the departing flows.

Implemented 30 APR 2015

Project Group:

RFG SE

Project Category:

Airspace Structure TMA

SVN

Originator(s):

SVN

RAD Appendix 4 will be revised accordingly.

Proposal ID : 83.062 Impl. Status: State(s) & Org. Comments:

186.

Description: a. To implement bi-directional ATS route T519 NOGBO - LIVLI -

PEMAB (permanent FL195 - FL660). b. To change from CDR1 H24 to PERM the following ATS route

segments: i. N150 NUGTA - NOVRI; ii. T317 KRA - NOVRI; iii. Z108 ATLEM - AGMOL.

Objective:

To enable management of traffic when TRAs are activated.

Implemented 30 APR 2015

Project Category:

ATS Routes CDRs

SWE

Originator(s):

SWE

Pending on CAA decision regarding extension of TRAs. New ATS-route is implemented to give option when N150 is clsd.

Page 135: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

124 29 May 2015 Edition: 1.0

Proposal ID : 69.041b / DU0061 Impl. Status: State(s) & Org. Comments:

187.

Project Name: LETNI / VELBA dualisation

Description:

To implement the following ATS changes and use LETNI as west/southbound only: c. N731 TIMUR - LUKOV - LETNI - BITLA new westbound route (RD

extension); d. T262 LETNI - ERANA new westbound route (re-alignment); e. N731 BITLA - RAXAD re-designation as T261.

Objective:

To further improve the ATS route network between Skopje FIR and Sofia FIR (LETNI / VELBA dualisation).

Implemented 28 MAY 2015

Project Group:

FAB DANUBE RFG SE

Project Category:

ATS Routes

BGR MKD

Originator(s):

EUROCONTROL

Currently both LETNI (below FL245) and VELBA (UNL) are used as bidirectional.

Related proposals:

69.041a

69.041c

74.006

74.007

Proposal ID : 69.041c / DU0062 Impl. Status: State(s) & Org. Comments:

188.

Project Name: LETNI / VELBA dualisation

Description:

To implement the following ATS changes and use LETNI as west/southbound only: f. P92 PDV - LETNI new westbound route (RD extension); g. T214 LETNI - SIN change from bi-directional to westbound; h. P92 LETNI - SKJ change from bi-directional to westbound; i. P92 BLO - LETNI re-designation as T214 and change from bi-

directional to westbound.

Objective:

To further improve the ATS route network between Skopje FIR and Sofia FIR (LETNI / VELBA dualisation).

Implemented 28 MAY 2015

Project Group:

FAB DANUBE RFG SE

Project Category:

ATS Routes

BGR MKD

Originator(s):

EUROCONTROL

Currently both LETNI (below FL245) and VELBA (UNL) are used as bidirectional.

Related proposals:

69.041a

69.041b

74.006

74.007

Proposal ID : 81.002a Impl. Status: State(s) & Org. Comments:

189.

Project Name: ECAC States AIP en-route publication issues - Phase 1.

Description:

To resolve the spotted AIP ENR 3.3 publication issues - Phase 1.

Objective:

To resolve airspace data publication inconsistencies in State AIP.

Implemented 28 MAY 2015

Project Group:

RFG SE

Project Category:

AIP

BGR

Originator(s):

EUROCONTROL

Further discussed at BULATSA / EUROCONTROL bi-lateral meeting in October 2013.

AIS Office prepares the relevant updates in accordance with ECAC States AIP en-route publication issues document.

Related proposals:

81.002b

Page 136: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

125 29 May 2015 Edition: 1.0

Proposal ID : 69.041a / DU0007 Impl. Status: State(s) & Org. Comments:

190.

Project Name: LETNI / VELBA dualisation

Description:

To implement the following ATS changes and use VELBA as east/northbound only: j. T215 SIN - VELBA change from bi-directional to eastbound; k. T343 BITLA - VELBA - WAK change from bi-directional to

eastbound; l. P127 DOBAR - VELBA - PDV change from bi-directional to

eastbound; m. P127 VADEN - PDV re-designation as P92; n. T261 VELBA - XAXAN withdrawal.

Objective:

To further improve the ATS route network between Skopje FIR and Sofia FIR (LETNI / VELBA dualisation).

Implemented 28 MAY 2015

Project Group:

FAB DANUBE RFG SE

Project Category:

ATS Routes

BGR MKD

Originator(s):

EUROCONTROL

Currently both LETNI (below FL245) and VELBA (UNL) are used as bidirectional.

Related proposals:

69.041b

69.041c

74.006

74.007

Proposal ID : 83.059 Impl. Status: State(s) & Org. Comments:

191.

Project Name: ADORU / VADEN / IBLAL area re-organization

Description:

To establish two new FIR boundary points, re-allocate ARR/DEP flows and re-organize existing ATS routes inside/between Sofia FIR and Istanbul FIR.

Objective:

To further improve ATS route network between Bulgaria and Turkey.

Implemented 28 MAY 2015

Project Group:

RFG SE

Project Category:

ATS Routes

BGR TUR

Originator(s):

BGR

Proposed airspace re-organization is required due to increased traffic flows to/from LTBA / LTFJ airports

Initial proposal is as follows: ADORU - overflights and ARR LT.., except

LTBA; RILEX - new point East of ADORU for ARR

LTBA; VADEN - overflights and DEP LTBA/LTFJ

via LYBA FIR; TUDBU - new point East of VADEN for DEP

LTBA/LTFJ via LRBB FIR; IBLAL - DEP LTBA/LTFJ mainly via

ARGES. The above initial proposal was already

discussed between Bulgaria and Turkey.

Proposal ID : 85.017 Impl. Status: State(s) & Org. Comments:

192.

Description: To allow “Direct” H24 flight planning option LEMBI DCT DOKEL and

vice-versa.

Objective:

To further improve flight planning options for flights between Adriatic coast and Scandinavia.

Implemented 28 MAY 2015

Project Category:

DCTs

CZE

Originator(s):

IATA

New DCT LEMBI DOKEL will allow to flight plan via LOKVU TOMTI.

It will be published via NOTAM, from 25JUN by RAD Appendix 4.

Related proposals:

85.019

Page 137: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

126 29 May 2015 Edition: 1.0

Proposal ID : 83.005 Impl. Status: State(s) & Org. Comments:

193.

Description:

To re-designate the following existing ATS routes: 1. Z102 GIBMA - WSR as L23; 2. Z/UZ102 WSR - HAM- BINKA as L/UL23 (release of Z102); 3. UL190 HAM - KEMAD as UP605 (release of L190); 4. UZ611 LBE - HAM as UM170 (release of Z611).

Objective:

To further simplify the existing RDs within Germany.

Implemented 28 MAY 2015

Project Category:

Route Redesignation

DEU

Originator(s):

EUROCONTROL

RD L23 is currently used by Poland till BINKA.

RD P605 is currently used by Germany till HAM. Between HAM and KEMAD area for generally overlapping segments RDs used are P605 and UL190.

Proposal ID : 84.064 Impl. Status: State(s) & Org. Comments:

194.

Project Name: LEMO Departure

Description:

To revise current LEMO departure routing (RAD Appendix 5) as follows: o. FROM: LEMO - ALCOL - SVL - ONUBA. p. TO: LEMO - ONUBA.

Objective: To further improve the DEP options from Moron AB (LEMO)

airport for USAF flights.

Implemented 28 MAY 2015

Project Category:

DCTs

ESP U.S.A.F.E

Originator(s):

U.S.A.F.E

Save USAF €4K per flight

Proposal ID : 83.048 Impl. Status: State(s) & Org. Comments:

195.

Project Name: TGR - TMA Barcelona ACC

Description:

To modify two approach sectors of Barcelona TMA and extend the TMA sector boundary to the border with Marseille ACC to enable direct transfer of departing flights from Barcelona TMA sector to Marseille ACC. creation of a new XAR elementary sector (XAL reduced); modification of TGR sector (the actual TGR volume will expand

northeast) and opened during high season to absorb some of the traffic from XAL sector.

Objective:

To further improve airspace structure and sector capacity in Barcelona ACC while reducing the delays caused by the current XAL sector in high season (May to October).

Implemented 28 MAY 2015

Project Group:

RFG SW

Project Category:

Airspace Structure ATC Sectors

ESP

Originator(s):

ESP

Proposal ID : 82.003 Impl. Status: State(s) & Org. Comments:

196.

Description:

To re-designate the following existing ATS routes: a. L175 CRK - BANBA - STU as P2; b. UL175 BANBA - STU as UP2.

Objective:

To rationalise the existing ATS route designators between UK and Ireland in order to comply with Annex 11 requirements.

Implemented 28 MAY 2015

Project Category:

Route Redesignation

GBR IRL

Originator(s):

EUROCONTROL

Requirement is due to duplicate use in different parts of the ICAO EUR/NAT region of route designator L175.

L175 is currently also used on segment LAMSI - ANEXA by DEU / AUT / SVK.

Page 138: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

127 29 May 2015 Edition: 1.0

Proposal ID : 84.118 Impl. Status: State(s) & Org. Comments:

197.

Description: To replace existing 5LNC KOSUN with OSGOG.

Objective:

a. To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region;

b. To improve the aeronautical information provided; c. To be compliant with ICAO Annex 11.

Implemented 28 MAY 2015

Project Category:

5LNC

GBR U.S.A.F.E

Originator(s):

EUROCONTROL ICAO

KOSUN is reserved in ICARD for Norway. Point is used in UK for military aerodrome

purpose at EGUN. Proposal for replacement is based on

“Common criteria for replacement of duplicated 5LNCs” as point is not reserved for UK.

Proposal ID : 81.086 Impl. Status: State(s) & Org. Comments:

198.

Project Name: Santorini - LGSR TMA

Description: To extend to the south of Santorini/ LGSR TMA.

Objective:

To fully contain the trajectory of the recently redesign STARs, Approach procedures for both RWYs of the Santorini airport.

Implemented 28 MAY 2015

Project Group:

RFG SE

Project Category:

TMA

GRC

Originator(s):

GRC

Proposal ID : 84.111 Impl. Status: State(s) & Org. Comments:

199.

Project Name: RAD Promulgation

Description:

To publish in AIP Croatia, ENR 1.10 FLIGHT PLANNING under paragraph 1. Procedures for the submission of a flight plan common text for Adherence to Airspace Utilization Rules and Availability - RAD inside Zagreb FIR.

Objective:

To harmonize the RAD promulgation via the AIP by the ECAC States.

Implemented 28 MAY 2015

Project Group:

RFG SE

Project Category:

AIP RAD

HRV

Originator(s):

EUROCONTROL

Proposal ID : 84.093 / BM5058 Impl. Status: State(s) & Org. Comments:

200.

Project Name: UM736

Description:

To change from FL250 to FL210 the minimum usable FL along ATS route segment UM736 MAREP - ULKEN - DIPOK - CRN.

Objective:

To harmonise with lower route M736 transformed in CDR1.

Implemented 28 MAY 2015

Project Group:

FAB BLUE MED

Project Category:

ATS Routes

ITA

Originator(s):

ITA

Related proposals:

84.092

Proposal ID : 66.081c Impl. Status: State(s) & Org. Comments:

201.

Description:

To implement the following ATS routes: a. FES - ARI bi-directional; b. BERUM - ARI bi-directional; c. ESAMI - TOGRO bi-directional. Objective: To improve ATS route network within Casablanca FIR/UIR.

Implemented 28 MAY 2015

Project Category:

ATS Routes

MAR

Originator(s):

MAR

Related proposals:

66.081b

Page 139: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

128 29 May 2015 Edition: 1.0

Proposal ID : 83.019 Impl. Status: State(s) & Org. Comments:

202.

Description:

To re-designate the following existing ATS routes: a. Q/UQ100 AGOVA - ERA as L/UL102 (extension of already used

RD); b. T/UT901 FES - BML - MAK as M/UM372 (extension of already used

RD); c. Z/UZ700 ARIAM - ALM as M/UM999 (extension of RD used by

Algeria); d. Z/UZ701 ABDOR - SLK - TOLSI as Z/UZ801.

Objective:

To adapt the existing ATS route designators and avoid duplication in ICAO EUR/NAT Region.

Implemented 28 MAY 2015

Project Category:

Route Redesignation

MAR

Originator(s):

EUROCONTROL

Proposed in view of rationalisation process within ICAO EUR/NAT to which Morocco belongs.

Proposal ID : 84.120 Impl. Status: State(s) & Org. Comments:

203.

Description:

To implement new TMA and properly adapt the ATS route network in OJD area.

Objective: To further improve airspace organisation around Oujda (GMFO) Angads

airport.

Implemented 28 MAY 2015

Project Category:

ATS Routes TMA

MAR

Originator(s):

MAR

Proposal ID : 83.050 Impl. Status: State(s) & Org. Comments:

204.

Project Name: MUNSTER Clip

Description: To re-align the north-western sector border between MUNSTER and DELTA sectors (low and high).

Objective:

To further improve the airspace structure while aligning sector borders with DCT flows and avoid recurring sector clipping.

Implemented 28 MAY 2015

Project Category:

ATC Sectors

MUAC

Originator(s):

MUAC

Proposal ID : 72.008 Impl. Status: State(s) & Org. Comments:

205.

Description: To implement, as CDR1/2, westbound ATS route M/UM90 BERGI -

LONAM.

Objective: To further improve ATS route options for DEP EHAM.

Implemented 28 MAY 2015

Project Group:

RFG NW

Project Category:

ATS Routes

NLD MUAC

Originator(s):

IATA

Airspace improvement proposal made by KLM reducing flying distance and allowing additional option.

Related proposals:

50.014

Page 140: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

129 29 May 2015 Edition: 1.0

Proposal ID : 84.070 Impl. Status: State(s) & Org. Comments:

206.

Description: To re-align existing ATS route L80 as GIKAV - TABEV.

Objective:

To further improve ATS route network within Norway.

Implemented 28 MAY 2015

Project Category:

ATS Routes

NOR FAB NEFAB

Originator(s):

NOR

TABEV (660223N 0072628E) will replace ESOLA

Proposal ID : 80.023c Impl. Status: State(s) & Org. Comments:

207.

Description: To introduce P-RNAV SIDs/STARs for Trabzon (LTCG) airport.

Objective:

To further improve the airspace organisation within Istanbul FIR and Ankara FIR.

Implemented 28 MAY 2015

Project Group:

RFG SE

Project Category:

PBN TMA

TUR

Originator(s):

TUR

Related proposals:

80.023a

80.023b

80.023d

80.023e

Proposal ID : 85.034 Impl. Status: State(s) & Org. Comments:

208.

Description: To put into operation new Ordu - Giresun (LTCB) Airport.

Objective:

To further improve airspace organisation within Turkey.

Implemented 28 MAY 2015

Project Group:

RFG SE

Project Category:

Airspace Structure

TUR

Originator(s):

TUR

Real airport operation starts on 22 MAY 2015.

Proposal ID : 80.023d Impl. Status: State(s) & Org. Comments:

209.

Description: To introduce RNP APCH, SIDs/STARs for Antalya/Gazipasa (LTFG) airport.

Objective:

To further improve the airspace organisation within Istanbul FIR and Ankara FIR.

Implemented 28 MAY 2015

Project Group:

RFG SE

Project Category:

PBN TMA

TUR

Originator(s):

TUR

Related proposals:

80.023a

80.023b

80.023c

80.023e

Page 141: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

130 29 May 2015 Edition: 1.0

Proposal ID : 80.012 Impl. Status: State(s) & Org. Comments:

210.

Project Name: RAD LBLT1000

Description: To allow ARR LBBG via IBLAL by revising RAD restriction LBLT1000.

Objective:

To further improve the utilisation of existing ATS route network.

Planned 25 JUN 2015

Project Group:

RFG SE

Project Category:

ATS Routes RAD

BGR TUR

Originator(s):

EUROCONTROL

Normally this restriction should be cross-border as IBLAL is boundary point and Turkey is also responsible for flights profile.

IBLAL currently is only available for traffic departing LTBA/BU/FJ with aim to reduce complexity of Varna sectors.

Saving for daily 2 - 3 flights ARR LBBG via IBLAL instead via MAKOL is 21NM per flight. Influence to Varna sectors will be negligible as flights are descending within Istanbul ACC and are over IBLAL below FL160. Via MAKOL flights are normally above FL320.

No additional airspace design actions required as LBBG STARs UVUDA already exist.

Proposal ID : 79.054 Impl. Status: State(s) & Org. Comments:

211.

Project Name: GNSS Low Flight Network (LFN) - Phase 1

Description: To implement 4 new Helicopter routes KY251, KY252, KY253 and KY254.

Objective:

To further improve lower route network within Switzerland.

Planned 25 JUN 2015

Project Category:

Airspace Structure

CHE

Originator(s):

CHE

These routes are part of low flight route network, designed primarily for helicopter IFR operations.

As the main users will be military and HEMS, the network is designed currently as an OAT network.

Proposal ID : 84.077 Impl. Status: State(s) & Org. Comments:

212.

Description: To implement westbound ATS route UZ613 BZO - SAFFA - RONAG.

Objective:

To further improve ATS route network between Italy and Switzerland.

Planned 25 JUN 2015

Project Category:

ATS Routes

CHE ITA

Originator(s):

CHE ITA

SAFFA will be new FIR boundary point.

Page 142: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

131 29 May 2015 Edition: 1.0

Proposal ID : 82.047a Impl. Status: State(s) & Org. Comments:

213.

Project Name: New Geis-Line

Description: To adaptat the sector border FUE/NDG within Munich ACC and move ex Rhein-Munich-Line to the east as new Geis-Line (Line of change in responsibility) and to:

a. create a new departure transition from EDDS via KUNOD to connect with UL607 (shorter route, improved vertical profile (Mil Off);

b. re-align Z79 via LUPOL-KUNOD-SUDEN (improved vertical profile for EDJA departure);

c. create a shorter route option for EDDK arrival from S/SE (shorter by 1-5NM, improved vertical profile by 4000ft);

d. improve the vertical profile for EDDF arrival via BABEG (UQ163) (due to new sector sequence Karlsruhe/Langen);

e. allow city-pair EDDM – LFSB via RAVED (shorter route option); f. provide better options for LSZH arrivals/departures due to new

Geis-Line.

Objective:

To further improve the airspace structure while optimizing the sector configuration, providing shorter route options and improve vertical profiles at the interface between Karlsruhe UAC, Munich ACC and Langen ACC.

Planned 25 JUN 2015

Project Category:

Airspace Structure Vertical FE

DEU

Originator(s):

DEU

Related proposals:

82.047b

Proposal ID : 84.001 Impl. Status: State(s) & Org. Comments:

214.

Project Name: ARR ETAD

Description: To allow “Direct” flight planning options on alighment LIPMI - COL - ROLIS - MANUV - WEZEL - SPA for ARR ETAD.

Objective:

To further improve flight planning options for ARR ETAD.

Confirmed 25 JUN 2015

Project Category:

DCTs

DEU U.S.A.F.E

Originator(s):

U.S.A.F.E

FL100 A/BUGAL fully acceptable to the

USAF. Current arrival option from North East is

NAVPI TB6 MOSUG T911 LIPMI T150 RUDUS Z656 IDOVI Z104 ODVUX Q760 ROPUV DCT WEZEL DCT SPA DCT ETAD which includes three 90 degree turns and one 170 degree turn.

New option proposed will be NAVPI TB6 PETOM DCT WEZEL DCT SPA DCT ETAD and will save 13 minutes of flight time.

USAF estimates that safety of flight will increase and it will also save €1,133,357 per year due to the decrease in flight time.

DFS studied the origonal proposal and option inlcluded is aggreed by Langen ACC and USAF.

Page 143: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

132 29 May 2015 Edition: 1.0

Proposal ID : 85.005 Impl. Status: State(s) & Org. Comments:

215.

Project Name: Westbound ETAD Arrivals

Description: To allow “Direct” flight planning option ODVUX DCT SPA for ARR ETAD.

Objective:

To further improve flight planning options within Germany.

Confirmed 25 JUN 2015

Project Category:

DCTs RAD

DEU U.S.A.F.E

Originator(s):

U.S.A.F.E

Current routing for westbound ARR ETAD LEPSA Z104 ODVUX DCT ROPUV DCT WEZEL DCT SPA has a 90 and 180 degree turn.

Proposed option will eliminate these turns by going planning ... LIPSA Z104 ODVUX DCT SPA.

Eliminating the 90 and 180 degree turn increases safety, save 6 minutes of flight time and €297K per year in operating costs along with 500 tons less of CO2 being emitted.

Proposal ID : 84.004 Impl. Status: State(s) & Org. Comments:

216.

Project Name: CCC sector split - Barcelona ACC

Description:

To split the current elementary Barcelona ACC sector 'CCC' into two new elementary sectors 'CCU' and 'CCL'.

Objective:

To further improve the airspace structure in Barcelona ACC while reducing delays and increasing safety.

Planned 25 JUN 2015

Project Group:

RFG SW

Project Category:

Airspace Structure ATC Sectors

ESP

Originator(s):

ESP

Five new volumes will be created to include the airspace changes.

Proposal ID : 84.076 Impl. Status: State(s) & Org. Comments:

217.

Description: To implement southbound ATS route UN13 ROCAN - IBRAP - LUKEV -

LORES.

Objective:

To further improve ATS route network between France and Spain

Planned 25 JUN 2015

Project Category:

ATS Routes

FRA ESP

Originator(s):

FRA ESP

IBRAP new bondary point; FL195 - FL500 in France / FL245 - FL460 in

Spain.

Proposal ID : 83.046 Impl. Status: State(s) & Org. Comments:

218.

Project Name: Marseille ACC re-organisation

Description:

Dedicated frequency to be allocated to “F4” elementary ATC sector of Marseille ACC

Objective:

To further improve the airspace structure and capacity within Marseille ACC.

Planned 25 JUN 2015

Project Group:

RFG SW

Project Category:

ATC Sectors

FRA

Originator(s):

FRA

This will eliminate reversion difficulties experienced in summer 2014 and offer more flexibility in sector configurations opening.

Page 144: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

133 29 May 2015 Edition: 1.0

Proposal ID : 84.062 Impl. Status: State(s) & Org. Comments:

219.

Project Name: RAD Promulgation

Description:

To publish in AIP UK, ENR 1.10 FLIGHT PLANNING under paragraph 1. Procedures for the submission of a flight plan common text for Adherence to Airspace Utilization Rules and Availability - RAD inside UK FIRs.

Objective:

To harmonize the RAD promulgation via the AIP by the ECAC States.

Planned 25 JUN 2015

Project Category:

AIP RAD

GBR

Originator(s):

EUROCONTROL

Proposal ID : 83.029 / 21.002 Impl. Status: State(s) & Org. Comments:

220.

Description: To withdraw point DISKA from ATS route N644.

Objective:

To solve the Baku ATC system problems with flight planning in FD processing.

Planned 25 JUN 2015

Project Group:

SG BLACK

Project Category:

ATS Routes

GEO AZE

Originator(s):

AZE

Proposal ID : 69.126 / BM0039 Impl. Status: State(s) & Org. Comments:

221.

Description: To allow proper connection between SRN - DIMLO and vice versa.

Objective:

To further improve the ATS route network while offering a direct route between Italy and Slovenia.

Planned 25 JUN 2015

Project Group:

FAB BLUE MED

Project Category:

ATS Routes

ITA SVN HRV

Originator(s):

FAB BLUE MED

Solved by Italian ACC reorganisation and new ITA / SVN interface: Eastbound SRN UL615 ELTAR UT147 SOVOX DCT DIMLO; Westbound DIMLO UM859 UP735 VIC UL615 SRN.

SOVOX is new COP btwn Padova ACC and Ljublijana ACC.

Proposal ID : 71.089b Impl. Status: State(s) & Org. Comments:

222.

Project Name: Free Route Airspace Malta - Phase 2

Description: To implement H24 DCTs linking cross border with Roma UIR aligning

with Free Route Airspace Italy project

Objective:

To further improve the flight planning options within Malta UIR as a second step towards full Free Route Airspace Malta implementation.

Confirmed 25 JUN 2015

Project Group:

FAB BLUE MED

Project Category:

Free Route Airspace

ITA MLT

Originator(s):

MLT FAB BLUE MED

Co-operation/ synchronisation with Free Route Airpsace Italy/ FAIR-IT, Phase 3.

Studies ongoing in the context of Blue Med. Depending on new system implementation.

Related proposals:

71.085a

71.085b

71.086

71.087

71.088

71.089a

71.089c

Page 145: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

134 29 May 2015 Edition: 1.0

Proposal ID : 81.024 Impl. Status: State(s) & Org. Comments:

223.

Description: To replace existing 5LNC BARAX with INVOP.

Objective:

To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region, to improve the aeronautical information provided and be compliant with ICAO Annex 11.

Planned 25 JUN 2015

Project Group:

RFG SE

Project Category:

5LNC

ITA CHE

Originator(s):

ICAO EUROCONTROL

Annex 11 stated that the 5LNCs shall be unique.

BARAX is used by and is allocated in ICARD to France.

ICAO DM sent relevant message to ESP. ESP will co-ordinate through planning unit.

Proposal ID : 84.102 / BM5067 Impl. Status: State(s) & Org. Comments:

224.

Project Name: Direct routes across Italy

Description: To implement ATS route segment UT415 RESIA - LISKO - DIPEP - VIE.

Objective:

To allow the possibility of flight planning for traffic currently planning UN1.

Planned 25 JUN 2015

Project Group:

FAB BLUE MED

Project Category:

ATS Routes

ITA

Originator(s):

ITA

The segment is former path of UN1 realigned.

RESIA - DIPEP Southbound only FL195/FL460; DIPEP - VIE Bidirectional FL315/FL460;

Extension of existing RD UT415.

Proposal ID : 84.106 Impl. Status: State(s) & Org. Comments:

225.

Project Name: Direct routes across Italy

Description: To implement northbound ATS route UZ804 AOSTA - GAPMI - ORVID -

MATED (FL315 - FL460).

Objective:

To further improve ATS route network.

Planned 25 JUN 2015

Project Group:

FAB BLUE MED

Project Category:

ATS Routes

ITA

Originator(s):

ITA

Proposal ID : 84.107 / BM5071 Impl. Status: State(s) & Org. Comments:

226.

Project Name: Direct routes across Italy

Description: To implement ATS route UZ805 BIBAN - BIBNO - ATRUP - MATED -

RUTOM (FL315 - FL460).

Objective:

To further improve ATS route network.

Planned 25 JUN 2015

Project Group:

FAB BLUE MED

Project Category:

ATS Routes

ITA

Originator(s):

ITA

Segment MATED - RUTOM bidirectional usable also by traffic proceeding along UZ904 in both direction.

BIBAN - BIBNO - ATRUP - MATED southbound.

MATED - RUTOM bi-directional.

Proposal ID : 84.095 / BM5060 Impl. Status: State(s) & Org. Comments:

227.

Project Name: Direct routes across Italy

Description: To implement southbound ATS route UQ727 KUMIN - GUDLU - LUNAR - RUTOM (FL315 - FL460).

Objective:

To further improve ATS route network within Italy.

Planned 25 JUN 2015

Project Group:

FAB BLUE MED

Project Category:

ATS Routes

ITA

Originator(s):

ITA

Usable H24 (classified CDR during activation periods of relevant military areas).

Page 146: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

135 29 May 2015 Edition: 1.0

Proposal ID : 84.110 / BM5074 Impl. Status: State(s) & Org. Comments:

228.

Project Name: Direct routes across Italy

Description: To implement ATS route UZ927 BIBAN - EKDIR - PREKI - LATAN

(FL315 - FL460).

Objective:

To further improve ATS route network.

Planned 25 JUN 2015

Project Group:

FAB BLUE MED

Project Category:

ATS Routes

ITA

Originator(s):

ITA

BIBAN - EKDIR - PREKI southbound; PREKI - LATAN bi-directional.

Proposal ID : 84.104 / BM5069 Impl. Status: State(s) & Org. Comments:

229.

Project Name: Direct routes across Italy

Description: To implement southbound ATS route UY973 NUTRO - VEMUD - BELIX

(FL315 - FL460).

Objective:

To offer better flight planning option according to the activation of defined NMOC scenarios.

Planned 25 JUN 2015

Project Group:

FAB BLUE MED

Project Category:

ATS Routes

ITA

Originator(s):

ITA

Proposal ID : 84.094 / BM5059 Impl. Status: State(s) & Org. Comments:

230.

Project Name: Direct routes across Italy

Description: To re-align existing ATS route UN1 RESIA - BELOV - BEDEG - VIE - LATAN and changes from Night / Weekend route to H24 (classified CDR

during activation periods of relevant military areas).

Objective: To further improve ATS route network within Italy.

Planned 25 JUN 2015

Project Group:

FAB BLUE MED

Project Category:

ATS Routes

ITA

Originator(s):

ITA

Proposal ID : 84.096 / BM5061 Impl. Status: State(s) & Org. Comments:

231.

Project Name: Direct routes across Italy

Description: To implement northbound ATS route UQ914 SUXAN - BELOV - NUTRO

- TOMGI (FL315 - FL460).

Objective:

To offer better flight planning option according to the activation of defined NMOC scenarios.

Planned 25 JUN 2015

Project Group:

FAB BLUE MED

Project Category:

ATS Routes

ITA

Originator(s):

ITA

Proposal ID : 84.099 / BM5064 Impl. Status: State(s) & Org. Comments:

232.

Project Name: Direct routes across Italy

Description: To implement southbound ATS route UT305 NITAM - KODOK - OGLAK - ATRUP - LATAN (FL315 - FL460).

Objective: To further improve ATS route network within Italy.

Planned 25 JUN 2015

Project Group:

FAB BLUE MED

Project Category:

ATS Routes

ITA

Originator(s):

ITA

Page 147: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

136 29 May 2015 Edition: 1.0

Proposal ID : 84.105 / BM5070 Impl. Status: State(s) & Org. Comments:

233.

Project Name: Direct routes across Italy

Description: To implement bi-directional ATS route UZ50 RESIA - NUTRO - RUTOM

(FL315 - FL460).

Objective:

To further improve ATS route network.

Planned 25 JUN 2015

Project Group:

FAB BLUE MED

Project Category:

ATS Routes

ITA CHE

Originator(s):

ITA

Extension of RD from Switzerland.

Proposal ID : 84.101 / BM5066 Impl. Status: State(s) & Org. Comments:

234.

Project Name: Direct routes across Italy

Description: To implement southbound ATS route UT345 LURAG - OGLAK (FL315 -

FL460).

Objective:

To further improve ATS route network.

Planned 25 JUN 2015

Project Group:

FAB BLUE MED

Project Category:

ATS Routes

ITA

Originator(s):

ITA

Proposal ID : 84.103 / BM5068 Impl. Status: State(s) & Org. Comments:

235.

Project Name: Direct routes across Italy

Description: To implement ATS route UT939 GIRIS - ROKIB - NUTRO - IBMAK -

LEVDI (FL315 - FL460).

Objective:

To offer better flight planning option according to the activation of defined NMOC scenarios.

Planned 25 JUN 2015

Project Group:

FAB BLUE MED

Project Category:

ATS Routes

ITA

Originator(s):

ITA

GIRIS - ROKIB Northbound only ROKIB - NUTRO - IBMAK - LEVDI Bi-directional

Proposal ID : 84.098 / BM5063 Impl. Status: State(s) & Org. Comments:

236.

Project Name: New interface ITA / SVN

Description: To implement eastbound ATS route UQ217 RESIA - KUBUD (FL285 -

FL460).

Objective:

To further improve ATS route network within Italy and to connect with DCT inside Ljubljiana FIR.

Planned 25 JUN 2015

Project Group:

FAB BLUE MED

Project Category:

ATS Routes

ITA SVN

Originator(s):

ITA SVN

KUBUD is former KUPUM.

Related proposals:

84.079

Proposal ID : 84.097 / BM5062 Impl. Status: State(s) & Org. Comments:

237.

Project Name: New interface ITA / SVN

Description: To implement eastbound ATS route UT147 ELTAR - SOVOX (FL285 - FL460).

Objective: To further improve ATS route network within Italy and to

connect to DCT inside Ljubljiana FIR.

Planned 25 JUN 2015

Project Group:

FAB BLUE MED

Project Category:

ATS Routes

ITA SVN

Originator(s):

ITA SVN

SOVOX is former 5LNC SORET.

Related proposals:

84.079

Page 148: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

137 29 May 2015 Edition: 1.0

Proposal ID : 84.100 / BM5065 Impl. Status: State(s) & Org. Comments:

238.

Project Name: Direct routes across Italy

Description: To implement bi-directional ATS route UT340 TOP - GUDLU - LAT - CDC

- SODMO - LEVDI (FL315 - FL460).

Objective:

To further improve ATS route network.

Planned 25 JUN 2015

Project Group:

FAB BLUE MED

Project Category:

ATS Routes

ITA

Originator(s):

ITA

Proposal ID : 84.108 / BM5072 Impl. Status: State(s) & Org. Comments:

239.

Project Name: Direct routes across Italy

Description: To implement northbound ATS route UZ906 LISKO - BEDEG - TOMGI

(FL315 - FL460).

Objective:

To offer better flight planning option according to the activation of defined NMOC scenarios.

Planned 25 JUN 2015

Project Group:

FAB BLUE MED

Project Category:

ATS Routes

ITA

Originator(s):

ITA

Extension of RD UZ906.

Proposal ID : 84.109 / BM5073 Impl. Status: State(s) & Org. Comments:

240.

Project Name: Direct routes across Italy

Description: To implement northbound ATS route UZ926 AOSTA - BIBNO - PREKI

(FL315 - FL460).

Objective:

To further improve ATS route network.

Planned 25 JUN 2015

Project Group:

FAB BLUE MED

Project Category:

ATS Routes

ITA

Originator(s):

ITA

Proposal ID : 84.115 Impl. Status: State(s) & Org. Comments:

241.

Description: To implement bi-directional ATS route Z/UZ404 LPD - DEXOL - DIRKA.

Objective:

To further improve ATS route network within Malta FIR.

Confirmed 25 JUN 2015

Project Category:

ATS Routes

MLT ITA

Originator(s):

MLT

Proposal ID : 84.116 Impl. Status: State(s) & Org. Comments:

242.

Description: To implement bi-directional ATS route L/UL30 OMENI - GODAK - VANIX

- IDANI - ARLOS.

Objective:

To further improve ATS route network within Malta FIR.

Planned 25 JUN 2015

Project Category:

ATS Routes

MLT

Originator(s):

MLT

Page 149: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

138 29 May 2015 Edition: 1.0

Proposal ID : 83.040 Impl. Status: State(s) & Org. Comments:

243.

Project Name: ECAC States AIP en-route publication issues

Description:

a. To adapt the lower/upper vertical limits, expressed in FL, of ATS routes within Ljubljana FIR - change of IFR FL to VFR FL.

b. To change the PBN navigation specification of area navigation routes within Tallinn FIR from RNP 5 to RNAV 5.

Objective: To adapt in State AIP ATS routes vertical limits.

Confirmed 25 JUN 2015

Project Category:

AIP

SVN

Originator(s):

EUROCONTROL

Proposal ID : 85.035 Impl. Status: State(s) & Org. Comments:

244.

Description: 1. To put into operation new Hakkari Yuksekova Airport (LTCW).

2. To implement bi-directional ATS routes for ARR/DEP LTCW T/UT301 NARLI - YKV.

Objective:

To further improve airspace organisation within Turkey.

Planned 25 JUN 2015

Project Group:

RFG SE

Project Category:

Airspace Structure ATS Routes

TUR

Originator(s):

TUR

Real airport operation will start end of MAY 2015

Proposal ID : 81.013 Impl. Status: State(s) & Org. Comments:

245.

Description: To re-designate existing ATS route T709 SW - DIBED as T708.

Objective:

To further simplify the existing RDs within Ukraine.

Planned 25 JUN 2015

Project Group:

RFG SE

Project Category:

Route Redesignation

UKR

Originator(s):

EUROCONTROL

Proposal ID : 80.033 / 19.004 Impl. Status: State(s) & Org. Comments:

246.

Description:

a. To implement the following westbound ATS routes: i. T730 POBUV - LONLA; ii. T731 KR - OKROT.

b. To realign the following exissting ATS routes: i. P129 as ROMOL - IDKOG - KOROP - UMOGA - BEMBI -

KUROS; ii. N164 as NEMIP - GEPTO - PISOK - GOLKU - LAPVA - POBUV

- BAMUD; iii. T983 as IDKOG - SORON.

c. To re-designate the following existing ATS routes: i. T983 SORON - KHR as N983; ii. N164 SW - BAMUD as T719.

Objective: To further improve the ATS route network within Ukraine.

Planned 25 JUN 2015

Project Group:

RFG SE SG BLACK

Project Category:

50 MPCPEs ATS Routes

UKR

Originator(s):

EUROCONTROL

Further improvement of options from/to Adriatic Coast Area to/from Moscow Area.

Page 150: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

139 29 May 2015 Edition: 1.0

Proposal ID : 85.026 Impl. Status: State(s) & Org. Comments:

247.

Project Name: PBN TMA Operation - Publication in Germany

Description: To introduce RNAV1/RNP/PBN SIDs/STARs for Frankfurt-Hahn/EDFH

airport.

Objective:

To further improve the airspace structure while changing SID/STAR (TMA) publications in a way to reach RNAV1/RNP/PBN standards (ICAO and PBN conformity).

Planned 23 JUL 2015

Project Category:

PBN TMA

DEU

Originator(s):

DEU

For the major airports in Germany it has already been finished for the Approach parts (Spring 2015).

The work for the complete package of SIDs and STARs is in progress.

Other aerodromes will follow successively to be finished by end 2024 according to the EASA PBN regulation.

Proposal ID : 84.039 Impl. Status: State(s) & Org. Comments:

248.

Description: To replace existing 5LNC OBADI.

Objective:

a. To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region;

b. To improve the aeronautical information provided; c. To be compliant with ICAO Annex 11.

Planned 20 AUG 2015

Project Category:

5LNC

DEU

Originator(s):

EUROCONTROL ICAO

OBADI is reserved in ICARD for Russian Federation.

Proposal for replacement is based on “Common criteria for replacement of duplicated 5LNCs” as point is not reserved for Germany.

OA/D to react accordingly.

Proposal ID : 84.040 Impl. Status: State(s) & Org. Comments:

249.

Description: To replace existing 5LNC RUSOT.

Objective:

a. To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region;

b. To improve the aeronautical information provided; c. To be compliant with ICAO Annex 11.

Planned 20 AUG 2015

Project Category:

5LNC

DEU

Originator(s):

EUROCONTROL ICAO

RUSOT is reserved in ICARD for Russian Federation.

Proposal for replacement is based on “Common criteria for replacement of duplicated 5LNCs” as point is not reserved for Germany.

OA/D to react accordingly.

Proposal ID : 82.047b Impl. Status: State(s) & Org. Comments:

250.

Description: To re-align Munich/ EDDM arrivals via T107 when Military activities

are off.

Objective:

To provide a shorter route option and improve vertical profiles at the interface between Karlsruhe ACC, Munich ACC and Langen ACC.

Planned 20 AUG 2015

Project Category:

ATS Routes Vertical FE

DEU

Originator(s):

DEU

Related proposals:

82.047a

Page 151: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

140 29 May 2015 Edition: 1.0

Proposal ID : 85.020 / 21.024 Impl. Status: State(s) & Org. Comments:

251.

Description:

1. To implement the following new bi-directional ATS routes: a. N11 ROLIN - BARUS - DF - KUFAN (FL195 - FL460); b. H24 ROLIN - NEDEK (FL095 - FL195).

2. To change to bi-directional existing eastbound ATS route N319

IDLER - KTS.

Objective: To further improve the ATS route structure within Tbilisi FIR.

Planned 20 AUG 2015

Project Category:

ATS Routes

GEO

Originator(s):

GEO

Relevant coordination with ICAO as the ATS routes are over the High Sea is in progress.

Proposal ID : 77.078a Impl. Status: State(s) & Org. Comments:

252.

Description: To implement ATS airspace class D in Ekofisk CTA.

Objective:

To improve the safety of operations on the continental shelf.

Planned 20 AUG 2015

Project Category:

Airspace Structure

NOR GBR

Originator(s):

NOR

Ekofisk CTA and Balder CTA are located within Norway FIR and Scottish FIR and involves "High Seas" airspace.

Proposal ID : 84.080 Impl. Status: State(s) & Org. Comments:

253.

Description:

To implement the following transition routes for DEP ESSA/SB: 1. T316 re-alignment as BABAP - ALOLA - NEPVA - VSB; 2. T365 ALOLA - ODIBI (new connection with N5); 3. New significant point DIGOX on M92.

Objective: To prepare Swedish airspace for NEFRA.

Planned 20 AUG 2015

Project Category:

ATS Routes

SWE

Originator(s):

SWE

Proposal ID : 84.075 Impl. Status: State(s) & Org. Comments:

254.

Description: To implement nothbound ATS route T844 SUDEN - KOVAN - UMDAS -

ASKIK.

Objective:

To further improve ATS route options for flights to Köln (EDDK) airport.

Planned 17 SEP 2015

Project Category:

ATS Routes

DEU

Originator(s):

DEU

Proposal ID : 67.005a Impl. Status: State(s) & Org. Comments:

255.

Description:

To implement the following bidirectional ATS route segments: 3. UT7 LND - KARNO (Phase 1) as CDR1; 4. UN21 GAPLI - MERLY as CDR1/3.

Objective:

To further improve the ATS route network within London FIR/UIR.

Planned 17 SEP 2015

Project Group:

RFG SW

Project Category:

ATS Routes CDRs

GBR

Originator(s):

GBR

FL300 and above only. Provide connectivity to/from UL180 and

UP16. Review greater use below FL300 post

implementation. BERUL - MERLY original proposal by

IACA.

Related proposals:

67.005b

Page 152: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

141 29 May 2015 Edition: 1.0

Proposal ID : 85.025 Impl. Status: State(s) & Org. Comments:

256.

Description: To implement ATS route segment T335 ZLA - BILNA.

Objective:

To further improve the ATS route network structure within Bratislava FIR.

Planned 17 SEP 2015

Project Category:

ATS Routes

SVK

Originator(s):

SVK

Proposal ID : 83.010 Impl. Status: State(s) & Org. Comments:

257.

Project Name: UDROS / ODERO area re-organization

Description:

To establish new FIR boundary points and re-organize existing ATS routes inside/between Bucuresti FIR, Sofia FIR and Istanbul / Ankara FIRs.

Objective:

To further improve ATS route network between Romania, Bulgaria and Turkey.

Proposed summer 2015

Project Group:

RFG SE

Project Category:

ATS Routes

BGR TUR ROU

Originator(s):

EUROCONTROL TUR

Proposed airspace re-organization is required due to increased traffic flows in that area of the Black Sea following partial airspace unavailability of Simferopol FIR and Dnipropetrovsk FIR and limited airspace use of Damascus FIR and Baghdad FIR.

Initial proposal is as follows: o UDROS - swap from westbound to

eastbound use to serve most probably traffic flows to Rostov FIR, Tbilisi FIR, Yerevan FIR and AGINA/DASIS to Tehran FIR;

o ODERO - swap from eastbound to westbound use to serve most probably traffic flows from Rostov FIR, Tbilisi FIR, Yerevan FIR and DASIS from Tehran FIR;

o NEGEM - new point South West of ODERO for westbound traffic flows most probably from Baghdad FIR and BONAM from Tehran FIR;

o ARTAT- new point South West of NEGEM for eastbound traffic flows most probably to Baghdad FIR and ALRAM to Tehran FIR.

The above initial proposal was already discussed between Bulgaria and Turkey.

RAD restrictions applied by Bulgaria, only if required.

Romania proposed revised ATS route connections via Bucuresti and Sofia FIR.

The study by all States for the best vertical split of sectors to cope with the new traffic distribution caused by the crisis situation imposing UDROS / ODERO area reorganization is required. EUROCONTROL to support in reaching the best solutions.

Page 153: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

142 29 May 2015 Edition: 1.0

Proposal ID : 83.009 Impl. Status: State(s) & Org. Comments:

258.

Description: To allow Night “Direct” flight planning option NAMUB DCT AMOSA for

DEP EDDP.

Objective:

To further improve flight planning options within Germany.

Proposed summer 2015

Project Category:

DCTs

DEU

Originator(s):

IACA

UQ209 BAMKI – NATOR available at night.

By initial calculations and checking the regularly given directs for traffic departing on SID NAMUB this DCT could be plannable before 04:45UTC.

Current option is NAMUB T173 WEMAR Z94 GERDO UZ94 VAGAB Y231 AMOSA UN869 TEDGO.

Option NAMUB DCT AMOSA UN869 TEDGO saves 9NM.

Proposal ID : 81.039 Impl. Status: State(s) & Org. Comments:

259.

Description: To replace existing 5LNC BRAVO.

Objective:

To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region, to improve the aeronautical information provided and be compliant with ICAO Annex 11.

Proposed summer 2015

Project Category:

5LNC

GBR

Originator(s):

EUROCONTROL ICAO

Annex 11 stated that the 5LNCs shall be unique.

BRAVO is used 7 times worldwide and is allocated in ICARD to Brazil.

ICAO DM sent relevant message to GBR (DM24/01 MSG 14-034).

Proposal ID : 84.047 Impl. Status: State(s) & Org. Comments:

260.

Description: To replace existing 5LNC BISBO.

Objective:

1. To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region;

2. To improve the aeronautical information provided; 3. To be compliant with ICAO Annex 11.

Proposed summer 2015

Project Category:

5LNC

GBR

Originator(s):

EUROCONTROL ICAO

BISBO is reserved in ICARD for France. Point is used in UK for military aerodrome

purpose at EGUN. Proposal for replacement is based on

“Common criteria for replacement of duplicated 5LNCs” as point is not reserved for UK.

Proposal ID : 81.009 Impl. Status: State(s) & Org. Comments:

261.

Description:

To implement new ATS route or allow “Direct” flight planning option or improve the RAD for flights to Pisa (LIRP) airport from ADOSA.

Objective:

To further improve ATS route options for ARR LIRP.

Proposed summer 2015

Project Category:

ATS Routes DCTs

ITA

Originator(s):

IATA

Solution possible after the re-organisation of Roma TMA, Milano ACC, Roma ACC, Padova ACC and Brindisi ACC.

Currently the shortest possible option for ARR LIRP from North is via VIC - FER - BOA - LUPOS.

Proposed solutions for B737-700 in zero wind conditions might save per flight up to 25NM, 116 kg fuel and 3 min flying time.

Related proposals:

79.034c

Page 154: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

143 29 May 2015 Edition: 1.0

Proposal ID : 74.056 Impl. Status: State(s) & Org. Comments:

262.

Description: To adapt RAD restriction LT2017 by adding exception during Night (Note 3) same as RAD restriction LT2070.

Objective:

To further improve airspace utilisation between Istanbul FIR, Hellas UIR and Sofia FIR.

Proposed summer 2015

Project Group:

50 MPCPEs RFG SE

Project Category:

RAD

TUR

Originator(s):

EUROCONTROL

None allowance of alternative ATS route option Restriction directly connected with any

changes to RAD restriction LT2070. As from 5 MAY 2011 LT2070 (Note 3) had been changed and during the NIGHT period 17.30h - 02.30h (AIRAC APR - AIRAC OCT inclusive) DEP LTAI are allowed to fly via IMR (and not only via VADEN/MAKOL). The most logic option is IMR UN128 LMO PEREN where there are two possibilities UN128 PEREN - FSK - RUGAS or UN133 PEREN - EVIVI. Currently LT2017 is not adapted to LT2070.

Restriction blocks second alternative and AOs are not able to fly via EVIVI.

Proposal ID : 81.028 Impl. Status: State(s) & Org. Comments:

263.

Description: To replace existing 5LNC DOGAN

Objective:

To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region, to improve the aeronautical information provided and be compliant with ICAO Annex 11.

Proposed summer 2015

Project Group:

RFG SE

Project Category:

5LNC

TUR

Originator(s):

EUROCONTROL ICAO

DOGAN is used by and is allocated in ICARD to Morocco.

ICAO DM sent relevant message to TUR (DM 20/01 MSG 14-015).

TUR will enquire with military.

Proposal ID : 84.050 Impl. Status: State(s) & Org. Comments:

264.

Description: To replace existing 5LNC BULUT.

Objective:

1. To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region;

2. To improve the aeronautical information provided; 3. To be compliant with ICAO Annex 11.

Proposed summer 2015

Project Category:

5LNC

TUR

Originator(s):

EUROCONTROL ICAO

BULUT is reserved in ICARD for Finland. Proposal for replacement is based on

“Common criteria for replacement of duplicated 5LNCs” as point is not reserved for Turkey.

Proposal ID : 83.001 Impl. Status: State(s) & Org. Comments:

265.

Project Name: Optimization of LKAA lower airspace structure

Description:

a. To optimize the Praha FIR lower airspace structure by changing division flight level between low sector and APP Brno, Karlovy Vary, Ostrava.

b. To re-design TMAs Brno, Karlovy Vary, Ostrava and Praha.

Objective:To improve lower airspace structure and distribute traffic load.

Confirmed 15 OCT 2015

Project Category:

Airspace Structure ATC Sectors TMA

CZE DEU AUT POL SVK

Originator(s):

CZE

Page 155: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

144 29 May 2015 Edition: 1.0

Proposal ID : 81.067 Impl. Status: State(s) & Org. Comments:

266.

Description: To allow DCT option between REGLI - VALPI.

Objective:

To further improve ATS route options within Praha FIR.

Planned 15 OCT 2015

Project Category:

ATS Routes RAD

CZE

Originator(s):

IATA

Related proposals:

81.064a

81.064b

81.064c

81.066

81.068b

Proposal ID : 83.023 Impl. Status: State(s) & Org. Comments:

267.

Project Name: Removal U prefix Praha FIR

Description: To remove the distinction between Upper and Lower ATS routes - "U"

prefix within Praha FIR.

Objective:

To simplify Air Traffic Management in Praha FIR.

Confirmed 15 OCT 2015

Project Category:

Airspace Structure

CZE

Originator(s):

CZE

Proposal ID : 83.053 Impl. Status: State(s) & Org. Comments:

268.

Description:

To re-designate the following ATS routes: 1. UT40 DOPOV - DOKEL as T46; 2. T/UT47 BNO - HLV as L/UL726.

Objective:

To simplify the existing RDs and avoid unforeseen RD break within ICAO EUR/NAT Region.

Confirmed 15 OCT 2015

Project Category:

Route Redesignation

CZE

Originator(s):

EUROCONTROL

Proposal ID : 83.065 Impl. Status: State(s) & Org. Comments:

269.

Project Name: ECAC States AIP en-route publication issues

Description: To publish in ENR 3.3 CDRs Z30 and Z37 based on ERNIP publication

requirement to cover the whole period of availability.

Objective:

To resolve airspace data publication inconsistencies in State AIP.

Confirmed 15 OCT 2015

Project Category:

AIP CDRs

CZE

Originator(s):

EUROCONTROL

Currently both CDRs are published with only weekend time availability.

Proposal ID : 85.019 Impl. Status: State(s) & Org. Comments:

270.

Description: To realign existing ATS route UM749 as LEMBI - DOKEL.

Objective:

To further improve flight planning options for flights between Adriatic coast and Scandinavia.

Planned 15 OCT 2015

Project Category:

ATS Routes

CZE

Originator(s):

IATA

Related proposals:

85.017

Page 156: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

145 29 May 2015 Edition: 1.0

Proposal ID : 80.094 Impl. Status: State(s) & Org. Comments:

271.

Description: 1. To re-align existing ATS route J62 MKN - NITSA as RIPLI - NITSA. 2. To implement UJ62, FL245 - FL320.

Objective:

To further improve the ATS route network within Athinai FIR.

Planned 15 OCT 2015

Project Group:

RFG SE

Project Category:

ATS Routes

GRC

Originator(s):

GRC

To facilitate traffic entering Athinai FIR via REDRA with destination LGIR.

Proposal ID : 77.078b Impl. Status: State(s) & Org. Comments:

272.

Description: To implement ATS airspace class D in Balder CTA.

Objective:

To improve the safety of operations on the continental shelf.

Planned 15 OCT 2015

Project Category:

Airspace Structure

NOR GBR

Originator(s):

NOR

Ekofisk CTA and Balder CTA are located within Norway FIR and Scottish FIR and involves "High Seas" airspace.

Proposal ID : 85.028 / 22.030 Impl. Status: State(s) & Org. Comments:

273.

Description: The implementation of RNAV GNSS approaches for Gyumri/Shirak (UYSG) airport.

Objective:

To further improve airspace organisation within Yerevan FIR.

Planned 12 NOV 2015

Project Group:

SG BLACK

Project Category:

Airspace Structure PBN

ARM

Originator(s):

ARM

Proposal ID : 85.001 Impl. Status: State(s) & Org. Comments:

274.

Description: To re-designate the existing ATS route T296 ROSOK - NIKDA - CDA as Q296.

Objective:

To rationalise the existing ATS route designators in order to further facilitate flight planning.

Planned 12 NOV 2015

Project Category:

Route Redesignation

DEU DNK

Originator(s):

DEU

Germany will change the status of that route and will allow all traffic to use it. Normally segregated arrival routes are designated as “T”.

Denmark was already informed and coordination is in progress.

Proposal ID : 69.064b / 16.035b Impl. Status: State(s) & Org. Comments:

275.

Project Name: NEFAB Free Route Airspace

Description: To implement H24 Free Route Airspace across NEFAB above FL95/FL135.

Objective:

To further improve the airspace structure between Norway FIR, Finland FIR, Tallinn FIR and Riga FIR.

Confirmed 12 NOV 2015

Project Group:

SG BALTIC

Project Category:

Free Route Airspace

EST FIN LVA NOR

Originator(s):

FAB NEFAB

ATS routes will be kept.

Related proposals:

69.064a / 16.035a

Page 157: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

146 29 May 2015 Edition: 1.0

Proposal ID : 83.021 / 20.040 Impl. Status: State(s) & Org. Comments:

276.

Description: To re-designate Y76 ULTIR - BEDSO as new Y75.

Objective:

To rationalize the non-regional ATS route designators.

Planned 12 NOV 2015

Project Group:

SG BALTIC

Project Category:

Route Redesignation

FIN

Originator(s):

EUROCONTROL

Proposal ID : 85.008 Impl. Status: State(s) & Org. Comments:

277.

Description: To re-designate the existing ATS route T94 OGTUD - SUTEV - SLU as P998 (release of T94).

Objective:

To rationalise the existing ATS route designators in order to further facilitate flight planning.

Planned 12 NOV 2015

Project Category:

Route Redesignation

FIN SWE

Originator(s):

EUROCONTROL

Extension of RD P998 currently used in Finland FIR.

Proposal ID : 85.023 Impl. Status: State(s) & Org. Comments:

278.

Description: To implement new bi-directional ATS route T255 ATPEL - XXXXX

(635903N 0234218E) - IXONO.

Objective:

To further improve the ATS route structure within Finland FIR.

Planned 12 NOV 2015

Project Category:

ATS Routes

FIN

Originator(s):

FIN

Alternate ATS route when TSA and R-areas on both sides of existing ATS route T89 are active.

TSA's will also be realigned east of T89 but restricted areas west of T89 cannot be realigned.

Proposal ID : 85.024 Impl. Status: State(s) & Org. Comments:

279.

Description: To allow DCT LELNA - GOBUR (FL195 - FL500), usable whenever

military zone EGD023 will be active.

Objective:

To provide an additional option when waypoint LORKU is not available (only when ATS routes UN866/UM195/UN63 are not available).

Planned 12 NOV 2015

Project Category:

DCTs

FRA

Originator(s):

FRA

Proposal ID : 80.061 Impl. Status: State(s) & Org. Comments:

280.

Project Name: AVANT - POL

Description: To establish H24 DCT AVANT - POL above FL 375 initially and later extend CDR/Airway UN863 from AVANT to POL.

Objective:

To further improve efficiency for traffic overflying the London FIR

Planned 12 NOV 2015

Project Category:

ATS Routes DCTs RAD

GBR

Originator(s):

GBR

Page 158: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

147 29 May 2015 Edition: 1.0

Proposal ID : 71.087 Impl. Status: State(s) & Org. Comments:

281.

Project Name: Night Free Route Airspace Greece

Description: To implement Night DCTs for Hellas UIR, FL355 and above (2300-0400

UTC).

Objective:

Allign the airspace structure with real operations. Operational DCT's to be made fligtht plannable

Planned 12 NOV 2015

Project Group:

FAB BLUE MED RFG SE

Project Category:

50 MPCPEs Free Route Airspace

GRC

Originator(s):

GRC FAB BLUE MED

Studies ongoing in the context of Blue Med. Earlier FRA implementation possible on a

national basis.

Related proposals:

71.085a

71.086

71.088

71.089b

Proposal ID : 75.040 / 15.042 Impl. Status: State(s) & Org. Comments:

282.

Project Name: Free Route Airspace Vilnius

Description: To implement H24 Free Route Airspace FL285+ in Vilnius ACC.

Objective:

To further improve airspace organisation within Vilnius FIR.

Confirmed 12 NOV 2015

Project Group:

SG BALTIC

Project Category:

50 MPCPEs Free Route Airspace

LTU

Originator(s):

LTU

Related proposals:

76.052

Proposal ID : 64.044 Impl. Status: State(s) & Org. Comments:

283.

Description: To enlarge AoR of the existing Cluj APP.

Objective:

To further improve the airspace organisation within Bucuresti FIR.

Planned 12 NOV 2015

Project Group:

RFG SE

Project Category:

Airspace Structure TMA

ROU

Originator(s):

ROU

The implementation of the new Terminal Area, NAPOC TMA for LRCL, LRTM and LRSB includes: vertical limits 3000 ft up to FL175; class C airspace; the three CTRs defined as rectangles, GND

up to 3000 ft ALT, class of airspace C; common transition altitude (including for

MCTR LRCT) 7000 ft; 121 standard and P-RNAV SIDs and

STARs for LRCL, LRTM and LRSB; realigned military areas; 44 DCTs to allow overflights.

Related proposals:

79.013 / 18.037

Page 159: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

148 29 May 2015 Edition: 1.0

Proposal ID : 79.013 / 18.037 Impl. Status: State(s) & Org. Comments:

284.

Project Name: Removal U prefix Bucuresti FIR

Description: To remove the distinction between Upper and Lower ATS routes - "U" prefix within Bucuresti FIR.

Objective:

To simplify Air Traffic Management in Bucuresti FIR.

Confirmed 12 NOV 2015 Project Group:

RFG SE SG BLACK Project Category:

Airspace Structure

ROU

Originator(s):

EUROCONTROL

Related proposals:

64.044

Proposal ID : 84.014 / 21.026 Impl. Status: State(s) & Org. Comments:

285.

Description: 1. To implement bi-directional ATS route L/UL851 ADINA - RIVOS. 2. To re-designate existing ATS route L/UL851 ADINA - CND - RIVOS

as L/UL5.

Objective:

To further improve ATS route network within Bucuresti FIR.

Planned 12 NOV 2015

Project Group:

SG BLACK Project Category:

ATS Routes

ROU

Originator(s):

ROU

Proposal ID : 84.065 / 21.025 Impl. Status: State(s) & Org. Comments:

286.

Description: To re-designate existing ATS route UP184 SODGO - DEGET as UL852 (release of P184).

Objective:

To rationalise the existing ATS route designators in Romania in order to further facilitate flight planning and release RD.

Planned 12 NOV 2015

Project Group:

RFG SE SG BLACK Project Category:

Route Redesignation

ROU

Originator(s):

EUROCONTROL

Proposal ID : 82.037 Impl. Status: State(s) & Org. Comments:

287.

Description: To implement ATS route segemnt Z652 NIT - RUTEG.

Objective:

To further improve the ATS route network between Bratislava and Budapest FIR.

Planned 12 NOV 2015

Project Category:

ATS Routes

SVK HUN

Originator(s):

SVK HUN

Dedicated for LHBP arrivals.

Proposal ID : 84.081 Impl. Status: State(s) & Org. Comments:

288.

Description: 1. To establish new 5LNC XXXXX at crossing between ATS routes

T400 and T401.

2. To change the following ATS route segments from CDR1 to permanent: a) T400 EGAGO - DIBVA - XXXXX; b) T401 SOLKA - XXXXX.

Objective: To further improve the airspace structure within ESAA FIR.

Planned 12 NOV 2015

Project Category:

CDRs

SWE

Originator(s):

SWE

Page 160: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

149 29 May 2015 Edition: 1.0

Proposal ID : 71.040b / 16.026b Impl. Status: State(s) & Org. Comments:

289.

Project Name: Free Route Airspace Ukraine, Step 2 (Sc 2a)

Description: To implement H24 Free Route Airspace operations above FL275

within individual UTAs in Ukraine.

Objective:

To implement FRA Concept and further improve flight efficiency within Kyiv UIR.

Confirmed 12 NOV 2015

Project Group:

RFG SE SG BLACK

Project Category:

Free Route Airspace

UKR

Originator(s):

UKR

Free Route Airspace Ukraine - FRAU project

Related proposals:

71.040a / 16.026a

81.018a / 19.021a

81.018b / 19.021b

Proposal ID : 57.018c / CE0082 Impl. Status: State(s) & Org. Comments:

290.

Project Name: Vienna TMA

Description:

To re-organise Vienna APP sectors after implemention of a new ATC system for Vienna approach.

Objective:

To further improve the airspace structure and increase the capacity within Vienna TMA, depending on traffic demand.

Planned 10 DEC 2015

Project Group:

FAB CE RFG SE

Project Category:

ATC Sectors TMA

AUT

Originator(s):

AUT

New ATC system plus sectorisation changes for the TMA planned 27/28 November 2015 (no AIRAC date).

Proposal ID : 84.024 Impl. Status: State(s) & Org. Comments:

291.

Project Name: ECAC States AIP en-route publication issues

Description:

To publish RNAV routes in ENR 3.3 in accordance with Annex 15.

Objective:

To resolve airspace data publication inconsistencies in State AIP.

Planned 10 DEC 2015

Project Category:

AIP

BIH

Originator(s):

EUROCONTROL

Part of proposed actions in AIP adaptation.

Proposal ID : 84.051 Impl. Status: State(s) & Org. Comments:

292.

Description: To replace existing 5LNC LUMEN.

Objective:

1. To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region;

2. To improve the aeronautical information provided; 3. To be compliant with ICAO Annex 11.

Planned 10 DEC 2015

Project Category:

5LNC

CZE

Originator(s):

EUROCONTROL ICAO

LUMEN is reserved in ICARD for Belgium. Proposal for replacement is based on

“Common criteria for replacement of duplicated 5LNCs” as point is not reserved for Czech Republic.

Page 161: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

150 29 May 2015 Edition: 1.0

Proposal ID : 83.002 Impl. Status: State(s) & Org. Comments:

293.

Project Name: CDO Munich - EDDM airport

Description: To implement new CDO approaches (STARs) at Munich/ EDDM airport.

Objective:

To further improve the ATS route network and flight efficiency within Munich FIR.

Planned 10 DEC 2015

Project Category:

ATS Routes Vertical FE

DEU

Originator(s):

DEU

Trial 13.10.2013 till 31.12.2014 (going to be extended till 31.12.2015):

ATC München, Sectors NDG/WLD, EGG/RDG und APP North, from 16.10.2014 STA und APPS, from 13.11.2014 LOVV.

CDO STA from Padua (16. Oct. 2014). CDO NAPSA from Vienna (13. Nov. 2014).

Proposal ID : 84.012 Impl. Status: State(s) & Org. Comments:

294.

Project Name: Point Merge

Description:

To create Point Merge arrival route system for Leipzig (EDDP) airport and to assure appropriate connections to en-route network by implementing the following unidirectional ATS routes: 4. T431 RENDO - NERID; 5. T432 BEBKU - NERID; 6. T433 LASGA - GERDO; 7. T434 TABAT - GERDO; 8. T435 PIBAD - GERDO; 9. T436 BERDI - TAVSO; 10. T437 ADMOS - TAVSO; 11. Y225 MAGDA - NENAN - TAMEB.

Objective:

To further improve airspace organization for arrivals to Leipzig (EDDP) airport.

Planned 10 DEC 2015

Project Category:

ATS Routes

DEU

Originator(s):

DEU

Proposal ID : 84.042 Impl. Status: State(s) & Org. Comments:

295.

Description: To replace existing 5LNC BANIX.

Objective:

1. To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region;

2. To improve the aeronautical information provided; 3. To be compliant with ICAO Annex 11.

Planned 10 DEC 2015

Project Category:

5LNC

DEU

Originator(s):

EUROCONTROL ICAO

BANIX is reserved in ICARD for Portugal. Proposal for replacement is based on

“Common criteria for replacement of duplicated 5LNCs” as point is not reserved for Germany.

OA/D to react accordingly.

Page 162: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

151 29 May 2015 Edition: 1.0

Proposal ID : 79.041 Impl. Status: State(s) & Org. Comments:

296.

Project Name: FABEC FRA Step 1 (Ref FABEC FRA RTS 1.1)

Description: Implementation of optimized cross border DCTs through DSNA/ Skyguide AoR outside of military activity, H24 and/or Night and Weekend.

Objective:

To implement FRA Concept and further improve flight efficiency within FABEC.

Planned 10 DEC 2015

Project Group:

FAB EC

Project Category:

50 MPCPEs Free Route Airspace

FAB EC CHE FRA

Originator(s):

FAB EC EUROCONTROL

FABEC FRA RTS 1.1 in DEC 2013 and P-RTS in APR 2014.

Related proposals:

70.059h

75.081

Proposal ID : 84.043 Impl. Status: State(s) & Org. Comments:

297.

Description: To replace existing 5LNC URENA.

Objective:

1. To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region;

2. To improve the aeronautical information provided; 3. To be compliant with ICAO Annex 11.

Planned 10 DEC 2015

Project Category:

5LNC

ITA

Originator(s):

EUROCONTROL ICAO

URENA is with double reservation in ICARD for Russian Federation and Italy.

Proposal for replacement by Italy is based on “Common criteria for replacement of duplicated 5LNCs” as point is used on single ATS route.

Change is planned to be done within the work for LIBD (Bari) SIDs/STARs revision.

Proposal ID : 65.018c Impl. Status: State(s) & Org. Comments:

298.

Description: To implement ATS route segment SONSO - RAVOL - OSDAM northbound.

Objective:To improve the ATS route network within Casablanca FIR.

Planned 10 DEC 2015

Project Category:

ATS Routes

MAR

Originator(s):

MAR

Proposal ID : 66.081b Impl. Status: State(s) & Org. Comments:

299.

Description:

To implement the following ATS route segments: 1. SUBAL - SUNID - IBALU - RBT bi-directional; 2. BEXAL - SUNID - NISBA bi-directional; 3. SONSO - MAK northbound; 4. CSD - RBT bi-directional;

Objective:To further improve ATS route network in Casablanca FIR/UIR.

Planned 10 DEC 2015

Project Category:

ATS Routes

MAR

Originator(s):

MAR

Currently SUBAL - SUNID - IBALU - RBT and BEXAL - SUNID - NISBA are available as

DCTs.

Related proposals:

66.081c

Proposal ID : 71.049 Impl. Status: State(s) & Org. Comments:

300.

Description:

1. To introduce radar approach (MSSR mode S and Primary radar approach) for Fes (GMFF) Saiis airport.

2. To implement new SIDs and STARs for Fes (GMFF) Saiis airport.

Objective:To improve the airspace organisation around Fes (GMFF)

Saiis airport.

Planned 10 DEC 2015

Project Category:

Airspace Structure TMA

MAR

Originator(s):

MAR

Re-organisation of existing Fes (GMFF) Saiis

airport TMA implemented.

Page 163: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

152 29 May 2015 Edition: 1.0

Proposal ID : 71.055 Impl. Status: State(s) & Org. Comments:

301.

Description:

To introduce radar approach (MSSR mode S and Primary radar approach) for Tanger (GMTT) Ibn Battouta airport.

Objective: To further improve airspace organisation around Tanger (GMTT) Ibn

Battouta airport.

Planned 10 DEC 2015

Project Category:

Airspace Structure

MAR

Originator(s):

MAR

Proposal ID : 71.048c Impl. Status: State(s) & Org. Comments:

302.

Description:

To introduce radar approach (MSSR mode S and Primary radar approach) for Marrakech (GMMX) Ménara airport.

Objective: To further improve airspace organisation around Marrakech (GMMX)

Ménara airport.

Planned 10 DEC 2015

Project Category:

Airspace Structure

MAR

Originator(s):

MAR

Related proposals:

71.048a

71.048b

71.048d

Proposal ID : 81.042 Impl. Status: State(s) & Org. Comments:

303.

Description: To replace existing 5LNC KESIR.

Objective:

To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region, to improve the aeronautical information provided and be compliant with ICAO Annex 11.

Planned 10 DEC 2015

Project Category:

5LNC

MAR

Originator(s):

EUROCONTROL ICAO

Annex 11 stated that the 5LNCs shall be unique.

KESIR is used by and is allocated in ICARD to Turkey.

Proposal ID : 81.047 Impl. Status: State(s) & Org. Comments:

304.

Description: To replace existing 5LNC TILDO.

Objective:

To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region, to improve the aeronautical information provided and be compliant with ICAO Annex 11.

Planned 10 DEC 2015

Project Category:

5LNC

MAR

Originator(s):

EUROCONTROL ICAO

Annex 11 stated that the 5LNCs shall be unique.

TILDO is used by and is allocated in ICARD to Finland.

DM to request MAR for replacement (DM31/01 MSG 14-056).

Proposal ID : 81.048 Impl. Status: State(s) & Org. Comments:

305.

Description: To replace existing 5LNC TOLSO.

Objective:

To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region, to improve the aeronautical information provided and be compliant with ICAO Annex 11.

Planned 10 DEC 2015

Project Category:

5LNC

MAR

Originator(s):

EUROCONTROL ICAO

Annex 11 stated that the 5LNCs shall be unique.

TOLSO is used by and is allocated in ICARD to Spain.

Page 164: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

153 29 May 2015 Edition: 1.0

Proposal ID : 74.008b Impl. Status: State(s) & Org. Comments:

306.

Description: To re-design existing SID KRATO for DEP LWSK by extension to RAXAD and withdrawal of 5LNC KRATO.

Objective:

To further improve airspace organisation within Skopje FIR.

Planned 10 DEC 2015

Project Group:

RFG SE

Project Category:

5LNC Airspace Structure

MKD

Originator(s):

IACA EUROCONTROL

SID KRATO is designed (10 years ago) for DEP LWSK from RWY16.

Currently 5LNC KRATO is not part of the ATS route network in Skopje FIR and there is no further continuation of the SID.

Based also on current RAD RWY16 could be used for DEP LWSK to RAXAD only on dog-leg SID SINKO where the absolute straight flying distance is +17.4NM.

DCT KRATO - RAXAD (6NM) was introduced on 16 AUG 2011 by NOTAM and was inserted in RAD from 20 OCT 2011. Will be withdrawn following the introduction of new SID to RAXAD.

Related proposals:

74.008a

Proposal ID : 84.006 Impl. Status: State(s) & Org. Comments:

307.

Description: To create a new sector configuration with 3 layers within the Maastricht/ MUAC Brussels Sector Group.

Objective:

To further improve the airspace structure within Maastricht UAC while providing an additional configuration enabling a better workload distribution between sectors in function of the traffic flows in the Brussels Sector Group.

Planned 10 DEC 2015

Project Category:

ATC Sectors

MUAC

Originator(s):

MUAC

Low sectors between FL245 and FL335. Middle Sectors btwn FL335 and FL375. 1 Upper sector in Brussels Sector Group

above FL375. Follow-on projects envisage an East/West

split of the Upper Sector in a later phase.

Proposal ID : 69.084a Impl. Status: State(s) & Org. Comments:

308.

Project Name: Beograd TMA re-organisation

Description: 1. To introduce RNAV 1 in Beograd TMA. 2. To introduce RNP1 1 in Nis TMA.

3. To re-organise the airspace of Beograd TMA.

Objective:

To further improve the airspace structure within Beograd UIR.

Planned 10 DEC 2015

Project Group:

RFG SE

Project Category:

PBN TMA

SRB

Originator(s):

SRB

Publication for trial purposes 03 APR 2014. Non RNAV procedures will be removed in

Beograd TMA while for Nis TMA procedures will be in trial.

Coordination with Serbian CAA is in progress expected to conclude by the end of 2014.

Page 165: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

154 29 May 2015 Edition: 1.0

Proposal ID : 80.081 Impl. Status: State(s) & Org. Comments:

309.

Project Name: ECAC States AIP en-route publication issues

Description: Phase 1 includes:

a. Change of en-route navigational requirements from RNP5 (B-RNAV) to PBN RNAV5 and RNAV routes adaptation;

b. Adjustment of coordinates in accordance with WGS84 Manual, Annex 15 and Doc 8168.

Objective:

To resolve airspace data publication inconsistencies in State AIP.

Planned 10 DEC 2015

Project Group:

RFG SE

Project Category:

AIP

SRB MNE

Originator(s):

EUROCONTROL

Proposal ID : 68.012a Impl. Status: State(s) & Org. Comments:

310.

Project Name: Lower airspace re-organisation Beograd FIR - Step 1

Description: To revise vertically all other TMAs inside Beograd FIR, except Beograd

TMA and Podgorica TMA.

Objective:

To further improve the airspace structure and ATS route network within Beograd FIR.

Planned 10 DEC 2015

Project Group:

RFG SE

Project Category:

Airspace Structure

SRB MNE

Originator(s):

SRB MNE

Currently Podgorica CTR and Tivat CTR/TMA exist.

Related proposals:

68.012b

68.012c

Proposal ID : 77.072d Impl. Status: State(s) & Org. Comments:

311.

Project Name: Free Route Airspace Wien, FRAW, Stage 4b

Description: To extend the DCTs H24/7, FL165+ (parallel operations with ATS routes) while initialising cross border operations with single States, when

possible between ATC units within FABCE or with adjacent FABs or ANSPs.

Objective:

To further improve the flight planning options between Wien FIR and adjacent FIRs/UIRs as a forth step towards FRAW (Free Route Airspace Wien) implementation.

Proposed autumn 2015

Project Group:

FAB CE RFG SE

Project Category:

50 MPCPEs DCTs Free Route Airspace

AUT

Originator(s):

AUT

Phased implementation: Stage 1 implemented 18 October 2012 (37

DCTs). Stage 2 implemented 7 MAR 2013. Stage 3a/b implemented 6 MAR 2014 - 11

DEC 2014. Stage 4a implemented 2 April 2015, Stage

4b planned autumn 2015. Stage 5 planned end 2016.

Related proposals:

76.047

77.072a

77.072b

77.072c

77.072e

Page 166: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

155 29 May 2015 Edition: 1.0

Proposal ID : 85.021 Impl. Status: State(s) & Org. Comments:

312.

Description: To allow H24 “Direct” flight planning options LUXUR DCT PIMAD or GENIO DCT PIMAD and vice-versa for ARR/DEP LERT / LEMO.

Objective:

To further improve flight planning options for flights arriving/departing to/from LERT / LEMO.

Proposed autumn 2015

Project Category:

DCTs

ESP

Originator(s):

U.S.A.F.E

Requested due to shifting of USAF routing to enter the Barcelona FIR at point LUXUR instead via point MORSS for aircraft coming from South West Asia which saves around 4 minutes of flight time and €100K per year.

Requested DCT options could decrease the USAF flight time by 7 minutes saving another €200K per year.

Options will allow proper connection to ATS route UT100 and will avoid existing very sharp turn LUXUR/GENIO UM134 XARON UT100 PIMAD

Proposal ID : 84.032 Impl. Status: State(s) & Org. Comments:

313.

Description: To replace existing 5LNC OMEDA

Objective:

1. To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region;

2. To improve the aeronautical information provided; 3. To be compliant with ICAO Annex 11. .

Proposed autumn 2015

Project Category:

5LNC

FRA

Originator(s):

EUROCONTROL ICAO

OMEDA is with double reservation in ICARD for Russian Federation and France.

Proposal for replacement by France is based on “Common criteria for replacement of duplicated 5LNCs” as there is reservation (decision date) in ICARD for Russian Federation

Proposal ID : 84.031 Impl. Status: State(s) & Org. Comments:

314.

Description: To replace existing 5LNC SULAX.

Objective:

To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region, to improve the aeronautical information provided and be compliant with ICAO Annex 11.

Proposed autumn 2015

Project Category:

5LNC

FRA

Originator(s):

EUROCONTROL ICAO

SULAX is reserved in ICARD for Sweden. Proposal for replacement is based on

“Common criteria for replacement of duplicated 5LNCs” as point is not reserved for France

Proposal ID : 84.033 Impl. Status: State(s) & Org. Comments:

315.

Description: To replace existing 5LNC LAGOR

Objective:

1. To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region;

2. To improve the aeronautical information provided; 3. To be compliant with ICAO Annex 11.

Proposed autumn 2015

Project Category:

5LNC

FRA

Originator(s):

EUROCONTROL ICAO

LAGOR is with double reservation in ICARD for Russian Federation and France.

Proposal for replacement by France is based on “Common criteria for replacement of duplicated 5LNCs” as point is used on single ATS route.

Page 167: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

156 29 May 2015 Edition: 1.0

Proposal ID : 84.034 Impl. Status: State(s) & Org. Comments:

316.

Description: To replace existing 5LNC ASMAT.

Objective:

a. To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region;

b. To improve the aeronautical information provided; c. To be compliant with ICAO Annex 11.

Proposed autumn 2015

Project Category:

5LNC

FRA

Originator(s):

EUROCONTROL ICAO

ASMAT is reserved in ICARD for Russian Federation.

Proposal for replacement is based on “Common criteria for replacement of duplicated 5LNCs” as point is not reserved for France.

Proposal ID : 80.001 Impl. Status: State(s) & Org. Comments:

317.

Description: To consider possible 5LNC removal from one of the ATS routes of the

crossing waypoints published on both ATS routes: 1. OKAMA - L/UL602 / UM604; 2. TOLSA - L/UL602 / UN866; 3. KUBAX - UY70 / UN866; 4. BEKMO - UY70 / UM604.

Objective:

To simplify the ATS route network within London FIR/UIR and Scottish FIR/UIR.

Proposed autumn 2015

Project Category:

5LNC ATS Routes

GBR

Originator(s):

EUROCONTROL

Two of these 5LNCs are crossings of upper unidirectional ATS routes and do not have connections with lower airspace unless allowed via DCT filling. The other two are also part of lower ATS routes.

Most of the possible undesired, even illogic, turns are not acceptable by the ACCs and unavailable by RAD restrictions.

Waypoints might continue to stay as crossings but published on only one of the ATS routes which will not allow undesired turns and RAD restrictions will be withdrawn.

Possible 5LNC removal from one of the ATS routes should also be considered in view of ATC procedures and usage in case of vectoring and resuming navigation to the relevant ATS route or waypoint.

Currently all crossing points part of UK ATS route network are under consideration by NATS.

Proposal ID : 84.025 Impl. Status: State(s) & Org. Comments:

318.

Description: To allow “Direct” flight planning option KLONN DCT RIVOT and vice-versa or to implement a new bi-directional ATS route.

Objective:

To allow additional shorter flight plannable option via London FIR.

Proposed autumn 2015

Project Category:

DCTs

GBR

Originator(s):

IATA

The purpose is to further shorten the new connections via NATEB area.

Presently the AOs are filing EPOTU DCT ALOTI UM89 RIVOT v.v., but KLONN DCT RIVOT would save 14 NM, e.g. on city pair ENBR - GCRR.

New option and unlimited DCT use within Norwegian airspace allows EPOTU DCT KLONN

KLONN DCT RIVOT could attract traffic to/from ENAL and ENVA to/from Canaries.

Page 168: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

157 29 May 2015 Edition: 1.0

Proposal ID : 84.119 Impl. Status: State(s) & Org. Comments:

319.

Description: To replace existing 5LNC GANTO with EVDEG.

Objective:

1. To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region;

2. To improve the aeronautical information provided; 3. To be compliant with ICAO Annex 11.

Proposed autumn 2015

Project Category:

5LNC

GBR U.S.A.F.E

Originator(s):

EUROCONTROL ICAO

GANTO is reserved in ICARD for France / UK with existing coordinates. One record exists in ICARD which is not connected to UK as GANTO is not FIR boundary point.

Point is used in UK for military aerodrome purpose at EGUN.

Proposal for replacement is based on “Common criteria for replacement of duplicated 5LNCs” as point is not reserved for UK and cannot be used twice in same State.

Proposal ID : 85.022 Impl. Status: State(s) & Org. Comments:

320.

Description: To allow the following Night “Direct” flight planning options for traffic type MIL: BZO DCT ROTAR; AIOSA DCT TIGRA.

Objective:

To further improve the flight planning options within Italy.

Proposed autumn 2015

Project Category:

Civil/Military Airspace DCTs

ITA

Originator(s):

U.S.A.F.E

The use of both DCTs is planned in combination with SEAFRA allowed option ROTAR DCT AIOSA.

The whole DCTs option BZO - ROTAR - AIOSA - TIGRA will reduce route distance by 31NM compared to current routing saving €1000 per flight.

Proposal ID : 77.032 / BM0201 Impl. Status: State(s) & Org. Comments:

321.

Description: To create bi-directional ATS route segement DDM - ELKAN - ELIMO - NAWRS/MIS.

Objective:

To further improve the ATS route network while shortening the axis of traffic from Istanbul/Athens towards Tripoli and other south-west African states.

Proposed autumn 2015

Project Group:

FAB BLUE MED

Project Category:

ATS Routes

MLT GRC LBY

Originator(s):

MLT

NAWRS connects HLLT arrivals/departures. MIS connects HLMS arrivals/departures. DDM - ELKAN will be Night route in

Greece.

Related proposals:

69.147

Proposal ID : 78.029 Impl. Status: State(s) & Org. Comments:

322.

Project Name: HOPE - Harmonisation of Oslo Procedures and Environment - Phase 2

Description:

1. Adjustments of HOPE 1 procedures. 2. RNP approaches based on Visual RNAV Approach tests

3. New adjusted noise abatement procedures at Oslo/ ENGM airport adapted to visual RNAV approach tests and revised SIDs.

Objective:

To further improve airspace organisation in Norway FIR for flights to/from Oslo (ENGM) airport. (Revised Point Merge System Oslo TMA - post ASAP development).

Proposed autumn 2015

Project Category:

PBN TMA

NOR

Originator(s):

NOR

Related proposals:

73.004

Page 169: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

158 29 May 2015 Edition: 1.0

Proposal ID : 79.076c Impl. Status: State(s) & Org. Comments:

323.

Project Name: RNAV procedures for EPPO

Description: To implement RNAV procedures for TMA Poznan South (EPPO) airport.

Objective:

To further improve the airspace organisation within Warszawa FIR.

Planned autumn 2015

Project Category:

PBN TMA

POL

Originator(s):

POL

Related proposals:

79.076a

79.076b

Proposal ID : 84.022 Impl. Status: State(s) & Org. Comments:

324.

Description: To re-designate existing ATS route Z136 LAGAR - GODLO as T871(release of Z136).

Objective:

To rationalise the existing ATS route designators within Warszawa FIR in order to further facilitate flight planning and release RDs.

Proposed autumn 2015

Project Category:

Route Redesignation

POL

Originator(s):

EUROCONTROL

Proposal ID : 69.091 Impl. Status: State(s) & Org. Comments:

325.

Description: To implement a new Lisboa ACC sector, depending on traffic evolution.

Objective:

To further improve the airspace structure within Lisboa UIR.

Proposed autumn 2015

Project Category:

ATC Sectors

PRT

Originator(s):

PRT

Related proposals:

84.055

Proposal ID : 80.003 Impl. Status: State(s) & Org. Comments:

326.

Project Name: Removal U prefix Lisboa FIR

Description:

To remove the distinction between Upper and Lower ATS routes - "U" prefix within Lisboa FIR.

Objective:

To simplify Air Traffic Management in Lisboa FIR.

Proposed autumn 2015

Project Category:

ATS Routes

PRT

Originator(s):

PRT

"U" prefix removal for all routes below FRAL is under consideration.

Further adaptation of lower and upper ATS routes might be required.

Proposal ID : 83.007 Impl. Status: State(s) & Org. Comments:

327.

Project Name: BARPI area

Description:

To withdraw from AIP Slovenia ENR 3.3 the vertical limits of ATS route segment M/UM859 BARPI - TITUV.

Objective:

To adapt the AIP publication of ATS routes within cross-border delegated airspace between Slovenia and Italy.

Proposed autumn 2015

Project Group:

RFG SE

Project Category:

AIP

SVN

Originator(s):

EUROCONTROL

BARPI area is special due to State border shape, none existence of boundary points between Ljubljana and Milano FIRs on ATS routes M859, Z495, P28 and different lower/upper DFL195/245.

Currently in AIP Italy M/UM859 BARPI - TITUV is published with limits FL95 - FL195 - FL460 while in AIP Slovenia these limits are 8000FT AMSL - FL245 - FL660. This double contradicting publication for both lower and upper limits creates difficulties in airspace data systems and flight plan

Page 170: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

159 29 May 2015 Edition: 1.0

processing. Similar in that area is ATS route segment

Z/UZ495 BARPI - ETAKO for which vertical limits are published only in AIP Italy as FL95 - FL195 - FL460 and covering portion in Ljubljana FIR despite that lower/upper limit is FL245 and top limit FL660.

For the third ATS route segment in that area P28 BARPI - RCH vertical limits are again published only in AIP Italy.

The data maintenance for ATS route segment BARPI - TITUV for the EAD SDO shall be similarly organized between Italy and Slovenia as for Z495 and P28.

Proposal ID : 84.055 Impl. Status: State(s) & Org. Comments:

328.

Project Name: Lisboa ACC South sector

Description: a. To implement a vertical split Lisboa ACC South sector. b. To allow a dynamic management (splitting/ collapsing) of the West,

South and MAD sectors.

Objective:

To further improve the airspace structure within Lisboa UIR.

Planned 07 JAN 2016

Project Category:

ATC Sectors

PRT

Originator(s):

PRT

Related proposals:

69.091

Proposal ID : 69.052 / 16.008 / DU0073 Impl. Status: State(s) & Org. Comments:

329.

Project Name: DANUBE FAB FRA - Phase 1

Description: To implement NIGHT Free Route Airspace within the DANUBE FAB area.

Objective:

To further improve the Free Route Airspace operations within and between Bucuresti FIR and Sofia FIR.

Planned 04 FEB 2016

Project Group:

FAB DANUBE RFG SE SG BLACK

Project Category:

50 MPCPEs Free Route Airspace

BGR ROU

Originator(s):

FAB DANUBE

Related proposals:

82.030 / 20.032

82.031 / 20.033

82.032 / 20.034

82.033 / 20.035

Proposal ID : 81.001 / 19.060 Impl. Status: State(s) & Org. Comments:

330.

Project Name: Night Free Route Sofia FIR - FRAS, Phase 2

Description:

Phase 2: To expand the FRAS by lowering the FL limit from FL245 to FL095, inclusion of ARR/DEP as part of FRA operations and introduction of new FRA points.

Planned 04 FEB 2016

Project Group:

FAB DANUBE RFG SE SG BLACK

BGR

Originator(s):

BGR

Currently Night FRA is applicable FL245 - FL660 and flights ARR/DEP from airports located within LBSR FIR are not eligible for FRA operations and must be planned along the route network published in ENR 3.3 irrespective of the planned FL.

Page 171: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

160 29 May 2015 Edition: 1.0

Objective:

To further improve the Free Route Airspace operations within Sofia FIR.

Project Category:

Free Route Airspace

Related proposals:

76.014 / 16.009

83.010

Proposal ID : 59.017e Impl. Status: State(s) & Org. Comments:

331.

Project Name: London Airspace Management Program, LAMP Phase 1a

Description:

1. 5 new RNAV5 STARs into TIMBA (and LUMBA should MAY be out of service). WILLO and TIMBA remain as conventional holds.

2. A Point Merge arrival structure for Thames Radar incorporating two new holding stacks for London City named JACKO and GODLU with new STARs, new SIDs for departures to the South and additional Controlled Airspace

3. Re-sectorisation of TCSE, TCSW and AC DVR/WOR sectors to include a solution to address the S17 OPA Hotspot

4. Re-routeing of Stansted, Cambridge, Luton and Northolt DET departures into TC EAST (out of TCSE)

5. Re-routeing of Thames arrivals from the North into TC EAST (out of TC MIDS and TCNE)

6. Lowering of CAS over the POMPI Triangle and Isle of Wight within which a new contingency hold for Solent traffic will be located

Objective:

To increase systemisation of the airspace structure in order to provide safety and efficiency enhancements and additional capacity in London TMA through a fundamental review of ATS route and sector structure (London Airspace Management Programme/ LAMP).

Planned 04 FEB 2016

Project Category:

Airspace Structure ATS Routes PBN TMA

GBR

Originator(s):

GBR

Designs based on P-RNAV routes requiring considerable regulatory input.

Related proposals:

59.017f

Proposal ID : 62.091c Impl. Status: State(s) & Org. Comments:

332.

Project Name: Polish Airspace Project 2010+, Phase 3a

Description: To implement a vertical split of all current Warszawa ACC sectors

(division into two layers).

Objective:

To further improve the airspace structure within Warszawa ACC and increase capacity while applying vertical splits.

Confirmed 03 MAR 2016

Project Category:

Airspace Structure ATC Sectors

POL

Originator(s):

POL

Depending on training of ATC staff. Vertical split of current GAT ACC sectors. Max. 10/11active sectors with vertical splits.

Related proposals:

62.091a

62.091b

62.091e

76.052

76.053

Page 172: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

161 29 May 2015 Edition: 1.0

Proposal ID : 75.010 / DU0089 Impl. Status: State(s) & Org. Comments:

333.

Description: 1. To implement southbound ATS route M/UM748 GOL - LMO. 2. To adapt Sofia ACC sectors C / D boundary.

Objective:

To further improve airspace organisation between Sofia FIR and Hellas UIR.

Proposed winter 2015/16

Project Group:

FAB DANUBE RFG SE

Project Category:

ATC Sectors ATS Routes

BGR GRC

Originator(s):

BGR GRC

Related proposals:

77.065

Proposal ID : 81.002b Impl. Status: State(s) & Org. Comments:

334.

Project Name: ECAC States AIP en-route publication issues - Phase 2.

Description:

To resolve the spotted AIP ENR 3.3 publication issues - Phase 2.

Objective:

To resolve airspace data publication inconsistencies in State AIP.

Proposed winter 2015/16

Project Group:

RFG SE

Project Category:

AIP

BGR

Originator(s):

EUROCONTROL

Further discussed at BULATSA / EUROCONTROL bi-lateral meeting in October 2013.

AIS Office prepares the relevant updates in accordance with ECAC States AIP en-route publication issues document.

Related proposals:

81.002a

Proposal ID : 69.220 Impl. Status: State(s) & Org. Comments:

335.

Description: To implement either an ATS route or a DCT to connect HDO - (ABUDO - NIPEL) - ILB.

Objective:

To further improve the ATS route network while providing a shorter route option for traffic from Scandinavia to the Adriatic cost.

Proposed winter 2015/16

Project Category:

ATS Routes

CZE AUT SVN

Originator(s):

IATA

New H24 DCT ABUDO DCT NIPEL available WEF AIRAC 11DEC in Austria/Czech airspace.

Consider FRA developments within States concerned.

Related proposals:

75.033a

Proposal ID : 81.040 Impl. Status: State(s) & Org. Comments:

336.

Description: To replace existing 5LNC BRAVO.

Objective:

To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region, to improve the aeronautical information provided and be compliant with ICAO Annex 11.

Proposed winter 2015/16

Project Category:

5LNC

ESP

Originator(s):

EUROCONTROL ICAO

Annex 11 stated that the 5LNCs shall be unique.

BRAVO is used 7 times worldwide and is allocated in ICARD to Brazil.

ICAO DM sent relevant message to ESP (DM23/01 msg 14-022).

ESP will co-ordinate through planning unit.

Page 173: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

162 29 May 2015 Edition: 1.0

Proposal ID : 79.020 Impl. Status: State(s) & Org. Comments:

337.

Description: To consider possible 5LNC removal from one of the ATS routes of the

crossing waypoints published on both ATS routes.

Objective:

To simplify the ATS route network within Madrid FIR/UIR and Barcelona FIR/UIR.

Proposed winter 2015/16

Project Category:

5LNC ATS Routes

ESP

Originator(s):

EUROCONTROL

Outcome of South West Europe RAD Review 21st - 22nd February 2013.

All 5LNCs are crossings of only upper ATS routes and in most of the cases unidirectional one. These 5LNCs do not have connections with lower airspace unless allowed via DCT filling.

Most of the possible undesired, even illogic, turns are not acceptable by the ACCs and unavailable by RAD restriction.

Waypoints might continue to stay as crossings but published on only one of the ATS routes which will not allow undesired turns and RAD restriction will be withdrawn.

Possible 5LNC removal from one of the ATS routes should also be considered in view of ATC procedures and usage in case of vectoring and resuming navigation to the relevant ATS route or waypoint.

Proposal ID : 81.035 Impl. Status: State(s) & Org. Comments:

338.

Description: To replace existing 5LNC ROYAL.

Objective:

To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region, to improve the aeronautical information provided and be compliant with ICAO Annex 11.

Proposed winter 2015/16

Project Category:

5LNC

ESP

Originator(s):

EUROCONTROL ICAO

Annex 11 stated that the 5LNCs shall be unique.

ROYAL is used 4 times worldwide and is created in ICARD for USA.

ICAO DM sent relevant message to ESP. ESP will co-ordinate through planning unit.

Related proposals:

81.034

Proposal ID : 84.038 Impl. Status: State(s) & Org. Comments:

339.

Description: To replace existing 5LNC PALME.

Objective:

1. To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region;

2. To improve the aeronautical information provided; 3. To be compliant with ICAO Annex 11.

Proposed winter 2015/16

Project Category:

5LNC

ESP

Originator(s):

EUROCONTROL ICAO

PALME is with double reservation in ICARD for France and USA. It is not used by USA and ICAO might consider reservation withdrawal from ICARD.

Point is used in Spain for military purpose. Proposal for replacement is based on

“Common criteria for replacement of duplicated 5LNCs” as point is not reserved for Spain.

Page 174: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

163 29 May 2015 Edition: 1.0

Proposal ID : 84.036 Impl. Status: State(s) & Org. Comments:

340.

Description: To replace existing 5LNC MAROT.

Objective:

To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region;

To improve the aeronautical information provided; To be compliant with ICAO Annex 11.

Proposed winter 2015/16

Project Category:

5LNC

ESP

Originator(s):

EUROCONTROL ICAO

MAROT is with double reservation in ICARD for Russian Federation and Haiti.

Proposal for replacement is based on “Common criteria for replacement of duplicated 5LNCs” as point is not reserved for Spain.

Proposal ID : 84.035 Impl. Status: State(s) & Org. Comments:

341.

Description: To replace existing 5LNC LEPES.

Objective:

1. To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region;

2. To improve the aeronautical information provided; 3. To be compliant with ICAO Annex 11.

Proposed winter 2015/16

Project Category:

5LNC

ESP

Originator(s):

EUROCONTROL ICAO

LEPES does not belong in ICARD to ICAO EUR/NAT Region. It is NACC Region allocated point and requires further action by ICAO DM.

Proposal for replacement by Spain is based on “Common criteria for replacement of duplicated 5LNCs” as point is used as FIR boundary in Russian Federation.

Proposal ID : 84.016 Impl. Status: State(s) & Org. Comments:

342.

Description: To re-designate existing ATS route UZ43 BIPET - ODEGI as UZ27.

Objective:To rationalise the existing ATS route designators in Spain in

order to further facilitate flight planning.

Proposed winter 2015/16

Project Category:

Route Redesignation

ESP

Originator(s):

EUROCONTROL

RDs will be published on 5 MAR 2015 but the RD is reserved in ICARD for Italy.

Proposal ID : 84.037 Impl. Status: State(s) & Org. Comments:

343.

Description: To replace existing 5LNC PODAS.

Objective:

1. To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region;

2. To improve the aeronautical information provided; 3. To be compliant with ICAO Annex 11.

Proposed winter 2015/16

Project Category:

5LNC

ESP

Originator(s):

EUROCONTROL ICAO

PODAS is reserved in ICARD for Russian Federation.

Proposal for replacement is based on “Common criteria for replacement of duplicated 5LNCs” as point is not reserved for Spain.

Proposal ID : 75.069 Impl. Status: State(s) & Org. Comments:

344.

Project Name: Paris Point Merge TE

Description: To implement the Point Merge TE (Paris ACC) for Paris

TMA arrivals from the north-east.

Objective:To further improve the airspace structure while increasing the

capacity of the sectors concerned, the decent profiles and sequencing of traffic with destination Paris TMA.

Planned winter 2015/16

Project Category:

Airspace Structure TMA

FRA BEL MUAC

Originator(s):

FRA

Page 175: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

164 29 May 2015 Edition: 1.0

Proposal ID : 84.029 Impl. Status: State(s) & Org. Comments:

345.

Description: To allow ARR ETAR during the week via point MAKOT by revising existing RAD restrictions LFED1000, LF2926 and LF7000.

Objective:

To allow additional shorter flight plannable option between France and Germany.

Proposed winter 2015/16

Project Category:

DCTs RAD

FRA DEU

Originator(s):

U.S.A.F.E

DFS and DSNA agreed to check possibility. Possible for DFS in case DSNA could deliver the traffic via MAKOT.

Current arrival option from South is DJL UM129 RESPO UM187 POGOL R11 OBORN V17 LUPEN T126 SUL Y710 ESULI N851 LBU Z11 TAGIK Z818 RINEX A Z12 XIDOD DCT which is inefficient and adds 25 minutes of flight time to the more efficient weekend route.

USAF proposes that the weekend route allowed by above RAD restrictions DJL UM129 EPL UL47 GTQ G21 MAKOT Z818 SBN DCT be allowed also during the week.

USAF estimates that safety of flight will increase and it will also save €134,400 per year due to the decrease in flight time.

Proposal ID : 74.064b Impl. Status: State(s) & Org. Comments:

346.

Description: 1. To implement ATS route M743 SKP - ROPOX (crossing point with

northern lateral limits of Athinai TMA) - ATV with the relevant procedures (SIDs and STARs) for LGAV.

2. To withdraw ATS route B1 SKP - ABLON - ATV following the implementation of M743.

Objective:

To further improve ATS route network within Athinai FIR / Hellas UIR.

Proposed winter 2015/16

Project Group:

RFG SE

Project Category:

ATS Routes

GRC

Originator(s):

GRC

Proposal ID : 74.064c Impl. Status: State(s) & Org. Comments:

347.

Description: 1. To realign ATS route segment G8 / N/UN604 KRO - OLIDA - LSV

as KRO - SUSOR (crossing point with G/UG802) - LSV. 2. To withdraw ATS route G8 ATV - KRO - OLIDA - LSV following the

re-alignment of N604.

Objective:

To further improve ATS route network within Athinai FIR.

Proposed winter 2015/16

Project Group:

RFG SE

Project Category:

ATS Routes

GRC

Originator(s):

GRC

Page 176: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

165 29 May 2015 Edition: 1.0

Proposal ID : 52.025a / BM0129 Impl. Status: State(s) & Org. Comments:

348.

Description:

To implement the following bidirectional ATS route segments: 1. CRAYE - TUPAL; OR 2. PAL-CRAYE.

Objective:

To further improve the ATS route network between Brindisi UIR and Roma UIR.

Proposed winter 2015/16

Project Group:

FAB BLUE MED RFG SE

Project Category:

ATS Routes

ITA

Originator(s):

ITA

Option usable by traffic to/from the new Enfhida airport in Tunisia.

Proposal ID : 65.080 / BM0080 Impl. Status: State(s) & Org. Comments:

349.

Project Name: DIRED - PNZ

Description: To implement northbound RNAV route DIRED - PNZ.

Objective:

To further improve the ATS route network within Roma ACC while offering a shorter route option for traffic LICC - LIRF (50MPCPE).

Proposed winter 2015/16

Project Group:

50 MPCPEs FAB BLUE MED

Project Category:

ATS Routes PBN

ITA

Originator(s):

ITA

Proposal ID : 65.081 / BM0165 Impl. Status: State(s) & Org. Comments:

350.

Description: To implement, as CDR, RNAV route DELER - NEKPI northbound only.

Objective:

To further improve the ATS route network in Roma UIR while offering a shorter route option for traffic LICC - LIRF.

Proposed winter 2015/16

Project Group:

50 MPCPEs FAB BLUE MED

Project Category:

ATS Routes

ITA

Originator(s):

ITA

Proposal ID : 66.021 Impl. Status: State(s) & Org. Comments:

351.

Description: To extend the availability of CDR3 UY170 LEGLO - ABREG within Milano UIR as CDR1/2 following the utilisation of UY170 ABREG -

ARGAX - ROMIR within Swiss UIR.

Objective:

To further harmonise the utilisation of the existing CDRs within ECAC airspace.

Proposed winter 2015/16

Project Category:

CDRs

ITA

Originator(s):

EUROCONTROL

Related proposals:

61.025b

79.026

Page 177: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

166 29 May 2015 Edition: 1.0

Proposal ID : 52.025b / BM0078 Impl. Status: State(s) & Org. Comments:

352.

Description:

To implement the following bidirectional ATS route segments: 1. BRD - CDC; OR 2. CDC-CRAYE

Objective:

1. To further improve the ATS route network within Brindisi UIR. 2. To allow new flight planning options for operators flying between

airports in the north Africa (DTMB, DTNH, DTTA), Malta (LMML) and south Italy (LICB, LICC, LICJ) on one side and Scandinavian States and Russian Federation on the other.

Proposed winter 2015/16

Project Group:

FAB BLUE MED RFG SE

Project Category:

ATS Routes

ITA

Originator(s):

IATA

Planned to be reassessed during works about reorganisation of military areas for strike fighter F35 needs (Ionian sea and Sicily areas combined) .

Proposal ID : 68.060 / BM0070 Impl. Status: State(s) & Org. Comments:

353.

Project Name: MABOX - ADEXI

Description: To extend existing ATS route M622 segment MABOX - ADEXI.

Objective:

To further improve the ATS route network while offering the shortest route for destination LICT according flow arrangement between Italy and Malta.

Proposed winter 2015/16

Project Group:

FAB BLUE MED

Project Category:

ATS Routes

ITA MLT

Originator(s):

FAB BLUE MED

Related proposals:

68.061

Proposal ID : 68.061 / BM0071 Impl. Status: State(s) & Org. Comments:

354.

Project Name: ADEXI - TRP

Description: To implement DCT ADEXI - TRP.

Objective:

To further improve the ATS route network while offering the shortest route for destination LICT according traffic flow arrangement between Italy and Malta.

Proposed winter 2015/16

Project Group:

FAB BLUE MED

Project Category:

DCTs

ITA

Originator(s):

FAB BLUE MED

DCT necessary due to the unavailability of STARs from ADEXI.

Related proposals:

68.060

Proposal ID : 62.086c / BM0004 Impl. Status: State(s) & Org. Comments:

355.

Description: To implement southbound ATS route M727 GIANO - TRP - DIGOS.

Objective:

To further improve the ATS route network within Roma FIR.

Proposed winter 2015/16

Project Group:

FAB BLUE MED

Project Category:

ATS Routes

ITA

Originator(s):

FAB BLUE MED

ATS route exist in Italy as upper one.

Related proposals:

62.086e

Page 178: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

167 29 May 2015 Edition: 1.0

Proposal ID : 69.100 / BM0006 Impl. Status: State(s) & Org. Comments:

356.

Description: To implement bidirectional ATS route segment TRP - TUC.

Objective:

To offer a shorter route option at the interface ITALY_TUNISIA.

Proposed winter 2015/16

Project Group:

FAB BLUE MED

Project Category:

ATS Routes

ITA TUN

Originator(s):

FAB BLUE MED

Planned to be reassessed during works about reorganisation of military areas for strike fighter F35 needs (Ionian sea and Sicily areas).

Proposal ID : 69.109 / BM0022 Impl. Status: State(s) & Org. Comments:

357.

Description: To implement bidirectional ATS route segment UT313 NEMBO - VALMA

- DORAS - FIR BDRY - INDOT, available during Night.

Objective:

To improve the route network between ELB and Sicily (Italy).

Proposed winter 2015/16

Project Group:

FAB BLUE MED

Project Category:

ATS Routes

ITA MLT

Originator(s):

FAB BLUE MED

Proposal ID : 69.128a / BM0041 Impl. Status: State(s) & Org. Comments:

358.

Description: To implement bidirectional ATS route segment PININ - PNZ - PES.

Objective:

To offer a direct route to traffic between Tunisia/Italy and East Europe.

Proposed winter 2015/16

Project Group:

FAB BLUE MED

Project Category:

ATS Routes

ITA

Originator(s):

FAB BLUE MED

Continuation PES - NIT requires further study for full benefits.

Related proposals:

69.128b

Proposal ID : 62.086e / BM0075 Impl. Status: State(s) & Org. Comments:

359.

Description: To implement bidirectional ATS route M742 PAL - ADEXI.

Objective:

To further improve the ATS route network within Roma FIR.

Proposed winter 2015/16

Project Group:

FAB BLUE MED

Project Category:

ATS Routes

ITA

Originator(s):

FAB BLUE MED

ATS routes exist in Italy as upper one.

Related proposals:

62.086c

Proposal ID : 75.037b Impl. Status: State(s) & Org. Comments:

360.

Project Name: Milano TMA, Phase 2

Description:

To re-organise Milano TMA.

Objective:

To further improve airspace organisation within Italy.

Proposed winter 2015/16

Project Category:

TMA

ITA

Originator(s):

ITA

Related proposals:

75.037a

Page 179: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

168 29 May 2015 Edition: 1.0

Proposal ID : 78.002 Impl. Status: State(s) & Org. Comments:

361.

Description: To implement new shorter option for ARR LIPR via RIFEN.

Objective:

To further improve ATS route network within Milano FIR.

Proposed winter 2015/16

Project Category:

ATS Routes

ITA

Originator(s):

EUROCONTROL

Currently in accordance with RAD restriction LI2253 UT128 ROSKA - BELOV is not available for traffic ARR LIPR. The aim is “To segregate arriving traffic. This traffic shall file ROSKA UM859”. This restriction is valid 05.00 - 21.00 (Summer) 06.00 - 21.00 (Winter). All ARR LIPR are forced to fly on very sharp dog-leg via ROSKA - CHI - BELOV additionally pushed 18NM.

If UT128 will be allowed for ARR LIPR there is a need for lower route as today limit is FL265 AGOMO - BELOV but contrary to that there is DCT ROSKA - RIM (FL095 - FL460) due to “There is no alternative route for flight planning for traffic type MIL”. There is a different treatment between civil and military flights in that case.

Proposal ID : 81.034 Impl. Status: State(s) & Org. Comments:

362.

Description: To replace existing 5LNC ROYAL.

Objective:

To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region, to improve the aeronautical information provided and be compliant with ICAO Annex 11.

Proposed winter 2015/16

Project Group:

RFG SE

Project Category:

5LNC

ITA

Originator(s):

EUROCONTROL ICAO

Annex 11 stated that the 5LNCs shall be unique.

ROYAL is used 4 times worldwide and is created in ICARD for USA.

ICAO DM sent relevant message to ITA.

Related proposals:

81.035

Proposal ID : 66.078b Impl. Status: State(s) & Org. Comments:

363.

Description:

To implement the following ATS routes: 1. RBT - TOLSI northbound; 2. BAGBO - RBT bidirectional (CDR).

Objective:To improve the ATS route network within Casablanca FIR.

Proposed winter 2015/16

Project Category:

ATS Routes

MAR

Originator(s):

MAR

Proposal ID : 66.081d Impl. Status: State(s) & Org. Comments:

364.

Description:

To implement the following ATS routes: a. ADM - BODNO - FES bi-directional; b. BAGBO - PIXOV bi-directional (CDR); c. OZT - OJD bi-directional (CDR).

Objective:To improve the ATS route network within Casablanca FIR.

Proposed winter 2015/16

Project Category:

ATS Routes

MAR

Originator(s):

MAR

Page 180: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

169 29 May 2015 Edition: 1.0

Proposal ID : 65.044 Impl. Status: State(s) & Org. Comments:

365.

Description: To design and publish RNAV SIDs and STARs for LMML airport.

Objective:

To further improve the airspace organisation within Malta FIR.

Proposed winter 2015/16

Project Category:

Airspace Structure PBN

MLT

Originator(s):

EUROCONTROL

Proposal ID : 80.058 Impl. Status: State(s) & Org. Comments:

366.

Project Name: RNAV 1 procedures Ljubljana TMA

Description: To design and publish RNAV 1 STARs for Ljubljana airport.

Objective:

To further improve the airspace organisation within TMA Ljubljana.

Proposed winter 2015/16

Project Group:

RFG SE

Project Category:

PBN TMA

SVN

Originator(s):

SVN

Proposal ID : 80.021a Impl. Status: State(s) & Org. Comments:

367.

Description: To introduce P-RNAV SIDs/STARs for Milas/Bodrum (LTFE) airport.

Objective:

To further improve the airspace organisation within Istanbul FIR and Ankara FIR.

Proposed winter 2015/16

Project Group:

RFG SE

Project Category:

PBN TMA

TUR

Originator(s):

TUR

PBN SID /STAR (P-RNAV ,Based on GNSS) procedures for LTFE Airport completed.

Implementation after completion of SMART project.

Related proposals:

60.010c

Proposal ID : 80.023e Impl. Status: State(s) & Org. Comments:

368.

Description: To introduce RNP APCH, SIDs/STARs for Igdir (LTCT) airport.

Objective:

To further improve the airspace organisation within Istanbul FIR and Ankara FIR.

Proposed winter 2015/16

Project Group:

RFG SE

Project Category:

PBN TMA

TUR

Originator(s):

TUR

Related proposals:

80.023a

80.023b

80.023c

80.023d

Proposal ID : 80.079 Impl. Status: State(s) & Org. Comments:

369.

Description: To re-designate ATS route UT330 VENAT - MOLUS as UN76.

Objective:

To simplify existing ATS route designation as post SWAP development.

Planned 31 MAR 2016

Project Category:

ATS Routes Route Redesignation

CHE FRA

Originator(s):

CHE FRA

Linked to EUC22 and SWAP UN852/853.

Related proposals:

50.010b

51.004

81.023

Page 181: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

170 29 May 2015 Edition: 1.0

Proposal ID : 84.052 Impl. Status: State(s) & Org. Comments:

370.

Description: To replace existing 5LNC GOGOL with KOVIM.

Objective:

a. To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region;

b. To improve the aeronautical information provided; c. To be compliant with ICAO Annex 11.

Planned 31 MAR 2016

Project Category:

5LNC

CHE

Originator(s):

EUROCONTROL ICAO

GOGOL is reserved in ICARD for Armenia. Proposal for replacement is based on

“Common criteria for replacement of duplicated 5LNCs” as point GOGOL is not reserved for Switzerland.

Proposal ID : 51.004 Impl. Status: State(s) & Org. Comments:

371.

Project Name: FAB EC SE - new Phase 2 (Full Swap UN852/UN853 and EUC 22 - Step1)

Description: To eliminate the cross-over of UN852/UN853 over DIK and in the

PENDU area while implementing: 1. Create parallel ATS routes to segregate overflights from

arriving/departing traffic; 2. Create new routes through the deleted parts of the existing TRA305

for connection to the North; 3. New ATS delegations between all impacted ANSPs; 4. Lower airspace changes:

a. SID/STAR - LSGG, Geneva Airport b. SID/STAR - LFSB , Basel-Mulhouse Airport c. SID/STAR - LFST, Strasbourg Airport d. SID/STAR - LFJL, Metz-Nacy-Lorraine Airport e. SID - EBBR, Brussels Airport

5. Phased implemention of EUC 22 cross border TRA

Germany/France: a. To delete part of the existing TRA205/305 to open the

bottleneck over Luxembourg to enable new SWAP ATS routes. b. To create 2 new CBAs to ensure that the military have the same

amount of training airspace. i. Extend the German area to the south over France

FL115+; ii. Extend the French area to the east in a new area over the

Rhine valley FL115+.

Objective:

To further improve the ATS route network and airspace structure at the interface between Maastricht UAC, Karlsruhe UAC, Reims UAC and Swiss UAC and in parallel, to create a cross-border military training area at the French/ German interface and make best use of the airspace for civil and military demand and de-congest the NTM/DIK area.

Planned 31 MAR 2016

Project Group:

FAB EC

Project Category:

50 MPCPEs Airspace Structure ATS Routes Civil/Military Airspace

DEU FRA CHE BEL MUAC

Originator(s):

FAB EC IACA

Related proposals:

50.010b

80.079

81.023

84.017b

Page 182: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

171 29 May 2015 Edition: 1.0

Proposal ID : 85.012 Impl. Status: State(s) & Org. Comments:

372.

Description: To implement eastbound RNAV route UZ360 MATUG - ABUKA.

Objective:

To further improve the ATS route structure within Germany.

Planned 31 MAR 2016

Project Category:

ATS Routes

DEU

Originator(s):

DEU

New route in the vicinity of existing TRA305 (future EUC22) with an intersection at UL608 and an additional new waypoint northwest of ABUKA.

Proposal ID : 74.011 Impl. Status: State(s) & Org. Comments:

373.

Project Name: Free Route Airspace Skopje

Description: To introduce H24 Free Route in Skopje ACC above FL145.

Objective:

To further improve airspace organisation within Skopje FIR.

Planned 31 MAR 2016

Project Group:

RFG SE

Project Category:

50 MPCPEs Free Route Airspace

MKD

Originator(s):

MKD

Free Route implementation depends on neighbouring States developments and requirements.

Full co-operation should be expected.

Proposal ID : 84.058 Impl. Status: State(s) & Org. Comments:

374.

Project Name: Free Route Airspace Santa Maria FIR

Description: To extend the Lisboa Free Route Airspace concept/ FRAL to Santa

Maria FIR.

Objective:

To further improve the airspace utilisation between Santa Maria FIR and Lisboa FIR.

Planned 31 MAR 2016

Project Category:

Free Route Airspace

PRT

Originator(s):

PRT

FRAL - Free Route Airspace Lisboa FIR above FL245 implemented 7 May 2009.

Free Route Airspace SAN & ASI sectors/FRASAI, Phase 2 implemented 1 May 2014.

Proposal ID : 70.018k / CE0014 Impl. Status: State(s) & Org. Comments:

375.

Description: To implement southbound ATS route segment BABKO - ALAMU.

Objective:

To further improve the ATS route network within the FAB CE area while providing additional shorter route options.

Planned 28 APR 2016

Project Group:

FAB CE

Project Category:

Night Routes

SVK

Originator(s):

FAB CE

Night ATS route: 23:00h - 05:00h (22:00h - 04:00h).

2012 - 2015 implementation plan approved by the FAB CE Committee Meeting 4th May 2010 and confirmed by FAB CE OPS WG.

Consider FRA H24 implememtation in Bratislava FIR.

Proposal ID : 70.019c / CE0043 Impl. Status: State(s) & Org. Comments:

376.

Description: To implement westbound H24 DCT PITOK - LALES.

Objective:

To further improve the ATS route network within the FAB CE area while providing additional shorter route options.

Planned 28 APR 2016

Project Group:

FAB CE

Project Category:

DCTs

SVK

Originator(s):

FAB CE

FRA H24 in Budapest FIR implemented 5 Feb 2015.

Consider FRA H24 implementation in Bratislava FIR.

Related proposals:

74.017 / 16.025

Page 183: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

172 29 May 2015 Edition: 1.0

Proposal ID : 70.019o / CE0055 Impl. Status: State(s) & Org. Comments:

377.

Description: To implement eastbound H24 DCT MAKAL - PITOK.

Objective:

To further improve the ATS route network within the FAB CE area while providing additional shorter route options.

Planned 28 APR 2016

Project Group:

FAB CE

Project Category:

DCTs

SVK

Originator(s):

FAB CE

Night ATS route: 23.00h - 05.00h (22.00h - 04.00h).

Will be re-evaluated within FRA H24 in Bratislava FIR as of winter 2015/16.

Proposal ID : 70.019x / CE0064 Impl. Status: State(s) & Org. Comments:

378.

Description: To implement eastbound H24 DCT PARAK - SUPAK - LDZ.

Objective:

To further improve the ATS route network within the FAB CE area while providing additional shorter route options.

Planned 28 APR 2016

Project Group:

FAB CE

Project Category:

DCTs

SVK POL

Originator(s):

FAB CE

Will be part of the RTS proposals for NE streams implementation.

Consider FRA H24 implementation Warsaw FIR.

Consider FRA H24 implementation in Bratislava FIR.

Proposal ID : 75.041 Impl. Status: State(s) & Org. Comments:

379.

Project Name: Free Route Airspace Bratislava

Description: To implement H24 Free Route Airspace (DCTs) in Bratislava ACC,

FL245+ (parallel operations with ATS routes).

Objective:

To further improve airspace organisation within Bratislava FIR.

Planned 28 APR 2016

Project Group:

FAB CE

Project Category:

Free Route Airspace

SVK

Originator(s):

SVK

Proposal ID : 80.062 Impl. Status: State(s) & Org. Comments:

380.

Project Name: Midlands Improvements

Description: To amend ROKUP 2D STAR to route AMPIT - NANTI - TNT - ROKUP (save 11NM) and ROKUP 1C STAR to route WAL - TNT - ROKUP (save 17NM).

Objective:

To amend the STARs to reflect what is routeinly tactically provided and reduce fuel uplift.

Planned 26 MAY 2016

Project Category:

ATS Routes

GBR

Originator(s):

GBR

Proposal ID : 80.072 Impl. Status: State(s) & Org. Comments:

381.

Project Name: Midlands Improvements

Description: To establish new STARs or amend existing STARs via VEGUS for EGBB and EGNX (save 17NM).

Objective: To make the STARs reflect what is tactically provided.

Planned 26 MAY 2016

Project Category:

ATS Routes

GBR

Originator(s):

GBR

Requires more airspace south of MAMUL in line with the TNT - LAMIX extension to (U)T29.

Page 184: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

173 29 May 2015 Edition: 1.0

Proposal ID : 80.065 Impl. Status: State(s) & Org. Comments:

382.

Project Name: Realign P18

Description: To realign P18 from STAFA - TELBA to STAFA - VIDOK.

Objective:

To reduce flight plannable mileage for EGGP NANTI departures and Manchester LISTO 1Y/1R departures by 2.5NM per flight (will increase flight plannable mileage for some Manchester HON 1Y/1R by 2.5NM). Actual mileage in both cases wil remain unchanged from today. Will facilitate correct positioning for transferring to next sector under aircraft's own navigation rather than being transferred on assigned headings.

Planned 26 MAY 2016

Project Category:

ATS Routes

GBR

Originator(s):

GBR

Allows for correct positioning via RAD restrictions for all MTMA departures. Dependent on HON SID truncation.

Proposal ID : 80.067 Impl. Status: State(s) & Org. Comments:

383.

Project Name: Humberside arrivals from the south

Description:

To allow EGNJ arrivals to route via (U)Y250 and (U)L613 to MAMUL with an improved descent profile.

Objective:

To improve the descent profile and shorten the flight plannable distance for traffic inbound Humberside from the south.

Planned 26 MAY 2016

Project Category:

ATS Routes

GBR

Originator(s):

GBR

Requires the (U)T29 TNT - LAMIX proposal to proceed.

Proposal ID : 82.055 Impl. Status: State(s) & Org. Comments:

384.

Project Name: SID Truncation

Description: To truncate EGBB Southbound SIDs as follows:

a. CPT 4D and COWLY 3D Truncated at new waypoint UTITU and become UTITU 1D and use extended Y321 and N615 to get to CPT and COWLY respectively - new waypoint ADBOS at intersection of extended Y321 and N615;

b. WCO 5D Truncated at new waypoint ABTAB and become ABTAB 1D and use extended Q41 to get to WCO;

c. WCO 1L Truncated at new waypoint ARDAB and become ARDAB 1L and use extened L8 HON - ARDAB - WCO to get to WCO;

d. COWLY 1L Truncated at new waypoint GOXER and become GOXER 1L and use N615 to get to COWLY;

e. CPT 1L Truncated at new waypoint EKMUM and become EKMUM 1L and use N859 to get to CPT.

Objective:

To reduce portion of flight plan route fuelled at SID Altitude.

Planned 26 MAY 2016

Project Category:

Airspace Structure ATM System

GBR

Originator(s):

GBR

Page 185: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

174 29 May 2015 Edition: 1.0

Proposal ID : 81.053 Impl. Status: State(s) & Org. Comments:

385.

Description: To replace 5LNC ROBIN.

Objective:

To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region, to improve the aeronautical information provided and be compliant with ICAO Annex 11.

Planned 26 MAY 2016

Project Category:

5LNC

GBR

Originator(s):

EUROCONTROL ICAO

Annex 11 stated that the 5LNCs shall be unique.

ROBIN is used 3 times worldwide and in ICARD is created by USA in 2008.

ICAO DM sent relevant message to GBR (DM24/01 MSG 14-034).

Proposal ID : 82.054 Impl. Status: State(s) & Org. Comments:

386.

Project Name: SID Truncation

Description: To truncate EGBB Northbound SIDs as follows:

a. WHI 4D Truncate at new waypoint LUVUM and become LUVUM 1D and use L8 to get to NANTI and use L8 to ASNIP and Y53 to WAL - removes requirement for DCT between WHI and WAL;

b. TNT 4D Truncate at new waypoint LEDLA and become LEDLA 1D and use T29 to get to TNT;

c. WHI 1L/TNT 1L Truncate at new waypoint ODUNU and become ODUNU 1L and use extended Y124 to get to NANTI and MOGTA and extended T29 to get from ODUNU to TNT (via LEDLA).

Objective:

To reduce portion of flight plan route fuelled at SID Altitude.

Planned 26 MAY 2016

Project Category:

Airspace Structure ATM System

GBR

Originator(s):

GBR

Proposal ID : 84.046 Impl. Status: State(s) & Org. Comments:

387.

Description: To replace existing 5LNC BEKSA.

Objective:

1. To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region;

2. To improve the aeronautical information provided; 3. To be compliant with ICAO Annex 11.

Planned 26 MAY 2016

Project Category:

5LNC

GBR

Originator(s):

EUROCONTROL ICAO

BEKSA is reserved in ICARD for Russian Federation.

Proposal for replacement is based on “Common criteria for replacement of duplicated 5LNCs” as point is not reserved for UK.

Proposal ID : 67.005b Impl. Status: State(s) & Org. Comments:

388.

Description: To implement, as CDR 1, bidirectional ATS route segment KARNO - POL (Phase 2).

Objective:

To further improve the ATS route network within London FIR/UIR.

Planned 26 MAY 2016

Project Group:

RFG SW

Project Category:

ATS Routes

GBR

Originator(s):

GBR

FL300 and above only. Provide connectivity to/from UL180 and

UP16. Review greater use below FL300 post

implementation. BERUL - MERLY original proposal by

IACA.

Page 186: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

175 29 May 2015 Edition: 1.0

Proposal ID : 76.021 / 16.016 Impl. Status: State(s) & Org. Comments:

389.

Description:

To implement the following ATS routes: 1. USTIL - AAAAA - BABUN bi-directional; 2. SUPAK - USTIL eastbound; 3. USTIL - BABKO westbound.

Objective:To further improve ATS route network between Warszawa

FIR, L'viv FIR and Minsk FIR.

Proposed spring 2016

Project Group:

SG BALTIC

Project Category:

ATS Routes

BLR POL UKR

Originator(s):

UKR

AAAAA will be new boundary point between Ukraine and Belarus.

Poland - further study required. Belarus further studies required taking into

account future changes of route network in Moscow area.

Proposal ID : 80.032 / 19.003 Impl. Status: State(s) & Org. Comments:

390.

Description: To implement southbound ATS route RATIN - DIBON - KOVUS.

Objective:

To further improve ATS route network between Minsk FIR and Lviv FIR.

Proposed spring 2016

Project Group:

SG BALTIC

Project Category:

50 MPCPEs ATS Routes

BLR UKR

Originator(s):

EUROCONTROL

Proposed option is part of EUROCONTROL evaluation of 50 MPCPE (Most Penalised City Pair Europe).

BLR further studies required taking into account further changes of route network in Moscow area

The city pairs interested in this new option are CP41 UUEE - LIRF and CP45 UUDD - LYTV.

Current option for flights via AMIRI is longer by 7.4NM.

Proposal ID : 81.065 Impl. Status: State(s) & Org. Comments:

391.

Description:

To allow traffic from southern Italy and Malta to Stockholm and Northern Scandinavia via UL156 by deleting/amending RAD restrictions LK2190 / LK2070 / EP2041 / EP2081.

Objective:

To further improve the airspace utilisation at the interface between Czech Republic and Poland providing shorter route options.

Proposed spring 2016

Project Category:

RAD

CZE POL

Originator(s):

IATA

Despite that restrictions are coded as LK their existence is also connected to the neighbouring States requirements.

LK2190 restricts flights over LEDVA along UL156 only for arrivals to 4 (four) Polish and 3 (three) Czech airports.

LK2070 restricts flights on UL156 HLV - LUMOT only for arrivals to 3 Polish airports and departures from 2 (two) Czech airports.

Saving is 16 NM compared to current available option via VEBAL - LITKU - JED.

Proposal ID : 78.051 Impl. Status: State(s) & Org. Comments:

392.

Project Name: RAD EPED5003

Description: To extend the availability of EPED5003 DCT LASIS - DIBED from

currently only Night to weekend (Friday 20.00 – Monday 06.00).

Objective:

To further improve the airspace utilisation at the interface between Germany and Poland.

Proposed spring 2016

Project Category:

RAD

DEU POL

Originator(s):

IATA

As of 28th June 2012 additional Night/ Weekend DCT’s are open by Free Route Airspace Maastricht/ FRAM, especially made for departure EHAM.

To make optimum use of these additional options by KLM the adjacent DCTs have to be open as well.

Germany ready to implement.

Page 187: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

176 29 May 2015 Edition: 1.0

Proposal ID : 84.074 Impl. Status: State(s) & Org. Comments:

393.

Description: To replace existing 5LNC ANIBI.

Objective:

To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region, to improve the aeronautical information provided and be compliant with ICAO Annex 11.

Proposed spring 2016

Project Category:

5LNC

DEU

Originator(s):

EUROCONTROL ICAO

ANIBI is reserved in ICARD for Morocco and used as VFR point.

Proposal for replacement is based on “Common criteria for replacement of duplicated 5LNCs” as point is not reserved for Germany.

Proposal ID : 77.075 Impl. Status: State(s) & Org. Comments:

394.

Description: To implement new SID PTC from LEIB.

Objective:

To further improve the ATS route network within Barcelona FIR while allowing a shorter route connection to existing route segment PTC - CPD - CHELY/ MEROS.

Proposed spring 2016

Project Category:

50 MPCPEs ATS Routes

ESP

Originator(s):

ESP

Related proposals:

75.007

Proposal ID : 81.069 Impl. Status: State(s) & Org. Comments:

395.

Project Name: ECAC States AIP en-route publication issues

Description:

To revise ENR 3.3 template column naming and publish relevant aeronautical data in accordance with ICAO requirements.

Objective:

To adapt publication of significant points in accordance with ICAO requirements.

Proposed spring 2016

Project Category:

AIP

EST

Originator(s):

EST

Proposal ID : 83.025 Impl. Status: State(s) & Org. Comments:

396.

Project Name: Marseille ACC re-organisation

Description: To implement a 4th layer FL375+ for sectors G - Y - A - B in Marseille

ACC.

Objective:

To further improve the airspace structure and capacity within Marseille ACC.

Proposed spring 2016

Project Category:

ATC Sectors

FRA

Originator(s):

FRA

Proposal ID : 69.095b Impl. Status: State(s) & Org. Comments:

397.

Project Name: Prestwick Upper Sectors

Description:

To re-organise the Upper sectors of Prestwick ACC.

Objective:

To further improve the airspace structure within Scottish UIR.

Proposed spring 2016

Project Category:

ATC Sectors

GBR

Originator(s):

GBR

Facilitates iTEC (interoperability Through European Collaboration).

Page 188: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

177 29 May 2015 Edition: 1.0

Proposal ID : 84.023 Impl. Status: State(s) & Org. Comments:

398.

Description: To re-designate existing ATS route N580 GOW - TIR as L602(release of N580).

Objective:

To rationalise the existing ATS route designators within Scottish FIR in order to further facilitate flight planning and release RDs.

Proposed spring 2016

Project Category:

Route Redesignation

GBR

Originator(s):

EUROCONTROL

Adaptation of RDs in lower and upper airspace.

Currently the ATS segment GOW - TIR is designated both as N580 and UL602.

RD N580 exists only along the GOW - TIR segment and by re-designation it can be released for use by other State/s.

This proposal reflects the ideal re-designation with use of only one RD - L/UL602 despite that presumably there will be a “RD break” of L602 between TLA - GOW.

Another possibility is to have two or three RDs on that segment by designating it as N572 and/or Y958 and UL602.

Proposal ID : 65.010b Impl. Status: State(s) & Org. Comments:

399.

Description: a. To implement westbound ATS route SUW - OSKUD. b. To change from eastbound to bidirectional the existing UY225 ATS

route segment BODLA - OSKUD.

Objective:

To further improve the ATS route network within Warszawa FIR.

Proposed spring 2016

Project Category:

ATS Routes

POL

Originator(s):

DEU EUROCONTROL

Pending on introduction of the vertical split.

Related proposals:

65.010a

68.078

Proposal ID : 64.017 Impl. Status: State(s) & Org. Comments:

400.

Project Name: USTIL dualisation

Description: To implement bidirectional ATS route segment SUI - XXXXX - AAAAA - REPLI.

Objective:

To further improve the ATS route network between Rhein UIR, Warszawa FIR and L'viv FIR/Kyiv FIR (USTIL dualisation).

Proposed spring 2016

Project Category:

ATS Routes

POL UKR

Originator(s):

POL UKR

XXXXX will be new TCP between Warszawa ACC and L'viv ACC.

AAAAA will be new TCP between L'viv ACC and Kyiv ACC.

Pending on introduction of vertical split in Warszawa FIR.

Proposal ID : 81.064b Impl. Status: State(s) & Org. Comments:

401.

Description: To allow “Direct” flight planning options MOTAD DCT MOLIL.

Objective:

To further improve the flight planning options within Warszawa FIR while providing additional shorter route options.

Proposed spring 2016

Project Category:

DCTs

POL

Originator(s):

IATA

Related proposals:

81.064a

81.064c

81.066

81.067

81.068b

Page 189: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

178 29 May 2015 Edition: 1.0

Proposal ID : 65.052 Impl. Status: State(s) & Org. Comments:

402.

Description: a. To implement a westbound ATS route segment LENOV - BABEN or

LENOV - VIBUL. b. To implement a northbound ATS route segment REGLI - BURAN. c. To implement eastbound ATS route segment XELOL - LENOV or

ELPOL - LENOV.

Objective:

To improve the utilisation of the existing ATS routes between Warszawa FIR and Sweden UIR.

Proposed spring 2016

Project Category:

ATS Routes

POL SWE

Originator(s):

IATA

Saving for city pair LTAI - EKCH is 9NM compared to LENOV UN133 LDZ UM70 BABEN UL617 KOLOB.

Saving for city pair LYTV - ESSA is 15NM compared to SOPAV UL617 RONEX UL733 BURAN.

Depends on implementation of vertical split in Warszawa ACC sectors.

As an intermediate step, XELOL-LENOV, ELPOL-LENOV and LENOV-RONEX published as a night DCTs.

Related proposals:

75.048b

Proposal ID : 84.026 Impl. Status: State(s) & Org. Comments:

403.

Description: To allow flight planning during Night on LENOV N133 POLON N983 ELPOL AMROR ROE , by excluding it from restriction EP2068.

Objective:

To allow additional shorter flight plannable options within Warszawa FIR.

Proposed spring 2016

Project Category:

RAD

POL SWE

Originator(s):

IATA

In accordance with EP2068 ATS route N983 POLON - ELPOL is not available for traffic when L621 is open with operational goal to reduce traffic complexity in sector C.

Proposal is penetrating the same ACC sectors as allowed routing but is saving 15NM.

After the implementation of Warszawa ACC vertical sector split .

Proposal ID : 84.027 Impl. Status: State(s) & Org. Comments:

404.

Description: To allow “Direct” flight planning option DIMEX DCT PENOR.

Objective:

To allow additional shorter flight plannable option within Warszawa FIR.

Proposed spring 2016

Project Category:

DCTs RAD

POL SWE

Originator(s):

IATA

Shorter option for flights from ESSA to/from Austria and beyond.

After implementation of Warszawa ACC vertical sector split.

Proposal ID : 63.051 / 08.006 Impl. Status: State(s) & Org. Comments:

405.

Description:

To implement the following ATS routes: 1. KUROS - AAAAA - PT (Petrovskoye) eastbound; 2. KOROT - BBBBB - KO (Koshany) westbound.

Objective:

To further improve the ATS route network at the Eastern ECAC interface between Kyiv/Dnepropetrovsk FIR and Moscow FIR.

Proposed spring 2016

Project Group:

SG BALTIC

Project Category:

ATS Routes

RUS UKR

Originator(s):

IATA

Further studies required taking into account future changes of route network in Moscow area;

AAAAA and BBBBB new TCPs between Dnepropetrovsk FIR and Moscow FIR.

a) CDR in Ukraine. In case of implementation ATS routes will

be available after prior coordination with ATC units.

Page 190: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

179 29 May 2015 Edition: 1.0

Proposal ID : 63.052 / 08.007 Impl. Status: State(s) & Org. Comments:

406.

Project Name: KUROS - BUTRI - ABARO

Description: To implement bidirectional ATS route KO - KUROS - AAAAA - BUTRI - ABARO.

Objective:

To further improve the ATS route network between Kyiv/Dnepropetrovsk FIR and Moscow FIR.

Proposed spring 2016

Project Group:

SG BALTIC

Project Category:

ATS Routes

RUS UKR

Originator(s):

IATA

KUROS - KO westbound; AAAAA will be new TCP between

Dnepropetrovsk FIR and Moscow FIR. KUROS - AAAAA CDR 1/2/3. For potential distance and environmental

savings see the relevant assessment. Further studies required taking into account

future changes of route network in Moscow area.

Proposal ID : 84.078 Impl. Status: State(s) & Org. Comments:

407.

Project Name: Malmo ACC

Description: To split Malmo ACC/ ESMM sector 2.

Objective:

To further improve the sectorisation within Sweden while balancing traffic and workload, increasing capacity and improving flight efficiency.

Proposed spring 2016

Project Category:

ATC Sectors

SWE

Originator(s):

SWE

Currently building mitigation measures for summer 2015.

Proposal ID : 69.064a / 16.035a Impl. Status: State(s) & Org. Comments:

408.

Project Name: NEFAB and DK/SE FAB Free Route Airspace - NEFRA

Description: To implement H24 Free Route Airspace across NEFAB and DK/SE FAB

above FL285 (NEFRA).

Objective:

To further improve the airspace structure between Norway FIR, Finland FIR, Sweden FIR, Tallinn FIR, Riga FIR and Kobenhavn FIR.

Planned 23 JUN 2016

Project Group:

FAB Denmark/Sweden FAB NEFAB SG BALTIC

Project Category:

Free Route Airspace

FIN NOR EST LVA DNK SWE

Originator(s):

FAB NEFAB

NEFRA: North European Free Route Airspace (NEFAB plus DK/SE).

ATS routes will be kept.

Related proposals:

67.046 / 16.024

69.064b / 16.035b

Proposal ID : 80.039 / 19.010 Impl. Status: State(s) & Org. Comments:

409.

Project Name: ECAC States AIP en-route publication issues

Description:

To adapt the lower/upper vertical limits, expressed in FL, of ATS routes within Baku FIR - change of IFR FL to VFR FL.

Objective:

To adapt in State AIP ATS routes vertical limits.

Proposed summer 2016

Project Group:

SG BLACK

Project Category:

AIP ATS Routes

AZE

Originator(s):

EUROCONTROL

Currently lower/upper limits of upper ATS routes are set as FL200 - FL430 while for lower ATS routes upper limit is FL195 and lower varies as FL050, FL060,…FL150 etc.

Upper limits will be expanded till FL660.

Page 191: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

180 29 May 2015 Edition: 1.0

Proposal ID : 79.029b / 18.012b Impl. Status: State(s) & Org. Comments:

410.

Description: To implement new bi-directional ATS route T916 MATAL - GND.

Objective:

To further improve the ATS route network in Baku FIR.

Proposed summer 2016

Project Group:

SG BLACK

Project Category:

ATS Routes

AZE

Originator(s):

EUROCONTROL

New ATS route requires for flights via GIPAR to allow improvement in flight efficiency and fly at high FLs. Current flights via ADVIN to/from MATAL normally should flight plan below FL195 but SAAM data show that most of them are above FL195. This new ATS route might be beneficial for more than 5 daily flights.

Proposal ID : 77.065 Impl. Status: State(s) & Org. Comments:

411.

Project Name: EVIVI dualisation

Description: To re-organize the existing ATS routes in the EVIVI area.

Objective:

To further improve ATS route network between Sofia FIR and Athens FIR/Hellas UIR.

Proposed summer 2016

Project Group:

RFG SE

Project Category:

ATS Routes

BGR GRC

Originator(s):

GRC

Request by Greece for a new exit point towards Bulgaria.

Bi-lateral meeting required to consolidate a common proposal.

Proposal ID : 80.036 / 19.007 Impl. Status: State(s) & Org. Comments:

412.

Description: To implement shorter ATS route option for DEP LROP/LRBS via Sofia

FIR towards Turkish airspace.

Objective:

To further improve ATS route options between Sofia FIR and Bucuresti FIR.

Proposed summer 2016

Project Group:

RFG SE SG BLACK

Project Category:

ATS Routes

BGR ROU

Originator(s):

EUROCONTROL

New point east of ARGES for DEP LROP/BS to ODERO.

Same point used for DEP LROP to RIXEN during Summer period (t.b.d.);

Use of RONBU for DEP LROP during Winter period (t.b.d.);

RAD: RONBU - RIXEN “Only available only for DEP LROP/BS”;

LOA: DEP LROP/BS initially climb FL150; Location of new point with regard to LRTSA

1C/1D, LRR34; Changes in LROP/LRCK TMA (new

departure routes, time); New SIDs from LROP/LRBS via OSTAL

planned by Romania; Implementation depends on UDROS /

ODERO reorganization.

Page 192: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

181 29 May 2015 Edition: 1.0

Proposal ID : 76.022 / 16.017 Impl. Status: State(s) & Org. Comments:

413.

Description: To implement westbound ATS route ASKIL - AAAAA - VI.

Objective:

To further improve ATS route network between L'viv FIR and Minsk FIR.

Proposed summer 2016

Project Group:

SG BALTIC

Project Category:

50 MPCPEs ATS Routes

BLR UKR

Originator(s):

UKR

AAAAA will be new boundary point between Ukraine and Belarus.

50MPCPE: Improving the flight efficiency of the city pair UUEE - LIRF.

BLR further studies required taking into account further changes of route network in Moscow area.

Proposal ID : 83.006 Impl. Status: State(s) & Org. Comments:

414.

Description: To re-designate existing ATS route Z55 BASUD - GERSA as Z50

(release of Z55).

Objective:

To further simplify the existing RDs within Switzerland.

Proposed summer 2016

Project Category:

Route Redesignation

CHE

Originator(s):

EUROCONTROL

Proposal ID : 69.087 Impl. Status: State(s) & Org. Comments:

415.

Description: To operate a 5th en-route sector.

Objective:

To further improve the airspace organisation and enhance sector capacities within Nicosia FIR.

Proposed summer 2016

Project Category:

ATC Sectors

CYP

Originator(s):

CYP

Proposal ID : 69.105 / BM0014 Impl. Status: State(s) & Org. Comments:

416.

Description: The implement north-westbound ATS route segment RASDA - ABILO - VAXOS - RDS.

Objective:

To improve the route network at the interface Cyprus_Greece.

Proposed summer 2016

Project Group:

FAB BLUE MED RFG SE

Project Category:

ATS Routes

CYP GRC

Originator(s):

FAB BLUE MED

Proposal ID : 71.088 Impl. Status: State(s) & Org. Comments:

417.

Project Name: Free Route Airspace Cyprus

Description: To implement H24 Free Route Airspace for Nicosia FIR, FL195 and

above.

Objective:

Allign the airspace structure with real operations. Operational DCT's to be made flight plannable

Proposed summer 2016

Project Group:

FAB BLUE MED RFG SE

Project Category:

Free Route Airspace

CYP

Originator(s):

CYP FAB BLUE MED

Studies ongoing in the context of Blue Med. Needs alignment with IDP & TEN-T expect

update by end SEP 2014.

Related proposals:

71.085a

71.086

71.087

71.089b

Page 193: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

182 29 May 2015 Edition: 1.0

Proposal ID : 83.008 Impl. Status: State(s) & Org. Comments:

418.

Description: To allow Night “Direct” flight planning option BELID DCT AMOSA for

DEP EDDB.

Objective:

To further improve flight planning options within Germany.

Proposed summer 2016

Project Category:

DCTs

DEU

Originator(s):

IACA

DFS to check feasibility and implementation date. DFS and Karlsruhe UAC looking for a alternative solution.

By initial calculations and checking the regularly given directs for traffic departing on SID BELID STAR this DCT could be plannable before 04:45UTC.

Current option is BELID Y204 LODRO UM736 GALMA DCT AMOSA UN869 TEDGO.

Option BELID DCT AMOSA UN869 TEDGO saves 16NM.

Proposal ID : 84.020 Impl. Status: State(s) & Org. Comments:

419.

Project Name: INSEL

Description: To integrate Munchen ACC Sector Family North-South into Sector

Family West (INSEL).

Objective:

To further improve the airspace organization within Germany.

Proposed summer 2016

Project Category:

ATC Sectors

DEU

Originator(s):

DEU

Depending on ATCO training (and license for WEST EBG).

Proposal ID : 80.010d Impl. Status: State(s) & Org. Comments:

420.

Project Name: ECAC States AIP en-route publication issues

Description: To re-designate existing Helicopter route KY04 as KY994.

Objective:

To adapt existing RDs in accordance with ICAO requirements.

Proposed summer 2016

Project Group:

RFG NW

Project Category:

AIP Route Redesignation

DNK NLD NOR

Originator(s):

EUROCONTROL

RD is not in accordance with Annex 11 and not coordinated via ICARD.

Proposal ID : 80.010b Impl. Status: State(s) & Org. Comments:

421.

Project Name: ECAC States AIP en-route publication issues

Description: To re-designate the following existing Helicopter routes: KY60 - KY66, KY70 - KY74, KY82, KY85.

Objective:

To adapt existing RDs in accordance with ICAO requirements.

Proposed summer 2016

Project Group:

RFG NW

Project Category:

AIP Route Redesignation

DNK

Originator(s):

EUROCONTROL

All RDs are not coordinated via ICARD.

Page 194: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

183 29 May 2015 Edition: 1.0

Proposal ID : 80.010e Impl. Status: State(s) & Org. Comments:

422.

Project Name: ECAC States AIP en-route publication issues

Description: To re-designate existing Helicopter route KY05 as KY995.

Objective:

To adapt existing RDs in accordance with ICAO requirements.

Proposed summer 2016

Project Group:

RFG NW

Project Category:

AIP Route Redesignation

DNK NOR

Originator(s):

EUROCONTROL

RD is not in accordance with Annex 11 and not coordinated via ICARD.

Proposal ID : 80.010f Impl. Status: State(s) & Org. Comments:

423.

Project Name: ECAC States AIP en-route publication issues

Description: To re-designate the following existing Helicopter routes: KZ10, KZ15.

Objective:

To adapt existing RDs in accordance with ICAO requirements.

Proposed summer 2016

Project Group:

RFG NW

Project Category:

AIP Route Redesignation

DNK NLD

Originator(s):

EUROCONTROL

All RDs are not coordinated via ICARD.

Proposal ID : 80.010g Impl. Status: State(s) & Org. Comments:

424.

Project Name: ECAC States AIP en-route publication issues

Description: To re-designate existing Helicopter route KY80.

Objective:

To adapt existing RDs in accordance with ICAO requirements.

Proposed summer 2016

Project Group:

RFG NW

Project Category:

AIP Route Redesignation

DNK GBR NLD

Originator(s):

EUROCONTROL

RD is not in accordance with Annex 11 and not coordinated via ICARD.

In AIP UK Helicopter routes are not published in ENR 3.4 as required by Annex 15. It is stated that these routes appear in AD 2, ENR 1.15 and ENR 6 but the information there is not sufficient and complete.

Proposal ID : 61.017 Impl. Status: State(s) & Org. Comments:

425.

Description: To implement, as CDR1/3, southbound ATS route segment PIMOS - FES.

Objective:

To further improve the ATS route network between Madrid UIR and Casablanca FIR.

Proposed summer 2016

Project Category:

ATS Routes

ESP MAR

Originator(s):

IATA

Morocco: ready for implementation. Initially approved by the Spanish military,

pending official confirmation. PIMOS - FES bidirectional to be considered

at a later stage.

Page 195: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

184 29 May 2015 Edition: 1.0

Proposal ID : 66.031 Impl. Status: State(s) & Org. Comments:

426.

Description: a. To adapt the availability of UM176 PPN - CMA - CLS within Madrid

UIR / Barcelona UIR. b. To use UM176 PPN - CMA - CLS as CDR 2, week-days during the

activation period of D104 (05:00 - 23:00 during winter and 06:00 - 24:00 during summer) and as CDR 1 or permanent the rest of the time.

Objective:

To further harmonise the utilisation of the existing CDRs within ECAC airspace.

Proposed summer 2016

Project Category:

CDRs

ESP

Originator(s):

EUROCONTROL

Currently the availability is as follows: o PPN - CMA:

CDR3: MON/FRI EXC HOL:SUMMER:0500-1500;WINTER:0600-1600.

o CMA - CLS: CDR3: MON/FRI EXC HOL:SUMMER:0500-2300;WINTER:0600-2400.

Pending military agreement. A full revision of CDRs ongoing.

Proposal ID : 77.029 Impl. Status: State(s) & Org. Comments:

427.

Description: To implement new SID MEROS and/or CHELY from LEPA

Objective:

To provide AOs with additional and more efficient options for traffic departing from LEPA and proceeding north-eastbound

Proposed summer 2016

Project Group:

50 MPCPEs

ESP

Originator(s):

EUROCONTROL IACA

The new SID would be 7 NM shorter than the current one and it could be used by a significant amount of flights and City Pairs (138 flights, 58 City Pairs, on 29 June 2012)

Related proposals:

76.003

Proposal ID : 79.021 Impl. Status: State(s) & Org. Comments:

428.

Description: To allow via RAD ATS route T16 - UN975 - ORTIS for ARR

GCRR/GCFV.

Objective:

To further improve the ATS route network while providing additional, shorter flight planning options within Canarias FIR/UIR.

Proposed summer 2016

Project Group:

RFG SW

Project Category:

ATS Routes RAD

ESP

Originator(s):

IACA

Outcome of South West Europe RAD Review 21st - 22nd February 2013.

Solution via the RAD was requested again due to missing STARs ORTIS.

Under Lisboa / Casablanca / Canarias Axis proposal by IACA for STAR ORTIS, request by Spain to be deleted as operationally not feasible.

The possibilities might be either DCTs from ORTIS via RAD Appendix 4 or connecting point ORTIS via RAD Appendix 5.

Connections after NAVIX via Casablanca FIR are also possible but complex due to difficult co-ordination with Morocco.

The NM RAD Team proposed this issue to be further discussed at SW Axis meetings.

Permanent airspace design solution will be linked to Canarias TMA Phase II.

Related proposals:

50.053b

75.022

Page 196: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

185 29 May 2015 Edition: 1.0

Proposal ID : 80.006 Impl. Status: State(s) & Org. Comments:

429.

Description:

To re-designate the following ATS routes: a. B600 GDV - DKH as B18; b. B/U600 DKH - MAURI as A/UA600; c. B825 CABOJ - LPC as new A, B, G or R RD.

Objective:

To adapt the existing RDs in accordance with RDs assigned to ICAO EUR/NAT Region.

Proposed summer 2016

Project Category:

Route Redesignation

ESP

Originator(s):

ICAO EUROCONTROL

These are RDs issues due to transfer of the ANP data for Canarias FIR from WACAF ICAO Region to EUR/NAT ICAO Region.

RDs B600 is not allocated to ICAO EUR/NAT Region while RD B825 is reserved for and used by Kazakhstan. Both RDs shall be replaced.

RD B18 is currently used till GDV and could be extended.

RD A600 is currently used as ADM - LAY - DKH and MAURI - PE where artificial route break exists. This RD is not allocated to EUR/NAT ICAO Region but as logic continuation is allowed to be used.

Subject to Western Sahara airspace diplomatic issues.

Proposal ID : 79.024 Impl. Status: State(s) & Org. Comments:

430.

Project Name: EUR/NAT States AIP en-route publication issues

Description:

To adapt the AIP CDR publication of: 1. Lower/Upper limits expression in VFR FLs or intermediate levels

between IFR FLs; 2. CDR categories of ATS routes UL58, UM445, UM744, UN747,

UN860, UT245, UT249, UT252 and UT312.

Objective:

To adapt in State AIP ATS route vertical limits.

Proposed summer 2016

Project Category:

AIP CDRs

ESP

Originator(s):

EUROCONTROL

Publication location (AIP placeholder) for Spain will be further discussed under WP/11. The ATS routes are published in 5 (five) ENR sub-parts instead of required by ICAO - ENR 3.1/3.2/3.3..

In most of the cases the CDRs are published with IFR FL limits and either FL340 or FL360 or FL380 is not covered by conditions and stays as available FL.

Pending military agreement.

Proposal ID : 80.046 Impl. Status: State(s) & Org. Comments:

431.

Description: To allow eastbound flights on UN741 from EDUMO to NELSO.

Objective:

To further improve the ATS route network while allowing eastbound flights between EDUMO and NELSO on UN741 for USAF flights when diplomatic clearances can't be obtained.

Proposed summer 2016

Project Group:

RFG SW

Project Category:

ATS Routes

ESP

Originator(s):

U.S.A.F.E

Saves 26 minutes of flight time and $5,965 USD per flight.

Under study by Canarias ACC due to conflicting routes in non-radar environment.

Page 197: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

186 29 May 2015 Edition: 1.0

Proposal ID : 82.019 Impl. Status: State(s) & Org. Comments:

432.

Description:

To re-consider the use of RWY13 procedures for DEP LEMG, depending on traffic demand and if necessary to revise them.

Objective:

To further improve SID / STAR procedures to improve flight efficiency and the environment.

Proposed summer 2016

Project Category:

Airspace Structure

ESP

Originator(s):

IACA

Currently crews can only request the BLN2H SID on departure (on ATC Approval). This is very rarely given and aircraft route to the south on BLN2C which uses an additional 145 kg of fuel. The large number of departures routing to the north via BLN would bring significant environmental benefits.

Proposal ID : 84.056 Impl. Status: State(s) & Org. Comments:

433.

Project Name: ECAC States AIP en-route publication issues

Description:

To publish all SIDs / STARs in AIP Spain, ENR 2 in accordance with Annex 11: 1. coded designator to contain maximum 7 (seven) characters; 2. after the validity indicator only 1 (one) letter indicating the route

indicator is allowed.

Objective:

To resolve airspace data publication inconsistencies in State AIP.

Proposed summer 2016

Project Category:

AIP

ESP

Originator(s):

EUROCONTROL

In accordance with AIP Spain, part AD2, LEMD P-RNAV SIDs are identified by coded designator containing 8 (eight) characters - BARDI1AX, BARDI1AY, NANDO3AR, etc. coming from additional letter added. All other P-RNAV SIDs also contain similar additional letter - SIE1AL, VTB2AS, etc.

In accordance with AIP Spain, part AD2, all LEMD and LEBL instrument arrivals - continuous descent (CDA) STARs are identified by coded designator containing 9 (nine) characters - MORAL3DCC or ORBIS1DCC or ALBER1DCN or PUMAL2DCN, etc.

Furthermore with AIRAC AMDT 01/15 (WEF 05 MAR 2015) Spain continued to publish new CDA STARs for Gran Canaria AD containing 9 characters such as COSTI1DCC, ODEGI1DCC, REMGI1DCC and VIDRI1DCC.

This 8 (eight) or 9 (nine) characters publication of designators is not compliant with ICAO and has an impact on aeronautical database systems. As an example in EAD SDO (Static Data Operations) STAR PUMAL2DCN is converted and coded as MAL2DCN due to 7 characters limit.

Spain (ENAIRE ATM and AIS part) as well as ICAO were approached on clarifying the justification of this publication.

Page 198: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

187 29 May 2015 Edition: 1.0

Proposal ID : 85.015 Impl. Status: State(s) & Org. Comments:

434.

Description:

To implement the following new bi-directional ATS routes: 3. MGA - BERUM; 4. MGA - ALM,

or, to allow “Direct” flight planning options for the two segments.

Objective:

1. To further improve the ATS route structure within Madrid FIR and Casablanca FIR. 2. To allow better flight planning options between Madrid FIR and Casablanca FIR.

Proposed summer 2016

Project Category:

ATS Routes DCTs

ESP MAR

Originator(s):

MAR

In practice currently there are no logic options between MGA and ALM except huge detours via GONZA and TTN.

First option is only inside Madrid FIR. Second option requires coordination

between the two States as possible DCTs are cross-border.

Proposal ID : 83.036 / 21.008 Impl. Status: State(s) & Org. Comments:

435.

Description:

To implement the following ATS routes: a. N182 GUNTA - AAAAA - PETOT westbound; b. P185 PETOT - BBBBB - BERIL eastbound.

Objective:

To further improve ATS route network between Riga FIR and Tallinn FIR.

Proposed summer 2016

Project Group:

SG BALTIC

Project Category:

ATS Routes

EST FIN LVA

Originator(s):

EST LVA

AAAAA and BBBBB new boundary waypoints.

N182 and P185 existing RDs used by LTU. Latvia ready to implement.

Proposal ID : 83.035 / 21.007 Impl. Status: State(s) & Org. Comments:

436.

Description:

To implement the following ATS routes: 1. Q11 LONSA - AAAAA - DEREX westbound; 2. Q33 EVONA - BBBBB - MOLOK - CCCCC - SUNUS eastbound

(CCCCC point at intersection of existing M611 and Y121)

Objective:

To further improve ATS route network between Riga FIR and Tallinn FIR.

Proposed summer 2016

Project Group:

SG BALTIC

Project Category:

ATS Routes

EST LVA

Originator(s):

EST

AAAAA and BBBBB new boundary waypoints

CCCCC point at intersection of existing M611 and Y121.

Latvia ready to implement.

Proposal ID : 78.014 Impl. Status: State(s) & Org. Comments:

437.

Description: To adapt all EFHK RNAV SIDs with ATS route network.

Objective:

To further improve airspace organisation within Helsinki TMA.

Proposed summer 2016

Project Category:

5LNC ATS Routes

FIN

Originator(s):

EUROCONTROL

Currently none of the published in AIP Finland EFHK RNAV SIDs last 5LNCs have connection to the existing ATS route network. Either points are on the line of relevant ATS route or far from any ATS routes. In AIP all these points are published as only connected to EFHK AD.

Page 199: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

188 29 May 2015 Edition: 1.0

Proposal ID : 84.063 Impl. Status: State(s) & Org. Comments:

438.

Description:

To withdraw or replace, in accordance with Annex 11, VFR reporting points published as pronounceable 5LNCs in AIP Finland, part AD 2.

Objective:

To comply with requirements of Annex 11 in designation of significant points with 5LNCs.

Proposed summer 2016

Project Category:

5LNC

FIN

Originator(s):

EUROCONTROL

Currently in AIP Finland, Part AD for each aerodrome after the table with RNAV terminal points there is a table with VFR reporting points most of which are declared as compulsory.

These VFR reporting points are designated as five-letter pronounceable name-codes (5LNCs) and internal finalization of their purpose, reason of AIP publication and compatibility with ICAO shall be discussed.

In accordance with Annex 11 only when a significant point is used for ATC purposes, it shall be designated by a unique five-letter pronounceable “name-code”.

None of these 5LNCs are reserved for Finland.

The use of already reserved 5LNCs is contrary to provisions of Annex 11 and might be considered as safety issue.

Proposal ID : 75.002 Impl. Status: State(s) & Org. Comments:

439.

Description: To reconsider the RAD restriction LILF1019 according to the criterion of

flexibility in order to cancel the RAD restriction during some specific periods/days/hours.

Objective:

To improve the FE of the CP LIRF - LEMD.

Proposed summer 2016

Project Group:

50 MPCPEs

Project Category:

RAD

FRA ITA

Originator(s):

EUROCONTROL FRA

Proposal supported by Marseille FMP. With origin in LE2001 restriction to be

managed in an interface Barcelona ACC-Marseille ACC.

Not acceptable by Italy - confirmed again at RAD review NOV 2013.

Proposal ID : 80.002 Impl. Status: State(s) & Org. Comments:

440.

Description:

To extend the time availability during summer period of existing night ATS route UQ236 PIBAT - MEDIL.

Objective:

To further improve the availability of night options within France.

Proposed summer 2016

Project Category:

Night Routes

FRA

Originator(s):

IATA

Outcome of West Europe RAD Review 30th - 31st May 2013.

This ATS route currently is available only during nights 22.00 - 05.00 (23.00 - 04.00).

Time availability in winter period is 7 hours while in summer only 5 hours.

Page 200: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

189 29 May 2015 Edition: 1.0

Proposal ID : 83.020 Impl. Status: State(s) & Org. Comments:

441.

Description:

To re-designate the following existing ATS routes: 1. Q169 ROMAK - NARAK as N869 (same segment with different RDs

Q169/UN869); 2. T13 DIPER - VESAN - RATUK - SOVAT as L613 (release of T13)

(same segment with different RDs T13/UL613); 3. T120 KOKOS - BADUR as N585 (same segment with different RDs

T120/UN858); 4. Y491 SOMEN - BETUV as Y111 (same segment with different RDs

Y491/UY111); 5. Y491 BETUV - KOKOS as N491 (release of Y491) (same segment

with different RDs Y491/UN491).

Objective:

To adapt the ATS route designation in lower and upper airspace.

Proposed summer 2016

Project Category:

Route Redesignation

FRA

Originator(s):

EUROCONTROL

Proposal ID : 75.073b Impl. Status: State(s) & Org. Comments:

442.

Project Name: Paris ACC re-organisation - Phase 2

Description:

To re-organise the lower airspace and delegate ATS to APP units below FL145 for relevant airspace in Paris ACC.

Objective: To further improve the airspace structure within France FIR.

Proposed summer 2016

Project Category:

Airspace Structure

FRA

Originator(s):

FRA

Related proposals:

69.089a, 69.089c, 69.089e

69.089f

75.080

75.082

Proposal ID : 80.010h Impl. Status: State(s) & Org. Comments:

443.

Project Name: ECAC States AIP en-route publication issues

Description: To re-designate the following existing Helicopter routes: KZ35, KZ40, KZ45, KZ46, KZ50.

Objective:

To adapt existing RDs in accordance with ICAO requirements.

Proposed summer 2016

Project Category:

AIP Route Redesignation

GBR NLD

Originator(s):

EUROCONTROL

All RDs are not in accordance with Annex 11 and not coordinated via ICARD.

In AIP UK Helicopter routes are not published in ENR 3.4 as required by Annex 15. It is stated that these routes appear in AD 2, ENR 1.15 and ENR 6 but the information there is not sufficient and complete.

Proposal ID : 67.005c Impl. Status: State(s) & Org. Comments:

444.

Description: To implement, as CDR 1, bidirectional ATS route segment POL - KLONN (Phase 3).

Objective:

To further improve the ATS route network within London FIR/UIR.

Proposed summer 2016

Project Group:

RFG SW

Project Category:

ATS Routes

GBR

Originator(s):

GBR

FL300 and above only. Provide connectivity to/from UL180/ UP16. Review greater use below FL300 post

implementation. BERUL - MERLY original proposal by

IACA.

Related proposals:

67.005a

67.005b

Page 201: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

190 29 May 2015 Edition: 1.0

Proposal ID : 85.013 Impl. Status: State(s) & Org. Comments:

445.

Project Name: DEP EGUN/EGUL via P/UP155

Description: a. To reconsider existing RAD restriction EGEH1013 in order to allow

DEP EGUL / EGUN via ATS route P/UP155 BANEM - ABEDA -

SOMVA. b. To allow “Direct” flight planning option SOMVA DCT TULIP for DEP

EGUL / EGUN.

Objective:

To improve departure routing out EGUN and EGUL

Proposed summer 2016

Project Category:

ATS Routes DCTs RAD

GBR MUAC U.S.A.F.E

Originator(s):

U.S.A.F.E

Currently P/UP155 UMBAG - BANEM - ABEDA is only available for traffic ARR/Overfly EF**, EK**, EN**, ES** and DEP Midlands Group, EGBG/TC/TK or via HON.

These limitations are due to traffic orientation requirements. The listed destinations (EF**, EK**, EN**, ES**) are in place due to the Netherlands traffic orientation requirement. Traffic to ED** and EH** cannot file via SOMVA.

Allows flight between BANEM and SOMVA eliminating the 45 degree turn increases departure route efficiency, saves 1 minute of flight time and €50K per year in operating costs along with 124K Ibs less of CO2 being emitted.

Proposal ID : 84.010 Impl. Status: State(s) & Org. Comments:

446.

Description:

a. To implement unidirectional ATS route system between Ankara FIR and Tbilisi FIR;

b. To change existing bi-directional ATS route N644 to eastbound;

c. To implement new westbound ATS route parallel to N644.

Objective:

To further improve the ATS route network between Ankara FIR and Tbilisi FIR.

Proposed summer 2016

Project Category:

ATS Routes

GEO TUR

Originator(s):

TUR

Outcome of the Second Meeting of the Ad Hoc Afghanistan Contingency Group (AHACG/2) held at Istanbul, Turkey from 17 to 19 November 2014.

The purpose of this reorganization is to enable an efficient traffic flow in the region.

Additionally a reduced ATS surveillance-based longitudinal spacing from 20NM to10NM after the implementation of OLDI is also considered.

Proposal ID : 69.104a / BM0013 Impl. Status: State(s) & Org. Comments:

447.

Description: To implement, as CDR, westbound ATS route SIT - SOKRI - CRN.

Objective:

To offer a shorter route option at the interface Greece_Italy.

Proposed summer 2016

Project Group:

FAB BLUE MED RFG SE

Project Category:

ATS Routes

GRC ITA

Originator(s):

FAB BLUE MED

Page 202: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

191 29 May 2015 Edition: 1.0

Proposal ID : 69.147 / BM0063 Impl. Status: State(s) & Org. Comments:

448.

Description: To implement the new route DDM - DEMAG - RAMLI.

Objective:

To improve the route network at the interface MALTA_GREECE_LIBYA.

Proposed summer 2016

Project Group:

FAB BLUE MED

Project Category:

ATS Routes

GRC LBY MLT

Originator(s):

FAB BLUE MED

Greece:Southbound only; Malta: bidirectional.

Related proposals:

77.032

Proposal ID : 69.162 / BM0094 Impl. Status: State(s) & Org. Comments:

449.

Description: To implement north-westbound ATS route segment KOR - OLGAT.

Objective:

To offer a shorter route option at the interface Italy_Greece.

Proposed summer 2016

Project Group:

FAB BLUE MED RFG SE

Project Category:

ATS Routes

GRC ITA ALB

Originator(s):

FAB BLUE MED

Due to close proximity to Tirana FIR border further coordination with ALB required.

Alternative option by ALB supported by GRC: KOR - GOKEL - GARGA. New alignment requiring new ATS routes within Greece, Albania and Italy. This option is 1NM shorter as current proposal; avoids the issue with close proximity to the FIR border and serves the same purpose. It is also shorter by 1.6NM compared to current UL613 KOR - YNN - PAPIZ - GARGA.

Proposal ID : 74.021 Impl. Status: State(s) & Org. Comments:

450.

Description: To establish a Night DCT between PINDO - ABLON - RIPLI - LINRO.

Objective:

To further improve ATS route network between Hellas UIR and Nicosia FIR.

Proposed summer 2016

Project Group:

RFG SE

Project Category:

ATS Routes

GRC

Originator(s):

FAB BLUE MED

Eastbound ATS route UL607 / UL52 PINDO

- ABLON - RIPLI - LINRO is existing. Westbound re-alignment is also planned. ATS route option would require regional

agreement for the implementation as it affects the route network over international waters.

Related proposals:

69.163

Proposal ID : 85.018 Impl. Status: State(s) & Org. Comments:

451.

Description:

To implement new SIDs/STARs for Athens (LGAV) airport.

Objective:

To further improve the airspace organisation within Athinai FIR.

Proposed summer 2016

Project Category:

Airspace Structure PBN

GRC

Originator(s):

GRC

Page 203: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

192 29 May 2015 Edition: 1.0

Proposal ID : 82.001 Impl. Status: State(s) & Org. Comments:

452.

Description: To implement bidirectional ATS route DBK - RETRA.

Objective:

To further improve ATS route network between Zagreb FIR and Beograd FIR.

Proposed summer 2016

Project Group:

RFG SE

Project Category:

ATS Routes

HRV SRB MNE

Originator(s):

IACA

Northbound option is available via RAD Appendix 4 DCTs from RETRA;

Outside FRA.

Proposal ID : 85.006 Impl. Status: State(s) & Org. Comments:

453.

Description: To allow “Direct” flight planning option DOLEV DCT PEVAL ouside of

SEA FRA.

Objective:

To further impeorve flight planning options within South East Europe.

Proposed summer 2016

Project Group:

RFG SE

Project Category:

DCTs

HRV BIH SRB

Originator(s):

MKD

Proposal ID : 65.066 Impl. Status: State(s) & Org. Comments:

454.

Description:

To re-designate all remaining ''Lower'' non-RNAV ATS routes as RNAV and rationalise the use of existing RNAV designators as follows: 1. W10 CRK - CML - GERVO - CLY - LIFFY as N12; 2. W12 SHA - CLY as N160; 3. W13 DUB - INKUR - KORAK - SHA as L975; 4. W15 KORAK - CRN as Q150; 5. V14 BAGSO - DUB - SHA as L70; 6. Q202 SUROX - DEVOL as L18 (release of Q202).

Objective:

To rationalise the existing ATS route designators within Shannon FIR/UIR and SOTA in order to make them compatible with the existing RNAV airspace and further facilitate the flight planning.

Proposed summer 2016

Project Category:

Route Redesignation

IRL

Originator(s):

EUROCONTROL

ENSURE project removed All ''Upper'' ATS routes as of 17 DEC 2009.

Minor rationalisation of lower routes feasible.

Release of freed up ATS routes required. Exact AIRAC date still to be confirmed.

Proposal ID : 83.016 Impl. Status: State(s) & Org. Comments:

455.

Project Name: ECAC States AIP en-route publication issues

Description:

To publish in AIP Ireland the Free Route Airspace procedures.

Objective:

To adapt in AIP the FRA publication in accordance with the ERNIP.

Proposed summer 2016

Project Category:

AIP

IRL

Originator(s):

EUROCONTROL

FRA was introduced on 17 DEC 2009 and announced via AIC.

Around 5 years later the AIP Publication is missing or it is not in accordance with ERNIP Part 1.

Coordination between the NM and Ireland on AIP publication was already initiated.

Page 204: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

193 29 May 2015 Edition: 1.0

Proposal ID : 81.041 Impl. Status: State(s) & Org. Comments:

456.

Description: To replace existing 5LNC BRAVO.

Objective:

To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region, to improve the aeronautical information provided and be compliant with ICAO Annex 11.

Proposed summer 2016

Project Group:

RFG SE

Project Category:

5LNC

ITA

Originator(s):

EUROCONTROL ICAO

Annex 11 stated that the 5LNCs shall be unique.

BRAVO is used 7 times worldwide and is allocated in ICARD to Brazil.

ICAO DM sent relevant message to ITA (DM23/01 MSG 14-027).

Proposal ID : 84.044 Impl. Status: State(s) & Org. Comments:

457.

Description: To replace existing 5LNC RASIN.

Objective:

a. To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region;

b. To improve the aeronautical information provided; c. To be compliant with ICAO Annex 11.

Proposed summer 2016

Project Category:

5LNC

ITA

Originator(s):

EUROCONTROL ICAO

RASIN is with double reservation in ICARD for Croatia and Senegal.

Point is used in Italy for military aerodrome purpose at LICZ.

Proposal for replacement is based on “Common criteria for replacement of duplicated 5LNCs” as point is not reserved for Italy.

Proposal ID : 84.045 Impl. Status: State(s) & Org. Comments:

458.

Description: To replace existing 5LNC LORIS.

Objective:

a. To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region;

b. To improve the aeronautical information provided; c. To be compliant with ICAO Annex 11.

Proposed summer 2016

Project Category:

5LNC

ITA

Originator(s):

EUROCONTROL ICAO

LORIS is not in ICARD and it is not available for selection in any region.

Point is used in Italy for two separate military aerodrome purpose at LICZ and LIPL.

Proposal for replacement is based on “Common criteria for replacement of duplicated 5LNCs” as point is not reserved for Italy.

Proposal ID : 78.020 / 17.013 Impl. Status: State(s) & Org. Comments:

459.

Description: To implement TMA and SIDs/STARs for airport EVJA (Tukums-Jurmala)

Objective:

To further improve airspace organisation in Riga FIR and provide ATS for IFR traffic to/from Tukums-Jurmala airport.

Proposed summer 2016

Project Group:

SG BALTIC

Project Category:

Airspace Structure TMA

LVA

Originator(s):

LVA

Page 205: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

194 29 May 2015 Edition: 1.0

Proposal ID : 71.051 Impl. Status: State(s) & Org. Comments:

460.

Description:

a. To implement new TMA. b. To implement new SIDs and STARs.

Objective: To further improve airspace organisation around Nador (GMMW) El

Aroui airport.

Proposed summer 2016

Project Category:

Airspace Structure TMA

MAR

Originator(s):

MAR

Proposal ID : 85.010 Impl. Status: State(s) & Org. Comments:

461.

Description: To allow “Direct” H24 flight planning option IBALU DCT SAMAR for ARR GCLP / GCXO.

Objective:

To further improve the flight planning options within Morocco for arivals to Grand Canaria and Tenerife North airports.

Proposed summer 2016

Project Category:

DCTs RAD

MAR

Originator(s):

ESP

Outcome of SW Axis/37 (17 - 18 MAR 2015).

An optimum use was considered by AOs and it is for all European DEP except EG.. / EI…

Information on possible loading (25 daily flights) was provided to Morocco for further consideration.

Similar distance as existing option via TERTO but shifts traffic in other Canarias ACC Sector allowing proper re-distribution.

Option available after the new sectorisation.

Proposal ID : 85.016 Impl. Status: State(s) & Org. Comments:

462.

Description: To allow “Direct” H24 flight planning option IBALU DCT SAMAR for ARR GCLP / GCXO.

Objective:

To further improve flight planning options for ARR GCLP / GCXO.

Proposed summer 2016

Project Category:

DCTs

MAR

Originator(s):

ESP

Outcome of SW Axis/37 (17 - 18 MAR 2015).

An optimum use was considered by AOs and it is for all European DEP except EG.. / EI…

Information on possible loading (25 daily flights) was provided to Morocco for further consideration.

Similar distance as existing option via TERTO but shifts traffic in other Canarias ACC Sector allowing proper re-distribution.

Proposal ID : 85.002 Impl. Status: State(s) & Org. Comments:

463.

Description: To re-designate the existing ATS route Q101 BML - OZT as Q401.

Objective:

To rationalise the existing ATS route designators in order to further facilitate flight planning.

Proposed summer 2016

Project Category:

Route Redesignation

MAR

Originator(s):

GBR EUROCONTROL

Re-designation requested on behalf of the UK in view of their Helicopter Route Project

It is proposed as much as possible RD number to be coherent with flight tracks.

Morocco was already informed and coordination is in progress.

Page 206: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

195 29 May 2015 Edition: 1.0

Proposal ID : 85.014 Impl. Status: State(s) & Org. Comments:

464.

Description:

To expand the availability and change the utilization of existing “Direct” flight planning option SAMAR DCT AKUDA to H24 for DEP GCXO.

Objective:

To further improve flight planning options for DEP GCXO.

Proposed summer 2016

Project Category:

DCTs

MAR

Originator(s):

ESP

Outcome of SW Axis/37 (17 - 18 MAR 2015);

An optimum use was considered by AOs and it is DEP GCFV / GCRR - ARR EGC. / EGP. / EI…

Currently this DCT is available for all traffic 22.00 - 06.00 but statistic shows that there are NO flights using it.

Shorter option by 4.8NM compare to VASTO. Will also allow proper distribution between Canarias ACC Sectors.

Information on possible loading (11 daily flights) was provided to Morocco for further consideration.

Proposal ID : 85.007 Impl. Status: State(s) & Org. Comments:

465.

Description:

To expand the availability of the existing “Direct” flight planning option SAMAR DCT AKUDA for DEP GCXO to H24.

Objective:

To further improve the flight planning options within Morocco for departures from Tenerife North airport.

Proposed summer 2016

Project Category:

DCTs RAD

MAR

Originator(s):

ESP

Outcome of SW Axis/37 (17 - 18 MAR 2015).

An optimum use was considered by AOs and it is DEP GCFV / GCRR - ARR EGC. / EGP. / EI…

Currently this DCT is available for all traffic 22.00 - 06.00 but statistic shows that there are NO flights using it.

Shorter option by 4.8NM compare to VASTO. Will also allow proper distribution between Canarias ACC Sectors.

Information on possible loading (11 daily flights) was provided to Morocco for further consideration.

Option available after the new sectorisation.

Proposal ID : 67.004b Impl. Status: State(s) & Org. Comments:

466.

Description: To redesignate existing ATS route L/UL19 MOLIX - TULIP as M/UM624

(release of L19).

Objective:

To further improve the ATS route network within Amsterdam FIR in order to adapt the ATS route designators to the existing traffic flows and facilitate flight planning.

Proposed summer 2016

Project Group:

FAB EC

Project Category:

Route Redesignation

NLD

Originator(s):

EUROCONTROL

Page 207: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

196 29 May 2015 Edition: 1.0

Proposal ID : 80.010c Impl. Status: State(s) & Org. Comments:

467.

Project Name: ECAC States AIP en-route publication issues

Description: To re-designate the following existing Helicopter routes: KZ02 - KZ09, KZ20, KZ23, KZ25, KZ30, KZ53, KZ60, KZ66.

Objective:

To adapt existing RDs in accordance with ICAO requirements.

Proposed summer 2016

Project Category:

AIP Route Redesignation

NLD

Originator(s):

EUROCONTROL

RDs KZ02 - 09 are not in accordance with Annex 11.

All RDs are not coordinated via ICARD.

Proposal ID : 81.045 Impl. Status: State(s) & Org. Comments:

468.

Description: To replace 5LNC REGNA.

Objective:

To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region, to improve the aeronautical information provided and be compliant with ICAO Annex 11.

Proposed summer 2016

Project Category:

5LNC

NLD

Originator(s):

EUROCONTROL ICAO

Annex 11 stated that the 5LNCs shall be unique.

REGNA is allocated to Russian Federation.Released by Netherlands on 19 AUG 2002 but still used for EHRD SID as per AIPNetherlands - ENR 4.4-4 / 27 JUN 2013.

ICAO DM sent relevant message to NLD (DM28/01 MSG 14-051).

NLD confirmed 290114 that they will investigate.

Proposal ID : 84.117 Impl. Status: State(s) & Org. Comments:

469.

Description: To replace existing 5LNC PEPEL.

Objective:

1. To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region;

2. To improve the aeronautical information provided; 3. To be compliant with ICAO Annex 11.

Proposed summer 2016

Project Category:

5LNC

NLD

Originator(s):

EUROCONTROL ICAO

PEPEL is reserved in ICARD for Uzbekistan.

Proposal for replacement is based on “Common criteria for replacement of duplicated 5LNCs” as point is not reserved for the Netherlands.

Proposal ID : 80.010a Impl. Status: State(s) & Org. Comments:

470.

Project Name: ECAC States AIP en-route publication issues

Description: To re-designate the following existing Helicopter routes: KY01, KY06 - KY09, KY10 - KY21, KY30 - KY42, KY50 - KY51, KY53 - KY56, KY70 and KY80 as described in the attached document.

Objective:

To adapt existing RDs in accordance with ICAO requirements.

Proposed summer 2016

Project Category:

AIP Route Redesignation

NOR

Originator(s):

EUROCONTROL

RDs KY01, KY06 - 09 are not in accordance with Annex 11.

All RDs are not coordinated via ICARD.

Page 208: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

197 29 May 2015 Edition: 1.0

Proposal ID : 62.028 Impl. Status: State(s) & Org. Comments:

471.

Description: To implement southbound ATS route segment ETRUS - GORPI - CHO - GOVEN.

Objective:

To further improve the ATS route network within Warszawa FIR.

Proposed summer 2016

Project Category:

ATS Routes

POL SWE

Originator(s):

IATA

Not accepted at present by Poland due to workload of ACC Sector Drezdenko.

Postponed until introduction of the vertical split in Warszawa FIR.

Proposal ID : 75.050 / 15.043 Impl. Status: State(s) & Org. Comments:

472.

Project Name: BALTIC FAB ATS routes

Description:

1. To implement the following new ATS routes: a. EVODO - AAAAA westbound; b. SUW - VABER eastbound; c. AAAAA - BADUS westbound; d. AAAAA - LAVAR westbound.

2. To change the folowing existing ATS routes: a. N858 DENKO - BOKSU - LAVAR change of direction to

westbound; b. L735 GOVEN - ZZZZZ - AAAAA westbound; c. T727 SUI - XXXXX - VABER change of direction to eastbound; d. Y225 new segment OSKUD - YYYYY (in T727) eastbound; e. L29 VABER – LAVAR change of direction to eastbound.

Objective:

To further improve the ATS route network within the Baltic FAB.

Proposed summer 2016

Project Group:

FAB Baltic SG BALTIC

Project Category:

ATS Routes

POL LTU

Originator(s):

FAB Baltic

AAAAA (540216N 0233059) will be a new common boundary point between FIR EPWA and FIR EYVL (coordinates are not finally fixed).

Changes to Vilnius SIDs/STARs also required.

Depends on changes in Moscow area followed by changes in interface between Republic of Belarus and Lithuania.

Related proposals:

75.039 / 15.041

Proposal ID : 81.064c Impl. Status: State(s) & Org. Comments:

473.

Description: To implement bi-directional ATS route MOTAD - MOLIL.

Objective:

To further improve the flight planning options within Warszawa FIR while providing additional shorter route options.

Proposed summer 2016

Project Category:

ATS Routes

POL

Originator(s):

IATA

Implementation will be considered following vertical sector split introduction.

Related proposals:

81.064a

81.064b

81.066

81.067

81.068b

Proposal ID : 82.005 Impl. Status: State(s) & Org. Comments:

474.

Description: To re-designate existing ATS route Z226 INBOM - PRT as new Z.

Objective:

To further simplify the existing RDs within Portugal.

Proposed summer 2016

Project Category:

Route Redesignation

PRT

Originator(s):

EUROCONTROL

Requirement is due to duplicate use in different parts of the ICAO EUR/NAT region of route designator Z226.

Z226 is reserved in ICARD for Sweden and is used.

Page 209: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

198 29 May 2015 Edition: 1.0

Proposal ID : 81.068b Impl. Status: State(s) & Org. Comments:

475.

Description:

3. To implement the following ATS routes: a. TABIN - BILNA; OR b. TABIN DCT BILNA or change southbound UL616 segment

TABIN - LUMOT to bidirectional; c. UP10 JAN - VAMOG bidirectional; d. UP10 BAREB - CE - VIBOP - KEB bidirectional.

4. To allow point BAREB in HUFRA above 9500FT ALT.

Objective:

To further improve ATS route network between Praha FIR, Bratislava FIR, Budapest FIR, Zagreb FIR and Sarajevo FIR.

Proposed summer 2016

Project Group:

RFG SE

Project Category:

ATS Routes DCTs

SVK HUN HRV BIH SRB CZE

Originator(s):

IATA

P10 in Zagreb FIR is permanent bi-directional ATS route but segment BAREB - CE is only available between 5500FT ALT - 9500FT ALT while CE - VIBOP 5000FT ALT - FL285.

P10 in Sarajevo FIR is permanent bi-directional ATS route available between FL100 - FL285. Bosnia is ready to implement UP10 up to FL325.

BAREB EX in HUFRA but allowed below 9500FT ALT.

SVK: no northbound track feasible for safety reasons.

Related proposals:

81.064a

81.064b

81.064c

81.066

81.067

Proposal ID : 60.010c Impl. Status: State(s) & Org. Comments:

476.

Project Name: SMART Phase 1/2/3:

Description: a. To transfer current Ankara ACC to the new OPS room. b. To transfer Istanbul ACC to new Ankara ACC FL235 and above. c. To transfer Izmir ACC to new Ankara ACC FL235 and above.

Objective:

To further improve airspace organisation within Istanbul FIR and Ankara FIR and enhance capacity within the Turkish ACCs in order to cope with the increasing traffic demand.

Proposed summer 2016

Project Group:

RFG SE

Project Category:

Airspace Structure

TUR

Originator(s):

TUR

Transfer of current Ankara ACC to the new OPS room planned 2015.

Related proposals:

60.010b

60.010f

60.010g

80.021a

Proposal ID : 60.010f Impl. Status: State(s) & Org. Comments:

477.

Project Name: SMART, Phase 4

Description:

To completely redesign entire Turkish lower and upper airspace, ACC sectorisation (20 sectors FL235 and above) and reconfigure ACC/APP with DFL235 and FL325.

Objective:

To further improve airspace organisation within Istanbul FIR and Ankara FIR and enhance capacity within the Turkish ACCs in order to cope with the increasing traffic demand (SMART project, Phase 4).

Proposed summer 2016

Project Group:

RFG SE

Project Category:

Airspace Structure ATC Sectors

TUR

Originator(s):

TUR

SMART: Systematic Modernization of ATM Resources in Turkey.

Related proposals:

60.010c

60.010g

Page 210: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

199 29 May 2015 Edition: 1.0

Proposal ID : 60.010g Impl. Status: State(s) & Org. Comments:

478.

Project Name: SMART, Phase 5

Description: To allow Free Route flight during Night (DCTs) and Weekend (DCTs) above FL285.

Objective:

To further improve airspace organisation within Istanbul FIR and Ankara FIR and enhance capacity within the Turkish ACCs in order to cope with the increasing traffic demand (SMART project, Phase 5).

Proposed summer 2016

Project Group:

RFG SE

Project Category:

50 MPCPEs Free Route Airspace

TUR

Originator(s):

TUR

Phased implementation SMART: Systematic Modernization of ATM

Resources in Turkey. 2012 -2015: gradual implementation of

DCTs during night or H24; Nov 2013: full current airspace structure

validation in SAAM, including en-route and TMA;

Nov 2013 - Spring 2014: detailed development of Free Route Airspace airspace design and associated sectorisation;

Autumn/Winter 2014/15 - RTS of new airspace structure;

Spring 2015 - Autumn 2015: fine-tuning of airspace design, airspace publication validation with NM, airspace structure testing in DNM systems;

Autumn/Winter 2015/16: FRA implementation.

Related proposals:

60.010c

60.010f

76.068

Proposal ID : 80.021b Impl. Status: State(s) & Org. Comments:

479.

Description: To introduce P-RNAV SIDs/STARs for Izmir/Adnan Menderes (LTBJ) and Ankara/Esenboga (LTAC) airports.

Objective:

To further improve the airspace organisation within Istanbul FIR and Ankara FIR.

Proposed summer 2016

Project Group:

RFG SE

Project Category:

PBN TMA

TUR

Originator(s):

TUR

Proposal ID : 77.062 Impl. Status: State(s) & Org. Comments:

480.

Description: To implement new dualised system of ATS routes in IFV / NM area: 1. New eastbound ATS route MALBE - AAAAA; 2. New westbound ATS route AAAAA - IVF; 3. New bi-directional ATS route AAAAA - YYYYY - LORDU.

Objective:

To further improve ATS route network within Ukrainian FIR.

Proposed summer 2016

Project Group:

RFG SE

Project Category:

ATS Routes

UKR

Originator(s):

EUROCONTROL

AAAAA will be new boundary point between L’viv FIR and Kyiv FIR.

YYYYY is crossing point with T254. Current option within Ukraine is via NM. Possible westbound connection LADOB -

PPD within Bratislava FIR will further shortens the flying distance.

Page 211: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

200 29 May 2015 Edition: 1.0

Proposal ID : 83.037 / 21.009 Impl. Status: State(s) & Org. Comments:

481.

Project Name: ECAC States AIP en-route publication issues

Description:

To adapt the lower/upper vertical limits, expressed in FL, of ATS routes within Kyiv UIR - change of IFR FL to VFR FL.

Objective:

To adapt in State AIP ATS routes vertical limits.

Proposed summer 2016

Project Group:

SG BLACK

Project Category:

AIP ATS Routes

UKR

Originator(s):

EUROCONTROL

Currently upper limit of lower ATS routes is set as FL270 while lower limit of upper ATS routes is set as FL280.

Proposal ID : 77.072e Impl. Status: State(s) & Org. Comments:

482.

Project Name: Free Route Airspace Wien, FRAW, Stage 5

Description: To introduce H24/7 Free Route Airspace within Wien ACC / APP and

Local Approach Units, including/excluding ATS delegated areas, from lower limit of controlled airspace up to FL660, cancellation of ATS routes foreseen (except of Non RNAV ATS Routes below FL95).

Objective:

To implement full FRA (FRAW) and further improve flight efficiency within Wien AoR.

Planned 10 NOV 2016

Project Group:

FAB CE RFG SE

Project Category:

50 MPCPEs Free Route Airspace

AUT

Originator(s):

AUT

Phased implementation: Stage 1 implemented 18 October 2012 (37

DCTs). Stage 2 implemented 7 MAR 2013. Stage 3a/b implemented 6 MAR 2014 - 11

DEC 2014. Stage 4a implemented 2 April 2015, Stage

4b planned autumn 2015. Stage 5 planned end 2016.

Related proposals:

76.047

77.072a

77.072b

77.072c

77.072d

Proposal ID : 85.003 Impl. Status: State(s) & Org. Comments:

483.

Description:

To re-designate the following existing ATS routes: d. Q107 KFT - GOTAR as new Q; e. Q110 SNU - MOGMA as new Q.

Objective:

To rationalise the existing ATS route designators in order to further facilitate flight planning.

Planned 10 NOV 2016

Project Category:

Route Redesignation

AUT

Originator(s):

GBR EUROCONTROL

Re-designation requested on behalf of the UK in view of their Helicopter Route Project.

It is proposed as much as possible RD number to be coherent with flight tracks.

Austria was already informed and coordination is in progress.

Proposal ID : 85.004 Impl. Status: State(s) & Org. Comments:

484.

Description:

To re-designate the following existing ATS routes: 1. Q104 BIBAG - MOGMA as new Q; 2. Q113 MATIG - NAPSA as new Q.

Objective: To rationalise the existing ATS route designators in order to

further facilitate flight planning.

Planned 10 NOV 2016

Project Category:

Route Redesignation

AUT DEU

Originator(s):

GBR EUROCONTROL

Re-designation requested on behalf of the UK in view of their Helicopter Route Project.

It is proposed as much as possible RD number to be coherent with flight tracks.

Austria was already informed and coordination is in progress.

Page 212: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

201 29 May 2015 Edition: 1.0

Proposal ID : 77.066b Impl. Status: State(s) & Org. Comments:

485.

Project Name: Free Route Airspace Ljubljana ACC, Phase 2

Description: To implement H24 Free Route in Ljubljana ACC, FL165 and above.

Objective:

To further improve airspace organisation within Ljubljana FIR.

Planned 10 NOV 2016

Project Group:

FAB CE RFG SE

Project Category:

50 MPCPEs Free Route Airspace

SVN

Originator(s):

SVN

In accordance with FAB CE Airspace Plan.

Related proposals:

77.066a

Proposal ID : 71.086 Impl. Status: State(s) & Org. Comments:

486.

Project Name: Free Route Airspace Albania

Description: To implement H24 Free Route Airspace for Tirana FIR, FL195 and

above.

Objective:

To allign the airspace structure with real operations and to make operational DCT's flight planable.

Proposed autumn 2016

Project Group:

RFG SE

Project Category:

Free Route Airspace

ALB

Originator(s):

ALB FAB BLUE MED

Studies ongoing in the context of Blue Med. Free route implementation depends on

neighbouring States developments and requirements.

To be developed in full cooperation with neighbouring States.

Current local ATC system does not support other than ATS routes. New features are considered to cope with FRA requirements.

Related proposals:

71.085a

71.087

71.088

71.089b

Proposal ID : 80.073 Impl. Status: State(s) & Org. Comments:

487.

Description: To establish a DCT or ATS route between RIBEL and GUNTU FL245+.

Objective:

To reduce flight plannable mileage and reflect the route tactically provided on a regular basis.

Proposed autumn 2016

Project Category:

DCTs RAD

GBR

Originator(s):

GBR

Not available for UK overflights via NATEB.

Proposal ID : 64.066b / 09.012b Impl. Status: State(s) & Org. Comments:

488.

Description: 1. To reconfigure existing Tbilisi TMA. 2. To introduce new SIDs/STARs for Tbilisi (UGTB) airport.

Objective:

To further improve the airspace organisation within Tbilisi FIR.

Proposed autumn 2016

Project Group:

SG BLACK

Project Category:

TMA

GEO

Originator(s):

EUROCONTROL GEO

Related proposals:

64.066a / 09.012a

Page 213: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

202 29 May 2015 Edition: 1.0

Proposal ID : 68.022 / 11.019 Impl. Status: State(s) & Org. Comments:

489.

Project Name: Batumi TMA

Description: To reconfigure Batumi TMA and establish new SIDs/STARs ROLIN

(FL190/FL180).

Objective:

To further improve airspace organisation within Tbilisi FIR.

Proposed autumn 2016

Project Group:

SG BLACK

Project Category:

TMA

GEO

Originator(s):

GEO

Proposal ID : 72.050 / 14.013 Impl. Status: State(s) & Org. Comments:

490.

Project Name: Batumi and Kutaisi TMAs Optimization

Description:

1. To expand the existing TMAs, both in their horizontal and vertical boundaries.

2. To implement separated SIDs and STARs.

Objective: To further improve airspace organisation within Tbilisi FIR.

Proposed autumn 2016

Project Group:

SG BLACK

Project Category:

TMA

GEO

Originator(s):

GEO

Proposal ID : 69.097c Impl. Status: State(s) & Org. Comments:

491.

Project Name: Free Route Airspace Praha/ FRAPRA, Step 3

Description: To transfer additional existing DCTs into H24/7 DCTs, FL 245+ (parallel operations with ATS routes) and to initialise cross border operations

with single States, when possible between ATC units within FABCE or with adjacent FABs or ANSPs.

Objective: To further improve the flight planning options within Praha

FIR as a third step towards the full implementation of Free Route Airspace Praha/ FRAPRA.

Proposed 2016

Project Group:

FAB CE

Project Category:

Free Route Airspace

CZE

Originator(s):

CZE

All Airways above FL 165 remain available for flight planning.

Departing/Arriving within FRA shall file via airways.

Looking for expansion with adjacent States (e.g. FRAMaK).

Related proposals:

69.097a

69.097b

Proposal ID : 50.053b Impl. Status: State(s) & Org. Comments:

492.

Project Name: Lisboa/ Casablanca/ Canarias Axis

Description: To review the airspace organisation on the

Lisboa/Casablanca/Canarias axis: 1. to optimise the ATS route network in line with the new Canarias

TMA organisation; 2. PRNAV structure for Canarias TMA, Phase 2 (includes

Casablance/ Canarias interface); 3. to create an ATS route segment from Fuerteventura (GCFV) and

Lanzarote (GCRR) to NAVIX and vice versa; 4. to create new STAR ORTIS and SID BIMBO for GCFV and GCRR

airports.

Objective: To further improve the ATS route network and airspace

organisation within Canarias FIR/UIR.

Proposed winter 2016/17

Project Group:

RFG SW

Project Category:

Airspace Structure TMA

ESP PRT MAR

Originator(s):

ESP PRT MAR

ONDA Morocco and NAV Portugal ready. Tri-lateral meeting required.

Related proposals:

60.034b

73.052

75.022

79.021

Page 214: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

203 29 May 2015 Edition: 1.0

Proposal ID : 75.023 Impl. Status: State(s) & Org. Comments:

493.

Project Name: LUMAS, Phase 2

Description: To implement northbound ATS route P/UP9 MEROS - DIBER.

Objective:

To further improve ATS route network in DIBER / LUMAS area of Barcelona FIR.

Proposed winter 2016/17

Project Category:

ATS Routes

ESP

Originator(s):

ESP

This proposal will be considered for integration as a part of the development.

Related proposals:

66.053b

66.053d

66.053e

Proposal ID : 66.053e Impl. Status: State(s) & Org. Comments:

494.

Project Name: LUMAS, Phase 2b

Description:

To re-organise the ATS route network at the interface between Spain and France, around LF-D54 military zone and to reconsider the traffic distribution of overflying currently points DIBER or LUMAS.

1. To implement a 3 point interface network structure for flights from Barcelona to Marseille ACC instead of current 2 points interface (DIBER / LUMAS).

Objective:

To further improve the ATS route network and airspace structure and to enhance sector capacity at the interface between Marseille ACC and Barcelona ACC.

Proposed winter 2016/17

Project Group:

RFG SW

Project Category:

Airspace Structure ATC Sectors ATS Routes

ESP FRA

Originator(s):

ESP FRA

Introduction of the new structure shall be without impact of the LF-D54 South that remains AMC non-manageable. Proposal is under study following the LECB-LFMM Interface Meeting No.2 held 15-16 OCT 2014.

Related proposals:

66.053d

75.023

Proposal ID : 65.046 Impl. Status: State(s) & Org. Comments:

495.

Project Name: LAGOR - BTZ

Description:

To implement a shorter ATS route between LAGOR and BTZ when military zones are not active.

Objective:

To further improve the ATS route network within France UIR while providing an additional route option.

Proposed winter 2016/17

Project Group:

RFG SW

Project Category:

ATS Routes

FRA ESP

Originator(s):

IACA

To improve access from the UK to south-eastern Spain.

Crossing not manageable military area R31. CDR 1 night and weekend, CDR 3 rest of

time. Proposal by Bordeaux ACC was rejected as

declared unsafe by Brest ACC controllers.

Proposal ID : 75.082 Impl. Status: State(s) & Org. Comments:

496.

Project Name: Brest ACC re-organisation

Description: To re-organise the lower airspace and ATS delegation to APP units below FL145 for relevant airspace in Brest ACC (2nd and final Step) .

Objective:

To further improve the airspace structure within France FIR.

Proposed winter 2016/17

Project Category:

Airspace Structure

FRA

Originator(s):

FRA

Under study. To be done progressively. Final Step summer 2015.

Related proposals:

69.089a, 69.089c, 69.089e, 69.089f

75.073a

75.080

Page 215: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

204 29 May 2015 Edition: 1.0

Proposal ID : 64.014d Impl. Status: State(s) & Org. Comments:

497.

Project Name: ESSO - Espace Superieur du Sud Ouest

Description: To re-organize Bordeaux ACC upper airspace (military zones, route

network and sectorisation) taking into account both French civilian and military requirements (adaptation to the new training needs resulting from new aircraft and new weapons).

Objective:

To further improve the ATS route network and associated airspace structure both within Bordeaux UIR and at the interface between France UIR, Madrid UIR and Barcelona UIR, by segregating major traffic flows and creating specialised ATC sectors, in order to increase capacity, considering civil as well as military airspace requirements.

Proposed winter 2016/17

Project Group:

RFG SW

Project Category:

50 MPCPEs Airspace Structure Civil/Military Airspace

FRA ESP

Originator(s):

FRA ESP

Common project at the Barcelona/Madrid/Bordeaux interface (BAMBI) is part of this project.

Related proposals:

64.014b

66.053a

66.053b

66.053d

Proposal ID : 64.014b Impl. Status: State(s) & Org. Comments:

498.

Project Name: Barcelona, Madrid, Bordeaux Interface, BAMBI

Description: To re-organise the Barcelona/ Bordeaux interface as part of the

Barcelona/Madrid/Bordeaux (BAMBI) interface: a. to implement PPG - ALBER dualization via new point EREPI. b. to implement northbound trident GIROM - TIPAP - OKABI.

Objective:

To further improve the ATS route network and associated airspace structure at the Barcelona FIR/ Bordeaux FIR interface by segregating major traffic flows in order to increase capacity, considering civil as well as military airspace requirements.

Proposed winter 2016/17

Project Group:

RFG SW

Project Category:

50 MPCPEs Airspace Structure Civil/Military Airspace

FRA ESP

Originator(s):

FRA ESP

BAMBI: Common project at the Barcelona/ Madrid/ Bordeaux interface along the South-west axis.

a. Agreement with French military required.

Related proposals:

64.014c

64.014d

Proposal ID : 64.014c Impl. Status: State(s) & Org. Comments:

499.

Project Name: Barcelona, Madrid, Bordeaux Interface, BAMBI

Description: To re-organise the Madrid/ Bordeaux interface as part of the

Barcelona/Madrid/Bordeaux (BAMBI) interface: a. To re-design TSA 34 (enlargement). b. To adjust ATS routes accordingly (LATEK area). c. To change Madrid ACC sectors ZGZ/PAU/PAL accordingly.

Objective:

To further improve the airspace structure at the interface between Madrid FIR/UIR and Bordeaux FIR by enlarging TSA34 in response to future military needs and adjust ATS routes/ ATC sectors accordingly, considering civil as well as military airspace requirements.

Proposed winter 2016/17

Project Group:

RFG SW

Project Category:

50 MPCPEs Airspace Structure Civil/Military Airspace

FRA ESP

Originator(s):

FRA ESP

BAMBI: Common project at the Barcelona/ Madrid/ Bordeaux interface along the South-west axis.

Design completed. Implementation linked to the new Madrid TMA (OPTIMA project).

Related proposals:

64.014b

Page 216: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

205 29 May 2015 Edition: 1.0

Proposal ID : 84.017a Impl. Status: State(s) & Org. Comments:

500.

Project Name: URMN/UL10 - Phase 1

Description: To revise the sectorisation of the current Reims ACC sectors by: 3. The creation of a new block 3B by the partition of the current block

4N. 4. The creation of a new block 2Y by the partition of the current block

5R.

5. Modification of the route network accordingly.

Objective:

To further improve the airspace organization within France and the service for the users while maintaining the security level in the new sctors. To allow the UL10 development. .

Proposed winter 2016/17

Project Category:

ATC Sectors

FRA

Originator(s):

FRA

Interface Reims/Paris - IRP implemented in December 2012 (50.023).

Related proposals:

50.023

84.017b

Proposal ID : 81.073b Impl. Status: State(s) & Org. Comments:

501.

Project Name: Free Route Airspace Prestwick Phase 2

Description: To implement H24 Free Route Airspace FRA Operations above FL 255 at Prestwick ACC within the following ATC Sectors: 1. Hebrides Sector EGHBN 2. Moray High Sector EGMOH 3. Montrose North Sector EGPMN 4. Tyne Sector (N of UL983) EGTYN

Objective:

To implement FRA Concept and further improve flight efficiency within a part of the Scottish UIR.

Proposed winter 2016/17

Project Group:

RFG NW

Project Category:

Free Route Airspace

GBR

Originator(s):

GBR

Dependant and possible to implement after instalation of the new ATM system at Prestwick ACC foreseen MAR 2016.

Related proposals:

81.073a

82.035

Proposal ID : 59.017f Impl. Status: State(s) & Org. Comments:

502.

Project Name: London Airspace Management Program, LAMP Phase 1b

Description:

Re-sectorisation of TC Capital and AC Central sectors.

Objective:

To increase systemisation of the airspace structure in order to provide safety and efficiency enhancements and additional capacity in London TMA through a fundamental review of ATS route and sector structure (London Airspace Management Programme/ LAMP).

Proposed winter 2016/17

Project Category:

ATC Sectors

GBR

Originator(s):

GBR

Related proposals:

59.017e

Page 217: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

206 29 May 2015 Edition: 1.0

Proposal ID : 85.009 / 21.023 Impl. Status: State(s) & Org. Comments:

503.

Project Name: Free Route Airspace Tbilisi ACC

Description: To implement H24 Free Route Airspace in Tbilisi ACC.

Objective:

To further improve airspace organisation within Tbilisi FIR.

Proposed winter 2016/17

Project Group:

SG BLACK

Project Category:

Free Route Airspace

GEO

Originator(s):

GEO

Require further clarification on lower limit.

Proposal ID : 74.016c / CE0096 Impl. Status: State(s) & Org. Comments:

504.

Project Name: Free Route Airspace Zagreb, Phase 5b - SEAFRA

Description: To introduce H24 Free Route Airspace in Zagreb ACC AoR.

Objective:

To further improve airspace organisation within Sarajevo FIR and Zagreb FIR.

Proposed winter 2016/17

Project Group:

FAB CE RFG SE

Project Category:

50 MPCPEs Free Route Airspace

HRV BIH SRB

Originator(s):

HRV

In coordination with Free Route introduction in Beograd ACC.

FRA cross border application in Zagreb ACC and Beograd ACC AoRs.

Implementation depends on BH ATM, Phase 2 implementation.

RTS in Jan/Feb 2016.

Related proposals:

69.086a

74.016a

74.048a

74.048b

74.059b

75.013

Proposal ID : 84.011 Impl. Status: State(s) & Org. Comments:

505.

Project Name: Central sector Zagreb Phase 2b

Description: Additional Sector Group Phase 2b: Full lateral and vertical implementation of Central sector below FL355.

Objective:

To further improve the airspace structure within Zagreb FIR and increase capacity.

Proposed winter 2016/17

Project Group:

RFG SE

Project Category:

ATC Sectors

HRV

Originator(s):

HRV

Phase 2a: FL355 and above 2 April 2015

Related proposals:

69.001

69.068b

74.051b

Proposal ID : 81.044 Impl. Status: State(s) & Org. Comments:

506.

Description: To replace 5LNC OTRON.

Objective:

To avoid 5LNCs duplication within the ECAC area of the ICAO EUR/NAT region, to improve the aeronautical information provided and be compliant with ICAO Annex 11.

Proposed winter 2016/17

Project Category:

5LNC

ISL

Originator(s):

EUROCONTROL ICAO

OTRON is used by and is allocated in ICARD to Russian Federation.

ICAO DM sent relevant message to ISL (DM28/01 MSG 14-050).

ISL states that point is used for RWY20 procedures at BIKF airport but agrees to release first semester 2015.

Page 218: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

207 29 May 2015 Edition: 1.0

Proposal ID : 71.085c Impl. Status: State(s) & Org. Comments:

507.

Project Name: FAIR-IT Free Route Airspace Italy, Phase 3

Description: To implement Full Free Route Airspace, initially above FL365.

Objective:

To further improve the airspace structure and the flight planning options within Milano, Roma and Brindisi UIR.

Proposed winter 2016/17

Project Group:

FAB BLUE MED RFG SE

Project Category:

50 MPCPEs Free Route Airspace

ITA

Originator(s):

ITA

Co-operation inside BLUE MED with all the partners involved, to extend FAIR-IT at FAB level, starting from 2015.

Related proposals:

71.085a

71.085b

71.089c

Proposal ID : 71.052 Impl. Status: State(s) & Org. Comments:

508.

Description: a. To implement a new TMA for Tetouan (GMTN) Saniat R’mel

airportTetouan (GMTN) Saniat R’mel airport. b. To implement new SIDs and STARs for Tetouan (GMTN) Saniat

R’mel airport.

Objective: To further improve airspace structure around Tetouan (GMTN) Saniat

R’mel airport.

Proposed winter 2016/17

Project Category:

Airspace Structure TMA

MAR

Originator(s):

MAR

Proposal ID : 71.053 Impl. Status: State(s) & Org. Comments:

509.

Description: a. To implement new TMA for Al Hoceima (GMTA) Cherif El Idrissi

airport. b. To implement new SIDs and STARs for Al Hoceima (GMTA) Cherif

El Idrissi airport.

Objective: To further improve airspace organisation around Al Hoceima (GMTA)

Cherif El Idrissi airport.

Proposed winter 2016/17

Project Category:

Airspace Structure TMA

MAR

Originator(s):

MAR

Proposal ID : 71.089c Impl. Status: State(s) & Org. Comments:

510.

Project Name: Free Route Airspace Malta - Phase 3

Description: To implement full H24 Free Route within Malta UIR.

Objective:

To further improve the flight planning options within Malta UIR as a third step of Free Route Airspace Malta implementation.

Proposed winter 2016/17

Project Group:

FAB BLUE MED

Project Category:

Free Route Airspace

MLT

Originator(s):

MLT

Co-operation/ synchronisation with Free Route Airpsace Italy/ FAIR-IT, Phase 3.

Depending on new system implementation.

Related proposals:

71.085c

71.089a

71.089b

Page 219: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

208 29 May 2015 Edition: 1.0

Proposal ID : 68.012c Impl. Status: State(s) & Org. Comments:

511.

Project Name: Lower airspace re-organisation Beograd FIR - Step 2

Description: To revise geographically all other TMAs inside Beograd FIR, except

Beograd TMA and Podgorica TMA.

Objective:

To further improve the airspace structure and ATS route network within Beograd FIR.

Proposed winter 2016/17

Project Group:

RFG SE

Project Category:

Airspace Structure

MNE SRB

Originator(s):

MNE SRB

Currently Podgorica CTR and Tivat CTR/TMA exist.

Related proposals:

68.012a

Proposal ID : 76.052 Impl. Status: State(s) & Org. Comments:

512.

Project Name: Free Route Airspace Warsaw FIR, Phase 3

Description: To implement H24 Free Route Airspace in the Upper airspace of

Warsaw FIR, FL355 and above.

Objective:

To further improve the airspace organisation and flight efficiency within Warsaw FIR (Polish Airspace Project 2010+, Phase 4). .

Proposed winter 2016/17

Project Category:

50 MPCPEs Free Route Airspace

POL

Originator(s):

POL

Stepped implementation: o Night DCTs o Weekend DCTs o H24 DCTs in upper airspace (FRA like)

RTS in April 2013. Part of Polish Airspace Project 2010+

(Phase 4).

Related proposals:

62.091b

62.091c

76.053

Proposal ID : 74.059b Impl. Status: State(s) & Org. Comments:

513.

Project Name: Free Route Airspace Beograd, Phase 5b - SEAFRA

Description: To introduce H24 Free Route Airspace in Beograd ACC AoR.

Objective:

To further improve airspace organisation within Sarajevo FIR and Beograd FIR.

Proposed winter 2016/17

Project Group:

FAB CE RFG SE

Project Category:

50 MPCPEs Free Route Airspace

SRB MNE BIH HRV

Originator(s):

SRB

In coordination with Free Route introduction in Zagreb ACC.

FRA cross border application in Zagreb ACC and Beograd ACC AoRs.

Implementation depends on BH ATM, Phase 2 implementation.

Related proposals:

69.086a

74.016a

74.016c

74.048a

74.048b

75.013

Page 220: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

209 29 May 2015 Edition: 1.0

Proposal ID : 68.012b Impl. Status: State(s) & Org. Comments:

514.

Project Name: Lower airspace re-organisation Beograd FIR - Step 1

Description: To revise vertically and geographically Beograd TMA and Podgorica TMA.

Objective:

To further improve the airspace structure and ATS route network within Beograd FIR.

Proposed winter 2016/17

Project Group:

RFG SE

Project Category:

Airspace Structure

SRB MNE

Originator(s):

SRB MNE

Currently Podgorica CTR and Tivat CTR/TMA exist.

Related proposals:

68.012a

68.012c

Proposal ID : 57.024 Impl. Status: State(s) & Org. Comments:

515.

Project Name: New TSA 6

Description: To redesign TSA6 LF_R146B and TSA8 LF_R7B.

Objective:

To adapt military areas for more dynamic ASM and specific training missions within Brest ACC.

Proposed spring 2017

Project Group:

RFG SW

Project Category:

Civil/Military Airspace

FRA GBR

Originator(s):

FRA

Potential for affecting access to UK sectors and close liaison with UK and airlines required. France: Civil - military agreement reached.

Related proposals:

65.045

Proposal ID : 83.030a / 21.003a Impl. Status: State(s) & Org. Comments:

516.

Description: To implement Night Free Route Airspace in Yerevan ACC.

Objective:

To further improve airspace organisation within Yerevan FIR.

Proposed summer 2017

Project Group:

SG BLACK

Project Category:

Free Route Airspace

ARM

Originator(s):

ARM

Related proposals:

83.030b / 21.003b

Proposal ID : 53.009 / DU0008 Impl. Status: State(s) & Org. Comments:

517.

Project Name: RAD LBLT1000

Description: To allow overflights via IBLAL by withdrawing RAD restriction

LBLT1000.

Objective:

To further improve the utilisation of existing ATS route network.

Proposed summer 2017

Project Group:

FAB DANUBE RFG SE

Project Category:

ATS Routes RAD

BGR TUR

Originator(s):

EUROCONTROL

IBLAL currently is only available for traffic departing LTBA/BU/FJ, to reduce complexity of Varna sectors.

Requires further study and simulations.

Page 221: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

210 29 May 2015 Edition: 1.0

Proposal ID : 62.048b Impl. Status: State(s) & Org. Comments:

518.

Project Name: Common Terminal Airspace System

Description:

a. To establish a common Terminal Airspace System and implement P-RNAV procedures for Burgas (LBBG) and Varna (LBWN) airports.

b. To adjust the ACC sectors according to the future common TMA, if necessary.

Objective:

To further improve the airspace structure within Sofia FIR and to cope with the expected traffic increase at the Black Sea airports(Phase 2).

Proposed summer 2017

Project Group:

RFG SE

Project Category:

Airspace Structure PBN

BGR

Originator(s):

BGR

Implementation date is not defined yet - FTS/RTS and Safety case are required.

Large scale airspace management project as a follow up of the merger of the two ACCs.

Related proposals:

62.048a

Proposal ID : 82.030 / 20.032 Impl. Status: State(s) & Org. Comments:

519.

Project Name: DANUBE FAB FRA - Phase 2

Description: To extend time availability of NIGHT Free Route Airspace within the DANUBE FAB area.

Objective:

To further improve the Free Route Airspace operations within and between Bucuresti FIR and Sofia FIR.

Proposed summer 2017

Project Group:

FAB DANUBE RFG SE SG BLACK

Project Category:

Free Route Airspace

BGR ROU

Originator(s):

FAB DANUBE

Related proposals:

69.052 / 16.008

82.031 / 20.033

82.032 / 20.034

82.033 / 20.035

Proposal ID : 75.078 Impl. Status: State(s) & Org. Comments:

520.

Project Name: Marseille ACC re-organisation

Description: To reorganise Marseille ACC sectors 'E' and 'K'.

Objective:

To further improve the airspace structure within Marseille ACC and to improve both safety and capacity in the area around Corsica.

Proposed summer 2017

Project Category:

Airspace Structure ATC Sectors

FRA

Originator(s):

FRA

Some improvement is expected before summer 2014 based on different working methods in Marseille ACC.

Proposal ID : 79.033 Impl. Status: State(s) & Org. Comments:

521.

Project Name: LOTEE / KORUL area

Description: To re-organise the ATS routes in LOTEE / KORUL area.

Objective:

To further improve AT Sroute network between France and Spain.

Proposed summer 2017

Project Category:

ATS Routes

FRA ESP

Originator(s):

FRA ESP

Proposals from Brest ACC have been rejected by Madrid ACC.

Brest ACC expects now proposals from ENAIRE.

NM support required.

Page 222: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

211 29 May 2015 Edition: 1.0

Proposal ID : 81.022a / 19.061a Impl. Status: State(s) & Org. Comments:

522.

Project Name: Free Route Airspace Turkey - Phase 1

Description: To implement Night FRA Operations above FL285 in Turkey.

Objective:

To implement FRA operations in Ankara and Istanbul FIRs

Proposed summer 2017

Project Group:

RFG SE SG BLACK

Project Category:

Free Route Airspace

TUR

Originator(s):

TUR EUROCONTROL

Turkey: within the sovereign airspace only. Night period 23.00 - 05.00 (22.00 - 04.00).

Related proposals:

81.022b / 19.061b

Proposal ID : 75.080 Impl. Status: State(s) & Org. Comments:

523.

Project Name: Interface Aix Marseille re-organisation

Description:

a. To extend the Provence SIV and junction with Lyon SIV and Montpellier SIV.

b. To define a new airspace organisation for Marseille approach.

Objective:

To further improve the airspace structure within France FIR and the service for the users.

Proposed autumn 2017

Project Category:

Airspace Structure

FRA

Originator(s):

FRA

Related proposals:

69.089a

69.089c

69.089e

69.089f

75.073a

75.082

Proposal ID : 84.018 Impl. Status: State(s) & Org. Comments:

524.

Description:

To change DFL between upper and lower airspace within Bordeaux ACC.

Objective:

To further improve airspace organization within France.

Proposed autumn 2017

Project Category:

ATC Sectors

FRA

Originator(s):

FRA

Airspace project part of the NOP.

Proposal ID : 82.031 / 20.033 Impl. Status: State(s) & Org. Comments:

525.

Project Name: DANUBE FAB FRA - Phase 3

Description: To extend time availability to H24 on Seasonal bases above a certain FL of NIGHT Free Route Airspace within the DANUBE FAB area.

Objective:

To further improve the Free Route Airspace operations within and between Bucuresti FIR and Sofia FIR.

Proposed winter 2017/18

Project Group:

FAB DANUBE RFG SE SG BLACK

Project Category:

Free Route Airspace

BGR ROU

Originator(s):

FAB DANUBE

Related proposals:

69.052 / 16.008

82.030 / 20.032

82.032 / 20.034

82.033 / 20.035

Page 223: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

212 29 May 2015 Edition: 1.0

Proposal ID : 70.059h Impl. Status: State(s) & Org. Comments:

526.

Project Name: FAB EC FRA Step 3

Description:

To implement in successive phases, according to traffic density and time period full Free Route within FAB EC AoR.

c. At night. d. WE / H24 in selected areas from 2018.

Objective:

To implement full FRA Concept and further improve flight efficiency within FAB EC AoR.

Proposed winter 2017/18

Project Group:

FAB EC

Project Category:

Free Route Airspace

DEU FRA CHE NLD BEL MUAC

Originator(s):

FAB EC

e. First phase will concern MUAC and Karlsruhe UAC AoR.

f. Second Phase extension to whole FABEC AoR.

g. MUAC ready, other States to confirm timing.

Related proposals:

70.059a

70.059b

70.059c

70.059f

71.083c

75.081

77.053

79.041

Proposal ID : 62.040c Impl. Status: State(s) & Org. Comments:

527.

Project Name: REGEN sector

Description:

To implement an additional REGEN sector above RDG/EGG sector until FL315 within München ACC or as an alternative option a lateral change of EGG-sector.

Objective:

To further improve the airspace structure while balancing traffic/workload and consequently increasing capacity within München ACC to meet traffic demand.

Proposed winter 2017/18

Project Category:

ATC Sectors

DEU

Originator(s):

DEU

Dependent on 3rd RWY EDDM (2017) and future evolution of traffic.

Related proposals:

62.040a

62.040e

Proposal ID : 84.017b Impl. Status: State(s) & Org. Comments:

528.

Project Name: URMN/UL10 - Phase 2

Description: To revise the sectorisation of the current Reims ACC sectors by: h. The creation of a new block 2D by the partition of the current sector

KD i. The modification of the cut-FL in the block F to ensure a better

compatibility with Paris departures to the East j. Possible change of the ATS route network, if required.

Objective:

To further improve the airspace organization within France and the service for the users while maintaining the security level in the new sctors. To allow UL10 development, taking into account FABEC project (IP/SE phase 2 - 51.004)

Proposed winter 2017/18

Project Category:

ATC Sectors

FRA

Originator(s):

FRA

Interface Reims/Paris - IRP implemented in December 2012 (50.023).

Related proposals:

50.023

51.004

84.017a

Page 224: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

213 29 May 2015 Edition: 1.0

Proposal ID : 65.051b Impl. Status: State(s) & Org. Comments:

529.

Project Name: New runway Dublin Airport (EIDW)

Description: a. To build a new north parallel runway for Dublin Airport (EIDW).

b. To develop SIDs and STARs for the new north parallel runway at Dublin airport.

Objective:

To further improve the airspace structure within Shannon UIR, to increase capacity and further enhance the efficiency of ATM operations at Dublin airport.

Proposed winter 2017/18

Project Category:

Airspace Structure

IRL

Originator(s):

IRL

Depending on traffic evolution, subject to growth to 23.5 M pax/y.

Related proposals:

65.051a

Proposal ID : 76.053 Impl. Status: State(s) & Org. Comments:

530.

Project Name: Free Route Airspace Warsaw FIR, Phase 4

Description: To implement full Free Route Airspace in Warsaw FIR.

Objective:

To further improve the airspace organisation and flight efficiency within Warsaw FIR (Polish Airspace Project 2010+, Phase 5).

Proposed winter 2017/18

Project Category:

Free Route Airspace

POL

Originator(s):

POL

Part of Polish Airspace Project 2010+ (Phase

5).

Related proposals:

62.091b

62.091c

76.052

Proposal ID : 81.023 Impl. Status: State(s) & Org. Comments:

531.

Project Name: FAB EC SE - Phase 3 (Full cross-border EUC22)

Description: Establishment of the full EUC22 to operate a true cross border area for

French, German and US air force. 1. Merge CBA22-1 and CBA22-2 to create one large airspace volume; 2. Modify lower limits of the areas and extend into lower airspace.

Objective:

To further improve utilisation of CBA22 for all military users.

Proposed spring 2018

Project Group:

FAB EC

Project Category:

Civil/Military Airspace

BEL MUAC CHE FRA DEU

Originator(s):

FAB EC

Related proposals:

50.010b

51.004

80.079

Proposal ID : 73.053 Impl. Status: State(s) & Org. Comments:

532.

Project Name: Barcelona TMA, Phase 1

Description: To introduce new SIDs and STARs for LEBL airport, prior to the

implementation of new P-RNAV structure of Barcelona TMA.

Objective:

To further improve airspace organisation within Barcelona FIR.

Proposed spring 2018

Project Group:

RFG SW

Project Category:

Airspace Structure TMA

ESP

Originator(s):

ESP

Project currently on hold, further update pending.

Related proposals:

66.085

Page 225: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

214 29 May 2015 Edition: 1.0

Proposal ID : 69.095a Impl. Status: State(s) & Org. Comments:

533.

Project Name: Northern Terminal Control Area - NTCA

Description: To re-design the Northern Terminal Control Area/ NTCA of Prestwick ACC (formerly Manchester TMA project).

Objective:

To further improve the airspace structure within London FIR through redesign in order to enhance safety, capacity and provide environmental improvements with expected traffic growth from airfields in Northern England.

Proposed spring 2018

Project Category:

PBN TMA

GBR

Originator(s):

GBR

To establish PRNAV procedures, revised SIDs that accommodate CCDs, revised STARs allowing CDAs from higher

altitudes, improved arrival and departure management and holding concepts to include Point Merge, if and where considerate appropriate.

To consider specific requests for route improvements from the operators such as TNT - LAMIX and LIBSO - PEDIG.

Delayed, need to be reviewed.

Proposal ID : 76.051 Impl. Status: State(s) & Org. Comments:

534.

Project Name: Free Route Airspace Madrid / Brest

Description: To implement Free Route Airspace based on DCTs in Madrid FIR and

Brest FIR as a continuation of Free Route Airspace in Lisboa FIR.

Objective:

To further improve the airspace organisation between Lisboa FIR, Madrid FIR and Brest FIR.

Proposed spring 2018

Project Group:

FAB EC FAB SW

Project Category:

50 MPCPEs Free Route Airspace

PRT ESP FRA

Originator(s):

PRT ESP FRA

Postponed from winter 2014/15 to winter 2017/18 after FRES/2 meeting.

FRAL - Free Route Airspace Lisboa FIR above FL245 implemented 7 May 2009.

Free Route Airspace SAN & ASI sectors/FRASAI, Phase 2 implemented 1 May 2014.

Related proposals:

73.051

Proposal ID : 83.030b / 21.003b Impl. Status: State(s) & Org. Comments:

535.

Description: To implement H24 Free Route Airspace in Yerevan ACC.

Objective:

To further improve airspace organisation within Yerevan FIR.

Proposed summer 2018

Project Group:

SG BLACK

Project Category:

Free Route Airspace

ARM

Originator(s):

ARM

Related proposals:

83.030a / 21.003a

Proposal ID : 64.027 Impl. Status: State(s) & Org. Comments:

536.

Project Name: Common Terminal Airspace System

Description:

1. To implement a common Terminal Airspace System and implement P-RNAV procedures for Sofia (LBSF), Plovdiv (LBPD) and Graf Ignatievo (LBGI) airports.

2. Adjust ACC sectors according to future common TMA, if necessary.

Objective: To further improve the airspace structure within Sofia FIR

and to cope with the expected traffic increase.

Proposed summer 2018

Project Group:

RFG SE

Project Category:

Airspace Structure PBN

BGR

Originator(s):

BGR

Implementation will be at least one year after introduction of P-RNAV procedures for Burgas (LBBG) and Varna (LBWN) airports..

Page 226: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

215 29 May 2015 Edition: 1.0

Proposal ID : 66.085 Impl. Status: State(s) & Org. Comments:

537.

Project Name: Barcelona TMA, Phase 2

Description: To introduce new P-RNAV structure for Barcelona (LEBL) TMA, Phase

2.

Objective:

To further improve airspace organisation within Barcelona FIR.

Proposed summer 2018

Project Group:

RFG SW

Project Category:

PBN TMA

ESP

Originator(s):

ESP

Project currently on hold, further update pending .

Related proposals:

73.053

Proposal ID : 71.047 Impl. Status: State(s) & Org. Comments:

538.

Project Name: Free Route Airspace Casablanca, Phase 1

Description:

To implement Night FRA based on DCTs in Western part of Casablanca FIR (Oceanic and West Sectors).

Objective:

To further improve the flight planning options within Casablanca FIR.

Proposed summer 2018

Project Category:

DCTs Free Route Airspace

MAR

Originator(s):

MAR

Night period to be further defined.

Related proposals:

71.054

Proposal ID : 71.054 Impl. Status: State(s) & Org. Comments:

539.

Project Name: Free Route Airspace Casablanca, Phase 2 & Phase 3

Description:

1. To introduce Casablanca ACC dynamic sector management. 2. To implement Free Route during Night/Week-end within South and

East Sectors (Phase 2). 3. To implement Free Route within South Sector FL250+ (Full concept

Phase 3). 4. To implement Free Route for East/West traffic (Oceanic and West

Sectors).

Objective:

To further improve airspace organisation within Casablanca FIR.

Proposed summer 2018

Project Category:

Free Route Airspace

MAR

Originator(s):

MAR

Related proposals:

71.047

Proposal ID : 76.068 Impl. Status: State(s) & Org. Comments:

540.

Project Name: Istanbul International Airport - Phase 1

Description: a. To implement a new Istanbul international airport - northwest of

the city - having initially 3 (three) runways with the plan to an extend up to six runways.

b. To re-organise the airspace of Istanbul FIR and Sofia FIR accordingly, if required.

Objective:

To further improve the airspace structure and to accomodate the traffic growth planned by Turkish airlines for the coming years.

Proposed summer 2018

Project Group:

RFG SE

Project Category:

Airspace Structure TMA

TUR BGR

Originator(s):

TUR

LTBA and LTFJ airports will continue to be operational. LTBA might be devoted to other types of traffic.

That will also result in a major TMA re-design with significant network impacts.

Related proposals:

60.010g

Page 227: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

216 29 May 2015 Edition: 1.0

Proposal ID : 81.022b / 19.061b Impl. Status: State(s) & Org. Comments:

541.

Project Name: Free Route Airspace Turkey - Phase 2

Description: To implement H24 FRA Operations above FL285 in Turkey.

Objective:

To implement FRA operations in Ankara and Istanbul FIRs.

Proposed summer 2018

Project Group:

RFG SE SG BLACK

Project Category:

Free Route Airspace

TUR

Originator(s):

TUR EUROCONTROL

Turkey: within the sovereign airspace only.

Related proposals:

81.022a / 19.061a

Proposal ID : 81.018a / 19.021a Impl. Status: State(s) & Org. Comments:

542.

Project Name: Free Route Airspace Ukraine, Step 2 (Sc 2a)

Description: To implement H24 - Free Route Airspace operations above FL275 -

Ukraine wide.

Objective:

To implement FRA Concept and further improve flight efficiency within Kyiv UIR.

Planned 08 NOV 2018

Project Group:

RFG SE SG BLACK

Project Category:

Free Route Airspace

UKR

Originator(s):

UKR

Free Route Airspace Ukraine - FRAU project

Related proposals:

71.040a / 16.026a

71.040b / 16.026b

81.018b / 19.021b

Proposal ID : 60.006b Impl. Status: State(s) & Org. Comments:

543.

Project Name: BH ATM, Phase 2

Description: To re-organise the airspace structure within Sarajevo FIR above FL325.

Objective:

To further improve the ATS route network and associated airspace structure in order to support the establishment of the new ACC within Sarajevo FIR (BH ATM Project, Phase 2).

Planned 06 DEC 2018

Project Group:

RFG SE

Project Category:

50 MPCPEs Airspace Structure

BIH HRV MNE SRB

Originator(s):

BIH

Phase 1: FL325 and below successfully implemented 13 NOV 2014. o Re-sectorisation required within Croatia

and Serbia. Close coordination with the Network

Manager and neighbouring ACCs. Phased implementation of Night DCTs and

H24 DCTs FL245+ planned. Postponed due to lack of ATCOs.

Related proposals:

60.006a

Proposal ID : 85.027 / 22.029 Impl. Status: State(s) & Org. Comments:

544.

Project Name: Free Route Airspace Moldova - Phase 3

Description: To implement H24 Free Route Airspace above certain FL within Chisinau FIR (NFRAC).

Objective:

To further improve the airspace organisation within Chisinau FIR.

Proposed autumn 2018

Project Group:

RFG SE SG BLACK

Project Category:

Free Route Airspace

MDA

Originator(s):

MDA

Related proposals:

72.052 / 14.015

83.061 / 21.016

Page 228: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

217 29 May 2015 Edition: 1.0

Proposal ID : 62.091e Impl. Status: State(s) & Org. Comments:

545.

Project Name: Polish Airspace Project 2010+, Phase 3b

Description:

To implement a new airspace structure and sectorisation within Warszawa ACC considering vertical splits (division into three layers),

including TMA connectivity and interface areas with neighbouring States.

Objective:

To further improve the airspace structure within Warszawa ACC and increase capacity while applying vertical splits.

Proposed autumn 2018

Project Category:

Airspace Structure ATC Sectors

POL

Originator(s):

POL

Depending on technical issues (frequencies) and increasing the amount of ATC staff.

New elementary sectors with vertical splits. Finally the division into three layers.

Related proposals:

62.091c

Proposal ID : 70.063 Impl. Status: State(s) & Org. Comments:

546.

Project Name: Sachsen/ SAS Upper sector

Description: To implement a Sachsen/ SAS Upper sector.

Objective:

To further improve the airspace structure while balancing traffic/workload and consequently increasing capacity within Bremen FIR to meet traffic demand.

Proposed 2018

Project Category:

ATC Sectors

DEU

Originator(s):

DEU

Depending on traffic evolution/ demand.

Related proposals:

64.031

Proposal ID : 79.038a Impl. Status: State(s) & Org. Comments:

547.

Project Name: London Airspace Management Program, LAMP Phase 2a

Description:

a. A new Heathrow APC function comprising the relocation of its 4 holding stacks and new SIDs to facilitate continuous climb of Heathrow departures above 6000ft.

b. New departure routes for Farnborough and Solent airways departures and all other changes (AC and TC) required to accommodate a new Heathrow function.

Objective:

To increase systemisation of the airspace structure in order to provide safety and efficiency enhancements and additional capacity in London TMA through a fundamental review of ATS route and sector structure (London Airspace Management Programme/ LAMP).

Proposed 2018

Project Category:

Airspace Structure TMA

GBR

Originator(s):

GBR

LAMP Phase 2 is subject to successful implementation of a higher Transition Altitude - (not expected before winter 2017).

Related proposals:

79.038b

Page 229: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

218 29 May 2015 Edition: 1.0

Proposal ID : 82.032 / 20.034 Impl. Status: State(s) & Org. Comments:

548.

Project Name: DANUBE FAB FRA - Phase 4

Description: To extend H24 availability on Seasonal bases to all FLs of NIGHT Free Route Airspace within the DANUBE FAB area.

Objective:

To further improve the Free Route Airspace operations within and between Bucuresti FIR and Sofia FIR.

Proposed winter 2018/19

Project Group:

FAB DANUBE RFG SE SG BLACK

Project Category:

Free Route Airspace

BGR ROU

Originator(s):

FAB DANUBE

Related proposals:

69.052 / 16.008

82.030 / 20.032

82.031 / 20.033

82.033 / 20.035

Proposal ID : 62.040e Impl. Status: State(s) & Org. Comments:

549.

Project Name: 3rd RWY Munich airport

Description:

To implement a 3rd RWY at Munich airport and - if affected - restructure Munich Terminal sectors accordingly.

Objective:

To further improve the airspace structure and increase capacity of Munich ACC to meet traffic demand.

Proposed winter 2018/19

Project Category:

Airspace Structure TMA

DEU

Originator(s):

DEU

Related proposals:

62.040c

Proposal ID : 82.033 / 20.035 Impl. Status: State(s) & Org. Comments:

550.

Project Name: DANUBE FAB FRA - Phase 5

Description: To extend to full H24 above certain FL of NIGHT Free Route Airspace within the DANUBE FAB area.

Objective:

To further improve the Free Route Airspace operations within and between Bucuresti FIR and Sofia FIR.

Proposed summer 2019

Project Group:

FAB DANUBE RFG SE SG BLACK

Project Category:

Free Route Airspace

BGR ROU

Originator(s):

FAB DANUBE

Related proposals:

69.052 / 16.008

82.030 / 20.032

82.031 / 20.033

82.032 / 20.034

Page 230: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

219 29 May 2015 Edition: 1.0

Proposal ID : 79.038b Impl. Status: State(s) & Org. Comments:

551.

Project Name: London Airspace Management Program, LAMP Phase 2b

Description:

1. A Point Merge arrival structure for Stansted APC incorporating new SIDs and relocation of holding stacks.

2. A new arrival structure for Luton APC incorporating new SIDs and a holding stack independent of Stansted APC.

3. New SID London City and all other changes required to complete the LAMP transition strategy.

Objective:

To increase systemisation of the airspace structure in order to provide safety and efficiency enhancements and additional capacity in London TMA through a fundamental review of ATS route and sector structure (London Airspace Management Programme/ LAMP).

Proposed 2019

Project Category:

Airspace Structure TMA

GBR

Originator(s):

GBR

LAMP Phase 2 is subject to successful implementation of a higher Transition Altitude - (not expected before winter 2017)

Related proposals:

79.038a

Proposal ID : 81.018b / 19.021b Impl. Status: State(s) & Org. Comments:

552.

Project Name: Free Route Airspace Ukraine, Step 2 (Sc 2b)

Description: To extend implementation of H24 - Free Route Airspace operations in entire Class C Airspace - Ukraine wide.

Objective:

To implement FRA Concept and further improve flight efficiency within L'viv CTA/UTA, Kyiv CTA/UTA, Odesa CTA/UTA, Simferopol CTA/UTA and Dnipropetrovs'k CTA/UTA.

Proposed 2019

Project Group:

RFG SE SG BLACK

Project Category:

Free Route Airspace

UKR

Originator(s):

UKR

Class C Airspace, in Ukraine, at present - (year 2014) is at FL105 and above.

Related proposals:

71.040a / 16.026a

71.040b / 16.026b

81.018a / 19.021a

Page 231: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

European Route Network Improvement Plan - Part 2 - ARN Version 2015 - 2019 - Catalogue of Projects

220 29 May 2015 Edition: 1.0

- END -

Page 232: European Route Network Improvement Plan - Eurocontrol · 1.3. EUROPEAN ROUTE NETWORK IMPROVEMENT PLAN - PRINCIPLES ... Chapter 3 Commences with the Airspace Action Plan and depicts

Contact details

EUROCONTROL

© May 2015 – European Organisation for the Safety of Air Navigation (EUROCONTROL)

This document is published by EUROCONTROL for information purposes. It may be copied in

whole or in part, provided that EUROCONTROL is mentioned as the source and it is not used

for commercial purposes (i.e. for financial gain). The information in this document may not be

modified without prior written permission from EUROCONTROL.

www.eurocontrol.int

DNM/COO/NOM/[email protected]