EXAMINING THE ROLE OF GOOD GOVERNANCE IN PUBLICPROCUREMENT AT MINISTRY OF HEALTH AND SOCIAL
WELFARE
EXAMINING THE ROLE OF GOOD GOVERNANCE IN PUBLICPROCUREMENT AT MINISTRY OF HEALTH AND SOCIAL
WELFARE
By
Sarah Patrick Swai
A Dissertation Submitted in Partial Fulfillment of the Requirements for thedegree of Master of Science in Procurement & Supply Chain Management ofMzumbe University
2013
i
CERTIFICATION
We the undersigned, certify that, we have read and hereby recommend for
acceptance by the Mzumbe University, a dissertation entitled Examining the Role of
Good Governance in Public Procurement at Ministry of Health and Social
Welfare, in partial fulfillment of the requirement for the award of Masters of Science
degree in Procurement & Supply Chain Management of Mzumbe University.
Signature____________________Major Supervisor
Signature__________________________Internal Examiner
Accepted for the Board of…………………………………
______________________________________________________
DEAN/DIRECTOR, FACULTY/DIRECTORATE/SCHOOL/BOARD
ii
DECLARATIONA ND COPYRIGHT
I, Sarah Patrick Swai, declare that this dissertation is my own original work and that
it has not been presented and will not be presented to any other University for the
similar or any other award.
Signature.............................................................
Date…………………………………………
©
This dissertation is a copyright material protected under the Berne Convention, the
Copyright Act 1999 and other international and national enactments, in that behalf,
on intellectual property. It may not be reproduced by any means in full or in part,
except for short extracts in fair dealings, for research or private study, critical
scholarly review or discourse with an acknowledgement, without the written
permission of Mzumbe University, on behalf of the author.
iii
ACKNOWLEDGEMENT
I wish first of all to thanks the Almighty God for giving me good health and strength
that enabled me to work with comfort throughout the period of field work.
I am grateful for the support I got from my supervisor Mrs Makawa Newa Laurent of
Mzumbe University. She has been very helpful and has supported me from the
beginning till the accomplishment of the final report. I must acknowledge that apart
from the scheduled time she even used her personal time to assist me all the way.
Sharing her valuable knowledge and expertise with me has been the bridge to the
completion of this report.
Many thanks to the Management of Ministry of Health and Social Welfare who
allowed me to carry out this study at their premises. I would also like to thank my
friends for their support and encouragement during my studies till the completion of
this dissertation.
My thanks also go to my lovely son Galton and my dear brothers and sisters
(Goodluck, Baraka, Valentine, Anna, Eugenia and Janeth)for their Moral support and
comfort during my study.
iv
DEDICATION
I dedicate this report to my beloved parents, the late Baba Patrick Swai and the late
Mama Valentina Swai who taught me how to saw seeds of education.
Lastly to my darling husband Albin Kimosso who encouraged me to complete my
study.
v
ABSTRACT
This study aimed at examining the Role of Good Governance in Public Procurement
in the Ministry of Health and Social Welfare and 45 respondents included in the
study. The research design used was case study design on which a single unit was
selected for study and data collection was done through primary and secondary data
through the use of data collection methods such as interviews, questionnaires and
documentary review. Analysis of the collected data was conducted through the use of
Statistical Package of Social Science (SPSS) and Microsoft Excel.
It was revealed that good governance plays a positive role on purchasing in supply
chain management. Ministry of Health and Social Welfare should embrace the
elements of good governance. The study insisted on application of E-procurement,
the direct network links between computers and trading partners. It was revealed that
transparency maintained through advertisement, evaluation of tender as well as
auditing.
The study recommends that Promoting transparency and accountability, capable and
competent public administration, and the rule of law must be at the forefront of
development policies. Policy planning and decision-making are the key concern to
public administration which is part and parcel of procurement. Good public
management and administration, with emphasis on accountability and responsiveness
to customer needs is crucial. Building the capacity of service providers it is important
that Ministry of Health and Social Welfare, the government and other stakeholders to
organizes training sections for contractors, surveyors, architects, consultants and
suppliers.
vi
TABLE OF CONTENTS
CERTIFICATION .................................................................................................................... i
DECLARATIONA ND COPYRIGHT.................................................................................... ii
ACKNOWLEDGEMENT...................................................................................................... iii
DEDICATION........................................................................................................................ iv
ABSTRACT .............................................................................................................................v
TABLE OF CONTENTS........................................................................................................ vi
LIST OF TABLES....................................................................................................................ix
LIST OF FIGURES ...................................................................................................................x
LIST OF ABBREVIATIONS AND ACRONYMS .................................................................xi
CHAPTER ONE: PROBLEM SETTING.............................................................................1
1.0 Introduction ...............................................................................................................1
1.1 Background Information ...........................................................................................1
1.2 Statement of the Problem ..........................................................................................2
1.3 Objectives of the Study .............................................................................................2
1.3.1 Main Objective .........................................................................................................2
1.3.2 Specific Objectives....................................................................................................2
1.4 Research Questions ...................................................................................................3
1.5 Significance of the Study...........................................................................................3
1.6 Scope and delimitation of the study ..........................................................................4
1.7 Limitations of the study.............................................................................................4
CHAPTER TWO: LITERATURE REVIEW.......................................................................5
2.0 Introduction ...............................................................................................................5
2.1 Theoretical Literature Review...................................................................................5
2.1.1 Agency Theory ..........................................................................................................5
2.1.2 Stakeholder Theory ...................................................................................................5
2.1.3 Stewardship Theory...................................................................................................6
2.1.3 Resource Dependency Theory...................................................................................6
2.2.1 Various Stages of the Procurement Process ..............................................................6
2.2.1.1 Supplier Evaluation and Selection.............................................................................6
2.2.1.2 The final selection ...................................................................................................10
2.2.2 Good governance in Public Procurement ................................................................10
2.2.2.1 Consequences of poor governance in public procurement ......................................11
vii
2.2.3 Measures Taken to Ensure Good Governance in Public Procurement....................12
2.2.3.1 Accountability and Transparency............................................................................12
2.2.3.2 Procurement Audits ................................................................................................13
2.2.4 The role of procurement audit in fighting corruption..............................................16
2.3 Challenges Facing Public Procurement...................................................................17
2.4 Empirical Literature ‘Review ..................................................................................22
2.5 Conceptual Framework ...........................................................................................24
CHAPTER THREE: RESEARCH METHODOLOGY ....................................................26
3.0 Introduction .............................................................................................................26
3.1 Research Design ......................................................................................................26
3.2 Area of the Study.....................................................................................................26
3.3 Study Population .....................................................................................................26
3.4 Sample and Sampling techniques ............................................................................26
3.5 Types and sources of Data.......................................................................................27
3.5.1 Data Collection Methods.........................................................................................27
3.5.2 Questionnaire...........................................................................................................27
3.5.3 Documentary Sources..............................................................................................28
3.6 Data Reliability and Validity...................................................................................28
3.7 Data Presentation and Analysis ...............................................................................28
CHAPTER FOUR: DATA ANALYSIS, DISCUSSIONS OF THE FINDINGS..............30
4.0 Introduction .............................................................................................................30
4.1 Respondent’s Characteristics...................................................................................30
4.1.1 Gender of the respondents .......................................................................................30
4.1.2 Age of respondents ..................................................................................................31
4.1.3 Duration of work of respondents .............................................................................32
4.2 Major Findings of the study ....................................................................................32
4.2.1 Awareness on good governance in public procurement ..........................................32
4.2.2 Knowing about good governance in public procurement........................................33
4.2.3 Aspects of good governance enhance public procurement......................................34
4. 2.4 Measures used to ensure transparency, accountability and participation in
public procurement..................................................................................................35
4.3 The extent to which transparency can enhance public procurement of the Ministry36
4.2.1 Competitiveness and Fairness .................................................................................38
viii
4.3 Effectiveness good governance in enhancing public procurement..........................39
4.4 The extent to which transparency enhances public procurement ............................41
4.5 Influence of Good Governance on Public Procurement Accountability .................41
4.6 Compliance with Public Procurement Act ..............................................................42
4.7 Completion of Contracts on Schedule and within Cost...........................................43
4.8 Challenges faced by MHSW in procurement ..........................................................45
4.8.1 E-procurement well developed at Ministry of Health and Social Welfare..............45
4.9 Measures to be taken by the ministry to overcome the challenges..........................46
4.9.1 Monitoring of day-to-day contract performance and compliance ...........................46
4.9.2 Procurement Planning and Negotiation...................................................................47
4.9.3 Education and sensitization on procurement and supply chain management..........49
4.9.4 Improvement of e-procurement ...............................................................................50
CHAPTER FIVE: SUMMARY, CONCLUSION AND RECOMMENDATION............52
5.0 Introduction .............................................................................................................52
5.2 Summary of the Findings ........................................................................................52
5.3 Conclusion...............................................................................................................54
5.4 Recommendations ...................................................................................................55
5.5 Policy Implications..................................................................................................58
5.6 Limitation of the study ............................................................................................60
5.7 Areas for Further Research......................................................................................61
REFERENCES: .....................................................................................................................62
APPENDIXES........................................................................................................................65
ix
LIST OF TABLES
Table 4.1:Gender of Respondents....................................................................................31
Table 4.2: Age of respondents .........................................................................................31
Table 4.3: Duration of work of respondents ....................................................................32
Table 4.4: Measures used to ensure transparency, accountability and participation .......36
Table 4.5: Respondents view on tenders being advertised in the local media.................41
Table 4.6: Influence of Good Governance on Public Procurement Accountability ........42
Table 4.7: E-procurement well developed at Ministry of Health and Social Welfare.....46
Table 4.8: Improvement of e-procurement ......................................................................51
x
LIST OF FIGURES
Figure 4.1: Awareness on good governance in public procurement .............................33
Figure 4.2: Respondents knowing about good governance in public procurement.......34
Figure 4.3: Aspects of good governance enhance public procurement .........................35
Figure4.4: the extent to which transparency can enhance public procurement of the
Ministry.......................................................................................................37
Figure 4.5: Respondents views on competitiveness and Fairness .................................38
Figure 4.6: Effective is the role of good governance in enhancing public
procurement ................................................................................................40
Figure 4.7: Respondent’s views on Compliance with Public Procurement Act............43
Figure 4.8: Respondents perception completion of Contracts on Schedule and
within Cost ..................................................................................................44
Figure 4.9: Monitoring of day-to-day contract performance and compliance ..............47
Table 4.10: Respondents view on whether procurement planning and negotiation.......48
Figure 4.11: Education and sensitization on procurement and supply chain
management ................................................................................................50
xi
LIST OF ABBREVIATIONS AND ACRONYMS
AFDB The African Development Bank
AVL Approved Vendor List
LOR List of Requirement
OECD The Organization for Economic Co-operation and Development
PPOA Public Procurement Oversight Authority
PPRA Public Procurement Regulatory Authority
RFI Request for Information
RFQ Request for Quotation
1
CHAPTER ONE
PROBLEM SETTING
1.0 Introduction
This chapter presents the introductory part of the study covering the background
information, statement of the problem, research questions, research objectives,
significance and scope and delimitation and limitations of the study.
1.1 Background Information
Efficient Public Procurement systems are essential to the achievement of
development goals. Public procurement mechanisms are key elements to the overall
efficiency of public sector management because they can contribute to a better
allocation of resources towards development objectives and improved governance in
the public sector. Weak and corrupted procurement systems often lead to a waste of
public financial resources and higher transaction costs and, therefore, undermine
development efforts; The African Development Bank (ADB, 2009).
During the last decade public procurement has gained attention amongst developing
countries than ever before. With procurement accounting for about 20% of all
government expenditure worldwide. Mlinga (2009) pointed out that, many
governments have embarked on reforms in their procurement systems particularly
streamlining and harmonizing the regulatory (legal) and institutional (structural)
framework. In some countries the reforms have gone further to address the
effectiveness and competence of the contracting authorities i.e. “Procurement
Operations and Market Practices” and “Integrity of Public Procurement Systems”
though some analysts are associating the success of the latter with issues like the
overall level of corruption in a country and effectiveness of the organs responsible
for addressing corruption.
In Tanzania, as part of reforms in public procurement to make it transparent,
accountable and capable of delivering better value for money, the Public
Procurement Regulatory Authority (PPRA) was set up under the Public Procurement
Act (2004). Among the various responsibilities of the PPRA is to ensure that
procurement in public institutions is done under good governance principles.
2
Public procurement is the government activity most vulnerable to Corruption.
However; transparency and accountability have been recognized as key conditions
for promoting integrity and efficiency in public procurement. Also, there is need to
balance all good governance imperatives so as to ensure overall value for money and
reduce risks to integrity in public procurement while pursuing other aims of public
procurement efficiently (The Organization for Economic Co-Operation and
Development (OECD), 2004). Therefore this study is aimed at examine the role of
good governance in public procurement in Tanzania specifically at the Ministry of
health and social welfare.
1.2 Statement of the Problem
Today, in many countries, public procurement has become an issue of public
attention and debate, and has been subjected to reforms, restructuring, rules and
regulations (Tukamuhabwa, 2012). However, there is a growing feeling, supported
by empirical cases, that many of the reforms have embraced the regulatory aspects of
public procurement giving little attention if at all, to the contribution of good
governance structure to effective public procurement.
Therefore, since the public procurement is a strategic activity which requires
managerial skills and competence so that it contributes fully towards delivery of
strategic objectives. In this case, the researcher aim at filling this gap in knowledge
by discussing the contribution of good governance structures to effective
procurement practices in public institutions.
1.3 Objectives of the Study
1.3.1 Main Objective
The main objective of this study is to examine the role of good governance in public
procurement in Tanzania specifically to the Ministry of health and social welfare.
1.3.2 Specific ObjectivesThe study is guided by the following specific objectives
(i) To assess the extent to which transparency can enhance public procurement of
the Ministry.
3
(ii) To assess the extent to which accountability can enhance public procurement of
the Ministry.
(iii) To assess the extent to which participation can enhance public procurement of
the Ministry.
1.4 Research Questions
The study was guided by the following research questions
1.4.1 Main Research Question
What is the role of good governance in public procurement specifically to the
Ministry of Health and Social Welfare?
1.4.2 Specific Research Questions
(i) To what extent can transparency enhance public procurement of the Ministry?
(ii) To what extent can accountability enhance public procurement of the Ministry?
(iii)To what extent can participation enhance public procurement of the Ministry?
1.5 Significance of the Study
It is expected that findings from this study will help the management and member of
staff of public procurement entities, PPRA and other stakeholders in public
procurement to become aware of the extent of good governance practices in public
institutions, the impact of good governance of public procurement practices and the
factors which hinder good governance practices in public institutions.
Also, the findings of the study will serve as a stepping stone for future researchers on
the same or similar topics by providing them with a source of empirical literature
review. Also, successful completion of the study will enable the researcher to
partially fulfill the requirements for the award of a Master’s of Science degree in
Procurement supply chain Management offered by Mzumbe University.
4
1.6 Scope and delimitation of the study
To address the delimitations, the first strategy was to conduct a case study based in
Dar es salaam in order to save time and financial related problems, also in order to
establish trust and transparency, potential participants were informed on information
sheets and during initial meetings participants were informed that the research was
independent, and it had nothing to do with their jobs and examples of how
confidentiality and anonymity would be assured were given. To further reassure
participants, the interview questions were circulated to participants before consent
was given and the details of a university member who could be contacted if a
participant wanted to complain about the research process were distributed. In
addition, to give participants some control over the interview process, the choice of
when and where the interview would take place was left to each individual. In terms
of scheduling interviews, several participants preferred to be interviewed at the end
of their first working session, meaning 1300 pm.
1.7 Limitations of the study
The main limitations of this study are generally; the scarcity of resources specifically
financial resources and inadequacy of allocated time for the research work. Time
based limitation as most of expected respondents are busy with their daily activities
this had drawn backs the effectiveness of data collection process.
To overcome the above two limitations the study was centered to only the Ministry
of Health and Social Welfare.
5
CHAPTER TWO
LITERATURE REVIEW
2.0 Introduction
This chapter presents the theoretical literature and empirical literature reviewed by
the researcher during the study. It also contains conceptual framework of the study.
2.1 Theoretical Literature Review
The study was guided by the following theories;
2.1.1 Agency Theory
The principal-agent theory is the starting point for debate on the issue of governance.
Jensen and Meckling (2006) describe principal-agency relationship as a contract
under which one or more persons (principal) engage another person (agent) to
perform some service on their behalf, which involves delegating some decision-
making authority to the agent. The application of the agency theory in public
procurement is that public procurement entities (agents) engaged by the government
(the principal) are responsible for ensuring that they conduct the procurement
function according to guidelines set by the government and by adhering to the
principles and guidelines of procurement as stipulated in the Public Procurement Act
of 2004.
2.1.2 Stakeholder Theory
The stakeholder theory stipulates that a multipurpose corporate entity invariably
seeks to provide a balance between the interests of its diverse stakeholders in order to
ensure that each interest constituency receives some degree of satisfaction (Abrams,
2001). The stakeholder theory stipulates that managers of the firm operate in a
manner that safeguards all the stakeholders of the firm.
Stakeholder theory highlights the responsibility of the firm to its various stakeholders
and pushes the management of the firm to design and employ appropriate measures
to safeguard the interests of all stakeholders of the firm. That is, the management of
the firm must act is a way that guarantees the interests of all the stakeholders of the
firm in a fair manner (Donaldson and Davis, 2001). The application of the
6
stakeholder’s theory in public procurement is that the stakeholders of public entities
(including the management and procurement practitioners) must act in a way that
safeguards the interest of their organization and the interests of other stakeholders in
public procurement such as the government, suppliers, and members of the general
public.
2.1.3 Stewardship Theory
According to the stewardship theory, a manager’s objective is primarily to maximise
the firm’s performance. The stewardship theory advocates for involvement of non-
executive directors in decision-making within the firm and separation of power
among various stakeholders of the firm (Donaldson and Davis, 2001). One key
distinguishing feature of the theory of stewardship is that it eliminates lack of trust
among stakeholders.
The application of the Stewardship Theory on public procurement is that it ensures
that the primary objective behind all decisions made by management of a public
institution with regard to public procurement is to maximize the performance of the
institution. That is, decisions made by the management of a public institution with
regard to the award of public tenders must aim to maximize the performance of the
firm.
2.1.3 Resource Dependency Theory
This theory advocates for separation of ownership and control and reduction of
external influences in decision-making within the firm. The application of this theory
in public procurement is that it ensures that there is separation of powers and
authority in award of public tenders and that the decision of awarding public tenders
is not influenced by external forces.
2.2 Procurement Concepts
2.2.1 Various Stages of the Procurement Process
2.2.1.1 Supplier Evaluation and Selection
Among the most significance parts of the procurement process is supplier evaluation
and selection. Monczka et al. (2005) state that the first step involves recognizing
7
there is a requirement to evaluate and select a supplier for an item or service. The
recognition that a need exists to evaluate suppliers can come about in many different
ways. Supplier selection begins with formulation of the criteria that will be used to
select suppliers.
The second step in the model is to identify key sourcing requirements. These
according to Telgen et al. (2005) are the Programme of Requirements. They add that
a distinction is made between functional and technical requirement specifications.
Functional requirement specifications describe what the good or service actually has
to do or provide. Technical requirement specifications describe which
product/service is looked for. They include management capability; employee
capabilities; cost structure; total quality performance, systems and philosophy;
process and technology capability; environmental regulation compliance; financial
stability; production scheduling and control systems; supplier’s sourcing strategies,
policies and techniques and Longer-term relationship potential (Monczka et al.
2005).
Nellore et al. (2009) add that a specification is a document that is used to build a
product. To strengthen communication and avoid confusion-related errors, redundant
statements need to be minimized. They cite Clark and Wheelwright (2003) who point
to four modes of communication that have great significance in the relation between
specifications and the suppliers.
8
Figure 2.1: Supplier selection and evaluation framework
Source: Mandal and Deshmukh, 2004
According to Mandal and Deshmukh (2004), before developing any framework it is
necessary to understand the significance of each criterion and the role which it plays
in the vendor selection process. It is also necessary to visualize the levels of
importance and relationships of criteria among themselves. The multi-criteria nature
of decision-making has been the focus of multiple papers since the 1960 (Aissaoui, et
al. 2007).
Mandal and Deshmukh (2004) opine that, attitude and willingness is one of the most
important criteria to be considered. It is very difficult to quantify or measure. It is an
effect of so many other variables such as financial position, geographical location,
production facilities, capacity utilization, labour relations, etc. A qualitative analysis
based on fuzzy set theory may be useful for measuring this attribute.
Sarkar and Mohapatra (2006) adopt a fuzzy theoretical approach towards the
problem of imprecision that usually occurs when eliciting expert opinion. They also
9
observe that many factors such as reputation and trustworthiness elude quantification
and thereby present measurement difficulties. Also, often quantification and
measurement of a factor for a supplier are practically impossible due to time or
monetary constraints.
The third step in supplier selection and evaluation entails determining the sourcing
strategy. No single sourcing strategy approach will satisfy the requirements of all
purchases (Telgen et al. 2005; Monczka et al. 2005). Because of this, the
procurement strategy adopted for a particular item or service will influence the
approach taken during the supplier evaluation and selection process.
Some of the decisions that a purchaser has to make when developing a sourcing
strategy include: single versus multiple sources; short-term versus long-term
contracts etc. It entails a clear understanding of the differentiations in purchasing.
The sector in which the buying organization operates; the supply market; the product
market; the product or service that is purchased and the buying situation (Telgen. et
al. 2005). The fourth step is to identify potential supply sources. The degree to which
a buyer must search for information or the effort put forth toward the search is a
function of several variables, including how well the existing suppliers can satisfy
cost, quality, or other performance variables. Sources of information that is helpful
when seeking to identify potential supply sources (Telgen et al, 2005).
The fifth step is pre-qualification. The concern of this phase is to limit suppliers in
selection pool. By means of a Request for Information (RFI), a purchaser obtains
some basic information from a selection of suppliers about their organization and/or
their product range (Telgen et al. 2005). Due to limited resources and variability in
the performance of suppliers, purchasers perform a first cut of potential supply
sources. Next, a Request for Quotation (RFQ) accompanied by a List of
Requirements (LOR) is used to ask suppliers to submit an offer. In practice, a
quotation is sometimes also referred to as bid or tender (Telgen et al. 2005). De Boer
et al. (2001) have summarized this phase as sorting rather than ranking and define
pre-qualification as the process of reducing the set of all suppliers to a smaller set of
acceptable suppliers.
10
Sarkar and Mohapatra (2006) however suggest that pre- selection/qualification of
suppliers has a number of elements in common with supply base reduction. A pre-
requisite for developing a strong buyer supplier relationship they argue is to have a
small number of suppliers. In most procurement entities, the number of registered
suppliers is large, but only a small fraction of suppliers get the business year after
year. Sarkar and Mohapatra (2006) proceed to observe that much of the information
on unknown suppliers collected through internet, peer feedback and onsite visit will
lack quantitative measurement. Even information on known suppliers may not have
been stored in a form that lends itself to quantitative conversion. To evaluate these
suppliers against the factors, the buying team has to resort to subjective, qualitative
assessment.
2.2.1.2 The final selection
This phase constitutes the sixth and seventh step in the Monczka et al. (2005)
process. According to Monczka et al. (2005), this is supplier evaluation and selection
using a list of so called approved suppliers from the approved vendor list (AVL).
Hence, supplier selection comprises more than one decision. Within purchasing
management, one of the prime functions is supplier selection.
Supplier selection is one of the most important decision making problems since
selecting the right suppliers significantly reduces the purchasing costs and improves
corporate competitiveness. Vokurka et al. (2006) states that, it is probable that of all
responsibilities which may be said to belong to the purchasing officers, there is none
more important than the selection of a proper source.
2.2.2 Good governance in Public Procurement
Lack of adherence to good governance in public procurement often results in the
misuse of public office for private gain. Absence of good governance in public
procurement also undermines fair competition and equal treatment of bidders. Bad
governance in public procurement comes in the form of exerting undue influence in
the procurement process especially during the evaluation and selection stage.
11
Absence of good governance practices in public procurement often results in
corruption, favouratism and poor delivery of goods and services due to award of
contracts to unqualified contractors. In the long run, this results in distortion of the
competitive process and poses a fundamental obstacles in delivery of public services
and the functioning of the government as a whole (PPRA, 2010).
2.2.2.1 Consequences of poor governance in public procurement
One of the consequences of poor governance in public procurement is that it fosters
the proliferation of corruption where by, bidders try to use corruption to obtain
favours from those who make decisions of awarding public tenders. Corruption in
public procurement is more rampant where principles of good governance
(accountability and transparency) are weak or are not adhered to by decision makers
(Vishney 2003). Due to corruption in public procurement, public tenders are awarded
to suppliers who don’t meet the set requirements and the suppliers deliver goods and
services which are below standard. Corruption in public procurement tends to thrive
in areas where separation of powers are weak and a few public officials have
enormous influence on the decision making process of awarding public tenders
(Vishney 2003).
Rose-Ackerman (2007) affirms that in order to be eligible for a corrupt transaction,
the bribee must necessarily be in a position of power, created either by the market
imperfections or an institutional position which grants him discretionary authority.
She further imputes that for any bribe to be feasible, it is necessary for it to earn
excess profits.
The imperative of secrecy entails potentially important cost of corruption, namely its
hostility to change and innovation. Keeping corruption secret requires keeping down
the number of people involved in giving and receiving bribes. The elite must then
include only a small oligarchy of politicians and businessmen and refuse entry to
newcomers (Vishney, 2003).
12
2.2.3 Measures Taken to Ensure Good Governance in Public Procurement
2.2.3.1 Accountability and Transparency
According to Søreide (2005), transparency and accountability are the best measures
to ensure good governance in public procurement. Transparency in public
procurement enables all participants to know and understand the actual means and
processes by which contracts are awarded and managed. This requires the release as
a minimum, of information sufficient to allow participants know how the system is
intended to work.
Transparency ensures that laws, regulations, guidelines, processes, plans and
decisions are made in public procurement are accessible to the public at large or
“representatives” of the public so that processes and decisions can be monitored,
reviewed, commented upon and influenced by the stakeholders, and decision makers
can be held accountable for them (Søreide, 2005).
It is essential that transparency be created from the very beginning of the public
procurement process and decision making process to ensure that the process is not
influenced by external forces and decisions are made on fair grounds. The
transparent process may appear time consuming and costly at the outset, but it is
irreplaceable and will in fact save time as well as costs in the long run (Søreide,
2005).
From agency theory perspective, Trepte (2005) notes that the transparency is
significant because it makes visible what would otherwise be concealed and allows
the actions of the agent to be verified objectively. Where the actions of the agent can
be verified, the opportunity for corruption, assuming that effective enforcement
procedures exist, is significantly reduced.
Beth (2005) emphasize transparency as the most effective pillars to good governance
in public procurement due to the perceived benefits as follows: availability of
information on the various steps involved in the procurement process can enable
potential suppliers to make informed decisions about whether to bid and how to
improve relevance of their bids by addressing governments needs and priorities.
13
Moreover, when governments provide feedback on the outcome of tender award, it
helps bidders to prepare better bids in the future; transparent procurement contributes
to a more efficient allocation of resources through increased competition and
budgetary savings for governments; as companies develop confidence in
participating in procurement practices, the number of bidders expands, yielding
stringer competition.
2.2.3.2 Procurement Audits
Another measure taken to ensure good governance in public procurement is
conducting procurement audits. In procurement audit, procurement activities have to
be audited to establish whether the procurement process complied with procurement
laws and regulations (Trionfetti, 2000). In Tanzania, the Public Procurement Act
2004 gives the Procurement Regulatory Authority (PPRA) the powers to conduct
procurement audit.
Section 6 (2) (f) of the Public Procurement Act 2004 stipulates that; PPRA has the
authority to commission and undertake investigations in public procurement matters
and institute procurement audits. PPRA conducts procurement audits on all
Ministries, Departments and Agencies (MDAs). Procurement audit is conducted
annually and is documented in the Annual procurement Audit published every year
by PPRA.
The Public Procurement Act 2004 empowers PPRA to institute procurement audit at
the following stages of the public procurement process; during the bid preparatory
process, contract audits in the course of the execution of an awarded bid and
performance audit after the completion of the contract in respect of any procurement
or disposal, as may be required (PPA, 2004). In Nigeria, section article (p) of their
Public Procurement Act 2007, empowers the Nigeria Bureau of Public Procurement
(NBPP) to conduct procurement audits. The bureau performs procurement audits and
submits such report to the National Assembly bi-annually; In Botswana, the Public
Procurement Board is not empowered to undertake procurement audit (Aissaoui,
2007).
14
In Kenya, Public Procurement and Disposal Act 2005 empowers the Public
Procurement Oversight Authority (PPOA) to conduct procurement audit. The law
empowers the Controller and Auditor General or an auditor authorized by the
Controller and Auditor-General to audit the accounts of public procuring entities and
contractors relating to the contract.
In Malawi, the Public Procurement Act 2003 empowers the Auditor General to
conduct procurement audit. In Section 39 of Public Procurement Act 2003, it says;
Procurement activities shall be subject to regular auditing by the Auditor General to
ensure that public funds are expended for their intended purpose, and with a view to
maximizing value received by the public purchaser (Aissaoui, 2007).
The literature above shows how those different countries conduct procurement audits
as a way of ensuring good governance in public procurement and ensure that public
procurement is conducted in a transparent manner. Procurement audits also help to
ensure that there is value for money, fair competition and accountability in the use of
public funds (Aissaoui, 2007). As a starting point for a procurement auditing,
auditors hold on to the traditional assumptions about the behavior of the staff with
respect to organization’s business and should not commence audit planning with the
suspicion of corruption. However, at the stage of familiarization of the organization
and its operations, they should remain alert to the opportunities for corruption
(Armstrong, 2005).
One of the objectives of procurement audit is to assess the opportunities of
corruption in … (name the function or operation under audit) of the … (name) the
organization and to evaluate the efficacy of the existing control environment in
preventing it. The corruption audit planning process would also pass through the
familiar audit planning stages. However, it will have some specific features as
discussed below (Armstrong, 2005). The audit criteria for corruption audit should be
developed in the light of good management practices accepted in the field of
operation under audit. The auditors should familiarize themselves with the lead
practices. The audit criteria, as the term itself specifies, acts as a benchmark to see if
the organization’s systems and procedures comply with them (Armstrong, 2005).
15
However, it has been noted that some countries went further to explain how
procurement audit would be done. For instance, in Botswana the procurement law is
more explicit on how it would be conducting the procurement audit. It clearly states
how the Auditor General and the Head of public procurement body would work in
conducting the exercise (Armstrong, 2005).
It is very important to clearly come out with the relations in terms of offices that will
be working hand in hand to avoid blame shifting which is common in public service.
Secondly, it is important to define the reporting/feedbacking procedure. In Nigeria
and Botswana, they have their public procurement laws detailing the reporting
procedure of the audit exercise (ibid).
In Nigeria, the Bureau has to report to Parliament bi-annually. However, it could be
assumed that Finance and Audit Acts of the respective countries have defined the
reporting procedures in auditing. Thirdly, the public procurement law has to be clear
on what stage(s) procurement audit would be conducted. A number of countries
sampled have detailed the stage s procurement audit would be conducted (ibid).
In Botswana and Uganda, procurement audit is conducted at bid preparatory stage,
during execution (contract audit) and after the procurement activity (performance
auditing). In Ghana, they conduct annual procurement audit and specific ones when
need arises. The Malawian Public Procurement Act 2003 only says that procurement
activities would be subjected to regular auditing (Jones, 2004).
The Audit Act defines regular auditing as an annual exercise. However, the Auditor
General is empowered to carryout audit at any time. Fourthly, the issue of
cooperation with the Auditor General or hired auditors in the exercise of
procurement audit is critical to be in the public procurement law. This is especially
important in those countries where the Auditor General or hired auditors on behalf of
the latter (Jones, 2004).
There some con tractors and government official that would hinder the exercise.
Therefore, those that are to carry out the exercise have to be empowered by the law.
16
For example in Malawi, Botswana and Kenya the law clear states that stakeholders
have to cooperate with those empowered to conduct procurement audit. Suppliers
and consultants can also be visited by auditors during the procurement audit (Jones,
2004).
However, it is good to come out clear on how discipline and enforcement measures
would be implemented in the way Botswana public procurement law h as done. In
conclusion, it is of paramount importance that public procurement laws of countries
be clear on a number of issues like; who would conduct procurement audit.
Secondly, the relation of the mainly players in conducting this exercise has to be
clearly defined.
2.2.4 The role of procurement audit in fighting corruption
Corruption is a highly complex phenomenon. The parties involved leave very little
telltale in the form of irrefutable hard evidence. Most of the corruption takes place in
an informal manner and under the dark cover of isolated contacts. At times it does
not even require a spoken word. Auditors know that they cannot physically see all
transactions and all situations (Beth, 2005).
Corruption requires a multifaceted attack. It requires, for example, a set of
regulations against corrupt practices, a code of conduct for employees and vendors,
awareness raising campaigns, training of staff, internal controls, sanctions and
incentives, protection of whistleblowers and an open approach towards information
reporting. Audit is only one such mechanism (Beth, 2005).
The reporting results of corruption audit would follow the usual audit report format.
However, the focus of the report would be recommendations to plug-in holes in the
organizations’ operations, systems, procedures, rules and regulations that can provide
opportunities for corruption. The audit report should not and cannot point finger to
any particular person with charges of corruption (Beth, 2005). The role of corruption
audit report is mostly to prevent corruption or to suggest steps for minimizing
opportunities for corruption. It is generally understood that performance auditing can
17
help detect corruption. A properly planned and executed performance audit would
highlight areas of diseconomy, inefficiency and failure to achieve results and impact.
2.3 Challenges Facing Public Procurement
Public procurement is an important function of government for several reasons. First,
the sheer magnitude of procurement outlays has a great impact on the economy and
needs to be well managed. Indeed, in all countries in the world, estimates of the
financial activities of government procurement managers are believed to be in the
order of 10% – 30 % of GNP (Callender and Mathews, 2000). Efficiently handling
this size of procurement outlays has been a policy and management concern as well
as a challenge for public procurement practitioners.
Second, public procurement has been utilized as an important tool for achieving
economic, social and other objectives (Arrowsmith, 1998; Thai, 2001). In its report
to the Congress, the Commission on Government Procurement states: “[T]he
magnitude of the Government’s outlays for procurement and grants creates
opportunities for implementing selected national policies” (Federal Acquisition
Institute, 1999, p. 1.8). The World Bank’s Procurement Under IBRD Loans and
IBRD Credits specifies following four major concerns or objectives of public
procurement for projects funded by its loans:
Ensuring that the loan is used to buy only those goods and services needed
for the project;
Ensuring fair competition for all qualified bidders from the World Bank’s
eligible countries;
Promoting transparency or integrity; and
Encouraging development of indigenous contractors and manufacturers by
allowing local buyers to build in a margin of preference for local contractors
and manufacturers (Tucker, 1998).
Third, due to many reasons (including greater scrutiny of taxpayers and competing
vendors), public procurement has been perceived as an area of waste and corruption.
The District of Columbia, USA government wasted hundreds of thousands of dollars
in revenue by selling used emergency vehicles for “bargain basement prices” in
18
auctions run by untrained staffers (Nakamura, 2004). In a 2 1/2-year period studied
by the city’s Inspector General's Office, the city sold 11 fire trucks for a total of
$3,125 while similar vehicles in make and model had been sold on the Internet for a
total of $360,875. Corruptions and bribes are widespread in government contracts
(International Transparency, undated; and see www.transparency.org). In the United
States, corruptions in government contracts have been regularly reported in
newspapers; and the first week of September 2004 witnessed the reporting of a flurry
of criminal prosecutions against state officials for violations of state procurement
laws. Separate newspapers reported on bidding scandals from Illinois, Connecticut,
Wisconsin, and Maryland (see www.aba.org). Similar newspaper reports can be
found in many countries. Overcoming the negative perception -- and the objective
reality, to a certain extent – is one of the biggest challenges in public procurement.
Fourth, as many countries have moved to a regional and or global economy, public
procurement practitioners face another challenge that is, how to comply with their
government’s procurement regulations and social and economic procurement goals
without violating regional and/or international trade agreements. For example, how
to comply with national economic policies (in nurturing domestic firms), without
dealing unfairly with foreign firms as provided in regional trade agreements and/or
the World Trade Organization (WTO) agreements is not easy, which requires a
careful study of trade agreements in order to take advantages of special provisions.
The WTO Agreement on Government Procurement (GPA) Article XVI provides:
“Entities shall not, in the qualification and selection of suppliers, products or
services, or in the evaluation of tenders and award of contracts, impose, seek or
consider offsets.” Without careful examination of GPA provisions, procurement
practitioners in developing countries may not use an exception: However, GPA
Article XVI.2 “expressly allows for the use of offsets by developing countries”
(Arrowsmith, 2003, p.165). Properly using ‘offsets’ is a major challenge for public
procurement practitioners. Similarly, the World Trade Organization's general rule
requiring that contracts be advertised for a period of no less than 40 days from the
date of publication of the notice to the tender submission deadline. The 40-day
requirement would hinder a speedy procurement. The 40-day standard period,
19
however, may be reduced in certain cases to 24 days or 10 days, as set out in GPA
Article XI.3.
Fifth, in developed as well as developing countries, disregarding their economic,
social, and political environment, a sound procurement system has accomplish two
sets of requirements: management requirements and policy requirements. The
procurement management requirements normally include quality, timeliness, cost
(more than just the price), minimizing business, financial and technical risks,
maximizing competition, and maintaining integrity. The procurement policy
requirements normally include economic goals (preferring domestic or local firms),
environment protection or green procurement (promoting the use of recycled goods),
social goals (assisting minority and woman-owned business concerns), and
international trade agreements. It is very difficult for policy makers and public
procurement practitioners to make an optimal decision, as there are always tradeoffs
among these goals (Federal Acquisition Institute, 1999; Thai, 2001).
Finally, facing the challenges above and others, including rapid developments in
technology (which have led to new procurement methods), public procurement
cannot be perceived as mere a ‘clerical routine,’ as procurement practitioners are and
should be involved in strategic procurement planning (Office of Management and
Budget, 1997; Hinson & McCue, 2004). In recent years, public procurement
practitioners have forcefully challenged the perceived clerical task of public
procurement. According to a recent unscientific survey of 704 members at the
National Institute of Governmental Purchasing, Inc., 83% of respondents contended
that the major role of current purchasing is tactical (www.nigp.org). Thus, making
public procurement a recognized profession is another challenge. Building a body of
public procurement knowledge, one of attributes of a profession, is very critical.
Trade Practices, private sector in Tanzania participation in public procurement,
particularly goods and services, is very minimal. Local traders, suppliers,
consultants, contractors, architects and engineers have not built enough capacity to
participate in tenders advertised internationally and locally particularly when the
values are large. Local suppliers and contractors often do not have the capacity to
20
raise credit, bid bonds and securities from local banks and insurance companies, in
part due to the high rates of interest charged (UNDP, 2009)
Suppliers who would like to participate in public procurement find the procurement
procedures irrational and cumbersome. They are sometimes excluded when the
procurement is too big and they are apprehensive of unfamiliar procedures. They are
not well informed of how the procurement process functions, which renders the
process open to abuse. The private sector does not believe the public procurement
process can move without a “push”. The private sector, however, would embrace
clear, easy-to-follow guidelines if this minimises costs and facilitates business. There
are indications that over and under-invoicing in imports and local procurement are
common practices. This is attributed to mainly inside dealings. However, long time
lags and delays on the part of government to pay suppliers are some of the causes for
over-invoicing. Under invoicing is due to uncertainties relating to a supplier’s
chances of winning a tender bid (UNDP, 2009).
There is evidence of malpractice that affects public sector procurement; e.g. vehicle
repair documents are often not used. Sometimes invoices, receipts and other
documents are faked. In other instances of government procurement, documents are
“chased” by suppliers pushing them through the process in person. The assumption
is that “chasing” will not be successful without bribes, commonly known as the “kitu
kidogo” or “speed money” (UNDP, 2009).
Financial Framework, most banks in the country have international connections.
They are able to issue letters of credit, bid bonds and other guarantees for compliance
with tenders. The credit worthiness of the banks is guaranteed in that the Bank of
Uganda supervises and ensures that only credit worthy and professionally managed
banks are licensed to operate in the country. High interest rates (e.g. 18% – 25%)
appear to be a hindrance for national suppliers to access credit. Similarly, some
national bidders find the 10% requirement for bid bond too high, and they end up not
participating in tenders advertised locally.
21
The Institutional Framework, the Central Tender Board (CTB) was the main overseer
of the public procurement process in Uganda. The CTB derived its authority from the
Tender Board Regulations of 1977 established under the Public Finance Act. Cap.
149. The Central Tender Board was established to regulate and control: the purchase
or sale of government stores and equipment; and the award of government contracts
for goods` services or works (UNDP, 2009).
It approved purchases submitted to it by procuring entities. Such procurements were
for goods, works and services above the threshold of Shillings 1 million for goods
and Shillings 2 million for works and services. The Government Central Purchasing
Corporation (GCPC) was set up by Statute No. 3 of 1990. The objectives of the
GCPC were to procure government goods and services at the fairest prices, to ensure
government gets value for money and to carry out the procurement functions
expeditiously. It acquired goods, supplied them to government departments and
advised government on procurement policy and practices (UNDP, 2009).
The Swiss Procurement Company (SWIPCO), a private contractor, performed the
following functions under Contract with the Ministry of Finance: Advised the CTB
to ensure that the professional capacity of the Board is strengthened and extended;
Assisted procuring entities in preparing tender documents, performing evaluations,
drafting contracts and supervising contract performance; and provided training on
procurement to staff at different levels of government (UNDP, 2009).
The Central Tender Board, which oversaw the procurement process in the country,
had a set of disparate, (in the sense that the District Governments were not covered)
and outdated procurement regulations and procedures. The responsibility for
procurement was inconsistent among various procuring entities within the system.
The government system operated through cash budgets that, because of a lack of
coherent management attention to problems caused by this in the procurement area,
made it an unreliable business partner. These problems were compounded by
impoverished management practices in the procurement sub-system both at the
central and district administrations (UNDP, 2009).
22
Bureaucratic delays and lack of institutional co-ordination characterised the current
procurement system in the country. Malpractice and unethical conduct also saddled
the system. There was a high incidence of vested interests, interference and insider
dealings. There were occasional cases of retroactive approvals of contract awards
(UNDP, 2009).
Procurement knowledge and expertise at policy and operational levels were
inadequate. This implies that the personnel involved were severely handicapped
concerning the requisite procurement skills. Analysis had also revealed that apart
from World Bank documents, the procurement system in the country lacked standard
documents for use in specific contract situations. The lack of focus in the existing
regulations and guidelines were giving rise to decisions, which were devoid of
objectivity, accountability and transparency and resulted in a high incidence of
corruption and high expenditure (UNDP, 2009).
2.4 Empirical Literature ‘Review
This section presents the empirical literature review on public procurement and good
governance.
2.4.1 Sustainable Public procurement as an approach to good governance
Adjei, A.B. (2010) in his paper titled; Sustainable Public Procurement: A New
Approach to Good Governance asserted that an efficient and effective public
procurement system is good governance tool that:
Promotes effective and efficient procurement practices and systems to enable
government to deliver the services demanded by its constituents in a timely
manner;
Seeks to achieve value for money based on whole life cost;
Enhances competitiveness among suppliers through its policies and practices;
Adopts high standards of equity to ensure fairness and transparency, and to
avoid corruption in its practices;
Ensures accountability through good record keeping, auditing, and
transparent review procedures, among others;
23
Ensures uniformity for all public procurement by entities through regulations
and use of standard documents;
Ensures that public procurement complies with provisions of the country’s
public procurement law as well as the constitution;
Enhances quality and quantity of government projects delivered. Even though
the above issues are elements of efficient public procurement systems, they
are at the heart of good governance.
Government procurement therefore needs to consider sustainability issues as it is the
only way that it can be sure to offer real value for money over a longer term without
compromising environmental and social responsibilities. This would ensure that
development targets are achieved through the acquisition of goods, works and
services without much damage to society and the environment.
2.4.2 Review of good governance in Public Procurement in East Africa:
Odhiambo and Kamau, (2003) in their research programme titled:The Integration of
Developing Countries into the World Trading System:Lesson from Tanzania,Kenya
and Uganda revealed that good governance is a fundamental building block of a just
and economically efficient public procurement system. Studies of public
procurement in the three countries have shown that corruption in public procurement
has mainly been through hidden violation of the laid down procurement rules. In this
case procurement officers may be involved in malpractices, such as misusing the
power of invitation by only inviting preferred firms, favouring certain firms at the
short-listing stage, to design tender documents in favour of particular firms or release
confidential information. While corrupt procurement officers can in their own
interest choose to violate procurement rules, they work in most cases under the
influence of powerful politicians.
Since mid-1999, the three East African countries have identified and implemented an
extensive set of measures in the area of governance, including anti-corruption
measures. In Kenya, the Government established the Kenya Anti-Corruption
Authority to fight corruption head-on. Although this organisation has since been
outlawed, there exists a police unit to fight against corruption. In Uganda, there is a
24
Ministry of Ethics and Integrity that is charged with the responsibility of cultivating
moral and ethical integrity in all public activities. The Ministry works closely with
the police and other lawenforcing agencies to ensure transparency and accountability
in public undertakings. In Tanzania, there is the Tanzania Anti-Corruption Authority
established in 1999.
The three governments are also at different stages in preparing legislation on the
Code of Ethics for all public office holders and working out modalities in the form of
a “wealth disclosure” system for all senior civil servants. In Tanzania, exclusive
preference is given to local persons or firms, if the financial resources are exclusively
provided for by a Tanzanian public body and where the procurement value of works,
goods or services does not exceed an amount specified in the regulations. It is a
requirement in both Uganda and Tanzania that a written explanation be given for the
exclusion of international firms and persons in the tendering process.
2.5 Conceptual Framework
The study will be guided by the conceptual framework below. According to the
conceptual framework below, the three principles of good governance; transparency,
accountability and participation result in good governance, which enhances the
effectiveness of public procurement.
25
Figure 2.2: Conceptual framework
Independent variables Dependent
variable
Source: Researcher (2013)
Transparency
Principles of good
Good governance
Effective publicprocurement
Participation
Accountability
26
CHAPTER THREE
RESEARCH METHODOLOGY
3.0 Introduction
This chapter presents the overall research design, location of the study, sample of the
study, sample size, sampling techniques that were used to select respondents, data
collection methods that were used to collect information and data analysis.
3.1 Research Design
A case study design was used. The case study was used in this particular study to allow
detailed data collection and analysis within a short period. Since variables are not
expected to change overtime, data were collected only once from the respondents.
3.2 Area of the Study
The study was conducted in Dar es Salaam, Tanzania at the Ministry of Health and
social welfare. But the study also involved respondents from PPRA which has the
sole responsibility to ensure that public procurement is being conducted effectively,
and one of its objectives is to ensure that public procurement is performed in a free
and transparent manner.
3.3 Study Population
Population refers an entire group of individuals, events or objects having common
observable characteristics. In other words, population is the aggregate of all who
conform to a given specification (Kothari, ibid). This study involved members of
staff in the Procurement Departments of the Ministry of health and social welfare
and also some few members of staff of PPRA.
3.4 Sample and Sampling techniques
According to Kothari (ibid), sampling refers the process of picking up few or small
units out of whole population for study. Such unit is expected to be a representative
of the whole population. The researcher used purposive sampling to select
respondents from among the population of the study based on their line of duties and
responsibility concerning prevention of corruption in public procurement. The
27
researcher selected a sample of 40 respondents from the Ministries, and 5 members
of staff from PPRA making a total of 45 respondents.
3.5 Types and sources of Data
The study mainly used primary data collected from respondents at their respective
offices as well as secondary data which was collected from various published and un
published sources.
3.5.1 Data Collection Methods
During the study, both primary and secondary data collection methods were used.
Primary data collection methods that used by the researcher to collect data include;
questionnaires and interviews. Questionnaires were designed and given out to
respondents for the purpose of having all questions answered. Questionnaires were
relatively cheap to formulate, distribute and save time. In interviewing tools the
study involved face to face contact. It provided the advantage of first hand
information as a result of the interaction between the researcher and the interviewer.
It also helped the interviewer to evaluate the knowledge and attitude towards the
topic. The researcher observed the different activities taking place in the company to
get further information relating to problem. It also allowed judgment by sight about
the relationship between variables.
The only secondary data collection method that was used to select data during the
study is documentation, which involved perusal of Procurement Audit and other
reports. Review of related literature was done and secondary data was extracted.
Among the many documents that were reviewed include: magazines, journals and
internet information. The above documents were reviewed and background
information pertaining Procurement on supply chain management.
3.5.2 Questionnaire
According Kothari (2006), a questionnaire is a method of collecting data which uses
a set of question for collecting data in carrying out social science research. By this
method, data is collected with the help of question. Respondents have to answer
questions on their own and bring back to the researcher. Both open ended and closed
28
ended questions since closed ended questionnaires restricted respondents to choose
among alternative, while open ended questionnaires enabled respondents to give
more explanation based on their experience, and perceptions. The advantage of using
closed-end questions is that it helped to avoid ambiguity in answering questions
while open-ended questions enabled respondents to give detailed answers.
3.5.3 Documentary Sources
Documentation will involve perusal of various documents and literature on the
subject matter. The researcher consulted various reports, records, Acts, regulations,
journals and websites. This method of data collection is suitable because the
researcher may fail to get information through other data collection methods since
respondents may not be able to provide all the required information.
3.6 Data Reliability and Validity
Kothari (2006) defines reliability as the quality of consistency of a study or
measurement. Kothari comments that a measuring instrument is reliable if it provides
similar results. That means if the same or different researcher repeats the study, it
should produce more or less results. In order to ascertain reliability of the study, a
pilot study was conducted with a few respondents. This implies that the researcher
wants to measure what is supposed to be measures. So if whatever the researcher
uses in the study enables her to get what she wants to measures, then, there is
validity. This allowed for corrections to be done before questionnaires are distributed
to respondents. The data collected confirmed to test a validity and reliability. The
data was valid because of the use of questionnaires, observation and interview
methods in the study designed to capture all the information that fulfilled the study
objectives were questionnaire were applied the researcher used the interviewing
techniques and observations.
3.7 Data Presentation and Analysis
The collected data were analyzed to obtain answers to all questions and all responses
were properly arranged so as to avoid misconception of the respondent’s ideas during
report writing. To make the research understandable the researcher used both
29
quantitative and qualitative data analysis methods using descriptive statistical
methods and narrative form respectively. Having gathered the data from the primary
and secondary sources, the data was assembled together, edited, organized by the use
of tabulations and statements. Appropriate analytical methods were then applied so
as to manipulate the data so that their inter-relationship and quantitative meaning
derived. Simple tabulation was some of the statistical tools that are to be used to
summarize the data. The researcher also used inductive reasoning to get a clear
understanding about the general instructions of the topic.
30
CHAPTER FOUR
DATA ANALYSIS, DISCUSSIONS OF THE FINDINGS
4.0 Introduction
This chapter presents the findings that were intended at examining the role of good
governance in public procurement in the Ministry of Health and Social Welfare. The
specific objectives of the study were to assess the extent to which transparency can
enhance public procurement of the Ministry, to assess the extent to which
transparency can enhance public procurement of the Ministry and to assess the extent
to which participation can enhance public procurement accountability of the
Ministry. The collected data had been analyzed where editing, coding and
classification had been done. Data cleaning which include editing and coding were
done in order o examine the collected raw data being free from errors and omissions
and make corrections as well as to assist the researcher to put respondents into
limited number of classes that were appropriate to the research problem. Data
classification was done on the basis of common characteristics with the help of
statistical package for scientific studies (SPSS). Tabulation was applied in order to
compliment explanatory and descriptive elements. The study was done at the
Ministry of Health and Social Welfare with the sample size of 45 respondents.
4.1 Respondent’s Characteristics
Population of the study taken hereunder as the sample study provide the following
characteristics that are descriptively presented with respect to gender, marital status,
Academic qualification and Age of the respondents.
4.1.1 Gender of the respondents
In this study gender were unevenly distributed by both male and female respondents,
this suggest that researcher were not biased in inclusion of both sex.
31
Table 4.1:Gender of Respondents
Gender Frequency Percentages (%)
Female 20 44.5%
Male 25 55.5%
Total 45 100
Source: Field Data, 2013
The Findings revealed that majority of the respondents (55.5%) were male
respondents followed by female respondents 44.5%. It implies that most of the
respondents who were invited in this study were male which translate directly that
most of employee’s at the Ministry of Health and Social welfare are male.
4.1.2 Age of respondents
Table 4.2: Age of respondents
Age bracket Frequency Percentage (%)
Between 18-25 years 9 20
Between 25-35years 21 47
35 years and above 15 33
Total 45 100
Source: Field Data, 2013
The findings showed that 20% of the respondents were between 18 to 25 years, 47%
were between 25 to 35 years and constituted the majority. 33% were between
35years and above, however this indicates that the information got is viable because
all respondents are of mid age and well educated.
32
4.1.3 Duration of work of respondents
Table 4.3: Duration of work of respondents
Respondents Frequency Percentage (%)
Between 0-5 years 6 10
Between 6-10 years 12 20
More than 10 years 30 50
Total 45 100
Source: Field Data, 2013
From the table above, findings show that 50% of the employees in the organization
had served for more than ten years and above. This thus revealed that most of the
employees involved in the supply chain are experienced once performing their duties
with confidence and perfection.
4.2 Major Findings of the study
4.2.1. Awareness on good governance in public procurement
The aim was to examine if respondents were aware of the importance of good
governance on public procurement at the Ministry of Health and Social Welfare.
Organization and procurement stage differ in degree of uniformity, complexity,
number of people involved and movement of efforts required to make a good
decision. There are basic activities that must be taken to complete a purchase. Buyers
have always had to follow some basic steps. Advancements have provided an
alternative to an endless time taking purchase stages because formerly processing a
purchase order regardless of the value, size and importance of the item in question
required on to strictly follow suits, all these steps can be effectively managed when
good governance is in place.
33
Figure 4.1: Awareness on good governance in public procurement
Source: Field Data, 2013
From the above table 49% agree that they were strongly aware on good governance
in public procurement and they believed that has eased the buying process of the
organization, 38% agree that they were aware, 13% they were partially aware, while
0% who aware not aware of role of good governance on procurement. This implies
that good governance has eased the buying process of the organization
4.2.2 Knowing about good governance in public procurement
The study sought to investigates about how the respondents at the Ministry of Health
and Social Welfare to know about the importance of good governance on
procurement activities. Results are as indicated in figure below.
Aware38%
Partially Aware13%
33
Figure 4.1: Awareness on good governance in public procurement
Source: Field Data, 2013
From the above table 49% agree that they were strongly aware on good governance
in public procurement and they believed that has eased the buying process of the
organization, 38% agree that they were aware, 13% they were partially aware, while
0% who aware not aware of role of good governance on procurement. This implies
that good governance has eased the buying process of the organization
4.2.2 Knowing about good governance in public procurement
The study sought to investigates about how the respondents at the Ministry of Health
and Social Welfare to know about the importance of good governance on
procurement activities. Results are as indicated in figure below.
StronglyAaware
49%
Partially Aware13%
Not Aware0%
33
Figure 4.1: Awareness on good governance in public procurement
Source: Field Data, 2013
From the above table 49% agree that they were strongly aware on good governance
in public procurement and they believed that has eased the buying process of the
organization, 38% agree that they were aware, 13% they were partially aware, while
0% who aware not aware of role of good governance on procurement. This implies
that good governance has eased the buying process of the organization
4.2.2 Knowing about good governance in public procurement
The study sought to investigates about how the respondents at the Ministry of Health
and Social Welfare to know about the importance of good governance on
procurement activities. Results are as indicated in figure below.
34
Figure 4.2: respondents knowing about good governance in public procurement
Source: Field Data, 2013
The findings revealed that 37% of the respondents agreed that they know about good
governance in public procurement through on job training, 17% agreed that they
knew about good governance in public procurement through professional training,
27% through workshops and seminars and 19% through online or distance training.
During the administration of this study many respondents agreed that they were
familiar about thr influence of good governance on procurement as they argued that
it has improved on the organizational purchase function through cost reduction.
4.2.3 Aspects of good governance enhance public procurement
This was among the key objective of the study whereby respondents were asked to
provide information on whether the aspects of good governance were useful
mechanism in managing public procurement. Data collection was done through the
use of questionnaires and interviews as well as documentary reviewed.
0
5
10
15
20
25
30
35
40
By on-jobtraining
Byprofessional
training
Throughworkshops
andseminars
Online ordistancetraining
37
17
27
19
35
Figure 4.3: Aspects of good governance enhance public procurement
Source: Field Data, 2013
From figure above 16% of the respondents agree that the aspects of good governance
were useful mechanism in managing public procurement since the most
critical/major objective of procurement is to shorten the response time to customers
demand and reduce corruption on investment, 32% agreed that the aspects of good
governance in an average were useful mechanism in managing public procurement ,
17% were not sure and 21% they said somehow, while 14 said that not all aspects of
good governance were useful mechanism in managing public procurement.
4. 2.4 Measures used to ensure transparency, accountability and participation
in public procurement
Respondents were asked to rank the following measures as used to ensure
transparency, accountability and participation in public procurement at the ministry
of health and social welfare.
Not at all14%
Somehow21%
Not sure17%
Average32%
Maximum16%
36
Table 4.4: Measures used to ensure transparency, accountability andparticipation
Measure Ranks in (%)
Checking if tenders were advertised properly 19%
Checking if tender documents were submitted properly 39%
Checking if tenders are evaluated properly 15%
Checking if tender was awarded in a transparent manner 11%
Checking if goods/services were delivered as promised 16%
Source: Field Data, 2013
39% which is the majority of the respondents agree that measures most often used to
ensure transparency, accountability and participation in public procurement at the
ministry of health and social welfare was checking if tender documents were
submitted properly, with no time delay which lastly increased flexibility and
responsiveness of the whole supply chain system, followed by 19% agreed that
Checking if tenders were advertised properly was often, also 16% agreed that
Checking if goods/services were delivered as promised were somehow used, and
Checking if tender was awarded in a transparent manner was used with 16% of
response this indicates that transparency was not highly used compared to other
measures which implies that the statement is true.
The researcher in this case wanted to find out whether the same rules apply to all
suppliers of goods, works and services and whether these rules are publicized as the
basis of procurement decisions. The descriptions of the various items were mostly
agreed upon by all respondents. The analysis reveals some efforts of transparency
such as advertising using the appropriate medium were used by the ministry,
utilization of the PPA website for notice and debriefing of unsuccessful bidders.
4.3 The extent to which transparency can enhance public procurement of the
Ministry
The study aimed at examining the extent to which transparency can enhance public
procurement at the Ministry of Health and Social Welfare as it believed that
37
transparency serves as the mirror for the process of public procurement of which
trust is created for the process. Thus, Public procurement Act endorse the use of
Standard Tender Documents (STDs), advertising procurement opportunities, public
opening, publication of contract awards, resolving disputes and complains, and
effective monitoring.
Figure4.4: the extent to which transparency can enhance public procurement of
the Ministry
Source: Field Data, 2013
The findings revealed that 22% of the respondents strongly agreed that transparency
can enhance public procurement at the Ministry of Health and Social Welfare. 29%
agree, 37% which are the majority were not sure which implies that respondents are
not sure whether transparency can enhance public procurement at the Ministry of
Health and Social Welfare. While, 7% and 5% respectively disagreed.
The study found out that effective monitoring and auditing of procurement activities
were conducted. To guard against this phenomenon the public procurement act
provides that Procurements using other uncompetitive methods (Price Quotation,
38
Sole source etc) are vigorously monitored and evaluated by Audit Agency to ensure
transparency. A position further supported by Schapper, et al (2006) when they
agreed with (Shadrach and Ekeanyanwu, (2003) that e-commerce can be used to
enhance transparency through effective audit and monitoring of low value
transactions. According to them high value and complex procurement procedures
must involve publicly available information on policies, bidding process, evaluation,
and bid results. In summary, transparency was rated high which gives much evidence
to the belief of transparency in public procurement practice at the ministry of Health
and Social Welfare.
4.2.1 Competitiveness and Fairness
The section intended to measure whether Ministry of Health and Social Welfare
demonstrated fairness and whether it actively encouraging greater supplier
participation in the tendering process through transparency and interaction with the
suppliers to make them competitive in the procurement process. Results are indicated
in figure 4.5 below.
Figure 4.5: Respondents views on competitiveness and Fairness
Source: Field Data, 2013
In public procurement in Tanzania Competitiveness and fairness stand to be the
parameter of the Public Procurement Act, to allow as many legal entities to compete
Disagree27%
StrongDisagreed
19%
38
Sole source etc) are vigorously monitored and evaluated by Audit Agency to ensure
transparency. A position further supported by Schapper, et al (2006) when they
agreed with (Shadrach and Ekeanyanwu, (2003) that e-commerce can be used to
enhance transparency through effective audit and monitoring of low value
transactions. According to them high value and complex procurement procedures
must involve publicly available information on policies, bidding process, evaluation,
and bid results. In summary, transparency was rated high which gives much evidence
to the belief of transparency in public procurement practice at the ministry of Health
and Social Welfare.
4.2.1 Competitiveness and Fairness
The section intended to measure whether Ministry of Health and Social Welfare
demonstrated fairness and whether it actively encouraging greater supplier
participation in the tendering process through transparency and interaction with the
suppliers to make them competitive in the procurement process. Results are indicated
in figure 4.5 below.
Figure 4.5: Respondents views on competitiveness and Fairness
Source: Field Data, 2013
In public procurement in Tanzania Competitiveness and fairness stand to be the
parameter of the Public Procurement Act, to allow as many legal entities to compete
Strong Agreed17%
Agreed26%
Neutral11%
Disagree27%
StrongDisagreed
19%
38
Sole source etc) are vigorously monitored and evaluated by Audit Agency to ensure
transparency. A position further supported by Schapper, et al (2006) when they
agreed with (Shadrach and Ekeanyanwu, (2003) that e-commerce can be used to
enhance transparency through effective audit and monitoring of low value
transactions. According to them high value and complex procurement procedures
must involve publicly available information on policies, bidding process, evaluation,
and bid results. In summary, transparency was rated high which gives much evidence
to the belief of transparency in public procurement practice at the ministry of Health
and Social Welfare.
4.2.1 Competitiveness and Fairness
The section intended to measure whether Ministry of Health and Social Welfare
demonstrated fairness and whether it actively encouraging greater supplier
participation in the tendering process through transparency and interaction with the
suppliers to make them competitive in the procurement process. Results are indicated
in figure 4.5 below.
Figure 4.5: Respondents views on competitiveness and Fairness
Source: Field Data, 2013
In public procurement in Tanzania Competitiveness and fairness stand to be the
parameter of the Public Procurement Act, to allow as many legal entities to compete
39
for public project in order to instill competition for bidders. Figure above indicate
that there is competition and fairness at the Ministry of Health and Social Welfare
since 17% strongly agreed, 26% agreed and 11% remained silent. However, 27% and
19% respectively disagreed.
This finding mirrors with UNIDO Annual Report (2009) that there is an improved
participation rate of four (4) tenders and responsive rate of three (3) per tender notice
by the suppliers. In summary, competitiveness and fairness had a certain level of
acceptance which suggests that, the public procurement reform ensures increased
competition.
Beside its direct hindrances on access to the public procurement market, lack of
transparency is harmful because it enables a culture in which there are no checks on
corruption. Corruption – the abuse of public office for private gain – is inevitably
harmful for the overall social services in particular as it distorts the size of
government expenditures and the decision-making process for public projects.
Transparency International’s handbook on curbing corruption in public procurement
highlights that each phase of the procurement process is vulnerable to corruption,
from advertising bids to the selection process. This makes efforts to tackle corruption
crucial in any attempt to reform public procurement (UNIDO Annual Report, 2009).
4.3 Effectiveness good governance in enhancing public procurement
This part aimed at investigating the effectiveness good governance in enhancing
public procurement Transparency can be used as a tool aimed directly at reform in
public procurement, but it is important to understand that non compliance in public
procurement does not exist in a vacuum. Results are indicated in figure 4.6 below.
40
Figure 4.6: Effective is the role of good governance in enhancing public
procurement
Source: Field Data, 2013
Based on the above findings when respondents were asked on the effectiveness
good governance in enhancing public procurement more than 40% agreed that it was
effective and they commented that it promoted procurement laws more enforceable
and effective right to freedom of information, 29% remained silent, while 8% and
21% respectively said they were not effective, this was due to the fact that they had
experience bribes practices in public offices, when they were asked about the reasons
for these payments, most of them regarded it as something normal, ‘something
everybody does. For this reason, we need to see efforts to improve transparency in
public contracting as part of a broader transparency in procurement.
While narrower transparency efforts, focused on public procurement only, help
Ministry of Health and Social Welfare by improving access and simplifying
procedures, broad efforts to improve transparency have a far-reaching impact in
deterring a culture of secrecy. To this end, a combination of disclosure of documents
related to public procurement, as well as information on assets of public officials as
used to be previously in Tanzania, enables public scrutiny over the procurement
processes. This, in turn, contributes to open competition and improves overall
accountability.
0
Very Effective
Effective
Not sure
Less effective
Not Effective
40
Figure 4.6: Effective is the role of good governance in enhancing public
procurement
Source: Field Data, 2013
Based on the above findings when respondents were asked on the effectiveness
good governance in enhancing public procurement more than 40% agreed that it was
effective and they commented that it promoted procurement laws more enforceable
and effective right to freedom of information, 29% remained silent, while 8% and
21% respectively said they were not effective, this was due to the fact that they had
experience bribes practices in public offices, when they were asked about the reasons
for these payments, most of them regarded it as something normal, ‘something
everybody does. For this reason, we need to see efforts to improve transparency in
public contracting as part of a broader transparency in procurement.
While narrower transparency efforts, focused on public procurement only, help
Ministry of Health and Social Welfare by improving access and simplifying
procedures, broad efforts to improve transparency have a far-reaching impact in
deterring a culture of secrecy. To this end, a combination of disclosure of documents
related to public procurement, as well as information on assets of public officials as
used to be previously in Tanzania, enables public scrutiny over the procurement
processes. This, in turn, contributes to open competition and improves overall
accountability.
5 10 15 20 25
19
24
8
21
40
Figure 4.6: Effective is the role of good governance in enhancing public
procurement
Source: Field Data, 2013
Based on the above findings when respondents were asked on the effectiveness
good governance in enhancing public procurement more than 40% agreed that it was
effective and they commented that it promoted procurement laws more enforceable
and effective right to freedom of information, 29% remained silent, while 8% and
21% respectively said they were not effective, this was due to the fact that they had
experience bribes practices in public offices, when they were asked about the reasons
for these payments, most of them regarded it as something normal, ‘something
everybody does. For this reason, we need to see efforts to improve transparency in
public contracting as part of a broader transparency in procurement.
While narrower transparency efforts, focused on public procurement only, help
Ministry of Health and Social Welfare by improving access and simplifying
procedures, broad efforts to improve transparency have a far-reaching impact in
deterring a culture of secrecy. To this end, a combination of disclosure of documents
related to public procurement, as well as information on assets of public officials as
used to be previously in Tanzania, enables public scrutiny over the procurement
processes. This, in turn, contributes to open competition and improves overall
accountability.
30
29
41
4.4 The extent to which transparency enhances public procurement
There must be tenders advertised in the local media, bids are then evaluated by the
evaluation committee to come up with the best evaluated bidder, then results must be
put for a certain number of days. All this takes a lot of time
Table 4.5: Respondents view on tenders being advertised in the local media
Responses Frequencies Percentages (%)
Strongly agree 10 22
Agree 5 11
Not sure 3 7
Disagree 17 38
Strongly disagree 10 22
Total 45 100
Source: Field Data (2013)
According to the above Table 4.5 , 22% of the respondents strongly agree that there
must be tenders advertised in the local media, bids are then evaluated by the
evaluation committee to come up with the best evaluated bidder, then results must be
put for a certain number of days in most cases it takes a duration of 60 -90 days . All
this takes a lot of time. 11% agree, 7% are not sure, 38% disagree and 22% strongly
disagree.
4.5 Influence of Good Governance on Public Procurement Accountability
The study sought to investigates as to whether good governance improved public
procurement accountability or not. Respondents were asked provide their views on
how procurement system which is based on good governance can lead into improved
organizational purchase function through like cost reduction and others. Results are
indicated in table 4.5 below.
42
Table 4.6: Influence of Good Governance on Public ProcurementAccountability
Responses Frequencies Percentages (%)
Strongly agree 6 10
Agree 17 38
Not sure 14 31
Disagree 5 11
Strongly disagree 3 7
Total 45 100
Source: Field Data, 2013
The findings revealed that 10% of the respondents strongly agreed that good
governance improved public procurement accountability and it has improved on the
organizational purchase function through cost reduction. 38% agreed, 31% were not
sure which implies that respondents are not sure whether good governance improved
public procurement accountability and has led to increase of organizational purchase
function through cost reduction.
It was found out that, accountability is one of the major actions taken by the
practitioners of the public procurement at the Ministry of Health and Social Welfare.
As noted in Table 5 respondents were of the opinion that, procurement practitioners
are held accountable for their actions and inactions was strongly agreed. However in
terms of applying sanctions against procurement entity or staff recorded a total
disapproval, which shows that, taking actions and sanctions against officials is hardly
done. Irrespective of the above mentioned, accountability in general was found out
that practitioners are held accountable for their actions and inaction with regards to
the procurement process.
4.6 Compliance with Public Procurement Act
Furthermore the study looked into respondent’s opinion to find out whether the
Ministry of Health and Social Welfare procurement team complied with terms and
conditions of procurement act or not. Findings are presented in the Figure 4.7 below.
43
Figure 4.7: Respondent’s views on Compliance with Public Procurement Act
Source: Field Data, 2013
The finding exhibited a high proportion 27% agreed and 21% who are the majority
strongly agreed that staff of Ministry of Health and Social Welfare procurement team
complied with terms and conditions of procurement act, 12% of respondents were
not sure with the statement and 23% disagreed and 17% strongly. This implies that
respondents are not sure that procurement team at the Ministry of Health and Social
Welfare procurement complied with terms and conditions of procurement act. Since
the study intended to ascertain whether Ministry of Health and Social Welfare
complied with the regulatory framework of the procurement act or not, As indicated
in figure 7 respondents think Ministry of Health and Social Welfare comply with the
public procurement Act. Ministry of Health and Social Welfare applied appropriate
procurement methods for appropriate thresholds and used Standard Tender
Documents authorised in procurement.
4.7 Completion of Contracts on Schedule and within Cost
On the basis of the completion of contracted projects and its associated cost, the
researcher wanted to find out the proportion of awarded contracts that were able to
meet deadline as planned. Results are indicated in figure 4.8 below.
Disagree23%
Stronglydisagree
17%
43
Figure 4.7: Respondent’s views on Compliance with Public Procurement Act
Source: Field Data, 2013
The finding exhibited a high proportion 27% agreed and 21% who are the majority
strongly agreed that staff of Ministry of Health and Social Welfare procurement team
complied with terms and conditions of procurement act, 12% of respondents were
not sure with the statement and 23% disagreed and 17% strongly. This implies that
respondents are not sure that procurement team at the Ministry of Health and Social
Welfare procurement complied with terms and conditions of procurement act. Since
the study intended to ascertain whether Ministry of Health and Social Welfare
complied with the regulatory framework of the procurement act or not, As indicated
in figure 7 respondents think Ministry of Health and Social Welfare comply with the
public procurement Act. Ministry of Health and Social Welfare applied appropriate
procurement methods for appropriate thresholds and used Standard Tender
Documents authorised in procurement.
4.7 Completion of Contracts on Schedule and within Cost
On the basis of the completion of contracted projects and its associated cost, the
researcher wanted to find out the proportion of awarded contracts that were able to
meet deadline as planned. Results are indicated in figure 4.8 below.
Strongly agree21%
Agree27%
Not sure12%
Stronglydisagree
17%
43
Figure 4.7: Respondent’s views on Compliance with Public Procurement Act
Source: Field Data, 2013
The finding exhibited a high proportion 27% agreed and 21% who are the majority
strongly agreed that staff of Ministry of Health and Social Welfare procurement team
complied with terms and conditions of procurement act, 12% of respondents were
not sure with the statement and 23% disagreed and 17% strongly. This implies that
respondents are not sure that procurement team at the Ministry of Health and Social
Welfare procurement complied with terms and conditions of procurement act. Since
the study intended to ascertain whether Ministry of Health and Social Welfare
complied with the regulatory framework of the procurement act or not, As indicated
in figure 7 respondents think Ministry of Health and Social Welfare comply with the
public procurement Act. Ministry of Health and Social Welfare applied appropriate
procurement methods for appropriate thresholds and used Standard Tender
Documents authorised in procurement.
4.7 Completion of Contracts on Schedule and within Cost
On the basis of the completion of contracted projects and its associated cost, the
researcher wanted to find out the proportion of awarded contracts that were able to
meet deadline as planned. Results are indicated in figure 4.8 below.
44
Figure 4.8: Respondents perception completion of Contracts on Schedule and
within Cost
Source: Field Data, 2013
From the data in the figure 4.7 above concerning the effectiveness of terms and
condition of procurement contracts this proved to be an area of weaknesses for
procurement sector with 29% percent out of 45 respondents reporting “more”
capability, while 47% respondents agreed that terms and conditions are effective and
24% respondents said that they less effective. The study found that the design and
management of mandatory, optional and alternate terms and conditions clauses for
various types of products and services are foundations for contracts risk
management. Contracting should NOT entail the reinvention of terms and conditions
each and every time a purchase is to occur.
Also it was said that standard, legally-approved terms and conditions provide the
organization with significant protection and risk control while greatly speeding up
routine contracting activities. The response shows that certain contractual terms and
conditions were negotiated for products and services that are not pure “commodities”
by nature. The need for negotiation flexibility and variance from standard depends on
issues such as the nature of the purchase, the sourcing strategy itself and the relative
Less Effective24%
44
Figure 4.8: Respondents perception completion of Contracts on Schedule and
within Cost
Source: Field Data, 2013
From the data in the figure 4.7 above concerning the effectiveness of terms and
condition of procurement contracts this proved to be an area of weaknesses for
procurement sector with 29% percent out of 45 respondents reporting “more”
capability, while 47% respondents agreed that terms and conditions are effective and
24% respondents said that they less effective. The study found that the design and
management of mandatory, optional and alternate terms and conditions clauses for
various types of products and services are foundations for contracts risk
management. Contracting should NOT entail the reinvention of terms and conditions
each and every time a purchase is to occur.
Also it was said that standard, legally-approved terms and conditions provide the
organization with significant protection and risk control while greatly speeding up
routine contracting activities. The response shows that certain contractual terms and
conditions were negotiated for products and services that are not pure “commodities”
by nature. The need for negotiation flexibility and variance from standard depends on
issues such as the nature of the purchase, the sourcing strategy itself and the relative
More Effective29%
Effective47%
Less Effective24%
44
Figure 4.8: Respondents perception completion of Contracts on Schedule and
within Cost
Source: Field Data, 2013
From the data in the figure 4.7 above concerning the effectiveness of terms and
condition of procurement contracts this proved to be an area of weaknesses for
procurement sector with 29% percent out of 45 respondents reporting “more”
capability, while 47% respondents agreed that terms and conditions are effective and
24% respondents said that they less effective. The study found that the design and
management of mandatory, optional and alternate terms and conditions clauses for
various types of products and services are foundations for contracts risk
management. Contracting should NOT entail the reinvention of terms and conditions
each and every time a purchase is to occur.
Also it was said that standard, legally-approved terms and conditions provide the
organization with significant protection and risk control while greatly speeding up
routine contracting activities. The response shows that certain contractual terms and
conditions were negotiated for products and services that are not pure “commodities”
by nature. The need for negotiation flexibility and variance from standard depends on
issues such as the nature of the purchase, the sourcing strategy itself and the relative
45
power of the supplier versus the buyer. Certainly it is very unwise to ignore these
factors. Even in these instances, standard alternative terms and conditions should be
developed to reduce the risks in the process and to speed up negotiations for the good
of all parties. Some respondents confirmed that contracts were not completed on
schedule and within cost. The disagreement is based on the premise that contracts are
in majority and so has influence the decision of the respondents. The respondents
explained that government grants were not paid on schedule and sometimes not the
amount expected.
4.8 Challenges faced by MHSW in procurement
Findings revealed that procurement system at Ministry of Health and Social Welfare
is not practical well established because of low level of law enforcement and there is
no specific agency that deals with enforcement of public procurement act enabling,
there is need of signatures on many documents as they move from one level to
another especially in public procurement, where as procurement promises to make
procurement processes easier, it’s not clear whether there must be tenders advertised
in the local media, bids are then evaluated by the evaluation committee to come up
with the best evaluated bidder, then results must be put for a certain number of days.
4.8.1 E-procurement well developed at Ministry of Health and Social Welfare
In modern world procurement is done through e-procurement as is considered to e
the easiest model of procuring various materials and supplies and as a useful model
to avoid corruption especially in public offices in country like Tanzania. Because of
the complexity of these relationships, E-procurement must do more than support ad
hoc purchases from a consolidated catalog. Getting real value from E-procurement in
supply-chain scenarios requires a raft of additional services. Results are indicated in
table.
46
Table 4.7: E-procurement well developed at Ministry of Health and SocialWelfare
Responses Frequencies Percentages (%)
Strongly agree 12 27
Agree 23 51.1
Not sure 1 2.2
Disagree 4 5
Strongly disagree 5 11
Total 45 100
Source: Field Data, 2013
The table above shows that 50% of the respondents strongly agree that E-
procurement is not well developed at Ministry of Health and Social Welfare because
there is no enabling law that can govern its use. 45% agree, none is not sure, 2%
disagree and 3% strongly disagree implying that the statement is true.
4.9 Measures to be taken by the ministry to overcome the challenges
4.9.1 Monitoring of day-to-day contract performance and compliance
This question relates to the methods that are used to manage contract in cost effective
way and as tools required to deal with routine contract performance and compliance
monitoring. This essential yet basic capability again proved to be “out of reach” as
respondents and an overwhelming 27% and 31% agreed that that they did not have
the methodology and tools to effectively monitor contract performance and
compliance, rating them, while 5% remained silent which may mean that they don’t
know, while 18% and 19% Ministry of Health and Social Welfare had such capacity.
The study found that the organization’s ability and methods for addressing audit
results are weak, as well as for identifying the root cause of issues identified, for
developing effective action plans and for monitoring and controlling the
implementation of those plans. The internal audit function may or may not be
responsible for providing this methodology for organizations. The results are
presented in the Figure 4.9 bellow.
47
Figure 4.9: monitoring of day-to-day contract performance and compliance
Source: Field Data, 2013
Contract life-cycle information generated and produced for contract administrators
and managers. The study sought to investigate information that would include
various alerts, warnings, action messages, recommendations and other information
for those personnel responsible for controlling and managing various elements of
contracts with varying degrees of significance and complexity. This capability should
be in place to help prevent problems and/or respond to issues such as renewal
requirements, contract expiration, contract improvement, etc.
4.9.2 Procurement Planning and Negotiation
The researcher sought to unveil as to whether procurement planning and negotiation
can act as important factor of procurement management at Ministry of Health and
Social Welfare. Both questionnaires and interviews were used as instruments of data
collection from the various respondents who engages themselves in the procurement
activities at the respective ministry. The results are presented in the figure 4.10
05
101520253035
StrognlyAgreed
Agreed NeutralDisagree
StronglyDisagree
2731
5
18 19
48
Table 4.10: Respondents view on whether procurement planning and
negotiation
Source: Field Data, 2013
The findings indicated that 45% respondents strongly agreed that procurement
planning and negotiation can act as important factor of procurement management at
Ministry of Health and Social Welfare, 28 agreed, 13% remained silent, while 10%
and 4% disagreed and they explained that the overall procurement management
process design as “less effective” Within these overall ratings further analysis
evidenced that the planning aspects, contract planning and negotiation planning, both
better practices, can act as a solution towards various challenges,
From the available findings it was revealed that once product or services
requirements, scope, quality, quantity and so forth have been finalized, the
procurement planning as a process and discipline helps the organization to put an
overall plan and project schedule in place for the rest of the procurement process,
right through to post-award management and administration. Tasks included in the
plan are: any finalization of contract requirements and scope, contract negotiation
planning, negotiation and collaboration
This findings indicate that procurement planning help ensure that all key aspects
have been covered and that the company’s objectives and procurement management
45
28
1310 4
05
101520253035404550
StrognlyAgreed
Agreed Neutral Disagree StronglyDisagree
49
and control requirements have been met. The procurement plan and schedule should
be communicated to all key parties. The team should select the most appropriate
contract to work from based on the clearly defined product/service requirements.
This reflects the defined sourcing strategy for the product/service. The study found
that sourcing strategy is typically based on business requirements, a market analysis,
the procurement risk and impact analysis, and the desired business relationship with
the supplier that makes most sense for the organization.
From data viewpoint among the most concerning of all findings was the level of
immaturity in the entire area of post-award contracts management, control and
administration, was the highest risk area within contracting for procurement planning
and negotiation can act as important factor of procurement management at Ministry
of Health and Social Welfare. As Cox (2008) argued that that post-award contract
management activities are intended to help the organization to ensure and to control
performance, scope, quality, costs, service, terms and conditions compliance, and
compliance with a range of other key aspects of agreements, including those relating
to regulatory and environmental concerns. During the administration of this study it
was found that senior executive teams and boards of directors are highly concerned
procurement management structures and responsibilities to be in place to effectively
measure, monitor, manage and control the supplier/contract performance, as well as
the supplier relationship throughout the life of the contract. Contract administration
and control includes actions, either by the purchaser or supplier (the parties to the
contract), from the time the contract is awarded until such time as the deal is
formally closed. This can entail a wide variety of people, functions and activities in
many agreements
4.9.3 Education and sensitization on procurement and supply chain
management.
The study sought to suggest solution against problems associated with procurement
activities at Ministry of Health and Social Welfare, suggesting education and
sensitization as a means towards effective procurement. Results are provided in
Figure 4.11 below:
50
Figure 4.11: Education and sensitization on procurement and supply chain
management
Source: Field Data, 2013
Based on the data available in Figure 4.11 above 51% respondents agreed that
suggesting education and sensitization as a means towards effective procurement,
36% agreed, while, 7 disagreed and 6% were not decided. Respondents were asked
to evaluate the quality, availability, and implementation of training and education
programs for all those personnel involved in key contract procurement planning
process, development, negotiation and contracts management activities. The answers
were not encouraging, so, not only are there gaps in skills and competencies to plan
negotiate and manage procurement contracts, but there is a serious lack of investment
in training and education to improve the capabilities of the people to do this work
effectively and efficiently. It was revealed that personnel who play those roles should
always have qualifications and skills to carry out the task and be provided with
development and training opportunities wherever there is a gap. These expectations
should apply whether it is for direct or indirect purchases, and whether the position
resides in an official “procurement” function or in an end-user or “decentralized”
function, drive very specific requirements.
4.9.4 Improvement of e-procurement
Improvement of e-procurement is among of the major suggestions brought up by
respondents who participated in this study, whereas e-procurement promises to make
procurement processes easier, its implementation in developing countries like
Strognly Agreed51%
Agreed36%
Neutral6%
Disagree7%
StronglyDisagree
0%
51
Tanzania as it seems to be more of a dream than a reality. E-procurement is
considered to be among good governance measures to be taken to enhance public
procurement at the Ministry. Results are indicated in table 4.7 below.
Table 4.8: Improvement of e-procurement
Responses Frequencies Percentages (%)
Strongly agree 23 51
Agree 13 29
Not sure 5 11
Disagree 4 9
Strongly disagree 0 0
Total 45 100
Source: Field Data, 2013
In the table 4.7 above, 51% of the respondents strongly agree that e-procurement
promises to make procurement processes easier and therefore should be improved at
the Ministry of Health and Social Welfare, its implementation in developing
countries like Tanzania will be useful strategy I fighting against corruption. 29%
agree, 5% are not sure and none disagree meaning that where as e-procurement
promises to make procurement processes easier, its implementation and as a useful
tool in fighting against corruption in developing countries like Tanzania. Moreover,
respondents who participated in this study insisted on establishment of enforceable
laws and effective promote right to freedom of information; others insisted on
regular and open publication of information; Effective audit and regulation bodies
with real independence; and an active and engaged civil society and media capable of
challenging corruption
52
CHAPTER FIVE
SUMMARY, CONCLUSION AND RECOMMENDATION
5.0 Introduction
This chapter presents the summary, conclusions and recommendations with regards
to the research topic. The chapter has three sections, section one presents the
summary of findings, section two provides conclusions drawn from the study and
section three provides recommendations and study limitations as well as areas for
further studies which will contribute to the whole process of examining the
procurement management.
5.2 Summary of the Findings
This study that aimed at examining the Role of Good Governance in Public
Procurement in the Ministry of Health and Social Welfare. Good governance in
procurement process drives the improvement of all elements of supply chain
management process capability. Good Governance provides the overall guidance and
direction for the design or redesign and implementation of realistic, pervasive and
effective procurement policies. Procurement policies should represent management’s
direction, expectations and intent as to how the organization will develop, manage
and control supplier arrangements and the major expenditures, risks and regulatory
requirements that must be addressed, managed, monitored and controlled throughout
the organization. Other procurement management process capabilities should be
clearly aligned with and support the contracting process strategic objectives and
contracts management policies.
The study found out that effective monitoring and auditing of procurement activities
were conducted. To guard against this phenomenon the public procurement act
provides that Procurements using other uncompetitive methods (Price Quotation,
Sole source etc) are vigorously monitored and evaluated by Audit Agency to ensure
transparency. Some respondents argued that procedure and mechanisms of
procurement established by the Ministry of Health and Social Welfare were not
effective, this was due to the fact that they had experience bribes practices in public
offices, when they were asked about the reasons for these payments, most of them
53
regarded it as something normal, ‘something everybody does. For this reason, we
need to see efforts to improve transparency in public contracting as part of a broader
transparency in procurement. While narrower transparency efforts, focused on public
procurement only, help Ministry of Health and Social Welfare by improving access
and simplifying procedures, broad efforts to improve transparency have a far-
reaching impact in deterring a culture of secrecy.
It was found out that, accountability is one of the major actions taken by the
practitioners of the public procurement at the Ministry of Health and Social Welfare.
Respondents who took part in this study agreed that procurement practitioners were
held accountable for their actions and inactions was strongly agreed. However in
terms of applying sanctions against procurement entity or staff recorded a total
disapproval, which shows that, taking actions and sanctions against officials is hardly
done. Likewise the findings indicated that to certain extent Ministry of Health and
Social Welfare complied with the regulatory framework of the procurement Ministry
of Health and Social Welfare applied appropriate procurement methods for
appropriate thresholds and used Standard Tender Documents authorized in
procurement.
Findings revealed that procurement system at Ministry of Health and Social Welfare
is not practical well established because of low level of law enforcement and there is
no specific agency that deals with enforcement of public procurement act enabling,
also, it was revealed that E- Procurement was underdeveloped, therefore there is a
need of signatures on many documents as they move from one level to another
especially in public procurement because most of the procurement process were
conducted manually, where as procurement promises to make procurement processes
easier, it’s not clear whether there must be tenders advertised in the local media, bids
are then evaluated by the evaluation committee to come up with the best evaluated
bidder, then results must be put for a certain number of days. Also, the study
suggested that, there should be improvement of E-procurement to ease purchasing,
training is required to all officials who are involved in procurement.
54
5.3 Conclusion
In reference to the research objectives set, the researcher concludes that good
governance plays a positive role on purchasing in supply chain management.
Ministry of Health and Social Welfare should embrace the elements of good
governance. However despites the many benefits that accrue from the application of
E-procurement, the direct network links between computers and trading partners are
not widely used because of fear of loss of confidentiality and security due to the
different mode of information attack like hijacking of a website, social engineering
among others.
In developing countries where corruption is still a pervasive issue, transparency
initiatives are key to unlock many challenges facing Ministry of Health and Social
Welfare in benefitting from the public procurement market. Through active
disclosure of documentation and creation of a level playing field for Ministry of
Health and Social Welfare in public procurement, these initiatives can maximise
Ministry of Health and Social Welfare growth, and indirectly contribute to overall
improvement of service delivery. Despite the absence of reliable data on levels of
corruption at the Ministry of Health and Social Welfare, perception surveys indicate
that corruption levels remain an issue in the ministry’s business environment.
Although this paper emphasized the benefits from transparency in public
procurement, if Ministry of Health and Social Welfare is to achieve maximum
benefit from public procurement and contribute to the overall service delivery, these
efforts need to be part of a broader transparency regime as well as a more
comprehensive public procurement reform. In summary, while transparency is
necessary, it is not a sufficient condition to guarantee maximum benefits from public
procurement for Ministry of Health and Social Welfare. Although the challenges
Ministry of Health and Social Welfare face are diverse, and transparency is not the
only solution.
The roles of both donors and government procurements agencies also need to be
enhanced to achieve greater accountability and transparency. At present many donors
seem to focus excessively on strict complacence with the procurement law and
55
regulatory framework rather than on helping strengthen the institution carrying out
day to day procurement operations, so they can achieve better results. Peter Pease
and Khadija Fardi (2010) argued that Public Procurement has been an area that is
prone to mismanagement, corruption, and vendors’ ploys. One of major causes of
public procurement problems is a lack of competent procurement workforce (Thai,
Khi, 2010). In the past it was felt that basic training was sufficient, but now there is
evidence that training is only part of the requirement for creating an effective
procurement professional .The most effective procurement practitioners have a blend
of the competency, good relationship, management and communication skills and an
ability to think laterally(Guinipero and Handfiled, 2004).
However, Certified Public Procurement Specialists are also required to perform in a
more constructive manner, in Tanzania as it is considered as a poverty-stricken
country. When poverty comes all the ethical values and morality goes in vein. Not
only, has in health services but also in other sectored. Similarly Basheka and Benon
(2008) argued that the quality of public administration must be improved and
accountable, which is an integral part of good governance as well.
Promoting transparency and accountability, capable and competent public
administration, and the rule of law must be at the forefront of development policies.
Policy planning and decision-making are the key concern to public administration
which is part and parcel of procurement. Governance can make a country prosperous
even in a resource poor setting. The connection between corruption and poverty is
therefore clearly visible. Good public management and administration, with
emphasis on accountability and responsiveness to customer needs against the
backdrop of serious accountability scandals, has been seen as an aspect of good
governance by donor agencies supporting reforms in developing countries.
5.4 Recommendations
The results of this study indicated the influence of good governance on public
procurement management. In light of the discussions, findings and the conclusions,
the following recommendations are important for both public and private
organization. These recommendations include:
56
Procurement "training Centres of Expertise" should be established on a
commodity-by-commodity basis which means based on certain
specialization. And these centres of expertise, which can be cross-
disciplinary, should be coordinated by a centre of excellence. This is
important since it seems that procurement professionalism in Tanzania has
not yet fulfilled procurement needs of public sector.
It is obvious that there is a level of mandatory compliance required for the
effective operation of the public procurements based on the provided legal
framework of Tanzania to ensure effective contracts management. Projected
cost avoidance is only realized if the plan is followed.
A Charter for Suppliers should be established for the complete public sector
in Tanzania. It should essentially describe the sector's commitment to
suppliers by defining the generic standards which suppliers can expect from
the operation of public-sector procurement and in turn what will be expected
of them as suppliers to the sector. Suppliers should know what to expect and
what to deliver.
There should be total transparency in connection with procurement decisions.
Hidden opportunities are lost opportunities. Also, there should be a review of
non-core activities to establish candidates for outsourcing evaluation.
Remember, outsourcing doesn't necessarily mean off shoring. Ministry of
Health and Social Welfare can outsource to an operation down the street.
Outsourcing is about doing what makes financial sense.
Electronic procurement systems should be made part and partial of the
decision making as a way of availing reliable information at the Ministry of
Health and Social Welfare and in the other organizations. Managers should
seek to adopt the most appropriate technology that will aid the whole
organization to achieve its objectives.
57
Electronic procurement applications can be used by both public and private
sector. Ministry of Health and Social Welfare should adopt online purchasing
as a way of checking on their total transaction costs since E-procurement
aims at reducing operational costs. Ministry of Health and Social Welfare
should also ensure that the embracement of E-procurement assists in
establishing better working relationships. E-procurement should be geared at
strengthening relationships between employees, employers and suppliers.
The benefits that accrue from application of E-procurement should be
adequately analyzed. That is the organization’s management should be in
position to continuously weigh the benefits that accrue from application of E-
procurement.
Ministry of Health and Social Welfare should ensure strict adherence to the
company’s policies and guideline regarding the application electronic
procurement. That is the employees should execute their duties following the
pre requisites in place. All employees in one way or another should be
involved in the purchasing process especially as far as procedures governing
procurement are in place.
Ministry of Health and Social Welfare and other Public entities must ensure
that suitable candidates are employed on the basis of merit and placed in their
relevant qualifications, skills, and experience with their roles and
responsibilities clearly defined to avoid role conflicts with other professions
and departments. Strategies must also be put in place to retain them. Public
procurement cannot be perceived as a mere ‘clerical routine,’ activity. For an
entity to derive the full benefit of the procurement reform, procurement
function must be placed in strategic management level.
Building the capacity of service providers has been identified as one of the
success factors of public procurement management. It is important that
Ministry of Health and Social Welfare, the government and other
stakeholders to organizes training sections for contractors, surveyors,
58
architects, consultants and suppliers in the private sector on tendering
process, and the Appeals, Complaints and Dispute Mechanism. Audit
Service, the Judiciary, and other oversight bodies should be trained on the
procurement process and audit to appreciate the public procurement issues to
enforce accountability to improve compliance.
A thorough training for government procurers should be integrated into
existing programs and modules and supported where applicable by online
education (e-learning) inclusive of case studies tailored to the reality of each
country or region. Training programmes should target suppliers, budget
holders, technical specifiers, commissioners of services as well as those
directly responsible for procurement. The selection process of trainees should
be given careful attention. The entire implementation process, including
training and capacity building, requires robust monitoring and quality
assurance. The results of these processes inform the review of policies and
action plans, as well as ensuring that capacity building programmes continue
to reflect the latest developments of supply chain management
An effective procurement policy must be designed to obtain goods and
services at the lowest possible price or, more generally, to achieve the best
value for money. Vigorous competition among suppliers helps ministries and
other government’s agencies to attain this objective. However, the formal
rules that govern procurement, the way in which an auction is carried out and
the design of the auction itself can all act to hinder competition and help
promote or sustain bid-rigging conspiracies. Bid-rigging conspiracies waste
taxpayers’ money and cause governments to pay far more than a fair price.
5.5 Policy Implications
The purpose of this paper was to examine the role of good governance in public
procurement whereby various dimensions of public procurement practices were
covered. Few elements of policy implication have been generated based on the
findings of the study, this is because public procurement is a relatively new field of
study, and the study of its policy is also immature. The rules guiding government
purchasing and contracting need to be accountable and transparent. This is not only
59
to limit corruption – a central concern with regard to procurement – but to contribute
to a more accountable relationship between a government and its citizens. It is also
important because of the sums involved. In Tanzania as much as 70 per cent is spent
in procurement
As with all policies, governing procurement management policies must be current,
they must reflect the way things are and can be done today, and mirror the current
capabilities of the process and organization. It is unproductive to enforce policies that
cannot be followed because some critical elements of process, or skill, or
organizational design, or information for decision-making, or information
methodologies and tools or systems and data are not in place, or not yet at the desired
level of maturity. Policies should be designed and implemented in line with the
organization’s capabilities to implement and comply. Training and awareness is
another key factor in policy implementation. And it is essential that management
require compliance with policies. Businesses are loaded with failed policy
“guidelines.”
Procurement Management Process Policy should reflect and cover all key aspects of
the supply chain management process in general and procurement in particular,
including expectations for the use of standard terms and conditions, planning,
negotiation planning and negotiation, finalization, and post-award contract
administration and risk management, measurement, and control. Aligned processes,
practices and procedures should be in place to reflect these policies, and to document
the process steps and controls.
1. Design and implement aligned procurement management practices, work
flows and procedures for the process that will enable the achievement of the
overall strategic vision and objectives though standardized procedures.
2. Develop, source and deploy adequate numbers of resources with the
appropriate level of skills and competencies, assign well-defined
responsibilities and accountabilities, and ensure viable organizational
alignment. Typically, these resources should be both central and de-central to
60
effectively manage, execute and control the process and to achieve the
strategic objectives.
3. Define information and reporting requirements comprehensively for procure
management. And, provide the support to meet those needs and to ensure that
timely, complete and accurate information is consistently used for decision-
making and reporting, so as to enable the organization to effectively execute,
manage, monitor and control contracting processes and risks.
4. Identify and provide the tools and methodologies for the organization to
extract and manipulate data from various systems so as to produce the
required and defined measures, analyses, controls and reports to manage,
control and monitor contracting expenditures, performance, risk and terms
and conditions
5. Design, develop and implement strategies and detailed, integrated action
plans to achieve the desired levels of performance and process maturity,
actions that address each and all of the six components of contracts
management capability, and cover the immediate, middle and longer term
horizons.
6. Identify the executive management support to make those improvements and
include actions in the plan to achieve and maintain that executive-level
support for the execution of the short-term as well as mid to longer-term
improvement plans.
7. Make appropriate mid to longer-term investments on policies governing
procurement management process capabilities. These investments should be
used to improve strategies, policies, practices, as well as the organizational
tools and technological upgrades needed to achieve the targeted level of
contracts management process performance and control.
5.6 Limitation of the study
i. Time constraint- The study involved collection of data for dissertation apart
from classroom coursework. This required spending much time in the study
area collecting data. Due to the fact that the researcher was also
61
accomplishing employer’s tasks, availability of enough time for research
work was questionable. To solve this problem, a researcher used annual leave
including public holidays and week end days for research work.
ii. Lack of seriousness on research response by many participants in the study,
because despite of being aware of the research topic some of them
respondents did not provide detailed opinions/views to some question.
iii. Resistance from other respondents due to lack of trust on the subject matter
on the study, resistance was common among few individuals fearing that the
results might have negative impact on their jobs.
iv. Financial constrain, as the researcher was self-sponsored and in this case has
few sources of funds and that were available affected doing extensive
research. To solve this constrain researcher is expected to cut and
unnecessary cost and at the same and decided to opt for case study instead of
survey.
5.7 Areas for Further Research
The study examined the Role of Good Governance in Public Procurement in the
Ministry of Health and Social Welfare. However, some areas were not covered and
hence being recommended for further research and these include:
Further studies are needed to evaluate procurement implementation within
other government entities that might have varied administrative structures.
Case study to be carried out to the public procuring entity which has high
level of procurement technologies implementation
The effect of E-Procurement on employee performance in the organization.
The impact of E-Procurement on training and tracking of deliveries in supply
chain management. It desires further scrutiny and study so as to generate
more information.
The effect of electronic procurement on SMEs (Small medium enterprises) in
supply chain management.
The effect of e-procurement on price negotiation in supply
62
REFERENCES:
Aissaoui, N et al (2007). Supplier selection and lot sizing modeling: A review,
omputers & Operations Research, 34, pp 3516-3540.
Arrowsmith & A. Davies (Eds.), Public Procurement: Global Revolution (pp. 139-
157). London: Kluwer Law International.
Arrowsmith, S., & Trybus, M. (Eds.) (2003). Public Procurement: The Continuing
Revolution. New York: Kluwer Law International.
Asia Development Bank (2003). Purchasing and supply chain management;
Thomson learning, Netherlands
Basheka, Benon C (2008). “Procurement Planning and Accountability of Local
Government Procurement Systems in Developing Countries: Evidence
From Uganda”. Journal of Public Procurement - Vol. 8 Nbr.3.
Paramedics Press.
Berg (2004). Challenges Faced By Procurement Professional, University of
Bradford Management November 2006
Brilliantes, M. (2005). Urban governance in relation to the operation of urban
services in developing countries. Habitat International, 21(1), 65–77.
Callendar, G. & Mathews, D. (2000). “Government Purchasing: An Evolving
Profession?” Journal of Public Budgeting, Accounting & Financial
Management, 12 (2): 272-290
CPAR (2003). Country Procurement Assessment Report, World Bank.
Beth, E (2005). Main findings of the forum workshop on “Improving transparency in
public Procurement”. OECD publishing.
De Boer, L (2006). An analysis of some mistakes, miracles and myths in supplier
selection, Journal of Purchasing and Supply Management, 9, pp.109-118.
63
Ehlermann-Cache, N (2005). Regulating access to public procurement: Issues for
consideration in Fighting Corruption and Promoting Integrity in Public
Procurement, OECD Publishing.
Federal Acquisition Institute (1999). The Federal Acquisition Process. Washington,
DC: Author.
Guinipero, L & Habdfield, R. (2004). “Purchasing Education and Training II.”
Tempe, AS: CAPS Research.
Graham, J., Amos, B., and Plumptre, T. (2003). Principles for good governance in
the 21st century, (Institute on Governance Policy Brief No. 15.
Hinson, C., & McCue, C. P. (2004). Planning, Scheduling & Requirement Analysis.
Herndon, VA: National Institute of Governmental Purchasing, Inc.
Mandal, A, and Deshmukh S.G., (2003). Vendor selection using interpretive
structural modeling. International Journal of Operations and Production
management. Vol. 14 No. 6. pp. 52-59.
Mgonja, B. E. (2005). Good governance: A contrivance for foreign direct investment
(FDI) inflows to least developed countries (LDCs) –A Tanzanian
experience. Journal of Politics, 21.
Monczka, R. et al (2005). Purchasing and Supply Chain Management, 3rd edition.,
Thompson Corporation.
Mwakibinga, A (2008). Public sector procurement in Tanzania: An analysis of rule
compliance antecedents, PhD Theses in Logistics, Molde, Norway.
OECD (2007). Organization for Economic Co-operation and Development., 2007a.
Integrity in public procurement: good practice from A to Z, OECD
Publishing.
Nakamura, D. (2004, September 4). “Untrained Staffers Blamed for Costing City
Thousands.” Washington Post: p. B01.
64
Passa, H (1997) Purchasing and supply management; Rob Zuethre New York
Peter Pease and Khadija Fardi (2010). Procurment and Governance: An Uneasy
Relationship. International Public Procurment Conference, 2010, Seoul,
South Korea, Aug 26-28, 2010
Pieth, M. (2005). Using Good Governance to Fight Corruption in Public
Procurement: Major considerations and Issues.OECD Publishing.
PPRA (2010). Public Procurement Regulatory Authority Annual Report.
Saunders, M.K. (2000) Research Methods for Business Students, Second Edition,
New York Prentice Hall.
Sarkar, A and Mohapatra K.J (2006). Evaluation of supplier capability and
performance: a method for supply base reduction, Journal of Purchasing &
Supply Management, 12, pp 148-163
Søreide, T., (2005). Grey zones in public procurement: Issues for consideration in
Promoting Integrity in Public Procurement, OECD Publishing.
Telgen, J and Sitar, P (2001). Possible kinds of value added by the purchasing
department, The 10th International Annual IPSERA Conference.
Trionfetti, F. (2000). Discriminatory Public Procurement and International Trade.
The World Economy, Vol. 23, pp. 57-76.
Tucker, T. (1998). “A Critical Analysis of the Procurement Procedures of the World
Bank.” In S.
URT (2004). Public Procurement Act (PPA) of 2004, United Republic of Tanzania.
Vishiney, K (2003) . Purchasing and supplies management; Mc Grow Hill
companies Inc.
World Bank (2002). Governance and development. Washington, D.C: World Bank.
65
APPENDIXES
Appendix 1: QUESTIONNAIRE
I am a student at Mzumbe University pursuing a Master’s of Science degree in
Procurement and Supply Chain Management. I have prepared this questionnaire for
purpose of collecting data concerning “The Role of Good Governance in Public
Procurement in the Ministry of Health and Social Welfare. Assurance is given that
your personal information will be handled confidentially and it will be used for
academic purposes only.
QUESTIONS
1. Age
a) 18 – 30 years
b) 31 – 45 years
c) above 45 years
2. Gender a) Male
b) Female
3. Level of education
a) Diploma
b) Advanced Diploma or Degree
c) Post Graduate Diploma
d) Masters Degree
4. Rank/position a) Senior position
b) Middle-level position
c) Junior position
66
5. Level of work experience in your current position
a) 0 – 5 years
b) 6 – 10 years
c) More than 10 years
6. What is your level of awareness on good governance in public procurement?
a) Strongly aware
b) Aware
c) Partially aware
d) Not aware
7. How did you come to know about good governance in public procurement?
a) By on-job training
b) By professional training
c) Through workshops and seminars
d) Online or distance training
8. To what extent do the following aspects of good governance enhance public
procurement?
1 = Not at all, 2 = Somehow, 3 = Not sure, 4 = Average, 5 = Maximum
Aspect of good governance Rank
Transparency
Accountability
Participation
67
Explain your answers above:
---------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------
9. Rank the following measures are used to ensure transparency, accountability and
participation in public procurement at the ministry?
1 = Not used at all, 2 = Somehow used, 3 = Not sure, 4 = Often used, 5 = Most
often used
Measure Rank
Checking if tenders were advertised properly
Checking if tender documents were submitted properly
Checking if tenders are evaluated properly
Checking if tender was awarded in a transparent manner
Checking if goods/services were delivered as promised
10. What are challenges faced by the ministry in good governance in public
procurement?
---------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------
68
11. What are measures taken by the ministry to overcome the challenges mentioned
above?
---------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------
12. What weaknesses have you observed in public procurement at the ministry?
--------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------
13. How effective is the role of good governance in enhancing public procurement
(a) Very Effective
(b) Effective
(c ) Not sure
(d) Less effective
(e) Not Effective
14. What good governance measures should be taken to enhance public procurement
at the Ministry?
--------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------
Thank you very much for your cooperation!