By Le Ngoc Son, Petrovietnam
JOGMEC Techno ForumTokyo, May 7-8, 2013
Agenda1. Overview of Vietnam Oil & Gas
2. Collaboration between PVN and JOGMEC
3. GTL studies
4. CO2 EOR studies
5. Vietnam Technical Challenges & Expectation to
Japanese technologies
103107
108
109104
105
112
114 115
116
118-2
119-2
117
118-1
119-1
CAM PU CHIA
TRUNG QUỐC
VIỆTNAM
120
121
123
124
125
126
127
128
129
130
131
132
133134
135
WAB-21
04-2
03
04-1
04-315-2
0606-1
07
08
15-215-1
15-309-216-
116-2 09-1
09-3
10
11-1
17
1819
20 12(W)11-2
12(E)
1314
21
22
2324
25
26
27
29
28
30
31
32
33
34
3536
37
38
3940
41
42
43
44
45
52/9748/95 (B)
15°N
10°N
105°E
110°E
Rong
Bach Ho
Lan DoLan
Tay
Dai Hung
LÀO
THÁI LAN
N
102 10620°N
Tien Hai
HANOI BASIN
Hainan Isl.
05-1A05-3
Joint Historic Waters
(1982)
TP HO CHI MINH
HÀ NỘI
0 100
KM
101
110
113
111
0102 02/97
01/97
46/02
46-Cai Nuoc
122
Lô 06-1: LAN TÂY, LAN ĐỎ
Lô 15-2: RẠNG ĐÔNG, PHƯƠNG ĐÔNG
Lô 05-2&05-3: HẢI THẠCH, MỘC TINH
Lô 11-2: RỒNG ĐÔI, RỒNG ĐÔI TÂY
Lô 15-1: SƯ TỬ ĐEN, SƯ TỬ VÀNG, SƯ TỬ TRẮNG, SƯ TỬ NÂU
Lô 15-2/01: HẢI SƯ ĐEN, HẢI SỬ TRẮNG
Lô 09-1: BẠCH HỔ, RỒNG
PM3-CAA/46-CÁI NƯỚC
Lô 46/02: SÔNG ĐỐC, NĂM CĂN, NGỌC HIỂN
Lô B, 48/95, 52/97:KIM LONG, ÁC QUỶ, CÁ VOI
TIỀN HẢI C, D14,ĐÔNG QUAN
Lô 05-1a: ĐẠI HÙNG
Lô 102&106: THÁI BÌNH, HÀM RỒNG
Lô 01&02/97: THĂNG LONG, ĐÔNG ĐÔ
Lô 01&02: RUBY, PEARL, TOPAZ, DIAMOND
Lô 12W: CHIM SÁO, DỪA
Lô 09-3: ĐỒI MỒI
Lô 16-1: TÊ GIÁC TRẮNG
Lô 09-2: CÁ NGỪ VÀNG
Lô 112&113: BÁO VÀNG
Lô 103&107: HỒNG LONG, BẠCH LONG
33
Overview of Oil & Gas dev. in Vietnam
4
Vietnam Oil and Gas production
0
70
140
210
280
350
0
5
10
15
20
25
1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012
Cum
. Oil
Prod
., M
MTo
n
Oil
Prod
., M
MTo
n/ye
ar
300
0
10
20
30
40
50
60
70
80
90
0
1
2
3
4
5
6
7
8
9
10
Cum
. Sal
e G
as, B
SCM
Sale
Gas
, BSC
M/y
ear
82
JOGMEC Techno ForumTokyo, May 7-8, 2013
Agenda
1. Overview of Vietnam Oil & Gas
2. Collaboration between PVN and JOGMEC
3. GTL studies
4. CO2 EOR studies
5. Vietnam Technical Challenges & Expectation to
Japanese technologies
Ø 55 technical staffs were trained since 1992
Ø MOU was signed in 2007
Ø CO2 EOR: successful of Pilot Test in 2011
Ø Japan GTL Study: screening conducted
between JOGMEC and VPI.
PVN & JOGMEC
PVN appreciate the good co-operation & support from JOGMEC !
66
JOGMEC Techno ForumTokyo, May 7-8, 2013
Agenda
1. Overview of Vietnam Oil & Gas
2. Collaboration between PVN and JOGMEC
3. GTL studies
4. CO2 EOR studies
5. Vietnam Technical Challenges & Expectation to
Japanese technologies
JOGMEC Techno ForumTokyo, May 7-8, 2013
Japan GTL studies
Ø Screening studies conducted between JOGMEC & VPI, potential fields identified.
Ø Agreement for Phase 2 of study was signed on 4/2011.
Ø Japan GTL is potential solution for :ü High CO2 gas fields
developmentü Intergration with CO2
EOR Project
88
Potential fields for Japan GTLPotential fields for Japan GTL
Potential for developments- Block 102-106-103-107-104- Block 117, 118, 119 (high CO2)- Block 04-3, Block 46-2
Japan GTL Demonstration Plant in Niigata
JOGMEC Techno ForumTokyo, May 7-8, 2013
Agenda
1. Overview of Vietnam Oil & Gas
2. Collaboration between PVN and JOGMEC
3. GTL studies
4. CO2 EOR studies
5. Vietnam Technical Challenges & Expectation to
Japanese technologies
CO2 EOR studies 2008 - 2010
Rang Dong CO2 EORMOU between PVN and JX-NOEX was signed on 9th May, 2008
Phase 1 Study
Cuu Long Basin fields CO2 Potential Study
CO2 Huff&PuffPilot Test
Hydrocarbon Gas EOR
(Source: PVN, 2008)
1111
CO2 EOR Pilot Test (Huff'n'Puff) in 2011
Ø 17-days Test (May-June 2011)Ø 111 tons of CO2 injected and flowed
back (2.1 MMscf)Ø Pumped CO2 from boatØ 7 hours CO2 Injection and 4-days flow
back
(Source: JOGMEC, 2011) 1212
CO2 EOR Pilot Test (Huff'n'Puff) in 2011 (cont.)
EOR effect is confirmed:§ Oil rate increased (up to
1500bpd)§ Water cut dropped§ Oil saturation changed§ CO2 utilization factor
9.8 Mscf/bbl
(Source: JOGMEC, 2011)
1313
JOGMEC Techno ForumTokyo, May 7-8, 2013
Agenda
1. Overview of Vietnam Oil & Gas
2. Collaboration between PVN and JOGMEC
3. GTL studies
4. CO2 EOR studies
5. Vietnam Technical Challenges & Expectation to
Japanese technologies
01. CO2 Management
Difficulties:Ø High CAPEXØ High frequency of
maintenance jobs (every 6 months)
Ø Reduce production when doing maintenance
Ø Not commercial to develop very high CO2 reservoirs (70-80%)
Conventional Membrane System• Two skids; Footprint = 257m2/ea• Weight (w/elements) = 302 tons
(Source: Talisman Energy, 2012)1515
01. CO2 Management (cont.)
Current development in PM-3 CAA field shown many difficulties in CO2 management (removal):§ High CAPEX for CO2 removal facilities (membrane)§ Requires frequent maintenance (reduce prod. rate)§ Environment unfriendly (vent CO2 to the air)
Middle Vietnam has many TCFs gas reservoirs with high CO2 content!
How to develop these reservoir efficiently?! GTL/EOR/CSS?
1616
02. EOR
Big fields are mature & production declining <= the need of applying EOR to maintain production rate.EOR methods:§ Thermal: not applicable in Vietnam§ Chemical: limited studies, poor
laboratory facilities.§ Gas injection:
How to well match these two parts in one mega project ?!
We have BIG CO2 sources (gas fields) + BIG potential to apply CO2 EOR (pilot test confirmed!)
1717
03. Mercury Content Treatment
Difficulties:§ High CAPEX§ High frequency of
maintenance jobs§ Reduce production when
doing maintenance§ No technology available to
remove Hg in Oil
Service Companies:
(Source: Talisman Energy, 2012)
1818
Difficulties in handling Hg content:§ High CAPEX for removal facilities§ Requires frequent maintenance (reduce prod.
rate)§ No technology available to remove Hg in Oil§ Transport, Storage & Disposal of Mercury
Big project (KL-AQ-CV) in development phase, is going to face with this problem!
03. Mercury Content Treatment (cont.)
How to resolve this issue efficiently ?!
1919
Traditional offshore field development schematic:WHPs + FPSO + Pipeline + Conventional wells
- Heavy (topside around 2000 tons)- High CAPEX- Mostly not reusable- Not commercial for marginal fields (ie. <100 mmstbo)
We have many marginal offshore oil and gas fields, with:- Strictly metocean conditions (storm, high wave)- Scatteringly distributed
04. Marginal Fields Development
How to develop these field commercially ?!
2020
The development of Halo model
Many other technologies applied (Artificial Neural Network, DFN, dual porosity,…) but yet not to achieve good result.
05. Fractured Basement Reservoir Management
Need more studies and new Initiatives to successful model fractured basement reservoirs!
Ø The co-operation between PVN & JOGMEC in the past has demonstrated beneficial for both sides. Japan technologies have been successfully applied in Vietnam.
Ø In alignment with “New Initiative” of JOGMEC, we (PVN) would like to introduce our current focusing topics and our expectation to your technology in solving them, including:ü High CO2 reservoir development, application of GTL, CSSü EOR utilizing CO2ü Mercury content treatmentü Marginal fields developmentü Fractured basement reservoir management
Summary
JOGMEC Techno Forum 2013Tokyo, May 7-8, 2013
JOGMEC Techno Forum 2013Tokyo, May 7-8, 2013
Arigato Gozaimasu!
ありがとう !
Thank you for your attention!
Xin cảm ơn!
Arigato Gozaimasu!
ありがとう !
Thank you for your attention!
Xin cảm ơn!