Page 1: Existing Building Commissioning Guidelines … Building Commissioning Guidelines (ASHRAE Guidelines 0.2 & 1.2) ... Purpose & Scope : ... Create Investigation Report

Mark F. Miller, PE, CCP

Principal - Strategic Building Solutions, LLC

Existing Building Commissioning Guidelines(ASHRAE Guidelines 0.2 & 1.2)

Page 2: Existing Building Commissioning Guidelines … Building Commissioning Guidelines (ASHRAE Guidelines 0.2 & 1.2) ... Purpose & Scope : ... Create Investigation Report

Overview

ASHRAE Guidelines for EBCX Best Practices

• General description and context• EBCX Process and Specific Tasks• Comparison to New Commissioning• Terminology• Keys Concepts• Characteristics of a CX Provider for EBCX

Page 3: Existing Building Commissioning Guidelines … Building Commissioning Guidelines (ASHRAE Guidelines 0.2 & 1.2) ... Purpose & Scope : ... Create Investigation Report

ASHRAE Guideline 0.2Title, Purpose & Scope : “ The Commissioning Process for Existing Building Systems

and Assemblies “

• Purpose: The purpose of this guideline is to describe the procedures, methods, documentation requirements and physical activities of the commissioning process using the principles developed in ASHRAE Guideline 0, The Commissioning Process.

• Scope: This guideline applies to existing building systems and assemblies.

PROCESS GUIDELINE

Page 4: Existing Building Commissioning Guidelines … Building Commissioning Guidelines (ASHRAE Guidelines 0.2 & 1.2) ... Purpose & Scope : ... Create Investigation Report

ASHRAE Guideline 1.2Title, Purpose & Scope :

“ HVAC&R Technical Requirements of the Commissioning Process for Existing Building Systems and Assemblies”

• Purpose: The purpose of this guideline is to describe the technical requirements of the commissioning process for existing HVAC&R systems and assemblies, based on the processes described in ASHRAE Guideline 0.2P-200X, The Commissioning Process for Existing Systems and Assemblies.

• Scope: The guideline applies to existing HVAC&R systems and assemblies.

HVAC&R TECHNICAL REQUIREMENTS GUIDELINE

Page 5: Existing Building Commissioning Guidelines … Building Commissioning Guidelines (ASHRAE Guidelines 0.2 & 1.2) ... Purpose & Scope : ... Create Investigation Report

Building Commissioning GuidelinesASHRAE

Gdl. 0-2005

ASHRAE Gdl. 1.1-2007

NIBS Gdl. 3-2006 Others …

ASHRAE Gdl. 0.2P

ASHRAE Gdl. 1.2P

Others …

= Existing Building = New Building

= Process Guideline = Technical Guideline

Page 6: Existing Building Commissioning Guidelines … Building Commissioning Guidelines (ASHRAE Guidelines 0.2 & 1.2) ... Purpose & Scope : ... Create Investigation Report

Terminology

• Guideline is for “Existing Building Commissioning” – EBCX

• What is the difference between: 

“Retrocommissioning”and

“Recommissioning”?

o Covers all existing buildingso Acknowledges if CX previously: 

‐ some steps may not be needed‐ same level of effort not required

Page 7: Existing Building Commissioning Guidelines … Building Commissioning Guidelines (ASHRAE Guidelines 0.2 & 1.2) ... Purpose & Scope : ... Create Investigation Report

Overall Process: Flow Chart/Major Tasks

Multiple Facility Planning

Implementation

Assessment

Investigation

On Going Commissioning

Hand‐off

FLOW IS NOT LINEAR

Process is typically

ITERATIVE(loops between tasks)

Page 8: Existing Building Commissioning Guidelines … Building Commissioning Guidelines (ASHRAE Guidelines 0.2 & 1.2) ... Purpose & Scope : ... Create Investigation Report

Multiple Facility Planning

Define EBCxP Program Goals & Objectives

Decision To Proceed

YesNoTo Assessment Phase

Multiple Facilities

Assemble and Rank Facilities

Develop EBCxP Program Plan

Assemble EBCxP Planning Team

Yes

To Assessment PhaseNo

Page 9: Existing Building Commissioning Guidelines … Building Commissioning Guidelines (ASHRAE Guidelines 0.2 & 1.2) ... Purpose & Scope : ... Create Investigation Report

AssessmentDefine Owner’s EBCxP ObjectivesDefine Owner’s EBCxP Objectives

Select Initial EBCx Team

Conduct EBCxP Planning Meeting

Decision To Proceed

YesNo

Document EBCxP Goals and Objectives

Develop Initial EBCxP Plan

Develop Current Facility Requirements (CFR)

To Investigation PhaseResolution of Issues

Develop EBCxP Assessment Report

Perform Facility Assessment

Page 10: Existing Building Commissioning Guidelines … Building Commissioning Guidelines (ASHRAE Guidelines 0.2 & 1.2) ... Purpose & Scope : ... Create Investigation Report

InvestigationAssemble EBCxP Investigation Team

Update EBCxP Plan

Create Investigation Report

Perform Site Investigation and Testing

YesResolution of Issues

Additional Investigation

Decision To Proceed

Yes

No

Conduct Investigation Planning Meeting

Perform Issue and Opportunity Analysis

Review Existing System Records

To Implementation Phase

Page 11: Existing Building Commissioning Guidelines … Building Commissioning Guidelines (ASHRAE Guidelines 0.2 & 1.2) ... Purpose & Scope : ... Create Investigation Report

ImplementationSelect Recommendations

To Investigation To Hand‐off Phase

Select EBCxP Implementation Team

Incorporate Informal Training

Update the EBCxP Plan

New DiscoveryYes No

Implement Recommendations

Update EBCxP Report for Implementation Report

Capital Project

Yes

No

Implement Capital Projects

Commissioning of Capital Project

Create Commissioning Report

Verify Completed Recommendations

Page 12: Existing Building Commissioning Guidelines … Building Commissioning Guidelines (ASHRAE Guidelines 0.2 & 1.2) ... Purpose & Scope : ... Create Investigation Report

Hand Off

Resolution of Issues

Owner Acceptance

YesNo

Provide Project Documents to Owner

Train Facility Personnel 

Verify Training Effectiveness

Conduct Lessons Learned Workshop

Update and Complete Systems Manual

Update Systems Manual & EBCxP Plan Report

Develop On Going Commissioning Plan

Ongoing Commissioning

Page 13: Existing Building Commissioning Guidelines … Building Commissioning Guidelines (ASHRAE Guidelines 0.2 & 1.2) ... Purpose & Scope : ... Create Investigation Report

Ongoing Commissioning

Update OCx Plan

Verify Achievement of Current Facility Requirements

Investigate Unacceptable Performance or Outcome

Assemble OCx Team

Owner Acceptance

YesNoResolution of Issues

Implement Corrective Actions

Update Facility Personnel Training

Write/Deliver OCx Report

Update Systems Manual

Page 14: Existing Building Commissioning Guidelines … Building Commissioning Guidelines (ASHRAE Guidelines 0.2 & 1.2) ... Purpose & Scope : ... Create Investigation Report

Comparison: Overall Process

Multiple Facility Planning

Implementation 

Assessment

Investigation

On Going Commissioning

Hand‐Off

Existing Building – Gdl 0.2

Construction 

Pre‐Design

Design

On Going Commissioning

Occupancy & Operation

New Construction – Gdl 0

Page 15: Existing Building Commissioning Guidelines … Building Commissioning Guidelines (ASHRAE Guidelines 0.2 & 1.2) ... Purpose & Scope : ... Create Investigation Report

TerminologyNew Buildings

OPRBOD

CX PlanIssues Log

CX ReportSystems ManualFacility Guide

On‐Going CX Plan

Construction/Design

Existing BuildingsCFR

MACFREBCX PlanIssues Log

List of Findings & Reccommendations

EBCX ReportSystems Manual:Facility Guide

On‐Going CX Plan

Implementation/Plan

Page 16: Existing Building Commissioning Guidelines … Building Commissioning Guidelines (ASHRAE Guidelines 0.2 & 1.2) ... Purpose & Scope : ... Create Investigation Report

Key ConceptsSuccess: • Recommendations improve facilities• Don’t stop at investigation• On‐going process• Not too cost prohibitive• Document and verify benefits• Fit the operation to current need

Page 17: Existing Building Commissioning Guidelines … Building Commissioning Guidelines (ASHRAE Guidelines 0.2 & 1.2) ... Purpose & Scope : ... Create Investigation Report

Key ConceptsCurrent Facility Requirements (CFR)• Establish before you begin• Involve Key stakeholders• What will make the facility a success?• Not going back to Original Design• Update through life of building

? ?

Page 18: Existing Building Commissioning Guidelines … Building Commissioning Guidelines (ASHRAE Guidelines 0.2 & 1.2) ... Purpose & Scope : ... Create Investigation Report

Key ConceptsMaintaining Benefits (Persistence)• Training• Systems Manual• On‐Going Commissioning• Build in features to assist• Document means to achieve CFR (MACFR)

STOP SAVING THE SAME KWH OVER & OVER

Setpoint should be 32.8 psi

Page 19: Existing Building Commissioning Guidelines … Building Commissioning Guidelines (ASHRAE Guidelines 0.2 & 1.2) ... Purpose & Scope : ... Create Investigation Report

Key Concepts

Investigation/Testing• Quick Fixes• Targeted• Testing – Everything?• 80/20 Rule

Page 20: Existing Building Commissioning Guidelines … Building Commissioning Guidelines (ASHRAE Guidelines 0.2 & 1.2) ... Purpose & Scope : ... Create Investigation Report

Key Concepts

Training• Systems Manual• Facility Guide• Involve staff throughout process• Informal & Formal• Evaluate Training• Update in On‐going CX

Page 21: Existing Building Commissioning Guidelines … Building Commissioning Guidelines (ASHRAE Guidelines 0.2 & 1.2) ... Purpose & Scope : ... Create Investigation Report

Key Concepts

Measurement & Verification• Quantify benefits• Verification of improvements• Approach Appropriate

• Repeatable

o Match requirementso Agree with ownero Fits size and scope 