Expert in the field of Piping

CONTENTS

Company Profile

Quality assurance & Certificates

Experience of Key Person

Main Equipment for Fabrication

Vision & Strengths

Measuring & Inspection Instruments

2

Strengths of NAMIN

High Efficiency ,

Productivity and Quality by

excellent leadership and

with high skilled & trained

Welders & QC and NDT

inspectors

Expert & Experienced Management by skilled

engineers with NIPS

Reasonable, Fair and

Competitive Price

Customer

Satisfaction

3

Vision for NAMIN till 2016

4

6,000 12,000 15,000 20,000 25,000 30,000 35,000

8 10

20

30

50

70

100

0

20

40

60

80

100

120

2010 2011 2012 2013 2014 2015 2016

-

5,000

10,000

15,000

20,000

25,000

30,000

35,000

YEAR

Ca

pa

cit

y(t

on

/ye

ar)

An

nu

al

Sa

les

(Millio

n U

SD

)

Company summary

- Name : NAMIN Corporation Limited , President Hung-Cheol, Choi

- Address: 897, Yucheon-Ri , Sanam-Myun, Sacheon-City,

Gyeongnam,South Korea 664-942

- Total Area 50,000㎥(Width 205 M, Length 240 M),

- Buildings 11,635 ㎡: Main office , Cutting, Machining ,Welding, NDT, Heating

Shot blasting & Painting

- CAPITAL: KRW 1,800,000,000(30% invested by Foreign company)

- Asset : KRW 10,000,000,000

OPERATION

SPACE

General

information

5

* Main office : 1,312 m2 with the area of 3 story (customer’s office , work office)

* Accommodation : 515 m2 (restaurant & a boarding house for employee)

* Factory #1 : 7,809 m2 (66M x 110M, cutting, machining, welding NDT & Heating)

* Factory #2 : 1,999 m2 (20M x 90M, shot blasting & painting)

- Engineering , Procurement, Production with best quality for Spool and

Hangers & supports of Piping

- Applicable Plants

Power Plant of Nuclear, Coal fired, Combined Cycle ,

Plant of Petro-Chemical and Ocean Developments

Contact Point

Services of

Business

-110 Average

A working staff

Company summary

6

-TEL +82-55-830-8899

- FAX +82-55-830-0027

- Mobile +82-10-6220-6310

- E-mail [email protected]

- Website www.inamin.co.kr

A bird’s eye view of company

1. Total Area 50,000 ㎥(W205 M, L240 M),

2. Buildings 11,635 ㎡

1) Main office 3) Factory #2

2) Factory #1 4) Restaurant & a boarding house

Factory #2

Main Office

Restaurant &

A boarding house for employee

Factory #1

1F: customer’s

2F: work office

3F: president , PM

LINE PRODUCTION

SYSTEM FOR PIPING 7

(66M x 110M)

(20M x 90M)

Acquired ASME “S”, “PP” certificates

(2010.6.25)

Will acquire PED “H1” certificate (within

this year)

Will acquire KEPIC certificate(within this

year)

Completion of factory construction

HISTORY

Acquired a certificate of enterprise

for Piping.

Acquired a certificate of a foreigners

investment enterprise.

A Ground-breaking Ceremony.

Acquired a certificate of ISO 9001:2008.

2009 2010

8

Organization

9

Quality Policy & Certificates

Customer Satisfaction to Applicable Code and Standards

Quality Management Policy

Certificates

10

CERTIFICATE CERT. NO EXPIRES

ISO 9001:2008 AP1416 Dec 23, 2012

ASME "PP" 39,695 June 25, 2013

ASME "S" 39,696 June 25, 2013

PED "H1" This certificate will be acquired within this year

KEPIC This certificate will be acquired within this year

Certificate of ISO 9001

11

Certificates of ASME “S”, “PP”

12

Registration for Business

Certificate of enterprise Certificate of a foreign

investment enterprise

13

Welding Process

GTAW

Root Pass and

Stainless Steel

FCAW

Carbon / Stainless

and Alloy Steel(P4, P5A)

SMAW

High Alloy Steel (P5B)

SAW All Materials Over OD 20”

and Thicker 20mm

14

1G Position Welding Parts Automatic

FCAW

* FABRICATION ISO DWG

Sample of Drawing by NAMIN

15

Sample of Drawing by NAMIN

* SPOOL DWAWING

16

* TRAVELLA

Sample of Drawing by NAMIN

17

1st Receiving Inspection

of Materials

2nd Color coding for control

of Materials class & Projects 3rd Safekeeping in the Rack

4th Cutting & Machining 5th Stamping & DI, VI

For 4th Step

6th Fit-up and Inspection

* preHeat will be performed

in accordance with WPS

before fit-up

Arrow for flow

direction Material class

Heat Number Spool Number

P91

P11

P22

CS

Spool fabrication process

18

7th Welding 8th Inspection of DI, VI

after welding 9th NDE

10th PWHT(Post weld Heat

Treatment) 11th Hardness Test 12th PMI(Positive Material

Identification)

Spool fabrication process

19

13th Shot Blast

and Inspection

14th Painting 15th Painting Inspection

16th Packing

and Inspection

17th Shipping / Transportation

Packing & Shipping Method - Container, Bulk

Transportation Services - Inland, Marine, Air Transportation

Spool fabrication process

20

Business Performance

21

Customer Project Name Location Period

SOL Group General Trading

& Contracting Co. W.L.L Subiya Power Station Kuwait 2010

SIEMENS POSCO Power #5,6 Korea 2010

PANAMETS CO.,LTD

(Fluenta Korea) FLOWMETER GAS Korea 2010

PROJECT NAME LOCATION CUSTOMER ITEM PERIOD

ULSAN #1/2(250MWx2) Korea HEC. MHI PIPING '96~'97

PORYONG #1/2(100MWx2) Korea HEC, ABB PIPING/HANGER '97~'98

ILIJAN(1200MWx1) Philippines DAELIM, RAYTHEON PIPING/HANGER 2000

PELICAN POINT(480MWx1) Australia HEC, ABB PIPING/HANGER 2000

BANG BO(380MWx1) Thailand HEC, ALSTOM PIPING/HANGER 2001

SWAN BANK(380MWx1) Australia HEC, ALSTOM PIPING/HANGER 2001

BOWIN(380MWx2) Thailand HEC, ALSTOM PIPING/HANGER 2001

SPA #3 ECONOPACS U.S.A HHI, WESTINGHOUSE PIPING 2001

PERRYVILLE POWER STATION U.S.A GE PIPING 2001

NEVADA APEX1 N860 U.S.A GE PIPING/HANGER 2001

PERRYVILLE POWER STATION U.S.A GE PIPING 2001

WYANDOTTE(250MWx2) U.S.A IHI PIPING/HANGER '01~'02

POSSUM/DRESDEN POINT N880(500MW) U.S.A GE PIPING 2002

POLETTI N881(500MW) U.S.A GE PIPING 2002

ELK HILLS(250MWx2) U.S.A IHI PIPING/HANGER 2002

BOWLINE(250MWx3) U.S.A IHI PIPING/HANGER 2002

SENOKO(360MWx2) Singapore HEC,ALSTOM PIPING/HANGER 2003

MOKAI PROJECT New Zealand ORMAT PIPING 2004

WAIRAKEI PROJECT New Zealand ORMAT PIPING 2004

Combined Cycle Power Plant

Experience of Key Person

22

PROJECT NAME LOCATION CUSTOMER ITEM PERIOD

SABON(300MWx1) Spain DOOSAN, GE PIPING 2004

AMOREBIETA(720MWx1) Spain DOOSAN, GE PIPING 2004

UMM AL NAR(850MWx1) U.A.E DOOSAN, GE PIPING 2004

MOKAI PROJECT New Zealand ORMAT PIPING 2004

WAIRAKEI PROJECT New Zealand ORMAT PIPING 2004

INCHEON(450MWx1) Korea SIEMENS,KOMIPO PIPING/HANGER 2004

ACECA(400MWx1) Spain DOOSAN, GE PIPING/HANGER '04~'05

GALENA GEOTHERMAL PROJECT U.S.A ORMAT PIPING 2005

GALENA GEOTHERMAL PROJECT U.S.A ORMAT PIPING 2005

LAVERTON GAS TURBINE Australia SIEMENS PIPING/HANGER 2005

KEMERTON POWER STATION Australia SIEMENS PIPING/HANGER 2005

RAS LAFFAN B(1025MWx1) Qatar SIEMENS PIPING/HANGER '05~'06

AL-EZZEL(473MWx2) Bahrain SIEMENS PIPING/HANGER '05~'06

SERAYA #30, #40 PROJECT Singapore Doosan,Siemens Piping 2008

EMAL UAE Doosan Piping '08~'09

RAS LAFFAN HRSG PIPE SPOOL Qatar Doosan.Hyundai PIPING/HANGER 2009

AMAZON PROJECT Korea Doosan Piping 2009

Gun-San Complex Gas-Turbine Korea Doosan,Korea Western Power Piping 2009

YeungWol #1/2/3 Korea Doosan, Korea South-East Power PIPING/HANGER 2009

MURIDIKE Pakistan AEE in Czech Piping 2008

Experience of Key Person

23

num name capacity quantity Installation

1 Band Saw MC 600A/800A 1EA/1EA May of 2010

2 Gas Cutting MC 800A 1EA Jun of 2010

3 CNC Coaster 600A 1EA May of 2010

4 End Prep. MC 800A 1EA May of 2010

5 Branch Hole MC 500A 1EA Jun of 2010

6 Radial Drill MC 1600A 1EA Jun of 2010

7 Punching MC 100x17 1EA Jun of 2010

8 TIG Welders 500A 22EA May of 2010

9 CO2 Welders 600A 22EA May of 2010

10 SAW MC 1500A 1EA May of 2010

11 GOUGING MC 1000A 1EA Jun of 2010

12 ROTATOR 1000A/1500A 8EA/4EA May of 2010

Main Equipment for Fabrication

26

num name capacity quantity Installation

13 Shot Blasting W20m x L30m x H5m 1 Bay Jun of 2010

14 Painting W20m x L30m x H6m 2 Bay Jun of 2010

15 Dry & Holding oven

for welding Rod

500kg 1 EA May of 2010

16 Forklift 3.5t/4.5t/7t 3EA/2EA/2EA May of 2010

17 Over Head Crane 20t/10t/5t 1EA/2EA/5EA May of 2010

18 Semi gantry 2.8t 10 EA May of 2010

19 PWHT Furnace crane W4m x L12m x H6m 1 EA Jun of 2010

20 Compressor 100HP 5 EA May of 2010

Main Equipment for Fabrication

27

num name capacity quantity Installation

1 ULTRASONIC THICKNESS GAGE 1.2~225 1EA May of 2010

2 CLAMP METER AC,DC 1EA May of 2010

3 INFRARED LIGHT THERMOMETER 20~1000℃ 1EA May of 2010

4 VERNIER CALIPER 300mm 1EA May of 2010

5 PRESSURE GAUGE 50kgf/cm2 2EA May of 2010

6 MEASURING TAPE 50M 1EA May of 2010

7 AC/DC CLAMP METER 100A,6KV,10MΩ 1EA

Will be purchased

by 30 JUN

8 TEMPERATURE HYGROMETER -5 ~ 50 ℃ 1EA

9 DIAL THICKNESS GAGE 0 ~ 1.0 mm 1EA

10 PMI ALL Materials exp. CS 1EA

11 HARDNESS TESTER 20 ~ 1740 Hv 1EA

12 SURFACE PROFILE GAGE ~1000 ㎛ 1EA

13 DIGITAL SURFACE TEMPERATURE

GAGE

~200 ℃ 1EA

14 DIGITAL FLIM THICKNESS GAGE ~1500 ㎛ 1EA

15 LASER TEMPERATURE GAGE ~ 300 ℃ 1EA

16 WET FILM THICKNESS GAGE 25 ~ 300 ㎛ 1EA

Measurement & Instrument for Inspection

28

NAMIN Co., Ltd.

897, Yucheon-Ri, Sanam-Myun, Sacheon-City,

Gyeongnam, South Korea 664-942

Thank You !

29

Telephone : +82-55-830-8800

Website : www.inamin.co.kr

E-mail : [email protected]