    :- :- C/o 1.5 No. Dormitory with 6 Nos. Warden Residences, 2/I, 2/II, 8/III Quarters, Guest Hous

    :- Amount of previous statement :-

    :- - - . Nil :- s. , , , - :- Rs. 2,73,38,638/-

    . age:- . a ove .e ate :- . Amount of this Statement :- Rs.83,524.00Sl.

    No.Description of Item Quantity

    Rate

    (Rs.)Unit

    Amount

    (Rs.)Remarks

    1

    Precast terrazo tiles 22 mm thick with graded marble chips of sizesupto 12 mm in skir ting and r isers of steps not exceeding 30 cm inheight on 12 mm thick cement plaster 1:3 (1 cement : 3 coarse sand)jointed with neat cement slurry mixed with pigment to match theshade of the tiles, including rubbing and polishing complete with tilesof:(a) Dark shade using ordinary cement.

    70.00 570.45 Sqm 39932.00

    In dormitory, warden quarters and stairprovision for terrazo tiles are made.However, corresponding provision forterrazo skirting was not made. Hence,extra item.

    2

    Providing and fixing long arm 'P' trap for WC Pan including cuttingand making good the walls.(a) 100 mm inlet and 100 mm outlet.(i) Centrifugally Cast (Spun) Iron S&S.

    36.00 1210.90 Each 43592.00

    In Agreement Item No. 11.16, there is noprovision for 100 mm dia 'P' trap for ruraltype WC. Hence, extra item.

    TOTAL 83524.00

    Certificate :-

    (1). This statement contains 02 (Two) items only.(2). The rates are net and are not subjected to any further enhancement / abatement.(3). The payment shall be made for quantities actually executed at site and for measurements recorded in the M.B.

    - , , - , ,

    EXTRA ITEM STATEMENT NO. - I

    EIS No. - I sent to SE, GCC for Principle Approval for Rs. 83,524/- (Rupees Eighty Three Thousand, Five Hundred and Twenty Four only)

  • 7/30/2019 Extra Item Shayona

    2/7

    :- :- C/o 1.5 No. Dormitory with 6 Nos. Warden Residences, 2/I, 2/II, 8/III Quarters, Guest Hous

    :- Amount of previous statement :-

    :- - - . (1) EIS-I sent to SE for PA for Rs. 3,36,308/- :- s. , , , . age:- . a ove . :- s. , , , - e ate :- . (2) Amount of this Statement :- Rs. 1,15,781/-

    Sl.

    No.Description of Item Quantity

    Rate

    (Rs.)Unit

    Amount

    (Rs.)Remarks

    1

    Providing and fixing chicken mesh jali 15 cm wide between thejunction of RCC and brick work before the plastering work withnecessary nails or screws complete as per the direction of Engineer-in-charge.

    3525.00 5.10 Metre 17978.00

    No provision in the Agreement. Hence,extra item.

    2

    Supply and fixing in position CI covers with frames for RCC waterstorage tanks up to floor five level of size 455 mm x 610 mm

    rectangular shape (medium duty) the weight of frame should be 10Kg. (Total weight 25 Kg) including locking arrangement with MS flat50 x 6 mm all complete as per the direction of Engineer-in-charge.

    13.00 1056.30 Each 13732.00 ---do---

    3Providing and fixing GI pipe spout having 25mm dia and 30 cmlength, champhere at outer edge at balconies, sunken floors etc. 60.00 58.85 Each 3531.00 ---do---

    4

    Making connection of GI distribution branch with GI main of followingsizes by providing and fixing tee including cutting and threading thepipe etc. complete.(a) 50 to 80 mm nominal bore.

    9.00 530.95 Each 4779.00 ---do---

    5

    Making connection of drain or sewer l ine with exist ing manhole

    including breaking into and making good the walls, floors with cementconcrete 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stoneaggregate 20 mm nominal size) cement plastered on both sides(a) For pipes 100 to 230 mm diameter.

    10.00 142.00 Each 1420.00 ---do---

    6 (b) Neat cement punning. 490.00 18.45 Sqm 9041.00 ---do---

    7Providing and laying cement concrete 1:5:10 (1 cement : 5 coarsesand : 10 graded brick aggregate 40 mm nominal size) in all floor andat all levels of sunken RCC floors.

    12.00 1463.20 Cum 17558.00 ---do---

    EXTRA ITEM STATEMENT NO. - II

  • 7/30/2019 Extra Item Shayona

    3/7

    Sl.

    No.Description of Item Quantity

    Rate

    (Rs.)Unit

    Amount

    (Rs.)Remarks

    8

    Supply and filling good earth from any distance in layers not

    exceeding 20 cm in depth including breaking clods, watering, rollingof earth layer by 0.5 tonne roller/ surface vibrater or wooden or steelrammer and rolling every third and top most layer with power roller ofminimum eight tonne capacity and dressing up in embankment orplinth or similar location for all level and lift. Note : Quantity for payment shall be the volume of earth calculated after reduction of5%.

    575.00 73.90 Cum 42493.00 ---do---

    9

    Providing and f ixing bend of required degree with access door,insertion rubber washer 3 mm thick, bolts and nuts complete.(a) 100 mm(i) Sand Cast Iron S&S.

    6.00 374.90 Each 2249.00 ---do---

    10

    Providing and f ixing GI Union in existing GI pipe l ine, cutt ing andthreading the pipe and making long screws including excavation,refilling the earth or cutting of wall and making good the samecomplete wherever required.(a) 65 mm nominal bore.

    7.00 428.50 Each 3000.00 ---do---

    TOTAL 115781.00

    Certificate :-

    (1). This statement contains 10 (Ten) items only.(2). The rates are net and are not subjected to any further enhancement / abatement.

    (3). The payment shall be made for quantities actually executed at site and for measurements recorded in the M.B.

    ( ) -I

    . . . ., . . . .,

    EIS No. - II sent to SE, GCC for Principle Approval for Rs. 1,15,781/- (Rupees One Lakh, Fifteen Thousand, Seven Hundred and Eighty One only)

  • 7/30/2019 Extra Item Shayona

    4/7

    2

    Chequerred precast cement concrete tiles 30 mm thick in footpathand courtyard jointed with neat cement slurry mixed with pigment tomatch the shade of tiles including rubbing and cleaning etc. complete

    on 20 mm thick bed of cement mortar 1:4 (1 cement : 4 coarse sand).(a) Dark shade using ordinary cement.

    460.00 492.10 Sqm 226366.00

    In the all footpPhase-A Cheqhave been use

    aspects alongwcomparision witvisit of SE, GCdecided that themay be used. Tsuch tiles in theitem.

  • 7/30/2019 Extra Item Shayona

    5/7

    ase- .e i/c W/S, S/I, Drainage, Devt. Works.

  • 7/30/2019 Extra Item Shayona

    6/7

    ase- .e i/c W/S, S/I, Drainage, Devt. Works.

  • 7/30/2019 Extra Item Shayona

    7/7

    -I