![Page 1: FAARMS Facilities And Assets Risk Management System) · –Defect Category –Defect severity –Failure Mode –Final risk assessment –Revise site comments and information –Action](https://reader034.vdocuments.net/reader034/viewer/2022051805/5ff7f292a7c6a3691378432a/html5/thumbnails/1.jpg)
FAARMS(Facilities And Assets Risk Management System)
2008-04-21
![Page 2: FAARMS Facilities And Assets Risk Management System) · –Defect Category –Defect severity –Failure Mode –Final risk assessment –Revise site comments and information –Action](https://reader034.vdocuments.net/reader034/viewer/2022051805/5ff7f292a7c6a3691378432a/html5/thumbnails/2.jpg)
Contents
• What is FAARMS (Methodology)?
• FAARMS Application Development
• Auditing Process
FA
AR
MS
![Page 3: FAARMS Facilities And Assets Risk Management System) · –Defect Category –Defect severity –Failure Mode –Final risk assessment –Revise site comments and information –Action](https://reader034.vdocuments.net/reader034/viewer/2022051805/5ff7f292a7c6a3691378432a/html5/thumbnails/3.jpg)
FAARMS is an objective asset
auditing methodology supported by a
global database tool that records the
complete history of an asset condition and associated risks and physical
condition through multiple objective
audits.
What is FAARMS
FA
AR
MS
![Page 4: FAARMS Facilities And Assets Risk Management System) · –Defect Category –Defect severity –Failure Mode –Final risk assessment –Revise site comments and information –Action](https://reader034.vdocuments.net/reader034/viewer/2022051805/5ff7f292a7c6a3691378432a/html5/thumbnails/4.jpg)
In short, FAARMS assists clients to manage assets
so that the life of assets can be extended with
minimum maintenance cost.
Actions out of FAARMS is sorted according to
priority defined by RISK (Likelihood \
Consequence) and condition rating.
This allow client to budget for next financial year
only on the critical items.
Why FAARMS
FA
AR
MS
![Page 5: FAARMS Facilities And Assets Risk Management System) · –Defect Category –Defect severity –Failure Mode –Final risk assessment –Revise site comments and information –Action](https://reader034.vdocuments.net/reader034/viewer/2022051805/5ff7f292a7c6a3691378432a/html5/thumbnails/5.jpg)
Condition Assessment through defects
Defects are categorised into type and severity.
Allows reporting to general condition
![Page 6: FAARMS Facilities And Assets Risk Management System) · –Defect Category –Defect severity –Failure Mode –Final risk assessment –Revise site comments and information –Action](https://reader034.vdocuments.net/reader034/viewer/2022051805/5ff7f292a7c6a3691378432a/html5/thumbnails/6.jpg)
Risk Assessment
• Usually based on client risk assessment
system
• Likelihood and consequence of failure
scenario
• Consequence based on injury, operational
impact or business impact
FA
AR
MS
![Page 7: FAARMS Facilities And Assets Risk Management System) · –Defect Category –Defect severity –Failure Mode –Final risk assessment –Revise site comments and information –Action](https://reader034.vdocuments.net/reader034/viewer/2022051805/5ff7f292a7c6a3691378432a/html5/thumbnails/7.jpg)
Failure Mode
• Identifies likely type of failure
• Allows general reporting function
• Identifies scenario for risk assessment
FA
AR
MS
![Page 8: FAARMS Facilities And Assets Risk Management System) · –Defect Category –Defect severity –Failure Mode –Final risk assessment –Revise site comments and information –Action](https://reader034.vdocuments.net/reader034/viewer/2022051805/5ff7f292a7c6a3691378432a/html5/thumbnails/8.jpg)
Action Type
• Allows reporting on type of action
required.
• Assists in developing packages of work for
construction contracts
FA
AR
MS
![Page 9: FAARMS Facilities And Assets Risk Management System) · –Defect Category –Defect severity –Failure Mode –Final risk assessment –Revise site comments and information –Action](https://reader034.vdocuments.net/reader034/viewer/2022051805/5ff7f292a7c6a3691378432a/html5/thumbnails/9.jpg)
Global Access to FAARMS system
FA
AR
MS
![Page 10: FAARMS Facilities And Assets Risk Management System) · –Defect Category –Defect severity –Failure Mode –Final risk assessment –Revise site comments and information –Action](https://reader034.vdocuments.net/reader034/viewer/2022051805/5ff7f292a7c6a3691378432a/html5/thumbnails/10.jpg)
Summary of FAARMS
FAARMS is a proactive and cost effective
approach to extent the life of physical
structural assets for corporate clients with
large facilities. This is done through repeated
structural audits based on an objective
condition and risk methodology.
FA
AR
MS
![Page 11: FAARMS Facilities And Assets Risk Management System) · –Defect Category –Defect severity –Failure Mode –Final risk assessment –Revise site comments and information –Action](https://reader034.vdocuments.net/reader034/viewer/2022051805/5ff7f292a7c6a3691378432a/html5/thumbnails/11.jpg)
Auditing Process
The following process outlines the
auditing process for structures:
• Project/Client set up (Once off process)
• Site Inspection– Reporting on Site
– Reporting in office
– FAARMS Entry
– Issue Report
• Design (as required)
• RepairFA
AR
MS
![Page 12: FAARMS Facilities And Assets Risk Management System) · –Defect Category –Defect severity –Failure Mode –Final risk assessment –Revise site comments and information –Action](https://reader034.vdocuments.net/reader034/viewer/2022051805/5ff7f292a7c6a3691378432a/html5/thumbnails/12.jpg)
Client Set up
Each client requires set up for the first audit to be entered. Information includes:
– Client contacts
– Disciplines
– Defect categories and severities
– Failure Modes
– Risk configuration
– Priorities
– Action Type
– Status codes
– Package type
– CostsFA
AR
MS
![Page 13: FAARMS Facilities And Assets Risk Management System) · –Defect Category –Defect severity –Failure Mode –Final risk assessment –Revise site comments and information –Action](https://reader034.vdocuments.net/reader034/viewer/2022051805/5ff7f292a7c6a3691378432a/html5/thumbnails/13.jpg)
Reporting on Site
On site the following things are noted:
• Identify condition and assign item
• Condition statement
• Proposed action
• Preliminary risk assessment
• Photograph of area
• Locate item on drawing
FA
AR
MS
![Page 14: FAARMS Facilities And Assets Risk Management System) · –Defect Category –Defect severity –Failure Mode –Final risk assessment –Revise site comments and information –Action](https://reader034.vdocuments.net/reader034/viewer/2022051805/5ff7f292a7c6a3691378432a/html5/thumbnails/14.jpg)
Reporting in office
After the site work is complete further
information is added to the data. This
includes:
– Defect Category
– Defect severity
– Failure Mode
– Final risk assessment
– Revise site comments and information
– Action type and code
– PriorityFA
AR
MS
![Page 15: FAARMS Facilities And Assets Risk Management System) · –Defect Category –Defect severity –Failure Mode –Final risk assessment –Revise site comments and information –Action](https://reader034.vdocuments.net/reader034/viewer/2022051805/5ff7f292a7c6a3691378432a/html5/thumbnails/15.jpg)
Issue Report
• After information is entered into FAARMS
the report can be extracted automatically
into Excel for review and final editing
before it is issued to the client
• Standard Report formats can be easily
customized to meet client requirements
• Add final Word document introduction and
Appendices
• Attach Final PDF Report to FAARMS
DatabaseFA
AR
MS
![Page 16: FAARMS Facilities And Assets Risk Management System) · –Defect Category –Defect severity –Failure Mode –Final risk assessment –Revise site comments and information –Action](https://reader034.vdocuments.net/reader034/viewer/2022051805/5ff7f292a7c6a3691378432a/html5/thumbnails/16.jpg)
Issue Report
FA
AR
MS
Standard excel report templates can be customized using standard Excel
![Page 17: FAARMS Facilities And Assets Risk Management System) · –Defect Category –Defect severity –Failure Mode –Final risk assessment –Revise site comments and information –Action](https://reader034.vdocuments.net/reader034/viewer/2022051805/5ff7f292a7c6a3691378432a/html5/thumbnails/17.jpg)
Final Report output in Excel
FA
AR
MS
![Page 18: FAARMS Facilities And Assets Risk Management System) · –Defect Category –Defect severity –Failure Mode –Final risk assessment –Revise site comments and information –Action](https://reader034.vdocuments.net/reader034/viewer/2022051805/5ff7f292a7c6a3691378432a/html5/thumbnails/18.jpg)
Final Report output in Excel
FA
AR
MS