facade facade / 1 - clearviewelitehomes.com.au · p r o p o s e d p o r c h ... house design: i /...

9
PROPOSED RESIDENCE PROPOSED GARAGE N PROPOSED PORCH 6410 1940 4870 3540 1000 28000 90° 00' 00" 14000 360° 00' 00" 28000 270° 00' 00" 14000 180° 00' 00" 3880 PROPOSED DRIVEWAY 1 : 200 Site Plan 1 Perspective / 3D images are shown for illustration purposes only, refer to plans and elevations for full details. PERSPECTIVE VIEW NOTE: Printed: FOR: SHEET NO: REVISION: SHEET SIZE: JOB NO: A3 CHECKED DRAWN LOCATION: ISSUE DATE: CLIENT: This drawing is issued for: Building Practitioners Board Reg No DP - AD1195 Ted Lord 146 COBURNS ROAD, MELTON - P.O BOX 256, MELTON, VIC. 3337 Ph: 9743 3861 Fax: 9743 3489 email: [email protected] HOUSE DESIGN: I / WE (being the owner/s) have had sufficient time to fully review & understand the current set of plans and in our opinion are satisfied that the plans incorporate all of our requirements. Owners Signature: Date: 28/06/2017 3:39:37 PM N/A A01.1 Clearview Homes - Master Plan - Not for Construction Designer THE CARWEN Facade 2 Facade / 1 3

Upload: lyhanh

Post on 13-May-2018

214 views

Category:

Documents


1 download

TRANSCRIPT

PROPOSEDRESIDENCE

PROPOSEDGARAGE

N

PRO

PO

SED

PO

RC

H

6410

19

40

4870

35

40

10

00

2800090° 00' 00"

14000

360°

00'0

0"

28000270° 00' 00"

14000

180°

00'0

0"

3880

PROPOSEDDRIVEWAY

1 : 200

Site Plan1

Perspective / 3D images are shown for illustrationpurposes only, refer to plans and elevations for full details.

PERSPECTIVE VIEW NOTE:

Prin

ted:

FOR:

SHEET NO:

REVISION:

SHEET SIZE:

JOB NO:

A3CHECKED

DRAWN

LOCATION:

ISSUE DATE:

CLIENT:

This drawing is issued for:

Building Practitioners BoardReg No DP - AD1195

Ted Lord

146 COBURNS ROAD, MELTON - P.O BOX 256, MELTON, VIC. 3337Ph: 9743 3861 Fax: 9743 3489 email: [email protected]

HOUSE DESIGN:

I / WE (being the owner/s) have had sufficient time to fully review & understand the currentset of plans and in our opinion are satisfied that the plans incorporate all of ourrequirements.

Owners Signature: Date:

28/0

6/2

017

3:3

9:3

7P

M

N/A

A01.1Clearview Homes

-

Master Plan - Not for Construction

Designer

THE CARWEN

Facade2

Facade / 13

2/520

820

820

820

720

720

2127 S/D2

12

7S/D

21

18

R/D

720

2/720

Study3.1x2.6

P'dr

L'dry

Pantry

Garage5.5x6.0

Kitchen3.0x2.8

Dining4.9x4.3

Living3.5x4.9

Entry

Lounge3.4x4.3

Alfresco3.2x3.9

2103

CRNR

061

6

06

06

Seat

Br'm

820 Porch

1809 1809

19250

11

06

0

Linen

DW

21

48

P/D

15180606

WM

Spa

ce5

20

Prin

ted:

FOR:

SHEET NO:

REVISION:

SHEET SIZE:

JOB NO:

A3CHECKED

DRAWN

LOCATION:

ISSUE DATE:

CLIENT:

This drawing is issued for:

Building Practitioners BoardReg No DP - AD1195

Ted Lord

146 COBURNS ROAD, MELTON - P.O BOX 256, MELTON, VIC. 3337Ph: 9743 3861 Fax: 9743 3489 email: [email protected]

HOUSE DESIGN:

I / WE (being the owner/s) have had sufficient time to fully review & understand the currentset of plans and in our opinion are satisfied that the plans incorporate all of ourrequirements.

Owners Signature: Date:

28/0

6/2

017

3:3

9:3

8P

M

N/A

A02.1Clearview Homes

-

Master Plan - Not for Construction

Designer

THE CARWEN

Area Schedule - Ground Floor

Name Area Squares

Ground Floor 118.8 m² 12.8

First Floor 119.8 m² 12.9

Porch 2.1 m² 0.2

Alfresco 12.3 m² 1.3

Balcony 8.0 m² 0.9

Garage 36.3 m² 3.9

Grand total 297.2 m² 32.0

1 : 100

Ground Floor1

Facade / 22

2/520

820

820

21

48

P/D

820

720

720

2127 S/D

21

27

S/D

21

18

R/D

720

2/720

Study3.1x2.6

P'dr

L'dry

Pantry

Garage5.5x6.0

Kitchen3.0x2.8

Dining4.9x4.3

Living3.5x4.9

Entry

Lounge3.4x4.3

820

Alfresco3.2x3.9 1

821

1809 1809

Br'm

Porch

18670

11

06

0

Linen

520

Prin

ted:

FOR:

SHEET NO:

REVISION:

SHEET SIZE:

JOB NO:

A3CHECKED

DRAWN

LOCATION:

ISSUE DATE:

CLIENT:

This drawing is issued for:

Building Practitioners BoardReg No DP - AD1195

Ted Lord

146 COBURNS ROAD, MELTON - P.O BOX 256, MELTON, VIC. 3337Ph: 9743 3861 Fax: 9743 3489 email: [email protected]

HOUSE DESIGN:

I / WE (being the owner/s) have had sufficient time to fully review & understand the currentset of plans and in our opinion are satisfied that the plans incorporate all of ourrequirements.

Owners Signature: Date:

28/0

6/2

017

3:3

9:4

0P

M

N/A

A02.2Clearview Homes

-

Master Plan - Not for Construction

Designer

THE CARWEN

Area Schedule - Ground Floor (Optional Facade)

Name Area Squares

Ground Floor 118.8 m² 12.8

First Floor 119.8 m² 12.9

Porch 2.1 m² 0.2

Alfresco 12.3 m² 1.3

Balcony 11.4 m² 1.2

Garage 36.4 m² 3.9

Grand total 300.6 m² 32.4

1 : 100

Ground Floor - Optional Facade1

Optional Facade2 Optional Facade 1

3

820

820

820

820

820

720

720

720

2/8

20

2/8

20

2/820

720

09

15

15

18

15

18

0624

Master5.0x4.0

Ens

Bed 23.0x3.3

Bath

Bed 33.0x3.3

WC

Bed 43.0x3.4

WIR

Leisure4.4x6.0

Hall

0418

21

05

21

05

Robe

Balcony

2/8

20

Linen

Robe

Robe

Line

n

0906

1821 0909

19250

85

20

900

15

00

Bat

h Shower

Shower

Tile base

Tile base

900x900

1500x900

Prin

ted:

FOR:

SHEET NO:

REVISION:

SHEET SIZE:

JOB NO:

A3CHECKED

DRAWN

LOCATION:

ISSUE DATE:

CLIENT:

This drawing is issued for:

Building Practitioners BoardReg No DP - AD1195

Ted Lord

146 COBURNS ROAD, MELTON - P.O BOX 256, MELTON, VIC. 3337Ph: 9743 3861 Fax: 9743 3489 email: [email protected]

HOUSE DESIGN:

I / WE (being the owner/s) have had sufficient time to fully review & understand the currentset of plans and in our opinion are satisfied that the plans incorporate all of ourrequirements.

Owners Signature: Date:

28/0

6/2

017

3:3

9:4

0P

M

N/A

A03.1Clearview Homes

-

Master Plan - Not for Construction

Designer

THE CARWEN

Area Schedule - First Floor

Name Area Squares

Ground Floor 118.8 m² 12.8

First Floor 119.8 m² 12.9

Porch 2.1 m² 0.2

Alfresco 12.3 m² 1.3

Balcony 8.0 m² 0.9

Garage 36.3 m² 3.9

Grand total 297.2 m² 32.0

1 : 100

First Floor1

820

820

80

40

820

820

820

720

720

720

2/8

20

2/8

20

2/820

720

09

15

15

18

15

18

0624

Master5.0x4.0

Ens

Bed 23.0x3.3

Bath

Bed 33.0x3.3

WC

Bed 43.0x3.4

WIR

Leisure4.4x6.0

Hall

0418

21

18

S/D

0503

0503

0503

Robe

Robe

Line

nRobe

Linen

18670

Balcony

900

15

00

Shower

ShowerBath

900x900

1500x900Tile base

Tile base

Prin

ted:

FOR:

SHEET NO:

REVISION:

SHEET SIZE:

JOB NO:

A3CHECKED

DRAWN

LOCATION:

ISSUE DATE:

CLIENT:

This drawing is issued for:

Building Practitioners BoardReg No DP - AD1195

Ted Lord

146 COBURNS ROAD, MELTON - P.O BOX 256, MELTON, VIC. 3337Ph: 9743 3861 Fax: 9743 3489 email: [email protected]

HOUSE DESIGN:

I / WE (being the owner/s) have had sufficient time to fully review & understand the currentset of plans and in our opinion are satisfied that the plans incorporate all of ourrequirements.

Owners Signature: Date:

28/0

6/2

017

3:3

9:4

1P

M

N/A

A03.2Clearview Homes

-

Master Plan - Not for Construction

Designer

THE CARWEN

Area Schedule - First Floor (Optional Facade)

Name Area Squares

Ground Floor 118.8 m² 12.8

First Floor 119.8 m² 12.9

Porch 2.1 m² 0.2

Alfresco 12.3 m² 1.3

Balcony 8.0 m² 0.9

Garage 36.3 m² 3.9

Grand total 297.2 m² 32.0

1 : 100

First Floor - Optional Facade1

Ground Floor

Ceiling LevelFirst Floor

Ceiling Level 2

Garage Level

24

40

30

02

59

08

6

Ground Floor

Ceiling LevelFirst Floor

Ceiling Level 2

Garage Level

86

25

90

30

02

44

0

Prin

ted:

FOR:

SHEET NO:

REVISION:

SHEET SIZE:

JOB NO:

A3CHECKED

DRAWN

LOCATION:

ISSUE DATE:

CLIENT:

This drawing is issued for:

Building Practitioners BoardReg No DP - AD1195

Ted Lord

146 COBURNS ROAD, MELTON - P.O BOX 256, MELTON, VIC. 3337Ph: 9743 3861 Fax: 9743 3489 email: [email protected]

HOUSE DESIGN:

I / WE (being the owner/s) have had sufficient time to fully review & understand the currentset of plans and in our opinion are satisfied that the plans incorporate all of ourrequirements.

Owners Signature: Date:

28/0

6/2

017

3:3

9:4

1P

M

N/A

A04.1Clearview Homes

-

Master Plan - Not for Construction

Designer

THE CARWEN

1 : 100

Front View1

1 : 100

Side View2

Ground Floor

Ceiling LevelFirst Floor

Ceiling Level 2

24

40

30

02

59

0

Ground Floor

Ceiling LevelFirst Floor

Ceiling Level 2

Garage Level

24

40

30

02

59

08

6

Prin

ted:

FOR:

SHEET NO:

REVISION:

SHEET SIZE:

JOB NO:

A3CHECKED

DRAWN

LOCATION:

ISSUE DATE:

CLIENT:

This drawing is issued for:

Building Practitioners BoardReg No DP - AD1195

Ted Lord

146 COBURNS ROAD, MELTON - P.O BOX 256, MELTON, VIC. 3337Ph: 9743 3861 Fax: 9743 3489 email: [email protected]

HOUSE DESIGN:

I / WE (being the owner/s) have had sufficient time to fully review & understand the currentset of plans and in our opinion are satisfied that the plans incorporate all of ourrequirements.

Owners Signature: Date:

28/0

6/2

017

3:3

9:4

2P

M

N/A

A04.2Clearview Homes

-

Master Plan - Not for Construction

Designer

THE CARWEN

1 : 100

Side View 14

1 : 100

Rear View3

Ground Floor

Ceiling LevelFirst Floor

Ceiling Level 2

24

40

30

02

59

08

6

Garage Level

Ground Floor

Ceiling LevelFirst Floor

Ceiling Level 2

Garage Level

24

40

30

02

59

08

6

1 : 100

Front View - Optional Facade1

1 : 100

Rear View - Optional Facade2

Prin

ted:

FOR:

SHEET NO:

REVISION:

SHEET SIZE:

JOB NO:

A3CHECKED

DRAWN

LOCATION:

ISSUE DATE:

CLIENT:

This drawing is issued for:

Building Practitioners BoardReg No DP - AD1195

Ted Lord

146 COBURNS ROAD, MELTON - P.O BOX 256, MELTON, VIC. 3337Ph: 9743 3861 Fax: 9743 3489 email: [email protected]

HOUSE DESIGN:

I / WE (being the owner/s) have had sufficient time to fully review & understand the currentset of plans and in our opinion are satisfied that the plans incorporate all of ourrequirements.

Owners Signature: Date:

28/0

6/2

017

3:3

9:4

3P

M

N/A

A04.3Clearview Homes

-

Master Plan - Not for Construction

Designer

THE CARWEN

Ground Floor

Ceiling LevelFirst Floor

Ceiling Level 2

24

40

30

02

59

0

Ground Floor

Ceiling LevelFirst Floor

Ceiling Level 2

Garage Level

86

25

90

30

02

44

0

1 : 100

Side View - Optional Facade3

1 : 100

Side View - Optional Facade 14

Prin

ted:

FOR:

SHEET NO:

REVISION:

SHEET SIZE:

JOB NO:

A3CHECKED

DRAWN

LOCATION:

ISSUE DATE:

CLIENT:

This drawing is issued for:

Building Practitioners BoardReg No DP - AD1195

Ted Lord

146 COBURNS ROAD, MELTON - P.O BOX 256, MELTON, VIC. 3337Ph: 9743 3861 Fax: 9743 3489 email: [email protected]

HOUSE DESIGN:

I / WE (being the owner/s) have had sufficient time to fully review & understand the currentset of plans and in our opinion are satisfied that the plans incorporate all of ourrequirements.

Owners Signature: Date:

28/0

6/2

017

3:3

9:4

3P

M

N/A

A04.4Clearview Homes

-

Master Plan - Not for Construction

Designer

THE CARWEN