fach utilisation

1
a.Total FACH load: i. (pmNoOfTfc1OnFach1+pmNoOfTfc2OnFach1+pmNoOfTfc3OnFach2)/(measurement period ( sec)*100) b. FACH1 load: i. (pmNoOfTfc1OnFach1+pmNoOfTfc2OnFach1)/ (measurement period (sec)*100) c. FACH is considered loaded if: i. Total FACH load is > 80% and FACH1 Load is > 30%. From RNC: FachPayload = pmDlTrafficVolumePsCommon

Upload: doraemon8076

Post on 08-Apr-2016

70 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: FACH Utilisation

a.Total FACH load:

i. (pmNoOfTfc1OnFach1+pmNoOfTfc2OnFach1+pmNoOfTfc3OnFach2)/(measurement period (sec)*100)

b. FACH1 load:

i. (pmNoOfTfc1OnFach1+pmNoOfTfc2OnFach1)/ (measurement period (sec)*100)

c. FACH is considered loaded if:

i. Total FACH load is > 80% and FACH1 Load is > 30%.

From RNC:

FachPayload = pmDlTrafficVolumePsCommon