Facility Planning and Design

Mini Lecture

Page 2: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 2/92

2

Learning Objectives

Define facility layout & its objectives

Describe the six types of layout

Do load-distance analysis of processlayouts

Define work cell

State the retail store flow guidelines Balance assembly lines

Page 3: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 3/92

3

Thinking Challenge

 At many public events, longlines occur outside women’srestrooms; none, outside men’s.

Recently, many states in the UShave passed ‘potty-parity’ bills. 

Many say: for every 2 toiletsand/or urinals for men, there

must be 3 toilets for women.How can we evaluate the

 ‘layout’ requirements? 

© 1995 Corel Corp.

45 sec.80 sec.

Page 4: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 4/92

4

Possible Solutions

What is meant by ‘parity’? Desirable? 

Business goal is customer satisfaction

 – Use whatever method is necessary Alternatives

 – Status quo (equal number of ‘potties’) 

 – Different number of ‘potties’ (equal wait)  – Moveable walls or partitions

 – Common washroom

 – Unisex restrooms

Page 5: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 5/92

5

Introduction

to Layout Designs

Page 6: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 6/92

6

What is Facility Layout?

Location or arrangement of everythingwithin & around buildings

Objectives are to maximize

 – Customer satisfaction

 – Utilization of space, equipment, & people

 – Efficient flow of information, material, & people

 – Employee morale & safety

Page 7: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 7/92

Page 8: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 8/92

8

Constraints onLayout Objectives

Product design & volume

Process equipment & capacity

Quality of work life Building & site

Page 9: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 9/92

9

Layout Types

Fixed-position layout

Process-oriented layout

Office layout Retail/service layout

Warehouse layout

Product-oriented layout

Page 10: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 10/92

10

Fixed-Position Layout

Page 11: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 11/92

11

Fixed-Position Layout

Design is for stationary project

Workers & equipment come to site

Complicating factors – Limited space at site

 – Changing material needs

Page 12: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 12/92

12

Fixed-Position Layout

Design is for stationary project

Workers & equipment come to site

Complicating factors – Limited space at site

 – Changing material needs

Examples – Ship building

 – Highway construction

© 1995 Corel Corp.

© 1995

Corel Corp.

© 1995

Corel Corp.

Page 13: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 13/92

13

Process-Oriented Layout

Page 14: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 14/92

14

Process-Oriented Layout

Design places departments with large flowsof material or people together

Dept. areas have similar processes – e.g., All x-ray machines in same area

Used with process-focused processes

Page 15: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 15/92

15

Process-Oriented Layout

Design places departments with large flowsof material or people together

Dept. areas have similar processes• e.g., All x-ray machines in same area

Used with process-focused processes

Examples – Hospitals

 – Machine shops© 1995 Corel Corp.

Page 16: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 16/92

16

Process-Oriented LayoutFloor Plan

Page 17: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 17/92

Page 18: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 18/92

18

Process-Oriented LayoutFloor Plan

Office

Tool Room

Table Saws

Page 19: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 19/92

19

Process-Oriented LayoutFloor Plan

Office

Tool Room

Drill Presses

Table Saws

Page 20: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 20/92

20

Construct ‘from-to-matrix’  

Determine space needs for each dept.

Develop initial schematic diagram

Determine layout cost, S S X ij •   C ij  

By trial-and-error, improve initial layout Prepare detailed plan

 – Includes factors besides cost

Process-Oriented LayoutSteps

Page 21: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 21/92

21

From-to-Matrix

Page 22: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 22/92

22

From-to-Matrix

Page 23: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 23/92

23

From-to-Matrix

5

1 2 3 4 5 6

Department

Dept.

1

2

3

4

6

Page 24: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 24/92

24

From-to-Matrix

5

1 2 3 4 5 6

Department

Dept.

1

2

3

4

6

Number of Trips

50 100 0 0 20

30 50 10 0

20 0 100

50 00

Page 25: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 25/92

25

Process-Oriented LayoutExample

Page 26: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 26/92

26

Process-Oriented LayoutExample

 You work in facilities engineering. You want tofind the cost of this layout. The cost of moving 1load between adjacent dept. is $1. The cost

between nonadjacent dept. is $2.

Room 1 Room 2 Room 3

Dept. 1 Dept. 2 Dept. 3

Dept. 4 Dept. 5 Dept. 6

Room 4 Room 5 Room 6

60 ft.

40 ft.

Page 27: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 27/92

27

Number of Mat’l Moves(From-to-Matrix)

5

1 2 3 4 5 6

Department

Dept.

1

2

3

4

6

50 100 0 0 20

30 50 10 0

20 0 100

50 00

Page 28: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 28/92

28

Schematic Diagram

& Cost Solution

Page 29: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 29/92

29

Schematic Diagram& Cost Solution

Dept. Dept. Cost 

Total Cost $0

1 2 3

64 5

Page 30: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 30/92

30

100

Schematic Diagram& Cost Solution

Dept. Dept. Cost 1 3 $200

Total Cost $200

1 2 3

64 5

Page 31: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 31/92

31

100

50

Schematic Diagram& Cost Solution

Dept. Dept. Cost 1 3 $2001 2 $ 50

Total Cost $250

1 2 3

64 5

Page 32: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 32/92

32

20

100

50

Schematic Diagram& Cost Solution

Dept. Dept. Cost 1 3 $2001 2 $ 50

1 6 $ 40

Total Cost $290

1 2 3

64 5

Page 33: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 33/92

33

20

100

50

50

Schematic Diagram& Cost Solution

Dept. Dept. Cost 1 3 $2001 2 $ 50

1 6 $ 404 2 $ 50

Total Cost $340

1 2 3

64 5

Page 34: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 34/92

34

Schematic Diagram& Cost Solution

Dept. Dept. Cost 1 3 $2001 2 $ 50

1 6 $ 404 2 $ 504 3 $ 40

Total Cost $380

20

100

50

50

20

1 2 3

64 5

Page 35: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 35/92

35

Schematic Diagram& Cost Solution

Dept. Dept. Cost 1 3 $2001 2 $ 50

1 6 $ 404 2 $ 504 3 $ 404 5 $ 50

Total Cost $430

20

100

50

50

50

20

1 2 3

64 5

Page 36: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 36/92

36

20

100

50

50

50

10

20

Schematic Diagram& Cost Solution

Dept. Dept. Cost 1 3 $2001 2 $ 50

1 6 $ 404 2 $ 504 3 $ 404 5 $ 502 5 $ 10

Total Cost $440

1 2 3

64 5

Page 37: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 37/92

37

20

100

50 30

50

50

10

20

Schematic Diagram& Cost Solution

Dept. Dept. Cost 1 3 $2001 2 $ 50

1 6 $ 404 2 $ 504 3 $ 404 5 $ 502 5 $ 102 3 $ 30

Total Cost $470

1 2 3

64 5

Page 38: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 38/92

38

20

100

50 30

50

50

10

20

Schematic Diagram& Cost Solution

Dept. Dept. Cost 1 3 $2001 2 $ 50

1 6 $ 404 2 $ 504 3 $ 404 5 $ 502 5 $ 102 3 $ 303 6 $100

Total Cost $570

1 2 3

64 5

100

P O i t d L t

Page 39: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 39/92

39

Process-Oriented LayoutThinking Challenge

 You work in facilities engineering. You’ve foundthat the cost of this layout is $570. Develop alower cost layout.

Room 1 Room 2 Room 3

Dept. 1 Dept. 2 Dept. 3

Dept. 4 Dept. 5 Dept. 6

Room 4 Room 5 Room 6

60 ft.

40 ft.

P O i t d L t

Page 40: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 40/92

40

Process-Oriented LayoutSolution*

Probably, you have developed many differentlayouts. There are 6! or 720 possibilities.Putting departments 1 & 3 adjacent to each

other gives a total cost of $480.

Room 1 Room 2 Room 3

Dept. 1 Dept. 3 Dept. 2

Dept. 4 Dept. 5 Dept. 6

Room 4 Room 5 Room 6

60 ft.

40 ft.

C ll l L

Page 41: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 41/92

41

Cellular Layout(Work Cells)

Special case of process-oriented layout

Consists of different machines broughttogether to make a product

Temporary arrangement only

Example: Assembly line set up to produce3000 identical parts in a

 job shop

Page 42: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 42/92

42

Work Cell Floor Plan

Office

Tool Room Work Cell

Saws Drills

Page 43: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 43/92

43

Work Cell Advantages

Page 44: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 44/92

44

Work Cell Advantages

Inventory

Floor space

Direct labor costs

Page 45: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 45/92

45

Work Cell Advantages

Inventory

Floor space

Direct labor costsEquipmentutilization

Employeeparticipation

Quality

Page 46: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 46/92

46

Office Layout

Page 47: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 47/92

47

Office Layout

Design positions people, equipment, & offices for maximum information flow

 Arranged by process or product – Example: Payroll dept. is by process

Relationship chart used

Examples – Insurance company

 – Software company

© 1995Corel Corp.

Offi L t

Page 48: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 48/92

48

Office LayoutFloor Plan

Accounting

Mgr.Brand X

Finance

Fin. Acct.

Page 49: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 49/92

49

Relationship Chart

Page 50: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 50/92

50

1

2

3

4

Relationship Chart

12

3

4

Page 51: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 51/92

51

1 President

2 Costing

3 Engineering

4 President’s Secretary

Relationship Chart

12

3

4

Page 52: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 52/92

52

1 PresidentO

2 Costing

3 Engineering

4 President’s Secretary

Relationship Chart

12

3

Ordinarycloseness:President (1)

& costing (2)

4

Page 53: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 53/92

53

Absolutelynecessary:Costing (2)

& Eng. (3)

1 PresidentO

2 CostingA

3 Engineering

4 President’s Secretary

Relationship Chart

12

3

4

Page 54: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 54/92

54

Ordinarycloseness:Eng. (3) &

secretary (4)

1 PresidentO

2 CostingA

3 Engineering

O4 President’s Secretary

Relationship Chart

12

3

4

Page 55: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 55/92

55

Unimportant:President (1)& costing (3)

1 PresidentO

2 Costing UA

3 Engineering

O4 President’s Secretary

Relationship Chart

12

3

4

Page 56: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 56/92

56

Important:Costing (1) &secretary (4)

1 PresidentO

2 Costing UA

3 Engineering I

O4 President’s Secretary

Relationship Chart

12

3

4

Page 57: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 57/92

57

Absolutelynecessary:President (1) &

secretary (4)

1 PresidentO

2 Costing UA A

3 Engineering I

O4 President’s Secretary

Relationship Chart

12

3

4

Page 58: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 58/92

59

Retail/Service Layout

Page 59: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 59/92

Retail/Service Layout

Page 60: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 60/92

61

Retail/Service LayoutGrid Design

Office Carts Check-out

Grocery Store

MeatBread

   M   i   l   k

Retail/Service Layout

Page 61: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 61/92

62

Retail/Service LayoutFree-Flow Design

Feature

DisplayTable

Trans.Counter

Apparel Store

Page 62: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 62/92

63

Retail Store

Flow Guidelines

Retail Store

Page 63: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 63/92

64

Retail StoreFlow Guidelines

High-draw items aroundperiphery

© 1995 Corel Corp.

© 1995 Corel Corp.

Retail Store

Page 64: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 64/92

65

Retail StoreFlow Guidelines

High-draw items aroundperiphery

High-impulse & high margin

items in prominent locations

Cereal

© 1995

Corel Corp.© 1995

Corel Corp.

Retail Store

Page 65: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 65/92

66

Retail StoreFlow Guidelines

High-draw items aroundperiphery

High-impulse & high margin

items in prominent locations

 ‘Power items’ on both sides of aisle

© 1995

Corel Corp.

© 1984-1994 T/Maker Co.

Retail Store

Page 66: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 66/92

67

Retail StoreFlow Guidelines

High-draw items aroundperiphery

High-impulse & high margin

items in prominent locations

 ‘Power items’ on both sides of aisle

Use end of aisles for highexposure

© 1984-1994 T/Maker Co.

© 1995

Corel

Corp.

Retail Store

Page 67: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 67/92

68

Retail StoreFlow Guidelines

High-draw items aroundperiphery

High-impulse & high margin

items in prominent locations

 ‘Power items’ on both sides of aisle

Use end of aisles for highexposure

Eliminate cross-over aisles

Retail Store

Page 68: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 68/92

70

Retail StoreShelf Space Planogram

Computerized toolfor shelf-spacemanagement

Generated fromstore’s scanner dataon sales

Often supplied bymanufacturer

2 ft.

5 facings

   V   O  -   5

   V   O  -   5

   V   O  -   5

   S   U   A   V   E

   S   U   A   V   E

   V

   O  -   5

   P   E   R   T

   P   E   R   T

   P   E   R   T

   P   E   R   T

   P   E   R   T

   V

   O  -   5

Page 69: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 69/92

71

Warehouse Layout

Page 70: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 70/92

72

Warehouse Layout

Design balances space (cube)utilization & handling cost

Similar to process layout

 – Items moved between dock & various storage areas

Optimum layout depends on

 Variety of itemsstored

No. items picked

© 1995 Corel Corp.

Page 71: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 71/92

73

Warehouse Layout Floor Plan

Page 72: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 72/92

74

Warehouse Layout Floor Plan

Zones

Conveyor

Page 73: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 73/92

75

Warehouse Layout Floor Plan

Zones

Conveyor

Order Picker

Page 74: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 74/92

76

Warehouse Layout Floor Plan

Zones

Conveyor

Truck

Order Picker

Page 75: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 75/92

77

Warehouse Layout Floor Plan

Zones

Conveyor

Order Picker

Truck

Page 76: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 76/92

78

Cross-Docking

Transferring goods

k

Page 77: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 77/92

79

Cross-Docking

Transferring goods

from incoming  trucks at receiving

docks

In-coming

© 1984-1994 T/Maker Co.

k

Page 78: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 78/92

80

Cross-Docking

Transferring goods

from incoming  trucks at receiving

docksto outgoing trucks atshipping docks

 Avoids placinggoods into storage

In-coming

Outgoing

© 1984-1994 T/Maker Co.

© 1995 Corel Corp.

Page 79: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 79/92

81

Product-Oriented Layout

P d t O i t d L t

Page 80: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 80/92

82

Product-Oriented Layout

Facility organized around product

Design minimizes line imbalance

 – Delay between work stations Types: fabrication line, assembly line

P d t O i t d L t

Page 81: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 81/92

83

Product-Oriented Layout

Facility organized around product

Design minimizes line imbalance

 – Delay between work stations Types: fabrication line, assembly line

Examples

 – Auto assembly line – Brewery

 – Paper mfg.© 1984-1994 T/Maker Co.

P d t O i t d L t T

Page 82: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 82/92

84

Product-Oriented Layout Types

P d t O i t d L t T

Page 83: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 83/92

85

Product-Oriented Layout Types

Builds components

Uses series of machines

Repetitive process

Machine paced

Balanced by physicalredesign

Fabrication Line

P d t O i t d L t T

Page 84: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 84/92

86

 Assembles fabricated

parts Uses workstation

Repetitive process

Paced by tasks

Balanced by movingtasks

Builds components

Uses series ofmachines

Repetitive process

Machine paced Balanced by physical

redesign

Product-Oriented Layout Types

Fabrication Line Assembly Line

Page 85: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 85/92

87

Product-Oriented Layout

Floor Plan

Product-Oriented Layout

Page 86: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 86/92

88

yFloor Plan

Office

BeltConveyor

Product-Oriented Layout

Page 87: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 87/92

89

yFloor Plan

Office

BeltConveyor

Product-Oriented Layout

Page 88: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 88/92

90

1 3

2

4

5

yFloor Plan

Office

BeltConveyor

Operations

Product-Oriented Layout

Page 89: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 89/92

91

1 3

2

4

5

yFloor Plan

Work

Office

BeltConveyor

WorkStation

Note: 5 tasks or operations; 3 work

stations

Work Station

Station

Product-Oriented Layout

Page 90: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 90/92

92

yRequirements

Standardized product

High production volume

Stable production quantities

Uniform quality of raw materials & components

Product-Oriented Layout

Page 91: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 91/92

93

Lower variable costper unit

Lower material

handling costs Lower work-in-

process inventories

Easier training & supervision

y Advantages

© 1984-1994 T/Maker Co.

Product-Oriented Layout

Page 92: Facility Planning and Design

7/30/2019 Facility Planning and Design

http://slidepdf.com/reader/full/facility-planning-and-design 92/92

yDisadvantages

Higher capitalinvestment

 – Special equipment

 Any work stoppagestops whole process

Lack of flexibility

 – Volume – Product