7/24/2013
For additional information contact: Russell Rutkowski, Monroe County 753-7515, or Jeffrey Richardson, Waste Management 494-3000.
Monroe County, as the owner and permittee of the Mill Seat Landfill, received permit approval on July 19, 2011 for twosoil borrow areas in the Town of Riga to satisfy the operational needs of the current permitted landfill. Thisinformational sheet provides brief overview of the existing site and the ongoing construction and operation of the soilborrow areas.
Mill Seat Landfill Facts.Mill Seat Landfill has been community partner forover 20 years. In 2002, Waste Management of NewYork, LLC (WMNY) assumed operation of the MillSeat Landfill through life-use lease with MonroeCounty. The current permitted landfill can be definedas:
977 acres Total Property owned by MonroeCounty and WMNY.
98.6 acres Permitted Landfill Footprint. 1,945 tons per day or 776,000 tons per year
Permitted Design Capacity. The current permitted landfill is set to expire in
2018.
Soil Needs.In 2008, following an analysis of the on-site soilneeds to construct and operate the presentlypermitted footprint area, it was determined thatthere were inadequate on-site soils from existingborrow areas to support the Mill Seat Landfillthrough the remaining life of the landfill (2018).Consequently, the County pursued NYCRR Part360, Solid Waste Management Facility (SWMF)Permit modification from the New York StateDepartment of Environmental Conservation(NYSDEC) to construct and operate two soil borrowareas, approximately 20 acres and 42 acres in size,which would provide sufficient soil for operations ofthe permitted landfill including final cover andclosure of the permitted landfill.
Community Input.The Soil Borrow Project was reviewed pursuant tothe New York State Environmental Quality ReviewAct (SEQRA) process, which included an importantpublic participation component. Severalopportunities for public participation were availableduring the Soil Borrow Project’s SEQR process, suchas:
public scoping meeting was held on December2, 2009, which allowed individuals to commenton issues they felt should be identified andaddressed in the Draft SupplementalEnvironmental Impact Statement (DSEIS).
SEQR public hearing was held on February 24,2011, in addition to 30-day public commentperiod, to receive comments on the completedDSEIS.
Permits and Approvals.Following the required permitting review process, theSoil Borrow Project received NYSDEC SWMF PermitModification; NYSDEC General Permit for StormwaterDischarge; and approval from Monroe County for thedemapping (i.e., closure) of portion of Brew Road.
Current Construction Status.Construction of the West Soil Borrow Area began inlate 2011. The most recent construction occurring aspart of the East Soil Borrow Area in the spring of2013 includes stormwater management pond andthe closure of portion of Brew Road.
site plan on the backside of this fact sheet providesthe layout ofthe permittedsoil borrowareas.
Reclamation. Followingcompletion ofthe borrowareas, the landwill be
reclaimed with two permanent ponds and uplandmeadows. Re-vegetation will restore the shores ofthe basins to natural state. typical reclaimed soilborrow area is shown in the photo provided.
Fact SheetPermitted Mill Seat Landfill Soil Borrow Area
NO
T8S
I.B
ase
map
imao
epr
oNde
dby
Aer
s-M
ebic
from
ieñal
phot
ogra
phy
0End
Juy
2,20
08.
2.Pr
oper
tyIr
onw
ere
piss
ided
byO
dder
Ass
ocia
tes
from
0ro
ing
fre
X07
3863
09A
-Pro
pnrt
yLi
near
idby
Pas
sers
Ass
ocia
tes
P551
Odw
irg
file
2007
6510
3b,S
osee
.
3.W
etla
ndbo
rert
larn
san
dbu
ffer
Sar
eba
sed
onB
aron
&L
ogud
itla.
PC
.W
etla
ndD
efin
eStio
nM
opda
ted
Aug
ust
12.
2009
.
MIL
LS
EA
TFA
CIL
ITY
PR
OJE
CT
LO
CA
TIO
NM
gflfl
PR
OP
OS
ED
SOIL
BO
RR
OW
AR
EA
PLA
N
MO
NR
OE
CO
UN
TY
FS
EIS
NE
WY
OR
KD
WG
.N
O08
015-
029d
FIG
UR
E1-
2
LE
GE
ND
-En
JS11
NG
LAN
DFI
LLLI
MTr
S
PRO
POSE
DB
OR
RO
WA
RE
ALI
MIT
S
MO
NR
OE
CO
VN
TY
PR
QP
IYLI
NE
(SE
EN
OT
E2)
—.
—W
AST
EM
AN
AG
EM
EN
TPR
OPE
RT
YU
NE
(SE
EN
OT
E2)
DE
LIN
EA
TE
DW
ET
LA
ND
LIM
ITS
(SE
EN
OT
ES)
800
0ci
o1?
ioA
PPR
OX
IMA
TE
SCA
LE
:r
=80
0