Environmental conditions
COMMUNITY FACTSHEET
Water Quality Monitoring Programme
Since February 2010 water quality data has been collected to establish a baseline for the project monitoring programme. Over 190,000 records of water quality data have been collected to date.
Water quality monitoring is carried out by Vision Environment, University of Technology Sydney and Marine Ecology Group – at 16 continuous sites and 16 manual sites.
Who does the water quality testing?
GPC does not conduct its own water quality sampling or analysis. An external company, Vision Environment, (contracted to the project, independent of GPC and of all other regulatory bodies) carries out the data collection. This local company has extensive research and scientific expertise of many years in the Gladstone area and use worlds’ best research and methodology. GPC use this independent data to carry out the project ensuring minimal impact on the environment.
There are 52 Commonwealth Government and 143 Coordinator General conditions covering all aspects of the project.
The environmental conditions include an Environmental Impact Statement, water quality monitoring, seagrass monitoring, a flora and fauna management plan, air and noise limits, dredge management plan, and offsets for marine habitat and coastal biodiversity.
Who is involved in the environmental monitoring program?
Over 20 external organisations, including 4 Australian universities have been involved in the preparation, planning, implementation and assessment of the environmental programme.
Is there any independent oversight?
Independent panels of dredging specialists and environmental scientists work alongside
the project, routinely analysing water quality, seagrass, dredging operations, and marine ecosystem health.
The Dredge Technical Reference Panel (DTRP) and the Ecosystem Research and Monitoring Program (ERMP) Advisory Panel provide independent advice and guidance to the dredging project.
CSIRO Metals Report
CSIRO water quality scientist Dr Simon Apte and colleagues carried out work for a report on Metals Concentrations in the Waters and Sediments of Port Curtis, Queensland. CSIRO found there were no detectable elevations of metal concentrations at sites where dredging is being conducted and all concentrations of dissolved metals were below ANZECC/ARMCANZ guideline values.
CSIRO stated in their report Gladstone is a relatively clean industrial harbour compared to other Australian and international working ports.
westernbasinportdevelopment.com.au
GLADSTONE
CURTISISLAND
KeppelSands
FACINGISLAND
Lady Musgrave Island
Fairfax Islands
Hoskyn Islands
One Tree IslandHeron Island
North West Island
Masthead Island
Masthead Island(appox 56.5km
from Gladstone)
North Reef Island
Barren Island
Great KeppelIsland
North KeppelIsland
Seventeen Seventy
Agnes Water
Tannum Sands
Emu Park
Yeppoon
N
CURTIS CH
ANNEL
CAPRICORN CHANNEL
KEPPELBAY
GLADSTONEHARBOUR
0 5 10
Scale (km)
16 Continuous water sampling sites16 Manual water sampling sites
GLADSTONE
CURTISISLAND
KeppelSands
FACINGISLAND
Lady Musgrave Island
Fairfax Islands
Hoskyn Islands
One Tree IslandHeron Island
North West Island
Masthead Island
Masthead Island(appox 56.5km
from Gladstone)
North Reef Island
Barren Island
Great KeppelIsland
North KeppelIsland
Seventeen Seventy
Agnes Water
Tannum Sands
Emu Park
Yeppoon
N
CURTIS CH
ANNEL
CAPRICORN CHANNEL
KEPPELBAY
GLADSTONEHARBOUR
0 5 10
Scale (km)
16 Continuous water sampling sites16 Manual water sampling sites6 Seagrass light monitoring sites
COMMUNITY FACTSHEET
Seabed soil tests
Before the dredging began the entire Western Basin seabed was tested to determine the kind of soil for each area. This was done by collecting over 1000 samples of sediment and boreholes down to 25 metres deep. The samples were analysed to determine the chemical composition of the seabed as well as for the composition of the soils so the right methods and equipment are used during dredging. The borehole samples were also tested for Potential Acid Sulphate Soils (PASS).
Metals Tests
Over 10 years of surveys have been undertaken to determine the metal levels in Gladstone harbour. 17 different metals in sediment and dissolved metals in water are tested on a monthly basis and additional samples are taken if extra data is required. The majority of metals levels in Gladstone have remained within the Australian guidelines for marine water quality.
What is PASS and how is it removed?
PASS is soil that has the potential to release acid sulphates if oxidized by being exposed to air for more than 24 hours. In practical terms this means when these soils are dredged they must be kept wet and disposed of under water so those sulphates cannot oxydise.
Elutriate Testing
Prior to dredging samples were taken throughout the harbour to test the likelihood of metals and other chemicals changing under dredging-like conditions. Elutriate testing was carried out, disturbing sediment samples in water, simulating the treatment of these materials during dredging. The results of all these tests showed chemical composition of the seabed and water does not contain toxic chemicals or metals at levels that could be harmful to fish health or water quality when dredged. High levels of metals or toxins are not present in the seabed or in the water.
bOrEHOlE TEST SITES IN THE wESTErN bASINP
:\GIS
\Pro
ject
s\20
2708
_GP
C\W
B_S
DA
_048
.mxd
0
6/10
/201
1 16
:18
Coordinate system: GDA_1994_MGA_Zone_56
Map
by:
by:
PIC
Figure X.X: Sample Locations within the Dredge Phase AreaWestern Basin Sea Disposal Application Amendment°
Source:Aerial: Bing Maps, 2010.
GeoCoastal Group, October 2011.
Marine Sediment Investigation – EnvironmentalInvestigations of Proposed Capital Dredging atChina Bay and Pipeline Crossing at the Narrows,Gladstone. Prepared by URS for Santos LtdJanuary 2009.
Raw Data xls provided by Australia Pacific LNG– Sediment samples taken between April – May2010
Australia Pacific LNG – Dredge Area Option 1B.Worley Parsons October 2009
Queensland Curtis LNG Project Gladstone Harbour,Queensland Sediment Quality Assessment Report:Jetty Optimisation Program Volume 1. Geocoastal
Geocoastal operations / ERM Raw data xlsprovided by Queensland Curtis LNG – Sedimentsamples taken between November 2008 – June2009.
Qld Curtis LNG Project Geotechnical Data ReportMarine Structures – Geotechnical InvestigationFactual Report. Prepared by Golder Associates forBechtel Australia Pty Ltd, July 2009.
06/10/2011 1Version:Date:
Job No: 217460-2-1
")
")
")
"
"
"
"
"
""
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!!!
! !!! !
!!!
!
!
! !
! !
! !
!
!
!
!
!
!!
!
!!
! !
!
!!
! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!FL-144
FL-143
FL-142
FL-141
FL-140 FL-139
FL-138
FL-137
FL-136
FL-135
FL-134
FL-133
FL-132
FL-131
FL-130
FL-129
FL-128
FL-127
FL-126
FL-125
FL-124
FL-123
FL-122
FL-121
FL-120
FL-119
FL-118
FL-117
FL-116
FL-115
FL-114
FL-113
FL-112
FL-111
FL-110
FL-109
FL-108
FL-107
FL-106
FL-105
FL-104
FL-103
FL-102
FL-101
FL-100
FL-099
FL-098
FL-097
FL-096
FL-095
FL-094
FL-093
FL-092
FL-091
FL-090
FL-089
FL-088
FL-087
FL-086
FL-085
FL-084
FL-083
FL-082
FL-081
FL-080
FL-079FL-078
FL-077
FL-076
FL-075
FL-074
FL-073
FL-072
FL-071
FL-070
FL-069
FL-068
FL-067
FL-066
FL-065
FL-064
FL-063
FL-062
FL-061
FL-060
FL-059
FL-058
FL-057
FL-056
FL-055
FL-054
FL-053
FL-052
FL-051
FL-050
FL-049
FL-048
FL-047
FL-046
FL-045
FL-044
FL-043
FL-042
FL-041
FL-040
FL-039
FL-038
FL-037
FL-036
FL-035
FL-034
FL-033
FL-032
FL-031
FL-030
FL-029
FL-028
FL-027
FL-026
FL-025
FL-024
FL-023
FL-022
FL-021
FL-020
FL-019
FL-017
FL-016
FL-015
FL-014
FL-013
FL-012
FL-011
FL-010
FL-009
FL-008
FL-007
FL-006
FL-005
FL-004
FL-003
FL-002
FL-001
E
F
I
G
H
D
FL-018
A1 scale: 1:9,742
0 500 1,000 1,500 2,000250 Meters
Legend
! SampleLocations_2009 selection
")Western Basin Sea Disposal ApplicationOctober 2011 Amendment Sampling Locations
QC LNG Jetty OptimisationStudy Sampling Locations
Construction Dock Cores
Sediment Quality Previous Studies
!Western Basin AddendumSampling Locations 2010
" AP LNG EIS Sampling Locations
Dredging Phase Areas for Sea Disposal
Dredging Phase Areas forDisposal in Western basin andFL153 Reclamation Areas
Western Basin Reclamation Area
Fisherman's Landing 153 Reclamation Area
1991 – 1994Curtis Coast Study Resource Report (Environmental Scan)
1998 – 2005Contaminate pathways in Port Curtis – a CRC study in metals & dissolved metals in Gladstone harbour by CSIRO, University of Queensland and CQ University
2002 – PresentAnnual and now monthly Seagrass Monitoring
2001 – PresentPort Curtis Integrated Monitoring Program GPC contribute $750,000 each year
PCIMP Ecosystem Health Report Card– water monitoring– seagrass monitoring– no sewerage effluent into
Gladstone harbour
2007 – 2010Detailed testing of harbour environs for Western Basin Dredging Project and LNG projects marine studies and Envrionmental Impact Studies
3 Decades of Gladstone Harbour Health Checks
westernbasinportdevelopment.com.au