fair lawn board of education
DESCRIPTION
FAIR LAWN BOARD OF EDUCATION. BUILDINGS & GROUNDS ACCOMPLISHMENTS. SASSO FIELD New Turf Field Installed. Sasso Field Painted buildings & new tent. Sasso Field Lightning Detector. SASSO FIELD. New cameras Installed Sealed blacktop under bleachers. High School A-gym Floor Refinished. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: FAIR LAWN BOARD OF EDUCATION](https://reader036.vdocuments.net/reader036/viewer/2022070408/568143cf550346895db05d51/html5/thumbnails/1.jpg)
FAIR LAWN BOARD OF EDUCATION
BUILDINGS & GROUNDS
ACCOMPLISHMENTS
![Page 2: FAIR LAWN BOARD OF EDUCATION](https://reader036.vdocuments.net/reader036/viewer/2022070408/568143cf550346895db05d51/html5/thumbnails/2.jpg)
SASSO FIELDNew Turf Field Installed
![Page 3: FAIR LAWN BOARD OF EDUCATION](https://reader036.vdocuments.net/reader036/viewer/2022070408/568143cf550346895db05d51/html5/thumbnails/3.jpg)
Sasso Field Painted buildings & new tent
![Page 4: FAIR LAWN BOARD OF EDUCATION](https://reader036.vdocuments.net/reader036/viewer/2022070408/568143cf550346895db05d51/html5/thumbnails/4.jpg)
Sasso Field Lightning Detector
![Page 5: FAIR LAWN BOARD OF EDUCATION](https://reader036.vdocuments.net/reader036/viewer/2022070408/568143cf550346895db05d51/html5/thumbnails/5.jpg)
SASSO FIELD
• New cameras Installed• Sealed blacktop under bleachers
![Page 6: FAIR LAWN BOARD OF EDUCATION](https://reader036.vdocuments.net/reader036/viewer/2022070408/568143cf550346895db05d51/html5/thumbnails/6.jpg)
High School A-gym Floor Refinished
![Page 7: FAIR LAWN BOARD OF EDUCATION](https://reader036.vdocuments.net/reader036/viewer/2022070408/568143cf550346895db05d51/html5/thumbnails/7.jpg)
FAIR LAWN HIGH SCHOOL
B-WING CAFETERIA
ROOF
![Page 8: FAIR LAWN BOARD OF EDUCATION](https://reader036.vdocuments.net/reader036/viewer/2022070408/568143cf550346895db05d51/html5/thumbnails/8.jpg)
HIGH SCHOOL
• Abated 3 classrooms (Rms B120, B122, B204)• Painted 5 classrooms• Retiled A-wing girls’ bathroom• HS Stage Lighting• HS Lighting (pending)• Auditorium underground conduit, carpeted
aisles
![Page 9: FAIR LAWN BOARD OF EDUCATION](https://reader036.vdocuments.net/reader036/viewer/2022070408/568143cf550346895db05d51/html5/thumbnails/9.jpg)
Memorial – Completed installation of windows on west side of building
![Page 10: FAIR LAWN BOARD OF EDUCATION](https://reader036.vdocuments.net/reader036/viewer/2022070408/568143cf550346895db05d51/html5/thumbnails/10.jpg)
Memorial SchoolPainted lockers on 1st and 2nd floor
![Page 11: FAIR LAWN BOARD OF EDUCATION](https://reader036.vdocuments.net/reader036/viewer/2022070408/568143cf550346895db05d51/html5/thumbnails/11.jpg)
MEMORIAL SCHOOL – Trimmed trees back from field
![Page 12: FAIR LAWN BOARD OF EDUCATION](https://reader036.vdocuments.net/reader036/viewer/2022070408/568143cf550346895db05d51/html5/thumbnails/12.jpg)
Memorial SchoolTrimmed trees back from steps
![Page 13: FAIR LAWN BOARD OF EDUCATION](https://reader036.vdocuments.net/reader036/viewer/2022070408/568143cf550346895db05d51/html5/thumbnails/13.jpg)
MEMORIAL SCHOOL
• Installed new energy efficient LED lights in auditorium
• Rm 214 – converted from storeroom to classroom instruction
• Auditorium – rebuilt exhaust fan• Repaired terrazzo floor outside main office
![Page 14: FAIR LAWN BOARD OF EDUCATION](https://reader036.vdocuments.net/reader036/viewer/2022070408/568143cf550346895db05d51/html5/thumbnails/14.jpg)
THOMAS JEFFERSON SCHOOL
Repaved & striped front lotWidened exit driveway to allow right & left turns upon exiting
![Page 15: FAIR LAWN BOARD OF EDUCATION](https://reader036.vdocuments.net/reader036/viewer/2022070408/568143cf550346895db05d51/html5/thumbnails/15.jpg)
THOMAS JEFFERSON SCHOOL
• Painted lockers and installed new lockers on 1st floor
• Carpeted 5 offices in Child Study Team room• Boys’ locker bathroom and boys’ room by Rm 119
– installed new floor drains & waterless urinals• Installed wireless clock system• Rm 116 – abated floor and installed VCT tile
![Page 16: FAIR LAWN BOARD OF EDUCATION](https://reader036.vdocuments.net/reader036/viewer/2022070408/568143cf550346895db05d51/html5/thumbnails/16.jpg)
EDISON SCHOOL
Moved sign from HS and installed at
Edison
![Page 17: FAIR LAWN BOARD OF EDUCATION](https://reader036.vdocuments.net/reader036/viewer/2022070408/568143cf550346895db05d51/html5/thumbnails/17.jpg)
EDISON SCHOOL
• Paving of front lot and re-striping for bus access (pending)
• Repaired windows
![Page 18: FAIR LAWN BOARD OF EDUCATION](https://reader036.vdocuments.net/reader036/viewer/2022070408/568143cf550346895db05d51/html5/thumbnails/18.jpg)
FORREST SCHOOL
• Installed VCT tile in 4 classrooms• Moved KECO from Forrest to Edison School
![Page 19: FAIR LAWN BOARD OF EDUCATION](https://reader036.vdocuments.net/reader036/viewer/2022070408/568143cf550346895db05d51/html5/thumbnails/19.jpg)
Lyncrest School Canopy, Ceiling & LED lights
![Page 20: FAIR LAWN BOARD OF EDUCATION](https://reader036.vdocuments.net/reader036/viewer/2022070408/568143cf550346895db05d51/html5/thumbnails/20.jpg)
MILNES SCHOOLRefurbished 2 storm drains in rear parking lot and repaved.
![Page 21: FAIR LAWN BOARD OF EDUCATION](https://reader036.vdocuments.net/reader036/viewer/2022070408/568143cf550346895db05d51/html5/thumbnails/21.jpg)
INSTALLED CHAIRLIFT
AT
MILNES SCHOOL
![Page 22: FAIR LAWN BOARD OF EDUCATION](https://reader036.vdocuments.net/reader036/viewer/2022070408/568143cf550346895db05d51/html5/thumbnails/22.jpg)
Radburn School
Kindergarten WindowsInstalled new
energy efficient thermopane
windows
![Page 23: FAIR LAWN BOARD OF EDUCATION](https://reader036.vdocuments.net/reader036/viewer/2022070408/568143cf550346895db05d51/html5/thumbnails/23.jpg)
RADBURN SCHOOL
• Converted music room to new kindergarten room on ground floor
• Installed new security gate on ground floor by new addition lobby
• Ground floor boys’ room in stairwell – installed new floor drains and waterless urinals
![Page 24: FAIR LAWN BOARD OF EDUCATION](https://reader036.vdocuments.net/reader036/viewer/2022070408/568143cf550346895db05d51/html5/thumbnails/24.jpg)
Warren Point SchoolInstalled new digital sign on
Broadway
![Page 25: FAIR LAWN BOARD OF EDUCATION](https://reader036.vdocuments.net/reader036/viewer/2022070408/568143cf550346895db05d51/html5/thumbnails/25.jpg)
Warren Point SchoolMilled and repaved teacher parking lot and installed new security
gates
![Page 26: FAIR LAWN BOARD OF EDUCATION](https://reader036.vdocuments.net/reader036/viewer/2022070408/568143cf550346895db05d51/html5/thumbnails/26.jpg)
Warren Point SchoolInstalled 100 cubic yards of mulch on playground
![Page 27: FAIR LAWN BOARD OF EDUCATION](https://reader036.vdocuments.net/reader036/viewer/2022070408/568143cf550346895db05d51/html5/thumbnails/27.jpg)
Warren Point SchoolInstalled new Fire Doors in old wing-1st floor
![Page 28: FAIR LAWN BOARD OF EDUCATION](https://reader036.vdocuments.net/reader036/viewer/2022070408/568143cf550346895db05d51/html5/thumbnails/28.jpg)
Westmoreland SchoolInstalled energy efficient thermopane windows in gym
![Page 29: FAIR LAWN BOARD OF EDUCATION](https://reader036.vdocuments.net/reader036/viewer/2022070408/568143cf550346895db05d51/html5/thumbnails/29.jpg)
WESTMORELAND SCHOOL
• Replacement of bathroom partitions (pending)
![Page 30: FAIR LAWN BOARD OF EDUCATION](https://reader036.vdocuments.net/reader036/viewer/2022070408/568143cf550346895db05d51/html5/thumbnails/30.jpg)
DISTRICT
• Installed security locks in all school buildings• Room numbers stenciled on exterior windows
in all school buildings• Purchased maintenance truck• Purchase of leaf vacuum (pending)• Purchase of salt spreader (pending)