Neighborhood and Community Leaders Conference Ellen Kamilakis Senior Public Affairs Officer Harihar Shiwakoti Senior Pavement Engineer

Upload: vdot-northern-virginia

Post on 17-Feb-2017

319 views

Category:

Government & Nonprofit


2 download

TRANSCRIPT

Page 1: Fairfax Community Leaders Conference

Neighborhood and Community Leaders Conference

Ellen KamilakisSenior Public Affairs Officer

Harihar ShiwakotiSenior Pavement Engineer

Page 2: Fairfax Community Leaders Conference

2

• Proposed 2016 Paving Plan

• Questions?

• Snow Mobilization

• Snowzilla Slideshow

• Questions?

Agenda

Page 3: Fairfax Community Leaders Conference

3

NOVA District Proposed 2016 Paving Plan

Page 4: Fairfax Community Leaders Conference

4

Overview

• VDOT Asphalt Pavement Conditions

• NOVA District Proposed 2016 Paving Schedules

• Secondary Corrective Maintenance

• NOVA District Additional Proposed 2016 Paving Schedules

• Primary and Secondary Roads Preventive Maintenance

Estimates

• Primary and Secondary Roads Preventive Maintenance Lane

Miles

• VDOT Online Road Work Request Form

• Questions

Page 5: Fairfax Community Leaders Conference

5

For asphalt pavements, VDOT calculates two different condition indices from the distress information that is collected, and then combines them into a single condition value.

•Load-Related Distress Rating (LDR) is calculated from load-related distresses, such as fatigue cracking in the wheel path (VDOT, 2006). •The Non-Load Related Distress rating (NDR) is calculated from non-load-related distresses, such as construction deficiencies, bleeding, etc. (VDOT, 2006).

The Critical Condition Index (CCI) is then calculated as the lower of the NDR and LDR. The CCI values range from 1 to 100 and the roads are given an overall rating using the ranges shown in Table 1.

VDOT Pavement Conditions Scale

Page 6: Fairfax Community Leaders Conference

VDOT Pavement Conditions Scale

6

Table 1. Pavement Condition Definitions (VDOT, 2006)

Index Scale (CCI) Pavement Condition Likelihood of Corrective Action

90 and Above Excellent Very Unlikely

70-89 Good Unlikely

60-69 Fair Possibly

50-59 Poor Likely

49 and Below Very Poor Very Likely

Page 7: Fairfax Community Leaders Conference

NOVA District Proposed 2016 Paving Schedules

# Schedule ID Location/System Total Tons

Asphalt Total Lane Miles Tons of Latex

SY (Slurry Surface

Treatment)

Preventive Maintenance        

1 SS-9A-16 Districtwide Slurry Seal - 36.7 - 298,430

2 SS-9B-16 Districtwide Slurry Seal - 61.5 - 579,920

3 LM-9B-16 Districtwide Primary Latex 7,752 40.4 4,872 -

4 LM-9C-16 Districtwide Secondary Latex - 45.6 4,361 -

5 LM-9D-16 Fairfax Primary Latex - 34.3 4,489 -

Total 7,752 218.5 13,722 878,350

Interstate (Corrective Maintenance)        

6 PM-9I-16 Fairfax Interstate Paving 34,421 23.4 - -

Total 34,421 23.4 - -

Primary (Corrective Maintenance)        

7 PM-9A-16 Arlington Primary Paving 7,764 9.3 - -

8 PM-9F-16 Fairfax Primary Paving 47,325 37.9 - -

9 PM-9L-16 Loudoun Primary Paving 47,259 38.3

10 PM-9P-16 Prince William Primary Paving 1,156 1.4 - -

Total 103,504 86.9 - -

7

Page 8: Fairfax Community Leaders Conference

Secondary Corrective MaintenanceLocation  Total Tons Lane Miles Tons of Latex Slurry Surface

Treatment

11 PM-9Y-16 Districtwide Secondary Paving 23,440 37.6 - -

12 PM-9B-16 Fairfax Secondary Paving 35,767 36.2 - -

13 PM-9C-16 Fairfax Secondary Paving 57,740 38.4 - -

14 PM-9D-16 Fairfax Secondary Paving 38,737 34.9 - -

15 PM-9E-16 Fairfax Secondary Paving 61,960 67.9 - -

16 PM-9G-16 Fairfax Secondary Paving 18,993 17.5 - -

17 PM-9H-16 Fairfax Secondary Paving 57,005 56.2 - -

18 PM-9J-16 Fairfax Secondary Paving 32,637 41.3 - -

19 PM-9W-16 Prince William Secondary Paving 42,063 40.1 - -

20 PM-9X-16 Prince William Secondary Paving 40,104 39.3 - -

21 PM-9Z-16 Prince William Secondary Paving 36,465 35.6 - -

22 PM-9N-16 Loudoun Secondary Paving 41,320 50.0 - -

23 PM-9O-16 Loudoun Secondary Paving 33,087 27.8 - -

Total 519,318 522.8 - -

Grand Total 664,995 851.6 13,722 878,350

8

Page 9: Fairfax Community Leaders Conference

Primary and Secondary Roads Paving Maintenance Estimates

Estimated $98,842,6449

Page 10: Fairfax Community Leaders Conference

10

Primary and Secondary Roads Paving Maintenance Estimates

Page 11: Fairfax Community Leaders Conference

Primary and Secondary Roads Paving Maintenance Lane Miles

Lane Miles: 851.611

Page 12: Fairfax Community Leaders Conference

12

Primary and Secondary Roads Paving Maintenance Lane Miles

Page 13: Fairfax Community Leaders Conference

VDOT Online Work Request

13

my.vdot.virginia.gov

Filling potholes; drainage culvert cleaning and repair; guardrail repair; signs and traffic signals; animal, tree, and debris removal from roadway; and shoulder repair.

Page 14: Fairfax Community Leaders Conference

14

Questions about the 2016 Paving Program?

Page 15: Fairfax Community Leaders Conference

15

Snow Removal and Snowzilla Slideshow

Page 16: Fairfax Community Leaders Conference

16

VDOT in Northern Virginia

Fairfax, Prince William, Loudoun, and Arlington counties(Arlington maintains own secondary roads)

Total lane miles: 13,016 (4,800 lane miles Fairfax County)

Interstate: 726 lane miles(Includes Express Lanes)

Primary: 1,729 lane miles

Secondary: 10,561 lane miles(318 miles gravel roads)(16,000 neighborhood streets)

24 commuter lots

Page 17: Fairfax Community Leaders Conference
Page 18: Fairfax Community Leaders Conference

18

VDOT Roads – Northern Virginia

Crews work interstates, major roads and main roads in subdivisions concurrently.

Interstates 66/95/395/495 made passable, then bare pavement

High-volume routes (1, 7, 28, 50, etc.) made passable, then bare pavement

Subdivisions(Main roads) made passable, then remaining streets and cul-de-sacs.

Additional priorities:•Shoulders•Moving snow where there is no storage (I-95/395 HOV, construction areas)•12,000 park-and-ride spaces along I-95, I-66

Page 19: Fairfax Community Leaders Conference

19

Subdivisions are divided into 650 snow maps (350 in Fairfax)Updated annually to ensure all state-maintained roads are included.

How subdivisions are assigned and plowed

• Plows staged in subdivisions when 2”+ forecasted• Plowing begins with 2” of snow on the ground• Main thoroughfares are priority and plowed repeatedly in storm• Crews then work streets, cul-de-sacs

Drivers:• Assigned up to five maps each• Report back after at least one pass on each road

Page 20: Fairfax Community Leaders Conference

One of 650 snow maps assigned to plow drivers. Hot spots are identified by superintendents and added annually.

Neighborhood Snow Maps

Page 21: Fairfax Community Leaders Conference

21

Subdivisions and low-volume roads

• Goal: Reach the most residents as quickly as possible• One pass for a typical storm; major storms require multiple

passes and heavy equipment• Hills, curves, intersections sanded for traction• Driveways, sidewalks, trails, hydrants: drivers asked to be

mindful but blocking is often an unintended consequence.

What does “passable” mean?

An 8- to 10-foot path cleared for emergency vehicle access, and drivable with extreme caution. The road remains snow-packed and rutted. The path will not be curb-to-curb or bare pavement.

Page 22: Fairfax Community Leaders Conference

22

Completing Subdivisions

• Monitors: VDOT staff drive routes for quality control

• Maps are considered complete when a driver reports to area headquarters and monitors have spot-checked

• Once subdivisions are passable,the call center logs inquiries for the field to revisit

• AVL Plow tracking site can help verify that passes were made;

provides data for inquiries

Page 23: Fairfax Community Leaders Conference

23

So what did it look like?

Page 24: Fairfax Community Leaders Conference
Page 25: Fairfax Community Leaders Conference

25

Page 26: Fairfax Community Leaders Conference

26

Page 27: Fairfax Community Leaders Conference
Page 28: Fairfax Community Leaders Conference

28

Page 29: Fairfax Community Leaders Conference
Page 30: Fairfax Community Leaders Conference

30

Page 31: Fairfax Community Leaders Conference
Page 32: Fairfax Community Leaders Conference

32

Page 33: Fairfax Community Leaders Conference
Page 34: Fairfax Community Leaders Conference
Page 35: Fairfax Community Leaders Conference

35

Page 36: Fairfax Community Leaders Conference
Page 37: Fairfax Community Leaders Conference

37

Page 38: Fairfax Community Leaders Conference
Page 39: Fairfax Community Leaders Conference

39

Page 40: Fairfax Community Leaders Conference

40

Page 41: Fairfax Community Leaders Conference
Page 42: Fairfax Community Leaders Conference

42

Page 43: Fairfax Community Leaders Conference
Page 44: Fairfax Community Leaders Conference
Page 45: Fairfax Community Leaders Conference

45

Page 46: Fairfax Community Leaders Conference

46

Page 47: Fairfax Community Leaders Conference

47

Page 48: Fairfax Community Leaders Conference
Page 49: Fairfax Community Leaders Conference
Page 50: Fairfax Community Leaders Conference

50

Page 51: Fairfax Community Leaders Conference

51

Page 52: Fairfax Community Leaders Conference

52

Page 53: Fairfax Community Leaders Conference

53

So what happens next?

Page 54: Fairfax Community Leaders Conference

54

Post-Storm ActivitiesPotholes•Crews have filled 10,000+ potholes since Jan. 1•Using “Pothole Killers” as well as traditional methods•Report locations at www.virginiadot.org or 800-FOR-ROAD