1 MINUTES 21 st Joint Meeting API C2/SC 17 & ISO/TC67/SC4/WG6 Subsea Production Equipment Houston, Texas February 7, 2007 1. John Bednar, API SC 17 Chairman, welcomed the group to the meeting at 8:30 AM and outlined various safety and housekeeping issues. 2. A roll call was completed and it was confirmed that there was not a quorum present for this meeting. (Attendee List provided in Attachment A) 3. The agenda was adopted (Attachment B) 4. The minutes from the 20 th Joint Meeting, held in Atlanta were reviewed by John McManus and tentatively approved by the attendees, no vote given as there was no quorum available. 5. The latest Work Program Listing (Attachment C) was presented and the Action items were reviewed and updated/added as appropriate (Attachment D) throughout the meeting. 6. Task Group Chair/Project Group Leader reports. a. ISO 13628-1/API RP 17A---Subsea Production Systems--- See Task Group Chair report (Attachment E) i. Jonathan Jordan reported that the recent ballot resulted in 15-yes votes and 2-no votes. There were roughly 30 pages of comments from the US votes which will be reconciled by the ISO group following ISO balloting of the NWI. SC 17 recommended the US TAG vote “yes” to ISO. ii. The formal report from Per Ragnar Dahl was presented by Olav Indreberg. iii. DIS ballot for the Amendment may be sent to ISO CS March 2007 and start May-June. iv. Anthony Muff’s proposal on System requirements for primary load bearing components/structures in subsea systems subjected to loads from drilling, completion, workover and well intervention operations was discussed. Olav Indreberg and Gary Hurta presented opposing views on the subject. John Bednar suggested that Jonathan Jordan e-mail out a “ballot” essentially asking for comments on the proposal.

Upload: dinhminh

Post on 05-Jun-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

1

MINUTES 21st Joint Meeting

API C2/SC 17 & ISO/TC67/SC4/WG6 Subsea Production Equipment

Houston, Texas February 7, 2007

1. John Bednar, API SC 17 Chairman, welcomed the group to the meeting at 8:30 AM and outlined various safety and housekeeping issues.

2. A roll call was completed and it was confirmed that there was not a

quorum present for this meeting. (Attendee List provided in Attachment A)

3. The agenda was adopted (Attachment B) 4. The minutes from the 20th Joint Meeting, held in Atlanta were reviewed by

John McManus and tentatively approved by the attendees, no vote given as there was no quorum available.

5. The latest Work Program Listing (Attachment C) was presented and the

Action items were reviewed and updated/added as appropriate (Attachment D) throughout the meeting.

6. Task Group Chair/Project Group Leader reports.

a. ISO 13628-1/API RP 17A---Subsea Production Systems--- See

Task Group Chair report (Attachment E) i. Jonathan Jordan reported that the recent ballot resulted in

15-yes votes and 2-no votes. There were roughly 30 pages of comments from the US votes which will be reconciled by the ISO group following ISO balloting of the NWI. SC 17 recommended the US TAG vote “yes” to ISO.

ii. The formal report from Per Ragnar Dahl was presented by Olav Indreberg.

iii. DIS ballot for the Amendment may be sent to ISO CS March 2007 and start May-June.

iv. Anthony Muff’s proposal on System requirements for primary load bearing components/structures in subsea systems subjected to loads from drilling, completion, workover and well intervention operations was discussed. Olav Indreberg and Gary Hurta presented opposing views on the subject. John Bednar suggested that Jonathan Jordan e-mail out a “ballot” essentially asking for comments on the proposal.

Page 2: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

2

b. ISO 13628-11/API RP 17B, ISO 13628-2/API 17J & ISO 13628-10/API 17K Flexible Pipe and API RP 17L Ancillary Equipment for Flexible Pipe— See Task Group Chair report (Attachment F)

i. The formal report from Krassimir Doynov was presented by Jonathan Jordan.

ii. The 2-month FDIS voting on ISO 13628-11 is expected to start around March/April 2007. Publication of standard is expected by the end of Summer 2007.

iii. The Ancillary Equipment draft proposal of API Specification 17L1 and API RP 7L2 to be submitted in Spring 2007 and request to made for NWI from ISO.

iv. The TG is preparing proposals for the next revision of ISO 13628-2 & -11 and API 17J/B – 2207/2008

v. JIP is ongoing c. ISO 13628-3 (API 17C) ---TFL Systems---No formal report

submitted i. Harold Reeves with BP is the new chairman. Harold

reported that there is no new activity in TFL systems but intends to keep the group intact. There are still two TFL systems being used.

d. ISO 13628-4 (API 17D) ---Subsea Wellheads and Trees--- See TG chair report (Attachment G)

i. Ross Fraser and Brian Skeels submitted report. ii. The API DIS ballot closes the 2/14. ISO ballot closes 2/28. iii. (Well head) connectors (Annex L) draft released and

comments received. Decision is for Annex L to be referred to 16A – Drill Through equipment. However, it was reported that David Tannich did not think that 16A would be willing to take this on. It was again suggested that the new work group on flowline connectors may be a home for this. Note, was made that Annex L is still referenced in text of current DIS.

1. All tree connectors kept in D / drilling connectors to 16A.

a. To wellhead / to flowline / etc. b. Functional requirements are fit for tree

2. Action item: TG to decide to possibly rework annex L considering only Subsea Tree Wellhead Connectors, excluding Drilling Connectors. If done, it would be for inclusion into the 17D document at a later date, possibly as an addendum.

iv. Pad eyes general requirements are in 13628–1/17A. 17D only addresses specific issues -- issues resolved and closed.

v. Annex M has been proposed to be move to 17N. 17N TG and Brian Skeels /17D members are to get together to discuss further.

Page 3: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

3

e. ISO 13628-5 (API 17E) --- Umbilicals---See Task Group Chair report (Attachment H)

i. John McManus reported that the final merged API TG & DNV JIP document is still with the ISO representative within Shell Hague to undergo review to ensure ISO editorial correctness. Shell reported that the expected due date for submittal to the ISO Secretariat and the API TG is February 28, 2007.

ii. DIS is expected to be issued June/July 2007. f. ISO 13628-6 (API 17F) --- Production Controls---No Report

available. Olav Indreberg gave update. i. Better integration between production and work-over control

systems will be proposed for the next revision. ii. Action is required that ISO and API TG communicate more

often g. ISO 13628-7 (API 17 G) --- Completion/Workover Risers— See

Task Group Chair report (Attachment I) i. Brian Skeels submitted the report. ii. RP 16ST document on containment systems and testing

(barrier systems) is still pending to be reviewed by TG. The TG can not move until this is transmitted and reviewed. Action for Jonathan Jordan to go to 16 head, David Tannich, and push for action from 16ST chair Alex Sas-Jaworski for testing & barrier philosophy.

1. note: the NORSOK D002 and D010 has been issued to TG for review

iii. The TG is still open to possibly subdivide 17G into subsections: 17G1, 17G2, 17G3, etc., etc.

iv. It is confirmed that IWOCS will remain in 17G v. Report on Interface proposal (see a iv above) -1, -4, & -7

given by Olaf Indreberg. Interface also with 16 (drilling) series. Current designs are based primarily on pressure. Fatigue is not taken into account. After drilling, sometimes the fatigue limit has already been achieved and thus no margin for safety.

1. Gary Hurta countered that everyone must read this carefully. This leads away from the minimum requirement philosophy which allows standard equipment to be manufactured. How do you monogram a SYSTEM?

2. John Bednar encouraged all to read and consider the impacts and need. This will be put out as a Technical Paper and solicit comments. E-mail will be sent to all SC-17 members.

3. A work session will be held the day before summer session for discussion to resume.

Page 4: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

4

h. ISO 13628-8 &-9 (API 17 H&M)---ROV & ROT Systems--- See Task Group Chair report (Attachments J1 & J2)

i. Charles White submitted the report. ii. 13628-8 and 13682-9 are now officially retired and has been

reinstated a 13628-13 iii. New document layout has begun and is in process – both

API & ISO iv. API 17R is the new assigned API designation.

i. ISO/WD 16389 (API RP 2RD)---Dynamic Risers for Floating Production---See Task Group Chair report (Attachment K)

i. Report presented by Paul Stanton. ii. Subgroup 2, Design Considerations, plans on having four

levels of criteria: 1. Level 1: based on the current 2RD

2. Level 2: based on ISO 13628-7

3. Level 3: LRFD format based on DNV OS F201

4. Level 4: Essentially RP 1111

iii. Subgroup 3 on Riser Components, chaired by Gordon Craig, GrantPrideco, are reviewing the first draft of Section 9 prepared by Finn Kirkemo, Statoil.

iv. Subgroup 4 on Materials has a new chairman (Howard Cook, BP), and met 18 Jan 2007. Jim Burk, BP is taking the lead.

v. Subgroup 5 on Riser Integrity Management has completed a second draft and is making good progress.

j. API 17N---Subsea Reliability and Technical Risk Management--See Task Group Chair report (Attachment L)

i. Report presented by Mark Sigmund. ii. First full draft released in April 2006. Re-draft released in

October 2006. Workshop in KL in November 2006. iii. Reviewed with ISO In December 2006 with reference to the

existing ISO document on reliability, ISO 20815 1. All areas of discrepancy were resolved. 2. Since the two are so close, it is important to ensure

conflict is not reintroduced later iv. Funding by API of $50,000 was given. v. There will be a joint Deepstar/API 17N workshop in March

2007. 1. a case study will be introduced

vi. Chevron has agreed to fund a technical author. vii. Goal is to pass final version to API the end of the first quarter

2007 viii. Action item: John Allen writing request. Asking for

additional $20,000 funding

Page 5: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

5

ix. Request made to have Jonathan Jordan post current version on web so all can have access

k. API 17O---HIPPS---No formal report available. No discussion l. API 17P---Templates and Manifolds---See Task Group Chair

report (Attachment M) i. Report presented by Charles White. ii. Marc Hyndman of Chevron is new TG chair iii. Funds approved and work started iv. Annex L & clause 6 have been forwarded to for

inclusion in 13628-1. The Manifold sections will eventually be moved into P. When P is complete, they will be removed from 13268-1.

v. API 17P has been given the designation of ISO 13628-15

m. Flowline Connection Group i. Craig Redding has left Southwest Research and is

now working with JP Kenny. Craig has confirmed he will continue to chair this work group

n. Buoyancy and Insulation Aspects ---No report available. i. No update was available

o. Other Business; a. John Bednar asked Jonathan Jordan to update the Sunset

Committee rosters b. Andrew Wainright still needs to be on contacted with regards

to his proposal for a NWI on standardized installation reels for coiled subsea products.

c. HP/HT i. Brian Skeels is to continue to monitor the 6HP

committees work and advise if there is to be any impact ton SC 17

1. 6HP is dealing with HP/HT– wait and see what can be brought over into 17

ii. Identify any specific factors in HP/HT that is below 6HP temperature levels. These may be better situated for 17 – temps @ 350F and below – 6HP is dealing with 400F and above

p. Funding a. Decisions for Funding for 2008 are made in June 2007.

Need proposals for any new funding to be inplace April/May latest.

q. OGP Int’l workshop a. Workshop met Feb 7-8 in London b. Material selection is the issue. Olav will contact to make to

ensure intent of their work. r. Work Group 6 now does not have a representative from SC 17.

Page 6: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

6

a. Action for Leadership Team to have this representatives found and in place by June meeting.

s. ECS has recommended that all winter meetings be held at same time and in the same location – preferably in the Texas area. 16C disagrees and plan to keep its winter meeting separate.

t. Next Meeting---Winter 2007. ; Summer June 25-29 2007 API Summer Conference in San Francisco.

a. See the API Meeting Webpage for Registration and Hotel information.

b. Meeting Wednesday morning and end lunch c. Will have working session meeting on the Tuesday before

the Wed. group for entire day

Page 7: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing
radforda
Text Box
Attachment A
Page 8: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing
Page 9: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

21st Joint Meeting of ISO/TC67/SC4/WG6 and API SC17 Technip Building – 11700 Old Katy Road

Houston, TX

February 7, 2007 – Joint Meeting - 8:30 am 1. Opening of the meeting (Bednar/Inderberg) 2. Roll call/Roster Update (Jordan) 3. Adoption of the proposed agenda (Bednar/Inderberg) 4. Adoption of the minutes from 20th joint meeting (Bednar/Inderberg) 5. Status and action plan update (See Attached Action Items) 6. Task Group/Project Group Reports (See Attached Work Program)

A. Subsea Production Systems (Souza/Dahl) • Update on activity • WG for Flowline Connections – New WG Leader needed

B. Flexible Pipe (API TG1) (Doynov) • Initiate Adopt-back for 17J/-2 • Request to initiate simultaneous Adopt-back for 17B/-11 on FDIS release • 17L - Flexible Pipe Ancillary Equipment JIP – report on progress to date • ISO 13628-2/API Spec 17J & ISO 13628-11/API RP 17B – report on progress and status of JIP

to update standards C. TFL Systems (API TG6) (Reeves)

• ISO 13628-3/API RP 17C – Update on activity D. Subsea Wellheads/Tree (API TG5) (Frazer/Skeels)

• ISO Spec 13628-4 – Discussion/report on DIS ballots • Document interface (annexes) with 17A/-1; 17G/-7; 17N; 16A

E. Umbilicals (API TG4) (McManus) • ISO 13628-5/API Spec 17E - report on progress of revision

F. Control Systems (API TG 2) (Neuenkirchen) • ISO 13628-6/API Spec 17F – API 17F published Dec 2006

G. Completion/Workover Risers (Skeels) • ISO 13628-7/API RP 17G – report on activity (17G published July 2006)

H. ROV/ROT (API TG3) (White) • ISO 13628-8 and –9/API RP 17H and RP 17M – report on progress of NWI to combine

documents into one standard I. Dynamic Risers (Stanton)

• ISO 13628-12 NWI (16389/API RP 2RD) – report on status of revision J. Subsea Reliability RP (Allen)

• Update on RP17N activity K. HIPPS RP (Goggans)

• Update on RP17O activity L. Templates and Manifolds (Whipple)

• Update on 17P activity M. Subsea System Engineering (tbd)

• Update on 17Q activity N. Materials Study Group (tbd)

• Update on activity/API Chair 7. Summary of Discussions of Prior Meetings

• Document Interfaces Discussion (Inderberg) See SC17 Website (Meeting Material) for Document • Report on Path Forward for Insulation and Buoyancy Spec and RP (Given)

8. Other Business • 2006/2007/2008 Research Funding Proposals (Jordan/White/Allen) • OGP International Standards Workshop (Feb 7-8) Discussion

9. Review of Action Items 10. Next meetings – Summer 2007, June 25-29 San Francisco, CA; Winter 2008, TBA

radforda
Text Box
Attachment B
Page 10: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API SC17 (ISO TC67/SC4/WG6), SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS

2007 WORK PROGRAM Revised January 2007 BRIEF DESCRIPTION OF WORK/SCOPE

API Standard

ISO Standard

API Chair ISO Project Leader SC17 Leadership

Team Champion

STATUS

Design and operation of subsea systems

RP 17A 13628-1 Luiz Souza, Petrobras America (TG7)

Per Dahl, Norsk Hydro

TBD (Wilkinson)

Published (Jan 2006). Amendment ballot in progress. API closed Jan 26, ISO closes Feb 20.

Flexible pipe RP 17B 13628-11 (was 10420)

Krassimir Doynov, ExxonMobil (TG1)

Krassimir Doynov, ExxonMobil

TBD (Wilkinson)

FDIS anticipated in 2-3 months. Simultaneous API adopt-back requested.

TFL systems RP 17C 13628-3 Harold Reeves, BP (TG6)

TBD Hurta No action needed at this time.

Subsea wellhead and tree equipment

Spec 17D 13628-4 Ross Frazer, ATP Vice Chair: Brian Skeels, FMC (TG5)

Ross Frazer, ATP Vice Chair: Brian Skeels, FMC

Hurta Work ongoing. DIS ballot in progress. API closes Feb 14, ISO Feb 28.

Production control umbilicals

Spec 17E 13628-5 John McManus, Gibson Tube (TG4)

Ron Dee, Shell TBD Currently undergoing editorial checks, expect ISO DIS in 3rd quarter ’06.

Subsea controls Spec 17F 13628-6 John Bodine, Chevron (TG2)

Jens Neuenkirken, Statoil

Bednar Published December 2006 (with errata). Possible revisions forwarded to ISO.

Design & operation of completion/workover risers

RP 17G 13628-7 Brian Skeels, FMC

Anthony Muff, FMC

Hurta Published July 2006.

ROV interfaces RP 17H 13628-8 Charles White, DORIS, Inc (TG3)

Eric Luzi, Statoil Hurta ISO 13628-8/API 17H published. NWI passed to combine with 13628-9 to become 13628-13.

Unbonded flexible pipe Spec 17J 13628-2 Krassimir Doynov, Exxon Mobil (TG1)

Krassimir Doynov, Exxon Mobil

TBD (Wilkinson)

ISO -2 published July 2006. API adopt-back needed.

Bonded flexible pipe Spec 17K 13628-10 Krassimir Doynov, ExxonMobil (TG1)

Krassimir Doynov, Exxon Mobil

TBD (Wilkinson)

Second Ed Published Nov 2005.

radforda
Text Box
Attachment C
Page 11: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

BRIEF DESCRIPTION OF WORK/SCOPE

API Standard

ISO Standard

API Chair ISO Project Leader SC17 Leadership

Team Champion

STATUS

Flexible Pipe Ancillary Equipment (Spec)

Spec 17L1 TBD Krassimir Doynov, ExxonMobil (TG1)

Krassimir Doynov, Exxon Mobil

TBD (Wilkinson)

Incorporating comments in working draft.

Flexible Pipe Ancillary Equipment (RP)

RP 17L2 TBD Krassimir Doynov, ExxonMobil (TG1)

Krassimir Doynov, Exxon Mobil

TBD (Wilkinson)

Incorporating comments in working draft.

ROT Intervention System

RP 17M 13628-9 Charley White, DORIS Inc.

Eric Luszi, Statoil TBD NWI passed to combine with 13628-8 to become 13628-13.

Dynamic Risers RP2RD 13628-12 Paul Stanton, Technip

Paul Stanton, Technip

Bednar Working draft being prepared.

Subsea Reliability RP 17N TBD John Allen, Vetco-Grey

Olav Inderberg, FMC

TBD Working draft being prepared. API contract in progress.

HIPPS 17O TBD Tim Goggans, FMC Tim Goggans, FMC Bednar Document ready for TG review.

Templates and Manifolds

17P 13628-15(proposed)

Jeff Whipple, Intec Borge Brubaek, Statoil

TBD (Wilkinson)

Working draft being prepared. API contract in progress.

Systems Engineering 17Q TBD (-TBD-) Olav Inderberg, FMC

TBD (Wilkinson)

Decision on continuing this project is pending discussion at next meeting.

Materials Study Group n/a annexes to existing

(-TBD-) Ragnar Mollan,Norsk Hydro

Inderberg Generating annex materials for 17A (-1) and 17P

Page 12: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

ISO SC4/WG6 / API SC17 Action Items

February 7, 2007 Joint Meeting

Standard/ Subject

Action Item Last Update Current Status (items in bold are complete)

2006- 7 Working group for flowline connections/ connection systems proposed to make recommendation of what and where this should go.

6/14/06 – Jonathan Jordan will put out an e-mail soliciting support. Craig Redding, SW Research, volunteered to lead the work group.

2/07/07 – Craig Redding has moved to JP Kenny in Houston and will continue to lead the work group.

2006- 8 Working group for metering system requirements and needs to be identified to ascertain who is working on metering systems and what should SC17 do with regards to metering systems.

6/14/06 – SC17 Leadership Team with assistance of John Allen to get working group started.

2/07/07 -- Ongoing

2006- 9 Question as to whether 17A should continue its existence as a Recommended Practice or if it should be written as a specification.

6/14/06 – SC17 Leadership Team to give guidance.

2/07/07 – Leadership Team agreed to keep as RP. Complete. Will be removed following next meeting.

2006- 10 17D work group to compare wording on lifting that is currently in 17A and only provide additional information in 17D which is not adequately supplied in 17A.

6/14/06 – Ongoing 2/7/2007 – Complete. Will be removed following next meeting.

2006- 11 Motion passed for SC17 to recommend that Clause 6 and Annex L go out for ballot to be included in 17A.

6/14/06 – Ongoing 2/7/2007 – Complete. Will be removed following next meeting.

2006- 12 Work Group to be formed to come up with recommendations for one definition of pressure rating for general use

6/14/06 – Glen Cuiper with AKS volunteered to chair the WG.

2/07/07 – Ongoing

Flexible Pipe 13628-2 (17J), 13628-10 (17K), 13628-11 (17B) 17L1, 17L2 (Ancillary Equipment)

2004-6: Olav Inderberg to prepare an ISO NWI based on the 17Ls work for consideration at the June meeting.

6/29/05 – Ongoing 9/30/05 – Ongoing 3/03/06 – Waiting on draft 6/14/06 – Waiting on draft

2/07/07 – Waiting on draft

February 7, 2007 1

radforda
Text Box
Attachment D
Page 13: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

Standard/ Subject

Action Item Last Update Current Status (items in bold are complete)

2004-18: Krassimir Doynov to forward a draft of 17Ls (when draft is deemed ready for widespread release) to be used in the ISO new work item and this should include a proposed title and how it could also include umbilicals.

9/30/05 – Ongoing 3/3/06 – Incorporating comments into draft documents 3/03/06 – Waiting on draft 6/14/06 – Waiting on draft

2/07/07 – Waiting on draft

2006- 13 Motion passed to initiate adopt back immediately for 13628-2/17J in parallel with ISO when FDIS is completed.

6/14/06 – SC17 to initiate adopt back.

2/7/2007 – Complete. Will be removed following next meeting.

TFL 13628-3 (17C)

No outstanding action items

2006- 14 SC leadership team to address the new Normative Annex L document.

6/14/06 – Ongoing.

2/7/2007 – Complete. Will be removed following next meeting.

2006- 15 Motion passed to delete Annex M as part of 17D and be given to 17N.

6/14/06 – 17D Chairman to transfer information to 17N.

2/7/2007 – Complete. Will be removed following next meeting.

Umbilicals 13628-5 (17E)

No outstanding action items

Control Systems 13628-6 (17F)

No outstanding action items

Comp./Work-over Risers 13628-7 (17G)

2005-5: Brian Skeels will prepare New Work Item to form a new API task group related IWOCS with ISO participation. This will then be submitted to Olav Inderberg to prepare an ISO New Work Item request before the June API meeting.

9/30/05 – Ongoing 3/3/06 - Brian Skeels to propose an approach on what systems (including IWOCS?) the TG will address and how the documents will be structured by June ‘06 meeting 6/14/06 – Ongoing.

2/7/2007 – Complete. Will be removed following next meeting.

February 7, 2007 2

Page 14: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

Standard/ Subject

Action Item Last Update Current Status (items in bold are complete)

2006-2: TG to provide a proposal with reference to barrier philosophy for well bore interventions systems.

3/3/06 - Brian Skeels to provide update on barrier discussion at June ’06 meeting 6/14/06 – Ongoing.

2/07/07 – Ongoing

2006- 16 John McManus and Brian Skeels to propose how and where the IWOC umbilical goes.

6/14/06 – Ongoing.

2/07/07 – Complete. Will be removed following next meeting.

ROVs 13628-8 (17H) ROTs 13628-9 (17M)

2006- 17 API to assign API letter for the merged 17H and 17M..

6/14/06 – API to assign letter.

2/07/07 – Complete. Will be removed following next meeting.

2006- 18 Olav Inderberg will review the 17N document and the existing ISO 20815 document to make judgment if new ISO NWI should be raised.

6/14/06 – Ongoing.

2/07/07 – Ongoing

2006- 19 Motion passed for 17N work group to present request for NWI to raise a 13628 number.

6/14/06 – 17N WG to make request to ISO.

2/07/07 – Ongoing

2006- 20 Motion passed that following the raising of the ISO NWI, the SC17 leadership committee to request ISO to issue the document as a working draft for comment.

6/14/06 – Ongoing.

2/07/07 – Ongoing

HIPPS 17O

No outstanding action items

2006- 21 SC17 Leadership Team to ensure Annex L and 17P are not in conflict

6/14/06 – Ongoing.

2/07/07 – Ongoing

13628-12 (API RP 2RD) Dynamic Risers

No outstanding action items

February 7, 2007 3

Page 15: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

Standard/ Subject

Action Item Last Update Current Status (items in bold are complete)

General/ Admin.

2004-25: Leadership team to explore ways to get information out to industry in a more timely manner.

3/3/06 – Verify document status sheet on API website and/or develop dedicated page. Review System Poster in Atlanta 6/14/06 – Jonathan Jordan to see if existing “poster” or new “flyer” recommendation can be made to the leadership team.

2/07/07 – Ongoing

2006- 22 The current SC17 Sunset Team listing is outdated. List needs to be updated with current member’s names.

6/14/06 – Jonathan Jordan to update the list.

2/07/07 – Ongoing

Permanent Discussion Items

2001-18: John Bednar, Gary Hurta, and Olav Inderberg are to look at the direction that SC17 should be pursuing relative to the composite suite of API 17 Series general and specific documents that address the broad spectrum of subsea hardware.

3/3/06 – To be discussed at Atlanta meeting during -1 and -7 sessions.

6/14/06 – Ongoing.

New Work 2003-22: Brian Skeels to develop a plan for dealing with HPHT issues for subsea production system standards, addressing: - what areas should be covered in terms of equipment and procedures; - how this would best be integrated into the SC17 documents e.g. stand alone document versus HPHT Annexes in each existing document; - what else is going on in the industry in this regard e.g. API sponsorship of testing of effects of HT on material properties.

3/3/06: Maintain continued SC17 awareness of issue and provide input relevant to SC17 6/14/06 – Ongoing.

2/07/07 – Closed. This Is being handled by 6HP Task Group. Brian Skeels will still keep an eye on issues/conclusions for future recommendations to SC17. Complete. Will be removed following next meeting.

2004-13: Dave Wilkinson, John Bednar, and Andy Radford to determine path forward for Insulation and Buoyancy standards prior to the June meeting.

3/3/06 – Mike Given to provide update/recommendation at June ’06 Meeting. 6/14/06 – Dave Wilkinson to follow up with Mike Given to determine way forward.

2/07/07 – Leadership Team to follow up with Mike Given.

February 7, 2007 4

Page 16: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

Standard/ Subject

Action Item Last Update Current Status (items in bold are complete)

2006-6: David Wilkinson to contact Andrew Wainright regarding his proposal for NWI on standardized installation reels for coiled subsea products

3/3/06 – Ongoing 6/14/06 – Ongoing.

2/07/07 – Leadership Team to follow up with Andrew Wainright.

February 7, 2007 5

Page 17: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

ISO/TC67/SC4/WG6 Subsea production systems ISO 13628-1 Design and operation of subsea production systems – Part 1: General recommendations and requirements Task Group status report – January 2007 1. Membership of task group ISO Project leaders; Part 1 project leader: Per Ragnar Dahl, Hydro, Norway Other ISO 13628 project leaders: Krassimir Doynov - ExxonMobil Ross Frazer - ATP Ron Dee - Shell Jens Henrik Neuenkirchen - Statoil Antony Muff – FMC Paul Stanton – Technip Eric Luzi – Statoil Other task group members; Olav Inderberg – FMC David Wilkinson – ExxonMobil John Bednar – BP Bruce Crager – ABB Brian Skeels – FMC Gary L. Hurta – Dril Quip Rolf Nordaunet – ABB Steve Dean / Giorgio Pastore – Agip Alain Creatine – Total Mauricio Werneck – Petrobras Eric Wehner - Cameron John MacManus – Gibson Tube

ISO/TC67/SC4/WG6 N.....

radforda
Text Box
Attachment E
Page 18: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

2. Status of work item ISO 13628-1, second edition was published 2005-11-15. It has been adopted as EN ISO 13628-1, November 2005 without any changes. It has also been adopted as API RP 17A, fourth edition, January 2006 (identical). The joint API SC17 and ISO TC67/SC4/WG6 meeting agreed to create a Materials task group to develop the material requirements in the ISO13628 suite of standards. This work has progressed well and a draft for an official Amendment to ISO 13628-1 Clause 6, Materials and corrosion protection” is now available together with a proposal for a new Annex L "Materials and welding of subsea manifolds". Launching this as a NWIP was however overseen until late fall 2006. The NWIP ballot is closing 2007-02-20. Thereafter follows the DIS and FDIS (if not 100% approved at DIS stage). 3. Updated target dates for deliverables DIS ballot for the Amendment may be sent ISO CS March 2007 and start May-June. 4. Major issues No major issues remains to be solved at this moment. 5. Anticipated new work /new work items Part 1 is the main subsea production systems standard and it needs to be regularly maintained. During the last revision process some comments were left for later considerations. These comments were suffixed with “noted” in the commentary report. The following list present by keywords “noted” issues from the commentary report and some issues that have been defined after the commentary report was closed. - Separate doc for Annex A to be considered - Define drilling loads (work has started by DNV for Standards Norway)

- Include separate paragraph to consider physical interface to subsea processing equipment such as pumps, metering equipment etc.

- Template and manifold (section 5.12 and Annex G) is proposed merged and pulled out into a separate ISO 13628 part 15 to be co-ordinated with the API 17P work.

- Commentaries report Ref NO 052. - Landing speed suggested moved to part 9. - Ref NO 054. Include running clearances - NO 055.Consider suction systems. - Ref US 049. Definition of dropped object protection and trawl resistant

structure. - US 067. Consider special tests for handling systems etc. - US 068. Consider reversibility and repeatability tests - US 076. How does one commission a subsea processing system?

Page 19: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

- US 077. Additional information for annex F - US 079. Active actuators considerations - US 099 Ref 6.2.1 This section discusses acid-gas related chemical

corrosion on an "agreed-upon model" basis, while direction is given to correlations for corrosion for oxygen. In section 6.2.1.5, this is related to flow phenomena. This should probably refer to individual standards, rather than these specifics.

- Subsea processing issues - Terminology and definitions to be consistent with the N172 document. - Revisit the system engineering guidelines - Flanges design etc.

The initiative to revise the material clause 6 needs to be amalgamated with next revision of the standard and further developed as necessary. Future work should also typically include more focus on systems engineering, and examine the need for describing interfaces to subsea processing equipment such as separators, sand management systems, pumps etc. In addition, maintenance of Part 1 can also be triggered by changes in the other corresponding parts or by activity on upcoming new work items as e.g. the template and manifolds, system engineering, HIPPs and other initiatives. 6. Plans for future meetings None. However, in view of comments above, it was suggested at the joint API/SC17 and ISO... WG6 meeting at the API Summer Conference that the issues mentioned above be discussed at a task group meeting, late fall/early winter 2006. Interested parties were requested to contact the undersigned at [email protected] or +47 9172 8832. No response have been received to date. Suggest this request be brought up again at the next joint API/SC17 and ISO... WG6 meeting at the API Summer Conference 2007. 7. Resource needs (money and/or people) Population of TG1 is necessary to start soon for planned revision work. Also, identification of a new Project Leader for API 17A would facilitate coordination. Per Ragnar Dahl, Hydro January 2007

Page 20: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS

STATUS OF

API 17J,B,K AND ISO 13628 -2,11,10 FLEXIBLE PIPE STANDARDS

JOINT API-ISO FLEXIBLE PIPE TASK GROUP

JANUARY 19, 2007

Prepared by: Krassy Doynov

Flexible Pipe Task Group Chair Ph.D., Subsea / Riser Systems ExxonMobil Development Company 12450 Greenspoint Dr., Houston, TX 77060 Tel.: 281-654-4735; FAX: 281-654-6202 E-mail: [email protected]

radforda
Text Box
Attachment F
Page 21: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API 17 B,J,K,L & ISO 13628-11,2,10 FLEXIBLE PIPE STANDARDS 2007 WINTER MEETING STATUS REPORT

-1-

1. INTRODUCTION

The joint API-ISO Flexible Pipe Task Group (FPTG) is an international group of Subject Matter Experts (SME) representing the flexible pipe community worldwide, whose tasks are to address all technical comments arising from revisions and updates of the flexible pipe standards, and to provide smooth transition between:

ISO 13628-11: Flexible pipe systems for subsea and marine applications, and API RP 17B, Recommended practice for flexible pipe, Third edition, March 2002

ISO 13628-2: Unbonded flexible pipe systems for subsea and marine applications, and API 17J, Specification for Unbonded Flexible Pipe, Second edition, November 1999

ISO 13628-10: Bonded flexible pipe, and API 17K, Specification for Bonded Flexible Pipe, First edition, March 2002

by maintaining the technical content Identical. This report contains comments on the completion of the scope of work, as well as presents the status of the:

a) Ancillary Equipment JIP aimed at the creation of draft for API 17L1 and L2 standards,

b) Flexible Pipe Technology JIP whose purpose is the next revision of the ISO 13628-2/-11 and API 17 J/B standards, intended for the 2008/2009 timeframe.

2. CURRENT STATUS

The flexible pipe ISO standards are based on, and improve the API standard revisions mentioned above, by virtue of addressing a number of comments received in that process. The flexible pipe community desire is to back adopt the improvements made in the ISO standards into next API standard revisions, to facilitate the use of flexibles worldwide.

The ISO 13628-10 was published on October-1, 2005, while the identical API 17K was published on November-1, 2005.

The ISO 13628-2 was published on July-12, 2006. This process included a 2-month FDIS voting. In principle, only comments of editorial nature are allowed after FDIS voting, while technical comments are not allowed. After the FDIS voting, the FPTG was involved in resolving one issue – finding a substitute for a reference to an old ASTM

Page 22: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API 17 B,J,K,L & ISO 13628-11,2,10 FLEXIBLE PIPE STANDARDS 2007 WINTER MEETING STATUS REPORT

-2-

D671 standard that was discontinued in 2002 without replacement. While this issue was identified as editorial, it was probably of a mixed editorial/technical nature since it was resolved practically with the help of the FPTG. This example highlights the need of a transparent documentation of all changes made to the standard after FDIS voting, to facilitate the back adoption into API 17J standard. Identical API 17J standard is yet to be published.

The preparation of the ISO/FDIS 13628-11 document was delayed practically for 6-7 months due to delays in editing all Figures (see Lessons Learned section for details). The ISO/FDIS 13628-11 document was accepted by ISO Central Secretariat for FDIS processing on January-12, 2007. As advised by Alain Samne of the ISO Central Secretariat, it takes 2.5 to 3-months to launch the 2-month FDIS ballot, or 5.5 to 6 months to Publication, meaning that the ISO 13628-11 standard is expected to be published around July 2007.

The Ancillary Equipment JIP is completed. The JIP manager MCS is expected to the draft proposals for API Specification 17L1, and API Recommended Practice 17L2 standards by the end of February, 2007.

The Flexible Pipe Technology JIP, whose purpose is the next revision of the ISO 13628-2/-11 and API 17 J/B standards within the 2008/2009 timeframe, has 19 participants – manufacturers, operators, service companies, regulators and standardization bodies – a very broad Industry representation worldwide. The JIP was kicked off in January 2005 and is about to be completed in 2007. The JIP main task is to work on resolving the most challenging issues associate mostly with deepwater applications, which cannot be resolved by simple e-mail correspondence. The final deliverables of the FPT JIP is draft proposals for the next revision of the API and ISO standards mentioned above.

3. MEMBERSHIP

The list of the subject matter experts volunteering their time to support the Flexible Pipe Task Group (FPTG) activities is provided in the table shown below. This list is being updated only when the FPTG Chair receives a request for that from a Subject Matter Expert (SME), Company, or Country with a stake in the development of the ISO 13628-2/-10/-11 standards. Most of the requests are usually for the replacement of one SME with another SME from the same institution. This list is a reflection of all companies with

Page 23: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API 17 B,J,K,L & ISO 13628-11,2,10 FLEXIBLE PIPE STANDARDS 2007 WINTER MEETING STATUS REPORT

-3-

a stake Table 2 and notable presence Table 1 in the International flexible pipe user community.

List of Subject Matter Experts actively participating in the FPTG activities

No. Name Company E-mail address 1. Krassimir Doynov ExxonMobil Development Co. [email protected]. Kent Caveny ExxonMobil Development Co. [email protected] 3. Phil Abrams ExxonMobil Development Co. [email protected] 4. Antoine Felix Henry Technip - Flexi France [email protected] 5. Jean Rigaud Technip - Flexi France [email protected] 6. Zhimin Tan Wellstream Inc. [email protected] 7. Paul Lewicki Wellstream Inc. [email protected] 8. Terry Sheldrake Wellstream Ltd. [email protected] 9. Niels Rishoj NKT Flexibles [email protected] 10. Mike Bryant DeepFlex Inc. [email protected] 11. Tibor Nagy Phoenix Rubber (Industrial) Ltd. [email protected] 12. Michael Werth Atofina [email protected] 13. Thierry Roland

Delahaye Total [email protected]

14. Denis Melot Total [email protected] 15. Trond Stokka Meling Statoil [email protected] 16. Knut-Aril Farnes Statoil [email protected] 17. Einar Oeren Statoil [email protected] 18. Harald Thon Norsk Hydro [email protected] 19. Jon Olav Bondevik SeaFlex [email protected] 20. Rune Haakonsen SeaFlex Riser Technology Inc. [email protected] 21. Chris Mungall KBR [email protected] 22. Kam Zandiyeh Dunlop Oil [email protected]

TABLE 1 LIST OF ACTIVE API–ISO FPTG MEMBERS

List of Subject Matter Experts invited to participate in the –2/-11 FPTG activities

No. Name Company E-mail address 23. Jemei Chang Shell Oil Company [email protected] 24. Ali Anaturk Shell Oil Company [email protected] 25. Neil Reeve Shell Global Solutions [email protected] 26. Alan Bliault Shell International E&P [email protected] 27. Dick Percy BP Exploration [email protected] 28. Stephen Groves BP Exploration [email protected] 29. Carlos Lemos PetroBras [email protected]

Page 24: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API 17 B,J,K,L & ISO 13628-11,2,10 FLEXIBLE PIPE STANDARDS 2007 WINTER MEETING STATUS REPORT

-4-

30. Marcos Carpigiani PetroBras [email protected] 31. Renato Da Silva PetroBras [email protected] 32. Luiz Lobianco PetroBras [email protected] 33. George Gu ConocoPhillips [email protected] 34. Richard Thompson ChevronTexaco [email protected] 35. Paul Hays ChevronTexaco [email protected] 36. John Lawson ChevronTexaco [email protected] 37. Todd Jones ChevronTexaco Products [email protected] 38. Chris Lawlor Woodside [email protected] 39. Tore Narum Woodside [email protected] 40. Don Johnson ASME [email protected] 41. Meyrick Hadfield HSE [email protected] 42. Nicola Feroleto Agip [email protected] 43. Rick Hill Kvaerner Oilfield Products Inc. [email protected] 44. Sijm Last Materials Engineering Consultancy [email protected] 45. Bob Rothberg JP Kenny Inc. [email protected] 46. Barry Thomson Materials Engineering Research

Laboratory [email protected]

47. Jean Philippe Roques SAIPEM [email protected]

48. Olivier Moutet Singlebuoy [email protected] 49. Graeme Reid CNR International Ltd [email protected] 50. Frank Grealish MCS International [email protected] 51. Kieran Kavanaugh MCS International [email protected] 52. Patrick O’Brien MCS International [email protected] 53. Michael O'Sullivan MCS International [email protected] 54. Craig Redding Southwest Research Institute [email protected] 55. George Wolfe Southwest Research Institute [email protected]

TABLE 2 LIST OF INVITED SME COPIED WITH FPTG CORRESPONDENCE

This FPTG list is subject to further modification based on the availability of the volunteering SMEs.

4. UPDATED TARGET DATES FOR DELIVERABLES

The target dates for the milestones described in Section 2 are:

a) The 2-month FDIS voting on ISO 13628-11 is expected to start around March-April 20076. Publishing of ISO 13628-11 standard is expected in the Summer of 2007

Page 25: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API 17 B,J,K,L & ISO 13628-11,2,10 FLEXIBLE PIPE STANDARDS 2007 WINTER MEETING STATUS REPORT

-5-

b) Submitting Ancillary Equipment standard draft proposals of API Specification 17L1 and API Recommended Practice 7L2, and requesting ISO New Work Items for these standards – Spring, 2007

c) Preparing Flexible Pipe Technology proposals for the next revision of ISO 13628-2/-11 and API 17J/B – 2007/2008

5. LESSONS LEARNED

The previous experience with the revision of the ISO 13628-10 and API 17K standards has demonstrated the success of the formula of clearly defined and separated responsibilities of a technical leadership (FPTG Chair), and editorial leadership (API).

The preparation of the ISO/FDIS 13628-11 document was delayed practically for 6-7 months due to delays in editing of all Figures. The DIS document was assembled by more than one API editor due to job changes and/or rotations. The figure editing was subcontracted by the International Association of Oil and Gas Producers (OGP) to a contractor (Galbraith Consulting Ltd.) who consequently merged with another contractor - Poseidon International Ltd. The ISO/FDIS 13628-11 document is being edited by the ISO Central Secretariat. The lesson is that such 6-7 month delays can be perhaps avoided by :

a) assigning a clearly defined editorial leadership,

b) outlining a matrix and schedule of agreed upon responsibilities spread out among all organizations (like API, OGP, ISO) supporting the editorial work.

ISO FDIS voting process lasts two months. In principle, only comments of editorial nature are allowed after FDIS voting, while technical comments are not allowed. After the 13628-2 FDIS voting, the FPTG was involved in resolving one issue – finding a substitute for a reference to an old ASTM D671 standard that was discontinued in 2002 without replacement. While this issue was identified as editorial, it was probably of a mixed editorial/technical nature since it was resolved practically with the help of the FPTG.

Page 26: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API 17 B,J,K,L & ISO 13628-11,2,10 FLEXIBLE PIPE STANDARDS 2007 WINTER MEETING STATUS REPORT

-6-

It is documented in item 7, b), iii) of the MOM from Atlanta 2006 ISO-API meeting, that Motion was made and seconded “that SC17 initiate adopt back immediately for 13628-11 (perhaps a typo - 13628-2 should have been added too) in parallel with ISO when FDIS is completed. This is contingent that no changes are made without the approval of the respective API and ISO Committees.” The apparent condition for back adoption of API 17J is a transparent documentation of all changes made to the standard after FDIS voting. The imposing of this condition is supported by the 13628-2 example of the old ASTM D671 reference explained in the previous paragraph.

This second lesson highlights the need of a transparent documentation of all changes made to the standard after FDIS voting, to facilitate the back adoption into API standards.

6. ANTICIPATED NEW WORK ITEMS

Two draft proposals for API 17L1 “Ancillary Equipment” Specification and API 17L2 Recommended Practice standards are expected in Spring, 2007. Since these standards are about to compliment API 17 J/B/K ISO 13628-2/11/10 to provide the business framework for complete flexible pipe/ancillary equipment system, I expect the need of two NWI for corresponding ISO standards in the Summer of 2007.

7. PLANS FOR FUTURE MEETINGS

None at this time.

8. RESOURCE NEEDS

The FPT JIP is currently experimenting with an Internet Forum type discussion on the JIP manager’s web site. The three distinctive advantages of using the Internet Forum that surfaced up are:

- ability to continuously exchange opinions, and giving SMEs the chance to get familiar with and discuss competing points of view on controversial topics,

Page 27: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API 17 B,J,K,L & ISO 13628-11,2,10 FLEXIBLE PIPE STANDARDS 2007 WINTER MEETING STATUS REPORT

-7-

- the potential impact of shortening lengthy discussions during face-to-face meeting with a large group of SMEs seeking opportunity to share different lessons learned and offer unique perspective on a variety of controversial topics,

- providing transparency (and documentation) of arriving at a logic for making a final decision on technical comments.

These advantages are seen as a vehicle to accelerate the work of API-ISO FPTG, and perhaps decrease the need for interpretation of technical clauses accepted in the flexible pipe standards already published.

Thus, I request the establishment of an Internet Forum on the API SC17 website, and/or on the ISO TC67 SC4 WG6 website, for facilitating API-ISO FPTG future activities.

Alternatively, I expect to request some funding for using MCS Internet Forum, for the same FPTG purposes, in Summer, 2007.

Page 28: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API C2 / SC 17

SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS

API 17D/ISO 13628-4 Subsea Wellheads and Christmas Trees

JOINT TASK GROUP STATUS

07 FEB 2007

radforda
Text Box
Attachment G
Page 29: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

SPECIFICATION API 17D/ISO 13628-4 SUBSE WELLHEADS AND TREES

STATUS REPORT

-1- 07 February 2007

TABLE OF CONTENTS

1. INTRODUCTION ................................................................................................................. 1

2. STATUS ................................................................................................................................. 1

3. MEMBERSHIP ..................................................................................................................... 2

4. TARGET DATES FOR DELIVERABLES........................................................................ 3

5. MAJOR ISSUES.................................................................................................................... 3

6. ANTICIPATED NEW WORK ITEMS .............................................................................. 3

7. PLANS FOR FUTURE MEETINGS .................................................................................. 3

8. RESOURCE NEEDS ............................................................................................................ 3

Page 30: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

SPECIFICATION API 17D/ISO 13628-4 SUBSE WELLHEADS AND TREES

STATUS REPORT

-1- 07 February 2007

1. INTRODUCTION

The API 17D task group’s scope was to develop a second edition of the specification, combining ISO 13628-4 and API 17D into a second edition of 13628-4. Once that ISO document is fully balloted & accepted, it is planned that it will be adopted by API as the second edition of 17-D. Items considered in the new edition of the specification include:

• Revised information on gaskets and flanges

• Addressed GLL and HXTs

• Revised mudline equipment definitions

• Updated pressure testing and acceptance criteria

• Added annexes on flange bolting, material compatibility testing, and lifting devices

• Pressure ranges (limit to 15k equipment)

• Updated PSL, material class and temperature class

• Clarified wellhead annular monitoring requirements

2. STATUS

In June it was reported that the last outstanding issues had been resolved to the point that members were ready to release the document as a DIS. This occurred on 28 September 2006. API balloting closes 25 Jan 2007 and ISO balloting closes 28 Feb 2007. Once ballots and comments are received, the task group will begin working on comment resolution As per agreement at the last joint meeting, 17D/13628-4 leadership (Ross Frazer & Brian Skeels) forwarded Annex L, Performance verification (qualification) of wellhead connectors, to the 16A subcommittee in early January and asked that group to consider including it in their specification.

Page 31: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

SPECIFICATION API 17D/ISO 13628-4 SUBSE WELLHEADS AND TREES

STATUS REPORT

-2- 07 February 2007

3. MEMBERSHIP

The current membership is listed below. The task group leadership is in the process of updating this.

API 17D TASK GROUP MEMBERS (January 2007)

Name Company E-Mail Address

Ross Frazer ATP Oil & Gas [email protected]

Brian Skeels FMC Technologies [email protected]

Tom Ames BP [email protected]

Don Wells ConocoPhillips [email protected]

Gary Hurta Dril-Quip [email protected]

Tim Dean Kerr-McGee [email protected]

Sterling Lewis ExxonMobil [email protected]

David Lacaze Shell [email protected]

Sean Thomas Vetco Gray [email protected]

Loren Kowalchuk Master Flo [email protected]

Mike Larkin Cameron [email protected]

Russell Hoshman MMS [email protected]

Tony Ratcliffe Chevron [email protected]

James Waithman KBR [email protected]

Karl Winter Mariner Energy [email protected]

Erik Opoien Hydro [email protected]

Alain Cretenet Total [email protected]

Tor Geir Wernø Statoil [email protected]

Bhailal Parmer Chevron [email protected]

Finn Kirkemo Statoil [email protected]

Ed Knerr Technip [email protected]

Alternates

Chris Bartlett FMC Technologies [email protected]

David Morgan Cameron [email protected]

Dave Garnham Cameron [email protected]

Mike Conner MMS [email protected]

Bobby Voss Vetco Gray [email protected]

Frank Gallander Chevron [email protected]

Page 32: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

SPECIFICATION API 17D/ISO 13628-4 SUBSE WELLHEADS AND TREES

STATUS REPORT

-3- 07 February 2007

4. TARGET DATES FOR DELIVERABLES

The ISO balloting closes 28 Feb 2007. A date for resolution of comments will be issued by the task group leadership after a high-level review of the number and content of those.

5. MAJOR ISSUES

None at this time.

6. ANTICIPATED NEW WORK ITEMS

None at this time.

7. PLANS FOR FUTURE MEETINGS

None at this time. The task group will wait on direction from ISO TAG regarding steps after the review mentioned in item four.

8. RESOURCE NEEDS

None at this time.

Page 33: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API C2 / SC 17

SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS

API 17E SPECIFICATION for SUBSEA UMBILICALS

REVISION TASK GROUP STATUS

FEBRUARY 7, 2007

radforda
Text Box
Attachment H
Page 34: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API 17E/ISO 13628-5 SUBSEA UMBILICALS WINTER MEETING STATUS REPORT

-1- February 7, 2007

1. INTRODUCTION

On June 18, 2003 the NWI was formally sanctioned by SC17 for the API task group to work on a revision to the recently passed joint API/ISO document. The API 17E task group would begin the revision process by correcting or supplementing areas of the document which were deemed weak or incorrect.

In June 2004 a JIP was formed by DNV. The JIP began work on selected items and worked in parallel to the API TG.

In October/November 2004, a NWI was formally submitted by Olav Inderberg to the ISO Committee.

2. STATUS

A final merged, API TG & DNV JIP, document has been submitted to ISO representatives within Shell Hague to undergo review to ensure ISO editorial correctness.

3. MEMBERSHIP

Task Group

The working task group is made up of the following personnel:

TABLE 1-1: API 17P TASK GROUP MEMBERS Name Company e-mail John McManus RathGibson [email protected] Katrina Paton Clausing Shell International Exploration & [email protected] Peter Worman Chevron [email protected] Teguh Inarsoyo BP [email protected] Dave Madden DUCO Inc. [email protected] Fraser Thomson Oceaneering Multiflex [email protected]

Alternate to Katrina Tom Williams Shell International Exploration & [email protected]

Note: Teguh Inarsoyo has recently joined the TG and will support DIS & FDIS clarifications and the next revision effort.

Page 35: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API 17E/ISO 13628-5 SUBSEA UMBILICALS WINTER MEETING STATUS REPORT

-2- February 7, 2007

Reader/Comment Group

The reader/comment group is made up of the following personnel:

1. Mark Stevenson Chevron 2. Virginia Nelson Chevron 3. Jason Ellis Chevron 4. Dave Wilkinson ExxonMobil 5. Paul Donavan ExxonMobil 6. David Micheletti ExxonMobil 7. John Respess Marathon Oil 8. Lisbeth Holst Norsk Hydro 9. Sigmund Lunde Norsk Hydro 10. Godfried Dekeyser Pioneer Energy 11. Paul Shaw Alpha Petroleum 12. Knut Ivar Ekeberg Nexans Norway AS 13. Kjell Garvik Aker Kvaerner Subsea AS 14. Tim Wooters Cabett Parker Subsea 15. John Brown DUCO Ltd. 16. Peter Fellows DUCO Ltd. 17. John Tokaruk Sandvik Steel 18. Dave O’Donnell RathGibson 19. Kurt Jones Tenaris 20. Ken Bertram Webco 21. Philippe Roelants Intec Engineering 22. Jim Morrison Pegasus International 23. Steve Mansfield J P Kenny 24. Fraser Gourlay Consultant 25. Vincent Ledoux Technip 26. Jean François Saint Marcoux Paragon Engineering 27. Darrel Evans Stolt Offshore 28. Norb Gorman Oceaneering International 29. David Gray Consultant 30. Jeremy Woulds Cal Dive International 31. Jim Macklin Cal Dive International 32. Sandy Fraser Subsea 7

Page 36: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API 17E/ISO 13628-5 SUBSEA UMBILICALS WINTER MEETING STATUS REPORT

-3- February 7, 2007

4. UPDATED TARGET DATES FOR DELIVERABLES

Table 4-1 shows the new proposed milestone targets:

TABLE 4-1: MILESTONE TARGET DATES Milestone Targets Proposed Completion Date

ISO review for editorial correctness / Shell Hague

February 2007

Send updated DIS proposal to SC 4 March 2007 (1 month)

Send to ISO secretariat in Geneva to issue as DIS

April 2007 (2 months)

Publication of ISO DIS June/July 2007

5. MAJOR ISSUES

None at this time

6. ANTICAPTED NEW WORK ITEMS

Following publication as FDIS, a NWI will be prepared to begin the next revision process.

7. PLANS FOR FUTURE MEETINGS

The TG will meet as required to reconcile comments to DIS.

8. RESOURCE NEEDS

None at this time

Page 37: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API SC 17

SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS

API 17G Subsea Completion Risers

TASK GROUP STATUS

FEBRUARY, 2007

radforda
Text Box
Attachment I
Page 38: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API 17G RISERS STATUS REPORT

-1- 2/7/2007

TABLE OF CONTENTS

1. INTRODUCTION ................................................................................................................. 1

2. PREVIOUS REPORTED STATUS..................................................................................... 1

3. CURRENT REPORTED STATUS ..................................................................................... 1

4. MEMBERSHIP ..................................................................................................................... 1

5. UPDATED TARGET DATES FOR DELIVERABLES.................................................... 2

6. MAJOR ISSUES.................................................................................................................... 2

7. ANTICIPATED NEW WORK ITEMS .............................................................................. 2

8. PLANS FOR FUTURE MEETINGS .................................................................................. 2

9. RESOURCE NEEDS ............................................................................................................ 2

Page 39: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API 17G RISERS STATUS REPORT

-1- 2/7/2007

1. INTRODUCTION

The have been no 17G task group meetings in 2006. At the last task group meeting, the group decided they would meet again to review the 16ST document drafted by Alex Sas-Jaworski. The draft has not been issued. At the February SC 17 meeting, it was decided that task group 17G would continue to contain IWOCS controls and create several sub documents to cover various well intervention techniques. No further action has been taken since then. 2. PREVIOUS REPORTED STATUS

During previous meetings, it has been agreed that:

1. IWOCS controls will stay in ISO 13628-7 / RP 17G.

2. Alex Sas-Jaworski’s task group will release their document on containment systems and testing (RP 16ST) by mid-March 2007. The task group agreed to use this document to update testing and operating procedures within 17G, once the group has time to review and comment on the 16ST document – no progress.

3. The task group at the February 2006 SC 17 meeting agreed to re-form to address other well intervention schemes and possibly subdivide RP 17G into sub documents (17G1, 17G2, 17G3, etc.) to specifically address these systems. This effort will follow the operations/testing work, and will work closely with the 13628-7 task group.

3. CURRENT REPORTED STATUS

No new business.

4. MEMBERSHIP

Table 1 shows the current volunteer membership for the API RP 17G task group:

TABLE 1: API 17G TASK GROUP MEMBERS

Name Company E-Mail Address

Tony Muff (Norway) (ISO Chair) FMC Technologies [email protected]

Brian Skeels (API 17G Chair) FMC Technologies [email protected]

Tom Ames BP [email protected]

Ginny Stover BP [email protected]

Sterling Lewis ExxonMobil [email protected]

David Lacaze Shell [email protected]

Mike Hess Shell [email protected]

Bill Parks DTC International [email protected]

Alex Sas-Jaworsky SAS Industries [email protected]

Russell Hoshman MMS [email protected]

Page 40: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API 17G RISERS STATUS REPORT

-2- 2/7/2007

Bobby Voss has been removed from the roster since he has been transferred to Aberdeen. Mike Hess has been added to the 17G roster as of January. 5. UPDATED TARGET DATES FOR DELIVERABLES

Table 2 shows the current proposed milestone targets:

TABLE 2: MILESTONE TARGET DATES Milestone Targets Proposed Completion Date

Review RP 16ST 4/07

17G Task Group Meeting to discuss well operational requirements for completion/ workover risers, and other subsea well intervention techniques.

6/07

6. MAJOR ISSUES

None.

7. ANTICIPATED NEW WORK ITEMS

No new progress.

o Look at where well control testing and operational procedures belong in RP 17G.

o Plan future scope of RP 17G, retaining IWOCS and expanding the overall scope to include other subsea intervention techniques based on a common LRP interface. Outside technical writing assistance will be sought.

8. PLANS FOR FUTURE MEETINGS

Tentatively the task group will meet in June 2007 to discuss the path forward.

9. RESOURCE NEEDS

No new progress. All task group members and SC 17 members and their member companies are still urged to spread the word of companies and/or subject matter experts who would volunteer their time and expertise by participating in the “expanded” task group over the next few years. Controls systems experts, companies working on light well intervention, and additional operator company participation – especially

Page 41: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API 17G RISERS STATUS REPORT

-3- 2/7/2007

those who are actively looking at light well intervention operations are being sought to join the 17G task group. Several task group members have also asked for technical writing assistance. However, this will be contingent on the scope of what the task group wants to do.

Page 42: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API C2 / SC 17

SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS

API 17H & 17 M / ISO 13628-8 & ISO 13628-9

ROV/ROT INTERFACE

TASK GROUP STATUS

FEBRUARY 2007

radforda
Text Box
Attachment J1
Page 43: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API 17P TEMPLATES AND MANIFOLDS STATUS REPORT

-1- 21-Dec-06

TABLE OF CONTENTS

1. INTRODUCTION ..............................................................................................................1-1

2. PREVIOUS REPORTED STATUS..................................................................................2-1

3. MEMBERSHIP ..................................................................................................................3-2

4. UPDATED TARGET DATES FOR DELIVERABLES.................................................4-2

5. MAJOR ISSUES.................................................................................................................5-3

6. ANTICIPATED NEW WORK ITEMS ...........................................................................6-3

7. PLANS FOR FUTURE MEETINGS ...............................................................................7-3

8. RESOURCE NEEDS .........................................................................................................8-3

Page 44: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API 17P TEMPLATES AND MANIFOLDS STATUS REPORT

-1- 21-Dec-06

1. INTRODUCTION

The API 17H and API 17M were adopted in 2004 from ISO 13628-8 and ISO 13628-9 respectively. A new work item has been identified to combine the two standards into one new standard titled ISO 13628-13. Comments to the previous release of the standards will need to be incorporated into the next revision.

The API 17H task group, working with an equivalent ISO team, has the scope of work to update and combine the existing API-17H / ISO 13628-8 and API-17M / ISO 13628-9 into a single concise specification.

2. PREVIOUS REPORTED STATUS

Statoil has setup a FTP web site to allow universal access to all team members. The “strawman” document and other supporting documents have been posted to the site.

An ISO work group and an API task group have been assembled, member names and contacts are listed in section 3.

Several meetings between Erich Luzi and Charles White have been held and a table of contents have been developed. Using the table of contents a “strawman” document has been created for use by both teams. Responsibility for chapters of the “strawman” have been distributed to each team for comment.

The ISO work group has commented on the table of contents and has held their first meeting in January, the API task group is scheduled to have the first meeting by the end of February.

Page 45: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API 17P TEMPLATES AND MANIFOLDS STATUS REPORT

-2- 21-Dec-06

3. MEMBERSHIP

Membership to the task group has grown with several new members participating. Table 3-1, Table 3-2, and Table 3-3 show the changes in the current volunteer membership for the API 17P RP:

TABLE 3-1: API 17P TASK GROUP MEMBERS Name Company E-mail Charles White DORIS [email protected] George Siappas Chevron [email protected] Lynn Dates Shell [email protected] Doug Hernandez BP [email protected] Don Ross Pegasus Engineering [email protected]

TABLE 3-2: ISO 13628-13 WORK GROUP MEMBERS Name Company E-mail Eurich Luzi Statoil [email protected] Kjersti Kannei Vetco [email protected] Jon Thoresen Statoil [email protected] Alain Cretenet Total [email protected] Diddier Renard Technip [email protected] Finn Haugen FMC [email protected] Harald Arnt Friisk Norsk Hydro [email protected] Harald Wahl Breivik Shell [email protected] TABLE 3-3: RESERVE API 17P TASK GROUP MEMBERS Name Company E-mail

Reserve members are not able to participate directly due to combination of project workload and temporary relocation to support projects, but are interested in the success of the task group.

4. UPDATED TARGET DATES FOR DELIVERABLES

Now that the team have been formed, a milestone schedule will need to be created:

TABLE 4-1: MILESTONE TARGET DATES Milestone Targets Proposed Completion Date

Page 46: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API 17P TEMPLATES AND MANIFOLDS STATUS REPORT

-3- 21-Dec-06

Working Draft agreed by TG to proceed to Subcommittee (SC) (ISO Stage 20.99)

TBD

Draft approved by SC for formal ballot (ISO Stage 30.99)

TBD

Publication of Standard (ISO Stage 60.60) TBD

5. MAJOR ISSUES

No major technical issues at this time.

6. ANTICIPATED NEW WORK ITEMS

None at this time.

7. PLANS FOR FUTURE MEETINGS

ISO Work Group and API Task Group are scheduled to meet quarterly. A milestone schedule need to be developed.

8. RESOURCE NEEDS

Operators are asked to submit any “standard” subsea manifold specifications that may be useful to this team.

Page 47: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

ISO/TC67/SC4/WG6 Subsea production systems ISO 13628-13 Remotely Operated Tools and Interfaces on Subsea Production Systems Task Group status report – January 2007 1. Membership of task group ISO Project leaders; Part 13 project leader: Erich Luzi, Statoil, Norway co-operation with API work group headed by Charles White Task group members; Alain Cretenet Total Didier Renard Technip Finn Haugen FMC Harald Arnt Friisk Norsk Hydro Harald Wahl Breivik Shell Kenneth Jakobsen Statoil Kjersti Kanne Vetco Timothy Marsh Shell Alf Kristian Aadland Oceaneering

ISO/TC67/SC4/WG6 N.....

radforda
Text Box
Attachment J2
Page 48: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

2. Status of work item ISO 13628-13, is a merged standard from the previous 13628-8 and 13628-9 standards. At present a new document layout and work split between API and ISO workgroup has been prepared as a working document. Initial telephone meeting in the ISO workgroup has been held early January 2007, with a follow –up work meeting scheduled for march 20th 2007. 3. Updated target dates for deliverables CD planned ready for review November 2007 4. Major issues No major issues remains to be solved at this moment. 5. Anticipated new work /new work items The main focus for the new standard will be to implement experiences with existing standard and introduce new requirements and additions as found appropriate. A close coordination with the revision of 13628-1 is foreseen. 6. Plans for future meetings New work meeting within ISO group planned for march 20th 2007. In addition co-ordination meetings with API work group will be planned for. 7. Resource needs (money and/or people) No specific needs identified at this stage Erich Luzi, Statoil January 2007

Page 49: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

ISO TC 67/SC 4/WG 6 API C2 / SC 17

SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS

API RP 2RD REVISION / ISO/WD 13628-12 DYNAMIC RISERS FOR FLOATING PRODUCTION INSTALLATIONS

TASK GROUP STATUS

February 7, 2007

radforda
Text Box
Attachment K
Page 50: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API RP 2RD DYNAMIC RISERS FOR FLOATING PRODUCTION INSTALLATIONS STATUS REPORT

-i- 16-Jun-04

TABLE OF CONTENTS

1. INTRODUCTION

2. STATUS

3. MEMBERSHIP

4. TARGET DATES FOR DELIVERABLES

5. MAJOR ISSUES

6. ANTICIPATED NEW WORK ITEMS

7. PLANS FOR FUTURE MEETINGS

8. RESOURCE NEEDS

Page 51: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API RP 2RD DYNAMIC RISERS FOR FLOATING PRODUCTION INSTALLATIONS STATUS REPORT

1 14-Jun-06

1. INTRODUCTION

The ISO 13628-12/API RP 2RD Task Group’s scope of work is to revise API RP 2RD and to submit the revision to ISO. The new document will cover top-tensioned risers, catenary risers, hybrid risers and offloading risers. The new name of the document will be Dynamic Risers for Floating Production Installations.

2. STATUS

The TG has met four times since the 14 June 2006 report. The focus has continued to been on the work of Subgroup 2, Design Considerations. The current plan is to have four levels of criteria:

• Level 1: based on the current 2RD

• Level 2: based on ISO 13628-7

• Level 3: LRFD format based on DNV OS F201

• Level 4: Essentially RP 1111

Subgroup 5 on Riser Integrity Management has completed a second draft and is making good progress.

Subgroup 4 on Materials has a new chairman (Howard cook, BP), and met 18 Jan 2007. Jim Burk, BP is taking the lead.

Subgroup 3 on Riser Components, chaired by Gordon Craig, GrantPrideco, met last week to discuss a first draft of Section 9 prepared by Finn Kirkemo, Statoil.

The other subgroups should be able to progress soon.

Page 52: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API RP 2RD DYNAMIC RISERS FOR FLOATING PRODUCTION INSTALLATIONS STATUS REPORT

2 14-Jun-06

3. MEMBERSHIP

Table 1 shows the current volunteer membership for the API RP 2RD TG:

TABLE 1: API RP 2RD TASK GROUP MEMBERS

Name Company EmailStanton Paul N. Technip USA, Inc [email protected], Rajiv KBR [email protected], Carl RTI [email protected], Shankar KBR [email protected], Jim BP [email protected], Mark 2H Offshore [email protected], Muthu DnV [email protected], Craig DNV Tech. Services [email protected], Howard bp [email protected], Gordon Grant Prideco [email protected], Early R. Shell [email protected], Amit KBR [email protected], David Stress Engineering [email protected], Joe ExxonMobil [email protected], Metin Chevron [email protected], Kieran MCS [email protected], WanJun Shell [email protected], Frans Shell [email protected], Finn Statoil [email protected], Jacky Vallourec & Mannesmann [email protected], Basim Enterprise Field Services [email protected], Trond Stokka Statoil [email protected], Kim DNV [email protected], Thanos BP [email protected], Vidish Shell [email protected], Song, Ruxin Technip USA, Inc [email protected], Flora Technip USA, Inc [email protected], Alan Technip USA, Inc [email protected]

API & ISO/TC67Inderberg, Olav FMC [email protected], Philippe bp [email protected], Alf Reidar Norsk Hydro [email protected], Elizabeth MMS [email protected], Andy API [email protected]'Connor, Patrick BP [email protected], Cheryl BP [email protected], Antoine Flexi France [email protected]

Page 53: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API RP 2RD DYNAMIC RISERS FOR FLOATING PRODUCTION INSTALLATIONS STATUS REPORT

3 14-Jun-06

TABLE 2: API RP 2RD Sub Task Group Members

Section Content STG# Members

1 Scope STG#1 Stanton, Yiu2 Normative references 3 Definitions and Nomenclature (Refer to Annex A) 4 General 5 Description of Riser Systems and Components 6 General Design Considerations STG#2 Garrett, Song, Kirkemo, Mork, Denison7 Design Loads and Conditions8 Design Criteria for Riser Pipes 9 Connectors and Riser Components STG#3 Craig, Stanton, Massaglia, Kirkemo, Baxter, Yu, Garrett10 Materials STG#4 Cook, Baxter, Massaglia, Jin, Burk11 Fabrication and Installation 12 Riser Integrity Management STG#5 Kavanagh, Chezhian, Kim

Annex A (Normative) Definitions and Nomenclature STG#1 Stanton, YiuAnnex B (Informative) Design Basis STG#6 Song Annex C (Informative) Analytical Considerations STG#7 Garrett, Kavanagh, Kim Annex D (Informative) Load Case Examples STG#2 Garrett, Song, Kirkemo, MorkAnnex E (Informative) Example TTR Design STG#1 YuAnnex F (Informative) Example SCR Design STG#8 Song Annex G (Informative) Example Hybrid Riser Design STG#9 Cerkovnik, SongAnnex H (Informative) Bibliography STG#1 Stanton, Yiu

Un-assigned Aggarwal, Bhat, Colby, Dutta, KarayakaMeling, Rao, Kopp, Moros, Shu

Page 54: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API RP 2RD DYNAMIC RISERS FOR FLOATING PRODUCTION INSTALLATIONS STATUS REPORT

4 14-Jun-06

4. TARGET DATES FOR DELIVERABLES

Table 3 shows the proposed milestone targets:

TABLE 3: MILESTONE TARGET DATES Milestone Targets Proposed Completion Date

Revised Draft agreed by TG to proceed to Subcommittee (SC)

9/07

Draft approved by SC for formal ISO ballot 1/08

Publication of Standard 2008

5. MAJOR ISSUES

Available resources.

6. ANTICIPATED NEW WORK ITEMS

None at this time.

7. PLANS FOR FUTURE MEETINGS

Next full TG meeting currently scheduled for mid March, 2007. We are trying to meet about every six weeks.

8. RESOURCE NEEDS

Still need volunteer to lead Fabrication and Installation Section.

Page 55: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API Recommended PracticeRP17N

Subsea Production System Reliability& Technical Risk Management

API 17N Presentation to API/ISO meeting February 07

Introduction to API RP 17N

radforda
Text Box
Attachment L
Page 56: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API RP 17N Key Elements

PurposeScopeTerms, Definitions and Abbreviations

Executive Summary

How to use this Recommended Practice

Reliability and Maintainability Practice GuideTechnical Risk CategorizationImplementation in Field development Projects

Annex 1 – Process DescriptionAnnex 2 – Reliability Data ManagementAnnex 3 - Qualification

Page 57: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API RP 17N – full draft roll out

•First full draft released 15th April 2006

•Reviewed by committee mid June 2006

•Re draft October 2006

•Reviewed by committee October 2006

•Workshop at Reliability Conference in KL November 06

•Reviewed with ISO December 2006

Page 58: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API RP 17N – full draft roll out

•API approve funding for update January 07.

•Incorporated changes from KL workshop and ISO review January 07.

•Proposal to DeepStar for Workshop in Houston January 07 (for work shop march 07)

•Agree with Chevron for technical author January 07.

•Review by steering committee February 07.

•Pass to API for formal process 1Q07

Page 59: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API RP 17N – full draft roll out

•Workshop at Reliability Conference in KL 21st to 23rd November 06• The KL workshop was a 1 day session (preceded the previous day with an overview of

API 17N). This workshop provided example field developments which the participants worked.

• Good feedback was provided on how to use the RP and what constituted ‘compliance’.• A great deal of energy and enthusiasm. A keenness to adopt API 17N by the company

leaders attending.

•Reviewed with ISO 4th and 5th December 2006• A two day meeting was held in London on the 4/5th December with the convener and

technical authority of ISO 20815.• All the areas of discrepancy were resolved.• API17N is now a fully aligned superset of ISO 20815. ISO being the umbrella and API

being the implementation recommended practice.

•API approve funding for update January 07.• API approved funding for a scope more limited than proposed. Additional funding has

since been sought (see below) to fill the gaps.

Page 60: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API RP 17N – full draft roll out

•Proposal to DeepStar for Workshop in Houston planned 6th march 07• DeepStar have now agreed to support the workshop in Houston and in particular this will

assist with the preparation of the case studies.• This workshop is planned for the first week in March

•Agree with Chevron for technical author January 07.• Chevron have agreed to fund a technical author to read the RP in total and• Give comments on the possible improvements.• This will be reviewed by the steering committee.• Approved changes will be made.• This is aimed at improving the readability of the RP for people not already familiar.

•Pass to API for formal process 1Q07• The current pre ‘authored’ version is included in this report.• An authored version should follow in a few weeks.• It is assumed API will DISTRIBUTE this improved version as an API issue and• API distribution having read the draft RP will be invited to the workshop in Houston.

Page 61: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API C2 / SC 17

SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS

API 17P TEMPLATES AND MANIFOLDS

TASK GROUP STATUS

FEBRUARY 2007

radforda
Text Box
Attachment M
Page 62: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API 17P TEMPLATES AND MANIFOLDS STATUS REPORT

-1- 21-Dec-06

TABLE OF CONTENTS

1. INTRODUCTION ..............................................................................................................1-1

2. PREVIOUS REPORTED STATUS..................................................................................2-1

3. MEMBERSHIP ..................................................................................................................3-3

4. UPDATED TARGET DATES FOR DELIVERABLES.................................................4-4

5. MAJOR ISSUES.................................................................................................................5-4

6. ANTICIPATED NEW WORK ITEMS ...........................................................................6-4

7. PLANS FOR FUTURE MEETINGS ...............................................................................7-4

8. RESOURCE NEEDS .........................................................................................................8-4

Page 63: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API 17P TEMPLATES AND MANIFOLDS STATUS REPORT

-1- 21-Dec-06

1. INTRODUCTION

The API 17P task group has the scope of work to develop a standard that would be applicable to all types of templates and the manifolds supported by them. This would include well spacer templates, riser support templates, manifold templates and multiwell/manifold temples; i.e. drilling and production templates, as well as pipeline end terminations and pipeline end manifolds. Some of the main topics to be covered by the standard are:

• Design and performance requirements for all components

• Definition of interface requirements

• Fabrication guidance

• Installation guidance

• Operations and maintenance guidance

• Abandonment considerations

2. PREVIOUS REPORTED STATUS

INTEC Engineering has setup a FTP web site to post the skeleton of the draft to allow access by more than the local members of the task group (ftp:\\API:[email protected]). The draft document and other supporting documents have been posted to the site.

Second quarterly workshop was held on June 22 at INTEC Engineering in Houston. This was the last workshop held in 2006. A re-formation meeting was held in January at INTEC Engineering in Houston. It was agreed to meet at least quarterly

We had received word in June that we had gotten clearance for funding to hire staff to work full time on development of the rough draft. Actual implementation of executing a purchase order with Doris Inc, supplying the personnel, was not executed until January 15, 2007, hence no progress being made on the rough draft in the 3rd and 4th quarter of 2006. Since receiving the purchase order, the project has been initiated within Doris Inc. A cleanup of the rough draft has been completed and will be returned to the task group by February 9, 2007.

Jeff Whipple has stepped down as chairman of the task group and has passed this duty onto the co-chairs Charles White and Robert McInnes. During the re-formation meeting in January, it was decided that Marc Hyndman of Chevron will assume the role of task group chairman. Jeff intends to still participate but on a limited basis.

Page 64: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API 17P TEMPLATES AND MANIFOLDS STATUS REPORT

-2- 21-Dec-06

Dave Wilkinson has moved back home to Australia leaving this task group without a defined sponsor/champion within the SC 17 management.

Page 65: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API 17P TEMPLATES AND MANIFOLDS STATUS REPORT

-3- 21-Dec-06

3. MEMBERSHIP

Membership to the task group has grown with several new members participating. Table 3-1, Table 3-2, and Table 3-3 show the changes in the current volunteer membership for the API 17P RP:

TABLE 3-1: API 17P TASK GROUP MEMBERS - HOUSTON Name Company E-mail Bill Parks DTC International [email protected] Charles White DORIS [email protected] Victor Vargus FMC [email protected] Jeff Whipple INTEC Engineering [email protected] Jonathan Dubois ExxonMobil [email protected] Kim Dyson INTEC Engineering [email protected] Marc Hyndman Chevron Texaco [email protected] Matthew Herrold BP [email protected] Robert McInnes INTEC Engineering [email protected] Ron Pfluger Cameron [email protected]

TABLE 3-2: API 17P TASK GROUP MEMBERS - OVERSEAS Name Company E-mail Børge Brubæk Statoil [email protected] Jørgen Holst Norsk Hydro jorgen.holst@hydro@com TABLE 3-3: RESERVE API 17P TASK GROUP MEMBERS Name Company E-mail Bhailal Parmar ChevronTexaco [email protected] Chad Hughes FMC [email protected] Hevle, Eric J. (ejhe) ChevronTexaco [email protected] John Hellums Cameron [email protected] Ken Stefano ChevronTexaco [email protected] Mario Lugo Exxonmobil [email protected] Paul Mason Consultant [email protected] Yong Bai Grenland Group [email protected]

Reserve members are not able to participate directly due to combination of project workload and temporary relocation to support projects, but are interested in the success of the task group.

Page 66: February 2007 Meeting FINAL Mintues - My Committeesmycommittees.api.org/standards/ecs/sc17/Meeting Materials/2007... · 13628-2 & -11 and API 17J/B – 2207/2008 v. JIP is ongoing

API 17P TEMPLATES AND MANIFOLDS STATUS REPORT

-4- 21-Dec-06

4. UPDATED TARGET DATES FOR DELIVERABLES

Failure in implementation of the purchase order for full time personnel has severely delayed progress of completing the rough draft. Table 4-1 proposed milestone targets will have to be discussed with the task group during the proposed January 1 Qtr meeting:

TABLE 4-1: MILESTONE TARGET DATES Milestone Targets Proposed Completion Date

Working Draft agreed by TG to proceed to Subcommittee (SC) (ISO Stage 20.99)

TBD

Draft approved by SC for formal ballot (ISO Stage 30.99)

TBD

Publication of Standard (ISO Stage 60.60) TBD

5. MAJOR ISSUES

No major technical issues at this time.

6. ANTICIPATED NEW WORK ITEMS

None at this time.

7. PLANS FOR FUTURE MEETINGS

Task Group half-day meeting scheduled quarterly. Update and develop a new schedule now that the funds have been approved.

8. RESOURCE NEEDS