February (2) Page 1 GNNON DUNKERLEY & CO.LTD., HYDERABAD CIVIL ENGG.DIVN. Statement of Purchase Orders and Dispatch of materials to various sites for the Sl. no Description Unit 1 01.02.13 No 1 No 1 No 1 No 1 No 1 No 1 No 1 2 30.01.13 9-14Amps Elec Starter 3HP to 5HP L&T Nos 7 Nos 2 3 31.01.13 Bearing 6206 (Make: SKF) Nos 2 Bearing 6005 (Make: SKF) Nos 8 4 01.02.13 ltrs 200 Turpentine ltrs 160 AG7 Grinding Wheel (Bosch) Nos 40 Cotton Hand Gloves pair 15 Paint Brush 4" Nos 6 Dark Blue Enamel Paint Berger ltrs 40 5 01.02.13 Seal Wiper 25/221933 Nos 4 Seal Spool 25/221934 Nos 4 6 29.01.13 Sft 8000 7 31.01.13 Exide Battery 12 V-88 Amps Nos 1 8 31.01.13 Solenoid Valve DS5120 Nos 3 Date of Indent Indent Qty Vibratory Screen 40 mm dia 1185W x 2100L (Clamp 1185-C) Vibratory Screen 22 mm dia 1185W x 2200L (Clamp 1185-C) Vibratory Screen 24 mm dia 1185W x 2000L (Clamp 1185-S) Vibratory Screen 12 mm dia 1185W x 2100L (Clamp 1185-S) Vibratory Screen 14 mm dia 1185W x 1900L (Clamp 1185-S) Vibratory Screen 6 mm dia 1185W x 2000L (Clamp 1185-C) Vibratory Screen 6 mm dia 1185W x 1800L (Clamp 1185-S) 18-32Amps Elec Starter 10HP to 15HP L&T Red Oxide - Berger 20Ltr (Zinc Cromite) Film Coated Water Proof Plywood 12 mm(8' x 4') 30 kKgs - 250 Nos Hansa

Upload: charibackup

Post on 07-Nov-2014

204 views

Category:

Documents


3 download

DESCRIPTION

Statement

TRANSCRIPT

Page 1: February Statement - 28.3.13

February (2)

Page 1

GNNON DUNKERLEY & CO.LTD.,HYDERABAD CIVIL ENGG.DIVN.Statement of Purchase Orders and Dispatch of materials to various sites for the month of FEB – 2013

Sl. no Description Unit

1 01.02.13 No 1

No 1

No 1

No 1

No 1

No 1

No 1

2 30.01.13 9-14Amps Elec Starter 3HP to 5HP L&T Nos 7

Nos 2

3 31.01.13 Bearing 6206 (Make: SKF) Nos 2

Bearing 6005 (Make: SKF) Nos 8

4 01.02.13 ltrs 200

Turpentine ltrs 160

AG7 Grinding Wheel (Bosch) Nos 40

Cotton Hand Gloves pair 15

Paint Brush 4" Nos 6

Dark Blue Enamel Paint Berger ltrs 405 01.02.13 Seal Wiper 25/221933 Nos 4

Seal Spool 25/221934 Nos 46 29.01.13 Sft 8000

7 31.01.13 Exide Battery 12 V-88 Amps Nos 1

8 31.01.13 Solenoid Valve DS5120 Nos 3

9 01.02.13 Engine oil filter - 06.436.01.0.00 Nos 1

Date of Indent

Indent Qty

Vibratory Screen 40 mm dia 1185W x 2100L (Clamp 1185-C)Vibratory Screen 22 mm dia 1185W x 2200L (Clamp 1185-C)Vibratory Screen 24 mm dia 1185W x 2000L (Clamp 1185-S)Vibratory Screen 12 mm dia 1185W x 2100L (Clamp 1185-S)Vibratory Screen 14 mm dia 1185W x 1900L (Clamp 1185-S)Vibratory Screen 6 mm dia 1185W x 2000L (Clamp 1185-C)Vibratory Screen 6 mm dia 1185W x 1800L (Clamp 1185-S)

18-32Amps Elec Starter 10HP to 15HP L&T

Red Oxide - Berger 20Ltr (Zinc Cromite)

Film Coated Water Proof Plywood 12 mm(8' x 4') 30 kKgs - 250 Nos Hansa

Page 2: February Statement - 28.3.13

February (2)

Page 2

Fuel filter - 48.117.04.0.00 Nos 1

Fuel filter - 48.117.05.0.00 Nos 1

10 01.02.13 Lub Oil Filter (605411880008) Nos 3

Fuel Filter Primary (001200240911) Nos 2

Fuel Filter Secondary (001200240912) Nos 211 31.01.13 Plough Bolt(40/303404) Nos 16

Nut (1340/0701) Nos 16Nos 1

Bucket Tooth(40/303603) Nos 812 01.02.13 Binding Wire 20 Swg Kgs 3000

Wire Nails 3" x 10 Swg Kgs 350Wire Nails 1½" x 12 Swg Kgs 100

13 02.02.13 K Oil super 13 ltrs can Nos 1Lub oil filter element Nos 11.1 liter fuel filter kit Nos 1Air cleaner assly with precleaner Nos 1Hose for air cleaner (70 ID X 80 L) Nos 1Fuel pipe 8.0, 14 B, 1000 WB Nos 1Assembly of A.V.MTG (Hard) Nos 1Leak off pipe Nos 1Leak off pipe M14 X M12, 1700L Nos 1

14 01.02.13 Valve(boom)-85812116 Nos 1

Relief Valve-(boom)-85812117 Nos 1

Relief Valve-(bucket)-85812115 Nos 1

Seal Kit-bucket-SSP4218 Nos 1

Seal Kit.boomCyl.-DC7309650 Nos 1

Sender Unit trans Oil-85817672 Nos 1

Kit misc-85824278 Nos 1

15 01.02.13 3/8 Bolt&Nut with washer 1 ½inch Nos 40

5/16 Bolt&Nut with washer 1inch Nos 50

5/16 Rivets Nos 40

Rear D/F Cutter Kit-side cutter(550/42065A)

Page 3: February Statement - 28.3.13

February (2)

Page 3

Clamp bolts 4inch Nos 15

Front 2A plates Nos 2

Front 2A plates Nos 2

Hi-bolts 11 inch Nos 8

Front main bush Nos 6

Front shakel pin Nos 4

Front jhulla Nos 1

Front center bolts Nos 4

LF 8 NO clamp Nos 2

TATA cater bolts Nos 15

Leyland Center bolt front Nos 6

“U” clamp sleeves thick Nos 40

Back plate 2A Nos 4

Back plate 3A Nos 4

Back centre bolt Nos 4

Main bush Nos 8

Page 4: February Statement - 28.3.13

February (2)

Page 4

Bell crank bush set Nos 12

Bell crank Nos 2

Bell crank big pin Nos 4

Bell crank Medium pin Nos 4

Main pin Nos 4

Bed bolts Nos 30

Bell crank shims 6mm Nos 20

Bell crank shims 5mm Nos 20

Bell crank shims 4mm Nos 20

Main shims 8 mm Nos 25

“U”clamp back 17 inches Nos 8

Nos 3

5 mm wire Cable (Deluxe) (red,black) Nos 2

8 mm wire cable (Deluxe) (Black&red) Nos 2

Black tape Nos 4

Insulation tape Nos 4

4 mm wire Cable (Deluxe) (White,red,black)

Page 5: February Statement - 28.3.13

February (2)

Page 5

Indicators Front assembly Nos 2

Back light assembly Nos 2

Head light assembly(L&R) Nos 2

Air horn set Nos 2

24 volt roots horn Nos 1

Reverse light assembly Nos 1

Reverse horn Nos 1

Head light dipper switch Nos 1

16 01.02.13 Nos 1

Nos 1

Nos 1

Nos 6

Nos 1

Nos 2

Nos 4

Nos 2

Nos 2

Nos 2

Nos 2

Nos 1

Nos 1

ROPE TIE ROD

SPRING

SLEEVE OF RUBBER

RIVET

CHARGE HOPPER

HEX BOLT

SP WASHER

Washer

NUT

HEX BOLT

NUT

SUPPORT ARTICULATION

HEX BOLT

Page 6: February Statement - 28.3.13

February (2)

Page 6

Nos 2

Nos 1

Nos 1

Nos 1

Nos 1

Nos 1

Nos 8

Nos 8

Nos 1

Nos 1

Nos 2

Nos 4

Nos 1

Nos 1

Nos 4

Nos 4

Nos 1

Steel Pipe Nos 1

Nos 1

Release Coupling Nos 1

Nos 1

Nos 1

Nos 1

Nos 1

Nos 1

SP WASHER

SELF LOCKING NUT

BRAKE DISC FOR CHUTE

BRAKE SHOE

LEVER

MAN HOLE GASKET

SCREW

PLASTIC TAP FOR BUSHING(911430)

DISCHARGE CHUTE

SCREW CYLINDER - CHUTE LIFTING

NYLOCKNUT

WASHER

WATER PUMP TP. C1

HYDR. FILTER

RUBBER BUFFER

STRAP

RUBBER PIPE

BALL VALVE

STRAP

RUBBER PIPE

RUBBER PIPE

RUBBER PIPE

ASSY OF MANIFOLD

Page 7: February Statement - 28.3.13

February (2)

Page 7

Nos 1

Nos 1

Nos 1

Nos 2

Braided hose Nos 1

Nos 1

Nos 1

Nos 1

Nos 1

Nos 1

Nos 1

Nos 1

Nos 1

Nos 1

Nos 1

Nos 1

Nos 2

Nos 1

Nos 2

Nos 2

Nos 2

Nos 2

Nos 2

Nos 2

U Shaped Support Nos 1

NIPPLE

BALL VALVE

PIPE FITTING

STRAP

PIPE FITTING

NIPPLE D -1 1/4 X30

BALL VALVE

HOSE COLLER

RUBBER PIPE

1" BALL VALVE

V' BELT

SUPPORT ASSY FOR STOP CABLE

STOP CABLE

IGNITION SWITCH

GREEN LENS ASSEMBLY 24V DC

IGNITION SWITCH

COMPLETE DOUBLE COMMAND

SUPPORT FOR CHUTE(LEFT)

SUPPORT FOR CHUTE(RIGHT)

HOOK.

SPRING

HANDLE (RUBBER)

EYE BOLT M8x1.25P

Page 8: February Statement - 28.3.13

February (2)

Page 8

Nos 8

Tube Nos 1

Nos 1

Screw Nos 1

Screw Nos 1

Electric Fan Nos 1

Ball Valve Nos 1

Nozzle Nos 1

Hour Counter Nos 117 02.02.13 MS Sheet 4' x 4' x 10 ( 1 No) Kgs 125

MS Sheet 8' x 4' x 6 ( 2 No) Kgs 300MS Sheet 8' x 4' x 4 ( 5 No) Kgs 500

mtr 12

18 02.02.13 Stripper - 80200845 Nos 4

Wearing packing - 60073424 Nos 6

Double horn showel (SQ) - 80200844 Nos 6

Bottom plate CP30 - 87300006 set 1

Hex nut M12 8 Verz DIN 934 - 60083297 Nos 68

Lock wahser S 12- Zinc C - 60083300 Nos 68

Rubber wahser ID-13, OD-25 - 80150065 Nos 68

Nos 68

Internal wear sheet LX - 80200921 Nos 2

WASHER

WEAR SHEET

MS Square tube 122 x 61 mm x 6mtr(4.5mm thickness)

Counter sunk screw M12 X 45 DIN 7991 - 80150065

Page 9: February Statement - 28.3.13

February (2)

Page 9

Hex nut M12 8 Verz DIN 934 - 60083297 Nos 20

Lock wahser S 12- Zinc C - 60083300 Nos 20

Nos 20

Weairng plate LX - 80200923 Nos 3

Nos 8

Nos 12

Nos 20

Nos 12

Lock wahser 16 - 60083304 Nos 28

19 02.02.13 Engine oil valvoline 15 w 40 Ltrs 20Gear oil 90 grade Ltrs 40

Hydraulic oil Ltrs 20

Bearing grease AP3 Ltrs 20

Brake oil Ltrs 2

TQ oil Ltrs 5

Coolant (1 Tin = 5 Ltr) Tin 1

21 15.01.13 Rmt 1818

22 Rmt 72

23 28.01.13 Hydraulic Oil 68 HLP Grade(Servo) Ltrs 40024 31.01.13 Elbow DN125 90 Degree Bend Nos 1

Counter sunk screw M12 X 45 DIN 7991 - 80150828

Square socket CSK screw M16X55 - 80150774

Square socket CSK screw M16X30 - 80150775

Hex nut DIN 6915 M16-10-GT500 - 10001209

Dome nut M16 DIN 1587 M16-6-A2C - 10001274

PVC Pipe 160 dia x 4Swg Pressure (Sudhakar)

PVC Pipe 110 dia x 4Swg Pressure (Sudhakar)

Page 10: February Statement - 28.3.13

February (2)

Page 10

Filter Element (10072694) Nos 1

Filter Element (10190588) Nos 1

25 02.02.13 Nos 4

Nos 2

27 02.02.13 Sq.m 297.68

26 01.11.12 Two Lever Box (200664) Nos 1

Actuation Cable (20903701) Nos 1

Pump Cable (20118801) Nos 1

28 04.02.13 Nos 2

29 31.01.13 Conbextra GP2 (Fosroc) 25Kgs (15Bag) Kgs 375

Concure WB 200 Ltr Barrel 2

Nitobond SBR Ltr 10

31 04.02.2013

30 02.02.13 Filter element-10155110 Nos 132 04.02.13 Hydraulic Oil 68 HLP Grade(Castrol) Ltrs 30033 02.02.13 Leaver Key Nos 2

Leaver Spring Nos 6

Oil seal Nos 4

1.5 Pinion gear Nos 1

34 02.02.13 Needle 60mm with Shaft 5mtr long Avon Nos 1

35 03.02.13 Nos 15

Coil 8

Coil 3

Nos 20

Rear Tyre with Tube flap Jet One 10-0020-16PRFront Tyre with Tube flap Jet One 10-0020-16PRFilm Coated with Water Proof Plywood 12 mm (8' x 4') (SEMI-densified - 100 Nos )

Front Tyre with Tube flap 7.50-16PR(MRF)

1000wt Halogen fittings complete set with lamp “ (Crompton Greaves)1.5 Sqmm 3Core pvc cable 1.1 kv grade “ Super Lite Make”1.5 Sqmm 2Core pvc cable 1.1 kv grade “ Super Lite Make”30Amps 3 pole Metal clad plug Top - SG Make

Page 11: February Statement - 28.3.13

February (2)

Page 11

Nos 20

Nos 20

Nos 20

40Amps 4 pole 30 ma ELCB Nos 5

36 04.02.13 Nos 5

Set 437 05.02.13 Wire Nails 3" x 10 Swg Kgs 500

Wire Nails 1½" x 12 Swg Kgs 200

Wire Nails 2½" x 12 Swg Kgs 10038 05.02.13 Cube Moulds150x150x150mm Nos 12

Slump cone with Rod Nos 239 05.02.13 Enclo Gear Oil 220 Grade Ltr 20

Gear Oil 680 Grade Ltr 20

40 01.02.13 Nos 24

41 05.02.13 Emergency push button with element Nos 1

Reverse & Forward push button element Nos 1Back stopper Nos 1Fastners Nos 1On / Off Switch two way Nos 1Foot pedal Nos 1Plug & Saket 5 pin Nos 1Plug & Saket 2 pin Nos 1Cable Nos 1Auto switch Nos 1Oil 220 Nos 10Servicing & Repairing Nos 1Painting Nos 1

42 05.02.13 Bearing SKF 6208 Nos 2Inset PB Bush Nos 1Body PB Bush Nos 1Clutch PB Bush Nos 1Cover PB Bush Nos 1A 62 Belts Nos 2Cuttingh Blades Nos 2Fly Wheel Inset Nos 1Springs Nos 1

30Amps 3 pole Metal clad socket - SG Make20Amps 2 pole Metal clad plug Top - SG Make20Amps 2 pole Metal clad socket - SG Make

Metal Mercury light with bulb 400 W - Complete set with accessories (White bulb) - (Make: Samsung)400W MH fitting (Make: Samsung) - Complete set

Rear Tyre with Tube flap Jet One 10-0020-16PR

Page 12: February Statement - 28.3.13

February (2)

Page 12

5.0 Madul Pinion gear Nos 1Clutch key Nos 1Oil seal Nos 1Cable Nos 1Fastners Nos 1Oil 680 gear oil Ltr 3Handle Repair Nos 1Connecting Rod Repairing Nos 1Servicing & Repairing Nos 1Painting Nos 1

43 05.02.13 Cutting blade Nos 2Hand liver spring Nos 2

Coupling nib spring Nos 4

Coupling nib Plate Nos 1

Coupling nib Nos 1

Back Nos 1

30mm pin Nos 1

Ledge pin Nos 1

Center pin Nos 1

Bending pin Nos 1

Hexgouel pin Nos 1

Hand lever spring (Cutting Machine) Nos 444 04.02.13 Armer cable 70 Sqmm 3.5 core cable Rmt 70

Armer cable 25 Sqmm 3.5 core cable Rmt 130

45 05.02.13 Rock and Pinion Hoist Model SCT-100 Nos 1

46 31.01.13 Nos 150

Nos 300

Pair 250

Nos 20

Roll 15

Fullbody Harness "D" Class Double leyland Push Type Hook 1.8Mtr with Polyester Sling with TC (Alkoplus) Helmet Yellow (Male) IS 2925 Guard MakeSaftey shoes (Sizes 6-50,7-150,8-50) Make Alkoplus with Six Month WarrantySafety Net 20mm( 10/5) Space make Shree arcBarricating Tape With Logo (Each 300 mtrs)

Page 13: February Statement - 28.3.13

February (2)

Page 13

Nos 3

Nos 2

Nose Mask Nos 150

Nos 20

Kgs 65

47 04.02.13 Nos 4

Nos 4

O ring 29.2 X 3 MAT NBR - 10000469 Nos 4

Flanged shaft - 10004173 Nos 1

O Ring 48 X 5 - 10000705 Nos 3

Sealing cone - 10004928 Nos 3

Bushing 45 X 45 - 10003717 Nos 248 5/2/2013 MS Flat Patti 50 x 12 mm - 10 Nos Kgs 28549 05.02.13 Nitobond SBR (Fosroc) Ltr 15

Nitobond EP (Fosroc) Ltr 5

50 06.02.13 Bucket Tooth (40/303603) Nos 9

Plough Bolt (40/303404) Nos 18

Nut (1345/0701) Nos 18

51 2/2/2013 Exide Battery 12 V-180 Amps Nos 152 2/2/2013 Formalce Ring (7024206110310) Nos 24

Nos 6

Hyd Sealing Set (9942325938218) Nos 6

Bearing Bushing (7024206080314) Nos 6

Sealing Cone (9944524338516) Nos 6Bushing (7024401030109) Nos 6

Fire Extinguisher Co2 (2 kg, Grade "B" powder)Fire Extinguisher DCP (2 kg, Grade "B" powder)

Helmet White (Male) IS 2925 Guard Make16 MM PP Rope ( Each 7.8Kgs/Mtrs) MarutiGroove O ring sealing 45/65 X 27.4 - 10003413 Sealing gland set 45/65 X 27.5 - 1007414

Grooved Ring Sealing Set (9942025901205)

Page 14: February Statement - 28.3.13

February (2)

Page 14

Ram DN 180 (8251030200006) Nos 3

53 6/2/2013 Nos 254 31/01/13 Main Bearing Set 1

Connecting Rod bearing Set 1Thrust Washers Set 1Piston Set 1Piston Rings Set 1Cylinder liners Set 1Full Gasket kit Set 1Valves inlet & Exhaust Set 1Valve guide Set 1Valve seats Set 1Air filter Set 1Engine oil filter Set 1Fuel filter Set 1O Rings kit Set 1Benzo Washer Set 1Lub oil pump Set 1Main oil seal & gear wheel end oil seal Set 1Fan belt & Hose pipe kit Set 1

55 5/2/2013 Spacer (BU0172928) Nos 2Nos 2

56 6/2/2013 Aluminum Staves (5Mtr) Nos 1Leveling Instrument Leica Joggr 24 Nos 2Aluminum Stand Nos 1

57 5/2/2013 Nos 2

58 6/2/2013 Nos 200

Nos 24

59 7/2/2013 Nos 1

60 2/2/2013 Nos 2

61 7/2/2013 ltrs 200Turpentine ltrs 160AG7 Grinding Wheel (Bosch) Nos 40Cotton Hand Gloves pair 15

Rear Tyre with Tube flap 16.9 / 28 (Make : MRF)

Stud Cylinder Mounting Head (BU2770026)

Hand Grinding Machine(Bosch GWS 6-100)Thermocol 200x200x1Mtr Long (Density-12)Thermocol 250x250x1Mtr Long (Density-12)Drilling Machine (upto 1 inch capacity,double gear)with motor.KST makeRear Tyre with Tube Flap 14/25 (Make :JK Tyre)Red Oxide - Berger 20Ltr (Zinc Cromite)

Page 15: February Statement - 28.3.13

February (2)

Page 15

Paint Brush 4" Nos 6Dark Blue Enamel Paint Berger ltrs 40

62 7/2/2013 Superthern 550 (castrol ) Barrel 163 5/2/2013 Kgs 50

Sets 1

Nos 40

Nos 50

Safety White helmet (Karam brand) Nos 7

64 6/2/2013 Air Filter Set (PP612499/612500) Nos 1Oil Filter (PP 1R0739) Nos 1Fuel Filter (PP 1R0753) Nos 1Fuel Filter (PP 1R0751) Nos 1Cutting Edge (PP 5D9553) Nos 1Bolt and Nut (PP 3F5108) Nos 30

66 7/2/2013 Nos 1

67 6/2/2013 Exide Battery 12 V-150 Amps Nos 1

68 7/2/2013 Emergency push button with eliment Nos 4

Green push button with eliment Nos 4

Centre pin Nos 2

30 dia pin Nos 2

Contactor A9 30 01 ABB Nos 2

Relay 6 to 8.5 ABB Nos 1

Transformer Nos 1

Limit Switch Nos 4

M12*35 Alen CSK Nos 6

Fly wheel insert Nos 1

16 MM PP Rope ( Each 7.8Kgs/Mtrs) MarutiVertical fall arrestor with poly amide rope - 200M KaramSafety Net 20mm( 10/5) Space make Shree arc

Fullbody Harness "D" Class Double leyland Push Type Hook 1.8Mtr with Polyester Sling with TC (Alkoplus)

Mahindra Bolero ZLX AC 7 seater 2WD BS-4

Page 16: February Statement - 28.3.13

February (2)

Page 16

6208 Bearing SKF Nos 2

Pinion gear 5 module Nos 1

Handle springs Nos 5

Clutch springs Nos 5

Ball springs Nos 5

Belts A62 Poly F Nos 4

Cutting blades Nos 4

M16*20 Alen CSK Nos 6

69 7/2/2013 Conplast SP430 AA 230 Kgs Barrel Kgs 300070 7/2/2013 Core Cutting Bit 150mm Dia Nos 1

Core Cutting Bit 100mm Dia Nos 1Steel thermometeres, range 0-360C Nos 4

71 8/2/2013 HY-Motor B465 BRH (C23813000) Nos 172 8/2/2013 Hitachi Hard Disk 500 GB Nos 173 9/2/2013 Engine Oil Filter (9624531001) Nos 1

74 10/2/2013 Power Trowel Nice Blade Indigenous Set 1

Power Floater Disc Indigenous Nos 1

75 11/2/2013 Nos 2

76 11/2/2013 Nos 7

77 11/2/2013 Nos 2

78 11/2/2013 Nos 1

11/2/2013 Nos 1

79 11/2/2013 Shim (Slide Frame) Nos 1

Washer (851) (Alt. No. 11193879) Nos 4

Screw TCE M5 x50 Nos 2

Cap screw ,Hex ,M8x1.25x14 Nos 4

Front Tyre With Tube Flap Jet R Plus 10-00-20-16PRTyre with Tube JEP Radial 215 / 75 R15 MRFTyre with Tube JEP Radial 185 / 85 R16 MRFCyberoam CR100ia Appliance without 8x5 SupportTotal valve subription with 8*5 support for 1 year

Page 17: February Statement - 28.3.13

February (2)

Page 17

Screw M10*16 (Altpno 613-10016) Nos 4

Nos 2

Guard (851) Nos 2

Cap front wheel hub (851) Nos 2

Cup M88010 Nos 2

Cone - M88048 Nos 2

Nut 7/16" 20 HEX Nos 2

Fan Nos 1

Bush (851) Nos 4

Bush (851) Replaced by 83910548 Nos 4

Spring washer 7/16" (492-11044) Nos 2

Shaft Nos 2

Bolt new partno-E3NN1N118AB Nos 2

Bolt 5/8"-18*2-3/8" Nos 2

Thrust bearing - T158 904A1 Nos 2

Cone LM104949 Nos 2

Bushing front wheel spindle pin Nos 4

Gasket Nos 2

Pin / Shaft Nos 2

Cup LM104911A Nos 2

Gasket Nos 4

Pin Nos 1

Lower Pin - Swing post pivot Nos 1

spacer Nos 2

Nut M24*1.5 (Attached with 83961705)

Page 18: February Statement - 28.3.13

February (2)

Page 18

Nut Nos 2

Oil level indicator Nos 1

Cross joint Nos 3

RH Rabbet Nos 1

Switch assy (Replaced by 85828252) Nos 1

Reverser Nos 1

Nut-Repl by 81833776 Nos 2

Nos 1

Bush - swing tower-770 Nos 2

Bush - swing tower-770 Nos 2

Ring 65.5 X 2.5 Nos 1

Grill cover front - new holland Nos 1

Tube 16MM Nos 1

Throttle cable - Genesis Nos 1

Accelator pedal assy Nos 1

Bolt M16*2*75 Nos 26

Bolt M16*2.0*65MM Nos 4

Nylock nut M16 X 2 PRCL 8 Nos 30

Side cutting tooth LH Nos 1

Side cutting tooth RH Nos 1

Tooth pint (Casting) Nos 11

Nos 1

Washer (Ref. Tab. BU0330023) Nos 30

Seal kit B/H swing cyl. Wipro Nos 2

Clamp - Klipco 130A (Repl-BU3690011)

Cutting Edge LDR BKT (0.9/1.0/1.2M3)

Page 19: February Statement - 28.3.13

February (2)

Page 19

80 11/2/2013 Nos 1

Nos 1

81 9/2/2013 Sq.m 596.23

82 10/2/2013 Conbextra GP2 (Fosroc) 25Kgs (15Bag) Bags 80

83 1/2/2013 End Tips (A+B+C) for 60mm Nos 6

Oil Seal for 60mm Needle Nos 6

60 MM Needle Bearing (2204) Nos 684 12/2/2013 Aluminium Staves (5 Mtr) Nos 185 7/2/2013 Hydraulic Oil 68 (Castrol) Ltr 21086 12/2/2013 Bearing Grease AP3 Castrol Kgs 3087 3/1/2013 Kgs 2100

Kgs 2600

89 12/2/2013 1.5 Sqmm 2core flexible cable (Finecab) Roll 10

Nos 2MCCB 63Amps 4 pole with Box Nos 6

Nos 5

Nos 15

Nos 40

Nos 25

Nos 3030Amps 3Pin Metal Plug Nos 10

90 12/2/2013 Nos 1

Nos 1

Bearing spindle front axle (51108) Nos 2

Hub front wheel Nos 1

Kit front wheel bolts and nuts set Nos 1

Rear Tyre with Tube flap 16.9 / 28 (Make : MRF)Front Tyre With Tube Flap 9.00 / 16 (Make :MRF)Film Coated with Water Proof Plywood 12 mm (8' x 4') (SEMI-densified - 200 Nos ) 34 Kgs

G.I.Sheet 10' Long - 200 Nos (26 Swg) IspatG.I.Sheet 12' Long - 200 Nos (26 Swg) Ispat 13Kgs

1.5 Sqmm 4 Core flexible cable (Finecab)

ELCB 63 Amps 4 Pole 30MA with Enclosure (IA)Metal Socket 20 Amps 2 Pole Make ElectraMetal Socket 20 Amps 3 Pole Make Electra03Pin 20 Amps Plug (Top & Bottom) (Electro)02Pin 20 Amps Plug (Top & Bottom) (Electro)

Spindle assembly front axle RH (SQUARE)Spindle assembly front axle LH (SQUARE)

Page 20: February Statement - 28.3.13

February (2)

Page 20

Seal front axle hub Nos 2

Bearing assembly front wheel inner Nos 2

Bearing assembly front wheel outer Nos 2

Tube assembly fuel injection cylinder N Nos 1

Tube assembly fuel injection cylinder N Nos 1

Tube assembly fuel injection cylinder N Nos 1

Kit Engine inlet and exhaust valves (AV) Nos 1

Valve Guide Nos 6

Pump assembly engine lube oil Nos 1

Kit engine man and connecting rod bear Nos 1

Seal assembly crankshaft rear oil seal Nos 1

Seal crankshaft front oil Nos 1

Kit piston ring set (FT60/70 AVL) Nos 1

Kit gasket for engine overhauling with Nos 1

Kit hose pipes Nos 1

Filter assembly lube oil (Farmtrac) Nos 1

Arm steering spindle front axle (Square) Nos 2

Filter assembly hydraulic lift oil Nos 2

Nos 1

Switch assembly heater and starter Nos 1

Horn and bracket assembly Nos 1

Cleaner assembly engine air Nos 1

Wire assembly fuse box Nos 1

Kit seal spiindle (FT/PT-445/455) Nos 2

Shaft valve rocker Nos 1

Kit fuel filter inserts primary and secoundary

Page 21: February Statement - 28.3.13

February (2)

Page 21

Kit rocker arm with screw Nos 6

Pump assembly water half Nos 1

Connection water outlet Nos 1

Switch assembly horn blowing Nos 1

Wheel assembly front without primer Nos 1

91 11/2/2013 Rmt 600

92 11/2/2013 Lightrning Arrestor -Porsilean Type Nos 293 5/2/2013 Ltr 420

94 13/02/13 Charging hopper Nos 1

Butterfly valve for water Nos 1

Butterfly valve Actuator Nos 1

Microswitch Nos 1

Avcon(3/2)valve for water Nos 1

Proximity sensors Nos 2

Pneumatic hose(8mm) Nos 10

Pneumatic hose(10mm) Nos 20

Pneumatic hose(12mm) Nos 7

Elbow (8,10,12) Nos 5

Reducer(10-8) Nos 4

G.I.Pipe 150mm dia Medium B Class (100 Pipes) as per IS: 1239 (Make Jindal)

Hydraulic Oil 46 - Castrol Hyspin AWS 46 SC (2 Barrel)

Page 22: February Statement - 28.3.13

February (2)

Page 22

Connector(10-10) Nos 10

Nos 1

Nos 1

Nos 2

Nos 1

Hosepiece(Screw to weigher)-168 dia Nos 1

Hosepiece( weigherto mixer) Nos 2

Hose clamp 178 Nos 1

Hose Clamp 265 Nos 4

Hose clamp 400 Nos 1

Silencer for 5/2 solenoid block Nos 4

Sand vibrator motor Nos 1

Hooter set Nos 1

Aggregate gate pedestral bearing Nos 8

Hanger bearing-168 dia screw Nos 2

Mixer discharge gate with Bold&nut Nos 1

Elastic intermediate piece(Screw to weigher)-219 dia

Elastic intermediate piece(Screw to weigher)-168 dia

Elastic intermediate piece(weigher to mixer)

Hosepiece(Screw to weigher)-219 dia(centre large open)

Page 23: February Statement - 28.3.13

February (2)

Page 23

Nos 1

FORK JOINT ASSEMBLY M12 Nos 2

FORK JOINT ASSEMBLY M16 Nos 12

THREADED ROD M16x1.5x400 Nos 2

THREADED ROD M12x1.25x360lg Nos 2

THREADED ROD M16x1.5x160 lg Nos 4

Skip rope tension spring Nos 2

Mixer side wear plate Nos 1

Nos 1

Arms Nos 6

Showel Nos 6

Stripper Nos 4

Wear packing Nos 12

Rotor cover Nos 1

Rotor sealing ledge clamp set Nos 1

discharge gate hydraulic cylinder seal kit set

Threaded rod set withNut&vaucer for aggregate weigher

Bottom tiles for discharge gate with bolt&nut

Page 24: February Statement - 28.3.13

February (2)

Page 24

Load cell assembly for Aggregate

Loadcell 1 tonne capacity Nos 2

THREADED ROD M12x1.25x360lg Nos 4

Nut M12 Nos 8

Load cell assembly for Cem/wat

Loadcell 450 kg Nos 2

THREADED ROD M12x1.25x360lg Nos 4

Nut M12 Nos 8

Junction box Nos 1

JB connectors (agg,cem/wat,JB1,JB2) Nos 25

Fork rod assembly for Cem/wat

Fork M16 Nos 12

Fork M12 Nos 2

Threaded rod M12x1.25x360lg Nos 2

Threaded rod M16x380 Nos 4

Threaded rod M16x280 Nos 1

Page 25: February Statement - 28.3.13

February (2)

Page 25

Threaded rod M16x200 Nos 1

95 13/02/13 Sq.m 596.23

96 13/02/13 Mtr 105

97 6/2/2013 Nos 1

Oil Seal(0177849) Nos 1

98 11/2/2013 Spring Nos 2

Side Tiles J" Type Nos 1

Side Tiles K" Type Nos 1

Side Tiles L" Type Nos 2

99 8/2/2013 Exide Battery 12V - 80 Amps Nos 1

100 10/2/2013 Exide Battery 12V - 100 Amps Nos 1

101 13/02/13 PA Flange 10" - 10042541 Nos 1

Hub bowex - 10071013 Nos 1

Pressure spring - 10002363 Nos 1

Steel ball 6.35MM - 10006001 Nos 1

Filter element - 10002989 Nos 1

102 13/02/13 Lube filter (PP31Z5180443) Nos 1

Fuel Filter(PP41Z7181537) Nos 1103 13/02/13 Exide Battery 12 V-150 Amps Nos 2104 11/2/2013 Water pump 21482300 Nos 1

105 11/2/2013 Centrifugal Water pump (80100299) Nos 1106 11/2/2013 Sikament NNSP South 250 Kgs Kgs 8000

Kgs 2070

107 14/02/13 Rotter for 40mm Needle make Avon Nos 2

Film Coated Plywood 12 mm (8' x 4') (SEMI-densified - 200 Nos ) 24 Kgs Sharp Is 4990 Film Thick 150 GSM12mm 6/36 Steel Core Wirerope(Ushamartin)Hydraulic Cylinder dia 50x295 mm (80207116)

Sika Viscorete 10 R3,230 Kgs each(Barrel(09 Barrel)

Page 26: February Statement - 28.3.13

February (2)

Page 26

Connection Tubes(5705003) Nos 3Connection Tubes(3605003) Nos 3Rotter Gun 60mm with End Nut Nos 2Rotter Gun 40mm with End Nut Nos 2

108 14/02/13 Oxygen Regulator Nos 1

DA Regulator Nos 1

LPG Regulator Nos 1

Hose Pipe Red&Black each 30Mtr Mtr 60

Welding Cable Aluminium Mtr 50

Cutting Torch Nos 2

Welding Holder Nos 2

Welding Helmet Nos 2

Wlding Cable 400 amps mtrs 25

109 14/02/13 Nos 100

Nos 25

Nos 2

Nos 30

Nos 2

Nos 1

Nos 1Nose Mask Nos 150Gum Boots (6,7,8&9) Pair 10

Roll 10

110 11/2/2013 Nos 6

Nos 2

111 13/02/13 Nos 2

Nos 2

Helmet Yellow (Male) IS 2925 Guard MakeHelmet Yellow (Female) IS 2925 Guard MakeHelmet Green (Male) IS 2925 Guard MakeHelmet White (Male) IS 2925 Guard MakeHelmet Red (Male) IS 2925 Guard MakeFire Extinguisher Co2 (2 kg, Grade "B" powder)Fire Extinguisher DCP (2 kg, Grade "B" powder)

Barricating Tape With Logo (Each 300 mtrs)Rear Tyre with Tube flap Jet One 10-0020-16PRFront Tyre with Tube flap Jet One 10-0020-16PRRear Tyre with Tube flap Jet One 10-0020-16PRFront Tyre with Tube flap Jet One 10-0020-16PR

Page 27: February Statement - 28.3.13

February (2)

Page 27

112 14/02/13 Garish Pump Assembly With MS Pipe Set 1

Mixer Gear Box Sparket Nos 1

Mixer Chain Nos 1

Limit Switch LL1 Nos 4

Skip Bucket Limit Switch Box Nos 1

Set 1

Mixer Gear Box Oil Sell Set 1

Mixer Gear Box Coupling Nos 1

Skip Bucket Rubber Pad Nos 4

PU Pipe 8x5 Mtr 100

FRL Unit Nos 1

PU Fitting Set 1

Siliencer For Solenoid Valve Nos 10

Cement Butter Fly Valve Assembly Nos 1

Water Discharge Bottom Rubber Nos 1

Load Cell Square Seating Base With Bolt Nos 15

Scrapper Boom Swing Motor Brick Assembly

Page 28: February Statement - 28.3.13

February (2)

Page 28

Additive Glass Nos 1

Additive Safety Valve Nos 1

Additive Discharge Valve Nos 1

Additive Feed Valve Nos 1

Solenoid Valve Single Coil Nos 1

Water Load Cell 300kg With Nut Bolt Nos 2

Additive Load Cell 100kg. Nos 1

Load Cell Junction Box For Aggregate Nos 1

Break Liner For Drum Set 1

C4 Amps MCB Single Pole Nos 1

C6 Amps MCB Single Pole Nos 2

Glass Relay Nos 2

Relay Card Glass Relay Nos 2

Snubber Circuit Nos 5

Green Colour Push Button Nos 5

Red Colour Indicator 240V Nos 5

Page 29: February Statement - 28.3.13

February (2)

Page 29

Compressor Details :

ELGI Make, Model - TS03120HN

Fab No- 55940, Max W/P-12KG / CM2

(1) 1/4"BSP 25 65 GIMC PG Nos 1

(2) SV ASSY 1/4"BSP 9 KG TS03/07 Nos 1

(3) ELEMENT AIR FILTER BP03/05 Nos 1

(4) PSW ASSY PS15 1C WITH UL Nos 1

113 14/02/13 Nos 3

Mtr 25

Mtr 50

Mtr 300

Mtr 100

114 14/02/13 Nos 2

115 11/2/2013 End Hose 5" x 4 Meter (Parker) Nos 1

116 14.02.13

119 15/02/13 Case 6

3" Suction hose heavy duty Mtr 8

3" Foot vale Nos 3

3" clamp Nos 4

3" Foot valve nipple Nos 2

3" Canvas hose heavy duty Mtr 150120

Auto / Manual Switch With NO / NC Point (Make: Fine cabe)6Square mm 3 Core Flexible Cable (Make: Fine cabe)4Square mm 3 Core Flexible Cable (Make: Fine cabe)1.5Square mm 4 Core Flexible Cable (Make: Fine cabe)1.5Square mm 2 Core Flexible Cable (Make: Fine cabe)Tyre with Tube Flap 13 / 24(Make: MRF) Muscle rock

E6013 Welding electrodes sun Arc 3.15X350mm

Page 30: February Statement - 28.3.13

February (2)

Page 30

121 13/02/13 Conbextra GP2 (Fosroc) 25Kgs (15Bag) Bags 80

122 12/2/2013 Ltr 250Thinner Ltr 150

123 12/2/2013 Kgs 825

124 12/2/2013 Ltr 200Turpentine Ltr 160AG7 Grinding Wheel (Bosch) Nos 40Cotton Hand Gloves Pair 15Paint Brush 4" Nos 6Dark Blue Enamel Paint Berger Ltr 40

125 13/02/13 Exide Battery 12 V-100 amps Nos 1126 15/02/13 Nos 1127 15.02.13128 13/02/13 No 1

Lub Oil Filter (605411880009) No 2Fuel Filter Primary (001200240911) No 1

No 1

129 15/02/13 75KVA RC Gasket - P21108530124 No 4

125KVA RC Gasket - P21108530124 No 4

160KVA RC Gasket - 623208530144 No 6130 16/02/13 Binding Wire 20 Swg Kgs 1000131 16/02/13 Engine oil 20w/40w (Servo) Ltrs 25

AP-3 Bearing Grease (Gastrol) Kgs 20Gear oil 90 Grade Castrol Ltrs 15Shuttering Oil Ltr 200

132133 16/02/13 Wire Nails 3" x 10 Swg Kgs 50134 Wire Nails 1½" x 12 Swg Kgs 50135 Wire Nails 2½" x 12 Swg Kgs 25136 Binding Wire 20 Swg Kgs 1000137 Wire Nails 2" x 10 Swg Kgs 25138 16/02/13 Cement silo Air hose (Wire type 5m) Nos 2

Flange 4" Nos 4Nipple 4" Nos 4

Red Oxide - Berger 20 Ltr (Zinc Cromite )

G.I.Corrugated sheet 0.8 mm Thick x 10 feet Long 860 mm width(Approx Weight 16.5 Kgs) per Sheet 50 NosRed Oxide - Berger 20 Ltr (Zinc Cromite )

Manual Discharge Gate(Butterfly Valve)300 dia V22FS 300

Greaves Lub Oil 20Ltr Pack (123200198458) - 20W40

Fuel Filter Secondary (001200240912)

Page 31: February Statement - 28.3.13

February (2)

Page 31

Clamp 6" (Nut bolt type) Nos 10Packing rubber (1m X 1m) Nos 2

139 22/01/13 Needle 60mm with Shaft 5mtr long Avon Nos 2

140 16/02/13 Sft 6400

141 16/02/13 2.5 Sqmm 2core flexible cable (Finecab) Roll 8

1.5 Sqmm 2core flexible cable (Finecab) Roll 12

4 Sqmm 4 core flexible cable (Finecab) Roll 8Halogen Set 1000W Make CGL Nos 24

142 15/02/13 Sft 11200143 16/02/13 Seal Kit for motor (10130089) Nos 1

Nos 1Drive link (80004303) Nos 1

144 16/02/13 Mtr 6

Mtr 8D Cycle (2MT) Nos 8

145 14/02/13 Nos 2

Fuel Fliter Element pre(48.117.04.00) Nos 2

Nos 1146 8/2/2013 Engine oil valvoline 15 w 40 Ltrs 50

Hydralic Oil 68 Grade ( Castrol) Ltrs 50Grease MP3 Kgs 10TQ oil Ltrs 10

147 6/2/2013 SERVO System 46 Barrel 1SERVO GEAR HP 90 Barrel 1

148 18/02/13 Enclo Gear Oil 220 Grade Ltr 10Gear Oil 680 Grade Ltr 5

149 15/02/13 Transformer Oil for Tower Crane Ltr 5Ltr 10

150 18/02/13 Safety White helmet (Karam brand) Nos 10

151 13/02/13 Aggregate CPU Card Nos 1

Aggregate Signal Codition Card Nos 1

Film Coated Plywood 12mm (8' x 4 ')-200 Nos 24 Kgs sharp IS 4990

Film Coated Water Proof Plywood 12 mm(8' x 4') 30 Kgs - 350 Nos Hansa

Shaft for motor BRFL 470 (80004371)

12mm 6/36 Steel core Wirerope (Ushamartin) 3Mtr - 2Nos12mm 6/36 Steel core Wirerope (Ushamartin) 4Mtr - 2Nos

Spin On filter for Lubrication Oil (06.423.01.00)

Air Cleaner Filter Element (F6.504.08.0.00)

Gear Oil 390 Grade for Bar Cutting Machine

Page 32: February Statement - 28.3.13

February (2)

Page 32

BCU Power Card Nos 1

BCU Relay Card Nos 1

Scraper Break Patti Nos 2

Nos 1152 18/02/13 Discharge gate T500 Nos 1153 18/02/13 Carbut tank 1 kg carbot capacity Nos 1

Welding torch Milan make Nos 1

Mtrs 30

cutting pliyer Nos 1

Files set Nos 1

Pipe wrench 12’’ Mos 1

M.s plate 1 ½’’x2’x2’ Nos 1

Hammer make taparia 100gms Nos 1

Hammer make taparia 200 gms Nos 1

Hammer make taparia 500 gms Nos 1

Hammer make taparia 800gms Nos 1

Puti pathi Nos 1

Clissel Nos 1

Chizel taparia Nos 1

Chizel medium Nos 1

Shanan big Nos 1

Center punch Nos 1

Center punch big Nos 1

Gas lighter toruch stainless make Nos 1

Hand glowes leather Pairs 2

Scraper Gearbox Chain (Double Row)

Gas welding tube red:15 mtrs,blue:15 mtrs

Page 33: February Statement - 28.3.13

February (2)

Page 33

White googles safety Nos 2

Welding glass black Nos 2

Welding glass white Nos 2

Oxygen guage Nos 1

G.I wire 14 guage Kgs 10

Brass rod Nos 25

M.s plate 12 guage 4’x8’ Nos 2

M.s plate 18 guage 4’x8’ Nos 1

M .s angle 2’’x5mm full length Nos 4

Gravity meter Nos 1

Hand kerosene stove Nos 1

Solder 125 watts Nos 1

Solder wire 1mm Roll 1

Solder paste Nos 1

Hydraulic jack 40 tonn capacity Nos 1

35 to 50 mm rammer Nos 1

Rammer handle Nos 1

¼ BSF Tap set Set 1

516 BSF Tap set Set 1

3/8 BSF Tap set SET 1

½’’ BSF Tap set SET 1

12MMX1.75 Tap set SET 1

10 MMX1.5 Tap set SET 1

6MMX1.5 Tap set SET 1

8 MM X1.25 Tap set SET 1

Page 34: February Statement - 28.3.13

February (2)

Page 34

Drill bit 10.5 mm Nos 1

Drill bit 3.5 to 12.5 distance Set 1

154 18/02/13 Nos 1155 16/02/13 Renderoc S2 (25 Kgs / Bag ) Fosroc Bags 10

156 18/02/13 Nos 1

Nos 2

Nos 1

Nos 1

157 16/02/13 Engine Oil 15 W /40 (CRB TURBO)Castrol Ltrs 210

158 18/02/13 ltrs 200

Turpentine ltrs 160

AG7 Grinding Wheel (Bosch) Nos 40

Cotton Hand Gloves pair 15

Paint Brush 4" Nos 6

Dark Blue Enamel Paint Berger ltrs 40159 16/02/13 Tapper Roller Bearing (900603) Nos 2

Nos 3

160 16/02/2013 Sft 5600

161 19/02/13 Engine Oil 20 W / 40 w (Servo) Ltrs 210

AP-3 Bearing Grease (Gastrol) Kgs 200162 19/02/13 Aluminium Straves (5 Mtr) Nos 2

Levelling Instrument Leica Joggr 24 Nos 1Aluminium Stand Nos 1

163 19/02/13 Needle 60mm with Shaft 5mtr long Avon Nos 2

Nos 2

Nos 1

Nos 1

Female Clevis for Pneumatic Cylinder for CP 30 Batching Plant

LC1D1156-2305 Contractor Schneider

LC1D09 Contractor Schneider

LC1D32 Contractor Schneider

LC1D12M7 Contractor Schneider

Red Oxide - Berger 20Ltr (Zinc Cromite)

Pillow Block Rod End M12 (213710530104)Semi Waterproof Plywood 9mm (8 ' x 4 ')-175 Nos 17 Kgs Sharp IS 303

Needle 40mm with Shaft 5 mtr long AvonPetrol Vibrator motor 1.5 HP Killicks 3PhaseElectrical Vibrator motor 3HP Avon 3Phase

Page 35: February Statement - 28.3.13

February (2)

Page 35

164 19/02/13 Cube Moulds150x150x150mm Nos 18165 19/02/13 Nos 1

166 16/02/13 Nos 12

Nos 12

Roll 6

Rmt 20040A MCB 4 pole - Legrend Nos 325A MCB 4 pole - Legrend Nos 3

Nos 12

Nos 12

167 19/02/13 Wheel Brown 16 SWG Double Wheel Nos 1168 18/02/13 Dell Optical Mouse Nos 2

VGA Cable (LCD Monitor) Nos 1169 20/02/13 O Ring 92 x 4 - 10001046 Nos 8

PTFE Back up ring - 10004250 Nos 2

170 20/02/13 Sft 11200

171 20/02/13 Nos 100

Nos 10

Pair 230

172 18/02/13 Kgs 2100

Kgs 140

Kgs 2600

173 20.02.13 Kgs 1050

Kgs 140

Filter Element HC 9600 FKN 13 H (10073397)

Mercury vapor lamp 220V 400W (fitting with lamp) - Samson

Mercury vapor lamp 220V 250W (fitting with lamp) - Samson2.00 Sqmm 3 core copper flexible cable - Orbit70 Sqmm 3.5 core Al Armd cable - Orbit

20A 2 pin metal cold socket with top - Elemeck20A 3 pin metal cold socket with top - Elemeck

Film Coated Plywood 12mm (8' x 4 ')-350 Nos 24 Kgs sharp IS 4990Helmet Yellow (Male) IS 2925 Guard MakeHelmet White (Male) IS 2925 Guard MakeSaftey shoes (Sizes 6-40,7-120,8-60,9-10) Make Alkoplus with Six Month WarrantyG.I.Sheet 10' Long - 200 Nos (26 Swg) Ispat 10.5KgsG.I.Plain Sheet 3feet Width (90Mtr x 2Roll)G.I.Sheet 12' Long - 200 Nos (26 Swg) Ispat 13KgsG.I.Sheet 10' Long - 100 Nos (26 Swg) Ispat 10.5KgsG.I.Plain Sheet 3feet Width (90Mtr x 2Roll)

Page 36: February Statement - 28.3.13

February (2)

Page 36

174 15/02/13 Kgs 166mm Nylon Rope Kgs 5

175 9/2/2013 Roll 20

176 19/02/13 Iron Pan G.I. Nos 50

Spade with handle Nos 25

Shovel Nos 20

Panza Nos 20

Pica xi with handle Nos 10

Crober Nos 5

Sledge Hammer (1Kgs) Nos 2

Sledge Hammer (3Kgs) Nos 3

Chisel 10" Nos 6

Steel tape 30 mtr Nos 2

Steel tape 15 mtr Nos 2

Steel tape 5 mtr Nos 10

Steel tape 3 mtr Nos 5

Pressure jack with rod Nos 1

Diesel measuring cane - 5 Ltr Nos 1

Diesel measuring cane - 10 Ltr Nos 1

177 16/02/13 Mtr 6

Mtr 8

178 15/02/13 Nos 1179 18/02/13 Exide Battery 12V-88Amps Nos 1180 17/02/13 Hydraulic Oil 68 Castrol Ltrs 210

181 18/02/13 Nos 2182 18/02/13 Exide Battery 12V-100Amps Nos 1183 21/02/13 20V Circuit Breaker (Siemens) Roll 2

16 MM PP Rope ( Each 7.8Kgs/Mtrs) Maruti

Barricating Tape With Logo (Each 300 mtrs)

12mm 6/36 Steel core seeling rope (Ushamartin)3 Mtr -2Nos12mm 6/36 Steel core seeling rope (Ushamartin)4 Mtr -2NosRecon Engine Model 6BTA 5.9 G suitable for JS200

Front Tyre with Tube flap Jet One 10-0020-16PR

Page 37: February Statement - 28.3.13

February (2)

Page 37

Carbon bush Roll 1184 21/02/13 Exide Battery 12V-100Amps Nos 1

185 21/02/13 Bar Bending machine spares

A9-30-01 ABB Contractor 24 volts Nos 2

Emergency push button with eliment Nos 1

Green push button with eliment Nos 1

Limit Switch Nos 2

Foot switch eliment Nos 1

Connectors Nos 2

30 dia Centre pin Nos 1

22212 Bearing URB Nos 1

30206 bearing SKF Nos 2

30204 bearing SKF Nos 2

6009 bearing FAG Nos 1

6002 bearing SKF Nos 1

Oil seal 42-55-8/60-80-10 Nos 2

Fastners Nos 1

Cabels Nos 1

Page 38: February Statement - 28.3.13

February (2)

Page 38

Oil 220 Ltrs 6

1.5 Modul Pinion gear repair Nos 1

Servicing & Repairing

Painting

Bar cutting machine spares

Bearing SKF 6213 6211 Nos 2

Cutting blades Nos 1

Springs Set 1

Oil seal Nos 1

Nib Nos 1

Nib Plate Nos 1

Harm (Nib stopper) Nos 1

Blade Guard Nos 1

Starter L4T Nos 1

Fastners Nos 1

Oil 680 Gear oil (4Ltrs) Nos 1

Page 39: February Statement - 28.3.13

February (2)

Page 39

Servicing & Repairing

Painting

186 19/02/13 Hydraulic Oil 68 Grade(Castrol) Ltrs 280187 16/02/13 No 1

No 1

Seal set for rod - 024294009 No 2

Wiper / Scrapper ring - 062814001 No 2

No. 2

Leap seal ring - 240421009 No 2

O ring - 043520000 No. 1

Bushing - 222484006 No 2

O ring - 043909003 No 2

Rubber disc - 242574006 No 2

No 1

No 1

Set of seals 445763 No 1

Wear sleeve - 228383004 No 1

O Ring - 042762005 No 2

188 21/02/13 ltrs 400

Turpentine ltrs 320

AG7 Grinding Wheel (Bosch) Nos 50

Cotton Hand Gloves pair 30

Paint Brush 4" Nos 6

Forward control valve (24v) - 240888008Throttle valve / Flow control - 245745007

Support / Scrapper ring - 238585009

Agitator paddle LHS -Mixing pedal - 441540Agitator paddle RHS -Mixing pedal - 441541

Red Oxide - Berger 20Ltr (Zinc Cromite)

Page 40: February Statement - 28.3.13

February (2)

Page 40

Dark Blue Enamel Paint Berger ltrs 100

Cup wheel brush (AG-7 Heavy Duty ) Nos 40

189 21/02/13 140PSI Grouting Pump No 1

Grouting Pipe 12mm Dia Rmt 3190 21/02/13 Rendroc Plug(5 Kgs/Bag) Fosroc Bags 5

Rendroc S2(25 Kgs/bags) Fosroc Bags 2191 21/02/13 Dell USB Optical Mouse Nos 1192 21/02/13 250 Metal halide fitting - CG Nos 10

ELCB 63 amps with box - Legrand Nos 5Igniter - Bajaj Nos 151000 W Halogen Lamp - Samson Nos 1006 Sqmm copper Flexible - Spike Nos 5RCCB 636 Amps with box - Legrand Nos 432 amps Metal socket - Elmek Nos 3020 amps metal socket - Elmek Nos 30Capacitor - Capco Nos 15PVC tapes - Miracle Nos 100

193 22/02/13 Nos 1194 22/02/13 Superthern 550 (Castrol) Barrel 2195 16/02/13 Gear Oil 320 Grade Ltr 65

Gear Oil 220 Grade Ltr 25196 22/02/13 Digital Thermometers,range 0-300 C Nos 4197 12/2/2013 Rubber Mat 4.0 x 4.0 Mtr Kgs 114

First Aid Kit Nos 1

198 23/02/13 Nos 1

125A MCCB with enclosure & with Fuses Nos 1199 25/02/13 Superthern 550 (Castrol) Barrel 2200 23/02/13 "O" Ring (80236535) Nos 4

"O" Ring (80271233) Nos 2Gasket (81875252) Nos 2Gasket (81875253) Nos 2Gasket (81834073) Nos 1Ring Snap (81803542) Nos 1Bearing (82958961) Nos 1

Wood Planner Machine wit Cutter 3 Phase without Motor Sarla Make

125A SF unit with enclosure & with Fuses

Page 41: February Statement - 28.3.13

February (2)

Page 41

Bearing (81845711) Nos 1Bearing (81824478) Nos 1

201 25/02/13 Conplast SP430AA 230 Kgs Barrel Kgs 10000202 23/02/13 Binding Wire 20 Swg Kgs 4000203 23/02/13 Hydraulic Oil 68 Grade (Castrol) Ltrs 20204 23/02/13 Wire Nails 3" x 10 Swg Kgs 100

Wire Nails 1½" x 12 Swg Kgs 100205 22/02/13 Chain Wheel ( 60014430 ) Nos 1

206 20/02/13 Mtr 35

207 25/02/13 No 1

208 25/02/13 Conplast SP430 KR(M) 6 (250 Kgs) Kgs 10000209 25/02/13 Wire Nails 3" x 10 Swg Kgs 500

Wire Nails 1½" x 12 Swg Kgs 200Binding Wire 20 Swg Kgs 2000

210 28/02/13 Binding Wire 20 Swg Kgs 4000Wire Nails 3" x 10 Swg Kgs 2000

211 17/02/13 Nos 4

212 26/02/13 Nos 1

Rod sealing 56 X 71 X 8.5 - 10197313 Nos 1Rod seal - 10209466 Nos 1

Nos 5Scraper 56 X 66 X 7 Nos 1

213 26/02/13 Sft 448

CFT 67

214 10/1/2013 Agitator shaft (10167220) PC 1

Hydraulic motor (10039180 PC 1

PC 1

12mm 6/36 Steel core Wirerope (Ushamartin)Product Description (cannon IR 2520 MFD)Black & White Network Print, B/W Digital Copy and Colour Scan & B/W Scanning,Multiple copies 1-999, Magnification 25% - 400% Speed: 20 ppm,1x250 sheet Cassettes, Auto Duplex,100 Sheet Stack by pass Tray, Trolley and Stabilizer.

Tyre with TubeJEP Radial 185/70 R14 MRFRod sealing 56 X 71 X 11.4 - 10113950

Guide band 15 X 2.5 X 180 - 10197314

Semi Waterproof Plywood 9mm (8' x 4') - 14Nos 17Kgs Sharp IS303Wood Runner (2"x4")8' Pinewood 150Nos

Agitator support drive side (10061072)

Page 42: February Statement - 28.3.13

February (2)

Page 42

PC 1

Sealing set 180 (10029138) PC 1

Hexagon bolt 12X30 (10001517) PC 8215 22/02/13 Bucket Tooth (40/303603) Nos 9

Plough Bolt (40/303404) Nos 18Nut (1345/0701) Nos 18Primary element Nos 1Safety element Nos 1LOP Filter Nos 2Service Kit - Nos 1

216 22/02/13 Fuse 5A - 716/05703 Nos 107.5A - 716/05704 Nos 10Fuse 10A - 716/05705 Nos 10Fuse 15A - 716/05706 Nos 10Relay (430Z) - 696/01480 Nos 8Relay 696/01479 Nos 2Flasher indicator - 696/01477 Nos 2

217 26/02/13 Needle 60mm with Shaft 5mtr long Avon Nos 2

218 25/02/13 Rmt 300

Rmt 120

Nos 1

219 26/02/13 Coil 4220 26/02/13 Tube -CWM103090H24 Nos 1

Bush - CWM02909387 Nos 2

221 26/02/13 ltrs 400

Turpentine ltrs 320

AG7 Grinding Wheel (Bosch) Nos 50

Cotton Hand Gloves pair 30

Paint Brush 4" Nos 6

Dark Blue Enamel Paint Berger ltrs 100

Cup wheel brush (AG-7 Heavy Duty ) Nos 40

Agitator support gland assy (10061073)

 120 Sqmm 3.5core all armd cable - Orbit25 Sqmm 3.5core all armd cable - Orbit250Amps 4Pole DN3 400D MCCB with Speader links - L & T1.5 Sq.m 4 Core PVC Cable 1.1 KV Grade "super lite make"

Red Oxide - Berger 20Ltr (Zinc Cromite)

Page 43: February Statement - 28.3.13

February (2)

Page 43

222 26/02/13 Binding Wire 20 Swg Kgs 2000223 25/02/13 Rmt 30

Rmt 250224 22/02/13 Dell USB Key Board Nos 1

Intel CPU Fan Nos 1225 28/02/13 Mtr 30

226 28/02/13 Hydraulic filter - PP H50120AA Nos 3

Pilot Filter - PP H50140AA Nos 1

228 28/02/13 Orbit air Sander 6" Kgs 1

229 27/02/13 Kgs 60

230 28/02/13 Platform Weigh Balance 100 Kg Capacity Nos 1

G.I.Pipe 50mm Dia B Class (Make Jindal)G.I.Pipe 100mm Dia B Class (Make Jindal)

20mm Steel core Wirerope 6/36 (Ushamartin)

G.I.Plain Sheet 8 x 4 Feet Width 18 SWG 2 Sheets 30 Kgs Approx

Page 44: February Statement - 28.3.13

February (2)

Page 44

Statement of Purchase Orders and Dispatch of materials to various sites for the month of FEB – 2013

Supplier Name P.O.No & Date PO . Qty Rate

2605 / 01.02.2013 1 4750.00

2605 / 01.02.2013 1 4950.00

2605 / 01.02.2013 1 4500.00

2605 / 01.02.2013 1 5200.00

2605 / 01.02.2013 1 4700.00

2605 / 01.02.2013 1 4250.00

2605 / 01.02.2013 1 3850.00 32120

M/s. Industrial Power Control 2606 / 01.02.2013 7 1480.00

M/s. Industrial Power Control 2606 / 01.02.2013 2 4800.00 20958

M/s. Beekay Bearing Associates 2607 / 01.02.2013 2 350.00

M/s. Beekay Bearing Associates 2607 / 01.02.2013 8 180.00 2247

M/s. Industrial Sales Corporation 2608 / 01.02.2013 200 94.50

M/s. Industrial Sales Corporation 2608 / 01.02.2013 160 53.00

M/s. Industrial Sales Corporation 2608 / 01.02.2013 40 85.00

M/s. Industrial Sales Corporation 2608 / 01.02.2013 15 14.50

M/s. Industrial Sales Corporation 2608 / 01.02.2013 6 66.00

M/s. Industrial Sales Corporation 2608 / 01.02.2013 40 148.00 47647.5M/s. Asian Earthmovers 2610 / 01.02.2013 4 83.41M/s. Asian Earthmovers 2610 / 01.02.2013 4 297.63 1688

2612 / 01.02.2013 8000 50.00 458000

2613 / 01.02.2013 1 6600.00 5500

2614 / 01.02.2013 3 10800.00 31065

M/s. Pace Engineering Services 2615 / 01.02.2013 1 487.00

Total value of PO (In Rs)

M/s. Kamala Screens & MetalperforatorsM/s. Kamala Screens & MetalperforatorsM/s. Kamala Screens & MetalperforatorsM/s. Kamala Screens & MetalperforatorsM/s. Kamala Screens & MetalperforatorsM/s. Kamala Screens & MetalperforatorsM/s. Kamala Screens & Metalperforators

M/s. Paam Commercial Private LimitedM/s. Sri Krishna Battery Sales & ServiceM/s. Basci Engineering Equipments P Ltd

Page 45: February Statement - 28.3.13

February (2)

Page 45

M/s. Pace Engineering Services 2615 / 01.02.2013 1 135.00

M/s. Pace Engineering Services 2615 / 01.02.2013 1 165.00 901

2616 / 01.02.2013 3 588.00

2616 / 01.02.2013 2 166.00

2616 / 01.02.2013 2 148.00 2738.84M/s. TRR Automotive 2617 / 01.02.2013 16 62.88M/s. TRR Automotive 2617 / 01.02.2013 16 42.79M/s. TRR Automotive 2617 / 01.02.2013 1 3531.87M/s. TRR Automotive 2617 / 01.02.2013 8 506.55 10620M/s. JPR Marketing 2619 / 02.02.2013 3000 58.5M/s. JPR Marketing 2619 / 02.02.2013 350 58.5M/s. JPR Marketing 2619 / 02.02.2013 100 59.5 212021M/s. Veetech diesels 2620 / 02.02.2013 1 2611.35M/s. Veetech diesels 2620 / 02.02.2013 1 89.08M/s. Veetech diesels 2620 / 02.02.2013 1 222.71M/s. Veetech diesels 2620 / 02.02.2013 1 3821.83M/s. Veetech diesels 2620 / 02.02.2013 1 137.12M/s. Veetech diesels 2620 / 02.02.2013 1 185.15M/s. Veetech diesels 2620 / 02.02.2013 1 735.37M/s. Veetech diesels 2620 / 02.02.2013 1 51.53M/s. Veetech diesels 2620 / 02.02.2013 1 144.10 9158M/s. Pace Engineering Services 2621 / 02.02.2013 1 14935

M/s. Pace Engineering Services 2621 / 02.02.2013 1 17575

M/s. Pace Engineering Services 2621 / 02.02.2013 1 15965

M/s. Pace Engineering Services 2621 / 02.02.2013 1 3863

M/s. Pace Engineering Services 2621 / 02.02.2013 1 6438

M/s. Pace Engineering Services 2621 / 02.02.2013 1 2524

M/s. Pace Engineering Services 2621 / 02.02.2013 1 13576 78994

M/s. shree balaji motors stores 2622 / 02.02.2013 40 11

M/s. shree balaji motors stores 2622 / 02.02.2013 50 7

M/s. shree balaji motors stores 2622 / 02.02.2013 40 5

M/s. Trans Diesel Engineers Pvt LtdM/s. Trans Diesel Engineers Pvt LtdM/s. Trans Diesel Engineers Pvt Ltd

Page 46: February Statement - 28.3.13

February (2)

Page 46

M/s. shree balaji motors stores 2622 / 02.02.2013 15 18

M/s. shree balaji motors stores 2622 / 02.02.2013 2 1787

M/s. shree balaji motors stores 2622 / 02.02.2013 2 1787

M/s. shree balaji motors stores 2622 / 02.02.2013 8 85

M/s. shree balaji motors stores 2622 / 02.02.2013 6 60

M/s. shree balaji motors stores 2622 / 02.02.2013 4 65

M/s. shree balaji motors stores 2622 / 02.02.2013 1 520

M/s. shree balaji motors stores 2622 / 02.02.2013 4 50

M/s. shree balaji motors stores 2622 / 02.02.2013 2 109

M/s. shree balaji motors stores 2622 / 02.02.2013 15 18

M/s. shree balaji motors stores 2622 / 02.02.2013 6 18

M/s. shree balaji motors stores 2622 / 02.02.2013 40 8

M/s. shree balaji motors stores 2622 / 02.02.2013 4 1692

M/s. shree balaji motors stores 2622 / 02.02.2013 4 1534

M/s. shree balaji motors stores 2622 / 02.02.2013 4 75

M/s. shree balaji motors stores 2622 / 02.02.2013 8 110

Page 47: February Statement - 28.3.13

February (2)

Page 47

M/s. shree balaji motors stores 2622 / 02.02.2013 12 93.33

M/s. shree balaji motors stores 2622 / 02.02.2013 2 2235

M/s. shree balaji motors stores 2622 / 02.02.2013 4 195

M/s. shree balaji motors stores 2622 / 02.02.2013 4 185

M/s. shree balaji motors stores 2622 / 02.02.2013 4 170

M/s. shree balaji motors stores 2622 / 02.02.2013 30 36

M/s. shree balaji motors stores 2622 / 02.02.2013 20 17

M/s. shree balaji motors stores 2622 / 02.02.2013 20 16

M/s. shree balaji motors stores 2622 / 02.02.2013 20 15

M/s. shree balaji motors stores 2622 / 02.02.2013 25 19

M/s. shree balaji motors stores 2622 / 02.02.2013 8 437

M/s. shree balaji motors stores 2622 / 02.02.2013 3 245

M/s. shree balaji motors stores 2622 / 02.02.2013 2 350

M/s. shree balaji motors stores 2622 / 02.02.2013 2 945

M/s. shree balaji motors stores 2622 / 02.02.2013 4 10

M/s. shree balaji motors stores 2622 / 02.02.2013 4 10

Page 48: February Statement - 28.3.13

February (2)

Page 48

M/s. shree balaji motors stores 2622 / 02.02.2013 2 89

M/s. shree balaji motors stores 2622 / 02.02.2013 2 210

M/s. shree balaji motors stores 2622 / 02.02.2013 2 135

M/s. shree balaji motors stores 2622 / 02.02.2013 2 280

M/s. shree balaji motors stores 2622 / 02.02.2013 1 290

M/s. shree balaji motors stores 2622 / 02.02.2013 1 120

M/s. shree balaji motors stores 2622 / 02.02.2013 1 85

M/s. shree balaji motors stores 2622 / 02.02.2013 1 420 44977

M/s. infra automotive serivces 2623 / 02.02.2013 1 178.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 46.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 5,749.00

M/s. infra automotive serivces 2623 / 02.02.2013 6 22.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 11,361.00

M/s. infra automotive serivces 2623 / 02.02.2013 2 35.00

M/s. infra automotive serivces 2623 / 02.02.2013 4 22.00

M/s. infra automotive serivces 2623 / 02.02.2013 2 22.00

M/s. infra automotive serivces 2623 / 02.02.2013 2 32.00

M/s. infra automotive serivces 2623 / 02.02.2013 2 51.00

M/s. infra automotive serivces 2623 / 02.02.2013 2 32.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 2,756.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 222.00

Page 49: February Statement - 28.3.13

February (2)

Page 49

M/s. infra automotive serivces 2623 / 02.02.2013 2 25.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 62.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 952.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 1,681.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 105.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 343.00

M/s. infra automotive serivces 2623 / 02.02.2013 8 83.00

M/s. infra automotive serivces 2623 / 02.02.2013 8 23.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 11,474.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 4,179.00

M/s. infra automotive serivces 2623 / 02.02.2013 2 32.00

M/s. infra automotive serivces 2623 / 02.02.2013 4 23.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 12,175.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 10,113.00

M/s. infra automotive serivces 2623 / 02.02.2013 4 424.00

M/s. infra automotive serivces 2623 / 02.02.2013 4 43.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 643.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 742.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 1,010.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 1,458.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 46.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 505.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 553.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 721.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 646.00

Page 50: February Statement - 28.3.13

February (2)

Page 50

M/s. infra automotive serivces 2623 / 02.02.2013 1 72.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 266.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 87.00

M/s. infra automotive serivces 2623 / 02.02.2013 2 41.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 2,496.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 92.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 247.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 827.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 346.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 1,195.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 505.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 333.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 194.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 294.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 296.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 187.00

M/s. infra automotive serivces 2623 / 02.02.2013 2 296.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 20,457.00

M/s. infra automotive serivces 2623 / 02.02.2013 2 263.00

M/s. infra automotive serivces 2623 / 02.02.2013 2 263.00

M/s. infra automotive serivces 2623 / 02.02.2013 2 423.00

M/s. infra automotive serivces 2623 / 02.02.2013 2 46.00

M/s. infra automotive serivces 2623 / 02.02.2013 2 58.00

M/s. infra automotive serivces 2623 / 02.02.2013 2 53.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 53.00

Page 51: February Statement - 28.3.13

February (2)

Page 51

M/s. infra automotive serivces 2623 / 02.02.2013 8 23.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 238.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 2,887.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 84.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 24.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 11,895.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 228.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 237.00

M/s. infra automotive serivces 2623 / 02.02.2013 1 7,987.00 125803M/s. Bhagwati Steel Tubes 2624 / 02.02.2013 125 46M/s. Bhagwati Steel Tubes 2624 / 02.02.2013 300 45M/s. Bhagwati Steel Tubes 2624 / 02.02.2013 500 45M/s. Bhagwati Steel Tubes 2624 / 02.02.2013 12 670 52280

M/s. schwing stetter (I) Pvt Ltd 2625 / 02.02.2013 4 1391.00

M/s. schwing stetter (I) Pvt Ltd 2625 / 02.02.2013 6 1983.00

M/s. schwing stetter (I) Pvt Ltd 2625 / 02.02.2013 6 1723.00

M/s. schwing stetter (I) Pvt Ltd 2625 / 02.02.2013 1 93960.00

M/s. schwing stetter (I) Pvt Ltd 2625 / 02.02.2013 68 5.00

M/s. schwing stetter (I) Pvt Ltd 2625 / 02.02.2013 68 16.00

M/s. schwing stetter (I) Pvt Ltd 2625 / 02.02.2013 68 14.00

M/s. schwing stetter (I) Pvt Ltd 2625 / 02.02.2013 68 70.00

M/s. schwing stetter (I) Pvt Ltd 2625 / 02.02.2013 2 11968.00

Page 52: February Statement - 28.3.13

February (2)

Page 52

M/s. schwing stetter (I) Pvt Ltd 2625 / 02.02.2013 20 5.00

M/s. schwing stetter (I) Pvt Ltd 2625 / 02.02.2013 20 16.00

M/s. schwing stetter (I) Pvt Ltd 2625 / 02.02.2013 20 70.00

M/s. schwing stetter (I) Pvt Ltd 2625 / 02.02.2013 3 16742.00

M/s. schwing stetter (I) Pvt Ltd 2625 / 02.02.2013 8 179.00

M/s. schwing stetter (I) Pvt Ltd 2625 / 02.02.2013 12 182.00

M/s. schwing stetter (I) Pvt Ltd 2625 / 02.02.2013 20 31.00

M/s. schwing stetter (I) Pvt Ltd 2625 / 02.02.2013 12 23.00

M/s. schwing stetter (I) Pvt Ltd 2625 / 02.02.2013 28 43.00 212198

M/s. Balaji supppliers 2626 / 02.02.2013 20 205.00M/s. Balaji supppliers 2626 / 02.02.2013 40 230.00

M/s. Balaji supppliers 2626 / 02.02.2013 20 160.00

M/s. Balaji supppliers 2626 / 02.02.2013 20 210.00

M/s. Balaji supppliers 2626 / 02.02.2013 2 360.00

M/s. Balaji supppliers 2626 / 02.02.2013 5 280.00

M/s. Balaji supppliers 2626 / 02.02.2013 1 755.00 23575

M/s. Sudhakar polymers limited 2631 / 02.02.2013 1818 432829

M/s. Sudhakar polymers limited 2631 / 02.02.2013 72 7811 464875.2

M/s. Balaji supppliers 2632 / 02.02.2013 400 160 64000M/s. schwing stetter (I) Pvt Ltd 2633 / 02.02.2013 1 60507

Page 53: February Statement - 28.3.13

February (2)

Page 53

M/s. schwing stetter (I) Pvt Ltd 2633 / 02.02.2013 1 6314

M/s. schwing stetter (I) Pvt Ltd 2633 / 02.02.2013 1 4278 71639

M/s. JK Tyre & industries Ltd 2635 / 02.02.2013 4 63316

M/s. JK Tyre & industries Ltd 2635 / 02.02.2013 2 29424 101939

M/s. Sharp Ply (India) Pvt Ltd 2636 / 02.02.2013 297.68 538.2 183442.03

M/s. Trans construction eqpt 2636-A/ 02.02.2013 1 5352

M/s. Trans construction eqpt 2636-A/ 02.02.2013 1 8195

M/s. Trans construction eqpt 2636-A/ 02.02.2013 1 10536.00 26196

M/s. Tyre Bank 2637 / 04.02.2013 2 7950 15900

M/s. S.V. Enterprises 2638 / 04.02.2013 375 26.00

M/s. S.V. Enterprises 2638 / 04.02.2013 2 16500.00

M/s. S.V. Enterprises 2638 / 04.02.2013 10 380.00 46550

M/s. Schwing stetter (I) Pvt Ltd 2639 / 04.02.2013

M/s. Schwing stetter (I) Pvt Ltd 2640 / 04.02.2013 1 8926 8994M/s. Balaji suppliers 2641 / 04.02.2013 300 205 61500M/s. Sri sai engineering works 2642 / 04.02.2013 2 1200.00M/s. Sri sai engineering works 2642 / 04.02.2013 6 50.00

M/s. Sri sai engineering works 2642 / 04.02.2013 4 50.00

M/s. Sri sai engineering works 2642 / 04.02.2013 1 1600.00 4500

M/s. M S Traders 2643 / 04.02.2013 1 10879 11423

M/s. Anand Enterprises 2644 / 04.02.2013 15 1,049.00

M/s. Anand Enterprises 2644 / 04.02.2013 8 3,480.00

M/s. Anand Enterprises 2644 / 04.02.2013 3 2,250.00

M/s. Anand Enterprises 2644 / 04.02.2013 20 197.00

Page 54: February Statement - 28.3.13

February (2)

Page 54

M/s. Anand Enterprises 2644 / 04.02.2013 20 206.00

M/s. Anand Enterprises 2644 / 04.02.2013 20 71.00

M/s. Anand Enterprises 2644 / 04.02.2013 20 82.00

M/s. Anand Enterprises 2644 / 04.02.2013 5 2,109.00 80780

M/s. U K Enterprises 2646 / 04.02.2013 5 3,450.00

M/s. U K Enterprises 2646 / 04.02.2013 4 3,100.00 33949M/s. JPR Marketing 2648 / 05.02.2013 500 58.50M/s. JPR Marketing 2648 / 05.02.2013 200 59.50

M/s. JPR Marketing 2648 / 05.02.2013 100 59.50 49455M/s. Apt Engineering Company 2649 / 05.02.2013 12 850.00M/s. Apt Engineering Company 2649 / 05.02.2013 2 1450.00 13755M/s. Balaji Supplies 2651 / 05.02.2013 20 185.00M/s. Balaji Supplies 2651 / 05.02.2013 20 185.00 7400

M/s. JK Tyre & industries Ltd 2652 / 05.02.2013 24 15829 417582

M/s. Sri sai engineering works 2653 / 05.02.2013 1 150.00

M/s. Sri sai engineering works 2653 / 05.02.2013 1 200.00M/s. Sri sai engineering works 2653 / 05.02.2013 1 4500.00M/s. Sri sai engineering works 2653 / 05.02.2013 1 300.00M/s. Sri sai engineering works 2653 / 05.02.2013 1 450.00M/s. Sri sai engineering works 2653 / 05.02.2013 1 1600.00M/s. Sri sai engineering works 2653 / 05.02.2013 1 500.00M/s. Sri sai engineering works 2653 / 05.02.2013 1 400.00M/s. Sri sai engineering works 2653 / 05.02.2013 1 300.00M/s. Sri sai engineering works 2653 / 05.02.2013 1 150.00M/s. Sri sai engineering works 2653 / 05.02.2013 10 220.00M/s. Sri sai engineering works 2653 / 05.02.2013 1 2000.00M/s. Sri sai engineering works 2653 / 05.02.2013 1 1000.00 13750M/s. Sri sai engineering works 2654 / 05.02.2013 2 450.00M/s. Sri sai engineering works 2654 / 05.02.2013 1 3000.00M/s. Sri sai engineering works 2654 / 05.02.2013 1 2300.00M/s. Sri sai engineering works 2654 / 05.02.2013 1 3000.00M/s. Sri sai engineering works 2654 / 05.02.2013 1 1800.00M/s. Sri sai engineering works 2654 / 05.02.2013 2 325.00M/s. Sri sai engineering works 2654 / 05.02.2013 2 2000.00M/s. Sri sai engineering works 2654 / 05.02.2013 1 3500.00M/s. Sri sai engineering works 2654 / 05.02.2013 1 130.00

Page 55: February Statement - 28.3.13

February (2)

Page 55

M/s. Sri sai engineering works 2654 / 05.02.2013 1 5000.00M/s. Sri sai engineering works 2654 / 05.02.2013 1 1200.00M/s. Sri sai engineering works 2654 / 05.02.2013 1 50.00M/s. Sri sai engineering works 2654 / 05.02.2013 1 100.00M/s. Sri sai engineering works 2654 / 05.02.2013 1 700.00M/s. Sri sai engineering works 2654 / 05.02.2013 3 250.00M/s. Sri sai engineering works 2654 / 05.02.2013 1 400.00M/s. Sri sai engineering works 2654 / 05.02.2013 1 300.00M/s. Sri sai engineering works 2654 / 05.02.2013 1 3000.00M/s. Sri sai engineering works 2654 / 05.02.2013 1 500.00 31280M/s. Sri sai engineering works 2655 / 05.02.2013 2 2,000.00M/s. Sri sai engineering works 2655 / 05.02.2013 2 50.00

M/s. Sri sai engineering works 2655 / 05.02.2013 4 25.00

M/s. Sri sai engineering works 2655 / 05.02.2013 1 400.00

M/s. Sri sai engineering works 2655 / 05.02.2013 1 700.00

M/s. Sri sai engineering works 2655 / 05.02.2013 1 4,500.00

M/s. Sri sai engineering works 2655 / 05.02.2013 1 700.00

M/s. Sri sai engineering works 2655 / 05.02.2013 1 1,200.00

M/s. Sri sai engineering works 2655 / 05.02.2013 1 1,200.00

M/s. Sri sai engineering works 2655 / 05.02.2013 1 1,200.00

M/s. Sri sai engineering works 2655 / 05.02.2013 1 800.00

M/s. Sri sai engineering works 2655 / 05.02.2013 4 50.00 15100M/s. U K Enterprises 2656 / 05.02.2013 70 216.00M/s. U K Enterprises 2656 / 05.02.2013 130 101.00 29663

2657 / 05.02.2013 1 2400000 2448000

M/s. Emrald Enterprises 2658 / 05.02.2013 150 960.00

M/s. Emrald Enterprises 2658 / 05.02.2013 300 55.00

M/s. Emrald Enterprises 2658 / 05.02.2013 250 235.00

M/s. Emrald Enterprises 2658 / 05.02.2013 20 3500.00

M/s. Emrald Enterprises 2658 / 05.02.2013 15 450.00

M/s. Spratan Engineering Industries Pvt Ltd

Page 56: February Statement - 28.3.13

February (2)

Page 56

M/s. Emrald Enterprises 2658 / 05.02.2013 3 4000.00

M/s. Emrald Enterprises 2658 / 05.02.2013 2 1950.00

M/s. Emrald Enterprises 2658 / 05.02.2013 150 3.00

M/s. Emrald Enterprises 2658 / 05.02.2013 20 53.00

M/s. Emrald Enterprises 2658 / 05.02.2013 65 162.00 323940

M/s. Schwing Stetter (I) Pvt Ltd 2659/05.02.13 4 301.00

M/s. Schwing Stetter (I) Pvt Ltd 2659/05.02.13 4 384.00

M/s. Schwing Stetter (I) Pvt Ltd 2659/05.02.13 4 11.00

M/s. Schwing Stetter (I) Pvt Ltd 2659/05.02.13 1 4,710.00

M/s. Schwing Stetter (I) Pvt Ltd 2659/05.02.13 3 84.00

M/s. Schwing Stetter (I) Pvt Ltd 2659/05.02.13 3 236.00

M/s. Schwing Stetter (I) Pvt Ltd 2659/05.02.13 2 619.00 9987.84Bhagwati Steel Tubes 2661 / 05.02.2013 285 50 14963S.V. Enterprises 2669/06.02.13 15 380S.V. Enterprises 2669/06.02.13 5 1400 12700

M/s.Asian Earthmovers 2670 / 06.02.2013 9 580

M/s.Asian Earthmovers 2670 / 06.02.2013 18 72

M/s.Asian Earthmovers 2670 / 06.02.2013 18 52 1688

Sri Krishna Battery Sales 2671/06.02.13 1 10500 9900

Trans Construction Equipment 2672/06.02.13 24 53.00

Trans Construction Equipment 2672/06.02.13 6 211.00

Trans Construction Equipment 2672/06.02.13 6 341.00

Trans Construction Equipment 2672/06.02.13 6 457.00

Trans Construction Equipment 2672/06.02.13 6 225.00Trans Construction Equipment 2672/06.02.13 6 1224.00

Page 57: February Statement - 28.3.13

February (2)

Page 57

Trans Construction Equipment 2672/06.02.13 3 2893.00 28280

M/s. Tyre Bank 2673/06.02.13 2 33000 66000

Venkat Auto Agencies 2675/06.02.13 1 1,250.00 Venkat Auto Agencies 2675/06.02.13 1 750.00 Venkat Auto Agencies 2675/06.02.13 1 200.00 Venkat Auto Agencies 2675/06.02.13 1 10,500.00 Venkat Auto Agencies 2675/06.02.13 1 8,080.00 Venkat Auto Agencies 2675/06.02.13 1 2,800.00 Venkat Auto Agencies 2675/06.02.13 1 4,800.00 Venkat Auto Agencies 2675/06.02.13 1 2,200.00 Venkat Auto Agencies 2675/06.02.13 1 480.00 Venkat Auto Agencies 2675/06.02.13 1 800.00 Venkat Auto Agencies 2675/06.02.13 1 2,200.00 Venkat Auto Agencies 2675/06.02.13 1 400.00 Venkat Auto Agencies 2675/06.02.13 1 240.00 Venkat Auto Agencies 2675/06.02.13 1 400.00 Venkat Auto Agencies 2675/06.02.13 1 100.00 Venkat Auto Agencies 2675/06.02.13 1 3,500.00 Venkat Auto Agencies 2675/06.02.13 1 800.00 Venkat Auto Agencies 2675/06.02.13 1 1,600.00 47060Pace Engineering Services 2676/06.02.13 2 12.00Pace Engineering Services 2676/06.02.13 2 72.00 192

Nikki Engineering 2677/06.02.13 1 1100.00Nikki Engineering 2677/06.02.13 2 9200.00Nikki Engineering 2677/06.02.13 1 1200.00 21735

Industrial Sales Corporation 2678/06.02.13 2 2600 5486

Vesura EPS 2680 / 07.02.2013 200 137.00

Vesura EPS 2680 / 07.02.2013 24 213.00 34138

2681 / 07.02.2013 1 18500 19425

JK Tyre & industries Ltd 2682 / 07.02.2013 2 34965 80069.85

Industrial Sales Corporation 2684 / 07.02.2013 200 99Industrial Sales Corporation 2684 / 07.02.2013 160 56.5Industrial Sales Corporation 2684 / 07.02.2013 40 85Industrial Sales Corporation 2684 / 07.02.2013 15 14.5

Sidhpurwala Engineering Company

Page 58: February Statement - 28.3.13

February (2)

Page 58

Industrial Sales Corporation 2684 / 07.02.2013 6 66Industrial Sales Corporation 2684 / 07.02.2013 40 154 39013.5Alpha Lubricants 2685 / 07.02.2013 1 35105 30436

Emerald Enterprises 2688 / 07.02.2013 50 162.00

Emerald Enterprises 2688 / 07.02.2013 1 27,552.00

Emerald Enterprises 2688 / 07.02.2013 40 3500.00

Emerald Enterprises 2688 / 07.02.2013 50 960.00

Emerald Enterprises 2688 / 07.02.2013 7 125.00 224527

pioneer machinery 2689 / 07.02.2013 1 5627.00pioneer machinery 2689 / 07.02.2013 1 850.00pioneer machinery 2689 / 07.02.2013 1 1290.00pioneer machinery 2689 / 07.02.2013 1 950.00pioneer machinery 2689 / 07.02.2013 1 4250.00pioneer machinery 2689 / 07.02.2013 30 125.00 19332

Karnataka Agencies 2691 / 07.02.2013 1 635357 654736

2692 / 08.02.2013 1 12000 9300

M/s. Sri sai engineering works 2693 / 08.02.2013 4 150.00

M/s. Sri sai engineering works 2693 / 08.02.2013 4 100.00

M/s. Sri sai engineering works 2693 / 08.02.2013 2 1,200.00

M/s. Sri sai engineering works 2693 / 08.02.2013 2 700.00

M/s. Sri sai engineering works 2693 / 08.02.2013 2 950.00

M/s. Sri sai engineering works 2693 / 08.02.2013 1 1,400.00

M/s. Sri sai engineering works 2693 / 08.02.2013 1 950.00

M/s. Sri sai engineering works 2693 / 08.02.2013 4 600.00

M/s. Sri sai engineering works 2693 / 08.02.2013 6 35.00

M/s. Sri sai engineering works 2693 / 08.02.2013 1 3,500.00

M/s. Sri Krishna Battery Sales & Service

Page 59: February Statement - 28.3.13

February (2)

Page 59

M/s. Sri sai engineering works 2693 / 08.02.2013 2 450.00

M/s. Sri sai engineering works 2693 / 08.02.2013 1 5,000.00

M/s. Sri sai engineering works 2693 / 08.02.2013 5 50.00

M/s. Sri sai engineering works 2693 / 08.02.2013 5 50.00

M/s. Sri sai engineering works 2693 / 08.02.2013 5 20.00

M/s. Sri sai engineering works 2693 / 08.02.2013 4 300.00

M/s. Sri sai engineering works 2693 / 08.02.2013 4 2,000.00

M/s. Sri sai engineering works 2693 / 08.02.2013 6 15.00 30950

M/s. Fosroc chemicals (I) Pvt Ltd 2694 / 08.02.2013 3000 39.19 117570M/s. Apt Engineering Company 2695 / 08.02.2013 1 15000.00M/s. Apt Engineering Company 2695 / 08.02.2013 1 10500.00M/s. Apt Engineering Company 2695 / 08.02.2013 4 450.00 28665

2696 / 08.02.2013 1 28968 28616M/s. Visam computer services 2698 / 08.02.2013 1 3500 3500M/s. Pioneer Machinery & Spares 2699 / 11.02.2013 1 9995 11559

2700 / 11.02.2013 1 5145

2700 / 11.02.2013 1 5750 12475

M/s.Jk Tyre & industries ltd, 2701 / 11.02.2013 2 14712 32343

M/s.Tyre bank 2702 / 11.02.2013 7 5050 35350

M/s.Tyre bank 2703 / 11.02.2013 2 5600 11200

M/s Data System 2706 / 11.02.2013 1 105,000.00

M/s Data System 2706 / 11.02.2013 1 35,000.00 151542

2707 / 11.02.2013 1 45.00

2707 / 11.02.2013 4 12.00

2707 / 11.02.2013 2 13.00

2707 / 11.02.2013 4 4.00

M/s. Putzmeister concrete machines pvt ltd

M/s. Kem construction EquipmentsM/s. Kem construction Equipments

M/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltd

Page 60: February Statement - 28.3.13

February (2)

Page 60

2707 / 11.02.2013 4 12.00

2707 / 11.02.2013 2 75.00

2707 / 11.02.2013 2 155.00

2707 / 11.02.2013 2 55.00

2707 / 11.02.2013 2 325.00

2707 / 11.02.2013 2 675.00

2707 / 11.02.2013 2 8.00

2707 / 11.02.2013 1 1,950.00

2707 / 11.02.2013 4 235.00

2707 / 11.02.2013 4 357.00

2707 / 11.02.2013 2 3.00

2707 / 11.02.2013 2 125.00

2707 / 11.02.2013 2 145.00

2707 / 11.02.2013 2 55.00

2707 / 11.02.2013 2 1,200.00

2707 / 11.02.2013 2 875.00

2707 / 11.02.2013 4 325.00

2707 / 11.02.2013 2 85.00

2707 / 11.02.2013 2 575.00

2707 / 11.02.2013 2 675.00

2707 / 11.02.2013 4 155.00

2707 / 11.02.2013 1 1,225.00

2707 / 11.02.2013 1 1,325.00

2707 / 11.02.2013 2 385.00

M/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltd

Page 61: February Statement - 28.3.13

February (2)

Page 61

2707 / 11.02.2013 2 16.00

2707 / 11.02.2013 1 105.00

2707 / 11.02.2013 3 1,550.00

2707 / 11.02.2013 1 146.00

2707 / 11.02.2013 1 9,250.00

2707 / 11.02.2013 1 7,450.00

2707 / 11.02.2013 2 204.00

2707 / 11.02.2013 1 24.00

2707 / 11.02.2013 2 275.00

2707 / 11.02.2013 2 330.00

2707 / 11.02.2013 1 36.00

2707 / 11.02.2013 1 1,550.00

2707 / 11.02.2013 1 925.00

2707 / 11.02.2013 1 1,175.00

2707 / 11.02.2013 1 1,775.00

2707 / 11.02.2013 26 42.00

2707 / 11.02.2013 4 32.00

2707 / 11.02.2013 30 15.00

2707 / 11.02.2013 1 1,425.00

2707 / 11.02.2013 1 1,425.00

2707 / 11.02.2013 11 475.00

2707 / 11.02.2013 1 16,545.00

2707 / 11.02.2013 30 14.00

2707 / 11.02.2013 2 5,750.00 91086

M/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltdM/s. Case New holand construction (india)pvt ltd

Page 62: February Statement - 28.3.13

February (2)

Page 62

M/s. Tyre Bank 2708 / 11.02.2013 1 33000

M/s. Tyre Bank 2708 / 11.02.2013 1 11400 44400

M/s.Sharp ply (india) Pvt Ltd 2709 / 12.02.2013 596.23 538.2 367420.18

Shuban Enterprises 2714 / 12.02.2013 80 630 50400

M/s.M.S. Traders 2715 / 12.02.2013 6 205.00

M/s.M.S. Traders 2715 / 12.02.2013 6 71.00

M/s.M.S. Traders 2715 / 12.02.2013 6 650.00 5834M/s.Nikki Engineering 2716 / 12.02.2013 1 1100 1155M/s .Alpha Lubricants 2717 / 12.02.2013 210 164.96 30035M/s. Balagi Suppliers 2718 / 12.02.2013 30 210 6300M.B Trading Corporation 2719 / 12.02.2013 2100 58.00

2719 / 12.02.2013 2600 58.00 286230

M/s Industrial power Control 2724 / 12.02.2013 10 2,310.00

M/s Industrial power Control 2724 / 12.02.2013 2 4,550.00M/s Industrial power Control 2724 / 12.02.2013 6 1,235.00M/s Industrial power Control 2724 / 12.02.2013 5 1,890.00

M/s Industrial power Control 2724 / 12.02.2013 15 95.00

M/s Industrial power Control 2724 / 12.02.2013 40 130.00

M/s Industrial power Control 2724 / 12.02.2013 25 182.00

M/s Industrial power Control 2724 / 12.02.2013 30 168.00M/s Industrial power Control 2724 / 12.02.2013 10 186.00 67135

2725 / 12.02.2013 1 2,750.00

2725 / 12.02.2013 1 2,750.00

2725 / 12.02.2013 2 315.00

2725 / 12.02.2013 1 928.00

2725 / 12.02.2013 1 186.00

M/s Venkateshware Auto tractor Agencies M/s Venkateshware Auto tractor Agencies M/s Venkateshware Auto tractor Agencies M/s Venkateshware Auto tractor Agencies M/s Venkateshware Auto tractor Agencies

Page 63: February Statement - 28.3.13

February (2)

Page 63

2725 / 12.02.2013 2 51.00

2725 / 12.02.2013 2 284.00

2725 / 12.02.2013 2 290.00

2725 / 12.02.2013 1 152.00

2725 / 12.02.2013 1 169.00

2725 / 12.02.2013 1 159.00

2725 / 12.02.2013 1 2,699.00

2725 / 12.02.2013 6 105.00

2725 / 12.02.2013 1 2,500.00

2725 / 12.02.2013 1 3,500.00

2725 / 12.02.2013 1 1,750.00

2725 / 12.02.2013 1 1,528.00

2725 / 12.02.2013 1 2,450.00

2725 / 12.02.2013 1 2,432.00

2725 / 12.02.2013 1 336.00

2725 / 12.02.2013 1 146.00

2725 / 12.02.2013 2 750.00

2725 / 12.02.2013 2 354.00

2725 / 12.02.2013 1 171.00

2725 / 12.02.2013 1 264.00

2725 / 12.02.2013 1 255.00

2725 / 12.02.2013 1 1,607.00

2725 / 12.02.2013 1 901.00

2725 / 12.02.2013 2 250.00

2725 / 12.02.2013 1 763.00

M/s Venkateshware Auto tractor Agencies M/s Venkateshware Auto tractor Agencies M/s Venkateshware Auto tractor Agencies M/s Venkateshware Auto tractor Agencies M/s Venkateshware Auto tractor Agencies M/s Venkateshware Auto tractor Agencies M/s Venkateshware Auto tractor Agencies M/s Venkateshware Auto tractor Agencies M/s Venkateshware Auto tractor Agencies M/s Venkateshware Auto tractor Agencies M/s Venkateshware Auto tractor Agencies M/s Venkateshware Auto tractor Agencies M/s Venkateshware Auto tractor Agencies M/s Venkateshware Auto tractor Agencies M/s Venkateshware Auto tractor Agencies M/s Venkateshware Auto tractor Agencies M/s Venkateshware Auto tractor Agencies M/s Venkateshware Auto tractor Agencies M/s Venkateshware Auto tractor Agencies M/s Venkateshware Auto tractor Agencies M/s Venkateshware Auto tractor Agencies M/s Venkateshware Auto tractor Agencies M/s Venkateshware Auto tractor Agencies M/s Venkateshware Auto tractor Agencies M/s Venkateshware Auto tractor Agencies

Page 64: February Statement - 28.3.13

February (2)

Page 64

2725 / 12.02.2013 6 250.00

2725 / 12.02.2013 1 1,679.00

2725 / 12.02.2013 1 141.00

2725 / 12.02.2013 1 70.00

2725 / 12.02.2013 1 4,162.00 43224

M/s. Bharat tube corporation 2726 / 12.02.2013 600 1060 654444

M/s. Anand Enterprises 2727 / 12.02.2013 2 6500 14587M/s.Alpha Lubricants 2728 / 12.02.2013 420 144 61949

M/s. Universal engineers 2729 / 13.02.2013 1 85000.00

M/s. Universal engineers 2729 / 13.02.2013 1 12500.00

M/s. Universal engineers 2729 / 13.02.2013 1 14500.00

M/s. Universal engineers 2729 / 13.02.2013 1 5500.00

M/s. Universal engineers 2729 / 13.02.2013 1 19500.00

M/s. Universal engineers 2729 / 13.02.2013 2 4500.00

M/s. Universal engineers 2729 / 13.02.2013 10 65.00

M/s. Universal engineers 2729 / 13.02.2013 20 75.00

M/s. Universal engineers 2729 / 13.02.2013 7 85.00

M/s. Universal engineers 2729 / 13.02.2013 5 75.00

M/s. Universal engineers 2729 / 13.02.2013 4 85.00

M/s Venkateshware Auto tractor Agencies M/s Venkateshware Auto tractor Agencies M/s Venkateshware Auto tractor Agencies M/s Venkateshware Auto tractor Agencies M/s Venkateshware Auto tractor Agencies

Page 65: February Statement - 28.3.13

February (2)

Page 65

M/s. Universal engineers 2729 / 13.02.2013 10 95.00

M/s. Universal engineers 2729 / 13.02.2013 1 2500.00

M/s. Universal engineers 2729 / 13.02.2013 1 2500.00

M/s. Universal engineers 2729 / 13.02.2013 2 1500.00

M/s. Universal engineers 2729 / 13.02.2013 1 6500.00

M/s. Universal engineers 2729 / 13.02.2013 1 5500.00

M/s. Universal engineers 2729 / 13.02.2013 2 2500.00

M/s. Universal engineers 2729 / 13.02.2013 1 450.00

M/s. Universal engineers 2729 / 13.02.2013 4 500.00

M/s. Universal engineers 2729 / 13.02.2013 1 750.00

M/s. Universal engineers 2729 / 13.02.2013 4 175.00

M/s. Universal engineers 2729 / 13.02.2013 1 12500.00

M/s. Universal engineers 2729 / 13.02.2013 1 16500.00

M/s. Universal engineers 2729 / 13.02.2013 8 1450.00

M/s. Universal engineers 2729 / 13.02.2013 2 5500.00

M/s. Universal engineers 2729 / 13.02.2013 1 45000.00

Page 66: February Statement - 28.3.13

February (2)

Page 66

M/s. Universal engineers 2729 / 13.02.2013 1 3000.00

M/s. Universal engineers 2729 / 13.02.2013

M/s. Universal engineers 2729 / 13.02.2013 2 500.00

M/s. Universal engineers 2729 / 13.02.2013 12 750.00

M/s. Universal engineers 2729 / 13.02.2013 2 400.00

M/s. Universal engineers 2729 / 13.02.2013 2 360.00

M/s. Universal engineers 2729 / 13.02.2013 4 160.00

M/s. Universal engineers 2729 / 13.02.2013 2 950.00

M/s. Universal engineers 2729 / 13.02.2013 1 68000.00

M/s. Universal engineers 2729 / 13.02.2013 1 68500.00

M/s. Universal engineers 2729 / 13.02.2013 6 9500.00

M/s. Universal engineers 2729 / 13.02.2013 6 1250.00

M/s. Universal engineers 2729 / 13.02.2013 4 1250.00

M/s. Universal engineers 2729 / 13.02.2013 12 950.00

M/s. Universal engineers 2729 / 13.02.2013 1 8500.00

M/s. Universal engineers 2729 / 13.02.2013 1 6500.00

Page 67: February Statement - 28.3.13

February (2)

Page 67

M/s. Universal engineers 2729 / 13.02.2013

M/s. Universal engineers 2729 / 13.02.2013 2 14500.00

M/s. Universal engineers 2729 / 13.02.2013 4 360.00

M/s. Universal engineers 2729 / 13.02.2013 8 20.00

M/s. Universal engineers 2729 / 13.02.2013

M/s. Universal engineers 2729 / 13.02.2013 2 12500.00

M/s. Universal engineers 2729 / 13.02.2013 4 360.00

M/s. Universal engineers 2729 / 13.02.2013 8 20.00

M/s. Universal engineers 2729 / 13.02.2013 1 4000.00

M/s. Universal engineers 2729 / 13.02.2013 25 300.00

M/s. Universal engineers 2729 / 13.02.2013

M/s. Universal engineers 2729 / 13.02.2013 12 750.00

M/s. Universal engineers 2729 / 13.02.2013 2 500.00

M/s. Universal engineers 2729 / 13.02.2013 2 360.00

M/s. Universal engineers 2729 / 13.02.2013 4 380.00

M/s. Universal engineers 2729 / 13.02.2013 1 280.00

Page 68: February Statement - 28.3.13

February (2)

Page 68

M/s. Universal engineers 2729 / 13.02.2013 1 200.00 539649

M/s.Sharp ply (india)Pvt ltd 2730 / 13.02.2013 596.23 509.86 348072.93

M/s. Chains&Spares Coropration 2731 / 13.02.2013 105 106 11687

M/s.Schwing Stetter (I) Pvt Ltd 2732 / 13.02.2013 1 10415

M/s.Schwing Stetter (I) Pvt Ltd 2732 / 13.02.2013 1 1929 12438

M/s.Gaytri Engineering Works 2733 / 13.02.2013 2 800.00

M/s.Gaytri Engineering Works 2733 / 13.02.2013 1 1800.00

M/s.Gaytri Engineering Works 2733 / 13.02.2013 1 2500.00

M/s.Gaytri Engineering Works 2733 / 13.02.2013 2 1200.00 7993

2734 / 13.02.2013 1 6500 5200

2735 / 13.02.2013 1 8250 6500

M/s.Schwing Stetter (I) Pvt Ltd 2738 / 13.02.2013 1 9,183.00

M/s.Schwing Stetter (I) Pvt Ltd 2738 / 13.02.2013 1 13,376.00

M/s.Schwing Stetter (I) Pvt Ltd 2738 / 13.02.2013 1 11.00

M/s.Schwing Stetter (I) Pvt Ltd 2738 / 13.02.2013 1 11.00

M/s.Schwing Stetter (I) Pvt Ltd 2738 / 13.02.2013 1 502.00 24501

M/s.Pioneer Machinery &Spares 2740 / 13.02.2013 1 1931

M/s.Pioneer Machinery &Spares 2740 / 13.02.2013 1 1550 4026M/s.Sri Krishna Battery Sales 2741 / 13.02.2013 2 12000 18600m/s.Trans Cunstruction Equiment 2742 / 13.02.2013 1 12418 13508

M/s.Schwing Stetter (i)pvt Ltd 2743 / 13.02.2013 1 7389 7614M/s.Sika india Pvt Ltd 2746 / 14.02.2013 8000 30M/s.Sika india Pvt Ltd 2746 / 14.02.2013 2070 96 564423

M.S. Traders, 2748 / 14.02.2013 2 1320.00

M/s. Sri Krishna Battery Sales & ServiceM/s. Sri Krishna Battery Sales & Service

Page 69: February Statement - 28.3.13

February (2)

Page 69

M.S. Traders, 2748 / 14.02.2013 3 847.00M.S. Traders, 2748 / 14.02.2013 3 710.00M.S. Traders, 2748 / 14.02.2013 2 2125.00M.S. Traders, 2748 / 14.02.2013 2 1895.00 16119

2749 / 14.02.2013 1 3200.00

2749 / 14.02.2013 1 3200.00

2749 / 14.02.2013 1 2350.00

2749 / 14.02.2013 60 50.00

2749 / 14.02.2013 50 135.00

2749 / 14.02.2013 2 4450.00

2749 / 14.02.2013 2 150.00

2749 / 14.02.2013 2 120.00

2749 / 14.02.2013 25 450.00 41150

M/s.Emerald Enterprises 2750 / 14.02.2013 100 55.00

M/s.Emerald Enterprises 2750 / 14.02.2013 25 55.00

M/s.Emerald Enterprises 2750 / 14.02.2013 2 55.00

M/s.Emerald Enterprises 2750 / 14.02.2013 30 55.00

M/s.Emerald Enterprises 2750 / 14.02.2013 2 55.00

M/s.Emerald Enterprises 2750 / 14.02.2013 1 4000.00

M/s.Emerald Enterprises 2750 / 14.02.2013 1 1950.00M/s.Emerald Enterprises 2750 / 14.02.2013 150 3.00M/s.Emerald Enterprises 2750 / 14.02.2013 10 103.00M/s.Emerald Enterprises 2750 / 14.02.2013 10 450.00 20675

m/s. JK Tyre & Industries 2751 / 14.02.2013 6 15829

m/s. JK Tyre & Industries 2751 / 14.02.2013 2 14712 136141

M/s.JK Tyre & Industries 2752 / 14.02.2013 2 15829

M/s.JK Tyre & Industries 2752 / 14.02.2013 2 14712 67142

M/s. Sidhpurwala Engineering Company M/s. Sidhpurwala Engineering Company M/s. Sidhpurwala Engineering Company M/s. Sidhpurwala Engineering Company M/s. Sidhpurwala Engineering Company M/s. Sidhpurwala Engineering Company M/s. Sidhpurwala Engineering Company M/s. Sidhpurwala Engineering Company M/s. Sidhpurwala Engineering Company

Page 70: February Statement - 28.3.13

February (2)

Page 70

M/s.Gayatri Engineering Works 2753 / 14.02.2013 1 34,500.00

M/s.Gayatri Engineering Works 2753 / 14.02.2013 1 6,800.00

M/s.Gayatri Engineering Works 2753 / 14.02.2013 1 8,200.00

M/s.Gayatri Engineering Works 2753 / 14.02.2013 4 2,000.00

M/s.Gayatri Engineering Works 2753 / 14.02.2013 1 14,500.00

M/s.Gayatri Engineering Works 2753 / 14.02.2013 1 4,800.00

M/s.Gayatri Engineering Works 2753 / 14.02.2013 1 2,500.00

M/s.Gayatri Engineering Works 2753 / 14.02.2013 1 6,500.00

M/s.Gayatri Engineering Works 2753 / 14.02.2013 4 1,800.00

M/s.Gayatri Engineering Works 2753 / 14.02.2013 100 58.00

M/s.Gayatri Engineering Works 2753 / 14.02.2013 1 8,500.00

M/s.Gayatri Engineering Works 2753 / 14.02.2013 1 3,500.00

M/s.Gayatri Engineering Works 2753 / 14.02.2013 10 120.00

M/s.Gayatri Engineering Works 2753 / 14.02.2013 1 22,500.00

M/s.Gayatri Engineering Works 2753 / 14.02.2013 1 800.00

M/s.Gayatri Engineering Works 2753 / 14.02.2013 15 2,200.00

Page 71: February Statement - 28.3.13

February (2)

Page 71

M/s.Gayatri Engineering Works 2753 / 14.02.2013 1 3,600.00

M/s.Gayatri Engineering Works 2753 / 14.02.2013 1 400.00

M/s.Gayatri Engineering Works 2753 / 14.02.2013 1 8,500.00

M/s.Gayatri Engineering Works 2753 / 14.02.2013 1 8,500.00

M/s.Gayatri Engineering Works 2753 / 14.02.2013 1 3,800.00

M/s.Gayatri Engineering Works 2753 / 14.02.2013 2 8,500.00

M/s.Gayatri Engineering Works 2753 / 14.02.2013 1 8,500.00

M/s.Gayatri Engineering Works 2753 / 14.02.2013 1 4,500.00

M/s.Gayatri Engineering Works 2753 / 14.02.2013 1 4,800.00

M/s.Gayatri Engineering Works 2753 / 14.02.2013 1 800.00

M/s.Gayatri Engineering Works 2753 / 14.02.2013 2 950.00

M/s.Gayatri Engineering Works 2753 / 14.02.2013 2 850.00

M/s.Gayatri Engineering Works 2753 / 14.02.2013 2 2,150.00

M/s.Gayatri Engineering Works 2753 / 14.02.2013 5 125.00

M/s.Gayatri Engineering Works 2753 / 14.02.2013 5 450.00

M/s.Gayatri Engineering Works 2753 / 14.02.2013 5 150.00 236536

Page 72: February Statement - 28.3.13

February (2)

Page 72

M/s.Gayatri Engineering Works 2753 / 14.02.2013

M/s.Gayatri Engineering Works 2753 / 14.02.2013

M/s.Gayatri Engineering Works 2753 / 14.02.2013

M/s.Gayatri Engineering Works 2753 / 14.02.2013 1 800.00

M/s.Gayatri Engineering Works 2753 / 14.02.2013 1 750.00

M/s.Gayatri Engineering Works 2753 / 14.02.2013 1 350.00

M/s.Gayatri Engineering Works 2753 / 14.02.2013 1 3,500.00

M/s.Industrial power control 2754 / 14.02.2013 3 398.00

M/s.Industrial power control 2754 / 14.02.2013 25 128.00

M/s.Industrial power control 2754 / 14.02.2013 50 79.00

M/s.Industrial power control 2754 / 14.02.2013 300 49.00

M/s.Industrial power control 2754 / 14.02.2013 100 28.00 27250

M/s.Tyre bank 2755 / 14.02.2013 2 28000 56000

M/s.I.R.international 2756 / 14.02.2013 1 35000 34178

M/s.Schwing Stetter (i)Pvt.ltd 2757 / 14.02.2013

Pradeep Engineering Store 2765 / 15.02.2013 6 2,480.00

Pradeep Engineering Store 2765 / 15.02.2013 8 250.00

Pradeep Engineering Store 2765 / 15.02.2013 3 240.00

Pradeep Engineering Store 2765 / 15.02.2013 4 65.00

Pradeep Engineering Store 2765 / 15.02.2013 2 90.00

Pradeep Engineering Store 2765 / 15.02.2013 150 150.00M.B. trading corporation 2766 / 15.02.2013

Page 73: February Statement - 28.3.13

February (2)

Page 73

Shuban interpises 2767 / 15.02.2013 80 630 50400

Industrial sales Corporation 2768 / 15.02.2013 250 99Industrial sales Corporation 2768 / 15.02.2013 150 56.5 37803

Industrial sales Corporation 2769 / 15.02.2013 825 56.5 48943.5

Industrial sales Corporation 2770 / 15.02.2013 200 99Industrial sales Corporation 2770 / 15.02.2013 160 56.5Industrial sales Corporation 2770 / 15.02.2013 40 85Industrial sales Corporation 2770 / 15.02.2013 15 14.5Industrial sales Corporation 2770 / 15.02.2013 6 66Industrial sales Corporation 2770 / 15.02.2013 40 154 49347.5sri krishna Baittery & sles 2771 / 15.02.2013 1 8250 6500M/s. Conveytech system 2772 / 15.02.2013 1 21500 21930M/s. Balaji suppliers 2773 / 15.02.2013Trans diesel Engineeers 2776 / 15.02.2013 1 4,104.00Trans diesel Engineeers 2776 / 15.02.2013 2 460.00Trans diesel Engineeers 2776 / 15.02.2013 1 166.00

Trans diesel Engineeers 2776 / 15.02.2013 1 148.00 5781

Trans diesel Engineeers 2777 / 15.02.2013 4 72.00

Trans diesel Engineeers 2777 / 15.02.2013 4 72.00

Trans diesel Engineeers 2777 / 15.02.2013 6 46.00 976

JPR Marketing 2781 / 16.02.2013 1000 58.5 61425Balaji suppliers 2782 / 16.02.2013 25 205.00Balaji suppliers 2782 / 16.02.2013 20 210.00Balaji suppliers 2782 / 16.02.2013 15 230.00Balaji suppliers 2782 / 16.02.2013 200 45.00 21775Emerald enterprises 2783 / 16.02.2013JPR Marketing 2784 / 16.02.2013 50 58.50JPR Marketing 2784 / 16.02.2013 50 59.50JPR Marketing 2784 / 16.02.2013 25 59.50JPR Marketing 2784 / 16.02.2013 1000 58.50JPR Marketing 2784 / 16.02.2013 25 58.50 70718

Conveytech system 2785 / 16.02.2013 2 18,000.00Conveytech system 2785 / 16.02.2013 4 195.00Conveytech system 2785 / 16.02.2013 4 298.00

Page 74: February Statement - 28.3.13

February (2)

Page 74

Conveytech system 2785 / 16.02.2013 10 110.00Conveytech system 2785 / 16.02.2013 2 2,350.00 56961

M.S. Traders, 2786 / 16.02.2013 2 16000 33600

Sharp ply(india)Pvt ltd 2787 / 16.02.2013 6400 44.5 326096

Industrial power control 2788 / 16.02.2013 8 3,458.00

Industrial power control 2788 / 16.02.2013 12 2,310.00

Industrial power control 2788 / 16.02.2013 8 9,526.00Industrial power control 2788 / 16.02.2013 24 995.00 155472PAMM Commercial Pvt ltd 2789 / 16.02.2013 11200 50 641200

schwing stetter (india) pvt Ltd 2790 / 16.02.2013 1 4,900.00schwing stetter (india) pvt Ltd 2790 / 16.02.2013 1 11,121.00schwing stetter (india) pvt Ltd 2790 / 16.02.2013 1 3,958.00 20131

Pradeep engineering 2793 / 16.02.2013 6 100.00

Pradeep engineering 2793 / 16.02.2013 8 100.00Pradeep engineering 2793 / 16.02.2013 8 450.00 5439

Balaji service,Bellary 2794 / 16.02.2013 2 427.00

Balaji service,Bellary 2794 / 16.02.2013 2 121.00

Balaji service,Bellary 2794 / 16.02.2013 1 1497.00 2593

Balaji suppliers,Secunderabad 2795 / 16.02.2013 50 205.00Balaji suppliers,Secunderabad 2795 / 16.02.2013 50 205.00Balaji suppliers,Secunderabad 2795 / 16.02.2013 10 210.00Balaji suppliers,Secunderabad 2795 / 16.02.2013 10 280.00 25400Sri ram agencies 2796 / 16.02.2013 1 32942.72Sri ram agencies 2796 / 16.02.2013 1 38735.68 71678Balaji suppliers 2797 / 18.02.2013 10 185Balaji suppliers 2797 / 18.02.2013 5 185 2775Balaji suppliers 2798 / 18.02.2013 5 140Balaji suppliers 2798 / 18.02.2013 10 185 2550

2799 / 18.02.2013 10 125 1250

Gayatri engineering works 2800 / 18.02.2013 1 15635.00

Gayatri engineering works 2800 / 18.02.2013 1 8600.00

Emerald enterprises,secunderabad

Page 75: February Statement - 28.3.13

February (2)

Page 75

Gayatri engineering works 2800 / 18.02.2013 1 12540.00

Gayatri engineering works 2800 / 18.02.2013 1 11600.00

Gayatri engineering works 2800 / 18.02.2013 2 2400.00

Gayatri engineering works 2800 / 18.02.2013 1 3800.00 54867

Schwing stetter (1) Pvt ltd 2801 / 18.02.2013 1 96518 91209.22802 / 18.02.2013 1 4,800.00

2802 / 18.02.2013 1 1,800.00

2802 / 18.02.2013 30 65.00

2802 / 18.02.2013 1 190.00

2802 / 18.02.2013 1 650.00

2802 / 18.02.2013 1 293.00

2802 / 18.02.2013 1 2,340.00

2802 / 18.02.2013 1 125.00

2802 / 18.02.2013 1 165.00

2802 / 18.02.2013 1 246.00

2802 / 18.02.2013 1 330.00

2802 / 18.02.2013 1 45.00

2802 / 18.02.2013 1 80.00

2802 / 18.02.2013 1 137.00

2802 / 18.02.2013 1 160.00

2802 / 18.02.2013 1 230.00

2802 / 18.02.2013 1 40.00

2802 / 18.02.2013 1 60.00

2802 / 18.02.2013 1 30.00

2802 / 18.02.2013 2 65.00

Sidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering Company

Page 76: February Statement - 28.3.13

February (2)

Page 76

2802 / 18.02.2013 2 55.00

2802 / 18.02.2013 2 40.00

2802 / 18.02.2013 2 10.00

2802 / 18.02.2013 1 1,500.00

2802 / 18.02.2013 10 65.00

2802 / 18.02.2013 25 40.00

2802 / 18.02.2013 2 4,100.00

2802 / 18.02.2013 1 4,300.00

2802 / 18.02.2013 4 1,300.00

2802 / 18.02.2013 1 150.00

2802 / 18.02.2013 1 1,050.00

2802 / 18.02.2013 1 350.00

2802 / 18.02.2013 1 290.00

2802 / 18.02.2013 1 50.00

2802 / 18.02.2013 1 6,500.00

2802 / 18.02.2013 1 5,520.00

2802 / 18.02.2013 1 3,600.00

2802 / 18.02.2013 1 750.00

2802 / 18.02.2013 1 796.00

2802 / 18.02.2013 1 972.00

2802 / 18.02.2013 1 1,584.00

2802 / 18.02.2013 1 1,572.00

2802 / 18.02.2013 1 1,012.00

2802 / 18.02.2013 1 463.00

2802 / 18.02.2013 1 558.00

Sidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering CompanySidhpurwala Engineering Company

Page 77: February Statement - 28.3.13

February (2)

Page 77

2802 / 18.02.2013 1 350.00

2802 / 18.02.2013 1 2,990.00 66589

Universal engineers ,Chennai 2807 / 18.02.2013 1 1150 1208S.V. Enterprises 2808 / 18.02.2013 10 1000 10000

Industrial Power control 2809 / 18.02.2013 1 975.00

Industrial Power control 2809 / 18.02.2013 2 3195.00

Industrial Power control 2809 / 18.02.2013 1 1085.00

Industrial Power control 2809 / 18.02.2013 1 11053.00 22331

M/s.Alpha Lubricants 2810 / 18.02.2013 210 237.57 43254

M/s Industrial Sales Corporation 2811 / 18.02.2013 200 99

M/s Industrial Sales Corporation 2811 / 18.02.2013 160 56.5

M/s Industrial Sales Corporation 2811 / 18.02.2013 40 85

M/s Industrial Sales Corporation 2811 / 18.02.2013 15 14.5

M/s Industrial Sales Corporation 2811 / 18.02.2013 6 66

M/s Industrial Sales Corporation 2811 / 18.02.2013 40 154 49347.5Trans Construction Equipment 2812 / 18.02.2013 2 1627Trans Construction Equipment 2812 / 18.02.2013 3 1711 9123

M/s Sharp Ply (India ) Pvt Ltd 2823 / 19.02.2013 5600 34.5 221214

M/s Balaji Suppliors 2824 / 19.02.2013 210 205

M/s Balaji Suppliors 2824 / 19.02.2013 200 210 85050M/s. Nikki engineering 2833 / 19.02.2013 2 1100M/s. Nikki engineering 2833 / 19.02.2013 1 9200M/s. Nikki engineering 2833 / 19.02.2013 1 1200 13230M/s. M.S. Traders 2834 / 19.02.2013 2 10879

M/s. M.S. Traders 2834 / 19.02.2013 2 9074

M/s. M.S. Traders 2834 / 19.02.2013 1 10200

M/s. M.S. Traders 2834 / 19.02.2013 1 10950 64109

Sidhpurwala Engineering CompanySidhpurwala Engineering Company

Page 78: February Statement - 28.3.13

February (2)

Page 78

M/s.APT Engineering Company 2835 / 19.02.2013 18 850 160652836 / 19.02.2013 1 7489 7546

M/s. U K Enterprises 2837 / 19.02.2013 12 3,100.00

M/s. U K Enterprises 2837 / 19.02.2013 12 3,050.00

M/s. U K Enterprises 2837 / 19.02.2013 6 6,552.00

M/s. U K Enterprises 2837 / 19.02.2013 200 215.00M/s. U K Enterprises 2837 / 19.02.2013 3 1,150.00M/s. U K Enterprises 2837 / 19.02.2013 3 770.00M/s. U K Enterprises 2837 / 19.02.2013 12 195.00

M/s. U K Enterprises 2837 / 19.02.2013 12 175.00 188948

M/s. industrial Equipment Center 2838 / 19.02.2013 1 4400 5038M/s.Viswam Computer Service 2839 / 19.02.2013 2 270M/s.Viswam Computer Service 2839 / 19.02.2013 1 100 640M/s.I.R. international 2840 / 20.02.2013 8 38

M/s.I.R. international 2840 / 20.02.2013 2 150 587

M/s Sharp Ply 2841 / 20.02.2013 11200 47 602728

M/s.Emerald Enterprises 2845 / 20.02.2013 100 55.00

M/s.Emerald Enterprises 2845 / 20.02.2013 10 55.00

M/s.Emerald Enterprises 2845 / 20.02.2013 230 235.00 60100

M/s.Industrial sales Corporation 2846 / 20.02.2013 2100 58.00

M/s.Industrial sales Corporation 2846 / 20.02.2013 140 70.00

M/s.Industrial sales Corporation 2846 / 20.02.2013 2600 58.00 296520

M/s Industrial Sales Corporation 2848 / 20.02.2013 1050 58.00

M/s Industrial Sales Corporation 2848 / 20.02.2013 140 70.00 74235

M/s.Schwing Stetter (i) Pvt Ltd,Bangalore

Page 79: February Statement - 28.3.13

February (2)

Page 79

M/s.Emerald Enterprises 2849 / 20.02.2013 16 162M/s.Emerald Enterprises 2849 / 20.02.2013 5 110 3142M/s.Emerald Enterprises 2850 / 20.02.2013 20 450 9000

M/s Pradeep engineering store 2851 / 20.02.2013 50 165.00

M/s Pradeep engineering store 2851 / 20.02.2013 25 150.00

M/s Pradeep engineering store 2851 / 20.02.2013 20 295.00

M/s Pradeep engineering store 2851 / 20.02.2013 20 190.00

M/s Pradeep engineering store 2851 / 20.02.2013 10 250.00

M/s Pradeep engineering store 2851 / 20.02.2013 5 590.00

M/s Pradeep engineering store 2851 / 20.02.2013 2 45.00

M/s Pradeep engineering store 2851 / 20.02.2013 3 135.00

M/s Pradeep engineering store 2851 / 20.02.2013 6 160.00

M/s Pradeep engineering store 2851 / 20.02.2013 2 450.00

M/s Pradeep engineering store 2851 / 20.02.2013 2 365.00

M/s Pradeep engineering store 2851 / 20.02.2013 10 120.00

M/s Pradeep engineering store 2851 / 20.02.2013 5 75.00

M/s Pradeep engineering store 2851 / 20.02.2013 1 2750.00

M/s Pradeep engineering store 2851 / 20.02.2013 1 475.00

M/s Pradeep engineering store 2851 / 20.02.2013 1 950.00 35895

M/s Pradeep engineering store 2852 / 20.02.2013 6 1650

M/s Pradeep engineering store 2852 / 20.02.2013 8 2150 29478

M/s.Powerica Limited 2853 / 20.02.2013 1 166202 190301M/s. Sri Krishna Battery Sales 2854 / 20.02.2013 1 6600 5500M/s.Alpha Lubricants 2855 / 20.02.2013 210 164.96 30035

M/s.JK Tyre & Industries 2856 / 20.02.2013 2 14712 32343M/s Sri Krishna Battery Sales 2857 / 20.02.2013 1 8250 6500M/s.Industrial Power Control 2858 / 21.02.2013 2 1850

Page 80: February Statement - 28.3.13

February (2)

Page 80

M/s.Industrial Power Control 2858 / 21.02.2013 1 2250 5950M/s.Sri Krishna Battery 2859 / 21.02.2013 1 8250 6500

M/s.sri Sai Engineering works 2860 / 21.02.2013

M/s.sri Sai Engineering works 2860 / 21.02.2013 2 950

M/s.sri Sai Engineering works 2860 / 21.02.2013 1 150.00

M/s.sri Sai Engineering works 2860 / 21.02.2013 1 100.00

M/s.sri Sai Engineering works 2860 / 21.02.2013 2 600.00

M/s.sri Sai Engineering works 2860 / 21.02.2013 1 300.00

M/s.sri Sai Engineering works 2860 / 21.02.2013 2 75.00

M/s.sri Sai Engineering works 2860 / 21.02.2013 1 800.00

M/s.sri Sai Engineering works 2860 / 21.02.2013 1 1,700.00

M/s.sri Sai Engineering works 2860 / 21.02.2013 2 450.00

M/s.sri Sai Engineering works 2860 / 21.02.2013 2 350.00

M/s.sri Sai Engineering works 2860 / 21.02.2013 1 400.00

M/s.sri Sai Engineering works 2860 / 21.02.2013 1 150.00

M/s.sri Sai Engineering works 2860 / 21.02.2013 2 65.00

M/s.sri Sai Engineering works 2860 / 21.02.2013 1 900.00

M/s.sri Sai Engineering works 2860 / 21.02.2013 1 500.00

Page 81: February Statement - 28.3.13

February (2)

Page 81

M/s.sri Sai Engineering works 2860 / 21.02.2013 6 220.00

M/s.sri Sai Engineering works 2860 / 21.02.2013 1 200.00

M/s.sri Sai Engineering works 2860 / 21.02.2013 4,000.00

M/s.sri Sai Engineering works 2860 / 21.02.2013 700.00

M/s.sri Sai Engineering works 2860 / 21.02.2013

M/s.sri Sai Engineering works 2860 / 21.02.2013 2 600.00

M/s.sri Sai Engineering works 2860 / 21.02.2013 1 2,000.00

M/s.sri Sai Engineering works 2860 / 21.02.2013 1 130.00

M/s.sri Sai Engineering works 2860 / 21.02.2013 1 70.00

M/s.sri Sai Engineering works 2860 / 21.02.2013 1 700.00

M/s.sri Sai Engineering works 2860 / 21.02.2013 1 400.00

M/s.sri Sai Engineering works 2860 / 21.02.2013 1 300.00

M/s.sri Sai Engineering works 2860 / 21.02.2013 1 200.00

M/s.sri Sai Engineering works 2860 / 21.02.2013 1 1,600.00

M/s.sri Sai Engineering works 2860 / 21.02.2013 1 700.00

M/s.sri Sai Engineering works 2860 / 21.02.2013 1 1000

Page 82: February Statement - 28.3.13

February (2)

Page 82

M/s.sri Sai Engineering works 2860 / 21.02.2013 3,500.00

M/s.sri Sai Engineering works 2860 / 21.02.2013 700.00 28700

M/s. Balaji Suppliors 2862 / 21.02.2013 280 205 57400

2865 / 21.02.2013 1 67197.00

2865 / 21.02.2013 1 6891.00

2865 / 21.02.2013 2 3548.00

2865 / 21.02.2013 2 230.00

2865 / 21.02.2013 2 274.00

2865 / 21.02.2013 2 403.00

2865 / 21.02.2013 1 357.00

2865 / 21.02.2013 2 1201.00

2865 / 21.02.2013 2 56.00

2865 / 21.02.2013 2 281.00

2865 / 21.02.2013 1 2468.00

2865 / 21.02.2013 1 2468.00

2865 / 21.02.2013 1 21475.00

2865 / 21.02.2013 1 24306.00

2865 / 21.02.2013 2 92.00 122568.6

M/s. Industrial Sales Corporation 2866 / 21.02.2013 400 99.00

M/s. Industrial Sales Corporation 2866 / 21.02.2013 320 56.50

M/s. Industrial Sales Corporation 2866 / 21.02.2013 50 85.00

M/s. Industrial Sales Corporation 2866 / 21.02.2013 30 14.50

M/s. Industrial Sales Corporation 2866 / 21.02.2013 6 66.00

M/s. Putzmeister concrete machines pvt ltdM/s. Putzmeister concrete machines pvt ltdM/s. Putzmeister concrete machines pvt ltdM/s. Putzmeister concrete machines pvt ltdM/s. Putzmeister concrete machines pvt ltdM/s. Putzmeister concrete machines pvt ltdM/s. Putzmeister concrete machines pvt ltdM/s. Putzmeister concrete machines pvt ltdM/s. Putzmeister concrete machines pvt ltdM/s. Putzmeister concrete machines pvt ltdM/s. Putzmeister concrete machines pvt ltdM/s. Putzmeister concrete machines pvt ltdM/s. Putzmeister concrete machines pvt ltdM/s. Putzmeister concrete machines pvt ltdM/s. Putzmeister concrete machines pvt ltd

Page 83: February Statement - 28.3.13

February (2)

Page 83

M/s. Industrial Sales Corporation 2866 / 21.02.2013 100 154.00

M/s. Industrial Sales Corporation 2866 / 21.02.2013 40 370.00 88495

2869 / 21.02.2013 1 6000

2869 / 21.02.2013 3 220 6993M/s. S.V. Enterprises 2870 / 21.02.2013 5 300M/s. S.V. Enterprises 2870 / 21.02.2013 2 1000 3500M/s.Viswam Computer Service 2873 / 22.02.2013 1 270 270

M/s UK Enterprises 2874 / 22.02.2013 10 3,050.00M/s UK Enterprises 2874 / 22.02.2013 5 5,161.00M/s UK Enterprises 2874 / 22.02.2013 15 250.00M/s UK Enterprises 2874 / 22.02.2013 100 100.00M/s UK Enterprises 2874 / 22.02.2013 5 3,075.00M/s UK Enterprises 2874 / 22.02.2013 4 5,161.00M/s UK Enterprises 2874 / 22.02.2013 30 375.00M/s UK Enterprises 2874 / 22.02.2013 30 250.00M/s UK Enterprises 2874 / 22.02.2013 15 200.00M/s UK Enterprises 2874 / 22.02.2013 100 9.00 147389

2875 / 22.02.2013 1 24800 25792M/s. Alpha Lubricants 2876 / 22.02.2013 2 35105 60872M/s.Balaji Suppliers 2880 / 22.02.2013 65 185M/s.Balaji Suppliers 2880 / 22.02.2013 25 185 16650M/s. Apt Engineering Company 2881 / 22.02.2013 4 950 3990

2882 / 22.02.2013 114 150

2882 / 22.02.2013 1 2100 20160

M/s. Industrial Power Control 2883 / 23.02.2013 1 6850

M/s. Industrial Power Control 2883 / 23.02.2013 1 5800 14484M/s. Alpha Lubricants 2884 / 25.02.2013 2 35945.7 62329M/s.pace Enginering Service 2887 / 25.02.2013 4 57.00M/s.pace Enginering Service 2887 / 25.02.2013 2 178.00M/s.pace Enginering Service 2887 / 25.02.2013 2 464.00M/s.pace Enginering Service 2887 / 25.02.2013 2 386.00M/s.pace Enginering Service 2887 / 25.02.2013 1 901.00M/s.pace Enginering Service 2887 / 25.02.2013 1 76.00M/s.pace Enginering Service 2887 / 25.02.2013 1 2524.00

M/s. Sidhpurwala Engineering companyM/s. Sidhpurwala Engineering company

M/s.Andhra machine & tollsCorporation

M/s. Sidhpurwala Engineering companyM/s. Sidhpurwala Engineering company

Page 84: February Statement - 28.3.13

February (2)

Page 84

M/s.pace Enginering Service 2887 / 25.02.2013 1 2642.00M/s.pace Enginering Service 2887 / 25.02.2013 1 1774.00 10762

2888 / 25.02.2013 10000 39.19 391900M/s.JPR Marketing 2889 / 25.02.2013 4000 58.5 245700M/s.Balaji Suppliers 2890 / 25.02.2013 20 205 4100M/s.JPR Marketing 2891 / 25.02.2013 100 58.5M/s.JPR Marketing 2891 / 25.02.2013 100 59.5 12390M/s. Schwing Stetter (I) Pvt.Ltd 2895 / 25.02.2013 1 20507 20663

2896 / 25.02.2013 35 106 3896

M/s. Canon India Pvt Ltd 2897 / 25.02.2013 1 82971 79250

2899 / 26.02.2013 10000 35 450283M/s.JPR Marketing 2900 / 26.02.2013 500 58.5M/s.JPR Marketing 2900 / 26.02.2013 200 59.5M/s.JPR Marketing 2900 / 26.02.2013 2000 58.5 166058M/s.JPR Marketing 2901 / 26.02.2013 4000 58.5M/s.JPR Marketing 2901 / 26.02.2013 2000 58.5 368550M/s.Tyre Bank 2902 / 26.02.2013 4 4300 17200

M/s.Schwing Stetter 2903 / 26.02.2013 1 726.00

M/s.Schwing Stetter 2903 / 26.02.2013 1 2030.00M/s.Schwing Stetter 2903 / 26.02.2013 1 1156.00M/s.Schwing Stetter 2903 / 26.02.2013 5 406.00M/s.Schwing Stetter 2903 / 26.02.2013 1 297.00 6286

M/s. Sharp Ply (India) Pvt Ltd 2904 / 26.02.2013 448 34.50

M/s. Sharp Ply (India) Pvt Ltd 2904 / 26.02.2013 67 435.00 51068

M/s.Schwing Stetter 2905 / 26.02.2013 1 12,280.00

M/s.Schwing Stetter 2905 / 26.02.2013 1 39,478.00

M/s.Schwing Stetter 2905 / 26.02.2013 1 20,555.00

M/s.Fosroc Chemicals (India) Pvt Ltd

M/s.chains And Spares Corporation

M/s.Fosroc Chemicals (India) Pvt Ltd

Page 85: February Statement - 28.3.13

February (2)

Page 85

M/s.Schwing Stetter 2905 / 26.02.2013 1 23,562.00

M/s.Schwing Stetter 2905 / 26.02.2013 1 4,634.00

M/s.Schwing Stetter 2905 / 26.02.2013 8 42.00 101611.6

M/s. Asian Earthmovers 2906 / 26.02.2013 9 549.76 M/s. Asian Earthmovers 2906 / 26.02.2013 18 49.29 M/s. Asian Earthmovers 2906 / 26.02.2013 18 68.25 M/s. Asian Earthmovers 2906 / 26.02.2013 1 980.10 M/s. Asian Earthmovers 2906 / 26.02.2013 1 484.36 M/s. Asian Earthmovers 2906 / 26.02.2013 2 405.69 M/s. Asian Earthmovers 2906 / 26.02.2013 1 409.48 9771M/s. Asian Earthmovers 2907 / 26.02.2013 10 37.91M/s. Asian Earthmovers 2907 / 26.02.2013 10 19.91M/s. Asian Earthmovers 2907 / 26.02.2013 10 23.70M/s. Asian Earthmovers 2907 / 26.02.2013 10 29.38M/s. Asian Earthmovers 2907 / 26.02.2013 8 459.72M/s. Asian Earthmovers 2907 / 26.02.2013 2 127.96M/s. Asian Earthmovers 2907 / 26.02.2013 2 188.63 5432

M.S. Traders, 2908 / 26.02.2013 2 10879 22846

M/s. U K Enterprises 2909 / 26.02.2013 300 350.00

M/s. U K Enterprises 2909 / 26.02.2013 120 111.00

M/s. U K Enterprises 2909 / 26.02.2013 1 16,627.00 143274

M/s. Anand Enterprises 2911 / 26.02.13 4 4550 18727.8M/s.pace Enginering Service 2912 / 26.02.13 1 20343M/s.pace Enginering Service 2912 / 26.02.13 2 592 22711

M/s. Industrial Sales Corporation 2915 / 26.02.13 400 99.00

M/s. Industrial Sales Corporation 2915 / 26.02.13 320 56.50

M/s. Industrial Sales Corporation 2915 / 26.02.13 50 85.00

M/s. Industrial Sales Corporation 2915 / 26.02.13 30 14.50

M/s. Industrial Sales Corporation 2915 / 26.02.13 6 66.00

M/s. Industrial Sales Corporation 2915 / 26.02.13 100 154.00

M/s. Industrial Sales Corporation 2915 / 26.02.13 40 370.00 88495

Page 86: February Statement - 28.3.13

February (2)

Page 86

JPR Marketing 2916 / 26.02.13 2000 58.5 122850M/s. Bharat Tubes Corporation 2917 / 26.02.13 30 284.00

M/s. Bharat Tubes Corporation 2917 / 26.02.13 250 660.00M/s.Viswam Computer Service 2920 / 28.02.13 1 350M/s.Viswam Computer Service 2920 / 28.02.13 1 600 950M/s. Chains&Spares Coropration 2922 / 28.02.13 30 276 8694

M/s. Pioneer Machinery & Spares 2924 / 28.02.13 3 2565

M/s. Pioneer Machinery & Spares 2924 / 28.02.13 1 2094 11552

2927 / 28.02.13 1 6500 6825

M/s. Industrial Sales Corporation 2930 / 28.02.13 60 58 3654

M/s.APT Engineering Company 2931 / 28.02.13 1 11500 13168

M/s. Sidhpurwala Engineering company

Page 87: February Statement - 28.3.13

February (2)

Page 87

Mode of Transport D.C.NO. Invoice No

16.02.2013 Through Godwon 16.02.2013 194

16.02.2013 Through Godwon 16.02.2013 194

16.02.2013 Through Godwon 16.02.2013 194

16.02.2013 Through Godwon 16.02.2013 194

16.02.2013 Through Godwon 16.02.2013 194

16.02.2013 Through Godwon 16.02.2013 194

16.02.2013 Through Godwon 16.02.2013 194

01.02.2013 collected by uday 01.02.2013 31685

01.02.2013 collected by uday 01.02.2013 31685

01.02.2013 collected by uday 01.02.2013 601

01.02.2013 collected by uday 01.02.2013 601

02.02.2013 collected by uday 02.02.2013 356

02.02.2013 collected by uday 02.02.2013 356

02.02.2013 collected by uday 02.02.2013 356

02.02.2013 collected by uday 02.02.2013 356

02.02.2013 collected by uday 02.02.2013 356

02.02.2013 collected by uday 02.02.2013 35612023117012023117011120655

1139

99

1411

Date of Dispatch

L.R.No / Truck No

Page 88: February Statement - 28.3.13

February (2)

Page 88

1411

1411

1448

1448

1448129210310129210310129210310129210310

125312531253

18.02.2013 Through Godwon 18.02.2013 640318.02.2013 Through Godwon 18.02.2013 640318.02.2013 Through Godwon 18.02.2013 640318.02.2013 Through Godwon 18.02.2013 640318.02.2013 Through Godwon 18.02.2013 640318.02.2013 Through Godwon 18.02.2013 640318.02.2013 Through Godwon 18.02.2013 640318.02.2013 Through Godwon 18.02.2013 640318.02.2013 Through Godwon 18.02.2013 6403

1407

1407

1407

1407

1407

1407

1407

19.02.2013 Collected by uday 19.02.2013

19.02.2013 Collected by uday 19.02.2013

19.02.2013 Collected by uday 19.02.2013

4930 / 4931 / 4932 / 4933 / 4934 / 4935

4930 / 4931 / 4932 / 4933 / 4934 / 4935

4930 / 4931 / 4932 / 4933 / 4934 / 4935

Page 89: February Statement - 28.3.13

February (2)

Page 89

19.02.2013 Collected by uday 19.02.2013

19.02.2013 Collected by uday 19.02.2013

19.02.2013 Collected by uday 19.02.2013

19.02.2013 Collected by uday 19.02.2013

19.02.2013 Collected by uday 19.02.2013

19.02.2013 Collected by uday 19.02.2013

19.02.2013 Collected by uday 19.02.2013

19.02.2013 Collected by uday 19.02.2013

19.02.2013 Collected by uday 19.02.2013

19.02.2013 Collected by uday 19.02.2013

19.02.2013 Collected by uday 19.02.2013

19.02.2013 Collected by uday 19.02.2013

19.02.2013 Collected by uday 19.02.2013

19.02.2013 Collected by uday 19.02.2013

19.02.2013 Collected by uday 19.02.2013

19.02.2013 Collected by uday 19.02.2013

4930 / 4931 / 4932 / 4933 / 4934 / 4935

4930 / 4931 / 4932 / 4933 / 4934 / 4935

4930 / 4931 / 4932 / 4933 / 4934 / 4935

4930 / 4931 / 4932 / 4933 / 4934 / 4935

4930 / 4931 / 4932 / 4933 / 4934 / 4935

4930 / 4931 / 4932 / 4933 / 4934 / 4935

4930 / 4931 / 4932 / 4933 / 4934 / 4935

4930 / 4931 / 4932 / 4933 / 4934 / 4935

4930 / 4931 / 4932 / 4933 / 4934 / 4935

4930 / 4931 / 4932 / 4933 / 4934 / 4935

4930 / 4931 / 4932 / 4933 / 4934 / 4935

4930 / 4931 / 4932 / 4933 / 4934 / 4935

4930 / 4931 / 4932 / 4933 / 4934 / 4935

4930 / 4931 / 4932 / 4933 / 4934 / 4935

4930 / 4931 / 4932 / 4933 / 4934 / 4935

4930 / 4931 / 4932 / 4933 / 4934 / 4935

Page 90: February Statement - 28.3.13

February (2)

Page 90

19.02.2013 Collected by uday 19.02.2013

19.02.2013 Collected by uday 19.02.2013

19.02.2013 Collected by uday 19.02.2013

19.02.2013 Collected by uday 19.02.2013

19.02.2013 Collected by uday 19.02.2013

19.02.2013 Collected by uday 19.02.2013

19.02.2013 Collected by uday 19.02.2013

19.02.2013 Collected by uday 19.02.2013

19.02.2013 Collected by uday 19.02.2013

19.02.2013 Collected by uday 19.02.2013

19.02.2013 Collected by uday 19.02.2013

19.02.2013 Collected by uday 19.02.2013

19.02.2013 Collected by uday 19.02.2013

19.02.2013 Collected by uday 19.02.2013

19.02.2013 Collected by uday 19.02.2013

19.02.2013 Collected by uday 19.02.2013

4930 / 4931 / 4932 / 4933 / 4934 / 4935

4930 / 4931 / 4932 / 4933 / 4934 / 4935

4930 / 4931 / 4932 / 4933 / 4934 / 4935

4930 / 4931 / 4932 / 4933 / 4934 / 4935

4930 / 4931 / 4932 / 4933 / 4934 / 4935

4930 / 4931 / 4932 / 4933 / 4934 / 4935

4930 / 4931 / 4932 / 4933 / 4934 / 4935

4930 / 4931 / 4932 / 4933 / 4934 / 4935

4930 / 4931 / 4932 / 4933 / 4934 / 4935

4930 / 4931 / 4932 / 4933 / 4934 / 4935

4930 / 4931 / 4932 / 4933 / 4934 / 4935

4930 / 4931 / 4932 / 4933 / 4934 / 4935

4930 / 4931 / 4932 / 4933 / 4934 / 4935

4930 / 4931 / 4932 / 4933 / 4934 / 4935

4930 / 4931 / 4932 / 4933 / 4934 / 4935

4930 / 4931 / 4932 / 4933 / 4934 / 4935

Page 91: February Statement - 28.3.13

February (2)

Page 91

19.02.2013 Collected by uday 19.02.2013

19.02.2013 Collected by uday 19.02.2013

19.02.2013 Collected by uday 19.02.2013

19.02.2013 Collected by uday 19.02.2013

19.02.2013 Collected by uday 19.02.2013

19.02.2013 Collected by uday 19.02.2013

19.02.2013 Collected by uday 19.02.2013

19.02.2013 Collected by uday 19.02.2013

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

4930 / 4931 / 4932 / 4933 / 4934 / 4935

4930 / 4931 / 4932 / 4933 / 4934 / 4935

4930 / 4931 / 4932 / 4933 / 4934 / 4935

4930 / 4931 / 4932 / 4933 / 4934 / 4935

4930 / 4931 / 4932 / 4933 / 4934 / 4935

4930 / 4931 / 4932 / 4933 / 4934 / 4935

4930 / 4931 / 4932 / 4933 / 4934 / 4935

4930 / 4931 / 4932 / 4933 / 4934 / 4935

Page 92: February Statement - 28.3.13

February (2)

Page 92

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

Page 93: February Statement - 28.3.13

February (2)

Page 93

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

Page 94: February Statement - 28.3.13

February (2)

Page 94

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132

20.03.2013 Collected by uday 20.03.2013 96 / 132 02.02.2013 Collected by uday 02.02.2013 61102.02.2013 Collected by uday 02.02.2013 61102.02.2013 Collected by uday 02.02.2013 61102.02.2013 Collected by uday 02.02.2013 611

87117928 / 87118011

87117928 / 87118011

87117928 / 87118011

87117928 / 87118011

87117928 / 87118011

87117928 / 87118011

87117928 / 87118011

87117928 / 87118011

87117928 / 87118011

Page 95: February Statement - 28.3.13

February (2)

Page 95

05.02.2013 Collected by uday 05.02.2013 507305.02.2013 Collected by uday 05.02.2013 5073

05.02.2013 Collected by uday 05.02.2013 5073

05.02.2013 Collected by uday 05.02.2013 5073

05.02.2013 Collected by uday 05.02.2013 5073

05.02.2013 Collected by uday 05.02.2013 5073

05.02.2013 Collected by uday 05.02.2013 5073

22.02.2013 Thrugh godwon 22.02.2013

22.02.2013 Thrugh godwon 22.02.2013

18.02.2013 Thrugh godwon 18.02.2013 5112

87117928 / 87118011

87117928 / 87118011

87117928 / 87118011

87117928 / 87118011

87117928 / 87118011

87117928 / 87118011

87117928 / 87118011

87117928 / 87118011

87117928 / 87118011

4519015685 / 4519015691 /

4519015685 / 4519015691 /

87117931 / 87117930

Page 96: February Statement - 28.3.13

February (2)

Page 96

1750051155

1750051155

4610

1064

1064

1064

110413

8777

8777

8777

871179325072220220

220

220

2822

1576

1576

1576

1576

87117931 / 87117930

87117931 / 87117930

87117927 / 87118010

Page 97: February Statement - 28.3.13

February (2)

Page 97

1576

1576

1576

1576

191

19112521252

12521178117850745074

2070040577

20.03.2013 Collected By uday 20.03.2013 248

20.03.2013 Collected By uday 20.03.2013 24820.03.2013 Collected By uday 20.03.2013 24820.03.2013 Collected By uday 20.03.2013 24820.03.2013 Collected By uday 20.03.2013 24820.03.2013 Collected By uday 20.03.2013 24820.03.2013 Collected By uday 20.03.2013 24820.03.2013 Collected By uday 20.03.2013 24820.03.2013 Collected By uday 20.03.2013 24820.03.2013 Collected By uday 20.03.2013 24820.03.2013 Collected By uday 20.03.2013 24820.03.2013 Collected By uday 20.03.2013 24820.03.2013 Collected By uday 20.03.2013 24820.03.2013 Collected By uday 20.03.2013 24920.03.2013 Collected By uday 20.03.2013 24920.03.2013 Collected By uday 20.03.2013 24920.03.2013 Collected By uday 20.03.2013 24920.03.2013 Collected By uday 20.03.2013 24920.03.2013 Collected By uday 20.03.2013 24920.03.2013 Collected By uday 20.03.2013 24920.03.2013 Collected By uday 20.03.2013 24920.03.2013 Collected By uday 20.03.2013 249

Page 98: February Statement - 28.3.13

February (2)

Page 98

20.03.2013 Collected By uday 20.03.2013 24920.03.2013 Collected By uday 20.03.2013 24920.03.2013 Collected By uday 20.03.2013 24920.03.2013 Collected By uday 20.03.2013 24920.03.2013 Collected By uday 20.03.2013 24920.03.2013 Collected By uday 20.03.2013 24920.03.2013 Collected By uday 20.03.2013 24920.03.2013 Collected By uday 20.03.2013 24920.03.2013 Collected By uday 20.03.2013 24920.03.2013 Collected By uday 20.03.2013 24915.02.2013 Collected by Paul 15.02.2013 22115.02.2013 Collected by Paul 15.02.2013 221

15.02.2013 Collected by Paul 15.02.2013 221

15.02.2013 Collected by Paul 15.02.2013 221

15.02.2013 Collected by Paul 15.02.2013 221

15.02.2013 Collected by Paul 15.02.2013 221

15.02.2013 Collected by Paul 15.02.2013 221

15.02.2013 Collected by Paul 15.02.2013 221

15.02.2013 Collected by Paul 15.02.2013 221

15.02.2013 Collected by Paul 15.02.2013 221

15.02.2013 Collected by Paul 15.02.2013 221

15.02.2013 Collected by Paul 15.02.2013 22106.02.2013 Thrugh godwon 06.02.2013 19206.02.2013 Thrugh godwon 06.02.2013 192

09.02.2013 recived by jagdish 09.02.2013 196

11.02.2013 Thrugh godwon 11.02.2013 786

11.02.2013 Thrugh godwon 11.02.2013 786

11.02.2013 Thrugh godwon 11.02.2013 786

11.02.2013 Thrugh godwon 11.02.2013 786

11.02.2013 Thrugh godwon 11.02.2013 786

Page 99: February Statement - 28.3.13

February (2)

Page 99

11.02.2013 Thrugh godwon 11.02.2013 786

11.02.2013 Thrugh godwon 11.02.2013 786

11.02.2013 Thrugh godwon 11.02.2013 786

11.02.2013 Thrugh godwon 11.02.2013 786

11.02.2013 Thrugh godwon 11.02.2013 786

05.02.13 Collected by gopal das 05.02.13 85151758

05.02.13 Collected by gopal das 05.02.13 85151758

05.02.13 Collected by gopal das 05.02.13 85151758

05.02.13 Collected by gopal das 05.02.13 85151758

05.02.13 Collected by gopal das 05.02.13 85151758

05.02.13 Collected by gopal das 05.02.13 85151758

05.02.13 Collected by gopal das 05.02.13 8515175806.02.2013 Collected by uday 06.02.2013 624

87808780

11401076

1076

1076

1076

1076

1076

120231181 / 120231328

120231181 / 120231328

120231181 / 120231328

Page 100: February Statement - 28.3.13

February (2)

Page 100

1076

07.02.2013 Collected by das 07.02.2013 11041423.02.2013 recived by yougendar 23.02.2013 2673423.02.2013 recived by yougendar 23.02.2013 2673423.02.2013 recived by yougendar 23.02.2013 2673423.02.2013 recived by yougendar 23.02.2013 2673423.02.2013 recived by yougendar 23.02.2013 2673423.02.2013 recived by yougendar 23.02.2013 2673423.02.2013 recived by yougendar 23.02.2013 2673423.02.2013 recived by yougendar 23.02.2013 2673423.02.2013 recived by yougendar 23.02.2013 2673423.02.2013 recived by yougendar 23.02.2013 2673423.02.2013 recived by yougendar 23.02.2013 2673423.02.2013 recived by yougendar 23.02.2013 2673423.02.2013 recived by yougendar 23.02.2013 2673423.02.2013 recived by yougendar 23.02.2013 2673423.02.2013 recived by yougendar 23.02.2013 2673423.02.2013 recived by yougendar 23.02.2013 2673423.02.2013 recived by yougendar 23.02.2013 2673423.02.2013 recived by yougendar 23.02.2013 2673412.02.2013 recived by panni 12.02.2013 1412

12.02.2013 recived by panni 12.02.2013 1412

158158158

09.02.2013 recived by jagdish 09.02.2013 370

310

310

50

2070040209

09.02.2013 recived by uday 09.02.2013 36909.02.2013 recived by uday 09.02.2013 36909.02.2013 recived by uday 09.02.2013 36909.02.2013 recived by uday 09.02.2013 369

Page 101: February Statement - 28.3.13

February (2)

Page 101

09.02.2013 recived by uday 09.02.2013 36909.02.2013 recived by uday 09.02.2013 36920.02.2013 recived by shekawat 20.02.2013 46709.02.2013 recived by uday 09.02.2013 780

09.02.2013 recived by uday 09.02.2013 780

09.02.2013 recived by uday 09.02.2013 780

09.02.2013 recived by uday 09.02.2013 780

09.02.2013 recived by uday 09.02.2013 780

11.02.2013 recived by ramesh 11.02.2013 627

11.02.2013 recived by ramesh 11.02.2013 62711.02.2013 recived by ramesh 11.02.2013 62711.02.2013 recived by ramesh 11.02.2013 62711.02.2013 recived by ramesh 11.02.2013 62711.02.2013 recived by ramesh 11.02.2013 627

11.02.2013 recived by saithya 11.02.2013 1141

9/2/2013 VRL 620691395 231 / 232

9/2/2013 VRL 620691395 231 / 232

9/2/2013 VRL 620691395 231 / 232

9/2/2013 VRL 620691395 231 / 232

9/2/2013 VRL 620691395 231 / 232

9/2/2013 VRL 620691395 231 / 232

9/2/2013 VRL 620691395 231 / 232

9/2/2013 VRL 620691395 231 / 232

9/2/2013 VRL 620691395 231 / 232

9/2/2013 VRL 620691395 231 / 232

Page 102: February Statement - 28.3.13

February (2)

Page 102

9/2/2013 VRL 620691395 231 / 232

9/2/2013 VRL 620691395 231 / 232

9/2/2013 VRL 620691395 231 / 232

9/2/2013 VRL 620691395 231 / 232

9/2/2013 VRL 620691395 231 / 232

9/2/2013 VRL 620691395 231 / 232

9/2/2013 VRL 620691395 231 / 232

9/2/2013 VRL 620691395 231 / 232

22.02.2013 recived by shekhwat 22.02.2013 771409.02.2013 Diwakar Cargo 12313 118809.02.2013 Diwakar Cargo 12313 1188

09.02.2013 Diwakar Cargo 12313 1188

09.02.2013 Collected By uday 09.02.2013 90310545226

14.02.2013 srs travels 6559575 635

14.02.2013 Collected by sanjay 14.02.2013 108

14.02.2013 Collected by sanjay 14.02.2013 108

Cancellation order-2921

14.02.2013 ,diwakar transport , LR 12616 110583

15.02.2013 Bellary hyd Roadways l.R. 21171 110599

19.02.2013 recived BY HRO IT 36581 / 36675

19.02.2013 recived BY HRO IT 36581 / 36675

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

Cancellation order-2921

Cancellation order-2921

Cancellation order-2921

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

Page 103: February Statement - 28.3.13

February (2)

Page 103

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

Page 104: February Statement - 28.3.13

February (2)

Page 104

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

15.2.13 Gatti travels)

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

L.R. 179693442

2012024563 / 2012024564

Page 105: February Statement - 28.3.13

February (2)

Page 105

14.02.2013 Collected By KTR 14.02.2013 110585 / 110584

14.02.2013 Collected By KTR 14.02.2013 110585 / 110584

14.02.2013 Cancelled order 14.02.2013

02.03.2013 Collected by balkrishna 02.03.2013 1422

18.02.2013 VRL 2834

18.02.2013 VRL 2834

18.02.2013 VRL 2834Collected by KTR 164

4636300 5106

16.02.2013 239

16.02.2013 239

14.02.2013 31828

14.02.2013 3182814.02.2013 3182814.02.2013 31828

14.02.2013 31828

14.02.2013 31828

14.02.2013 31828

14.02.2013 3182814.02.2013 3182821.02.2013 Collected by Uday 21.02.2013 723

21.02.2013 Collected by Uday 21.02.2013 723

21.02.2013 Collected by Uday 21.02.2013 723

21.02.2013 Collected by Uday 21.02.2013 723

21.02.2013 Collected by Uday 21.02.2013 723

Cancellation order-2863

L.R.-227362689L.R.-227362689L.R.-227362689

Collected by Site person(Shekhawat)

Page 106: February Statement - 28.3.13

February (2)

Page 106

21.02.2013 Collected by Uday 21.02.2013 723

21.02.2013 Collected by Uday 21.02.2013 723

21.02.2013 Collected by Uday 21.02.2013 723

21.02.2013 Collected by Uday 21.02.2013 723

21.02.2013 Collected by Uday 21.02.2013 723

21.02.2013 Collected by Uday 21.02.2013 723

21.02.2013 Collected by Uday 21.02.2013 723

21.02.2013 Collected by Uday 21.02.2013 723

21.02.2013 Collected by Uday 21.02.2013 723

21.02.2013 Collected by Uday 21.02.2013 723

21.02.2013 Collected by Uday 21.02.2013 723

21.02.2013 Collected by Uday 21.02.2013 723

21.02.2013 Collected by Uday 21.02.2013 723

21.02.2013 Collected by Uday 21.02.2013 723

21.02.2013 Collected by Uday 21.02.2013 723

21.02.2013 Collected by Uday 21.02.2013 723

21.02.2013 Collected by Uday 21.02.2013 723

21.02.2013 Collected by Uday 21.02.2013 723

21.02.2013 Collected by Uday 21.02.2013 723

21.02.2013 Collected by Uday 21.02.2013 723

21.02.2013 Collected by Uday 21.02.2013 723

21.02.2013 Collected by Uday 21.02.2013 723

21.02.2013 Collected by Uday 21.02.2013 723

21.02.2013 Collected by Uday 21.02.2013 723

21.02.2013 Collected by Uday 21.02.2013 723

Page 107: February Statement - 28.3.13

February (2)

Page 107

21.02.2013 Collected by Uday 21.02.2013 723

21.02.2013 Collected by Uday 21.02.2013 723

21.02.2013 Collected by Uday 21.02.2013 723

21.02.2013 Collected by Uday 21.02.2013 723

21.02.2013 Collected by Uday 21.02.2013 723

25.02.2013 Collected by Uday 25.02.2013 6888

13.02.2013 Recived by Site 13.02.2013 159022.02.2013 Recived by Site 22.02.2013 472

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

Page 108: February Statement - 28.3.13

February (2)

Page 108

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

Page 109: February Statement - 28.3.13

February (2)

Page 109

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

Page 110: February Statement - 28.3.13

February (2)

Page 110

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

Page 111: February Statement - 28.3.13

February (2)

Page 111

613 / 630 /

4654 / 4645

19.02.2013 diwakar transport lR-12685 7503

15.02.2013 Professinol Couriers 87118009

15.02.2013 Professinol Couriers 87118009

14.02.2013 DTDC Transport 137

14.02.2013 DTDC Transport 137

14.02.2013 DTDC Transport 137

14.02.2013 DTDC Transport 137

13-02-13 Keseneni -Travels 13000699 1144

13.02.2013 Diwakar LR-13000699 1143

13.02.2013 Vrl Logistic 504771511 85151904

13.02.2013 Vrl Logistic 504771511 85151904

13.02.2013 Vrl Logistic 504771511 85151904

13.02.2013 Vrl Logistic 504771511 85151904

13.02.2013 Vrl Logistic 504771511 85151904

14.02.2013 By-ARK Travel B834766 634

14.02.2013 By-ARK Travel B834766 63414.02.2013 kessineni trav 13000727, 114514.02.2013 sharma trans port ,, SBC4278513 1100

8515194712000001039

recived by Site-Sanjay 12000001039

18.02.2013 VRL Transport 227362688 2833

LR. BPY 31152185

LR. BPY 31152185,Doket no.00287462,Doket no.00287462,Doket no.00287462,Doket no.00287462

Page 112: February Statement - 28.3.13

February (2)

Page 112

18.02.2013 VRL Transport 227362688 283318.02.2013 VRL Transport 227362688 283318.02.2013 VRL Transport 227362688 283318.02.2013 VRL Transport 227362688 283314.02.2013 Collected by site ,Dipu 51

14.02.2013 Collected by site ,Dipu 51

14.02.2013 Collected by site ,Dipu 51

14.02.2013 Collected by site ,Dipu 51

14.02.2013 Collected by site ,Dipu 51

14.02.2013 Collected by site ,Dipu 51

14.02.2013 Collected by site ,Dipu 51

14.02.2013 Collected by site ,Dipu 51

14.02.2013 Collected by site ,Dipu 51

14.02.2013 Collected by site ,Dipu 807

14.02.2013 Collected by site ,Dipu 807

14.02.2013 Collected by site ,Dipu 807

14.02.2013 Collected by site ,Dipu 807

14.02.2013 Collected by site ,Dipu 807

14.02.2013 Collected by site ,Dipu 807

14.02.2013 Collected by site ,Dipu 80714.02.2013 Collected by site ,Dipu 80714.02.2013 Collected by site ,Dipu 807

14.02.2013 Collected by site ,Dipu 807

01.02.2013 recived by N.K.Paul 2070040578

01.02.2013 recived by N.K.Paul 2070040578

1830040379

1830040379

recived by site( yougendar)

recived by site( yougendar)

Page 113: February Statement - 28.3.13

February (2)

Page 113

19.02.2013 VRL Logistic Do-620708577 139 / 146 / 150

19.02.2013 VRL Logistic Do-620708577 139 / 146 / 150

19.02.2013 VRL Logistic Do-620708577 139 / 146 / 150

19.02.2013 VRL Logistic Do-620708577 139 / 146 / 150

19.02.2013 VRL Logistic Do-620708577 139 / 146 / 150

19.02.2013 VRL Logistic Do-620708577 139 / 146 / 150

19.02.2013 VRL Logistic Do-620708577 139 / 146 / 150

19.02.2013 VRL Logistic Do-620708577 139 / 146 / 150

19.02.2013 VRL Logistic Do-620708577 139 / 146 / 150

19.02.2013 VRL Logistic Do-620708577 139 / 146 / 150

19.02.2013 VRL Logistic Do-620708577 139 / 146 / 150

19.02.2013 VRL Logistic Do-620708577 139 / 146 / 150

19.02.2013 VRL Logistic Do-620708577 139 / 146 / 150

19.02.2013 VRL Logistic Do-620708577 139 / 146 / 150

19.02.2013 VRL Logistic Do-620708577 139 / 146 / 150

19.02.2013 VRL Logistic Do-620708577 139 / 146 / 150

Page 114: February Statement - 28.3.13

February (2)

Page 114

19.02.2013 VRL Logistic Do-620708577 139 / 146 / 150

19.02.2013 VRL Logistic Do-620708577 139 / 146 / 150

19.02.2013 VRL Logistic Do-620708577 139 / 146 / 150

19.02.2013 VRL Logistic Do-620708577 139 / 146 / 150

19.02.2013 VRL Logistic Do-620708577 139 / 146 / 150

19.02.2013 VRL Logistic Do-620708577 139 / 146 / 150

19.02.2013 VRL Logistic Do-620708577 139 / 146 / 150

19.02.2013 VRL Logistic Do-620708577 139 / 146 / 150

19.02.2013 VRL Logistic Do-620708577 139 / 146 / 150

19.02.2013 VRL Logistic Do-620708577 139 / 146 / 150

19.02.2013 VRL Logistic Do-620708577 139 / 146 / 150

19.02.2013 VRL Logistic Do-620708577 139 / 146 / 150

19.02.2013 VRL Logistic Do-620708577 139 / 146 / 150

19.02.2013 VRL Logistic Do-620708577 139 / 146 / 150

19.02.2013 VRL Logistic Do-620708577 139 / 146 / 150

19.02.2013 VRL Logistic Do-620708577 139 / 146 / 150

Page 115: February Statement - 28.3.13

February (2)

Page 115

19.02.2013 VRL Logistic Do-620708577 139 / 146 / 150

19.02.2013 VRL Logistic Do-620708577 139 / 146 / 150

19.02.2013 VRL Logistic Do-620708577 139 / 146 / 150

19.02.2013 VRL Logistic Do-620708577 139 / 146 / 150

19.02.2013 VRL Logistic Do-620708577 139 / 146 / 150

19.02.2013 VRL Logistic Do-620708577 139 / 146 / 150

19.02.2013 VRL Logistic Do-620708577 139 / 146 / 150

15.02.2013 31830

15.02.2013 31830

15.02.2013 31830

15.02.2013 31830

15.02.2013 31830

15.02.2013 Bellary Hyd roadways 110596

kesineni travell NJPT 13000842 3169

Cancellation order-2770A

14.02.2013 recived by site (dipu) 1962 / 1964

14.02.2013 recived by site (dipu) 1962 / 1964

14.02.2013 recived by site (dipu) 1962 / 1964

14.02.2013 recived by site (dipu) 1962 / 1964

14.02.2013 recived by site (dipu) 1962 / 1964

14.02.2013 recived by site (dipu) 1962 / 196423.02.2013 recived by site(niraj) 243

recived by site (omprakash)

recived by site (omprakash)

recived by site (omprakash)

recived by site (omprakash)

recived by site (omprakash)

LR. Number 21171

Cancellation order-2770A

Cancellation order-2770A

Cancellation order-2770A

Page 116: February Statement - 28.3.13

February (2)

Page 116

recived by site(Balkrishna) 1348

16.02.2013 Collected by KTR 37316.02.2013 Collected by KTR 373

19.02.2013 Collected by KTR 379

16.02.2013 Collected by KTR 37416.02.2013 Collected by KTR 37416.02.2013 Collected by KTR 37416.02.2013 Collected by KTR 37416.02.2013 Collected by KTR 374

37413.02.2013 Diwakar Transport, L R-12809 1142

165176

16.02.2013 manjunath Road lines LR-37320 1505

16.02.2013 manjunath Road lines LR-37320 1505

16.02.2013 manjunath Road lines LR-37320 1505

16.02.2013 manjunath Road lines LR-37320 1505

16.02.2013 Indra Travels LR-15044 1506

16.02.2013 Indra Travels LR-15044 1506

16.02.2013 Indra Travels LR-15044 150612785110511051105110823

12791279127912791279

161616

Page 117: February Statement - 28.3.13

February (2)

Page 117

1616

2845

1482

31872

31872

3187231872

Chandra Road Line Bill 11120682 Ka-23a-5194 1112068287118160

87118160

871181601980

19801980

5111511151115111144914495116511651155115

824

143 / 145

143 / 145

Page 118: February Statement - 28.3.13

February (2)

Page 118

143 / 145

143 / 145

143 / 145

143 / 145 85152048

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

Page 119: February Statement - 28.3.13

February (2)

Page 119

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

Page 120: February Statement - 28.3.13

February (2)

Page 120

19.02.2013 Collected by uday 19.02.2013 52

19.02.2013 Collected by uday 19.02.2013 52

61922.02.2013 Through KTR 3041 8805

18.02.2013 Diwakar transport L.R. 12107- 31885

18.02.2013 Diwakar transport L.R. 12107- 31885

18.02.2013 Diwakar transport L.R. 12107- 31885

18.02.2013 Diwakar transport L.R. 12107- 31885

18.02.2013 Collected by site person 464

19.02.2013 Collected By uday(KTR) 378

19.02.2013 Collected By uday(KTR) 378

19.02.2013 Collected By uday(KTR) 378

19.02.2013 Collected By uday(KTR) 378

19.02.2013 Collected By uday(KTR) 378

19.02.2013 Collected By uday(KTR) 378

21.02.2013 Collected by site 1487

21.02.2013 Collected by ktr 5127 / 5155

21.02.2013 Collected by ktr 5127 / 5155 21.02.2013 Collected by ktr 16521.02.2013 Collected by ktr 16521.02.2013 Collected by ktr 16521.02.2013 Collected by ktr 2835

21.02.2013 Collected by ktr 2835

21.02.2013 Collected by ktr 2835

21.02.2013 Collected by ktr 2835

Page 121: February Statement - 28.3.13

February (2)

Page 121

21.02.2013 Collected by site person 124621.02.2013 VRL Logistic VT89010714 87118050

21.02.2013 Collected by ktr 202

21.02.2013 Collected by ktr 202

21.02.2013 Collected by ktr 202

21.02.2013 Collected by ktr 202

21.02.2013 Collected by ktr 20221.02.2013 Collected by ktr 202

21.02.2013 Collected by ktr 202

21.02.2013 Collected by ktr 202

Recived by HRO (IT) 240Recived by HRO (IT) 240

21.02.2013 Recived by Site (N K Paul) 3179

21.02.2013 Recived by Site (N K Paul) 3179

21.02.2013 recived by site person 1490 / 1492

21.02.2013 Collected By Site 843 / 882

21.02.2013 Collected By Site 843 / 882

21.02.2013 Collected By Site 843 / 882

21.02.2013 Collected By Site 383

21.02.2013 Collected By Site 383

21.02.2013 Collected By Site 383

…22.02.2013 Through KTR DC - 3042 382

…22.02.2013 Through KTR DC - 3042 382

cancellation order-3000

Page 122: February Statement - 28.3.13

February (2)

Page 122

22.03.2013 Collected by site 82222.03.2013 Collected by site 822

859

recived by site 2001 / 2002

22.03.2013 recived by site 2001 / 2002

22.03.2013 recived by site 2001 / 2002

22.03.2013 recived by site 2001 / 2002

22.03.2013 recived by site 2001 / 2002

22.03.2013 recived by site 2001 / 2002

22.03.2013 recived by site 2001 / 2002

22.03.2013 recived by site 2001 / 2002

22.03.2013 recived by site 2001 / 2002

22.03.2013 recived by site 2001 / 2002

22.03.2013 recived by site 2001 / 2002

22.03.2013 recived by site 2001 / 2002

22.03.2013 recived by site 2001 / 2002

22.03.2013 recived by site 2001 / 2002

22.03.2013 recived by site 2001 / 2002

22.03.2013 recived by site 2001 / 2002

23.03.2013 collected by ktr 2005

23.03.2013 collected by ktr 2005

22.02.2013 recived by site 114621.02.2013 469

175005115422.02.2013 Diwakar 3865 114821.02.2013 Diwakar 41135 31909

Dispatched by party vechicle

Page 123: February Statement - 28.3.13

February (2)

Page 123

21.02.2013 Diwakar 41135 3190922.03.2013 Diwakar 3865 1147

28.2.13 Collected by uday 28.2.13 235 / 236 / 237

28.2.13 Collected by uday 28.2.13 235 / 236 / 237

28.2.13 Collected by uday 28.2.13 235 / 236 / 237

28.2.13 Collected by uday 28.2.13 235 / 236 / 237

28.2.13 Collected by uday 28.2.13 235 / 236 / 237

28.2.13 Collected by uday 28.2.13 235 / 236 / 237

28.2.13 Collected by uday 28.2.13 235 / 236 / 237

28.2.13 Collected by uday 28.2.13 235 / 236 / 237

28.2.13 Collected by uday 28.2.13 235 / 236 / 237

28.2.13 Collected by uday 28.2.13 235 / 236 / 237

28.2.13 Collected by uday 28.2.13 235 / 236 / 237

28.2.13 Collected by uday 28.2.13 235 / 236 / 237

28.2.13 Collected by uday 28.2.13 235 / 236 / 237

28.2.13 Collected by uday 28.2.13 235 / 236 / 237

28.2.13 Collected by uday 28.2.13 235 / 236 / 237

28.2.13 Collected by uday 28.2.13 235 / 236 / 237

Page 124: February Statement - 28.3.13

February (2)

Page 124

28.2.13 Collected by uday 28.2.13 235 / 236 / 237

28.2.13 Collected by uday 28.2.13 235 / 236 / 237

28.2.13 Collected by uday 28.2.13 235 / 236 / 237

28.2.13 Collected by uday 28.2.13 235 / 236 / 237

28.2.13 Collected by uday 28.2.13 235 / 236 / 237

28.2.13 Collected by uday 28.2.13 235 / 236 / 237

28.2.13 Collected by uday 28.2.13 235 / 236 / 237

28.2.13 Collected by uday 28.2.13 235 / 236 / 237

28.2.13 Collected by uday 28.2.13 235 / 236 / 237

28.2.13 Collected by uday 28.2.13 235 / 236 / 237

28.2.13 Collected by uday 28.2.13 235 / 236 / 237

28.2.13 Collected by uday 28.2.13 235 / 236 / 237

28.2.13 Collected by uday 28.2.13 235 / 236 / 237

28.2.13 Collected by uday 28.2.13 235 / 236 / 237

28.2.13 Collected by uday 28.2.13 235 / 236 / 237

28.2.13 Collected by uday 28.2.13 235 / 236 / 237

Page 125: February Statement - 28.3.13

February (2)

Page 125

28.2.13 Collected by uday 28.2.13 235 / 236 / 237

28.2.13 Collected by uday 28.2.13 235 / 236 / 237

28.02.2013 Through KTR DC-3050 5130

23.02.2013 collected by uday 23.02.2013 386

23.02.2013 collected by uday 23.02.2013 386

23.02.2013 collected by uday 23.02.2013 386

23.02.2013 collected by uday 23.02.2013 386

23.02.2013 collected by uday 23.02.2013 386

Page 126: February Statement - 28.3.13

February (2)

Page 126

23.02.2013 collected by uday 23.02.2013 386

23.02.2013 collected by uday 23.02.2013 386

54

5455075507310

26.02.2013 Through KTR DC-3052 210

26.02.2013 Through KTR DC-3052 210

26.02.2013 Through KTR DC-3052 210

26.02.2013 Through KTR DC-3052 210

26.02.2013 Through KTR DC-3052 210

26.02.2013 Through KTR DC-3052 210

26.02.2013 Through KTR DC-3052 21026.02.2013 Through KTR DC-3052 21026.02.2013 Through KTR DC-3052 21026.02.2013 Through KTR DC-3052 210

7376473

23.02.2013 Jaypee Daily Parcel L.R.-47718 513123.02.2013 Jaypee Daily Parcel 513122.02.2013 Diwakar Transport, 3900 1255

53

53

Diwakar LR-4414 31928

Diwakar LR-4414 31928

1468146814681468146814681468

recived by IT HRO,Mr.umakant

Page 127: February Statement - 28.3.13

February (2)

Page 127

1468146880751308

26.02.2013 Through KTR 3051- 515313101310

27.02.2013 Professinol Couriers 87118103

7570

806413071307130713041304

110798

87021791

87021791870217918702179187021791

Professonal Corurier 1507

cancellation order-2996

Professonal Corurier

Professonal Corurier

Professonal Corurier

BLR4150047129

BLR4150047149

cancellation order-2996

cancellation order-2996

cancellation order-2996

BLR4150047149

87118115 / 87118158

BLR4150047149

87118115 / 87118158

BLR4150047149

87118115 / 87118158

Page 128: February Statement - 28.3.13

February (2)

Page 128

Professonal Corurier

Professonal Corurier

Professonal Corurier

Collected by Om Prakash 120231329Collected by Om Prakash 120231329Collected by Om Prakash 120231329Collected by Om Prakash 120231329Collected by Om Prakash 120231329Collected by Om Prakash 120231329Collected by Om Prakash 120231329

2842

211 / 212

211 / 212

211 / 212

160714741474

391 / 401

391 / 401

391 / 401

391 / 401

391 / 401

391 / 401

391 / 401

BLR4150047149

87118115 / 87118158

BLR4150047149

87118115 / 87118158

BLR4150047149

87118115 / 87118158

Collected by site ,MrShukla

Page 129: February Statement - 28.3.13

February (2)

Page 129

1316,06.03.2013 ,AP29T-6567 , ,L.R.4798 7138

,06.03.2013 ,AP29T-6567 , ,L.R.4798 7138401401

01.03.2013 Diwakar Transport L.R.4392 7608

1/3/13 911/10525 659

1/3/13 911/10525 659

55

Collected by kTR ,Uday 399

06.03.2013 Through KTR,AP26U/8444, DC/3078 1302

SRE Travel

SRE Travel

Page 130: February Statement - 28.3.13

February (2)

Page 130

Invoice Date MRP No Remarks

16.02.2013 32,120 1732 / 19.02.13 GMR

16.02.2013 32,120 1732 / 19.02.13 GMR

16.02.2013 32,120 1732 / 19.02.13 GMR

16.02.2013 32,120 1732 / 19.02.13 GMR

16.02.2013 32,120 1732 / 19.02.13 GMR

16.02.2013 32,120 1732 / 19.02.13 GMR

16.02.2013 32,120 1732 / 19.02.13 GMR

01.02.2013 20,958 1436/06.02.13 KTR

01.02.2013 20,958 1436/06.02.13 KTR

01.02.2013 2,247 1431/01.02.13 KTR

01.02.2013 2,247 1431/01.02.13 KTR

02.02.2013 42724 1431/ 01.02.13 KTR

02.02.2013 42724 1431/ 01.02.13 KTR

02.02.2013 42724 1431/ 01.02.13 KTR

02.02.2013 42724 1431/ 01.02.13 KTR

02.02.2013 42724 1431/ 01.02.13 KTR

02.02.2013 42724 1431/ 01.02.13 KTR05.02.13 1528 1592 / 11.02.13 JSWSL05.02.13 1528 1592 / 11.02.13 JSWSL04.02.13 458,000 1052 / 07.02.13 Dalmia

04.02.2013 5,500 401 / 11.02.2013 Alliance

05.02.2013 31065 1723 / 13.02.2013 GMR

12.02.2013 901 1707 / 01.02.13 GMR

Invoice Amount

Name of the Site

Page 131: February Statement - 28.3.13

February (2)

Page 131

12.02.2013 901 1707 / 01.02.13 GMR

12.02.2013 901 1707 / 01.02.13 GMR

02.02.2013 2,774 1742 / 25.02.13 GMR

02.02.2013 2,774 1742 / 25.02.13 GMR

02.02.2013 2,774 1742 / 25.02.13 GMR28.02.2013 10,620 440 / 02.03.2013 Alliance28.02.2013 10,620 440 / 02.03.2013 Alliance28.02.2013 10,620 440 / 02.03.2013 Alliance28.02.2013 10,620 440 / 02.03.2013 Alliance07.02.2013 212,359 2832 / 13.02.2013 OMPL07.02.2013 212,359 2832 / 13.02.2013 OMPL07.02.2013 212,359 2832 / 13.02.2013 OMPL18.02.2013 4,405 1449 / 19.02.2013 KTR18.02.2013 4,405 1449 / 19.02.2013 KTR18.02.2013 4,405 1449 / 19.02.2013 KTR18.02.2013 4,405 1449 / 19.02.2013 KTR18.02.2013 4,405 1449 / 19.02.2013 KTR18.02.2013 4,405 1449 / 19.02.2013 KTR18.02.2013 4,405 1449 / 19.02.2013 KTR18.02.2013 4,405 1449 / 19.02.2013 KTR18.02.2013 4,405 1449 / 19.02.2013 KTR12.02.2013 78,994 57 / 13.02.2013 Sathavana

12.02.2013 78,994 57 / 13.02.2013 Sathavana

12.02.2013 78,994 57 / 13.02.2013 Sathavana

12.02.2013 78,994 57 / 13.02.2013 Sathavana

12.02.2013 78,994 57 / 13.02.2013 Sathavana

12.02.2013 78,994 57 / 13.02.2013 Sathavana

12.02.2013 78,994 57 / 13.02.2013 Sathavana

109,719 KTR

109,719 KTR

109,719 KTR

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

Page 132: February Statement - 28.3.13

February (2)

Page 132

109,719 KTR

109,719 KTR

109,719 KTR

109,719 KTR

109,719 KTR

109,719 KTR

109,719 KTR

109,719 KTR

109,719 KTR

109,719 KTR

109,719 KTR

109,719 KTR

109,719 KTR

109,719 KTR

109,719 KTR

109,719 KTR

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

Page 133: February Statement - 28.3.13

February (2)

Page 133

109,719 KTR

109,719 KTR

109,719 KTR

109,719 KTR

109,719 KTR

109,719 KTR

109,719 KTR

109,719 KTR

109,719 KTR

109,719 KTR

109,719 KTR

109,719 KTR

109,719 KTR

109,719 KTR

109,719 KTR

109,719 KTR

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

Page 134: February Statement - 28.3.13

February (2)

Page 134

109,719 KTR

109,719 KTR

109,719 KTR

109,719 KTR

109,719 KTR

109,719 KTR

109,719 KTR

109,719 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

19.02.2013 / 19.02.2013 / 19.02.2013

1449,1450,1451, 1452,1453 / 19.02.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

Page 135: February Statement - 28.3.13

February (2)

Page 135

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

Page 136: February Statement - 28.3.13

February (2)

Page 136

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

Page 137: February Statement - 28.3.13

February (2)

Page 137

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR

134,709 1478 / 02.03.2013 KTR02.02.2013 54,809 1432/02.02.13 KTR02.02.2013 54,809 1432/02.02.13 KTR02.02.2013 54,809 1432/02.02.13 KTR02.02.2013 54,809 1432/02.02.13 KTR

212198 BMMI

212198 BMMI

212198 BMMI

212198 BMMI

212198 BMMI

212198 BMMI

212198 BMMI

212198 BMMI

212198 BMMI

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

02.03.2013 / 20.03.2013

05.02.2013 / 15.02.2013

96,97 / 07.02.2013, 127 / 22.02.2013

05.02.2013 / 15.02.2013

96,97 / 07.02.2013, 127 / 22.02.2013

05.02.2013 / 15.02.2013

96,97 / 07.02.2013, 127 / 22.02.2013

05.02.2013 / 15.02.2013

96,97 / 07.02.2013, 127 / 22.02.2013

05.02.2013 / 15.02.2013

96,97 / 07.02.2013, 127 / 22.02.2013

05.02.2013 / 15.02.2013

96,97 / 07.02.2013, 127 / 22.02.2013

05.02.2013 / 15.02.2013

96,97 / 07.02.2013, 127 / 22.02.2013

05.02.2013 / 15.02.2013

96,97 / 07.02.2013, 127 / 22.02.2013

05.02.2013 / 15.02.2013

96,97 / 07.02.2013, 127 / 22.02.2013

Page 138: February Statement - 28.3.13

February (2)

Page 138

212198 BMMI

212198 BMMI

212198 BMMI

212198 BMMI

212198 BMMI

212198 BMMI

212198 BMMI

212198 BMMI

212198 BMMI

05.02.2013 23,575 1437/07.02.13 KTR05.02.2013 1437/07.02.13 23,575 KTR

05.02.2013 1437/07.02.13 23,575 KTR

05.02.2013 1437/07.02.13 23,575 KTR

05.02.2013 1437/07.02.13 23,575 KTR

05.02.2013 1437/07.02.13 23,575 KTR

05.02.2013 1437/07.02.13 23,575 KTR

464,875 OMPL

464,875 OMPL

18.02.2013 67,200 1632 / 23.02.2013 JSWSL05.02.13 / 05.02.13 66848 JSWSL

05.02.2013 / 15.02.2013

96,97 / 07.02.2013, 127 / 22.02.2013

05.02.2013 / 15.02.2013

96,97 / 07.02.2013, 127 / 22.02.2013

05.02.2013 / 15.02.2013

96,97 / 07.02.2013, 127 / 22.02.2013

05.02.2013 / 15.02.2013

96,97 / 07.02.2013, 127 / 22.02.2013

05.02.2013 / 15.02.2013

96,97 / 07.02.2013, 127 / 22.02.2013

05.02.2013 / 15.02.2013

96,97 / 07.02.2013, 127 / 22.02.2013

05.02.2013 / 15.02.2013

96,97 / 07.02.2013, 127 / 22.02.2013

05.02.2013 / 15.02.2013

96,97 / 07.02.2013, 127 / 22.02.2013

05.02.2013 / 15.02.2013

96,97 / 07.02.2013, 127 / 22.02.2013

22.02.2013 / 22.02.2013

2895 / 26.02.2013, 2898 / 27.02.2013

22.02.2013 / 22.02.2013

2895 / 26.02.2013, 2898 / 27.02.2013

1585 / 08.02.13, 1584 / 08.02.13

Page 139: February Statement - 28.3.13

February (2)

Page 139

05.02.13 / 05.02.13 66848 JSWSL

05.02.13 / 05.02.13 66848 JSWSL

27.02.2013 101,954 1151 / 01.03.2013 Dalmia

27.02.2013 101,954 1151 / 01.03.2013 Dalmia

05.02.2013 183,442 384 / 05.02.2013 Alliance

04.02.2013 26,654 1220 / 15.03.2013 Dalmia

04.02.2013 26,654 Dalmia

04.02.2013 26,654 Dalmia

07.02.2013 15,900 1616 / 16.02.2013 JSWSL

04.02.2013 46550 1052 / 07.02.13 Dalmia

04.02.2013 1052 / 07.02.13 46550 Dalmia

04.02.2013 1052 / 07.02.13 46550 Dalmia

274066 BMMI

05.02.13 8,994 1636 / 24.02.2013 JSWSL05.02.2013 62250 109 / 12.02.2013 BMMI15.02.2013 4580 1586 / 08.02.13 JSWSL15.02.2013 1586 / 08.02.13 4580 JSWSL

15.02.2013 1586 / 08.02.13 4580 JSWSL

15.02.2013 1586 / 08.02.13 4580 JSWSL

04.02.2013 11,423 1586 / 08.02.2013 JSWSL

05.02.2013 77560 384 / 05.02.2013 Alliance

05.02.2013 77560 Alliance

05.02.2013 77560 Alliance

05.02.2013 77560 Alliance

1585 / 08.02.13, 1584 / 08.02.131585 / 08.02.13, 1584 / 08.02.13

05.02.2013 / 15.02.2013

98 / 07.02.2013,

127 / 22.02.2013

384 / 05.02.2013

384 / 05.02.2013

384 / 05.02.2013

Page 140: February Statement - 28.3.13

February (2)

Page 140

05.02.2013 77560 Alliance

05.02.2013 77560 Alliance

05.02.2013 77560 Alliance

05.02.2013 77560 Alliance

06.02.2013 33949 395 / 09.02.2013 Alliance

06.02.2013 33949 Alliance07.02.2013 49,455 395 / 09.02.2013 Alliance07.02.2013 49,455 Alliance

07.02.2013 49,455 Alliance07.02.2013 13,755 1060 / 08.02.13 Dalmia07.02.2013 1060 / 08.02.13 13,755 Dalmia05.02.2013 7,400 109 / 12.02.2013 BMMI05.02.2013 7,400 BMMI

28.02.2013 208,819 1758 / 01.03.13 GMR

20.03.2013 13,750 1512 / 18.03.2013 KTR

20.03.2013 13,750 1512 / 18.03.2013 KTR20.03.2013 13,750 1512 / 18.03.2013 KTR20.03.2013 13,750 1512 / 18.03.2013 KTR20.03.2013 13,750 1512 / 18.03.2013 KTR20.03.2013 13,750 1512 / 18.03.2013 KTR20.03.2013 13,750 1512 / 18.03.2013 KTR20.03.2013 13,750 1512 / 18.03.2013 KTR20.03.2013 13,750 1512 / 18.03.2013 KTR20.03.2013 13,750 1512 / 18.03.2013 KTR20.03.2013 13,750 1512 / 18.03.2013 KTR20.03.2013 13,750 1512 / 18.03.2013 KTR20.03.2013 13,750 1512 / 18.03.2013 KTR20.03.2013 31,280 1512 / 18.03.2013 KTR20.03.2013 31,280 1512 / 18.03.2013 KTR20.03.2013 31,280 1512 / 18.03.2013 KTR20.03.2013 31,280 1512 / 18.03.2013 KTR20.03.2013 31,280 1512 / 18.03.2013 KTR20.03.2013 31,280 1512 / 18.03.2013 KTR20.03.2013 31,280 1512 / 18.03.2013 KTR20.03.2013 31,280 1512 / 18.03.2013 KTR20.03.2013 31,280 1512 / 18.03.2013 KTR

384 / 05.02.2013

384 / 05.02.2013

384 / 05.02.2013

384 / 05.02.2013

395 / 09.02.2013

395 / 09.02.2013

395 / 09.02.2013

109 / 12.02.2013

Page 141: February Statement - 28.3.13

February (2)

Page 141

20.03.2013 31,280 1512 / 18.03.2013 KTR20.03.2013 31,280 1512 / 18.03.2013 KTR20.03.2013 31,280 1512 / 18.03.2013 KTR20.03.2013 31,280 1512 / 18.03.2013 KTR20.03.2013 31,280 1512 / 18.03.2013 KTR20.03.2013 31,280 1512 / 18.03.2013 KTR20.03.2013 31,280 1512 / 18.03.2013 KTR20.03.2013 31,280 1512 / 18.03.2013 KTR20.03.2013 31,280 1512 / 18.03.2013 KTR20.03.2013 31,280 1512 / 18.03.2013 KTR15.02.2013 15200 101 / 08.02.2013 BMMI15.02.2013 15200 BMMI

15.02.2013 15200 BMMI

15.02.2013 15200 BMMI

15.02.2013 15200 BMMI

15.02.2013 15200 BMMI

15.02.2013 15200 BMMI

15.02.2013 15200 BMMI

15.02.2013 15200 BMMI

15.02.2013 15200 BMMI

15.02.2013 15200 BMMI

15.02.2013 15200 BMMI06.02.2013 29663 110 / 12.02.2013 BMMI06.02.2013 29663 BMMI

09.02.2013 2,448,000 1073 / 11.02.2013 Dalmia Asset

11.02.2013 372951 1053 / 07.02.13 Dalmia

11.02.2013 1053 / 07.02.13 372951 Dalmia

11.02.2013 1053 / 07.02.13 372951 Dalmia

11.02.2013 1053 / 07.02.13 372951 Dalmia

11.02.2013 1053 / 07.02.13 372951 Dalmia

101 / 08.02.2013

101 / 08.02.2013

101 / 08.02.2013

101 / 08.02.2013

101 / 08.02.2013

101 / 08.02.2013

101 / 08.02.2013

101 / 08.02.2013

101 / 08.02.2013

101 / 08.02.2013

101 / 08.02.2013

110 / 12.02.2013

Page 142: February Statement - 28.3.13

February (2)

Page 142

11.02.2013 1053 / 07.02.13 372951 Dalmia

11.02.2013 1053 / 07.02.13 372951 Dalmia

11.02.2013 1053 / 07.02.13 372951 Dalmia

11.02.2013 1053 / 07.02.13 372951 Dalmia

11.02.2013 1053 / 07.02.13 372951 Dalmia

05.02.13 9988 385 / 05.02.2013 Alliance

05.02.13 9988 Alliance

05.02.13 9988 Alliance

05.02.13 9988 Alliance

05.02.13 9988 Alliance

05.02.13 9988 Alliance

05.02.13 9988 Alliance06.02.2013 14,438 1437 / 07.02.2013 KTR06.02.2013 12,700 1052 / 07.02.13 Dalmia06.02.2013 1052 / 07.02.13 12,700 Dalmia

6,642 JSWSL

6,642 JSWSL

6,642 JSWSL

07.02.2013 9,900 1586 / 08.02.2013 JSWSL06.02.2013 27382 1582 / 08 .02.13 JSWSL

06.02.2013 27382 1582 / 08 .02.13 JSWSL

06.02.2013 27382 1582 / 08 .02.13 JSWSL

06.02.2013 27382 1582 / 08 .02.13 JSWSL

06.02.2013 27382 1582 / 08 .02.13 JSWSL

06.02.2013 27382 1582 / 08 .02.13 JSWSL

385 / 05.02.2013

385 / 05.02.2013

385 / 05.02.2013

385 / 05.02.2013

385 / 05.02.2013

385 / 05.02.2013

11.03.2013 / 07.02.2013

1585 / 08.02.2013, 1601 / 130.02.2013

11.03.2013 / 07.02.2013

1585 / 08.02.2013, 1601 / 130.02.2013

11.03.2013 / 07.02.2013

1585 / 08.02.2013, 1601 / 130.02.2013

Page 143: February Statement - 28.3.13

February (2)

Page 143

06.02.2013 27382 1582 / 08 .02.13 JSWSL

07.02.2013 66,000 103 / 09.02.2013 BMMI23.02.2013 47,060 1784 / 13.02.2013 VSP23.02.2013 47,060 1784 / 13.02.2013 VSP23.02.2013 47,060 1784 / 13.02.2013 VSP23.02.2013 47,060 1784 / 13.02.2013 VSP23.02.2013 47,060 1784 / 13.02.2013 VSP23.02.2013 47,060 1784 / 13.02.2013 VSP23.02.2013 47,060 1784 / 13.02.2013 VSP23.02.2013 47,060 1784 / 13.02.2013 VSP23.02.2013 47,060 1784 / 13.02.2013 VSP23.02.2013 47,060 1784 / 13.02.2013 VSP23.02.2013 47,060 1784 / 13.02.2013 VSP23.02.2013 47,060 1784 / 13.02.2013 VSP23.02.2013 47,060 1784 / 13.02.2013 VSP23.02.2013 47,060 1784 / 13.02.2013 VSP23.02.2013 47,060 1784 / 13.02.2013 VSP23.02.2013 47,060 1784 / 13.02.2013 VSP23.02.2013 47,060 1784 / 13.02.2013 VSP23.02.2013 47,060 1784 / 13.02.2013 VSP12.02.2013 192 1724 / 13.02.2013 GMR

12.02.2013 192 1724 / 13.02.2013 GMR

07.02.2013 21,735 1060 / 08.02.13 Dalmia07.02.2013 21,735 1060 / 08.02.13 Dalmia07.02.2013 21,735 1060 / 08.02.13 Dalmia09.02.2013 5460 993 / 31.01.13 Dalmia

09.02.2013 34,938 528 / 20.02.2013 KHEL

09.02.2013 34,938 528 / 20.02.2013 KHEL

08.02.2013 19795 1060 / 08.02.2013 Dalmia

15.02.2013 80,070 1603 / 15.02.2013 JSWSL

09.02.2013 45644 1438/ 09.02.13 KTR09.02.2013 45644 1438/ 09.02.13 KTR09.02.2013 45644 1438/ 09.02.13 KTR09.02.2013 45644 1438/ 09.02.13 KTR

Page 144: February Statement - 28.3.13

February (2)

Page 144

09.02.2013 45644 1438/ 09.02.13 KTR09.02.2013 45644 1438/ 09.02.13 KTR20.02.2013 30,437 1741 / 23.02.13 GMR09.02.2013 257083 414 / Alliance

09.02.2013 257083 414 / Alliance

09.02.2013 257083 414 / Alliance

09.02.2013 257083 414 / Alliance

09.02.2013 257083 414 / Alliance

11.02.2013 19,332 1749 / 15.02.2013 TN-06

11.02.2013 19,332 1749 / 15.02.2013 TN-0611.02.2013 19,332 1749 / 15.02.2013 TN-0611.02.2013 19,332 1749 / 15.02.2013 TN-0611.02.2013 19,332 1749 / 15.02.2013 TN-0611.02.2013 19,332 1749 / 15.02.2013 TN-06

2955 / 11.03.2013 MRPL Asset

11.02.2013 9300 1334 / 15.02.2013 sarda

30,250 43/ 14.02.13 suryadev

30,250 43/ 14.02.13 suryadev

30,250 43/ 14.02.13 suryadev

30,250 43/ 14.02.13 suryadev

30,250 43/ 14.02.13 suryadev

30,250 43/ 14.02.13 suryadev

30,250 43/ 14.02.13 suryadev

30,250 43/ 14.02.13 suryadev

30,250 43/ 14.02.13 suryadev

30,250 43/ 14.02.13 suryadev

27.02.2013 / 27.02.2013

27.02.2013 / 27.02.2013

27.02.2013 / 27.02.2013

27.02.2013 / 27.02.2013

27.02.2013 / 27.02.2013

27.02.2013 / 27.02.2013

27.02.2013 / 27.02.2013

27.02.2013 / 27.02.2013

27.02.2013 / 27.02.2013

27.02.2013 / 27.02.2013

Page 145: February Statement - 28.3.13

February (2)

Page 145

30,250 43/ 14.02.13 suryadev

30,250 43/ 14.02.13 suryadev

30,250 43/ 14.02.13 suryadev

30,250 43/ 14.02.13 suryadev

30,250 43/ 14.02.13 suryadev

30,250 43/ 14.02.13 suryadev

30,250 43/ 14.02.13 suryadev

30,250 43/ 14.02.13 suryadev

22.02.2013 117,178 1742 / 23.02.13 GMR09.02.2013 28665 1725 / 15.02.2013 GMR09.02.2013 28665 1725 / 15.02.2013 GMR

09.02.2013 28665 1725 / 15.02.2013 GMR

09.02.13 28193 2852 / 19.02.2013 OMPL08.02.2013 4,500 -- HRO14.02.2013 11,559 -- GMR

14.02.2013 12,475 411 / 15.02.2013 Alliance

14.02.2013 12,475 411 / 15.02.2013 Alliance

KHEL

14.02.2013 43,750 1757 / 28.02.13 GMR

15.02.2013 11,200 1730 / 18.02.2013 GMR

151542 -- HRO

151542 -- HRO

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

27.02.2013 / 27.02.2013

27.02.2013 / 27.02.2013

27.02.2013 / 27.02.2013

27.02.2013 / 27.02.2013

27.02.2013 / 27.02.2013

27.02.2013 / 27.02.2013

27.02.2013 / 27.02.2013

27.02.2013 / 27.02.2013

Cancellation order-2921

Cancellation order-2921

Cancellation order-2921

13.02.2013 / 19.02.2013

13.02.2013 / 19.02.2013

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

Page 146: February Statement - 28.3.13

February (2)

Page 146

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

Page 147: February Statement - 28.3.13

February (2)

Page 147

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

15.2.13 / 15.2.13 102,514 suryadev

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

47,48,49,50 / 16.02.13

Page 148: February Statement - 28.3.13

February (2)

Page 148

44400 suryadev

44400 suryadev

alliance

02.03.2013 50,402 1330 / 04.03.2013 Ambuja

18.02.2013 5,834 431 / 26.02.2013 alliance

18.02.2013 5,834 431 / 26.02.2013 alliance

18.02.2013 5,834 431 / 26.02.2013 alliance19.02.2013 1,155 62 / 19.02.2013 Sathavana18.02.2013 30,034 1741 / 23.02.13 GMR18.02.2013 6,300 62 / 19.02.2013 Sathavana16.02.2013 322,791 50/18.2.13 suryadev

16.02.2013 322,791 50/18.2.13 suryadev

14.02.2013 73,811 62 / 19.02.2013 Sathavana

14.02.2013 73,811 62 / 19.02.2013 Sathavana14.02.2013 73,811 62 / 19.02.2013 Sathavana14.02.2013 73,811 62 / 19.02.2013 Sathavana

14.02.2013 73,811 62 / 19.02.2013 Sathavana

14.02.2013 73,811 62 / 19.02.2013 Sathavana

14.02.2013 73,811 62 / 19.02.2013 Sathavana

14.02.2013 73,811 62 / 19.02.2013 Sathavana14.02.2013 73,811 62 / 19.02.2013 Sathavana21.02.2013 30,558 1466 / 21.02.2013 KTR

21.02.2013 30,558 1466 / 21.02.2013 KTR

21.02.2013 30,558 1466 / 21.02.2013 KTR

21.02.2013 30,558 1466 / 21.02.2013 KTR

21.02.2013 30,558 1466 / 21.02.2013 KTR

14.02.2013 / 14.02.2013

42/ 14.2.13, 42/ 14.2.13

14.02.2013 / 14.02.2013

42/ 14.2.13, 42/ 14.2.13

Cancellation order-2863

Cancellation order-2863

Cancellation order-2863

Page 149: February Statement - 28.3.13

February (2)

Page 149

21.02.2013 30,558 1466 / 21.02.2013 KTR

21.02.2013 30,558 1466 / 21.02.2013 KTR

21.02.2013 30,558 1466 / 21.02.2013 KTR

21.02.2013 30,558 1466 / 21.02.2013 KTR

21.02.2013 30,558 1466 / 21.02.2013 KTR

21.02.2013 30,558 1466 / 21.02.2013 KTR

21.02.2013 30,558 1466 / 21.02.2013 KTR

21.02.2013 30,558 1466 / 21.02.2013 KTR

21.02.2013 30,558 1466 / 21.02.2013 KTR

21.02.2013 30,558 1466 / 21.02.2013 KTR

21.02.2013 30,558 1466 / 21.02.2013 KTR

21.02.2013 30,558 1466 / 21.02.2013 KTR

21.02.2013 30,558 1466 / 21.02.2013 KTR

21.02.2013 30,558 1466 / 21.02.2013 KTR

21.02.2013 30,558 1466 / 21.02.2013 KTR

21.02.2013 30,558 1466 / 21.02.2013 KTR

21.02.2013 30,558 1466 / 21.02.2013 KTR

21.02.2013 30,558 1466 / 21.02.2013 KTR

21.02.2013 30,558 1466 / 21.02.2013 KTR

21.02.2013 30,558 1466 / 21.02.2013 KTR

21.02.2013 30,558 1466 / 21.02.2013 KTR

21.02.2013 30,558 1466 / 21.02.2013 KTR

21.02.2013 30,558 1466 / 21.02.2013 KTR

21.02.2013 30,558 1466 / 21.02.2013 KTR

21.02.2013 30,558 1466 / 21.02.2013 KTR

Page 150: February Statement - 28.3.13

February (2)

Page 150

21.02.2013 30,558 1466 / 21.02.2013 KTR

21.02.2013 30,558 1466 / 21.02.2013 KTR

21.02.2013 30,558 1466 / 21.02.2013 KTR

21.02.2013 30,558 1466 / 21.02.2013 KTR

21.02.2013 30,558 1466 / 21.02.2013 KTR

25.02.2013 666,775 1799 / 21.02.2013 STM

13.02.2013 14,883 406 / 13.02.2013 Alliance22.02.2013 61,951 1741 / 23.02.13 GMR

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

Page 151: February Statement - 28.3.13

February (2)

Page 151

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

Page 152: February Statement - 28.3.13

February (2)

Page 152

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

Page 153: February Statement - 28.3.13

February (2)

Page 153

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

336,294 suryadev

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

Page 154: February Statement - 28.3.13

February (2)

Page 154

336,294 suryadev

348,053 406 / 13.02.2013 Alliance

19.02.2013 11,687 1640 / 27.02.2013 JSWSL

15.02.2013 1,944 JSWSL

15.02.2013 1,944 JSWSL

14.02.2013 8,000 431 / 26.02.2013 Alliance

14.02.2013 8,000 431 / 26.02.2013 Alliance

14.02.2013 8,000 431 / 26.02.2013 Alliance

14.02.2013 8,000 431 / 26.02.2013 Alliance

13.02.2013 5,200 417 / Alliance

13.02.2013 6,500 1724 / 14.02.2013 GMR

13.02.2013 24,501 405 / 13.02.2013 Alliance

13.02.2013 24,501 405 / 13.02.2013 Alliance

13.02.2013 24,501 405 / 13.02.2013 Alliance

13.02.2013 24,501 405 / 13.02.2013 Alliance

13.02.2013 24,501 405 / 13.02.2013 Alliance

14.02.2013 4,026 1769 / 14.03.2013 TN-06

14.02.2013 4,026 1769 / 14.03.2013 TN-0614.02.2013 18,600 417 / Alliance14.02.2013 13,966 414 / Alliance

15.02.2013 7,614 413 / 16.02.2013 Alliance28.02.2013 316,002 439 / 01.03.2013 Alliance28.02.2013 316,002 439 / 01.03.2013 Alliance

18.02.2013 16,119 1154 / 02.03.2013 Dalmia

14.02.2013 / 14.02.2013

39,40,41,42/ 14.2.13, 54 / 22.02.2013

15.02.2013 / 13.02.2013

1632 / 23.02.2013, 1624 / 22.02.2013

1632 / 23.02.2013, 1624 / 22.02.2013

Page 155: February Statement - 28.3.13

February (2)

Page 155

18.02.2013 16,119 1154 / 02.03.2013 Dalmia18.02.2013 16,119 1154 / 02.03.2013 Dalmia18.02.2013 16,119 1154 / 02.03.2013 Dalmia18.02.2013 16,119 1154 / 02.03.2013 Dalmia14.02.2013 41,150 51/ 18.2.13 suryadev

14.02.2013 41,150 51/ 18.2.13 suryadev

14.02.2013 41,150 51/ 18.2.13 suryadev

14.02.2013 41,150 51/ 18.2.13 suryadev

14.02.2013 41,150 51/ 18.2.13 suryadev

14.02.2013 41,150 51/ 18.2.13 suryadev

14.02.2013 41,150 51/ 18.2.13 suryadev

14.02.2013 41,150 51/ 18.2.13 suryadev

14.02.2013 41,150 51/ 18.2.13 suryadev

18.02.2013 23,105 52/ 18.2.13 suryadev

18.02.2013 23,105 52/ 18.2.13 suryadev

18.02.2013 23,105 52/ 18.2.13 suryadev

18.02.2013 23,105 52/ 18.2.13 suryadev

18.02.2013 23,105 52/ 18.2.13 suryadev

18.02.2013 23,105 52/ 18.2.13 suryadev

18.02.2013 23,105 52/ 18.2.13 suryadev18.02.2013 23,105 52/ 18.2.13 suryadev18.02.2013 23,105 52/ 18.2.13 suryadev

18.02.2013 23,105 52/ 18.2.13 suryadev

28.02.2013 136,757 145 / 01.03.2013 BMMI

28.02.2013 136,757 145 / 01.03.2013 BMMI

27.02.2013 67,151 1815 / 01.03.2013 VSP

27.02.2013 67,151 1815 / 01.03.2013 VSP

Page 156: February Statement - 28.3.13

February (2)

Page 156

235,985 JSWSL

235,985 JSWSL

235,985 JSWSL

235,985 JSWSL

235,985 JSWSL

235,985 JSWSL

235,985 JSWSL

235,985 JSWSL

235,985 JSWSL

235,985 JSWSL

235,985 JSWSL

235,985 JSWSL

235,985 JSWSL

235,985 JSWSL

235,985 JSWSL

235,985 JSWSL

19.02.2013 / 07.03.2013 / 12.03.2013

1656, 1657 / 01.03.2013

19.02.2013 / 07.03.2013 / 12.03.2013

1656, 1657 / 01.03.2013

19.02.2013 / 07.03.2013 / 12.03.2013

1656, 1657 / 01.03.2013

19.02.2013 / 07.03.2013 / 12.03.2013

1656, 1657 / 01.03.2013

19.02.2013 / 07.03.2013 / 12.03.2013

1656, 1657 / 01.03.2013

19.02.2013 / 07.03.2013 / 12.03.2013

1656, 1657 / 01.03.2013

19.02.2013 / 07.03.2013 / 12.03.2013

1656, 1657 / 01.03.2013

19.02.2013 / 07.03.2013 / 12.03.2013

1656, 1657 / 01.03.2013

19.02.2013 / 07.03.2013 / 12.03.2013

1656, 1657 / 01.03.2013

19.02.2013 / 07.03.2013 / 12.03.2013

1656, 1657 / 01.03.2013

19.02.2013 / 07.03.2013 / 12.03.2013

1656, 1657 / 01.03.2013

19.02.2013 / 07.03.2013 / 12.03.2013

1656, 1657 / 01.03.2013

19.02.2013 / 07.03.2013 / 12.03.2013

1656, 1657 / 01.03.2013

19.02.2013 / 07.03.2013 / 12.03.2013

1656, 1657 / 01.03.2013

19.02.2013 / 07.03.2013 / 12.03.2013

1656, 1657 / 01.03.2013

19.02.2013 / 07.03.2013 / 12.03.2013

1656, 1657 / 01.03.2013

Page 157: February Statement - 28.3.13

February (2)

Page 157

235,985 JSWSL

235,985 JSWSL

235,985 JSWSL

235,985 JSWSL

235,985 JSWSL

235,985 JSWSL

235,985 JSWSL

235,985 JSWSL

235,985 JSWSL

235,985 JSWSL

235,985 JSWSL

235,985 JSWSL

235,985 JSWSL

235,985 JSWSL

235,985 JSWSL

235,985 JSWSL

19.02.2013 / 07.03.2013 / 12.03.2013

1656, 1657 / 01.03.2013

19.02.2013 / 07.03.2013 / 12.03.2013

1656, 1657 / 01.03.2013

19.02.2013 / 07.03.2013 / 12.03.2013

1656, 1657 / 01.03.2013

19.02.2013 / 07.03.2013 / 12.03.2013

1656, 1657 / 01.03.2013

19.02.2013 / 07.03.2013 / 12.03.2013

1656, 1657 / 01.03.2013

19.02.2013 / 07.03.2013 / 12.03.2013

1656, 1657 / 01.03.2013

19.02.2013 / 07.03.2013 / 12.03.2013

1656, 1657 / 01.03.2013

19.02.2013 / 07.03.2013 / 12.03.2013

1656, 1657 / 01.03.2013

19.02.2013 / 07.03.2013 / 12.03.2013

1656, 1657 / 01.03.2013

19.02.2013 / 07.03.2013 / 12.03.2013

1656, 1657 / 01.03.2013

19.02.2013 / 07.03.2013 / 12.03.2013

1656, 1657 / 01.03.2013

19.02.2013 / 07.03.2013 / 12.03.2013

1656, 1657 / 01.03.2013

19.02.2013 / 07.03.2013 / 12.03.2013

1656, 1657 / 01.03.2013

19.02.2013 / 07.03.2013 / 12.03.2013

1656, 1657 / 01.03.2013

19.02.2013 / 07.03.2013 / 12.03.2013

1656, 1657 / 01.03.2013

19.02.2013 / 07.03.2013 / 12.03.2013

1656, 1657 / 01.03.2013

Page 158: February Statement - 28.3.13

February (2)

Page 158

235,985 JSWSL

235,985 JSWSL

235,985 JSWSL

235,985 JSWSL

235,985 JSWSL

235,985 JSWSL

235,985 JSWSL

15.02.2013 27,250 1659 / 01.03.2013 JSWSL

15.02.2013 27,250 1659 / 01.03.2013 JSWSL

15.02.2013 27,250 1659 / 01.03.2013 JSWSL

15.02.2013 27,250 1659 / 01.03.2013 JSWSL

15.02.2013 27,250 1659 / 01.03.2013 JSWSL

15.02.2013 56,500 1730 / 18.02.2013 GMR

18.02.2013 34,178 426 / 23.02.2013 Alliance

Alliance

42,915 37,38/15.2.13 suryadev

42,915 37,38/15.2.13 suryadev

42,915 37,38/15.2.13 suryadev

42,915 37,38/15.2.13 suryadev

42,915 37,38/15.2.13 suryadev

42,915 37,38/15.2.13 suryadev23.02.2013 172,977 1135 / 26.02.2013 Dalmia

19.02.2013 / 07.03.2013 / 12.03.2013

1656, 1657 / 01.03.2013

19.02.2013 / 07.03.2013 / 12.03.2013

1656, 1657 / 01.03.2013

19.02.2013 / 07.03.2013 / 12.03.2013

1656, 1657 / 01.03.2013

19.02.2013 / 07.03.2013 / 12.03.2013

1656, 1657 / 01.03.2013

19.02.2013 / 07.03.2013 / 12.03.2013

1656, 1657 / 01.03.2013

19.02.2013 / 07.03.2013 / 12.03.2013

1656, 1657 / 01.03.2013

19.02.2013 / 07.03.2013 / 12.03.2013

1656, 1657 / 01.03.2013

Cancellation order-2770A

Cancellation order-2770A

Cancellation order-2770A

14.02.2013 / 14.02.2013

14.02.2013 / 14.02.2013

14.02.2013 / 14.02.2013

14.02.2013 / 14.02.2013

14.02.2013 / 14.02.2013

14.02.2013 / 14.02.2013

Page 159: February Statement - 28.3.13

February (2)

Page 159

15.02.2013 50,402 1087 / 18.02.2013 MRpl-PP

16.02.2013 36,262 1102 / 21.02.2013 Dalmia16.02.2013 36,262 1102 / 21.02.2013 Dalmia

19.02.2013 49,358 24 / 20.02.2013 RPCL

16.02.2013 44,671 1447 / 16.02.2013 KTR16.02.2013 44,671 1447 / 16.02.2013 KTR16.02.2013 44,671 1447 / 16.02.2013 KTR16.02.2013 44,671 1447 / 16.02.2013 KTR16.02.2013 44,671 1447 / 16.02.2013 KTR16.02.2013 44,671 1447 / 16.02.2013 KTR13.02.2013 6,500 138 / 27.02.2013 BMMI16.02.2013 44/16.2.13 suryadev28.02.2013 9,350 527 / 18.02.2013 KHEL16.02.2013 6,093 2864 / 21.02.2013 OMPL

16.02.2013 6,093 2864 / 21.02.2013 OMPL

16.02.2013 6,093 2864 / 21.02.2013 OMPL

16.02.2013 6,093 2864 / 21.02.2013 OMPL

16.02.2013 1,090 1743 / 25.02.13 GMR

16.02.2013 1,090 1743 / 25.02.13 GMR

16.02.2013 1,090 1743 / 25.02.13 GMR19.02.2013 61,302 24 / 20.02.2013 RPCL18.02.2013 21,775 61 / 23.02.2013 suryadev18.02.2013 21,775 61 / 23.02.2013 suryadev18.02.2013 21,775 61 / 23.02.2013 suryadev18.02.2013 21,775 61 / 23.02.2013 suryadev22.02.2013 473 44/ 14.2.13 suryadev19.02.2013 70,564 62 / 23.02.2013 suryadev19.02.2013 70,564 62 / 23.02.2013 suryadev19.02.2013 70,564 62 / 23.02.2013 suryadev19.02.2013 70,564 62 / 23.02.2013 suryadev19.02.2013 70,564 62 / 23.02.2013 suryadev16.02.2013 44/16.2.13 suryadev16.02.2013 44/16.2.13 suryadev16.02.2013 44/16.2.13 suryadev

Page 160: February Statement - 28.3.13

February (2)

Page 160

16.02.2013 44/16.2.13 suryadev16.02.2013 44/16.2.13 suryadev05.03.2013 33,600 1150 / 01.03.2013 Dalmia

18.02.2013 347,872 119 / 19.02.2013 BMMI

18.02.2013 165,514 1103 / 21.02.2013 Dalmia

18.02.2013 165,514 1103 / 21.02.2013 Dalmia

18.02.2013 165,514 1103 / 21.02.2013 Dalmia18.02.2013 165,514 1103 / 21.02.2013 Dalmia27.02.2013 641,200 1152 / 01.03.2013 Dalmia05.03.2013 8,925 1663 / 06.03.2013 JSWSL

05.03.2013 8,925 1663 / 06.03.2013 JSWSL

05.03.2013 8,925 1663 / 06.03.2013 JSWSL18.02.2013 4,988 425 / 23.02.2013 Alliance

18.02.2013 4,988 425 / 23.02.2013 Alliance18.02.2013 4,988 425 / 23.02.2013 Alliance

GMR

GMR

GMR18.02.2013 25,400 421 / 21.02.2013 Alliance18.02.2013 25,400 421 / 21.02.2013 Alliance18.02.2013 25,400 421 / 21.02.2013 Alliance18.02.2013 25,400 421 / 21.02.2013 Alliance22.02.2013 71,678 1754 / 20.02.2013 TN-0622.02.2013 71,678 1754 / 20.02.2013 TN-0620.02.2013 2,775 61 / 23.02.2013 suryadev20.02.2013 2,775 61 / 23.02.2013 suryadev20.02.2013 2,550 270 / 22.02.2013 yashoda20.02.2013 2,550 270 / 22.02.2013 yashoda

22.02.2013 1,431 52/ 18.2.13 suryadev

54,917 281 / 01.03.2013 RPCL

54,917 281 / 01.03.2013 RPCL

26.02.2013 / 27.02.2013

26.02.2013 / 27.02.2013

Page 161: February Statement - 28.3.13

February (2)

Page 161

54,917 281 / 01.03.2013 RPCL

54,917 281 / 01.03.2013 RPCL

54,917 281 / 01.03.2013 RPCL

54,917 281 / 01.03.2013 RPCL21.02.2013 91,210 59 / 21.02.2013 suryadev19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

26.02.2013 / 27.02.2013

26.02.2013 / 27.02.2013

26.02.2013 / 27.02.2013

26.02.2013 / 27.02.2013

Page 162: February Statement - 28.3.13

February (2)

Page 162

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

Page 163: February Statement - 28.3.13

February (2)

Page 163

19.02.2013 67,849 1457 / 19.02.2013 KTR

19.02.2013 67,849 1457 / 19.02.2013 KTR

18.02.2013 1,208 51/ 18.2.13 suryadev21.02.2013 11,200 1115 / 23.02.2013 Dalmia

18.02.2013 22,331 1767 / 12.03.2013 GMR

18.02.2013 22,331 1767 / 12.03.2013 GMR

18.02.2013 22,331 1767 / 12.03.2013 GMR

18.02.2013 22,331 1767 / 12.03.2013 GMR

18.02.2013 43,254 1742 / 23.02.13 GMR

19.02.2013 44,671 1454 / 19.02.2013 KTR

19.02.2013 44,671 1454 / 19.02.2013 KTR

19.02.2013 44,671 1454 / 19.02.2013 KTR

19.02.2013 44,671 1454 / 19.02.2013 KTR

19.02.2013 44,671 1454 / 19.02.2013 KTR

19.02.2013 44,671 1454 / 19.02.2013 KTROMPLOMPL

21.02.2013 90,103 1115 / 23.02.2013 Dalmia

85,050 130 / 23.02.2013 BMMI

85,050 130 / 23.02.2013 BMMI20.02.2013 13,230 62 / 23.02.2013 suryadev20.02.2013 13,230 62 / 23.02.2013 suryadev20.02.2013 13,230 62 / 23.02.2013 suryadev20.02.2013 64,109 62 / 23.02.2013 suryadev

20.02.2013 64,109 62 / 23.02.2013 suryadev

20.02.2013 64,109 62 / 23.02.2013 suryadev

20.02.2013 64,109 62 / 23.02.2013 suryadev

21.02.2013 / 28.02.2013

21.02.2013 / 28.02.2013

Page 164: February Statement - 28.3.13

February (2)

Page 164

21.02.2013 16,065 130 / 23.02.2013 BMMI21.02.2013 7,546 1636 / 24.02.2013 JSWSL

21.02.2013 186,342 130 / 23.02.2013 BMMI

21.02.2013 186,342 130 / 23.02.2013 BMMI

21.02.2013 186,342 130 / 23.02.2013 BMMI

21.02.2013 186,342 130 / 23.02.2013 BMMI

21.02.2013 186,342 130 / 23.02.2013 BMMI21.02.2013 186,342 130 / 23.02.2013 BMMI

21.02.2013 186,342 130 / 23.02.2013 BMMI

21.02.2013 186,342 130 / 23.02.2013 BMMI

BMMI19.02.2013 640 -- HRO19.02.2013 640 -- HRO21.02.2013 588 152 / 04.03.2013 BMMI

21.02.2013 588 152 / 04.03.2013 BMMI

647,462 1115 / 23.02.2013 Dalmia

68,814 RPCL

68,814 RPCL

68,814 RPCL

21.02.2013 333,669 Orchid wood

21.02.2013 333,669 Orchid wood

21.02.2013 333,669 Orchid wood

21.02.2013 89,460

21.02.2013 89,460

cancellation order-3000

cancellation order-3000

cancellation order-3000

21.02.2013 / 21.02.2013

28.02.2013 / 07.03.2013

264 / 26.02.2013, 337 / 09.03.2013

28.02.2013 / 07.03.2013

264 / 26.02.2013, 337 / 09.03.2013

28.02.2013 / 07.03.2013

264 / 26.02.2013, 337 / 09.03.2013

ACC,Perundurai

ACC,Perundurai

Page 165: February Statement - 28.3.13

February (2)

Page 165

22.02.2013 3,409 270 / 22.02.2013 yashoda22.02.2013 3,409 270 / 22.02.2013 yashoda02.03.2013 10,305 1674 / 08.03.2013 JSWSL

33,153 60 / 22.02.2013 suryadev

33,153 60 / 22.02.2013 suryadev

33,153 60 / 22.02.2013 suryadev

33,153 60 / 22.02.2013 suryadev

33,153 60 / 22.02.2013 suryadev

33,153 60 / 22.02.2013 suryadev

33,153 60 / 22.02.2013 suryadev

33,153 60 / 22.02.2013 suryadev

33,153 60 / 22.02.2013 suryadev

33,153 60 / 22.02.2013 suryadev

33,153 60 / 22.02.2013 suryadev

33,153 60 / 22.02.2013 suryadev

33,153 60 / 22.02.2013 suryadev

33,153 60 / 22.02.2013 suryadev

33,153 60 / 22.02.2013 suryadev

33,153 60 / 22.02.2013 suryadev

22.02.2013 29,478 424 / 22.02.2013 alliance

22.02.2013 29,478 424 / 22.02.2013 alliance

Dalmia22.02.2013 5,500 127 / 22.02.2013 BMMI21.02.2013 30,034 1741 / 23.02.13 GMR

27.02.2013 34,803 337 / 09.03.2013 Surana22.02.2013 6,500 127 / 22.02.2013 BMMI21.02.2013 6,813 1090 / 22.02.2013 Ambuja

22.02.2013 / 22.02.2013

22.02.2013 / 22.02.2013

22.02.2013 / 22.02.2013

22.02.2013 / 22.02.2013

22.02.2013 / 22.02.2013

22.02.2013 / 22.02.2013

22.02.2013 / 22.02.2013

22.02.2013 / 22.02.2013

22.02.2013 / 22.02.2013

22.02.2013 / 22.02.2013

22.02.2013 / 22.02.2013

22.02.2013 / 22.02.2013

22.02.2013 / 22.02.2013

22.02.2013 / 22.02.2013

22.02.2013 / 22.02.2013

22.02.2013 / 22.02.2013

Page 166: February Statement - 28.3.13

February (2)

Page 166

21.02.2013 6,813 1090 / 22.02.2013 Ambuja22.02.2013 6,500 127 / 22.02.2013 BMMI

28,700 1471 / 26.02.2013 KTR

28,700 1471 / 26.02.2013 KTR

28,700 1471 / 26.02.2013 KTR

28,700 1471 / 26.02.2013 KTR

28,700 1471 / 26.02.2013 KTR

28,700 1471 / 26.02.2013 KTR

28,700 1471 / 26.02.2013 KTR

28,700 1471 / 26.02.2013 KTR

28,700 1471 / 26.02.2013 KTR

28,700 1471 / 26.02.2013 KTR

28,700 1471 / 26.02.2013 KTR

28,700 1471 / 26.02.2013 KTR

28,700 1471 / 26.02.2013 KTR

28,700 1471 / 26.02.2013 KTR

28,700 1471 / 26.02.2013 KTR

28,700 1471 / 26.02.2013 KTR

28.02.2013 / 28.02.2013 / 28.02.2013

28.02.2013 / 28.02.2013 / 28.02.2013

28.02.2013 / 28.02.2013 / 28.02.2013

28.02.2013 / 28.02.2013 / 28.02.2013

28.02.2013 / 28.02.2013 / 28.02.2013

28.02.2013 / 28.02.2013 / 28.02.2013

28.02.2013 / 28.02.2013 / 28.02.2013

28.02.2013 / 28.02.2013 / 28.02.2013

28.02.2013 / 28.02.2013 / 28.02.2013

28.02.2013 / 28.02.2013 / 28.02.2013

28.02.2013 / 28.02.2013 / 28.02.2013

28.02.2013 / 28.02.2013 / 28.02.2013

28.02.2013 / 28.02.2013 / 28.02.2013

28.02.2013 / 28.02.2013 / 28.02.2013

28.02.2013 / 28.02.2013 / 28.02.2013

28.02.2013 / 28.02.2013 / 28.02.2013

Page 167: February Statement - 28.3.13

February (2)

Page 167

28,700 1471 / 26.02.2013 KTR

28,700 1471 / 26.02.2013 KTR

28,700 1471 / 26.02.2013 KTR

28,700 1471 / 26.02.2013 KTR

28,700 1471 / 26.02.2013 KTR

28,700 1471 / 26.02.2013 KTR

28,700 1471 / 26.02.2013 KTR

28,700 1471 / 26.02.2013 KTR

28,700 1471 / 26.02.2013 KTR

28,700 1471 / 26.02.2013 KTR

28,700 1471 / 26.02.2013 KTR

28,700 1471 / 26.02.2013 KTR

28,700 1471 / 26.02.2013 KTR

28,700 1471 / 26.02.2013 KTR

28,700 1471 / 26.02.2013 KTR

28,700 1471 / 26.02.2013 KTR

28.02.2013 / 28.02.2013 / 28.02.2013

28.02.2013 / 28.02.2013 / 28.02.2013

28.02.2013 / 28.02.2013 / 28.02.2013

28.02.2013 / 28.02.2013 / 28.02.2013

28.02.2013 / 28.02.2013 / 28.02.2013

28.02.2013 / 28.02.2013 / 28.02.2013

28.02.2013 / 28.02.2013 / 28.02.2013

28.02.2013 / 28.02.2013 / 28.02.2013

28.02.2013 / 28.02.2013 / 28.02.2013

28.02.2013 / 28.02.2013 / 28.02.2013

28.02.2013 / 28.02.2013 / 28.02.2013

28.02.2013 / 28.02.2013 / 28.02.2013

28.02.2013 / 28.02.2013 / 28.02.2013

28.02.2013 / 28.02.2013 / 28.02.2013

28.02.2013 / 28.02.2013 / 28.02.2013

28.02.2013 / 28.02.2013 / 28.02.2013

Page 168: February Statement - 28.3.13

February (2)

Page 168

28,700 1471 / 26.02.2013 KTR

28,700 1471 / 26.02.2013 KTR

23.02.2013 57,400 436 / 28.02.2013 alliance2934 / 06.03.2013 OMPL

2934 / 06.03.2013 OMPL

2934 / 06.03.2013 OMPL

2934 / 06.03.2013 OMPL

2934 / 06.03.2013 OMPL

2934 / 06.03.2013 OMPL

2934 / 06.03.2013 OMPL

2934 / 06.03.2013 OMPL

2934 / 06.03.2013 OMPL

2934 / 06.03.2013 OMPL

2934 / 06.03.2013 OMPL

2934 / 06.03.2013 OMPL

2934 / 06.03.2013 OMPL

2934 / 06.03.2013 OMPL

2934 / 06.03.2013 OMPL

23.02.2013 85,968 1467 / 23.02.2013 KTR

23.02.2013 85,968 1467 / 23.02.2013 KTR

23.02.2013 85,968 1467 / 23.02.2013 KTR

23.02.2013 85,968 1467 / 23.02.2013 KTR

23.02.2013 85,968 1467 / 23.02.2013 KTR

28.02.2013 / 28.02.2013 / 28.02.2013

28.02.2013 / 28.02.2013 / 28.02.2013

Page 169: February Statement - 28.3.13

February (2)

Page 169

23.02.2013 85,968 1467 / 23.02.2013 KTR

23.02.2013 85,968 1467 / 23.02.2013 KTR

25.02.2013 7,128 1135 / 26.02.2013 Dalmia

25.02.2013 7,128 1135 / 26.02.2013 Dalmia23.02.2013 3,500 1135 / 26.02.2013 Dalmia23.02.2013 3,500 1135 / 26.02.2013 Dalmia22.02.2013 270 -- HRO02.03.2013 147,389 Dalmia

02.03.2013 147,389 Dalmia

02.03.2013 147,389 Dalmia

02.03.2013 147,389 Dalmia

02.03.2013 147,389 Dalmia

02.03.2013 147,389 Dalmia

02.03.2013 147,389 Dalmia02.03.2013 147,389 Dalmia02.03.2013 147,389 Dalmia02.03.2013 147,389 Dalmia22.02.2013 26,040 134 / 25.02.2013 BMMI22.02.2013 62,330 1740 / 23.02.13 GMR23.02.2013 15,725 1660 / 01.03.2013 JSWSL23.02.2013 15,725 1660 / 01.03.2013 JSWSL22.02.2013 3,780 1725 / 15.02.13 GMR20.02.2013 20,545 1459 / 20.02.2013 KTR

20.02.2013 20,545 1459 / 20.02.2013 KTR

23.02.2013 14,484 1640 / 27.02.2013 JSWSL

23.02.2013 14,484 1640 / 27.02.2013 JSWSL1745 / 26.02.2013 GMR

26.02.2013 3,360 1744 / 26.02.2013 GMR26.02.2013 3,360 1744 / 26.02.2013 GMR26.02.2013 3,360 1744 / 26.02.2013 GMR26.02.2013 3,360 1744 / 26.02.2013 GMR26.02.2013 3,360 1744 / 26.02.2013 GMR26.02.2013 3,360 1744 / 26.02.2013 GMR26.02.2013 3,360 1744 / 26.02.2013 GMR

Page 170: February Statement - 28.3.13

February (2)

Page 170

26.02.2013 3,360 1744 / 26.02.2013 GMR26.02.2013 3,360 1744 / 26.02.2013 GMR06.03.2013 387,589 156 / 07.03.2013 BMMI28.02.2013 244,472 1151 / 01.03.2013 Dalmia26.02.2013 4,100 72 / 28.02.2013 suryadev01.03.2013 12,390 274 / 02.03.2013 yashoda01.03.2013 12,390 274 / 02.03.2013 yashoda26.02.2013 20,663 1640 / 27.02.2013 JSWSL

28.02.2013 3,896 532 / 28.02.2013 KHEL

1256 / 22.03.2013 Dalmia

06.03.2013 450,283 1176 / 07.03.2013 Dalmia28.02.2013 166,672 441 / 03.03.2013 Alliance28.02.2013 166,672 441 / 03.03.2013 Alliance28.02.2013 166,672 441 / 03.03.2013 Alliance27.02.2013 369,779 1151 / 01.03.2013 Dalmia27.02.2013 369,779 1151 / 01.03.2013 Dalmia26.02.2013 17,200 72 / 28.02.2013 suryadev

26.02.2013 6,286 142 / 28.02.2013 BMMI

26.02.2013 6,286 142 / 28.02.2013 BMMI26.02.2013 6,286 142 / 28.02.2013 BMMI26.02.2013 6,286 142 / 28.02.2013 BMMI26.02.2013 6,286 142 / 28.02.2013 BMMI27.02.2013 18,221 534 / 07.03.2013 KHEL

KHEL

101,611 1186 / 09.03.2013 Dalmia

101,611 1186 / 09.03.2013 Dalmia

101,611 1186 / 09.03.2013 Dalmia

cancellation order-2996

cancellation order-2996

cancellation order-2996

28.02.2013 / 05.03.2013

28.02.2013 / 05.03.2013

28.02.2013 / 05.03.2013

Page 171: February Statement - 28.3.13

February (2)

Page 171

101,611 1186 / 09.03.2013 Dalmia

101,611 1186 / 09.03.2013 Dalmia

101,611 1186 / 09.03.2013 Dalmia

11.03.2013 9,608 JSWSL11.03.2013 9,608 JSWSL11.03.2013 9,608 JSWSL11.03.2013 9,608 JSWSL11.03.2013 9,608 JSWSL11.03.2013 9,608 JSWSL11.03.2013 9,608 JSWSL

1766 / 08.03.2013 GMR1766 / 08.03.2013 GMR1766 / 08.03.2013 GMR1766 / 08.03.2013 GMR1766 / 08.03.2013 GMR1766 / 08.03.2013 GMR1766 / 08.03.2013 GMR

26.02.2013 22,846 1150 / 01.03.2013 Dalmia

157224 147 / 02.03.2013 BMMI

157224 147 / 02.03.2013 BMMI

157224 147 / 02.03.2013 BMMI

27.02.2013 18,728 73 / 28.02.2013 suryadev26.02.2013 21,462 67 / 27.02.2013 Sathavana26.02.2013 21,462 67 / 27.02.2013 Sathavana

89,918 1467 / 27.02.2013 Sathavana

89,918 1467 / 27.02.2013 Sathavana

89,918 1467 / 27.02.2013 Sathavana

89,918 1467 / 27.02.2013 Sathavana

89,918 1467 / 27.02.2013 Sathavana

89,918 1467 / 27.02.2013 Sathavana

89,918 1467 / 27.02.2013 Sathavana

28.02.2013 / 05.03.2013

28.02.2013 / 05.03.2013

28.02.2013 / 05.03.2013

02.03.2013 / 02.03.2013

02.03.2013 / 02.03.2013

02.03.2013 / 02.03.2013

27.02.2013 / 05.03.2013 27.02.2013 / 05.03.2013 27.02.2013 / 05.03.2013 27.02.2013 / 05.03.2013 27.02.2013 / 05.03.2013 27.02.2013 / 05.03.2013 27.02.2013 / 05.03.2013

Page 172: February Statement - 28.3.13

February (2)

Page 172

01.03.2013 121,990 71 / 03.03.2013 Sathavana06.03.2013 178,766 1827 / 08.03.2013 Sathavana

06.03.2013 178,766 1827 / 08.03.2013 Sathavana27.02.2013 950 -- HRO27.02.2013 950 -- HRO06.03.2013 8,694 1686 / 15.03.2013 JSWSL

01.03.2013 11,552 1768 / 12.03.2013 GMR

01.03.2013 11,552 1768 / 12.03.2013 GMR

28.02.2013 6955 1474 / 01.03.2013 KTR

05.03.2013 3,532 1488 / 05.03.2013 KTR

04.03.2013 13168 132 / 07.03.2013 suryadev