+ffi i-l- v ph-257t g7 0-73, e-mait: [email protected]/pcd_time_order.pdf+ffi i-l-v haryana...

2
+ffi I-l- V HARYANA STATE POLLUTION CONTROL BOARD C.l 1, SECTOR.6, PANCHKULA Ph-257T g7 0-73, E-mait: [email protected] OfficeOrder As per policy of the Board approved in its 162nd meeting heldon 20.03.2012 and circulated vide order Endst No. HSPCBtpt}-74t652-671 dt, 03.05.2012, the units whose samples are found to be exceeding the permissible limits on account of minor operational problems, are provided an olportunitv, on submission of scheme of modification of ETP/APCM and undertaking to comply with the standards laid down by the Board in a time bound manneralongwith prescribed performance security and curtailment of production proportionate to the existing capacity of pollution control devices i.e. ETP/APCM, to operate with curtailed production for a specific period within which suchmodifications areto be carried out.However, it was provided in the policy that no opporlunity shall be given to the units which are found bypassing the effruent an'd units having no ETp/ApcM. whereas in the Policy orders issued videoffice order Endst No. HSpcB/pLG- 221784'802 dt' 11'05.2012, thereis a provision for grant of appropriate timeto non complying units, ranging from 3 to 6 months, for upgradation of ETp/sTp/ApcM or installation of ETP/STP/APOM afresh depending upon the nature & votume of work. Thus a provision of granting the opportunity to the noncomplying units for installation of ETP/STP/APCM afresh in the orders issued videEndst. No. HSpcB/p Lc-22tzg4- 802 dt' 11'05'2012 is contrary to the provisions of policy orders issued earlier vide order Endst. No.HSpcB/pLG-74 t6sz-671 dt.03.0s.2012. Whereas, the matter was placed before the TAC (policy) to examine the matter and to give recommendations in view of the suggestion of Regional Officer, Sonepat submitted videhis letter No. 1045 dt. 03.00.2013 to remove the above said ambiguity in the above said policy orders. TheTAC(Policy) examined the issue in its meeting held on 10.09.2013 and gubsequently on 2s.11.201g and submitted its recommendations. Therefore, in view of recommendations of TAC(policy) and in partial modification of office order Endst. No. HSPCBIPLG-741652-671dt. 03.05.2012 and office order Endst. No. HSPCBIPLG-22|784 -Bozdt. 11.0s.2012, it is clarified thatno unit should come up without installing the proper and adequate pollution Control Measures andshould not be allowed to operate without having the same andwithout complying the prescribed standards. However, in caseof units / projects where STp has not been provided and the industry / project is willing to install the srp afresh, the time for installing STP may be given to such units afterobtaining prescribed performance security and time bound designschemefor installation of STp, provided the unit undertakes to discharge its domestic effluent in septic tank/ soak pit till the STP is installed. ln respect of industries required to install the ETp and APCMafresh, time may be given after submission of time bound undertaking with design scheme for installation of ETPandAPCM alongwith prescribed performance security in the formof Demand Draft onlyafter closing down the polluting process of L.*l * F-1-

Upload: hoangtu

Post on 30-Mar-2018

215 views

Category:

Documents


2 download

TRANSCRIPT

+ffiI-l-

VHARYANA STATE POLLUTION CONTROL BOARD

C.l 1, SECTOR.6, PANCHKULAPh-257T g7 0-73, E-mait: [email protected]

Office Order

As per policy of the Board approved in its 162nd meeting held on 20.03.2012and circulated vide order Endst No. HSPCBtpt}-74t652-671 dt, 03.05.2012, theunits whose samples are found to be exceeding the permissible limits on account ofminor operational problems, are provided an olportunitv, on submission of schemeof modification of ETP/APCM and undertaking to comply with the standards laiddown by the Board in a time bound manner alongwith prescribed performancesecurity and curtailment of production proportionate to the existing capacity ofpollution control devices i.e. ETP/APCM, to operate with curtailed production for aspecific period within which such modifications are to be carried out. However, it wasprovided in the policy that no opporlunity shall be given to the units which are foundbypassing the effruent an'd units having no ETp/ApcM.

whereas in the Policy orders issued vide office order Endst No. HSpcB/pLG-221784'802 dt' 11'05.2012, there is a provision for grant of appropriate time to noncomplying units, ranging from 3 to 6 months, for upgradation of ETp/sTp/ApcM orinstallation of ETP/STP/APOM afresh depending upon the nature & votume of work.Thus a provision of granting the opportunity to the non complying units for installationof ETP/STP/APCM afresh in the orders issued vide Endst. No. HSpcB/p Lc-22tzg4-802 dt' 11'05'2012 is contrary to the provisions of policy orders issued earlier videorder Endst. No. HSpcB/pLG-74 t6sz-671 dt. 03.0s.2012.

Whereas, the matter was placed before the TAC (policy) to examine thematter and to give recommendations in view of the suggestion of Regional Officer,Sonepat submitted vide his letter No. 1045 dt. 03.00.2013 to remove the above saidambiguity in the above said policy orders. The TAC(Policy) examined the issue in itsmeeting held on 10.09.2013 and gubsequently on 2s.11.201g and submitted itsrecommendations.

Therefore, in view of recommendations of TAC(policy) and in partialmodification of office order Endst. No. HSPCBIPLG-741652-671dt. 03.05.2012 andoffice order Endst. No. HSPCBIPLG-22|784 -Bozdt. 11.0s.2012, it is clarified that nounit should come up without installing the proper and adequate pollution ControlMeasures and should not be allowed to operate without having the same and withoutcomplying the prescribed standards. However, in case of units / projects where STphas not been provided and the industry / project is will ing to install the srp afresh,the time for installing STP may be given to such units after obtaining prescribedperformance security and time bound design scheme for installation of STp,provided the unit undertakes to discharge its domestic effluent in septic tank / soakpit ti l l the STP is installed. ln respect of industries required to install the ETp andAPCM afresh, time may be given after submission of time bound undertaking withdesign scheme for installation of ETP and APCM alongwith prescribed performancesecurity in the form of Demand Draft only after closing down the polluting process of

L.*l * F-1-

the unit and the polltlting process may be allowed to operate only after installation ofrequisite ETP / APcryI as per design scheme submitted by the unit.The above orQers shall come into force with immediate effect.

- 7 "

Dated, Panchkula illre7th Februa ry, ZO1 4-gZ-10

Endst No. HSpcB/pLG/2o14t | 0 OSt-- 77A copy of the above is forwarded to the

immediate necessary action :-

Dr. Mahavir Singh, IASChairman

Dated : l l *2 -201+following for information and

1. All Section lncharges in Head Office.2. All Regional Officers in Field Offices.3. P.A. to chairman / p.s. to M.s. for information of the officer.

u( Sandeep Sha|rtla for uploading the orders on the website of the Board.

.\.*nn.Qo^

s r. E n v i ro n r " *n.ffi-$l L-

For Ghairman