fidelity campus, rhode island - small cell · pdf fileat&t wows fidelity with high speed...

1
AT&T wows Fidelity with high speed connectivity across their Rhode Island campus using Ericsson Radio Dot Find out more>> http://scf.io/case/032 533K Square Feet across 2 buildings (3 floors each) UMTS and LTE Service for up to 5000 Subscribers 35 Days Ready to Launch – 9 Days after Transport Ready “For the first of its kind project and launch, we are very pleased with the Ericsson collaboration and Fidelity seems to be in agreement. I look forward to closing this one out and moving to the Fidelity World Trade Center project.” Jennifer W Dupuis, ASG C&E PM AT&T Fidelity Campus, Rhode Island “Techs that did speed tests were very impressed by the results of the download/upload speeds. I believe the word ‘wow’ was used. That’s awesome folks. Congratulations All! Nice job.” Teri Watkins & team, Director, Technology Fidelity

Upload: phungquynh

Post on 31-Mar-2018

219 views

Category:

Documents


5 download

TRANSCRIPT

AT&T wows Fidelity with high speed connectivity across their Rhode Island campus using Ericsson Radio DotFind out more>> http://scf.io/case/032

533K  Square  Feet  across  2  buildings  (3  floors  each)UMTS  and  LTE  Service  for  up  to  5000  Subscribers35  Days  Ready  to  Launch  – 9  Days  after  Transport  Ready

“For the first of its kind project and launch, we are very pleased with the Ericsson collaboration and Fidelity seems to be in agreement. I look forward to closing this one out and moving to the Fidelity World Trade Centerproject.” Jennifer W Dupuis, ASG C&E PM AT&T

Fidelity Campus, Rhode Island

“Techs that did speed tests were very impressed by the results of the download/upload speeds. I believe the word ‘wow’ was used. That’s awesome folks. Congratulations All! Nice job.”Teri Watkins & team, Director, Technology Fidelity