Designated Substances Survey Report Women’s Residence 674 Dundas Street West, Toronto, Ontario
Prepared for:
The City of Toronto Facilities Management 55 John Street, 2nd Floor Toronto, Ontario, M5V 3C6
Attention: Sara Reid Environmental Project Manager
July 20, 2017
Pinchin File: 113698.002
Designated Substances Survey Report July 20, 2017
Women’s Residence, 674 Dundas Street West, Toronto, Ontario Pinchin File: 113698.002
The City of Toronto FINAL
© 2017 Pinchin Ltd. Page ii
Issued to: Contact: Issued on: Pinchin file: Issuing Office: Primary Contact:
The City of Toronto Sara Reid Environmental Project Manager July 20, 2017 113698.002 50 Wellington Street East, Suite 200, Toronto, ON M5E 1C8 Juliette McIntyre
Author: Tanya Stanisic, B.Sc. Hons. Project Manager 647.502.6665 [email protected]
Reviewer: Juliette McIntyre Senior Project Manager 416.368.6555 ext. 1910 [email protected]
Designated Substances Survey Report July 20, 2017
Women’s Residence, 674 Dundas Street West, Toronto, Ontario Pinchin File: 113698.002
The City of Toronto FINAL
© 2017 Pinchin Ltd. Page iii
EXECUTIVE SUMMARY
The City of Toronto (Client) retained Pinchin Ltd. (Pinchin) to conduct a Designated Substance survey of
Women’s Residence located at 674 Dundas Street West, Toronto, Ontario. The survey was performed on
October 18, 2016.
The objective of the survey was to document the locations of specified Designated Substances,
polychlorinated biphenyls (PCBs) and mould, evaluate their condition, and develop corrective action plans
as required for the purposes of long term management. The results of this survey are not intended for
construction, renovation, demolition or project tendering purposes.
The survey area consisted of the entire building. The building was occupied at the time of the survey.
SUMMARY OF FINDINGS
Asbestos: Asbestos-containing materials (ACM) were confirmed or assumed to be present as follows:
Roofing materials
Exterior window caulking.
Lead: Lead was confirmed present in select paints and is present in emergency light batteries.
Silica: Crystalline silica is present in concrete, mortar, brick, masonry, ceramics, etc., where present in the
building.
Mercury: Mercury vapour is present in fluorescent lamps throughout the building. Liquid mercury is
present in thermostat ampules throughout the building.
Polychlorinated Biphenyls (PCBs): PCBs may be present in light ballasts.
Mould: Mould-impacted materials were not found.
SUMMARY OF RECOMMENDATIONS
The following is a summary of significant recommendations; refer to the body of the report for detailed
recommendations.
1. Perform a pre-construction survey and remove all ACM prior to alteration or maintenance
work or if ACM may be disturbed by the work.
2. Remove and dispose of PCB ballasts and mercury-containing items when taken out of
service.
Designated Substances Survey Report July 20, 2017
Women’s Residence, 674 Dundas Street West, Toronto, Ontario Pinchin File: 113698.002
The City of Toronto FINAL
© 2017 Pinchin Ltd. Page iv
3. Follow appropriate safe work procedures when handling or disturbing asbestos, lead,
mercury and silica.
4. Remediate the following materials:
o Remove pink flaking paint on the 2nd Floor of the Main Stairwell (Location S1) using
Type 2a Lead Operations.
Please refer to Section 4.0 of this report for detailed recommendations regarding administrative actions.
This Executive Summary is subject to the same standard limitations as contained in the report and must be read in conjunction with the entire report.
Designated Substances Survey Report July 20, 2017
Women’s Residence, 674 Dundas Street West, Toronto, Ontario Pinchin File: 113698.002
The City of Toronto FINAL
© 2017 Pinchin Ltd. Page v
TABLE OF CONTENTS
1.0 INTRODUCTION AND SCOPE ....................................................................................................... 1
1.1 Scope of Survey ................................................................................................................... 1
2.0 BACKGROUND INFORMATION ..................................................................................................... 2
2.1 Building Description .............................................................................................................. 2
3.0 FINDINGS ........................................................................................................................................ 2
3.1 Inaccessible Locations ......................................................................................................... 2 3.2 Asbestos ............................................................................................................................... 2 3.3 Lead ...................................................................................................................................... 8 3.4 Silica ..................................................................................................................................... 9 3.5 Mercury ............................................................................................................................... 10 3.6 Polychlorinated Biphenyls .................................................................................................. 10 3.7 Mould .................................................................................................................................. 10
4.0 RECOMMENDATIONS .................................................................................................................. 10
4.1 General ............................................................................................................................... 10 4.2 Remedial Work ................................................................................................................... 10 4.3 On-going Management and Maintenance .......................................................................... 11
5.0 LIMITATIONS ................................................................................................................................. 12
6.0 REFERENCES ............................................................................................................................... 12
APPENDICES
APPENDIX I Drawings
APPENDIX II-A Asbestos Analytical Certificates
APPENDIX II-B Lead Analytical Certificates
APPENDIX II-C PCB Analytical Certificates (No Information to Report)
APPENDIX III Methodology
APPENDIX IV Survey Form
Designated Substances Survey Report July 20, 2017
Women’s Residence, 674 Dundas Street West, Toronto, Ontario Pinchin File: 113698.002
The City of Toronto FINAL
© 2017 Pinchin Ltd. Page 1 of 12
1.0 INTRODUCTION AND SCOPE
The City of Toronto (Client) retained Pinchin Ltd. (Pinchin) to conduct a Designated Substances Survey of
Women’s Residence, located at 674 Dundas Street West, Toronto, Ontario.
The survey was performed by Tanya Stanisic, B.Sc. Hons., Project Manager, on October 18, 2016. The
surveyor was accompanied by a representative of the Women’s Residence during the survey. The
building was occupied at the time of the survey.
The objective of the survey was to document any changes in condition and quantity of specified
Designated Substances, polychlorinated biphenyls (PCBs) and mould, identified in the previous
Designated Substances Survey (Pinchin File 103037), and develop corrective action plans as required.
This survey is only to be used for the purposes of long term management and routine maintenance. The
results of this survey are not to be used for construction, renovation, demolition or project tendering
purposes.
1.1 Scope of Survey
For the purpose of the survey and this report, hazardous building materials include the following
Designated Substances:
Asbestos
Lead
Silica
Mercury
The survey also included:
Polychlorinated Biphenyls (PCBs)
Mould
The following Ontario Designated Substances are not typically found in building materials in a
composition/state that is hazardous and were not included in this survey:
Arsenic
Acrylonitrile
Benzene
Coke oven emissions
Ethylene oxide
Isocyanates
Designated Substances Survey Report July 20, 2017
Women’s Residence, 674 Dundas Street West, Toronto, Ontario Pinchin File: 113698.002
The City of Toronto FINAL
© 2017 Pinchin Ltd. Page 2 of 12
Vinyl chloride monomer
2.0 BACKGROUND INFORMATION
2.1 Building Description
Item Details
Building Use Shelter and Housing Services
Number of Floors/Levels Four stories plus one below grade
Total Area of Building Approximately 10,000 square feet
Year of Construction 1911
Structure Structural steel, concrete
Exterior Cladding Pre-cast concrete, brick
HVAC Forced-Air, Boiler
Roof Built-up roofing
Flooring Vinyl floor tiles, vinyl sheet flooring, ceramic, concrete
Interior Walls Drywall, plaster, concrete
Ceilings Drywall, acoustic ceiling tiles, plaster
3.0 FINDINGS
3.1 Inaccessible Locations
The following rooms or areas of the building were not accessible to the surveyor and are therefore not
included in the report:
Area or Room Reason
Location E-1, Elevator Pit Only Accessible by Elevator Maintenance Personnel
3.2 Asbestos
3.2.1 Suspect Building Materials Not Found
The following types of building materials may historically contain asbestos but were not observed in the
building and are not discussed in the report findings:
Designated Substances Survey Report July 20, 2017
Women’s Residence, 674 Dundas Street West, Toronto, Ontario Pinchin File: 113698.002
The City of Toronto FINAL
© 2017 Pinchin Ltd. Page 3 of 12
Spray-applied fireproofing or thermal insulation
Vermiculite
Asbestos cement products
Firestopping
3.2.2 Texture Finishes (Acoustic/Decorative)
Texture finish is located on the plaster ceiling in the Dining Room (Location 1-05). The decorative texture
finish was sampled during this survey (samples 2016-A0001A-C) and determined not to contain asbestos.
Photo 1: Non-asbestos decorative texture finish on the ceiling
in the Dining Room (Location 1-05).
3.2.3 Thermal Systems Insulation (TSI)
3.2.3.1 Pipe Insulation
Parging cement is present on pipe fittings (elbows, valves, tees, hangers etc.) of various pipe systems in
the Basement Storage Room (Location B-27) (samples 2014-A0005A-C). Parging cement was sampled
and determined not to contain asbestos.
Remaining pipes observed throughout the building were insulated with non-asbestos insulation (e.g.
fibreglass, Armaflex).
3.2.3.2 Duct Insulation
Ducts are either uninsulated or insulated with non-asbestos fibreglass and jacketed with either canvas or
foil.
3.2.3.3 Mechanical Equipment Insulation
Mechanical equipment is insulated with non-asbestos fibreglass or not insulated.
Designated Substances Survey Report July 20, 2017
Women’s Residence, 674 Dundas Street West, Toronto, Ontario Pinchin File: 113698.002
The City of Toronto FINAL
© 2017 Pinchin Ltd. Page 4 of 12
3.2.4 Acoustic Ceiling Tiles
Three distinct types of acoustic ceiling tile are present in the assessed area, as follows:
Size, Type, Pattern, Photo #
Locations Sample Number Asbestos Type
24” x 48” lay-in, fissure and pinhole pattern, Photo 2
*See Survey Form in Appendix IV for Locations
2015-A0001A-C None Detected
24” x 48” lay-in, small and large pinhole pattern, Photo 3
*See Survey Form in Appendix IV for Locations
2014-A0006A-C None Detected
24” x 48” lay-in, widthwise fissure and pinhole pattern, Photo 4
*See Survey Form in Appendix IV for Locations
2015-A0002A-C None Detected
Photo 2: Non-asbestos ceiling tile, 24’x48’ fissure and pinhole
pattern (samples 2015-A0001A-C).
Photo 3: Non-asbestos ceiling tile, 24”x48” small and large
pinhole pattern (samples 2014-A0006A-C).
Photo 4: Non-asbestos ceiling tile, 24”x48” widthwise fissure and pinhole pattern (samples 2015-A0002A-C).
3.2.5 Plaster
Plaster is present on walls and ceilings in the building. Plaster does not contain asbestos (samples 2014-
A0008A-G).
Designated Substances Survey Report July 20, 2017
Women’s Residence, 674 Dundas Street West, Toronto, Ontario Pinchin File: 113698.002
The City of Toronto FINAL
© 2017 Pinchin Ltd. Page 5 of 12
3.2.6 Drywall Joint Compound
Drywall (gypsum board) and drywall joint compound is present as a wall and ceiling finish throughout the
building. Nine samples of drywall joint compound were previously collected (samples 2012-A0002A-C,
2013-14375-A17-03-A-C, 2014A-0003A-C) and determined not to contain asbestos.
3.2.7 Vinyl Sheet Flooring
Vinyl sheet flooring is present as follows:
Pattern, Colour and Photo Number
Paper Backing (Yes/No)
Locations Sample Number
Asbestos Type
Beige/Tan/White and Blue Lines, Photo 5
No *See Survey Form in Appendix IV for Locations
2015-A0006A-C
None Detected
Grey with blue flecks, Photo 6
No *See Survey Form in Appendix IV for Locations
2015-A0003A-C
None Detected
Grey, Photo 7 No *See Survey Form in Appendix IV for Locations
2015-A0004A-C
None Detected
Orange/Brown, Photo 8
No *See Survey Form in Appendix IV for Locations
2015-A0007A-C
None Detected
Orange, Photo 7 No *See Survey Form in Appendix IV for Locations
2015-A0005A-C
None Detected
Photo 5: Non-asbestos vinyl sheet flooring beige/tan/white and
blue lines (samples 2015-A0006A-C).
Photo 6: Non-asbestos vinyl sheet flooring, grey with blue
flecks (samples 2015-A0003A-C).
Designated Substances Survey Report July 20, 2017
Women’s Residence, 674 Dundas Street West, Toronto, Ontario Pinchin File: 113698.002
The City of Toronto FINAL
© 2017 Pinchin Ltd. Page 6 of 12
Photo 7: Non-asbestos vinyl sheet flooring, grey and orange
(samples 2015-A0004A-C, and 2015-A0005A-C).
Photo 8: Non-asbestos vinyl sheet flooring, orange/brown
(samples 2015-A0007A-C)
3.2.8 Vinyl Floor Tile and Mastic
Vinyl floor tiles are present as follows:
Size, Pattern, Colour and Photo Number
Locations Sample Number
Asbestos Type (tile)
Asbestos Type (mastic)
12” x 12”, Green *See Survey Form in Appendix IV for Locations
2014-A0001A-C
None Detected
None Detected
12” x 12”, Grey with grey flecks, Photo 9
*See Survey Form in Appendix IV for Locations
2014-A0002A-C
None Detected
None Detected
12” x 12”, Beige, Photo 10
*See Survey Form in Appendix IV for Locations
2014-A0004A-C
None Detected
None Detected
12” x 12”, Dark blue mottled, Photo 11
*See Survey Form in Appendix IV for Locations
2015-A0010A-C
None Detected
None Detected
12” x 12”, Orange mottled, Photo 11
*See Survey Form in Appendix IV for Locations
2015-A0009A-C
None Detected
None Detected
12” x 12”, Yellow mottled, Photo 11
*See Survey Form in Appendix IV for Locations
2015-A0008A-C
None Detected
None Detected
12” x 12”, Cream with beige flecks, Photo 12
*See Survey Form in Appendix IV for Locations
2015-A0011A-C
None Detected
None Detected
12” x 12”, Blue mottled, Photo 13
*See Survey Form in Appendix IV for Locations
2015-A0012A-C
None Detected
None Detected
12” x 12”, Grey with white streaks, Photo 14
*See Survey Form in Appendix IV for Locations
2015-A0013A-C
None Detected
None Detected
12” x 12”, Purple *See Survey Form in Appendix IV for Locations
2015-A0015A-C
None Detected
None Detected
Designated Substances Survey Report July 20, 2017
Women’s Residence, 674 Dundas Street West, Toronto, Ontario Pinchin File: 113698.002
The City of Toronto FINAL
© 2017 Pinchin Ltd. Page 7 of 12
Photo 9: Non-asbestos VFT (samples 2014-A0002A-C).
Photo 10: Non-asbestos VFT (samples 2014-A0004A-C).
Photo 11: Non-asbestos VFT (samples 2015-A0008A-C, 2015-
A0009A-C and 2015-A0010A-C).
Photo 12: Non-asbestos VFT (samples 2015-A0011A-C).
Photo 13: Non-asbestos VFT (samples 2015-A0012A-C).
Photo 14: Non-asbestos VFT (samples 2015-A0013A-C).
3.2.9 Assumed Asbestos Materials
roofing, felts and tar
concrete floor levelling compound
elevator and lift brakes
electrical components or wiring within control centers, breakers, motors or lights,
insulation on wiring
insulation under metal clad boilers and vessels
vermiculite in concrete block wall cavities
Designated Substances Survey Report July 20, 2017
Women’s Residence, 674 Dundas Street West, Toronto, Ontario Pinchin File: 113698.002
The City of Toronto FINAL
© 2017 Pinchin Ltd. Page 8 of 12
adhesives and duct mastics
levelling compound
sealants, caulking, and pPutty
paper products under wood flooring
soffit and fascia boards at elevated heights
mechanical packing, ropes and gaskets
fire resistant doors
3.3 Lead
3.3.1 Paints
Two paint samples were collected during this survey. The table below includes the two samples collected
during this assessment, and sample previously collected.
Sample Number
Colour, Substrate Description
Locations Lead (%)
2012-Pb01 Yellow paint on masonry and plaster wall
*See Survey Form in Appendix IV for Locations
0.14
2012-Pb02 Yellow paint on drywall *See Survey Form in Appendix IV for Locations
<0.009
2012-Pb03 Beige paint on masonry wall
*See Survey Form in Appendix IV for Locations
<0.009
2016-L0001, Photo 15
Pink paint on plaster *See Survey Form in Appendix IV for Locations
0.1%
2016-L0002 Blue paint of drywall *See Survey Form in Appendix IV for Locations
<0.006%
Pink paint was flaking/peeling in the following areas on the following items:
Approximately 2 square feet of pink paint, containing 0.1% of lead by weight, was
observed to be peeling from the wall on the 2nd Floor landing in the Main Stairwell
(Location S1).
Designated Substances Survey Report July 20, 2017
Women’s Residence, 674 Dundas Street West, Toronto, Ontario Pinchin File: 113698.002
The City of Toronto FINAL
© 2017 Pinchin Ltd. Page 9 of 12
Photo 15: Damaged wall paint in Location S1.
3.3.2 Lead Products and Applications
Lead-containing batteries are present in emergency lighting present in the building.
Photo 16: Emergency lighting with lead containing batteries is located throughout the building.
3.3.3 Assumed Lead Materials
Lead may be present in a number of materials which were not assessed and/or sampled. The following
materials, where found, should be considered to contain lead.
electrical components, including wiring connectors, fibre optic cable sheathing, grounding
conductors, and solder
glazing on ceramic tiles
3.4 Silica
Crystalline silica is assumed component of the following building materials where present in the building:
poured or pre-cast concrete
masonry and mortar
ceramic tiles, grout
plaster
Designated Substances Survey Report July 20, 2017
Women’s Residence, 674 Dundas Street West, Toronto, Ontario Pinchin File: 113698.002
The City of Toronto FINAL
© 2017 Pinchin Ltd. Page 10 of 12
3.5 Mercury
3.5.1 Lamps
Mercury vapour is present in fluorescent lamps throughout the assessed area.
3.5.2 Mercury-Containing Devices
Mercury is present as a liquid in thermostats found throughout the building.
3.6 Polychlorinated Biphenyls
3.6.1 Lighting Ballasts
The building has not been comprehensively re-lamped with new energy efficient light ballasts and lamps,
and as such, a percentage of light ballasts may be pre-1980 and contain PCBs.
3.6.2 Transformers
All transformers in the building are dry type transformers and do not contain PCB-containing dielectric
fluids.
3.7 Mould
Visible mould growth was not found in the assessed area.
4.0 RECOMMENDATIONS
4.1 General
Perform a detailed intrusive survey prior to building renovation or demolition operations. The survey
should include; destructive testing (i.e. coring and/or removal of building finishes and components), and
sampling of materials not previously tested (i.e. roofing materials, caulking, mastics).
4.2 Remedial Work
Perform the following remedial work to comply with existing regulations, due to the condition and location
of the material:
Material and Quantity Location Recommended Procedure
Delaminating pink paint, approximately 2 SF, Photo 15
Location S1 Type 2a Lead Operations
Designated Substances Survey Report July 20, 2017
Women’s Residence, 674 Dundas Street West, Toronto, Ontario Pinchin File: 113698.002
The City of Toronto FINAL
© 2017 Pinchin Ltd. Page 11 of 12
4.3 On-going Management and Maintenance
The following recommendations are made regarding on-going management and maintenance work
involving the hazardous materials identified.
4.3.1 Asbestos
Perform an assessment of asbestos materials on an annual basis. The next assessment of ACM should
be performed prior to October 2017 to remain in compliance.
Remove all asbestos-containing materials (ACM) prior to alteration or maintenance work or if ACM may
be disturbed by the work. Follow appropriate asbestos precautions for the classification of work being
performed.
Update the asbestos inventory report upon completion of any abatement and removal of asbestos-
containing materials.
4.3.2 Lead
Disturbance of lead in paint and coatings (or other materials) during maintenance activities may result in
over-exposure to lead dust or fumes. The need for work procedures, engineering controls and personal
protective equipment will need to be assessed on a project-by-project basis and must comply with
provincial standards or guidelines. Performing an exposure assessment during work that disturbs lead in
paints and coatings may be able to alleviate the use of some of the precautions specified by these
standards or guidelines.
Lead-containing items (lead-containing batteries) should be recycled when taken out of service.
4.3.3 Silica
Disturbance of silica-containing products during maintenance activities may result in excessive exposures
to airborne silica, especially if performed indoors and dry. Cutting, grinding, drilling or demolition of
materials containing silica should be completed only with proper respiratory protection and other worker
safety precautions that comply with provincial standards or guidelines.
4.3.4 Mercury
Recycle and reclaim mercury from fluorescent light tubes when taken out of service. Do not break lamps.
Light tubes are accepted free of charge at many local recycling depots.
Designated Substances Survey Report July 20, 2017
Women’s Residence, 674 Dundas Street West, Toronto, Ontario Pinchin File: 113698.002
The City of Toronto FINAL
© 2017 Pinchin Ltd. Page 12 of 12
4.3.5 PCBs
When light fixtures are removed from service, examine light ballasts for PCB content. If ballasts are not
clearly labelled as “non-PCB”, or are suspected to contain PCBs; package and ship ballasts for
destruction at a federally permitted facility.
5.0 LIMITATIONS
The work performed by Pinchin was conducted in accordance with the City of Toronto Contract Number
47018468, effective July 31, 2014.
6.0 REFERENCES
The following legislation and documents were referenced in completing the survey and this report:
1. Asbestos on Construction Projects and in Buildings and Repair Operations, Ontario
Regulation 278/05.
2. Designated Substances, Ontario Regulation 490/09.
3. Lead on Construction Projects, Ministry of Labour Guidance Document.
4. Ministry of the Environment Regulation, R.R.O. 1990 Reg. 347 as amended.
5. Surface Coating Materials Regulations, SOR/2005-109, Hazardous Products Act.
6. Silica on Construction Projects, Ministry of Labour Guidance Document.
7. Alert – Mould in Workplace Buildings, Ontario Ministry of Labour.
8. Standard Operating Procedures for Designated Substance Surveys, dated April, 2014,
City of Toronto, Facilities Management.
\\pinchin.com\miss\Job\113000s\113698 CITYOFTORONTO,Multilocation,DSUB,ASSMT\113698.002 CITYOFTORONTO,Shelter,DSUB,ASSMT\Locations\674 Dundas Street West\Report\Final\647 Dundas St W_DSS_2016 FINAL.docx
Template: Master Report City of Toronto, 2016 Designated Substance Survey, Haz, April 21, 2016
APPENDIX I
Drawings
NOT ALL KNOWN OR ASSUMED DESIGNATED
SUBSTANCES ARE IDENTIFIED ON THE
DRAWING. REFER TO THE DESIGNATED
SUBSTANCE REPORT FOR A COMPLETE LIST
OF KNOWN AND ASSUMED DESIGNATED
SUBSTANCES.
NO ACCESS TO ROOMNAR
1-01LOCATION NUMBER
ASBESTOS BULK SAMPLE
LEAD BULK SAMPLE
NO ACCESS TO ROOM/AREANAR
B-01
B-02
B-03
B-04
B-05 B-06
B-07a
B-08
B-09
B-10
B-11
B-07b
B-12
B-13
B-14
B-15
B-16
B-17
B-18
B-20
B-19
B-21
B-22
B-24
B-23
B-25
B-26
B-27
E1
S1
B-28
S2
NAR
DATE:
DRAWN BY:
LOCATION:
CHECKED BY:
CLIENT:
PROJECT # :
DRAWING:
TITLE:
LEGEND:
SCALE:
NTS
CITY OF TORONTO
WOMEN'S RESIDENCE
674 DUNDAS STREET
TORONTO, ONTARIO
DESIGNATED SUBSTANCES
SURVEY
BASEMENT
2016/11/18
BC
TS
113698.002
1 OF 5
1-01
1-03
1-02
1-04
1-05
1-06
1-07
1-09
1-08
1-10
1-12
1-13
1-11
1-19
1-20
1-21
1-22
1-18
1-17
1-16
1-14
1-15
S1
E1
S2
2016-A0001C
2016-A0001A,B
NAR
NOT ALL KNOWN OR ASSUMED DESIGNATED
SUBSTANCES ARE IDENTIFIED ON THE
DRAWING. REFER TO THE DESIGNATED
SUBSTANCE REPORT FOR A COMPLETE LIST
OF KNOWN AND ASSUMED DESIGNATED
SUBSTANCES.
NO ACCESS TO ROOMNAR
1-01LOCATION NUMBER
ASBESTOS BULK SAMPLE
LEAD BULK SAMPLE
NO ACCESS TO ROOM/AREANAR
DATE:
DRAWN BY:
LOCATION:
CHECKED BY:
CLIENT:
PROJECT # :
DRAWING:
TITLE:
LEGEND:
SCALE:
NTS
CITY OF TORONTO
WOMEN'S RESIDENCE
674 DUNDAS STREET
TORONTO, ONTARIO
DESIGNATED SUBSTANCES
SURVEY
GROUND FLOOR
2016/11/18
BC
TS
113698.002
2 OF 5
2-01
2-02
2-03
2-04
2-05 2-06 2-07
2-08
2-09
2-12
2-13
2-10
2-11
2-14
2-15
2-16
2-17
2-18
2-19
2-20
2-21
2-22
2-24
2-25
2-23
2-26
S2
S1
E1
L0001
L0002
NAR
NOT ALL KNOWN OR ASSUMED DESIGNATED
SUBSTANCES ARE IDENTIFIED ON THE
DRAWING. REFER TO THE DESIGNATED
SUBSTANCE REPORT FOR A COMPLETE LIST
OF KNOWN AND ASSUMED DESIGNATED
SUBSTANCES.
NO ACCESS TO ROOMNAR
1-01LOCATION NUMBER
ASBESTOS BULK SAMPLE
LEAD BULK SAMPLE
NO ACCESS TO ROOM/AREANAR
DATE:
DRAWN BY:
LOCATION:
CHECKED BY:
CLIENT:
PROJECT # :
DRAWING:
TITLE:
LEGEND:
SCALE:
NTS
CITY OF TORONTO
WOMEN'S RESIDENCE
674 DUNDAS STREET
TORONTO, ONTARIO
DESIGNATED SUBSTANCES
SURVEY
SECOND FLOOR
2016/11/18
BC
TS
113698.002
3 OF 5
3-01 3-02 3-03 3-04 3-05 3-06 3-07 3-08
3-09
3-10
3-15
3-16
3-17
3-13
3-14
3-11
3-12
3-18
3-19
3-22
3-23
3-213-20
3-24
S2
S1
E1
3-25
NAR
NOT ALL KNOWN OR ASSUMED DESIGNATED
SUBSTANCES ARE IDENTIFIED ON THE
DRAWING. REFER TO THE DESIGNATED
SUBSTANCE REPORT FOR A COMPLETE LIST
OF KNOWN AND ASSUMED DESIGNATED
SUBSTANCES.
NO ACCESS TO ROOMNAR
1-01LOCATION NUMBER
ASBESTOS BULK SAMPLE
LEAD BULK SAMPLE
NO ACCESS TO ROOM/AREANAR
DATE:
DRAWN BY:
LOCATION:
CHECKED BY:
CLIENT:
PROJECT # :
DRAWING:
TITLE:
LEGEND:
SCALE:
NTS
CITY OF TORONTO
WOMEN'S RESIDENCE
674 DUNDAS STREET
TORONTO, ONTARIO
DESIGNATED SUBSTANCES
SURVEY
THIRD FLOOR
2016/11/18
BC
TS
113698.002
4 OF 5
4-01 4-02 4-03 4-04 4-05 4-06 4-07 4-08
4-09
4-10
4-15
4-16
4-11
4-13 4-14
4-12
4-19
4-18
4-17
4-24
4-23
4-20
4-21
4-22
E1
S1
S2
NAR
NOT ALL KNOWN OR ASSUMED DESIGNATED
SUBSTANCES ARE IDENTIFIED ON THE
DRAWING. REFER TO THE DESIGNATED
SUBSTANCE REPORT FOR A COMPLETE LIST
OF KNOWN AND ASSUMED DESIGNATED
SUBSTANCES.
NO ACCESS TO ROOMNAR
1-01LOCATION NUMBER
ASBESTOS BULK SAMPLE
LEAD BULK SAMPLE
NO ACCESS TO ROOM/AREANAR
DATE:
DRAWN BY:
LOCATION:
CHECKED BY:
CLIENT:
PROJECT # :
DRAWING:
TITLE:
LEGEND:
SCALE:
NTS
CITY OF TORONTO
WOMEN'S RESIDENCE
674 DUNDAS STREET
TORONTO, ONTARIO
DESIGNATED SUBSTANCES
SURVEY
FOURTH FLOOR
2016/11/18
BC
TS
113698.002
5 OF 5
APPENDIX II-A
Asbestos Analytical Certificates
By Polarized Light MicroscopyEPA Method: 600/R-93/116 and 600/M4-82-020
113698.002, City of Toronto, 674 Dundas Street WestProject:
Sample ID
Lab Sample ID
Description
Lab Notes AsbestosFibrous
ComponentsNon-Fibrous Components
Attributes
Treatment
Tanya StanisicAttn:Customer: Pinchin Ltd.50 Wellington Street EastSuite 200Toronto, ON M5E 1C8
Analysis ID: 1622058_PLM
Date Amended: 7/19/2017
Date Reported: 11/9/2016
Date Received: 11/7/2016
Lab Order ID: 1622058
None Detected0001ADecorative Textured Finish (Ceiling) - Dinning Room [1-05]
White, YellowNon FibrousHeterogeneous
Dissolved1622058PLM_1
Other100%
None Detected0001BDecorative Textured Finish (Ceiling) - Dinning Room [1-05]
WhiteNon FibrousHeterogeneous
Crushed1622058PLM_2
Other100%
None Detected0001CDecorative Textured Finish (Ceiling) - Dinning Room [1-05]
WhiteNon FibrousHeterogeneous
Crushed1622058PLM_3
Other100%
Disclaimer: Due to the nature of the EPA 600 method, asbestos may not be detected in samples containing low levels of asbestos. We strongly recommend that analysis of floor tiles, vermiculite, and/or heterogeneous soil samples be conducted by TEM for confirmation of “None Detected” by PLM. This report relates only to the samples tested and may not be reproduced, except in full, without the written approval of SAI. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. government. Analytical uncertainty available upon request. Scientific Analytical Institute participates in the NVLAP Proficiency Testing program. Unless otherwise noted blank sample correction was not performed. Estimated MDL is 0.1%.
Page 1 of 1
Approved SignatoryAnalyst
Scientific Analytical Institute, Inc. 4604 Dundas Dr. Greensboro, NC 27407 (336) 292-3888
Sharon Donald (3)
P-F-002 r15 1/15/2018
APPENDIX II-B
Lead Analytical Certificates
Pinchin Ltd.50 Wellington Street EastSuite 200Toronto, ON M5E 1C8
Customer:
Analysis ID: 1622063_PBP
Attn: Tanya Stanisic
Date Amended: 7/19/2017
Date Reported: 11/11/2016
Date Received: 11/7/2016
Project: 113698.002, 674 Dundas Street West
Lab Order ID: 1622063
Lab Notes
Description
Lab Sample ID
Sample ID
by Flame Atomic Absorption SpectroscopyEPA SW-846 3050B/6010C/7000B
Concentration
(ppm)(g)
Mass Concentration
(% by weight)
1622063PBP_1
Pink wall paint - stairwell (S1)L000110000.0789 0.10%
1622063PBP_2
Blue wall paint - staff room (2-20)L0002< 550.0725 < 0.006%
Unless otherwise noted blank sample correction was not performed on analytical results. Scientific Analytical Institute participates in the AIHA ELPAT program. ELPAT Laboratory ID: 173190. This reportrelates only to the samples tested and may not be reproduced, except in full, without the written approval of SAI. Analytical uncertainty available upon request. The quality control samples run with thesamples in this report have passed all EPA required specifications unless otherwise noted. RL: (Report Limit for an undiluted 50ml sample is 4µg Total Pb).
Taylor Davis (2)
Scientific Analytical Institute, Inc. 4604 Dundas Dr. Greensboro, NC 27407 (336) 292-3888
Analyst Laboratory DirectorPage 1 of 1pbRpt_4.0.01_pbp001
L-F-021 r15 3/28/2014
APPENDIX II-C
PCB Analytical Certificates
(No Information to Report)
APPENDIX III
Methodology
Designated Substances Survey Report July 20, 2017
The City of Toronto Pinchin File: 113698.002
Methodology Appendix III
© 2017 Pinchin Ltd. Page 1 of 4
1.0 GENERAL
The following survey methodology is based on the requirements of the Standard Operation Procedure for
Designated Substance Surveys, dated April, 2014, provided by the City of Toronto (the “SOP”).
Pinchin conducted a room-by-room survey (rooms, corridors, service areas, exterior, etc.) to identify the
hazardous building materials as defined in Section 1.1. Information regarding the approximate quantity,
location, and condition of hazardous building materials encountered and visually estimated quantities
were recorded on the Survey Form, provided by the City of Toronto, found in Appendix V. The locations
of any samples collected were recorded on small-scale plans, found in Appendix I.
Drawings (i.e., floor plans), previous reports, and Survey Forms, were referenced where provided.
1.1 Limitations on Scope
The survey excludes the following:
Owner or occupant articles (e.g. stored items, furniture, appliances, etc.);
Underground materials or equipment (e.g. vessels, drums, underground storage tanks,
pipes, etc.);
Building envelope, structural components, inaccessible or concealed materials or other
items where sampling may cause consequential damage to the property.
Energized systems (e.g. internal boiler components, elevators, mechanical or electrical
components);
Controlled products (e.g. stored chemicals, operational or process-related substances);
and
Materials not typically associated with construction (e.g. settled dust, spills, residual
contamination from prior spills, etc.).
The survey was limited to non-intrusive testing. Concealed spaces such as those above solid ceilings and
within shafts and pipe chases were accessed via existing access panels only. Pinchin did not conduct
demolition of walls, solid ceilings, structural items, interior finishes or exterior building finishes, to
determine the presence of concealed materials.
1.2 Asbestos
Pinchin conducted an inspection for the presence of friable and non-friable asbestos-containing materials
(ACM). A friable material is a material that when dry can be crumbled, pulverized or powdered by hand
pressure.
Designated Substances Survey Report July 20, 2017
The City of Toronto Pinchin File: 113698.002
Methodology Appendix III
© 2017 Pinchin Ltd. Page 2 of 4
Pinchin collected samples at a rate that is in compliance with Table 1 of O.Reg. 278/05. A separate set of
samples was collected of each of homogenous material sampled. A homogenous material is defined by
the US EPA1 as material that is uniform in texture and appearance, was installed at one time, and is
unlikely to consist of more than one type or formulation of material. The homogeneous materials are
determined by visual examination, available information on the phases of the construction and prior
renovations.
The following materials were sampled:
All friable materials historically known to contain asbestos, regardless of year of
installation, not identified in previous reports;
Friable materials previously sampled in insufficient quantity to conclude the materials are
non-asbestos, in accordance with the requirements of O.Reg. 278/05;
Friable materials previously reported to contain less than 1% asbestos, if sampled prior to
the Ministry of Labour defining an asbestos-containing material as a material containing
contains 0.5 percent or more asbestos by weight;
Non-friable acoustic ceiling tiles;
Non-friable vinyl floor tiles and mastic.
The following materials were not sampled:
Materials previously identified in previous reports provided as asbestos-containing;
Materials previously confirmed to be non-asbestos in accordance with O.Reg. 278/05;
Unless damaged the following materials were not sampled: plaster, drywall joint
compound, mastic, window caulking, roofing materials, vinyl sheet flooring. Materials not
sampled are assumed to contain asbestos.
Materials where sampling poses an inherent, imminent danger to the Assessor such as
high voltage wiring, materials present at heights greater than 12 feet, or those in confined
spaces. These materials are assumed to be asbestos-containing.
In some cases, manufactured products such as asbestos cement pipe are visually identified without
sample confirmation.
1 Environmental Protection Agency
Designated Substances Survey Report July 20, 2017
The City of Toronto Pinchin File: 113698.002
Methodology Appendix III
© 2017 Pinchin Ltd. Page 3 of 4
Pinchin submits the bulk samples to a NVLAP2 accredited laboratory for analysis. The analysis is
performed in accordance with Test Method EPA/600/R-93/116: Method for the Determination of Asbestos
in Bulk Building Materials, July 1993.
The asbestos analysis is completed using a stop positive approach. Only one result of greater than the
regulated criteria (0.5%) is required to determine that a material is asbestos-containing, but all samples
must be analyzed to conclusively determine that a material is non-asbestos. The laboratory stops
analyzing samples from a homogeneous material once a result greater than the regulated criteria is
detected in any of the samples of that material. All samples of a homogeneous material are analyzed if no
asbestos is detected. In some cases, all samples are analyzed in the sample set regardless of result.
Where building materials are described in the report as non-asbestos, or described as containing no
asbestos, this is subject to the limitations of the analytical method used, and should be understood to
mean no asbestos was detected.
Asbestos materials are evaluated in order to make recommendations regarding remedial work. The
priority for remedial action is based on several factors:
friability (friable or non-friable).
condition (good, fair, poor, debris, based on definitions in the SOP).
accessibility (ranking from accessible to all building users to inaccessible).
visibility (whether the material is obscured by other building components).
efficiency of the work (for example, if damaged ACM is being removed in an area, it may
be most practical to remove all ACM in the area even if it is in good condition).
This includes friability, condition and efficiency and practicality of the work.
1.3 Lead
Pinchin collected samples of damaged paint not identified in a previous report. Drawings included show
sample locations.
Analysis for lead in paints or surface coatings is performed in accordance with EPA Method No.
3050B/Method No. 7420; flame atomic absorption at an accredited laboratory.
For this report, all paints containing lead at a concentration 0.1% or greater are discussed. Paint was
evaluated for condition.
Lead building products (e.g. batteries, lead sheeting, flashing) are identified by visual observation only.
2 National Voluntary Laboratory Accreditation Program
Designated Substances Survey Report July 20, 2017
The City of Toronto Pinchin File: 113698.002
Methodology Appendix III
© 2017 Pinchin Ltd. Page 4 of 4
1.4 Silica
Pinchin identifies building materials suspected of containing crystalline silica (e.g. concrete, cement, tile,
brick, masonry, mortar) by knowledge of current and historic applications and visual inspection only.
Pinchin does not perform sampling of these materials for laboratory analysis of crystalline silica content.
1.5 Mercury
Building materials/products/equipment (e.g. thermostats, barometers, pressure gauges, light tubes),
suspected to contain mercury were identified by visual inspection only. Dismantling of equipment
suspected of containing mercury was not performed. Sampling of these materials for laboratory analysis
of mercury content was not performed.
Mercury spills or damaged mercury-containing equipment was recorded where observed.
1.6 Polychlorinated Biphenyls
Pinchin determines the potential for light ballast and wet transformers to contain PCBs based on the age
of the building, a review of maintenance records and examination of labels or nameplates on equipment,
where present and accessible. The information is compared to known ban dates of PCBs and
Environment Canada publications.
Dry type transformers are assumed to be free of dielectric fluids and hence non-PCB.
Pinchin records spills or leakage of suspect PCB-containing fluids where observed.
Fluids (mineral oil, hydraulic or Askaral) in transformers or other equipment are not sampled for PCB
content.
Non-liquid forms of PCBs (i.e. sealants or caulking) are not sampled for PCB content.
1.7 Visible Mould
Pinchin identifies the presence of mould if visibly present in a significant quantity on exposed building
surfaces. If any mould growth is concealed within wall cavities it is not addressed in this survey.
APPENDIX IV
Survey Form
APPENDIX V - Survey Form
Location Number Location Name Building
System Material ObservedPotential
Hazardous Material
Sample ID Analytical Result
Qua
ntity
Con
ditio
n
Notes / Recommended Actions
0‐00 Building Exterior Roof Roofing Material Asbestos Not Sampled Assumed ACM 5000 ft² Good
0‐00 Building Exterior Windows Window Caulking Asbestos Not Sampled Assumed ACM 100 ft² Good
0‐00 Building Exterior Walls Concrete N/A N/A N/A N/A N/A
E1 Elevator Pit N/A N/A N/A N/A N/A N/A N/A *No access to room
B‐01 Housing Office Floor Vinyl Floor Tile Asbestos 2014‐A0001 A‐C None Detected N/A N/A12 x 12 Green and mastic; 2014 Pichin DSS Reassessment
B‐01 Housing Office Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
B‐01 Housing Office Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
B‐01 Housing Office Ceiling Acoustic Ceiling Tile Asbestos 2015‐A0001A‐C None Detected N/A N/A 2 x 4 Lay‐in Fissure and Pinhole Pattern
B‐01 Housing Office Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A
Located above ceiling tiles 2012 Pinchin DSS Assessment; 2013 ECHO Reassessment Survey; 2014 Pichin DSS Reassessment
B‐01 Housing Office Pipes Fibreglass N/A N/A N/A N/A N/A
B‐01 Housing Office Ducts Not Insulated N/A N/A N/A N/A N/A
B‐01 Housing Office Mechanical N/A N/A N/A N/A N/A N/A
B‐02 Lounge Floor Vinyl Floor Tile Asbestos 2014‐A0002 A‐C None Detected N/A N/A12 x 12 Grey with Grey Fleck and mastic; 2014 Pinchin DSS Reassessment
B‐02 Lounge Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
B‐02 Lounge Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
B‐02 Lounge Ceiling Acoustic Ceiling Tile Asbestos 2015‐A0001A‐C None Detected N/A N/A 2 x 4 Lay‐in Fissure and Pinhole Pattern
B‐02 Lounge Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A
Located above ceiling tiles 2012Pinchin DSS Assessment; 2013 ECHO Reassessment Survey; 2014 Pichin DSS Reassessment
B‐02 Lounge Pipes Fibreglass N/A N/A N/A N/A N/A
B‐02 Lounge Ducts Not Insulated N/A N/A N/A N/A N/A
B‐02 Lounge Mechanical N/A N/A N/A N/A N/A N/A
B‐03 Program Office Floor Vinyl Floor Tile Asbestos 2014‐A0002 A‐C None Detected N/A N/A12 x 12 Grey with Grey Fleck and mastic; 2014 Pinchin DSS Reassessment
B‐03 Program Office Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
October 18, 2016
Notes
674 Dundas Street West
Women's Residence Pinchin Ltd - T. Stanisic
Date(s) of Current Survey:
Organization Completing Survey
Building Address
Building Name
674 Dundas Street West, Toronto 1 of 31
APPENDIX V - Survey Form
Location Number Location Name Building
System Material ObservedPotential
Hazardous Material
Sample ID Analytical Result
Qua
ntity
Con
ditio
n
Notes / Recommended Actions
October 18, 2016
Notes
674 Dundas Street West
Women's Residence Pinchin Ltd - T. Stanisic
Date(s) of Current Survey:
Organization Completing Survey
Building Address
Building Name
B‐03 Program Office Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
B‐03 Program Office Ceiling Acoustic Ceiling Tile Asbestos 2015‐A0001A‐C None Detected N/A N/A 2 x 4 Lay‐in Fissure and Pinhole Pattern
B‐03 Program Office Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A
Located above ceiling tiles 2012Pinchin DSS Assessment; 2013 ECHO Reassessment Survey; 2014 Pichin DSS Reassessment
B‐03 Program Office Pipes Fibreglass N/A N/A N/A N/A N/A
B‐03 Program Office Ducts Not Insulated N/A N/A N/A N/A N/A
B‐03 Program Office Mechanical N/A N/A N/A N/A N/A N/A
B‐04 Corridor Floor Vinyl Floor Tile Asbestos 2014‐A0001 A‐C None Detected N/A N/A12 x 12 Grey with Grey Fleck and mastic; 2014 Pinchin DSS Reassessment
B‐04 Corridor Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
B‐04 Corridor Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
B‐04 Corridor Ceiling Acoustic Ceiling Tile Asbestos 2015‐A0001A‐C None Detected N/A N/A 2 x 4 Lay‐in Fissure and Pinhole Pattern
B‐04 Corridor Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A
Located above ceiling tiles 2012Pinchin DSS Assessment; 2013 ECHO Reassessment Survey; 2014 Pichin DSS Reassessment
B‐04 Corridor Pipes Fibreglass N/A N/A N/A N/A N/A
B‐04 Corridor Ducts Not Insulated N/A N/A N/A N/A N/A
B‐04 Corridor Mechanical N/A N/A N/A N/A N/A N/A
B‐05 Elevator Room Floor Concrete N/A N/A N/A N/A N/A
B‐05 Elevator Room Wall Masonry N/A N/A N/A N/A N/A
B‐05 Elevator Room Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
B‐05 Elevator Room Ceiling Acoustic Ceiling Tile Asbestos 2015‐A0001A‐C None Detected N/A N/A 2 x 4 Lay‐in Fissure and Pinhole Pattern
B‐05 Elevator Room Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A
Located above ceiling tiles 2012Pinchin DSS Assessment; 2013 ECHO Reassessment Survey; 2014 Pichin DSS Reassessment
B‐05 Elevator Room Pipes N/A N/A N/A N/A N/A N/A
674 Dundas Street West, Toronto 2 of 31
APPENDIX V - Survey Form
Location Number Location Name Building
System Material ObservedPotential
Hazardous Material
Sample ID Analytical Result
Qua
ntity
Con
ditio
n
Notes / Recommended Actions
October 18, 2016
Notes
674 Dundas Street West
Women's Residence Pinchin Ltd - T. Stanisic
Date(s) of Current Survey:
Organization Completing Survey
Building Address
Building Name
B‐05 Elevator Room Ducts Not Insulated N/A N/A N/A N/A N/A
B‐05 Elevator Room Mechanical N/A N/A N/A N/A N/A N/A
B‐06 Storage Room Floor Vinyl Floor Tile Asbestos 2014‐A0001 A‐C None Detected N/A N/A12 x 12 Green and mastic; 2014 Pichin DSS Reassessment
B‐06 Storage Room Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
B‐06 Storage Room Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
B‐06 Storage Room Ceiling Acoustic Ceiling Tile Asbestos 2015‐A0001A‐C None Detected N/A N/A 2 x 4 Lay‐in Fissure and Pinhole Pattern
B‐06 Storage Room Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; None Detected N/A N/A
Located above ceiling tiles 2012Pinchin DSS Assessment; 2013 ECHO
B‐06 Storage Room Pipes Fibreglass N/A N/A N/A N/A N/A
B‐06 Storage Room Ducts Not Insulated N/A N/A N/A N/A N/A
B‐06 Storage Room Mechanical N/A N/A N/A N/A N/A N/A
B‐07a Washrooms Floor Ceramic N/A N/A N/A N/A N/A
B‐07a Washrooms Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
B‐07a Washrooms Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
B‐07a Washrooms Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
B‐07a Washrooms Pipes Fibreglass N/A N/A N/A N/A N/A
B‐07a Washrooms Ducts N/A N/A N/A N/A N/A N/A
B‐07a Washrooms Mechanical N/A N/A N/A N/A N/A N/A
B‐07b Shower Floor Ceramic N/A N/A N/A N/A N/A
B‐07b Shower Walls Ceramic N/A N/A N/A N/A N/A
B‐07b Shower Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
B‐07b Shower Pipes Not Insulated N/A N/A N/A N/A N/A
B‐07b Shower Ducts N/A N/A N/A N/A N/A N/A
B‐07b Shower Mechanical N/A N/A N/A N/A N/A N/A
674 Dundas Street West, Toronto 3 of 31
APPENDIX V - Survey Form
Location Number Location Name Building
System Material ObservedPotential
Hazardous Material
Sample ID Analytical Result
Qua
ntity
Con
ditio
n
Notes / Recommended Actions
October 18, 2016
Notes
674 Dundas Street West
Women's Residence Pinchin Ltd - T. Stanisic
Date(s) of Current Survey:
Organization Completing Survey
Building Address
Building Name
B‐08 Janitor's Closet Floor Ceramic N/A N/A N/A N/A N/A
B‐08 Janitor's Closet Wall Masonry N/A N/A N/A N/A N/A
B‐08 Janitor's Closet Wall Yellow Paint Lead 2012‐Pb01 0.14% N/A N/A
B‐08 Janitor's Closet Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
B‐08 Janitor's Closet Pipes Not Insulated N/A N/A N/A N/A N/A
B‐08 Janitor's Closet Ducts N/A N/A N/A N/A N/A N/A
B‐08 Janitor's Closet Mechanical N/A N/A N/A N/A N/A N/A
B‐09 Laundry Room Floor Ceramic N/A N/A N/A N/A N/A
B‐09 Laundry Room Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
B‐09 Laundry Room Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
B‐09 Laundry Room Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
B‐09 Laundry Room Pipes Fibreglass N/A N/A N/A N/A N/A
B‐09 Laundry Room Ducts Not Insulated N/A N/A N/A N/A N/A
B‐09 Laundry Room Mechanical N/A N/A N/A N/A N/A N/A
B‐10 Storage Room Floor Ceramic N/A N/A N/A N/A N/A
B‐10 Storage Room Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
B‐10 Storage Room Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
B‐10 Storage Room Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
B‐10 Storage Room Pipes Fibreglass N/A N/A N/A N/A N/A
B‐10 Storage Room Ducts N/A N/A N/A N/A N/A N/A
B‐10 Storage Room Mechanical N/A N/A N/A N/A N/A N/A
B‐11 Storage Room Floor Ceramic N/A N/A N/A N/A N/A
674 Dundas Street West, Toronto 4 of 31
APPENDIX V - Survey Form
Location Number Location Name Building
System Material ObservedPotential
Hazardous Material
Sample ID Analytical Result
Qua
ntity
Con
ditio
n
Notes / Recommended Actions
October 18, 2016
Notes
674 Dundas Street West
Women's Residence Pinchin Ltd - T. Stanisic
Date(s) of Current Survey:
Organization Completing Survey
Building Address
Building Name
B‐11 Storage Room Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
B‐11 Storage Room Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
B‐11 Storage Room Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
B‐11 Storage Room Pipes Fibreglass N/A N/A N/A N/A N/A
B‐11 Storage Room Ducts Not Insulated N/A N/A N/A N/A N/A
B‐11 Storage Room Mechanical N/A N/A N/A N/A N/A N/A
B‐12Doctor's Office/ Exam Room
Floor Concrete N/A N/A N/A N/A N/A
B‐12Doctor's Office/ Exam Room
Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
B‐12Doctor's Office/ Exam Room
Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
B‐12Doctor's Office/ Exam Room
Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
B‐12Doctor's Office/ Exam Room
Pipes N/A N/A N/A N/A N/A N/A
B‐12Doctor's Office/ Exam Room
Ducts N/A N/A N/A N/A N/A N/A
B‐12Doctor's Office/ Exam Room
Mechanical N/A N/A N/A N/A N/A N/A
B‐13 Electrical Room Floor Concrete N/A N/A N/A N/A N/A12x12 Green vinyl floor tiles Non‐Asbestos (2014‐A0001A‐C), have been removed prior to 2015 Reassessment
B‐13 Electrical Room Walls Masonry N/A N/A N/A N/A N/A
B‐13 Electrical Room Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
B‐13 Electrical Room Pipes Fibreglass N/A N/A N/A N/A N/A
B‐13 Electrical Room Ducts N/A N/A N/A N/A N/A N/A
B‐13 Electrical Room Mechanical Not Insulated N/A N/A N/A N/A N/A
B‐14 Lounge Floor Concrete N/A N/A N/A N/A N/A
B‐14 Lounge Floor Masonry N/A N/A N/A N/A N/A
674 Dundas Street West, Toronto 5 of 31
APPENDIX V - Survey Form
Location Number Location Name Building
System Material ObservedPotential
Hazardous Material
Sample ID Analytical Result
Qua
ntity
Con
ditio
n
Notes / Recommended Actions
October 18, 2016
Notes
674 Dundas Street West
Women's Residence Pinchin Ltd - T. Stanisic
Date(s) of Current Survey:
Organization Completing Survey
Building Address
Building Name
B‐14 Lounge Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
B‐14 Lounge Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
B‐14 Lounge Pipes Fibreglass N/A N/A N/A N/A N/A
B‐14 Lounge Ducts N/A N/A N/A N/A N/A N/A
B‐14 Lounge Mechanical N/A N/A N/A N/A N/A N/A
B‐15 Office Floor Concrete N/A N/A N/A N/A N/A
B‐15 Office Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
B‐15 Office Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
B‐15 Office Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
B‐15 Office Pipes Fibreglass N/A N/A N/A N/A N/A
B‐15 Office Ducts N/A N/A N/A N/A N/A N/A
B‐15 Office Mechanical N/A N/A N/A N/A N/A N/A
B‐16 Kitchen Storage Floor Concrete N/A N/A N/A N/A N/A
B‐16 Kitchen Storage Walls Masonry N/A N/A N/A N/A N/A
B‐16 Kitchen Storage Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
B‐16 Kitchen Storage Pipes Fibreglass N/A N/A N/A N/A N/A
B‐16 Kitchen Storage Ducts N/A N/A N/A N/A N/A N/A
B‐16 Kitchen Storage Mechanical Not Insulated N/A N/A N/A N/A N/A Fan Unit
B‐17 Men's Changeroom Floor Vinyl Floor Tile Asbestos 2014‐A0004 A‐C None Detected N/A N/A12 x 12 Beige and mastic; 2014 Pinchin DSS Reassessment
B‐17 Men's Changeroom Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
B‐17 Men's Changeroom Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
674 Dundas Street West, Toronto 6 of 31
APPENDIX V - Survey Form
Location Number Location Name Building
System Material ObservedPotential
Hazardous Material
Sample ID Analytical Result
Qua
ntity
Con
ditio
n
Notes / Recommended Actions
October 18, 2016
Notes
674 Dundas Street West
Women's Residence Pinchin Ltd - T. Stanisic
Date(s) of Current Survey:
Organization Completing Survey
Building Address
Building Name
B‐17 Men's Changeroom Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
B‐17 Men's Changeroom Pipes Parging Cement AsbestosVisually Similar to 2014 A0005
A‐CNone Detected N/A N/A
B‐17 Men's Changeroom Pipes Fibreglass N/A N/A N/A N/A N/A
B‐17 Men's Changeroom Ducts N/A N/A N/A N/A N/A N/A
B‐17 Men's Changeroom Mechanical N/A N/A N/A N/A N/A N/A
B‐18 Women's Changeroom Floor Vinyl Floor Tile Asbestos 2014‐A0004 A‐C None Detected N/A N/A12 x 12 Beige and mastic; 2014 Pinchin DSS Reassessment
B‐18 Women's Changeroom Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
B‐18 Women's Changeroom Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
B‐18 Women's Changeroom Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
B‐18 Women's Changeroom Pipes Fibreglass N/A N/A N/A N/A N/A
B‐18 Women's Changeroom Ducts N/A N/A N/A N/A N/A N/A
B‐18 Women's Changeroom Mechanical N/A N/A N/A N/A N/A N/A
B‐19 Washroom Entrance Floor Vinyl Floor Tile Asbestos 2014‐A0004 A‐C None Detected N/A N/A12 x 12 Beige and mastic; 2014 Pinchin DSS Reassessment
B‐19 Washroom Entrance Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
B‐19 Washroom Entrance Wall Masonry N/A N/A N/A N/A N/A
B‐19 Washroom Entrance Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
B‐19 Washroom Entrance Ceiling Acoustic Ceiling Tile Asbestos 2014‐A0006 A‐C None Detected N/A N/A2 x 4 Lay‐in Small and Large Pinhole Pattern; 2014 Pinchin DSS Reassessment
B‐19 Washroom Entrance Pipes Not Insulated N/A N/A N/A N/A N/A
B‐19 Washroom Entrance Ducts Not Insulated N/A N/A N/A N/A N/A
B‐19 Washroom Entrance Mechanical N/A N/A N/A N/A N/A N/A
B‐20 Corridor Floor Concrete N/A N/A N/A N/A N/A 12x12 Green VFT (2014-A0001A-C) removed before 2015 reassessment
B‐20 Corridor Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
B‐20 Corridor Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
674 Dundas Street West, Toronto 7 of 31
APPENDIX V - Survey Form
Location Number Location Name Building
System Material ObservedPotential
Hazardous Material
Sample ID Analytical Result
Qua
ntity
Con
ditio
n
Notes / Recommended Actions
October 18, 2016
Notes
674 Dundas Street West
Women's Residence Pinchin Ltd - T. Stanisic
Date(s) of Current Survey:
Organization Completing Survey
Building Address
Building Name
B‐20 Corridor Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
B‐20 Corridor Pipes Parging Cement AsbestosVisually Similar to 2014 A0005
A‐CNone Detected N/A N/A
B‐20 Corridor Pipes Fibreglass N/A N/A N/A N/A N/A
B‐20 Corridor Ducts N/A N/A N/A N/A N/A N/A
B‐20 Corridor Mechanical N/A N/A N/A N/A N/A N/A
B‐21 Storage/Crawlspace Floor Concrete N/A N/A N/A N/A N/A
B‐21 Storage/Crawlspace Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
B‐21 Storage/Crawlspace Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
B‐21 Storage/Crawlspace Pipes N/A N/A N/A N/A N/A N/A
B‐21 Storage/Crawlspace Ducts N/A N/A N/A N/A N/A N/A
B‐21 Storage/Crawlspace Mechanical N/A N/A N/A N/A N/A N/A
B‐22 Washroom Floor Vinyl Floor Tile Asbestos 2014‐A0001 A‐C None Detected N/A N/A12 x 12 Green and mastic; 2014 Pichin DSS Reassessment
B‐22 Washroom Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
B‐22 Washroom Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
B‐22 Washroom Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
B‐22 Washroom Pipes Fibreglass N/A N/A N/A N/A N/A
B‐22 Washroom Ducts N/A N/A N/A N/A N/A N/A
B‐22 Washroom Mechanical N/A N/A N/A N/A N/A N/A
B‐23 Kitchen Floor Vinyl Floor Tile Asbestos 2014‐A0001 A‐C None Detected N/A N/A12 x 12 Green and mastic; 2014 Pichin DSS Reassessment
B‐23 Kitchen Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
B‐23 Kitchen Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
B‐23 Kitchen Ceiling Acoustic Ceiling Tile Asbestos 2015‐A0001A‐C None Detected N/A N/A 2 x 4 Lay‐in Fissure and Pinhole Pattern
674 Dundas Street West, Toronto 8 of 31
APPENDIX V - Survey Form
Location Number Location Name Building
System Material ObservedPotential
Hazardous Material
Sample ID Analytical Result
Qua
ntity
Con
ditio
n
Notes / Recommended Actions
October 18, 2016
Notes
674 Dundas Street West
Women's Residence Pinchin Ltd - T. Stanisic
Date(s) of Current Survey:
Organization Completing Survey
Building Address
Building Name
B‐23 Kitchen Ceiling Acoustic Ceiling Tile Asbestos 2015‐A0002A‐C None Detected N/A N/A 2 x 4 Lay‐in Widthwise Fissure and Pinhole
B‐23 Kitchen Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
N/A N/A N/A
Located above ceiling tiles 2012Pinchin DSS Assessment; 2013 ECHO Reassessment Survey; 2014 Pichin DSS Reassessment
B‐23 Kitchen Pipes Fibreglass N/A N/A N/A N/A N/A
B‐23 Kitchen Ducts N/A N/A N/A N/A N/A N/A
B‐23 Kitchen Mechanical N/A N/A N/A N/A N/A N/A
B‐24 Sprinkler Room Floor Concrete N/A N/A N/A N/A N/A
B‐24 Sprinkler Room Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
B‐24 Sprinkler Room Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
B‐24 Sprinkler Room Pipes Fibreglass N/A N/A N/A N/A N/A
B‐24 Sprinkler Room Ducts N/A N/A N/A N/A N/A N/A
B‐24 Sprinkler Room Mechanical Not Insulated N/A N/A N/A N/A N/A
B‐25 Electrical Room Floor Concrete N/A N/A N/A N/A N/A
B‐25 Electrical Room Wall Brick N/A N/A N/A N/A N/A
B‐25 Electrical Room Ceiling Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
B‐25 Electrical Room Pipes Fibreglass N/A N/A N/A N/A N/A
B‐25 Electrical Room Ducts N/A N/A N/A N/A N/A N/A
B‐25 Electrical Room Mechanical N/A N/A N/A N/A N/A N/A
B‐26 Storage Room Floor Concrete N/A N/A N/A N/A N/A
B‐26 Storage Room Wall Masonry N/A N/A N/A N/A N/A
B‐26 Storage Room Ceiling Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
B‐26 Storage Room Pipes Fibreglass N/A N/A N/A N/A N/A
B‐26 Storage Room Pipes PVC N/A N/A N/A N/A N/A
B‐26 Storage Room Ducts N/A N/A N/A N/A N/A N/A
674 Dundas Street West, Toronto 9 of 31
APPENDIX V - Survey Form
Location Number Location Name Building
System Material ObservedPotential
Hazardous Material
Sample ID Analytical Result
Qua
ntity
Con
ditio
n
Notes / Recommended Actions
October 18, 2016
Notes
674 Dundas Street West
Women's Residence Pinchin Ltd - T. Stanisic
Date(s) of Current Survey:
Organization Completing Survey
Building Address
Building Name
B‐26 Storage Room Mechanical N/A N/A N/A N/A N/A N/A
B‐27 Storage Room Floor Concrete N/A N/A N/A N/A N/A
B‐27 Storage Room Wall Masonry N/A N/A N/A N/A N/A
B‐27 Storage Room Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment; 2013ECHO Reassessment Survey; 2014 Pichin DSS Reassessment
B‐27 Storage Room Pipes Parging Cement Asbestos 2014‐A0005 A‐C None Detected N/A N/A
B‐27 Storage Room Pipes Fibreglass N/A N/A N/A N/A N/A
B‐27 Storage Room Ducts N/A N/A N/A N/A N/A N/A
B‐27 Storage Room Mechanical N/A N/A N/A N/A N/A N/A
B‐28 Rampway / Corridor Floor Vinyl Floor Tile Asbestos 2014‐A0001 A‐C None Detected N/A N/A12 x 12 Green and mastic; 2014 Pichin DSS Reassessment
B‐28 Rampway / Corridor Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
B‐28 Rampway / Corridor Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
B‐28 Rampway / Corridor Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment; 2013ECHO Reassessment Survey; 2014 Pichin DSS Reassessment
B‐28 Rampway / Corridor Pipes Fibreglass N/A N/A N/A N/A N/A
B‐28 Rampway / Corridor Ducts N/A N/A N/A N/A N/A N/A
B‐28 Rampway / Corridor Mechanical N/A N/A N/A N/A N/A N/A
1‐01 Office Floor Vinyl Sheet Flooring Asbestos 2015‐A0006A‐C None Detected N/A N/A Beige/Tan/White/Blue Lines
1‐01 Office Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
1‐01 Office Wall Drywall Joint Compound N/A2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
1‐01 Office Ceiling Acoustic Ceiling Tile Asbestos 2015‐A0001A‐C None Detected N/A N/A 2 x 4 Lay‐in Fissure and Pinhole Pattern
1‐01 Office Pipes Not Insulated N/A N/A N/A N/A N/A
1‐01 Office Ducts N/A N/A N/A N/A N/A N/A NAC
1‐01 Office Mechanical N/A N/A N/A N/A N/A N/A NAC
1‐02 Office Floor Vinyl Sheet Flooring Asbestos 2015‐A0006A‐C None Detected N/A N/A Beige/Tan/White/Blue Lines
674 Dundas Street West, Toronto 10 of 31
APPENDIX V - Survey Form
Location Number Location Name Building
System Material ObservedPotential
Hazardous Material
Sample ID Analytical Result
Qua
ntity
Con
ditio
n
Notes / Recommended Actions
October 18, 2016
Notes
674 Dundas Street West
Women's Residence Pinchin Ltd - T. Stanisic
Date(s) of Current Survey:
Organization Completing Survey
Building Address
Building Name
1‐02 Office Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
1‐02 Office Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
1‐02 Office Ceiling Acoustic Ceiling Tile Asbestos 2015‐A0001A‐C None Detected N/A N/A 2 x 4 Lay‐in Fissure and Pinhole Pattern
1‐02 Office Ceiling Acoustic Ceiling Tile Asbestos 2015‐A0002A‐C None Detected N/A N/A 2 x 4 Lay‐in Widthwise Fissure and Pinhole
1‐02 Office Pipes Not Insulated N/A N/A N/A N/A N/A
1‐02 Office Ducts N/A N/A N/A N/A N/A N/A NAC
1‐02 Office Mechanical N/A N/A N/A N/A N/A N/A NAC
1‐03 Office Floor Vinyl Sheet Flooring Asbestos 2015‐A0006A‐C None Detected N/A N/A Beige/Tan/White/Blue Lines
1‐03 Office Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
1‐03 Office Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
1‐03 Office Ceiling Acoustic Ceiling Tile Asbestos 2015‐A0001A‐C None Detected N/A N/A 2 x 4 Lay‐in Fissure and Pinhole Pattern
1‐03 Office Pipes Not Insulated N/A N/A N/A N/A N/A
1‐03 Office Ducts N/A N/A N/A N/A N/A N/A NAC
1‐03 Office Mechanical N/A N/A N/A N/A N/A N/A NAC
1‐04 Reception Floor Vinyl Sheet Flooring Asbestos 2015‐A0006A‐C None Detected N/A N/A Beige/Tan/White/Blue Lines
1‐04 Reception Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
1‐04 Reception Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
1‐04 Reception Wall Beige Paint Lead 2012‐Pb03 <0.009 N/A N/A
1‐04 Reception Ceiling Acoustic Ceiling Tile Asbestos 2015‐A0001A‐C None Detected N/A N/A 2 x 4 Lay‐in Fissure and Pinhole Pattern
1‐04 Reception Ceiling Acoustic Ceiling Tile Asbestos 2015‐A0002A‐C None Detected N/A N/A 2 x 4 Lay‐in Widthwise Fissure and Pinhole
1‐04 Reception Pipes Not Insulated N/A N/A N/A N/A N/A
1‐04 Reception Ducts N/A N/A N/A N/A N/A N/A NAC
1‐04 Reception Mechanical N/A N/A N/A N/A N/A N/A NAC
674 Dundas Street West, Toronto 11 of 31
APPENDIX V - Survey Form
Location Number Location Name Building
System Material ObservedPotential
Hazardous Material
Sample ID Analytical Result
Qua
ntity
Con
ditio
n
Notes / Recommended Actions
October 18, 2016
Notes
674 Dundas Street West
Women's Residence Pinchin Ltd - T. Stanisic
Date(s) of Current Survey:
Organization Completing Survey
Building Address
Building Name
1‐05 Dining Room Floor Vinyl Floor Tile Asbestos 2014‐A0001 A‐C None Detected N/A N/A12 x 12 Green and mastic; 2014 Pichin DSS Reassessment
1‐05 Dining Room Floor Vinyl Floor Tile Asbestos 2015‐A0008A‐C None Detected N/A N/A 12"x12" yellow mottled and mastic
1‐05 Dining Room Floor Vinyl Floor Tile Asbestos 2015‐A0009A‐C None Detected N/A N/A 12"x12" orange mottled and mastic
1‐05 Dining Room Floor Vinyl Floor Tile Asbestos 2015‐A0010A‐C None Detected N/A N/A 12 x 12 Dark Blue mottled and mastic
1‐05 Dining Room Floor Vinyl Sheet Flooring Asbestos 2015‐A0005A‐C None Detected N/A N/A VSF orange (located underneath vinyl floor tiles)
1‐05 Dining Room Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
1‐05 Dining Room Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
1‐05 Dining Room Ceiling Acoustic Ceiling Tile Asbestos 2015‐A0001A‐C None Detected N/A N/A 2 x 4 Lay‐in Fissure and Pinhole Pattern
1‐05 Dining Room Ceiling Texture Finish Asbestos 2016‐A0001A‐C None Detected N/A N/A 2016 Pinchin Reassessment
1‐05 Dining Room Pipes Not Insulated N/A N/A N/A N/A N/A
1‐05 Dining Room Ducts Not Insulated N/A N/A N/A N/A N/A
1‐05 Dining Room Mechanical N/A N/A N/A N/A N/A N/A NAC
1‐06 Dishwashing Room Floor Vinyl Sheet Flooring Asbestos 2015‐A0003A‐C None Detected N/A N/A Grey with blue flecks
1‐06 Dishwashing Room Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
1‐06 Dishwashing Room Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
1‐06 Dishwashing Room Ceiling Drywall N/A N/A N/A N/A N/A Drywall panel ceiling tiles for fire code
1‐06 Dishwashing Room Pipes Not Insulated N/A N/A N/A N/A N/A
1‐06 Dishwashing Room Ducts N/A N/A N/A N/A N/A N/A NAC
1‐06 Dishwashing Room Mechanical N/A N/A N/A N/A N/A N/A NAC
1‐07 Office Floor Vinyl Sheet Flooring Asbestos 2015‐A0003A‐C None Detected N/A N/A Grey with blue flecks
1‐07 Office Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
1‐07 Office Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
1‐07 Office Ceiling Acoustic Ceiling Tile Asbestos 2015‐A0001A‐C None Detected N/A N/A 2 x 4 Lay‐in Fissure and Pinhole Pattern
674 Dundas Street West, Toronto 12 of 31
APPENDIX V - Survey Form
Location Number Location Name Building
System Material ObservedPotential
Hazardous Material
Sample ID Analytical Result
Qua
ntity
Con
ditio
n
Notes / Recommended Actions
October 18, 2016
Notes
674 Dundas Street West
Women's Residence Pinchin Ltd - T. Stanisic
Date(s) of Current Survey:
Organization Completing Survey
Building Address
Building Name
1‐07 Office Pipes Not Insulated N/A N/A N/A N/A N/A
1‐07 Office Ducts N/A N/A N/A N/A N/A N/A NAC
1‐07 Office Mechanical N/A N/A N/A N/A N/A N/A NAC
1‐08 Servery Floor Vinyl Sheet Flooring Asbestos 2015‐A0004A‐C None Detected N/A N/A Grey
1‐08 Servery Floor Vinyl Sheet Flooring Asbestos 2015‐A0005A‐C None Detected N/A N/AOrange (located underneath newer vinyl floor tiles and vinyl sheet flooring)
1‐08 Servery Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
1‐08 Servery Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
1‐08 Servery Ceiling Drywall Panels N/A N/A N/A N/A N/A
1‐08 Servery Pipes N/A N/A N/A N/A N/A N/A NAC
1‐08 Servery Ducts N/A N/A N/A N/A N/A N/A NAC
1‐08 Servery Mechanical N/A N/A N/A N/A N/A N/A NAC
1‐09 Dry Goods Storage Room Floor Vinyl Floor Tile Asbestos 2014‐A0002 A‐C None Detected N/A N/A12 x 12 Grey with Grey Fleck and mastic; 2014 Pinchin DSS Reassessment
1‐09 Dry Goods Storage Room Wall Drywall Joint Compound N/A2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment; 2013ECHO Reassessment Survey; 2014 Pichin DSS Reassessment
1‐09 Dry Goods Storage Room Ceiling N/A N/A N/A N/A N/A N/A Concrete Deck
1‐09 Dry Goods Storage Room Pipes Fibreglass N/A N/A N/A N/A N/A
1‐09 Dry Goods Storage Room Ducts N/A N/A N/A N/A N/A N/A
1‐09 Dry Goods Storage Room Mechanical N/A N/A N/A N/A N/A N/A
1‐10 Freezer Floor Metal N/A N/A N/A N/A N/A
1‐10 Freezer Wall Metal N/A N/A N/A N/A N/A
1‐10 Freezer Ceiling Metal N/A N/A N/A N/A N/A
1‐10 Freezer Pipes N/A N/A N/A N/A N/A N/A
1‐10 Freezer Ducts N/A N/A N/A N/A N/A N/A
1‐10 Freezer Mechanical Not Insulated N/A N/A N/A N/A N/A Fan Unit
1‐11 Wash Station Floor Vinyl Floor Tile Asbestos 2014‐A0002 A‐C None Detected N/A N/A12 x 12 Grey with Grey Fleck and mastic; 2014 Pinchin DSS Reassessment
674 Dundas Street West, Toronto 13 of 31
APPENDIX V - Survey Form
Location Number Location Name Building
System Material ObservedPotential
Hazardous Material
Sample ID Analytical Result
Qua
ntity
Con
ditio
n
Notes / Recommended Actions
October 18, 2016
Notes
674 Dundas Street West
Women's Residence Pinchin Ltd - T. Stanisic
Date(s) of Current Survey:
Organization Completing Survey
Building Address
Building Name
1‐11 Wash Station Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
1‐11 Wash Station Wall Drywall Joint Compound N/A2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment; 2013ECHO Reassessment Survey; 2014 Pichin DSS Reassessment
1‐11 Wash Station Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
1‐11 Wash Station Pipes Not Insulated N/A N/A N/A N/A N/A
1‐11 Wash Station Ducts N/A N/A N/A N/A N/A N/A
1‐11 Wash Station Mechanical N/A N/A N/A N/A N/A N/A
1‐12 Kitchen Floor Terrazzo N/A N/A N/A N/A N/A
1‐12 Kitchen Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
1‐12 Kitchen Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
1‐12 Kitchen Ceiling Drywall Panels N/A N/A N/A N/A N/A
1‐12 Kitchen Pipes Not Insulated N/A N/A N/A N/A N/A
1‐12 Kitchen Ducts N/A N/A N/A N/A N/A N/A
1‐12 Kitchen Mechanical N/A N/A N/A N/A N/A N/A
1‐13 Office/Storage Floor Terrazzo N/A N/A N/A N/A N/A
1‐13 Office/Storage Wall Plaster Asbestos 2014‐A0002 A‐C None Detected N/A N/A
1‐13 Office/Storage Ceiling Limited Access Limited Access/View due to Stored Items and Ductwork
1‐13 Office/Storage Pipes Not Insulated N/A N/A N/A N/A N/A
1‐13 Office/Storage Ducts Not Insulated N/A N/A N/A N/A N/A
1‐13 Office/Storage Mechanical N/A N/A N/A N/A N/A N/A
1‐14 Corridor Floor Ceramic N/A N/A N/A N/A N/A
1‐14 Corridor Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
1‐14 Corridor Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
1‐14 Corridor Ceiling Acoustic Ceiling Tile Asbestos 2015‐A0001A‐C None Detected N/A N/A 2 x 4 Lay‐in Fissure and Pinhole Pattern
674 Dundas Street West, Toronto 14 of 31
APPENDIX V - Survey Form
Location Number Location Name Building
System Material ObservedPotential
Hazardous Material
Sample ID Analytical Result
Qua
ntity
Con
ditio
n
Notes / Recommended Actions
October 18, 2016
Notes
674 Dundas Street West
Women's Residence Pinchin Ltd - T. Stanisic
Date(s) of Current Survey:
Organization Completing Survey
Building Address
Building Name
1‐14 Corridor Pipes N/A N/A N/A N/A N/A N/A NAC
1‐14 Corridor Ducts N/A N/A N/A N/A N/A N/A NAC
1‐14 Corridor Mechanical N/A N/A N/A N/A N/A N/A NAC
1‐15 Overflow Room Floor Vinyl Floor Tile Asbestos 2014‐A0001 A‐C None Detected N/A N/A12 x 12 Green and mastic; 2014 Pichin DSS Reassessment
1‐15 Overflow Room Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
1‐15 Overflow Room Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
1‐15 Overflow Room Ceiling Acoustic Ceiling Tile Asbestos 2015‐A0001A‐C None Detected N/A N/A 2 x 4 Lay‐in Fissure and Pinhole Pattern
1‐15 Overflow Room Pipes N/A N/A N/A N/A N/A N/A
1‐15 Overflow Room Ducts N/A N/A N/A N/A N/A N/A
1‐15 Overflow Room Mechanical N/A N/A N/A N/A N/A N/A
1‐16 Intake Office Floor Vinyl Floor Tile Asbestos 2014‐A0001 A‐C None Detected N/A N/A12 x 12 Green and mastic; 2014 Pichin DSS Reassessment
1‐16 Intake Office Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
1‐16 Intake Office Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
1‐16 Intake Office Ceiling Acoustic Ceiling Tile Asbestos 2015‐A0001A‐C None Detected N/A N/A 2 x 4 Lay‐in Fissure and Pinhole Pattern
1‐16 Intake Office Pipes Fibreglass N/A N/A N/A N/A N/A
1‐16 Intake Office Ducts Not Insulated N/A N/A N/A N/A N/A
1‐16 Intake Office Mechanical N/A N/A N/A N/A N/A N/A
1‐17 Manager's Office Floor Vinyl Floor Tile Asbestos 2015‐A0011 A‐C None Detected N/A N/A 12 x 12 Cream with Beige Fleck and mastic
1‐17 Manager's Office Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
1‐17 Manager's Office Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
1‐17 Manager's Office Ceiling Acoustic Ceiling Tile Asbestos 2015‐A0001A‐C None Detected N/A N/A 2 x 4 Lay‐in Fissure and Pinhole Pattern
1‐17 Manager's Office Pipes Not Insulated N/A N/A N/A N/A N/A
1‐17 Manager's Office Ducts Not Insulated N/A N/A N/A N/A N/A
674 Dundas Street West, Toronto 15 of 31
APPENDIX V - Survey Form
Location Number Location Name Building
System Material ObservedPotential
Hazardous Material
Sample ID Analytical Result
Qua
ntity
Con
ditio
n
Notes / Recommended Actions
October 18, 2016
Notes
674 Dundas Street West
Women's Residence Pinchin Ltd - T. Stanisic
Date(s) of Current Survey:
Organization Completing Survey
Building Address
Building Name
1‐17 Manager's Office Mechanical N/A N/A N/A N/A N/A N/A
1‐18 Office Floor Vinyl Floor Tile Asbestos 2014‐A0001 A‐C None Detected N/A N/A12 x 12 Green and mastic; 2014 Pichin DSS Reassessment
1‐18 Office Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
1‐18 Office Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
1‐18 Office Ceiling Acoustic Ceiling Tile Asbestos 2015‐A0001A‐C None Detected N/A N/A 2 x 4 Lay‐in Fissure and Pinhole Pattern
1‐18 Office Pipes Fibreglass N/A N/A N/A N/A N/A
1‐18 Office Ducts Not Insulated N/A N/A N/A N/A N/A
1‐18 Office Mechanical N/A N/A N/A N/A N/A N/A
1‐19 Copy Room Floor Ceramic N/A N/A N/A N/A N/A
1‐19 Copy Room Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
1‐19 Copy Room Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
1‐19 Copy Room Ceiling Acoustic Ceiling Tile Asbestos 2014‐A0006 A‐C None Detected N/A N/A2 x 4 Lay‐in Small and Large Pinhole Pattern; 2014 Pinchin DSS Reassessment
1‐19 Copy Room Pipes Not Insulated N/A N/A N/A N/A N/A
1‐19 Copy Room Ducts Not Insulated N/A N/A N/A N/A N/A
1‐19 Copy Room Mechanical N/A N/A N/A N/A N/A N/A
1‐20 Washroom Floor Ceramic N/A N/A N/A N/A N/A
1‐20 Washroom Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
1‐20 Washroom Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
1‐20 Washroom Ceiling Acoustic Ceiling Tile Asbestos 2015‐A0001A‐C None Detected N/A N/A 2 x 4 Lay‐in Fissure and Pinhole Pattern
1‐20 Washroom Pipes Not Insulated N/A N/A N/A N/A N/A
1‐20 Washroom Ducts Not Insulated N/A N/A N/A N/A N/A
1‐20 Washroom Mechanical N/A N/A N/A N/A N/A N/A
1‐21 Laundry Room Floor Ceramic N/A N/A N/A N/A N/A
674 Dundas Street West, Toronto 16 of 31
APPENDIX V - Survey Form
Location Number Location Name Building
System Material ObservedPotential
Hazardous Material
Sample ID Analytical Result
Qua
ntity
Con
ditio
n
Notes / Recommended Actions
October 18, 2016
Notes
674 Dundas Street West
Women's Residence Pinchin Ltd - T. Stanisic
Date(s) of Current Survey:
Organization Completing Survey
Building Address
Building Name
1‐21 Laundry Room Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
1‐21 Laundry Room Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
1‐21 Laundry Room Ceiling Acoustic Ceiling Tile Asbestos 2015‐A0001A‐C None Detected N/A N/A 2 x 4 Lay‐in Fissure and Pinhole Pattern
1‐21 Laundry Room Pipes Not Insulated N/A N/A N/A N/A N/A
1‐21 Laundry Room Ducts Not Insulated N/A N/A N/A N/A N/A
1‐21 Laundry Room Mechanical N/A N/A N/A N/A N/A N/A
1‐22a Washroom Floor Ceramic N/A N/A N/A N/A N/A
1‐22a Washroom Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
1‐22a Washroom Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
1‐22a Washroom Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
1‐22a Washroom Pipes Not Insulated N/A N/A N/A N/A N/A
1‐22a Washroom Ducts Not Insulated N/A N/A N/A N/A N/A
1‐22a Washroom Mechanical N/A N/A N/A N/A N/A N/A
1‐22b Shower Wall Ceramic N/A N/A N/A N/A N/A
1‐22b Shower Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A
1‐22b Shower Pipes N/A N/A N/A N/A N/A N/A NAC
1‐22b Shower Ducts N/A N/A N/A N/A N/A N/A NAC
1‐22b Shower Mechanical N/A N/A N/A N/A N/A N/A NAC
1‐23 Janitor's Closet Floor Ceramic Tiles N/A N/A N/A N/A N/A
1‐23 Janitor's Closet Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
1‐23 Janitor's Closet Wall Drywall Joint Compound Asbestos 2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
1‐23 Janitor's Closet Wall Yellow Paint Lead 2012‐Pb02 <0.009% N/A N/A
674 Dundas Street West, Toronto 17 of 31
APPENDIX V - Survey Form
Location Number Location Name Building
System Material ObservedPotential
Hazardous Material
Sample ID Analytical Result
Qua
ntity
Con
ditio
n
Notes / Recommended Actions
October 18, 2016
Notes
674 Dundas Street West
Women's Residence Pinchin Ltd - T. Stanisic
Date(s) of Current Survey:
Organization Completing Survey
Building Address
Building Name
1‐23 Janitor's Closet Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
1‐23 Janitor's Closet Pipes Fibreglass N/A N/A N/A N/A N/A
1‐23 Janitor's Closet Ducts N/A N/A N/A N/A N/A N/A
1‐23 Janitor's Closet Mechanical N/A N/A N/A N/A N/A N/A
2‐01 Housing Office Floor Vinyl Floor Tile Asbestos 2015‐A0010A‐C None Detected N/A N/A 12 x 12 Dark Blue mottled and mastic
2‐01 Housing Office Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
2‐01 Housing Office Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
2‐01 Housing Office Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
2‐01 Housing Office Pipes Not Insulated N/A N/A N/A N/A N/A
2‐01 Housing Office Ducts Not Insulated N/A N/A N/A N/A N/A
2‐01 Housing Office Mechanical Not Insulated N/A N/A N/A N/A N/A Fan Unit
2‐02 Housing Outreach Floor Vinyl Floor Tile Asbestos 2014‐A0001 A‐C None Detected N/A N/A12 x 12 Green and mastic; 2014 Pichin DSS Reassessment
2‐02 Housing Outreach Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
2‐02 Housing Outreach Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
2‐02 Housing Outreach Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
2‐02 Housing Outreach Pipes N/A N/A N/A N/A N/A N/A
2‐02 Housing Outreach Ducts N/A N/A N/A N/A N/A N/A
2‐02 Housing Outreach Mechanical N/A N/A N/A N/A N/A N/A
2‐03 Washroom Floor Vinyl Floor Tile Asbestos 2015‐A0010A‐C None Detected N/A N/A 12 x 12 Dark Blue mottled and mastic
2‐03 Washroom Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
2‐03 Washroom Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
674 Dundas Street West, Toronto 18 of 31
APPENDIX V - Survey Form
Location Number Location Name Building
System Material ObservedPotential
Hazardous Material
Sample ID Analytical Result
Qua
ntity
Con
ditio
n
Notes / Recommended Actions
October 18, 2016
Notes
674 Dundas Street West
Women's Residence Pinchin Ltd - T. Stanisic
Date(s) of Current Survey:
Organization Completing Survey
Building Address
Building Name
2‐03 Washroom Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
2‐03 Washroom Pipes Not Insulated N/A N/A N/A N/A N/A
2‐03 Washroom Ducts N/A N/A N/A N/A N/A N/A
2‐03 Washroom Mechanical N/A N/A N/A N/A N/A N/A
2‐04 to 2‐11
Bedrooms Floor Vinyl Floor Tile Asbestos 2015‐A0012A‐C None Detected N/A N/A 12 x 12 Blue mottled and mastic
2‐04 to 2‐11
Bedrooms Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
2‐04 to 2‐12
Bedrooms Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
2‐04 to 2‐13
Bedrooms Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
2‐04 to 2‐14
Bedrooms Pipes Fibreglass N/A N/A N/A N/A N/A
2‐04 to 2‐15
Bedrooms Ducts N/A N/A N/A N/A N/A N/A
2‐04 to 2‐16
Bedrooms Mechanical Not Insulated N/A N/A N/A N/A N/A Fan Unit
2‐12 Storage Floor Vinyl Floor Tile Asbestos 2014‐A0004 A‐C None Detected N/A N/A12 x 12 Beige and mastic; 2014 Pinchin DSS Reassessment
2‐12 Storage Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
2‐12 Storage Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
2‐12 Storage Pipes Not Insulated N/A N/A N/A N/A N/A
2‐12 Storage Ducts N/A N/A N/A N/A N/A N/A
2‐12 Storage Mechanical N/A N/A N/A N/A N/A N/A
2‐13 Electrical Room Floor Vinyl Floor Tile Asbestos 2014‐A0004 A‐C None Detected N/A N/A12 x 12 Beige and mastic; 2014 Pinchin DSS Reassessment
2‐13 Electrical Room Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
2‐13 Electrical Room Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
2‐13 Electrical Room Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
674 Dundas Street West, Toronto 19 of 31
APPENDIX V - Survey Form
Location Number Location Name Building
System Material ObservedPotential
Hazardous Material
Sample ID Analytical Result
Qua
ntity
Con
ditio
n
Notes / Recommended Actions
October 18, 2016
Notes
674 Dundas Street West
Women's Residence Pinchin Ltd - T. Stanisic
Date(s) of Current Survey:
Organization Completing Survey
Building Address
Building Name
2‐13 Electrical Room Pipes Not Insulated N/A N/A N/A N/A N/A
2‐13 Electrical Room Ducts Not Insulated N/A N/A N/A N/A N/A
2‐13 Electrical Room Mechanical Not Insulated N/A N/A N/A N/A N/A
2‐13 Electrical Room Mechanical Transformer PCBs N/A None Detected N/A N/A Dry Type Transformer
2‐14 Maintenance / Storage Floor Vinyl Floor Tile Asbestos 2014‐A0004 A‐C None Detected N/A N/A12 x 12 Beige and mastic; 2014 Pinchin DSS Reassessment
2‐14 Maintenance / Storage Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
2‐14 Maintenance / Storage Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
2‐14 Maintenance / Storage Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
2‐14 Maintenance / Storage Pipes Fibreglass N/A N/A N/A N/A N/A
2‐14 Maintenance / Storage Ducts N/A N/A N/A N/A N/A N/A
2‐14 Maintenance / Storage Mechanical Not Insulated N/A N/A N/A N/A N/A Fan Unit
2‐16 Laundry Room Floor Terrazzo N/A N/A N/A N/A N/A
2‐16 Laundry Room Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
2‐16 Laundry Room Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
2‐16 Laundry Room Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
2‐16 Laundry Room Ceiling Acoustic Ceiling Tile Asbestos 2015‐A0001A‐C None Detected N/A N/A 2 x 4 Lay‐in, Fissure and Pinhole Pattern
2‐16 Laundry Room Pipes Fibreglass N/A N/A N/A N/A N/A
2‐16 Laundry Room Ducts Not Insulated N/A N/A N/A N/A N/A
2‐16 Laundry Room Mechanical N/A N/A N/A N/A N/A N/A
2‐15/2‐17 Washrooms Floor Terrazzo N/A N/A N/A N/A N/A
2‐15/2‐17 Washrooms Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
2‐15/2‐18 Washrooms Wall Drywall Joint Compound Lead 2016‐L0002 <0.006% N/A N/A
2‐15/2‐18 Washrooms Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
674 Dundas Street West, Toronto 20 of 31
APPENDIX V - Survey Form
Location Number Location Name Building
System Material ObservedPotential
Hazardous Material
Sample ID Analytical Result
Qua
ntity
Con
ditio
n
Notes / Recommended Actions
October 18, 2016
Notes
674 Dundas Street West
Women's Residence Pinchin Ltd - T. Stanisic
Date(s) of Current Survey:
Organization Completing Survey
Building Address
Building Name
2‐15/2‐19 Washrooms Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
2‐15/2‐20 Washrooms Pipes N/A N/A N/A N/A N/A N/A
2‐15/2‐21 Washrooms Ducts N/A N/A N/A N/A N/A N/A
2‐15/2‐22 Washrooms Mechanical N/A N/A N/A N/A N/A N/A
2‐18 Janitor's Closet Floor Terrazzo N/A N/A N/A N/A N/A
2‐18 Janitor's Closet Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
2‐18 Janitor's Closet Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
2‐18 Janitor's Closet Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
2‐18 Janitor's Closet Pipes Not Insulated N/A N/A N/A N/A N/A
2‐18 Janitor's Closet Ducts N/A N/A N/A N/A N/A N/A
2‐18 Janitor's Closet Mechanical N/A N/A N/A N/A N/A N/A
2‐19 Storage Floor Vinyl Floor Tile Asbestos 2015‐A0010A‐C None Detected N/A N/A 12 x 12 Dark blue mottled and mastic
2‐19 Storage Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
2‐19 Storage Wall Drywall Joint Compound Asbestos 2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
2‐19 Storage Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
2‐19 Storage Ceiling Acoustic Ceiling Tile Asbestos 2015‐A0001A‐C None Detected N/A N/A 2 x 4 Lay‐in, Fissure and Pinhole Pattern
2‐19 Storage Pipes Not Insulated N/A N/A N/A N/A N/A
2‐19 Storage Ducts N/A N/A N/A N/A N/A N/A
2‐19 Storage Mechanical N/A N/A N/A N/A N/A N/A
2‐20 Staff Room Floor Vinyl Floor Tile Asbestos 2015‐A0010A‐C None Detected N/A N/A 12 x 12 Dark blue mottled and mastic
2‐20 Staff Room Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
2‐20 Staff Room Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
674 Dundas Street West, Toronto 21 of 31
APPENDIX V - Survey Form
Location Number Location Name Building
System Material ObservedPotential
Hazardous Material
Sample ID Analytical Result
Qua
ntity
Con
ditio
n
Notes / Recommended Actions
October 18, 2016
Notes
674 Dundas Street West
Women's Residence Pinchin Ltd - T. Stanisic
Date(s) of Current Survey:
Organization Completing Survey
Building Address
Building Name
2‐20 Staff Room Ceiling Drywall Joint Compound Asbestos 2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
2‐20 Staff Room Wall Paint Lead 2016‐L0002 <0.006% N/A N/A blue paint
2‐20 Staff Room Pipes Fibreglass N/A N/A N/A N/A N/A
2‐20 Staff Room Ducts N/A N/A N/A N/A N/A N/A
2‐20 Staff Room Mechanical Not Insulated N/A N/A N/A N/A N/A Fan Unit
2‐21 Balcony Floor Concrete N/A N/A N/A N/A N/A
2‐21 Balcony Wall Concrete N/A N/A N/A N/A N/A
2‐21 Balcony Ceiling Concrete N/A N/A N/A N/A N/A
2‐21 Balcony Pipes N/A N/A N/A N/A N/A N/A
2‐21 Balcony Ducts N/A N/A N/A N/A N/A N/A
2‐21 Balcony Mechanical N/A N/A N/A N/A N/A N/A
2‐22 Office Floor Vinyl Floor Tile Asbestos 2015‐A0010A‐C None Detected N/A N/A 12 x 12 Dark blue mottled and mastic
2‐22 Office Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
2‐22 Office Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
2‐22 Office Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
2‐22 Office Pipes N/A N/A N/A N/A N/A N/A
2‐22 Office Ducts N/A N/A N/A N/A N/A N/A
2‐22 Office Mechanical N/A N/A N/A N/A N/A N/A
2‐23 Counsellor's Office Floor Vinyl Floor Tile Asbestos 2015‐A0012A‐C None Detected N/A N/A 12 x 12 Blue Mottled and mastic
2‐23 Counsellor's Office Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
2‐23 Counsellor's Office Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; None Detected N/A N/A
2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;
2‐23 Counsellor's Office Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; None Detected N/A N/A
2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;
2‐23 Counsellor's Office Pipes Fibreglass N/A N/A N/A N/A N/A
2‐23 Counsellor's Office Ducts Not Insulated N/A N/A N/A N/A N/A
674 Dundas Street West, Toronto 22 of 31
APPENDIX V - Survey Form
Location Number Location Name Building
System Material ObservedPotential
Hazardous Material
Sample ID Analytical Result
Qua
ntity
Con
ditio
n
Notes / Recommended Actions
October 18, 2016
Notes
674 Dundas Street West
Women's Residence Pinchin Ltd - T. Stanisic
Date(s) of Current Survey:
Organization Completing Survey
Building Address
Building Name
2‐23 Counsellor's Office Mechanical Not Insulated N/A N/A N/A N/A N/A Fan Unit
2‐24 Office Floor Vinyl Floor Tile Asbestos 2015‐A0012A‐C None Detected N/A N/A 12 x 12 Blue Mottled and mastic
2‐24 Office Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
2‐24 Office Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A
2‐24 Office Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A
2‐24 Office Pipes Fibreglass N/A N/A N/A N/A N/A
2‐24 Office Ducts Not Insulated N/A N/A N/A N/A N/A
2‐24 Office Mechanical Not Insulated N/A N/A N/A N/A N/A Fan Unit
2‐25 Meeting Room Floor Vinyl Sheet Flooring Asbestos 2015‐A0007A‐C None Detected N/A N/A Orange/Brown
2‐25 Meeting Room Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
2‐25 Meeting Room Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
2‐25 Meeting Room Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
2‐25 Meeting Room Pipes Fibreglass N/A N/A N/A N/A N/A
2‐25 Meeting Room Ducts Not Insulated N/A N/A N/A N/A N/A
2‐25 Meeting Room Mechanical Not Insulated N/A N/A N/A N/A N/A Fan Unit
2‐26 Corridor Floor Vinyl Floor Tile Asbestos 2015‐A0010A‐C None Detected N/A N/A 12 x 12 Dark blue mottled and mastic
2‐26 Corridor Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
2‐26 Corridor Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
2‐26 Corridor Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
2‐26 Corridor Pipes Not Insulated N/A N/A N/A N/A N/A
2‐26 Corridor Ducts N/A N/A N/A N/A N/A N/A NAC
2‐26 Corridor Mechanical N/A N/A N/A N/A N/A N/A NAC
674 Dundas Street West, Toronto 23 of 31
APPENDIX V - Survey Form
Location Number Location Name Building
System Material ObservedPotential
Hazardous Material
Sample ID Analytical Result
Qua
ntity
Con
ditio
n
Notes / Recommended Actions
October 18, 2016
Notes
674 Dundas Street West
Women's Residence Pinchin Ltd - T. Stanisic
Date(s) of Current Survey:
Organization Completing Survey
Building Address
Building Name
3‐01 to 3‐14
Bedrooms Floor Vinyl Floor Tile Asbestos 2015‐A0012A‐C None Detected N/A N/A 12 x 12 Blue Mottled and mastic
3‐01 to 3‐14
Bedrooms Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
3‐01 to 3‐15
Bedrooms Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
3‐01 to 3‐16
Bedrooms Ceiling Drywall Joint Compound N/A2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
3‐01 to 3‐17
Bedrooms Pipes Fibreglass N/A N/A N/A N/A N/A
3‐01 to 3‐18
Bedrooms Ducts N/A N/A N/A N/A N/A N/A
3‐01 to 3‐19
Bedrooms Mechanical Not Insulated N/A N/A N/A N/A N/A Fan Unit
3‐16 Staff Room Floor Vinyl Floor Tile Asbestos 2015‐A0015A‐C None Detected N/A N/A 12 x 12 Purple and mastic
3‐16 Staff Room Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
3‐16 Staff Room Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
3‐16 Staff Room Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
3‐16 Staff Room Pipes Fibreglass N/A N/A N/A N/A N/A
3‐16 Staff Room Ducts N/A N/A N/A N/A N/A N/A
3‐16 Staff Room Mechanical Not Insulated N/A N/A N/A N/A N/A Fan Unit
3‐17 Medical Supplies Floor Vinyl Floor Tile Asbestos 2015‐A0015A‐C None Detected N/A N/A 12 x 12 Purple and mastic
3‐17 Medical Supplies Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
3‐17 Medical Supplies Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
3‐17 Medical Supplies Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
3‐17 Medical Supplies Pipes Fibreglass N/A N/A N/A N/A N/A
3‐17 Medical Supplies Ducts N/A N/A N/A N/A N/A N/A
3‐17 Medical Supplies Mechanical Not Insulated N/A N/A N/A N/A N/A Fan Unit
3‐18 Storage Floor Vinyl Floor Tile Asbestos 2015‐A0013A‐C None Detected N/A N/A 12 x12 Grey with White Streaks and mastic
674 Dundas Street West, Toronto 24 of 31
APPENDIX V - Survey Form
Location Number Location Name Building
System Material ObservedPotential
Hazardous Material
Sample ID Analytical Result
Qua
ntity
Con
ditio
n
Notes / Recommended Actions
October 18, 2016
Notes
674 Dundas Street West
Women's Residence Pinchin Ltd - T. Stanisic
Date(s) of Current Survey:
Organization Completing Survey
Building Address
Building Name
3‐18 Storage Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
3‐18 Storage Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
3‐18 Storage Ceiling Acoustic Ceiling Tile Asbestos 2015‐A0002A‐C None Detected N/A N/A 2 x 4 Lay‐in Widthwise Fissure and Pinhole
3‐18 Storage Pipes Not Insulated N/A N/A N/A N/A N/A
3‐18 Storage Ducts Not Insulated N/A N/A N/A N/A N/A
3‐18 Storage Mechanical N/A N/A N/A N/A N/A N/A
3‐19 Janitor's Closet Floor Terrazzo N/A N/A N/A N/A N/A
3‐19 Janitor's Closet Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
3‐19 Janitor's Closet Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
3‐19 Janitor's Closet Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
3‐19 Janitor's Closet Pipes N/A N/A N/A N/A N/A N/A NAC
3‐19 Janitor's Closet Ducts N/A N/A N/A N/A N/A N/A NAC
3‐19 Janitor's Closet Mechanical N/A N/A N/A N/A N/A N/A NAC
3‐20 Washroom Floor Terrazzo N/A N/A N/A N/A N/A
3‐20 Washroom Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
3‐20 Washroom Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
3‐20 Washroom Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
3‐20 Washroom Pipes N/A N/A N/A N/A N/A N/A NAC
3‐20 Washroom Ducts N/A N/A N/A N/A N/A N/A NAC
3‐20 Washroom Mechanical N/A N/A N/A N/A N/A N/A NAC
3‐21 Showers Floor Terrazzo N/A N/A N/A N/A N/A
3‐21 Showers Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
674 Dundas Street West, Toronto 25 of 31
APPENDIX V - Survey Form
Location Number Location Name Building
System Material ObservedPotential
Hazardous Material
Sample ID Analytical Result
Qua
ntity
Con
ditio
n
Notes / Recommended Actions
October 18, 2016
Notes
674 Dundas Street West
Women's Residence Pinchin Ltd - T. Stanisic
Date(s) of Current Survey:
Organization Completing Survey
Building Address
Building Name
3‐21 Showers Ceiling Drywall Joint Compound N/A2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
3‐21 Showers Pipes N/A N/A N/A N/A N/A N/A NAC
3‐21 Showers Ducts N/A N/A N/A N/A N/A N/A NAC
3‐21 Showers Mechanical N/A N/A N/A N/A N/A N/A NAC
3‐22 Electrical Room Floor Vinyl Floor Tile Asbestos 2014‐A0004 A‐C None Detected N/A N/A12 x 12 Beige and mastic; 2014 Pinchin DSS Reassessment
3‐22 Electrical Room Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
3‐22 Electrical Room Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
3‐22 Electrical Room Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
3‐22 Electrical Room Pipes Not Insulated N/A N/A N/A N/A N/A
3‐22 Electrical Room Ducts N/A N/A N/A N/A N/A N/A
3‐22 Electrical Room Mechanical N/A N/A N/A N/A N/A N/A
3‐23 Storage Floor Vinyl Floor Tile Asbestos 2014‐A0004 A‐C None Detected N/A N/A12 x 12 Beige and mastic; 2014 Pinchin DSS Reassessment
3‐23 Storage Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
3‐23 Storage Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
3‐23 Storage Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
3‐23 Storage Pipes Not Insulated N/A N/A N/A N/A N/A
3‐23 Storage Ducts N/A N/A N/A N/A N/A N/A
3‐23 Storage Mechanical N/A N/A N/A N/A N/A N/A
3‐24 Corridor Floor Vinyl Floor Tile Asbestos 2015‐A0015A‐C None Detected N/A N/A 12 x 12 Purple and mastic
3‐24 Corridor Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
3‐24 Corridor Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
674 Dundas Street West, Toronto 26 of 31
APPENDIX V - Survey Form
Location Number Location Name Building
System Material ObservedPotential
Hazardous Material
Sample ID Analytical Result
Qua
ntity
Con
ditio
n
Notes / Recommended Actions
October 18, 2016
Notes
674 Dundas Street West
Women's Residence Pinchin Ltd - T. Stanisic
Date(s) of Current Survey:
Organization Completing Survey
Building Address
Building Name
3‐24 Corridor Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
3‐24 Corridor Pipes Not Insulated N/A N/A N/A N/A N/A
3‐24 Corridor Ducts N/A N/A N/A N/A N/A N/A
3‐24 Corridor Mechanical N/A N/A N/A N/A N/A N/A
3‐25 Maintenance / Storage Floor Vinyl Floor Tile Asbestos 2014‐A0004 A‐C None Detected N/A N/A12 x 12 Beige and mastic; 2014 Pinchin DSS Reassessment
3‐25 Maintenance / Storage Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
3‐25 Maintenance / Storage Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
3‐25 Maintenance / Storage Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
3‐25 Maintenance / Storage Pipes Not Insulated N/A N/A N/A N/A N/A
3‐25 Maintenance / Storage Ducts N/A N/A N/A N/A N/A N/A
3‐25 Maintenance / Storage Mechanical N/A N/A N/A N/A N/A N/A
4‐01 to 4‐12
Bedrooms Floor Vinyl Floor Tile Asbestos 2014‐A0001 A‐C None Detected N/A N/A12 x 12 Green and mastic; 2014 Pichin DSS Reassessment
4‐01 to 4‐12
Bedrooms Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
4‐01 to 4‐13
Bedrooms Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
4‐01 to 4‐14
Bedrooms Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
4‐01 to 4‐15
Bedrooms Pipes Fibreglass N/A N/A N/A N/A N/A
4‐01 to 4‐16
Bedrooms Ducts N/A N/A N/A N/A N/A N/A
4‐01 to 4‐17
Bedrooms Mechanical Not Insulated N/A N/A N/A N/A N/A Fan Unit
4‐14 Staff Room Floor Vinyl Floor Tile Asbestos 2014‐A0001 A‐C None Detected N/A N/A12 x 12 Green and mastic; 2014 Pichin DSS Reassessment
4‐14 Staff Room Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
4‐14 Staff Room Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
674 Dundas Street West, Toronto 27 of 31
APPENDIX V - Survey Form
Location Number Location Name Building
System Material ObservedPotential
Hazardous Material
Sample ID Analytical Result
Qua
ntity
Con
ditio
n
Notes / Recommended Actions
October 18, 2016
Notes
674 Dundas Street West
Women's Residence Pinchin Ltd - T. Stanisic
Date(s) of Current Survey:
Organization Completing Survey
Building Address
Building Name
4‐14 Staff Room Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
4‐14 Staff Room Pipes Not Insulated N/A N/A N/A N/A N/A
4‐14 Staff Room Ducts N/A N/A N/A N/A N/A N/A
4‐14 Staff Room Mechanical N/A N/A N/A N/A N/A N/A
4‐15 Lounge Floor Vinyl Floor Tile Asbestos 2014‐A0001 A‐C None Detected N/A N/A12 x 12 Green and mastic; 2014 Pichin DSS Reassessment
4‐15 Lounge Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
4‐15 Lounge Wall Drywall Joint Compound N/A2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
4‐15 Lounge Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
4‐15 Lounge Pipes Not Insulated N/A N/A N/A N/A N/A
4‐15 Lounge Ducts N/A N/A N/A N/A N/A N/A
4‐15 Lounge Mechanical N/A N/A N/A N/A N/A N/A
4‐16 Linen Room Floor Vinyl Floor Tile Asbestos 2014‐A0001 A‐C None Detected N/A N/A12 x 12 Green and mastic; 2014 Pichin DSS Reassessment
4‐16 Linen Room Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
4‐16 Linen Room Wall Drywall Joint Compound N/A2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
4‐16 Linen Room Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
4‐16 Linen Room Pipes Not Insulated N/A N/A N/A N/A N/A
4‐16 Linen Room Ducts N/A N/A N/A N/A N/A N/A
4‐16 Linen Room Mechanical N/A N/A N/A N/A N/A N/A
4‐17 Laundry Room Floor Terrazzo N/A N/A N/A N/A N/A
4‐17 Laundry Room Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
4‐17 Laundry Room Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
674 Dundas Street West, Toronto 28 of 31
APPENDIX V - Survey Form
Location Number Location Name Building
System Material ObservedPotential
Hazardous Material
Sample ID Analytical Result
Qua
ntity
Con
ditio
n
Notes / Recommended Actions
October 18, 2016
Notes
674 Dundas Street West
Women's Residence Pinchin Ltd - T. Stanisic
Date(s) of Current Survey:
Organization Completing Survey
Building Address
Building Name
4‐17 Laundry Room Ceiling Drywall Joint Compound N/A2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
4‐17 Laundry Room Ceiling Acoustic Ceiling Tile Asbestos 2015‐A0001A‐C None Detected N/A N/A 2 x 4 Lay‐in, Fissure and Pinhole Pattern
4‐17 Laundry Room Pipes Not Insulated N/A N/A N/A N/A N/A
4‐17 Laundry Room Ducts Not Insulated N/A N/A N/A N/A N/A
4‐17 Laundry Room Mechanical N/A N/A N/A N/A N/A N/A
4‐18 Storage Floor Terrazzo N/A N/A N/A N/A N/A
4‐18 Storage Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
4‐18 Storage Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
4‐18 Storage Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
4‐18 Storage Pipes Not Insulated N/A N/A N/A N/A N/A
4‐18 Storage Ducts N/A N/A N/A N/A N/A N/A
4‐18 Storage Mechanical N/A N/A N/A N/A N/A N/A
4‐19 Washroom Floor Terrazzo N/A N/A N/A N/A N/A
4‐19 Washroom Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
4‐19 Washroom Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
4‐19 Washroom Ceiling Drywall Joint Compound Asbestos 2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
4‐19 Washroom Pipes N/A N/A N/A N/A N/A N/A NAC
4‐19 Washroom Ducts N/A N/A N/A N/A N/A N/A NAC
4‐19 Washroom Mechanical N/A N/A N/A N/A N/A N/A NAC
4‐20 Showers Floor Terrazzo N/A N/A N/A N/A N/A
4‐20 Showers Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
4‐20 Showers Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
674 Dundas Street West, Toronto 29 of 31
APPENDIX V - Survey Form
Location Number Location Name Building
System Material ObservedPotential
Hazardous Material
Sample ID Analytical Result
Qua
ntity
Con
ditio
n
Notes / Recommended Actions
October 18, 2016
Notes
674 Dundas Street West
Women's Residence Pinchin Ltd - T. Stanisic
Date(s) of Current Survey:
Organization Completing Survey
Building Address
Building Name
4‐20 Showers Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
4‐20 Showers Pipes N/A N/A N/A N/A N/A N/A NAC
4‐20 Showers Ducts N/A N/A N/A N/A N/A N/A NAC
4‐20 Showers Mechanical N/A N/A N/A N/A N/A N/A NAC
4‐21 Electrical Room Floor Vinyl Floor Tile Asbestos 2014‐A0004 A‐C None Detected N/A N/A12 x 12 Beige and mastic; 2014 Pinchin DSS Reassessment
4‐21 Electrical Room Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
4‐21 Electrical Room Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
4‐21 Electrical Room Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
4‐21 Electrical Room Pipes Not Insulated N/A N/A N/A N/A N/A
4‐21 Electrical Room Ducts N/A N/A N/A N/A N/A N/A
4‐21 Electrical Room Mechanical N/A N/A N/A N/A N/A N/A
4‐22 Storage Floor Vinyl Floor Tile Asbestos 2014‐A0004 A‐C None Detected N/A N/A12 x 12 Beige and mastic; 2014 Pinchin DSS Reassessment
4‐22 Storage Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
4‐22 Storage Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
4‐22 Storage Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
4‐22 Storage Pipes Not Insulated N/A N/A N/A N/A N/A
4‐22 Storage Ducts N/A N/A N/A N/A N/A N/A
4‐22 Storage Mechanical N/A N/A N/A N/A N/A N/A
4‐23 Maintenance / Storage Floor Vinyl Floor Tile Asbestos 2014‐A0004 A‐C None Detected N/A N/A12 x 12 Beige and mastic; 2014 Pinchin DSS Reassessment
4‐23 Maintenance / Storage Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
4‐23 Maintenance / Storage Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
674 Dundas Street West, Toronto 30 of 31
APPENDIX V - Survey Form
Location Number Location Name Building
System Material ObservedPotential
Hazardous Material
Sample ID Analytical Result
Qua
ntity
Con
ditio
n
Notes / Recommended Actions
October 18, 2016
Notes
674 Dundas Street West
Women's Residence Pinchin Ltd - T. Stanisic
Date(s) of Current Survey:
Organization Completing Survey
Building Address
Building Name
4‐23 Maintenance / Storage Pipes Not Insulated N/A N/A N/A N/A N/A
4‐23 Maintenance / Storage Ducts N/A N/A N/A N/A N/A N/A
4‐23 Maintenance / Storage Mechanical N/A N/A N/A N/A N/A N/A
4‐24 Corridor Floor Vinyl Floor Tile Asbestos 2014‐A0001 A‐C None Detected N/A N/A12 x 12 Green and mastic; 2014 Pichin DSS Reassessment
4‐24 Corridor Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
4‐24 Corridor Wall Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
4‐24 Corridor Ceiling Drywall Joint Compound Asbestos2012‐A0002 A‐C;
2013‐14375‐A17‐03 A‐C; 2014‐A0003 A‐C
None Detected N/A N/A2012 Pinchin DSS Assessment;2013 ECHO Reassessment Survey;2014 Pichin DSS Reassessment
4‐24 Corridor Pipes Fibreglass N/A N/A N/A N/A N/A
4‐24 Corridor Ducts N/A N/A N/A N/A N/A N/A
4‐24 Corridor Mechanical N/A N/A N/A N/A N/A N/A
S1 Main Stairwell Floor Vinyl Floor Tile Asbestos 2014‐A0001 A‐C None Detected N/A N/A12 x 12 Green and mastic; 2014 Pichin DSS Reassessment
S1 Main Stairwell Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
S1 Main Stairwell Wall Plaster Lead 2012‐Pb01 0.14% 4 sf Good
S1 Main Stairwell Wall Plaster Lead 2016‐L0001 0.10% 4sf Poor pink flaking paint
S1 Main Stairwell Ceiling Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
S1 Main Stairwell Pipes N/A N/A N/A N/A N/A N/A
S1 Main Stairwell Ducts N/A N/A N/A N/A N/A N/A
S1 Main Stairwell Mechanical N/A N/A N/A N/A N/A N/A
S2 Stairwell Floor Concrete N/A N/A N/A N/A N/A
S2 Stairwell Wall Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
S2 Stairwell Ceiling Plaster Asbestos 2014‐A0008 A‐G None Detected N/A N/A
S2 Stairwell Pipes N/A N/A N/A N/A N/A N/A
S2 Stairwell Ducts N/A N/A N/A N/A N/A N/A
S2 Stairwell Mechanical N/A N/A N/A N/A N/A N/A
674 Dundas Street West, Toronto 31 of 31