final_presentation

28
The Tandon Market The Tandon Market, Inc. Lan La Leung, Chief Operating Officer Amy Wood, Chief Engineering Officer Asad Ahmed, Chief Technology Officer Date of Presentation: December 8th, 2015

Upload: amy-wood

Post on 20-Mar-2017

125 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Final_Presentation

The Tandon MarketThe Tandon Market, Inc.Lan La Leung, Chief Operating OfficerAmy Wood, Chief Engineering OfficerAsad Ahmed, Chief Technology OfficerDate of Presentation: December 8th, 2015

Page 2: Final_Presentation

Agenda• Company Profile

• Project Description

• Cost Estimate

• Project Schedule

• Advantages of The Tandon Market

• Conclusion

Page 3: Final_Presentation

Company Profile• The Tandon Market, Inc.

• Company mission

• Making the supermarket a destination, not just an errand!

• Founded in December 2012

• Other store locations

• Shanghai

• Abu Dhabi

• London

• Paris Figure 1: Store locations

Page 4: Final_Presentation

Company Profile• Chief Operating Officer (COO)• Graduate of NYU Tandon School of Engineering, 2013

• BS in Civil Engineering

• Chief Technology Officer (CTO)• Graduate of NYU Tandon School of Engineering, 2011

• BS in Computer Science, concentration in Politics

• Chief Engineering Officer (CEO)• Graduate of NYU Tandon School of Engineering, 2013

• BS in Chemical and Biomolecular Engineering

Page 5: Final_Presentation

Project Description• Supermarket for Downtown Brooklyn

• Jay St. and Tillary St.• 400’ x 400’ lot

• Advanced Virtual Instrumentation (VI) Systems • Heating & Cooling• Security• Water Management• Internet

• Leadership in Energy & Environmental Design (LEED) Gold Certified Figure 2: Proposed location

Page 6: Final_Presentation

Figure 3: 3D AutoCAD model

Project Description

Page 7: Final_Presentation

Project Description

Figure 4: Front elevation AutoCAD drawing

Page 8: Final_Presentation

Project Description

Figure 5: Side elevation AutoCAD drawing

Page 9: Final_Presentation

Project Description

Figure 6: Floor plan AutoCAD drawing

Page 10: Final_Presentation

Project Description

Figure 7: Plumbing AutoCAD drawing

Page 11: Final_Presentation

Project Description

Figure 8: Electrical AutoCAD drawing

Page 12: Final_Presentation

Figure 9: Parking lot floor plan

Project Description

Page 13: Final_Presentation

Project Description

Figure 10: Heating/Cooling VI back panel

Figure 11: H/C VI front (off)

Figure 12: H/C VI front (AC on)

Figure 13: H/C VI front (Heat on)

Page 14: Final_Presentation

Project Description

Figure 14: Internet VI back panel

Figure 15: Internet VI front (on)

Figure 16: Internet VI front (off)

Page 15: Final_Presentation

Project Description

Figure 17: Lighting VI back panel

Figure 18: Lighting VI front (off)

Figure 19: Lighting VI front (on)

Page 16: Final_Presentation

Project Description

Figure 21: Water quality VI front (off)

Figure 22: Water quality VI front (impure)

Figure 23: Water quality VI front (pure)

Figure 20: Water quality VI back panel

Page 17: Final_Presentation

Project Description

Figure 24: Water quality VI front (limit reached)

Figure 25: Water quality VI front (limit warning) Figure 26: Water quality VI back panel

Page 18: Final_Presentation

Project Description

Figure 27: Water system VI back panel Figure 28: Water VI front (on) Figure 29: Water VI front (off)

Page 19: Final_Presentation

Project Description

Figure 30: Fire alarm VI back panel Figure 32: Fire alarm VI front (on)

Figure 31: Fire alarm VI front (off)

Page 20: Final_Presentation

Project Description

Figure 33: Security VI back panel

Figure 34: Security VI front (off)

Figure 35: Security VI front (on)

Page 21: Final_Presentation

Project Description

Figure 36: Surveillance VI back panel

Figure 37: Surveillance VI front (off)

Figure 38: Surveillance VI front (on)

Page 22: Final_Presentation

Project Description

Table 1: Power consumption

ItemAnnual Hours of

usagePower Required

(kWh)Power required annually (kWh) Annual cost ($)

AC 1500 21 31500 6300Refrigeration 8640 6 51840 10368LED Light Panels 3240 21 67910 13582Security System 8640 0 1382 276Elevators 4320 600 2592000 518400Registers 4320 2 8640 1728Heating 2160 6 12852 2570Miscellaneous 150 648000 129600Total 806 3414125 682825

Power (kWh/year) Cost ($)Total power required 3414125 682825Total savings from solar panels (300 panels) 216000 43200Total after savings 3198125 639625

Table 2: Power saved by solar panels

*Assume the electricity cost for New York City is $0.20 per kWh

Page 23: Final_Presentation

Cost EstimateTable 3: Cost estimate Item           Unit Cost ($) U/M Quantity Total ($)

Display Unit 176,867 Per unit 1 176,867

Heating/Cooling Unit 5,800 Per unit 7 40,600

Electrical System 228,678 Per unit 1 228,678

Plumbing System 4,940 Per unit 1 4,940

Security System 4,732 Per unit 1 4,732

Labor Cost 50 Per hour 4680 234,000

Energy Cost 639,625 Per month 1 639,625

Miscellaneous 527,195 Per unit 1 527,195

Grand Total ($) 1,856,637

Page 24: Final_Presentation

Project Schedule

Figure 39: Microsoft Project schedule from 10/6 /15 to 10/26 /15

ID Task Name Duration Start Finish

1 Milestone 1 0 days Tue 10/6/15 Tue 10/6/152 Complete teamwork

agreement1 day Tue 9/29/15 Tue 9/29/15

3 Complete Microsoft Project schedule

1 day Tue 9/29/15 Tue 9/29/15

4 Sketch design of store layout

4 days Tue 9/29/15 Fri 10/2/15

5 Make up team logo andstore name

1 day Mon 10/5/15 Mon 10/5/15

6 Visit Supermarkets 1 day Thu 10/1/15 Thu 10/1/157 Cost Estimate 2 days Fri 10/2/15 Mon 10/5/158 Make presentation 3 days Thu 10/1/15 Mon 10/5/159 Benchmark Assessment

A0 days Thu 10/15/15 Thu 10/15/15

10 Make a Lighting System VI

4 days Thu 10/1/15 Tue 10/6/15

11 AutoCAD drawings 6 days Mon 10/5/15 Mon 10/12/1512 Floor plan 2 days Mon 10/5/15 Tue 10/6/1513 Front elevation 2 days Wed 10/7/15 Thu 10/8/1514 Most detailed side

elevation2 days Fri 10/9/15 Mon

10/12/1515 Milestone 2 0 days Tue 10/27/15 Tue 10/27/1516 Updated cost estimate 2 days Sat 10/17/15 Mon

10/19/1517 Updated microsoft

project schedule1 day Wed

10/21/15Wed 10/21/15

18 Presentation 3 days Thu 10/22/15 Mon 10/26/1519 Benchmark Assessment B 0 days Thu 11/5/15 Thu 11/5/15

10/6

10/15

10/27

11/5

T T S M W F S T T S M W F S T TSep 27, '15 Oct 4, '15 Oct 11, '15 Oct 18, '15 Oct 25, '15

Page 25: Final_Presentation

Project Schedule

Figure 40: Microsoft Project schedule from 11/5 /15 to 12/8/15

Page 26: Final_Presentation

Advantages of The Tandon Market• Located in the most upcoming economic center of New York

• Accessible for residents, students, and business personnels

• Environmentally friendly

• Gold LEED Certification

• Reduces energy cost & water usage

• Aesthetically pleasing, unlike most supermarkets

• Provides job opportunities

• Healthy & delicious eateries attract more customers

Page 27: Final_Presentation

ConclusionWhy is The Tandon Market the right choice for Downtown Brooklyn?

• Successful in previous worldwide locations

• Transforming image of supermarket

• Introduces unique architectural style to the heart of Brooklyn

• Diverse land usage

• Encourages environmental awareness

Supermarket is a destination, not just an errand!

Page 28: Final_Presentation

The Tandon MarketThe Tandon Market, Inc.Lan La Leung, Chief Operating OfficerAmy Wood, Chief Engineering OfficerAsad Ahmed, Chief Technology OfficerDate of Presentation: December 8th, 2015