financing the decarbonized electric future our biggest challenge yet?
DESCRIPTION
Financing the Decarbonized Electric Future Our biggest challenge yet?. NARUC Summer 2010 Committee Meetings Sacramento, California Remarks of Ron Binz, Chairman Colorado Public Utilities Commission July 17, 2010. Outline of this presentation. CapEx for US Electric Supply 2010-2030 - PowerPoint PPT PresentationTRANSCRIPT
Financing the Decarbonized Electric Future Our biggest challenge yet?
NARUC Summer 2010 Committee MeetingsSacramento, California
Remarks of
Ron Binz, Chairman
Colorado Public Utilities Commission
July 17, 2010
2
Outline of this presentation
• CapEx for US Electric Supply 2010-2030
– With and without carbon regulation
• How big is the challenge?
• What are the regional differences?
• What are our regulatory and policy tools?
• Implications for design of carbon legislation
3
Caveat
• I am one of three equal commissioners
• My positions are my own
• I am confused by many things and have not made up my mind on much at all
• I don’t even agree with some of the things I say
• Good advice: don’t believe everything you think
What Would EPRI Do?
8
Efficiency
Biomass
Wind
Hydro
Nuclear
Gas
Retrofit CCS
New CCS
Non-CCS Coal
Efficiency
Biomass
Wind
Hydro
Nuclear
Gas
Retrofit CCS
New CCS
Non-CCS Coal
• US Investor-owned utilities total assets: $1.1 Trillion
• Brattle Group estimates $2.0 trillion CapEx needed in 2010-2030 under climate legislaton assumption; $1.5 trillion otherwise
Brattle Group CapEx Estimate
EIA Regional Groupings
Brattle Group CapEx Estimate
Brattle Group CapEx Estimate
International Energy Agency View
18
$1.1 T $2.7 T
$3.8 Trillion
Implications for Climate Legislation
• Urgency: important to start soon– Electric sector ready to move now– Encourage early action
• Cost containment: climate adds to cost pressure– Allocation of allowances– Curbs on speculation
• Innovation needed: Manhattan Project scale– Substantial R&D funding essential
• Keep options open: EPRI may be right– CCS and nuclear must be kept viable
19
20
Available atwww.fortnightly.co
m
• Electric power fIrst• Carbon cap• $4/ton CO2 research fee• Allowance allocation• Dampened trading• Early action provision
Implications for State Regulation
24
Thanks for the invitation.
I look forward to your questions.