THE GREEN NECKLACE OCTOBER 20, 2015 · · 1. Explain what the Green Necklace is 2. Provide background and history on the Green Necklace 3. Identify the different groups of people who will use the greenway 4. Identify opportunities and constraints, especially regarding pedestrian and cycling improvements 5. Review the proposed concept plan 6. Get feedback on the draft design principles 7. Discuss the next steps 1 WELCOME! GOALS FOR TODAY’S OPEN HOUSE WHY ARE WE HERE TODAY? The City of North Vancouver is planning the next section of the Green Necklace greenway. This will extend eastward along East Keith Rd from St. Andrews to Grand Boulevard and north through Grand Boulevard to 19th Street. We invite you to review the initial concept plan tonight and share your thoughts and ideas with us. Throughout the open house, please take an opportunity to fill out a questionnaire. TIMELINE FOR PUBLIC CONSULTATION PROCESS TODAY EARLY 2016 Open House #1 Open House #2 Stakeholder Meetings Present concept plan with draft design principles and gather feedback regarding existing and proposed features Meetings with groups such as local school students and interested property owners to get feedback on the concept Present a concept design based on feedback from Open House #1 and the stakeholder meetings. LATE 2015 MID 2016 Final Design and Construction Staff are happy to answer any questions you may have today. Don’t forget to fill out a questionnaire.

Upload: others

Post on 14-Sep-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: First Open House Boards revised - North Vancouver/media/4A90251800674E23A7B348A01BEB46C5.pdf · 2016. 2. 9. · Open House #1 Open House #2Stakeholder Meetings Present concept plan

THE GREEN NECKLACE OCTOBER 20, 2015

·

·

1. Explain what the Green Necklace is2. Provide background and history on the Green Necklace3. Identify the different groups of people who will use the greenway 4. Identify opportunities and constraints, especially regarding pedestrian

and cycling improvements5. Review the proposed concept plan6. Get feedback on the draft design principles7. Discuss the next steps

1 WELCOME!

GOALS FOR TODAY’S OPEN HOUSEWHY ARE WE HERE TODAY?

The City of North Vancouver is planning the next section of the Green Necklace greenway. This will extend eastward along East Keith Rd from St. Andrews to Grand Boulevard and north through Grand Boulevard to 19th Street.

We invite you to review the initial concept plan tonight and share your thoughts and ideas with us. Throughout the open house, please take an opportunity to fill out a questionnaire.

TIMELINE FOR PUBLIC CONSULTATION PROCESS

TODAY EARLY 2016

Open House #1 Open House #2Stakeholder Meetings

Present concept plan with draft design principles and gather feedback regarding existing and proposed features

Meetings with groups such as local school students and interested property owners to get feedback on the concept

Present a concept design based on feedback from Open House #1 and the stakeholder meetings.

LATE 2015 MID 2016

Final Design and Construction

Staff are happy to answer any questions you may have today. Don’t forget to fill out a questionnaire.

Page 2: First Open House Boards revised - North Vancouver/media/4A90251800674E23A7B348A01BEB46C5.pdf · 2016. 2. 9. · Open House #1 Open House #2Stakeholder Meetings Present concept plan

THE GREEN NECKLACE OCTOBER 20, 2015

2 THE GREEN NECKLACE

Original Town Plan 1907

Jones Street (2014)

Victoria Park (2005) Today’s Discussion: Keith Rd and Grand Boulevard

“Completion of this great public way, with the supporting

parks and gardens, will perpetuate health areas and

pleasure grounds within a short distance of every resident

of the present city of North Vancouver, and our municipality

lung, encompassing the central town, breathing, pressing,

forcing into it health and vitality...”

~Edward Mahon

Founding Father

WHAT IS THE GREEN NECKLACE?The Green Necklace is a proposed urban greenway — an off-street, fully accessible path for people of all ages and abilities that will form a 7.5km loop around the City centre. As a key component of the City’s first 1907 Town Plan, it will link historic parks and buildings, public spaces, schools and commercial areas. The greenway will complement the City’s Bicycle Master Plan and existing transit routes, and also provide important connections to other trail systems such as the North Shore Spirit Trail.

As a result, fewer people will need to rely on vehicles to make short trips within the City Centre — especially at peak hours, thus helping decrease traffic congestion and greenhouse gas emissions.

Future Phases

Page 3: First Open House Boards revised - North Vancouver/media/4A90251800674E23A7B348A01BEB46C5.pdf · 2016. 2. 9. · Open House #1 Open House #2Stakeholder Meetings Present concept plan

THE GREEN NECKLACE OCTOBER 20, 2015

G R E E N W O O D P A R K

G R

A N

D

B O

U L

E V

A R

D

S T

. A

N D

R E

W S

A

V E

L O

N S

D A

L E

A

V E

V I C T O R I A P A R K

M A H O N P A R K

W 2 1 S T

D I S T R I C T O F N O R T H V A N C O U V E R

D I S T R I C T O F N O R T H V A N C O U V E R

S Q U A M I SH N A T I O N

J O N

E S

A

V E

E 1 7 T H S T.

E A S T K E I T H R D.

S T

. D

A V

I D

S

A V

E

Q U

E E

N S

B U

R Y

A

V E

MOSQUITO CREEK PARK

MCDOUGALL FIELD

GRA

ND

BO

ULE

VARD

PA

RK

OTTAWA GARDEN

SUNRISE PARK

LYNNMOUTH PARK

EASTVIEW PARK

LOUTET PARK

HEYWOOD PARK

LIONS GATE HOSPITAL

LUMS STORE

HARRY JEROME REC CENTRE

LONSDALE QUAY

WATERFRONTPARK

HARBOURSIDEMOSQUITO

CREEK MARINA

THE SHIPYARDS

QUEEN MARYELEMENTARY

RIDGEWAYELEMENTARY

QUEENSBURYELEMENTARY

SUTHERLAND SECONDARY

CARSON GRAHAM

SECONDARY

CHIEF MATHIAS JOE

PARK

RAY PERRAULT

PARK

L E G E N D

G R E E N N E C K L A C E

U P P E R L E V E L S T R A I L S Y S T E M

S P I R I T T R A I L S Y S T E M

G R E E N W A Y C O N N E C T I O N S

S C H O O L D E S T I N A T I O N N V C I T Y H A L L

A REGIONAL BICYCLE NETWORK

A East Keith Road and Grand Boulevard

B Victoria Park

C Mahon Park

D Future Sections

GREEN NECKLACE SECTIONS

THE SPIRIT TRAIL

GREENWAY CONNECTIONS AND DESTINATIONS

3 HOW DOES IT FIT IN?

AB

C

D

Page 4: First Open House Boards revised - North Vancouver/media/4A90251800674E23A7B348A01BEB46C5.pdf · 2016. 2. 9. · Open House #1 Open House #2Stakeholder Meetings Present concept plan

THE GREEN NECKLACE OCTOBER 20, 2015

G R E E N W O O D P A R K

G R

A N

D

B O

U L

E V

A R

D

S T

. A

N D

R E

W S

A

V E

L O

N S

D A

L E

A

V E

V I C T O R I A P A R K

M A H O N P A R K

W 2 1 S T

D I S T R I C T O F N O R T H V A N C O U V E R

D I S T R I C T O F N O R T H V A N C O U V E R

S Q U A M I SH N A T I O N

J O N

E S

A

V E

E 1 7 T H S T.

E A S T K E I T H R D

S T

. D

A V

I D

S

A V

E

Q U

E E

N S

B U

R Y

A

V E

L E G E N D

F A M I L Y C Y C L I S T

C O M M U T E R C Y C L I S T

T R A N S I T U S E R

P E D E S T R I AN

4 WHO WILL USE THE GREEN NECKLACE

Pedestrians include those walking, jogging, walking their dog, pushing a stroller or using a mobility aide. The Green Necklace will provide both a multi-use shared path on Keith Road and a central path on Grand Boulevard that will remain pedestrian oriented.

PEDESTRIANS

The Green Necklace will include an off-street multi-use path on Keith Road and dedicated off-street bike paths on Grand Boulevard. Family cyclists prefer not to ride with vehicles and are comfortable with a slower route.

FAMILY CYCLISTS

Commuter cyclists are more confident riding on the roadway and tend to prefer a more direct route than family cyclists. This project will include separated on-street bike lanes on Keith Road and dedicated off-street bike paths on Grand Boulevard.

COMMUTER CYCLISTS

Page 5: First Open House Boards revised - North Vancouver/media/4A90251800674E23A7B348A01BEB46C5.pdf · 2016. 2. 9. · Open House #1 Open House #2Stakeholder Meetings Present concept plan

THE GREEN NECKLACE OCTOBER 20, 2015

7 6 1

FOUR TYPES OF CYCLISTS BY POPULATION

60 % Interested but concerned

1 % Strong and fearless

7 % Enthused and confident

33 % No way, no how

43%...of students walked to school before the Walking School Bus program

In 2015 the City launched the walking school bus program at

Queensbury Elementary.

50%.... of students walked to school after the implementation of the Walking School Bus program

According to a 2013 survey with parents from Ridgeway

Elementary School...

... of parents reported that safer or improved cycling facilities would encourage them to allow their kids to cycle more often to school

55%

... reported that safer or improved walking routes would encourage them to allow their kids to walk more often to school

According to a 2013 survey conducted by the North Vancouver School District,

for every 7 families that walk to school, 6 families drive to school, and

1 family bikes to school.

Which type of cyclist are you? According to a survey done in

Portland in 2012...number of cyclists using our roads has increased upwards of 50% since 2010.

Staff are happy to answer any questions you may have today. Don’t forget to fill out a questionnaire.

We have developed draft design principles to guide the greenway design process based on feedback from the 2010 public consultation process and pedestrian and cyclist ridership data.

1. Provide safe, accessible, and enjoyable facilities for cyclists, pedestrians, users of mobility aids and strollers.

2. Respond the neighbourhood’s safety concerns identified in the 2010 public consultation process such as traffic calming, parking, potential conflicts between user groups, and impacts on homeowners.

3. Work with local schools to provide safe walking and cycling routes to schools.

4. Approach the design process with flexibility to allow the greenway to fit the needs of the neighbourhood.

5. Ensure that the Green Necklace works within the City’s overall Bicycle Master Plan (2012) and existing transit routes.

5 GREEN NECKLACE DRAFT DESIGN PRINCIPLES

50%

Page 6: First Open House Boards revised - North Vancouver/media/4A90251800674E23A7B348A01BEB46C5.pdf · 2016. 2. 9. · Open House #1 Open House #2Stakeholder Meetings Present concept plan

THE GREEN NECKLACE OCTOBER 20, 2015

6 WHAT WILL IT LOOK LIKE?

Staff are happy to answer any questions you may have today. Don’t forget to fill out a questionnaire.

MOVE CURB SOUTH TO WIDEN ROADWAY

NEW PARKING BAYS BETWEEN EXISTING HYDRO POLES

ON-STREET PARKING

NEW NORTH-BOUND SINGLE DIRECTION BICYCLE PATH

NEW ON-STREET BIKE LANE

NEW ON-STREET BIKE LANE

NEW STREET TREES

REDUCE WIDTH OF TRAVEL LANE

REDUCE WIDTH OF TRAVEL LANE

REDUCE WIDTH OF TRAVEL LANE

REDUCE WIDTH OF TRAVEL LANE

NEW ON-STREET BIKE LANE

NEW ON-STREET BIKE LANE

ON-STREET PARKING

ON-STREET PARKING

NEW MULTI-USE PATHWAY

NEW SOUTH-BOUND SINGLE DIRECTION BIKE PATH

NEW STREET TREES

NEW MULTI-USE PATHWAY

NEW STREET TREES WHERE POSSIBLE

G R

A N

D

B O

U L

E V

A R

D

E A S T K E I T H R O A D

9 T H S T R E E T E A S T

1 1 T H S T R E E T E A S T

1 3 T H S T R E E T E A S T

1 5 T H S T R E E T E A S T

1 7 T H S T R E E T E A S T

1 9 T H S T R E E T E A S T

S A

I N T

A

N D

R E

W S

A

V E

N U

E

EAST KEITH ROAD LOOKING WEST

EAST KEITH ROAD LOOKING WEST

A

B

C

CENTRAL PEDESTRIAN PATH

A

B

GRAND BLVD LOOKING NORTH

C

Page 7: First Open House Boards revised - North Vancouver/media/4A90251800674E23A7B348A01BEB46C5.pdf · 2016. 2. 9. · Open House #1 Open House #2Stakeholder Meetings Present concept plan
Page 8: First Open House Boards revised - North Vancouver/media/4A90251800674E23A7B348A01BEB46C5.pdf · 2016. 2. 9. · Open House #1 Open House #2Stakeholder Meetings Present concept plan

THE GREEN NECKLACE OCTOBER 20, 2015

8 GRAND BOULEVARD LAYOUT

EAST KEITH ROAD

9TH STREET

EAST

GR

AN

D B

OU

LEVA

RD

WES

T G

RA

ND

BO

ULE

VAR

D

9TH STREET

11TH STREET

EAST

GR

AN

D B

OU

LEVA

RD

WES

T G

RA

ND

BO

ULE

VAR

D

Added northbound bike path along West Grand Blvd edge and southbound bike path along East Grand Blvd edge.

Added safe shared crossings for pedestrians and cyclists

Added street trees along bike paths

Kept central pedestrian path – the City is proposing to pave the path for accessibility needs

Lighting upgrades at road intersections for overall safety

Fill out a survey and let us know how you feel about:1. Adding street trees

2. Upgrading the gravel path to paved to accommodate accessibility needs

3. Pedestrian scale lighting along the bike paths

WHAT’S NEW ON GRAND BOULEVARD ?

WE NEED YOUR FEEDBACK

Look at your survey for questions about the design of intersections

*

G R

A N

D

B O

U L

E V

A R

D

E A S T K E I T H R O A D

9 T H S T R E E T E A S T

1 1 T H S T R E E T E A S T

1 3 T H S T R E E T E A S T

1 5 T H S T R E E T E A S T

1 7 T H S T R E E T E A S T

1 9 T H S T R E E T E A S T

S A

I N T

A

N D

R E

W S

A

V E

N U

E

D

C

C D

NEW NORTHBOUND OFF-STREET CYCLE PATH

NEW SOUTHBOUND OFF-STREET CYCLE PATH

NEW STREET TREES

NEW STREET TREES

CENTRAL PEDESTRIAN PATHWAY

CENTRAL PEDESTRIAN PATHWAY

NEW STREET TREES

NEW STREET TREES

NEW SOUTHBOUND OFF-STREET CYCLE PATH

NEW SOUTHBOUND OFF-STREET CYCLE PATH

*

Page 9: First Open House Boards revised - North Vancouver/media/4A90251800674E23A7B348A01BEB46C5.pdf · 2016. 2. 9. · Open House #1 Open House #2Stakeholder Meetings Present concept plan

THE GREEN NECKLACE OCTOBER 20, 2015

9 GRAND BOULEVARD LAYOUT

11TH STREET13TH STREET

13TH STREET15TH STREET

EAST

GR

AN

D B

OU

LEVA

RD

EAST

GR

AN

D B

OU

LEVA

RD

WES

T G

RA

ND

BO

ULE

VAR

D

WES

T G

RA

ND

BO

ULE

VAR

D

Added northbound bike path along West Grand Blvd edge and southbound bike path along East Grand Blvd edge.

Added safe shared crossings for pedestrians and cyclists

Added street trees along bike paths

Kept central pedestrian path – the City is proposing to pave the path for accessibility needs

Lighting upgrades at road intersections for overall safety

WHAT’S NEW ON GRAND BOULEVARD ?

Fill out a survey and let us know how you feel about:1. Adding street trees

2. Upgrading the gravel path to paved to accommodate accessibility needs

3. Pedestrian scale lighting along the bike paths

WE NEED YOUR FEEDBACK

G R

A N

D

B O

U L

E V

A R

D

E A S T K E I T H R O A D

9 T H S T R E E T E A S T

1 1 T H S T R E E T E A S T

1 3 T H S T R E E T E A S T

1 5 T H S T R E E T E A S T

1 7 T H S T R E E T E A S T

1 9 T H S T R E E T E A S T

S A

I N T

A

N D

R E

W S

A

V E

N U

E

F

E

NEW NORTHBOUND OFF-STREET CYCLE PATH

NEW STREET TREES

CENTRAL PEDESTRIAN PATHWAY

NEW STREET TREES

NEW SOUTHBOUND OFF-STREET CYCLE PATH

NEW SOUTHBOUND OFF-STREET CYCLE PATH

NEW STREET TREES

CENTRAL PEDESTRIAN PATHWAY

NEW STREET TREES

NEW SOUTHBOUND OFF-STREET CYCLE PATH

FE

Page 10: First Open House Boards revised - North Vancouver/media/4A90251800674E23A7B348A01BEB46C5.pdf · 2016. 2. 9. · Open House #1 Open House #2Stakeholder Meetings Present concept plan

THE GREEN NECKLACE OCTOBER 20, 2015

10 GRAND BOULEVARD LAYOUT

15TH STREET 17TH STREET

17TH STREET 19TH STREET

EAST

GR

AN

D B

OU

LEVA

RD

EAST

GR

AN

D B

OU

LEVA

RD

WES

T G

RA

ND

BO

ULE

VAR

D

WES

T G

RA

ND

BO

ULE

VAR

D

Added northbound bike path along West Grand Blvd edge and southbound bike path along East Grand Blvd edge.

Added safe shared crossings for pedestrians and cyclists

Added street trees along bike paths

Kept central pedestrian path – the City is proposing to pave the path for accessibility needs

Lighting upgrades at road intersections for overall safety

WHAT’S NEW ON GRAND BOULEVARD ?

Fill out a survey and let us know how you feel about:1. Adding street trees

2. Upgrading the gravel path to paved to accommodate accessibility needs

3. Pedestrian scale lighting along the bike paths

WE NEED YOUR FEEDBACK

Look at your survey for questions about the design of intersections

*

G R

A N

D

B O

U L

E V

A R

D

E A S T K E I T H R O A D

9 T H S T R E E T E A S T

1 1 T H S T R E E T E A S T

1 3 T H S T R E E T E A S T

1 5 T H S T R E E T E A S T

1 7 T H S T R E E T E A S T

1 9 T H S T R E E T E A S T

S A

I N T

A

N D

R E

W S

A

V E

N U

E

H

G

HG

NEW NORTHBOUND OFF-STREET CYCLE PATH

NEW STREET TREES

CENTRAL PEDESTRIAN PATHWAY

NEW STREET TREES

NEW SOUTHBOUND OFF-STREET CYCLE PATH

NEW SOUTHBOUND OFF-STREET CYCLE PATH

NEW STREET TREES

CENTRAL PEDESTRIAN PATHWAY

NEW STREET TREES

NEW SOUTHBOUND OFF-STREET CYCLE PATH

*

Page 11: First Open House Boards revised - North Vancouver/media/4A90251800674E23A7B348A01BEB46C5.pdf · 2016. 2. 9. · Open House #1 Open House #2Stakeholder Meetings Present concept plan

THE GREEN NECKLACE OCTOBER 20, 2015

11 WHAT’S NEXT?

THANKS FOR COMING, NOW WE NEED YOUR FEEDBACK!

The ideas and concerns that you have contributed tonight will help us finalize the draft Design Principles. These guidelines will help us shape a Concept Design that we will present at the second open house.

All presentation boards will be posted on the project web page as well as an on-line version of the Questionnaire. Please either fill out a questionnaire here today or submit on-line by Tuesday, October 27th.

WHAT NEXT?

TODAY EARLY 2016

Open House #1 Open House #2Stakeholder Meetings

Present concept plan with draft design principles and gather feedback regarding existing and proposed features

Meetings with groups such as local school students and interested property owners to get feedback on the concept

Present a revised greenway design based on feedback from Open House #1 and the stakeholder meetings.

LATE 2015 MID 2016

Final Design and Construction