SI POLMED Flexible Pavement Method 1
FLEXIBLE PAVEMENT METHOD
![Page 2: Flexible Pavement](https://reader035.vdocuments.net/reader035/viewer/2022072008/55cf8f9f550346703b9e1cb7/html5/thumbnails/2.jpg)
SI POLMED Flexible Pavement Method 2
ASPHALT CONCRETE SURFACE COURSE t=40
ASPHALT CONCRETE BINDER COURSE t=60
ASPHALT TREATED BASE t=100
AGGREGAT BASE CLASS-A t=275
AGGREGAT BASE CLASS-B t=300
SUBGRADE CBR 5 %
DETAIL BWIDENING
START
PRIME COATBY COMPRESSOR/ASPHALT SPRAYER
ASPHALT TREATED BASE thick = 10 cmBY DT/ASPHALT FINISHER/TANDEM ROLLER/PNEUMATIC TYRED ROLLER
ASPHALT CONCRETE SURFACE thick 4,0 cmBY DT/ASPHALT FINISHER/TANDEM ROLLER/PNEUMATIC TYRED ROLLER
TACK COATBY COMPRESSOR/ASPHALT SPRAYER
FINISH
SUB GRADE PREPARATION - CBR 5%BY MOTOR GRADER/VIBRO ROLLER
AGGREGAT BASE CLASS B thick 30 cmBY MOTOR GRADER/VIBRO ROLLER
AGGREGAT BASE CLASS A thick 27.5 cmBY MOTOR GRADER/VIBRO ROLLER
ASPHALT CONCRETE BINDER thick = 6,0 cmBY DT/ASPHALT FINISHER/TANDEM ROLLER/PNEUMATIC TYRED ROLLER
TACK COATBY COMPRESSOR/ASPHALT SPRAYER
EXISTING PAVEMENT ( OVERLAY )
A C t=40
A T B t=40
![Page 3: Flexible Pavement](https://reader035.vdocuments.net/reader035/viewer/2022072008/55cf8f9f550346703b9e1cb7/html5/thumbnails/3.jpg)
SI POLMED Flexible Pavement Method 3
SUB GRADE PREPARATION
1. HAULING SUBGRADE MATERIAL FROM BORROW AREA GOING TO PROJECT LOCATION BY DUMP TRUCK (IF NECESSARY)
2. DUMPING SUBGRADE MATERIAL FROM DUMP TRUCK (IF NECESSARY)
3. SPREADING MATERIAL BY MOTOR GRADER
4. -SPRAY THE WATER APPLIED TO SURFACE BY WATER TANK TRUCK -COMPACTING (THICKNESS AT LEAST 20 CM PER LAYER) BY VIBRO ROLLER, TO KEEP CBR 5%
WATER TANK TRUCK
20CM
![Page 4: Flexible Pavement](https://reader035.vdocuments.net/reader035/viewer/2022072008/55cf8f9f550346703b9e1cb7/html5/thumbnails/4.jpg)
SI POLMED Flexible Pavement Method 4
AGGREGAT BASE B ~ 20 CM THICKNESS LAYERS
1. DUMPING THE AGGREGAT BASE A MATERIAL FROM BORROW AREA GOING TO PROJECT LOCATION BY DUMP TRUCK
2. UNLOAD AGGREGATE MATERIAL FROM DUMP TRUCK
3. SPREADING BY MOTOR GRADER 4. COMPACTING AGGREGAT BASE A BY VIBRO ROLLER
![Page 5: Flexible Pavement](https://reader035.vdocuments.net/reader035/viewer/2022072008/55cf8f9f550346703b9e1cb7/html5/thumbnails/5.jpg)
SI POLMED Flexible Pavement Method 5
AGGREGATE BASE A ~ 20 CM THICKNESS LAYERS
1. HAULING AGGREGATE BASE A MATERIAL FROM BORROW AREA GOING TO PROJECT LOCATION BY DUMP TRUCK 2. DUMP AGGREGATE MATERIAL BY DUMP TRUCK
3. SPREADING BY MOTOR GRADER 4. COMPACTING AGGREGATE BASE A BY VIBRO ROLLER
![Page 6: Flexible Pavement](https://reader035.vdocuments.net/reader035/viewer/2022072008/55cf8f9f550346703b9e1cb7/html5/thumbnails/6.jpg)
SI POLMED Flexible Pavement Method 6
1. THE PRIME COAT APPLIED TO SURFACE OF THE BASE COARSE BY ASPHALT SPRAYER, BEFORE THAT CLEAN THE SURFACE BY COMPRESSOR
1. PRIME COAT
2. ASPHALT TREATED BASE 10 CM
2. ALOCATE THE HOT ASPHALTIC MIXTURES (ASPHALT TREATED BASE BY DUMP TRUCK) INTO ASPHALT FINISHER
4. FIRST COMPACTING BY TANDEM ROLLER, MIDDLE COMPACTING BY PNEUMATIC TYRE ROLLER AND FINAL COMPACTING BY TANDEM ROLLER ALSO
- THE ASPHALT TEMPERATURE IS NOT LESS THAN 120ºC
3. SPREADING THE HOT ASPHALTIC MIX TURES BY ASPHALT FINISHER
3. TACK COAT
4. ASPHALT CONCRETE BINDER 6.0 CM
2. ALOCATE THE HOT ASPHALTIC MIXTURES (ASPHALT CONCRETE BINDER BY DUMP TRUCK) INTO ASPHALT FINISHER
WIDENING ROADFLEXIBLE PAVEMENT
1 2 3 4A 4B 4C1
1. THE TACK COAT APPLIED TO SURFACE OF THE ASPHALT TREATED BASE BY ASPHALT SPRAYER, BEFORE THAT CLEAN THE SURFACE BY COMPRESSOR
4. FIRST COMPACTING BY TANDEM ROLLER, MIDDLE COMPACTING BY PNEUMATIC TYRE ROLLER AND FINAL COMPACTING BY TANDEM ROLLER ALSO
- THE ASPHALT TEMPERATURE IS NOT LESS THAN 120ºC
3. SPREADING THE HOT ASPHALTIC MIX TURES BY ASPHALT FINISHER
3 4A 4B 4C1 21
![Page 7: Flexible Pavement](https://reader035.vdocuments.net/reader035/viewer/2022072008/55cf8f9f550346703b9e1cb7/html5/thumbnails/7.jpg)
SI POLMED Flexible Pavement Method 7
6. ASPHALT CONCRETE SURFACE 4.0 CM
5. TACK COAT
1. THE TACK COAT APPLIED TO SURFACE OF THE ASPHALT CONCRETE BINDER BY ASPHALT SPRAYER, BEFORE THAT CLEAN THE SURFACE BY COMPRESSOR
4. FIRST COMPACTING BY TANDEM ROLLER, MIDDLE COMPACTING BY PNEUMATIC TYRE ROLLER AND FINAL COMPACTING BY TANDEM ROLLER ALSO
3. SPREADING THE HOT ASPHALTIC MIX TURES BY ASPHALT FINISHER
3 4A 4B 4C1 21
2. ALOCATE THE HOT ASPHALTIC MIXTURES (ASPHALT CONCRETE SURFACE BY DUMP TRUCK) INTO ASPHALT FINISHER
WIDENING ROAD FLEXIBLE PAVEMENT
- THE ASPHALT TEMPERATURE IS NOT LESS THAN 120ºC
![Page 8: Flexible Pavement](https://reader035.vdocuments.net/reader035/viewer/2022072008/55cf8f9f550346703b9e1cb7/html5/thumbnails/8.jpg)
SI POLMED Flexible Pavement Method 8