A PROJECT REPORT ON FLYOVER CONSTRUCTION AT
BIHAR RAJYA POOL NIRMAN NIGAM LTD.GOVT OF BIHAR
SUBMITTED BY:- SUBMITTED TO;-AKHILASH KUMAR DR.SHEETAL AGARWAL CIVIL ENGG.(VIIth sem.) ( HOD OF CIVIL ENGG.)ROLL NO:-12EAYCE005
DEPARTMENT OF CIVIL ENGINEERING ARYA COLLEGE OF ENGINEERING &RESEARCH CENTRE SP-40, RIICO INDUSTRIAL AREA, KUKAS, JAIPUR, RAJASTHAN RAJASTHAN TECHNICAL UNIVERSITY, KOTA
![Page 2: Flyover construction](https://reader033.vdocuments.net/reader033/viewer/2022061323/587fbfe51a28ab3b158b4e99/html5/thumbnails/2.jpg)
Company : BIHAR RAJYA POOL NIRMAN NIGAM LTD.
Project Name : FLYOVER CONSTRUCTION
Location : MITHAPUR FLYOVER TO CHIRAIYATAND
& CHIRAIYATAND TO GANDHI MAIDAN Estimated cost : 100 Cr.
PROJECT DETAILS
![Page 3: Flyover construction](https://reader033.vdocuments.net/reader033/viewer/2022061323/587fbfe51a28ab3b158b4e99/html5/thumbnails/3.jpg)
PILEAs we know PILE is a column (of reinforced concrete) which transfers the load of superstructure directly to the soil strata.The piling is necessary to make the foundation as well as soil strata reliable to withstand the load conditions more safely.Before installation of END BEARING PILE, settlement under Pile Load Test was observed in between 6-12mm which shows the green signal to install.NOTE- In pile foundation, 10% cement more is required.
![Page 4: Flyover construction](https://reader033.vdocuments.net/reader033/viewer/2022061323/587fbfe51a28ab3b158b4e99/html5/thumbnails/4.jpg)
PILE
![Page 5: Flyover construction](https://reader033.vdocuments.net/reader033/viewer/2022061323/587fbfe51a28ab3b158b4e99/html5/thumbnails/5.jpg)
PILE –CAPA thick concrete mat that rests on piles collectively to provide a suitable stable foundation is Pile Cap. It is 1.8m thick and 5.2m wide.
![Page 6: Flyover construction](https://reader033.vdocuments.net/reader033/viewer/2022061323/587fbfe51a28ab3b158b4e99/html5/thumbnails/6.jpg)
PILE –CAP
![Page 7: Flyover construction](https://reader033.vdocuments.net/reader033/viewer/2022061323/587fbfe51a28ab3b158b4e99/html5/thumbnails/7.jpg)
PIERA vertical supporting structure over pile cap is Pier Shaft. The thickness is provided according to drawings.NOTE-Shaft dimension is 1500mm x1500mm at Exhibition road site.
![Page 8: Flyover construction](https://reader033.vdocuments.net/reader033/viewer/2022061323/587fbfe51a28ab3b158b4e99/html5/thumbnails/8.jpg)
PIER
![Page 9: Flyover construction](https://reader033.vdocuments.net/reader033/viewer/2022061323/587fbfe51a28ab3b158b4e99/html5/thumbnails/9.jpg)
ABUTMENT & A.CAPAbutment are typically used where column lengths on multi-column piers will require larger column sizes due to slenderness. Abutment are also an option where stream flow could result in debris build-up between columns of a multicolumn.
![Page 10: Flyover construction](https://reader033.vdocuments.net/reader033/viewer/2022061323/587fbfe51a28ab3b158b4e99/html5/thumbnails/10.jpg)
ABUTMENT
![Page 11: Flyover construction](https://reader033.vdocuments.net/reader033/viewer/2022061323/587fbfe51a28ab3b158b4e99/html5/thumbnails/11.jpg)
PEDESTALPedestal is an independent support to bearings, over Pier/Abutment Caps. NOTE-• Pedestal dimension is 950mm
x850mm x250mm.• The number of Pedestal over a
Pier Cap is 4.• The number of Pedestal over a
Abutment Cap is Wall. 2 with a Dirt
![Page 12: Flyover construction](https://reader033.vdocuments.net/reader033/viewer/2022061323/587fbfe51a28ab3b158b4e99/html5/thumbnails/12.jpg)
PEDESTAL
![Page 13: Flyover construction](https://reader033.vdocuments.net/reader033/viewer/2022061323/587fbfe51a28ab3b158b4e99/html5/thumbnails/13.jpg)
BEARINGThe bearings used in the construction are Pot Bearings. Pot bearing is named so because bearing is confined in a steel pot.Although it has some specific characteristics which tend an engineer to use it. These are as-
![Page 14: Flyover construction](https://reader033.vdocuments.net/reader033/viewer/2022061323/587fbfe51a28ab3b158b4e99/html5/thumbnails/14.jpg)
• Negligible vertical deflection as only 0.06”.
• Uniform loading acceptability.• Minimal load eccentricity as up to
3% of the disc diameter.• Having least resistance in the
range of 0.01 to 0.022 radians.• Lower peak pressure on bearing
seats due to hydraulic design principle, characteristic load distribution curve is flatter.
• High horizontal load capacity.
![Page 15: Flyover construction](https://reader033.vdocuments.net/reader033/viewer/2022061323/587fbfe51a28ab3b158b4e99/html5/thumbnails/15.jpg)
BEARING
![Page 16: Flyover construction](https://reader033.vdocuments.net/reader033/viewer/2022061323/587fbfe51a28ab3b158b4e99/html5/thumbnails/16.jpg)
SEGMENTA flyover segment is the roadway surface of the flyover.
![Page 17: Flyover construction](https://reader033.vdocuments.net/reader033/viewer/2022061323/587fbfe51a28ab3b158b4e99/html5/thumbnails/17.jpg)
These segments have shuttering formwork made of high strength steel which are cast in casting yard.
SHUTTERING FORMWORK OF SEGMENTS
![Page 18: Flyover construction](https://reader033.vdocuments.net/reader033/viewer/2022061323/587fbfe51a28ab3b158b4e99/html5/thumbnails/18.jpg)
These precast units are installed through a Bridge Launcher Machine.
SEGMENTS INSTALLED BY LAUNCHER MACHINE
![Page 19: Flyover construction](https://reader033.vdocuments.net/reader033/viewer/2022061323/587fbfe51a28ab3b158b4e99/html5/thumbnails/19.jpg)
GLUING BETWEEN SEGMENTS After gluing, the segments are connected through strand bars (15.2mm dia.). The process is termed technically as “Threading”
STRAND BARS
![Page 20: Flyover construction](https://reader033.vdocuments.net/reader033/viewer/2022061323/587fbfe51a28ab3b158b4e99/html5/thumbnails/20.jpg)
NOTE-• There are 10 holes on each face of
the segment.• Each hole comprises of 19 bars of
15.2mm dia.• The overall threading of a span is
parabolic due to variation of hole’s position of segments lying over the span.
• After this post tensioning is done to make it a pre stress unit using tendons.
![Page 21: Flyover construction](https://reader033.vdocuments.net/reader033/viewer/2022061323/587fbfe51a28ab3b158b4e99/html5/thumbnails/21.jpg)
CRASH BARRIERThe barrier which checks errant vehicles from jumping outside from the flyover is called as Crash Barrier/Traffic Barrier.The width of Crash Barrier is 500mm.
![Page 22: Flyover construction](https://reader033.vdocuments.net/reader033/viewer/2022061323/587fbfe51a28ab3b158b4e99/html5/thumbnails/22.jpg)
FACIA PANELThe facia panel is the smallest unit of reinforced earth wall.
It is a precast unit containing bricks and concrete with covering.
![Page 23: Flyover construction](https://reader033.vdocuments.net/reader033/viewer/2022061323/587fbfe51a28ab3b158b4e99/html5/thumbnails/23.jpg)
REINFORCED EARTH WALLThe Reinforced Earth wall is made up of facia panels. These panels are arranged in the same way as of brick’s bonds. This Reinforced Earth Wall provides 25% more safety to the superstructure.
![Page 24: Flyover construction](https://reader033.vdocuments.net/reader033/viewer/2022061323/587fbfe51a28ab3b158b4e99/html5/thumbnails/24.jpg)
GEOGRIDGeogrid is a geopolythene material, used to provide the levelling of sand stratum at its level. There is a Hook embeded in panel connecting its two front wall’s hooks with Geogrid by a connecting rod in each hook.
![Page 25: Flyover construction](https://reader033.vdocuments.net/reader033/viewer/2022061323/587fbfe51a28ab3b158b4e99/html5/thumbnails/25.jpg)
SAND COMPACTION• Sand compaction is an important
work in flyover a ramp. • The sand is get self compacted by
sprinkling water over it.• The compactor machine compacts
with 8kN/m2 at the middle.• The sides are compacted with
1Kn/m2 by a baby roller or plate vibrator.
![Page 26: Flyover construction](https://reader033.vdocuments.net/reader033/viewer/2022061323/587fbfe51a28ab3b158b4e99/html5/thumbnails/26.jpg)
SAND COMPCTION
![Page 27: Flyover construction](https://reader033.vdocuments.net/reader033/viewer/2022061323/587fbfe51a28ab3b158b4e99/html5/thumbnails/27.jpg)
DIRT WALL /BALLAST WALLThe dirt wall is a wall which stands on the Abutment cap end to end apart from pedestals. This wall bears the load of ramp next to RE Wall on the abutment.NOTE- The end sides of the dirt wall should be matched properly with the ends of R E Wall and thus in the same way till crash barrier.