Habib Construction Services 06 Bauma 2013 08 March 2013 Wwww.pcq.com.pk An Example of Excellence 21 Pir Wadhai Morr Underpass & Flyover 21 4,320 MW Dasu Dam to Be Constructed in Pakistan

Upload: hoangtuyen

Post on 28-Apr-2018

220 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Pir Wadhai Morr Underpass & Flyover · the Construction of flyover and underpass Highway Bridges 1967 main contractor worked closely with in a record time of 147 days which is two

Habib Construction Services 06 Bauma 2013 08

March 2013 Wwww.pcq.com.pk

An Example of Excellence

21

Pir Wadhai Morr

Underpass & Flyover

214,320 MW Dasu Dam to Be Constructed in Pakistan

Page 2: Pir Wadhai Morr Underpass & Flyover · the Construction of flyover and underpass Highway Bridges 1967 main contractor worked closely with in a record time of 147 days which is two
Page 3: Pir Wadhai Morr Underpass & Flyover · the Construction of flyover and underpass Highway Bridges 1967 main contractor worked closely with in a record time of 147 days which is two

Cover04Pir Wadhai Morr

Underpass & Flyover

www.pcq.com.pk 3Pakistan Construction & QuarryMarch 2013

Company in Focus

Events

07 New Hyundai R25Z-9A

Mini-Excavator

Technology Review

11

Quarry News

08 Bauma 2013

Pakistan Mineral

Development

Corporation

06 Habib Construction Services

News

16 Japan Special Economic Zone Planned at Dhabeji,Pakistan

News

19 Multiple GroundbreakingCeremonies for Thar CoalBlock II Held

Events

14 Build Tech Pakistan 2013

News

21 4,320 MW Dasu Dam To BeConstructed in Pakistan

Page 4: Pir Wadhai Morr Underpass & Flyover · the Construction of flyover and underpass Highway Bridges 1967 main contractor worked closely with in a record time of 147 days which is two

www.pcq.com.pk

COVER STORY

4 Pakistan Construction & Quarry March 2013

Introduction

Proposed Solution

Background

through the cantonment area and leads benefits to the thousands of daily

towards Peshawar via GT road. There are commuters and also helpful in overcoming The City of Rawalpindi is situated in the many educational institutes and business the traffic problems such as traffic delays, North Eastern corner of the Potohar Plateau areas located on this road. The existing road fuel consumption and traffic congestion.in the North of the Punjab province. The get choked at Chourr Chowk because of area is bounded on the North by the This road will surely save the travel time traffic coming from Saddar, Westridge and Margalla Hills stretching from the North and vehicle operating cost with increased Misrial road resulting in excessive delays East to North West. Due to Divisional level of ease and comfort for the road users.and traffic congestion problems. To Headquarters and Twin City, the population The project envisages improvement of the overcome this problem widening of road at of Rawalpindi City has rapidly increased road through grade separation to get a Chourr Chowk including Misrial Bridge has over the years. On account of these factors, better level of service (LOS) and improve already completed. When the same traffic the traffic problems have increased. To cope the structural capacity of the road. Length of joins with the traffic coming from Pirwadhai with the traffic congestion, the Housing and the project road is about 0.9 Km and width Road it makes the situation even worse at Physical – Planning Department, Municipal varies between 3.5 m and 14 m.Pirwadhai Chowk. Thus, due to heavy Corporation Rawalpindi and Rawalpindi traffic, frequent road blocks and traffic Improvement Trust (Defunct) developed

The project provides major tangible and delays occured at Pirwadhai Chowk. The the schemes, but all these efforts were futile intangible benefits that includeexisting road do not support traffic volume against the increasing population pressure.

t h e r e f o r e i t r e q u i r e d i m m e d i a t e Due to heavy traffic load the condition of l Saving in vehicle operating costs and improvement in the form of construction of the existing roads of the city kept

travel time.an under pass and Flyover at Pirwadhai deteriorating over the years. Chowk in addition to widening of road at

l Significant relief to the heavy traffic Taking into account all the factors, the Chourr Chowk which has already

l I t improves the environmental Government of the Punjab tasked Provincial completed. parameters of the project area.Highway Division Rawalpindi to deal with

the city problems.l Improve road riding quality and smooth

flow of traffic.

The construction of underpass and flyover l It facilitates residents of Rawalpindi as

at Pirwadhai Chowk provides un- well as the traffic coming from Lahore Peshawar Road is an important road of interrupted flow of two way traffic, good and Peshawar side which uses the Rawalpindi which takes the out-going and riding quality, tremendous relief and intersection on regular basis.incoming traffic of Rawalpindi. It passes

Pir Wadhai Morr, Flyover & UnderpassAn example of excellence

Page 5: Pir Wadhai Morr Underpass & Flyover · the Construction of flyover and underpass Highway Bridges 1967 main contractor worked closely with in a record time of 147 days which is two

www.pcq.com.pk 5Pakistan Construction & QuarryMarch 2013

See Us at

BAUMA 2013Hall # A5, Booth # 417

Design Standards Project Completion

Along with the existing underground services

appearing during execution of the work, traffic

was flowing through the construction site

where heavy machinery was in operation. The

main contractor managed to complete the

project with zero accidents which is in itself a

big achievement in modern construction.

Extra safety procedures were incorporated to

ensure accident free construction. The main

contractor worked round the clock to ensure l Government of Pakistan Highway The main contractor managed to complete Department CODE of Practice completion of the project in given time. The

the Construction of flyover and underpass Highway Bridges 1967 main contractor worked closely with

in a record time of 147 days which is two Rawalpindi Traffic Police and other service

days earlier from completion date. It was a l AASHTO LRFD Bridge Design providers to ensure smooth completion of the

huge task to complete the project in such a Specifications 3rd Edition alongwith project. On the inauguration of the Pir Wadhai

short time. There were many hurdles Subsequent interim editions flyover and underpass, CM praised the efforts

incurred during execution of flyover and of The main contractor .

l AASHTO Standard Specifications for underpass works. One of the biggest task Highway Bridges, 17th Edition was to improve the safety of commuters

that included pedestrians and heavy traffic. l Other rationale reference material

COVER STORY

Flyover - 118 Nos. Piles 1200mm dia 28m in length

Flyover - 12 Nos. Pile Cap & Pier

Flyover - Pre-Stress Girders 108 Nos, 30m in length

Flyover - Concreting of Deck Slab 378m Long Was Poured

Continuously in One Go (24 Hours) i.e 1000 Cubic Meter of

Concrete Volume (Milestone)

Flyover Length 570m

Underpass Length 454m

Total Cost = 1480 Million

Project Fact File

Page 6: Pir Wadhai Morr Underpass & Flyover · the Construction of flyover and underpass Highway Bridges 1967 main contractor worked closely with in a record time of 147 days which is two

6 Pakistan Construction & Quarry March 2013 www.pcq.com.pk

COMPANY IN FOCUSHabib Construction Services(Pvt) Ltd.

Projects Highlights

Company Profile

Habib Construction Services (Private) Limited, is an entrepreneur in the field of construction, comprising of professional engineers and skilled workers. The basic aim behind this high valued collection of professionals is to raise a company in Pakistan with the hallmark of excellence and integrity, capable of executing mega projects in a highly professional manner preferably without any cost or time overruns and to the entire satisfaction of the clients.

With the dedicated efforts of professionals possessing such a vast & diversified experience as a Client, Consultant and Constructor, we have succeeded to raise a highly reliable and prestigious construction company capable of delivering projects to the satisfaction of private and public sector clients.

Bringing innovative civil engineering solutions for Motorways, Highways, Runways and Buildings, Habib Construction Services (Pvt) Limited is delivering outstanding quality of services since day one of its formation.

Incorporated in February 2009, HCS has a short but inspiring story of struggle and success. As is said, “survival of the fittest” , the management realizing the need to be the ‘fittest’ made ‘quality’ as hot pursuit. The desperate desire for ‘recognition’ otherwise motivated the workers and management to meet the clients requirements as best as possible all being focused towards achieving a good and standard quality execution .

This commitment worked as a catalyst for accomplishing the business goals including the financial progression. The performance oriented efforts have boosted the name of the company to the glory of reputation and trust in a short time. By the grace of Almighty Allah, today HCS is known to be a trustworthy name of quality and skill, a hallmark which usually takes decades to achieve.

HABIB CONSTRUCTION SERVICES (PVT) LTD.15-A, Block G-1, Canal Bank Road, Near Doctors Hospital, Johar Town, Lahore

Tel: +92 42 35291006-9, Fax: +92 42 35291195, UAN: +92 42 111-123-427www.hcs.com.pk

?Benazir Bhutto International Airport, Islamabad

?Extension of Sialkot Airport

?Chashma Power Project

?Dualization of Lahore - Kasur Road Project

?Bahria Town, Canal Bank Road, Lahore

?Widening / improvement of Canal Bank Road, from mall road to doctors hospital underpass

?Improvement / Widening of Multan Road, Lahore

?Daulization of Lahore Ferozepur Road

?Widening & Improvement of Churr Chowk, G.T. Road, Rawalpindi

?Improvement and Rehabilitation of M.M. Alam Road, Lahore

?6th Road Flyover, Rawalpindi

?Kalma Chowk Flyover, Lahore

?Chandni Chowk Flyover, Rawalpindi

?Flyover and Underpass at Ring Road Package - 9, Lahore

?Flyover and Underpass at Pir Wadhai Morr, Rawalpindi

?Kalma Chowk Underpass, Lahore

?Model Town Underpass, Lahore

?Flyovers and Road Work, Lahore Ring Road Package - 7

?Muslim Town Flyover, Lahore

?Bus Rapid Transport System Package No. 4 & 7, Lahore

Flyovers and Underpass

Roads

Airports and Power Projects

Page 7: Pir Wadhai Morr Underpass & Flyover · the Construction of flyover and underpass Highway Bridges 1967 main contractor worked closely with in a record time of 147 days which is two

7Pakistan Construction & QuarryMarch 2013www.pcq.com.pk

TECHNOLOGY REVIEW

The new R25Z-9A mini excavator from Hyundai Heavy The R25Z-9A has been fitted with a long life plastic air filter for Industries (HI) being showcased at bauma 2013, is said to fill a easier maintenance. The long service life of the model’s hydraulic big gap in the company’s range between models R16-9 and filters (1,000 hours) and hydraulic oil (5,000 hours) are said to R27Z-9 in the 2.6tonne class of mini crawler excavators. reduce operating costs, and lubrication intervals have been

increased from 50 to 250 operating hours thanks to the use of self-The latest mini excavator model has a Mitsubishi Tier 4 engine lubricating bushings.and Z rating. The Z stands for Zero-Turn-Radius, which means

that the machine can turn within its own contours and so can A maximum excavation depth of 2.42m and its boom length of work in extremely confined spaces and be fitted with buckets 4.48m is said by Hyundai HI to make the R25Z-9A top of its with a capacity of up to 0.07m³. excavator class. As with all the company’s mini excavators, the

R25Z-9A has two driving speeds (2.5/4.5 km/h), so it can be used This R25Z-9A is being made available on the European market more slowly in a delicate work environment or be driven at higher with a glass ROPS/FOPS cab, which has a spring-loaded seat, speed to the work site. foldable pedals, sensitive joystick and storage space to enhance

operator comfort. The new excavator is 4.03m long, 2.5m high and 1.5m wide. It comes standard with 25cm rubber tracks for particularly low Hyundai HI says it has made sure its new mini excavator has ground pressure and with blade. It has a wide range of optional good soundproofing: the noise level for the operator inside the attachments for use in construction, excavation, and landscaping closed cab is only 82dB(A), and just 94dB(A) outside. The model work.is also said to have easy access for maintenance. All doors, flaps

and hoods can be fully opened, and all service points are located in the same area for effective daily checks.

New R25Z-9A fills the mini excavator gap

Hyundai's R25Z-9A mini excavator is said to fill a big gap in the company’s 2.6tonne class of mini crawler excavators

Page 8: Pir Wadhai Morr Underpass & Flyover · the Construction of flyover and underpass Highway Bridges 1967 main contractor worked closely with in a record time of 147 days which is two

8 Pakistan Construction & Quarry March 2013 www.pcq.com.pk

The growth in the construction market Excavators and truck cranes are rolling the future. Consequently, Indonesia has been worldwide is giving rise to a surge in over the open-air site, heavy loaders are chosen as the partner country for the next demand for concrete products, concrete delivering machinery and exhibits of edition of bauma 2013, the world's largest pipes and shafts as well as precast gigantic dimensions and already many of trade fair for construction machinery, components. This demand is in turn the booths are beginning to take shape. Set- building material machines, mining boosting developments among the up operations on the outdoor exhibition machines, construction vehicles and manufacturers of the machinery and plant area are in full swing; and from April 1, construction equipment.that is used to produce these components. work starts in earnest in the 16 halls. And At bauma 2013, a whole range of new that, too, will involve a lot of deliveries and

The Indonesian mining companies need products made of concrete and other booth construction activities.expertise, technology and capital and they are materials will be on show at the booths of looking to engage in cooperations with systems suppliers and components

Visitors have a choice of seven different foreign partners.specialists, across the spectrum from entrance points for the show – four leading newcomers to market leaders.into the halls and three onto the open-air site. In addition, the Paul-Henri-Spaak-

All space at the show is almost fully Strasse will be closed for traffic during the booked. This International Trade Fair for show, to enable visitors to cross safely and Construction Machinery, Building easily between the southern and northern Material Machines, Mining Machines, sections of the open-air site.Construction Vehicles and Construction Equipment has a waiting list for all

Messe München International (MMI) is one sections of the exhibition, and this is of the world´s leading trade-fair companies. despite the fact that the exhibition space It organises around 40 trade fairs for capital allocated to the event has been extended Indonesia's raw material reserves are the and consumer goods, and key high-tech to a record 570,000 square meters. sixth-largest in the world. According to the industries. Each year over 30,000

Ministry of Energy and Mineral Resources, the exhibitors from more than 100 countries,

republic ranks fifth worldwide for tin and over two million visitors from more

reserves, seventh for copper, and fifteenth for than 200 countries take part in the events in

coal. Overall investment in the Indonesian Munich. In addition, MMI organises trade

mining sector was around 3,187 million US fairs in Asia, Russia, the Middle East and

dollars in 2010. Of that 764 million was in South America. With six subsidiaries

coal, 1,480 million on other mining activities, abroad – in Europe and in Asia – and 64

and 905 million on mining services. Market foreign representatives actively serving

researchers Business Monitor International For this event, a further 15,000 square over 90 countries, MMI has a worldwide (BMI) predicts an average increase in meters of space has been made available business network. Environmental investment of ten to eleven percent per year in the north-west corner of the exhibition protection and sustainability are key by 2014. The value of production is forecast to site. Georg Moller, Exhibition Group priorities in all MMI´s operations, at home reach 123 billion US dollars by 2014.Director at Messe München International: and abroad.Indonesia is already the world's largest "With this additional space we can now exporter of coal for power stations. Extraction admit more exhibitors than at the last is exclusively by open-cast mining. Currently event. Nevertheless it is still not possible Indonesia has a population of 238 million, a the annual yield is 340 million tonnes, but this to accommodate all those who want to gross domestic product of 720 billion US is expected to grow to around 500 million take part, or to meet in full the space dollars (2010) and is one of the 20 largest tonnes p.a. by 2020. This forecast is based on requirements of all participants.” economies in the world. The country's the increasing demand from Asian economies Over 3,300 exhibitors and more than building industry is booming and in the raw and the rising needs of electricity suppliers in 450,000 visitors from all over the world materials sector, too, major investment is Indonesia. In particular China and India are are expected to come to Munich for bauma scheduled for the medium term – all of buying more and more coal. For example, the 2013. which are good reasons why bauma should electricity company PT PLN currently

focus more closely on this economic region consumes 40 million tonnes of coal per year,

and the exciting opportunities it offers for but this figure is expected to double by 2015.

TREMENDOUS POTENTIAL IN BAUMA'S PARTNER COUNTRY

VISITORS CAN ENTER THE SITE VIA SEVEN ENTRANCES

BAUMA 2013 TO BE THE BIGGEST BAUMA EVER

MESSE MÜNCHEN INTERNATIONAL (MMI)

INDONESIA SELECTED AS THE PARTNER COUNTRY

EXHIBITORS IN THE MIDST OF SETTING UP

The world's largest trade fair for construction machinery, building material

machines, mining machines, construction vehicles and construction equipment

Page 9: Pir Wadhai Morr Underpass & Flyover · the Construction of flyover and underpass Highway Bridges 1967 main contractor worked closely with in a record time of 147 days which is two

9Pakistan Construction & Quarrywww.pcq.com.pk

EVENTSBAUMA 2013 FEATURESN E W D E V E L O P M E N T S I N CONSTRUCTION MACHINERY DELIVER EVER GREATER FUEL EFFICIENCYEnergy-efficiency and fuel-saving are two of the main trends that will be in the spotlight at bauma 2013, International Trade Fair for Construction Machinery, Building Material Machines, Mining Machines, Construction Vehicles and Construction Equipment. New solutions to these challenges will be presented in almost all the segments at this event. Outlined below are just some of the fuel-saving innovations for construction machinery to be showcased at bauma.

The British construction machinery manufacturer JCB is presenting its Ecomax engines for the first time at bauma 2013. These engines meet the rigorous emissions standards Stage IIB and Tier 4 Interim, without the need for diesel particle filters or emissions after-treatment. Instead JCB is using a new engine technology (patent-pending) which enables particularly clean and efficient combustion.

Caterpillar will be unveiling its new Cat hybrid excavator 336E H to the trade audience for the first time in Munich. Instead of losing the kinetic energy when braking the upper structure, it is captured in accumulators and re-used during swing acceleration. According to this American manufacturer, it has mastered the technically very difficult challenge of re-using hydraulic energy.

The German manufacturer Liebherr will be presenting a hybrid solution for heavy duty applications at bauma – the HS 8300 HD Duty Cycle Crawler Crane. Weighing in at over 350 tonnes, this world´s first is f itted with a powerful and also environmentally friendly hybrid drive on a hydraulic basis

Doosan Construction Equipment has brought out two new heavy-duty excavators in the 50-tonne class, both of which meet the Stage IIIB emissions standard: the DX490LC-3 model, with an operating weight of 49 tonnes, and the DX530LC-3, with 52 tonnes. According to this Korean manufacturer, the ratio of productivity (excavated m3/h) to fuel consumption (l/h) in standard operating

JCB uses new engines

Liebherr’s new hybrid crawler crane

Doosan balances productivity and fuel consumption

Cat presents its first hybrid excavator

mode was increased by nine percent in both these models as compared to the previous models.

Hamm AG of Germany, part of the Wirtgen Group, is expanding its range of articulated tandem rollers. The new models – HD+ 70i and HD+ 80i – are fitted with engine technology that already meets the EU IV / Tier 4f standards, which will come into force in 2014. Two separately controlled ventilators cool the charge air, hydraulic oil and engine cooling fluid.

Improvements in cost-efficiency, noise control, environmental design and ergonomics – the construction industry is facing demands on many fronts. The i n t e r n a t i o n a l m a n u f a c t u r e r s o f construction machinery are responding to these challenges and they will be presenting their innovations in all these fields at bauma 2013. Here are some examples of the new developments visitors can expect to see at the show:

One of the biggest drivers of innovation a m o n g c o n s t r u c t i o n m a c h i n e r y manufacturers is the wish for greater user comfort and improved ergonomics. The response of Atlas Copco, for example, has been to bring out what the company is describing as the lightest vibration-reduced pick hammer on the market, weighing in at just 9.5 kg. The hammer mechanism in this tool floats in the housing, thereby significantly reducing the vibrations transmitted to the operator´s hands and arms. The model also has an efficient noise-reduction system.

Mobile Excavator Kaiser AGs new Walking Mobile Excavator also focuses on the human interface. This type of machine is designed for use in inaccessible terrain, a situation in which the driver often spends more time in the cab than at other construction sites. So, Kaiser has tuned the design of the cabs to better suit the needs of the driver. As well as an ergonomic arrangement of the extensive functions, there are also new joysticks for simple operation of the many hydraulic adjustment facilities and the various attachments. The new Walking Mobile Excavator is one of the nominees in this year´s bauma Innovations Awards, in the design category.

In today´s construction industry, it is not just about making the working conditions as pleasant as possible for the machine operators and drivers, it is also about protecting the environment around the building site from pressure of all kinds.

Hamm saves fuel with load-dependent control

BAUMA 2013 AS A PLATFORM FOR INNOVATIONS

Vibration-reduced pick hammer

Ergonomically designed Walking

Noise-reduced piling technology

Avoiding unnecessary noise is an important factor here. For example in pile-driving operations. Manufacturer ABI is presenting a new adjustable vibrator for its telescopic leaders. This vibrator is fitted with a combi clamp assembly for double-Z and U-profiles and tubular piles. Because of the precise clamping with two individual clamps, the piles are protected and the noise from the "flapping" of the profiles is reduced.

Vegetation, soil and ground water all benefit from a new semi-trenchless method for installing pipelines from Herrenknecht AG. A tunnel boring machine loosens the soil which is then directly conveyed above ground using a milling unit. At the same time, the pipeline is installed underground. Earthwork is re d u c e d t o a m i n i m u m a n d n o groundwater lowering along the route is necessary. In comparison to conventional, open-trench methods, the trench is considerably narrower. When crossing agricultural land this means harvest losses and compensation payments are reduced. This pipe-installation drive system has been nominated for the bauma Innovations Award 2013 in the machine category.

As well as technological innovations on the construction machines themselves, i.e. the hardware, as i t were, many manufacturers have also much to offer in terms of the extras. A key word here is fleet management. For example, the wheel loader manufacturer Kramer Allrad and the sales and service company Zeppelin are offering satellite-supported location systems that deliver real-time data on the

construction machines. As well as location, the data can also include operating times, engine condition and service dates, all of which can be called up online. The data are then available to the customer on his computer or smart phone.

Drive system for narrower trenches

Telematics solutions to improve cost-efficiency

March 2013

Page 10: Pir Wadhai Morr Underpass & Flyover · the Construction of flyover and underpass Highway Bridges 1967 main contractor worked closely with in a record time of 147 days which is two

The aim with telematics solutions is to maximize machine capacity, to optimize fleet management, particularly on large-scale building sites, to provide verifiable figures for calculations of efficiency and cost, and to protect against theft.

BAUMA 2013 TURNS THE SPOTLIGHT ON MINING

POWERFUL TECHNOLOGY IN MINING

Strong demand for German mining technology and expertise, particularly from abroadMining section again to take up an entire hall and part of the open-air site at bauma in 2013

At bauma in 2013 companies engaged in the mining sector will again be presenting their products and services to the international trade audience in a dedicated exhibition hall and on the outdoor area.

The mining sector is continuing to expand and so, too, is the number of exhibitors in the mining section at bauma 2013. Almost 700 companies involved in mining are showcasing their products and solutions at bauma 2013.

Outlined in the following are a number of products and techniques for deep drilling, tunnel driving and mining in general.

lTogether with Rio Tinto, one of the world´s biggest mining companies, Aker Wirth has developed the Mobile Tunnel Miner (MTM), which has also been nominated for the bauma Innovation Award 2013.

lPrakla Bohrtechnik GmbH, a BAUER Group company, is supplying six universal drilling rigs of type RBT90 to the Chinese coal extraction company China National Coal Development Co. Ltd.

lFor CDE Global Ltd. of Northern Ireland, the focus at bauma will be on the theme of ore processing, and on their M2500 series for washing iron ore, quartz and frac sands.

lESCO of Portland, Oregon, USA, is presenting the Hydra cutting drum for underground cutting operations in coal mining with methane-gas and coal-dust control systems.

lHAVER NIAGARA GmbH is a specialist in machinery and systems for handling primary and secondary raw materials in

the mining, building materials and recycling sectors, with the emphasis on sifting, washing and pelletizing.

lIBS Industriemaschinen-Bergbau-Service GmbH is presenting a brand new cleaning system with primary and secondary cleaners.

lA chain manufacturer with its own drop forge, THIELE is one of the leading companies in this segment.

lThe Vermeer Corporation of Iowa, USA, is presenting a surface miner for digging through harder rocks.

lThe Wirtgen Surface Miner is designed for use in opencast mining. It enables selective mining of mineral ores, coal, limestone, gypsum, bauxite, phosphate and iron ore in high purity.

The nominations for the bauma Innovation Award 2013, which is being presented as part of bauma, have been selected. The award is divided into five categories. Out of a total of 156 submissions from Germany and abroad, the jury selected three groundbreaking innovations per category to go through to the final round.High-ranking international guests from business and politics are expected to attend the award ceremony, honoring the winners and the nominees, on April 14 in the Allerheiligen-Hofkirche (Court Church of All Saints) in the Residenz Palace in Munich. Most of the new developments will also be on show at bauma.

lRevolution in underground mining – the Mobile Tunnel Miner,

lPipe Express - a new semi-trenchless method for insta l l ing pipel ines ,

lJFI Method: Ful ly automated production of multi-layer concrete elements,

lTablet PC – transferring the digital workplace to the construction machine,

BAUMA 2013 AWARDS

NOMINEES FOR BAUMA INNOVATION AWARD 2013

CATEGORY: MACHINERY

Aker Wirth GmbH, Erkelenz

Herrenknecht AG, Schwanau

Sommer Anlagentechnik GmbH, Altheim

CATEGORY: MACHINERY COMPONENTS

B a u e r M a s c h i n e n G m b H , Schrobenhausen

Volvo Construction Equipment

Wirtgen GmbH, Windhagen

CATEGORY: CONSTRUCTION PROCESS/CONSTRUCTION WORK

Bauer Spezialtiefbau GmbH

M a x B ö g l Bauunternehmung GmbH & Co

Hermann Kirchner Bauunternehmung GmbH

CATEGORY: RESEARCH

Technical University of Clausthal

Technical University of Dresden

Te c h n i c a l University of Kaiserslautern

CATEGORY: DESIGN

Liebherr-W e r k B i s c h o f s h o f e n

Kaiser AG Fahrzeugwerk

Wacker Neuson Vertrieb Europa GmbH & Co

lFume Extraction System, , London/Great

Britain

lAutoPilot Field Rover – 3D system for controlling offset slipform pavers,

lMonopile foundation for tidal engine turbine – offshore site in Scotland,

lUsing revolving tower cranes to erect hybrid-energy wind towers – in a fast c o n s t r u c t i o n t i m e ,

KG, Sengenthal

l"PAST": reliable, automated road-building – improved function along the whole building process chain,

lOnline grain size analyzer,

lParallel kinematics (HEXAPOD) for working equipment on mobile machinery,

lComputer tomography enables orientation analysis of steel fibers in r e i n f o r c e d c o n c r e t e ,

lLiebherr Compact Loader, ,

Bischofshofen/Austria

lKaiser Walking Mobile Excavator 2013, , Schaanwald/Liechtenstein

lEH 100 demolition breaker, KG,

Munich

10 Pakistan Construction & Quarry March 2013 www.pcq.com.pk

EVENTS

Page 11: Pir Wadhai Morr Underpass & Flyover · the Construction of flyover and underpass Highway Bridges 1967 main contractor worked closely with in a record time of 147 days which is two

INVESTMENT POTENTIAL

Total 2,484

Gold & Base Metal Geochemical Smokeless Coal Briquetting PlantExploration

Coal for Small Power Plants

Ultra Refined Crystalline Salt (PVD Salt)

Encouraged with the results generated demand both inside and export purpose. Its under this Project M/s Minorco carried out possible investment is about US$40 million.further work by analyzing 32 elements on 2600 duplicate samples and has confirmed

Total coal resources of the country stand PMDC carried out stream sediments based 586 anomalies including 97 of gold. During about 186 billion tons largely located in geochemical exploration as an executing t h e y e a r 1 9 9 9 - 2 0 0 0 t h e P r o j e c t Sindh. JICA carried out feasibility studies agency in the Northern Areas of Pakistan. concentrated in locating gold mother rocks. and suggested to install a 50,000 tons The Project was started in January 1992 Their effort helped in identifying at least capacity plant at the initial stage later on up-implemented with the assistance of AusAID. five localities with the following gold valuesgraded into a 300,000 tons capacity plant. Geochemical sampling has covered about

50% of the total area. A total number of Locality Name Gold Values (ppm)4,208 stream sediment samples have been

PMDC has 38 million tons of coal in its own Ranthak 0.2 to 24.0collected out of which 2,380 samples have lease with the production capacity of been chemically analyzed for eight Golo Das 0.1 to 1.2 300,000 tons annually. Planned production elements. By the end of December 2000 the can be increased if coal briquetting plant is Shigri Bala 0.24 to 1.5Project had invested a total amount of designed on these resources. PMDC has its Rs.64.216 million. Chemical analysis of both

Muchlu 0.15 to 0.24 own experience in operating a briquetting panned concentrate and -80 mesh samples plant at Quetta.have yielded the following results Bagrot 0.11 to 3.01

Element No. of AnomaliesWith a vision of large population and need Gold 199 f o r h i g h i n d u s t r i a l i z a t i o n p o w e r

Silver 131 requirement is inevitable. Oil and gas based Ultra Refined crystalline salt is not power plants' production cost is rapidly produced in Pakistan. There is a good Copper 280increasing. Coal with known resources market in the elite society both in Pakistan Lead 293stands a good viable proposition in thermal as well as in the nearby Middle East

Zinc 483 power generation. PMDC is supplying coal countries. Pakistan’s Warcha Salt Mines are to the WAPDA thermal power plant at producing approx 200,000 tons of rock salt Cobalt 477Khanot. annually. Resources are sufficient to double

Nickel 502this production. Plant with 150,000 tons of

Bismuth 119 PVD (Pure Vacuum Dried) salt is considered to be a good rationale target to meet the

Pakistan Mineral Development Corporation

QUARRY SECTOR

11Pakistan Construction & QuarryMarch 2013www.pcq.com.pk

Page 12: Pir Wadhai Morr Underpass & Flyover · the Construction of flyover and underpass Highway Bridges 1967 main contractor worked closely with in a record time of 147 days which is two
Page 13: Pir Wadhai Morr Underpass & Flyover · the Construction of flyover and underpass Highway Bridges 1967 main contractor worked closely with in a record time of 147 days which is two

Master of the Job-Site!

Hyundai Product RangeDiesel / LPG / BatteryOperated Forklift Trucks

FORK LIFTS

Smooth running

Efficient and Ergonomically Designed

Fast and Stable Performance

RASTGAR & CO1 1 1 - 7 2 7 - 7 7 7

RASTGAR & COMPANY (PVT.) LIMITED

Darul Uloom Plot # 9, Shahrah-e-Darul Uloom, Sector 28, Korangi Industrial Area, Karachi-75180, Pakistan

KARACHI LAHORE ISLAMABAD

Fax: +9 2 21 35 123112 Em ail: [email protected] Web: www.rastgar.com

Hall # F8, Booth # 813A

Page 14: Pir Wadhai Morr Underpass & Flyover · the Construction of flyover and underpass Highway Bridges 1967 main contractor worked closely with in a record time of 147 days which is two

May 24-26, at the Expo Centre, Lahore.Build Tech Pakistan 2013

14 Pakistan Construction & Quarry March 2013 www.pcq.com.pk

Buildtech Pakistan is the largest event in Pakistan focused on the Build Tech Pakistan 2013 promises the future of building and Building & Construction sector, along with the substantial drivers construction industry of Pakistan and symbolizes growth with the of the relevant industries. This year the event is scheduled from opportunities to excel and compete with the international 24th ~ 26th May at the Expo Centre Lahore. standards.

With the events dates fast approaching the final proceedings are quickly gaining pace. Considered as an unrivaled platform for the stone refiners, architects, interior designers, machinery and equipment manufacturers, landscapers, contractors, cement producers, builders & developers and all other industries that are the main drivers of the Building & Construction industry. The event is poised to support industry growth by creating an enabling environment for business networking, product and equipment display and business development.

Leading industry players, recognizing the significant benefit of exhibiting at Build Tech Pakistan are expecting the same outcomes this year as in previous years with off-the-floor sales, extensive sales leads and beneficial networking.

The successful response of Build Tech Pakistan reveals that despite an international economic downturn, the local construction industry remains a significant area of growth, with numerous developmental projects in the upcoming year in order to draw attention to the development of new technologies in the region and the impact these will have on the industry. This time the event is destined to engage more diverse country representation, worldwide networks and countless number of opportunities to prolong the era of development, quality and precision.

The event aspires to provide visitors with an access to the full spectrum of technologies, products and insight into the industry. The event will see a range of product launches, showcasing of new technologies, conferences and opportunities to network with professionals from across the industry.

Diesel / LPG Forklift Trucks

Flagship House, Reading Road North, Fleet, Hampshire, GU51 4WD, United KingdomTel: +44 1252 810261, Web: www.hyster.com

Hyster Europe

Powerful and Versatile

Dependable

Low Cost of Operation

Playing a part in

Building Pakistan

Page 15: Pir Wadhai Morr Underpass & Flyover · the Construction of flyover and underpass Highway Bridges 1967 main contractor worked closely with in a record time of 147 days which is two

15Pakistan Construction & QuarryMarch 2013

NEWS

www.pcq.com.pk

Syed Yousuf Raza Gilani and Foreign development in the country, as it will help Minister Hina Rabbani Khar. WAPDA reclaim about 400,000 acres of land for Chairman Syed Raghib Shah was also cultivation in Kot Addu and Muzaffar Garh. present on the occasion. Dilating upon the salient features, he said

that the project comprises of concrete In her address the Foreign Minister said lining of 63-kilometer long Muzaffar Garh that the project will significantly contribute Canal, construction of 110-kilometer long towards socio-economic uplift of the new drains, rehabilitation of allied people by boosting agriculture and structures as well as construction of 50 reducing poverty in the area. Counting the new bridges. The project has been advantages, she said that annual benefits bifurcated in six contracts, so as to of the project have been estimated at complete it in the shortest possible time by Rs.1.68 billion. carrying out work on all the contracts

The Pakistan Water and Power simultaneously, he added. The Chairman Development Authority (Wapda) initiated It is pertinent to mention that the twin said that the project will also be Muzaffar Garh Canal Lining Project to menace of water logging and salinity has instrumental in bringing additional land control water logging in Muzaffar Garh been on the rise in Muzaffar Garh district under cultivation, as more water will be District of Punjab province. Lining of due to excessive seepage from Muzaffar made available for irrigation due to control Muzaffar Garh Canal and other remedial Garh and Taunsa-Panjnad Link canals of seepage from the two canals.measures are scheduled to be completed since completion of Taunsa Barrage in in two years with an estimated cost of 1958, depriving the people of their Rs.8.66 billion. cultivable land.

Ground-breaking of the project was jointly WAPDA Chairman briefed that the project performed by the former Prime Minister is of immense importance for agriculture

Wapda Initiates Project to Control Water Logging

Pakistan’s two leading oil and gas exploration companies – Oil and Gas Development Company Limited (OGDCL) and Pakistan Petroleum Limited (PPL) are to start exploration and production activities in Sudan.

A h i g h - l e v e l S u d a n e s e delegation visited OGDCL and was welcomed by Dr Asim. The minister said that soon a high-level delegation of PPL and OGDCL will visit Sudan in this regard. Sudan is one of the promising highly prospective countries having huge potential in oil and gas sector and

Masood Siddiqui, MD OGDCL gave a Pakistan was keen to acquire blocks in Sudan. short and crisp presentation on overall PPL has already acquired exploration block in OGDCL activities in Pakistan. He also Iraq and wanted to expand its operation to showed OGDCL’s commitment in seeking other parts of the world. Further, there exist a international joint venture opportunities. It number of joint venture opportunities, which was decided that in the first phase, one can both be materialized by OGDCL and PPL exploration manager each from OGDCL jointly. Likewise, Sudan can also explore and PPL will accompany the team to possibilities of farm-in in blocks owned and Sudan to examine joint venture operated by OGDCL and PPL.opportunities presently available. In the second phase, commercial and technical professionals will visit Sudan for further Mahir Khalil, Manager (Exploration) gave a exploring possibilities of business comprehensive presentation on the oil and development opportunities.gas sector in Sudan with specific reference to

the available blocks for farm-ing. He stressed The advisor thanked the Sudanese that there is a lot of potential in Sudan and a delegation for taking interest in Pakistan number of international E&P companies are and assured that Pakistan will do its already working in Sudan. He further utmost to help Sudan in the oil and gas elaborated that the current oil production of sector.Sudan stood at 145,000 BPD and has further growth potential.

OGDCL,

PPL

to begin

Exploration

in Sudan

Page 16: Pir Wadhai Morr Underpass & Flyover · the Construction of flyover and underpass Highway Bridges 1967 main contractor worked closely with in a record time of 147 days which is two

16 Pakistan Construction & Quarry March 2013 www.pcq.com.pk

NEWS

Dr Hironao Takahashi, Honorary Investment He appreciated the initiative of Sindh Board of He also appreciated the efforts of Jetro to Counsellor, Board of Investment, Government Investment to sign the Memorandum of develop and promote SMEs sector in Pakistan of Pakistan, has sought co-operation of Karachi Understanding with Japan to execute the and JICA (Japan International Co-operation Chamber of Commerce and Industry (KCCI) to establishment of Japan Special Economic Zone Agency) for technical training programmes. He attract the Japanese companies to invest in earmarked near Dhabeji in the vicinity of said that Pakistan-Japan major joint ventures Japan Special Economic Zone and likewise Karachi city. He emphasized to promote SMEs were in automobiles and motorcycles, assured his close co-operation to KCCI on which are the driving force for the growth of investment banking and power plants.matters of mutual interest. economy. Pakistan should learn and adopt the

strategies of Japanese SMEs to uplift the SMEs sector here in Pakistan. Jetro (Japan External He asserted upon the Japanese companies to Trade Organisation) Pakistan and KCCI may A Japanese delegation of businesspersons invest in the Japan Special Economic Zone to join hands for mutual co-operation to promote exchanged views with President KCCI explore more opportunities of joint ventures SMEs in association with its Japanese Mohammad Haroon Aga. He apprised about in power generation, construction of mega counterparts.the details of Japan Special Economic Zone projects etc. He concluded that Pakistan offers

planned at Dhabeji in the vicinity of Karachi great opportunities to Japan due to its city. Initially 250 acres land is allocated which strategic location on the cross-roads of South will be enhanced to 2,000 acres. He focused that Pakistan’s exports to Japan Asia, Central Asian Republics & Middle East

can be multiplied while exploring the vast and through Gawadar; Japan while building a missed and untapped opportunities. The manufacturing base in Pakistan can tap the Pakistan-Japan Special Economic Zone regional huge markets.He stressed upon the need of productive planned for establishing in Karachi will prove action on discussion between Pakistan-Japan as a milestone for enhancement of bilateral B u s i n e s s C o m m u n i t y a n d f re q u e nt trade. He drew the attention of Japanese interaction. He highlighted that KCCI can join President KCCI, also invited Japanese delegation towards exports potential of hands with Tokyo Chamber of Commerce & companies to participate in KCCI’s 10th Pakistan fruits especially mango & citrus fruits, Industry for mutual co-operation and to International My-Karachi Exhibition to be vegetables, rice, and livestock along with facilitate the business communities of two organised in July 2013 whereby an textile products including cotton yarn, woven countries. Japanese companies from auto International Pavilion is planned for B2B and fabrics, leather goods, surgical & sports goods, sector have shown their interest in the B2C meetings. He apprised about the vital role hand-made-carpets, fish and fish products.Japanese Special Economic Zone. of KCCI in the socio-economic development of

Pakistan and to promote trade and industry in Karachi and elsewhere. Senior Vice President

He highlighted that Pakistan produces world’s KCCI Shamim Firpo, Vice President Nasir He said that Pakistan has flourishing potential best mango which has great demand in Japan. Mehmood and Managing Committee in the region and the Japanese companies can He stated that Pakistan-Japan trade was facing Members also participated in the meeting.take the advantage of its geo-strategic imbalance which cannot be abridged because location. KCCI President stated that Japan Japan is one of the world’s largest economy, Special Economic Zone will prove as a however, Japan offers t remendous milestone in the economic and commercial co-opportunities as the Pakistan’s exports are just operation between two countries.11 percent of what Japan exports to Pakistan.

Japan Special Economic Zone planned at Dhabeji, Pakistan

Page 17: Pir Wadhai Morr Underpass & Flyover · the Construction of flyover and underpass Highway Bridges 1967 main contractor worked closely with in a record time of 147 days which is two
Page 18: Pir Wadhai Morr Underpass & Flyover · the Construction of flyover and underpass Highway Bridges 1967 main contractor worked closely with in a record time of 147 days which is two

18 Pakistan Construction & Quarry March 2013 www.pcq.com.pk

OPIC Funds Wind Power in Pakistan and Peru

The Overseas Private Investment Corporation (OPIC) has approved $288 million in funding for two enormous wind farm projects in Pakistan and Peru, projects the corporation’s Board says will deliver vital renewable energy security to both nations.

$193 million will go towards building a 114 MW wind farm on Peru’s Northwest Pacific coast – the first to be hooked into the nation’s electricity grid. New York-based power generation group ContourGlobal will arrange financing for the Talara and Cupisnique wind parks. Vestas Corporation is the general contractor for the project and is supplying 62 of their 1.8 MW V-100 wind turbines.

“The provision of clean and reliable electricity is an essential building block of any economy,” said OPIC President and CEO Elizabeth L. Littlefield. “The Board today affirmed OPIC’s commitment to support efforts by Pakistan and Peru to diversify their energy production to include important contributions from renewable energy sources.”

A $95 million funding in OPIC will help build Pakistan’s Sapphire Wind Power plant, a 50-megawatt wind farm in the Ghoro-Keti Bandar Wind Corridor. Utilising General Electric wind turbines, the plant is designed to generate 133 gigawatt hours of emission-free power each year, and will support a US-Pakistan renewable energy pact to diversify Pakistani energy resources.

“The wind power projects will enable both countries to take advantage of their massive renewable energy potential to help meet unmet demand for electricity,” Ms. Littlefield continued. “We are thrilled to partner with innovative U.S. companies to bring these highly-developmental projects to realization.”

Citing figures from a study U.S. National Renewable Energy Agency (NREL) and the U.S. Agency for International Development, OPIC estimates Pakistan’s total available wind energy resources are “virtually equal to the world’s entire installed wind capacity for 2010.”

NEWS

Page 19: Pir Wadhai Morr Underpass & Flyover · the Construction of flyover and underpass Highway Bridges 1967 main contractor worked closely with in a record time of 147 days which is two

NEWS

19Pakistan Construction & QuarryMarch 2013www.pcq.com.pk

Multiple groundbreaking ceremonies were performed by Sindh “As a good corporate citizen, our investment in Thar Coal project is a Chief Minister Syed Qaim Ali Shah of four Thar Coal-related preliminary step towards building that very capacity, which will projects, including setting up an airport and a scheme for road foster a more, developed and energy-efficient Pakistan. Investments upgrading. in Thar Coal is not only the need of the hour but also make sound

economic sense,” he said. Adviser to the Chief Minister and Chairman The projects included Sindh Engro Coal Mining Company’s of the Sindh Board of Investment (SBoI) Zubair Motiwala said that Block-II Coal Mining Project, Thar Airport at Islamkot, the Thar Coal Project had a tremendous growth potential, adding improvement and widening of roads for transporting heavy that it was likely to yield 175 billion tons of coal per year sufficient to mining machinery to the Coalfield and a lodge at Islamkot. The produce 100,000MW of energy.ceremony was attended by provincial ministers, members of TCEB, heads of various energy-related corporations, provincial Sindh Engro Coal Mining Company is a joint venture between Engro secretaries and representatives of banks. Corporation and Government of Sindh. SECMC has completed the

feasibility study on Thar Coal project, confirming the technical, The Sindh government and Engro Corp had jointly initiated the commercial and environmental viability of the project. All the project and work on it had been continuing at a fast pace. The required government approvals have been obtained and the project aims at developing a coal mine in Thar with an annual Economic Co-ordination Committee (ECC) has approved $700 production capacity of 6.5 million tons, besides building a 300- million sovereign guarantee for the project. The mining project, megawatt power plant in the first phase. which will cost US$ 1.3 billion, is likely to start later in 2013, and is

expected to take less than four years for completion.As per President of the Engro Corp Ali Ansari, his company had been part of Pakistan’s economic landscape for the past four decades, adding that it shared various “challenges and triumphs that Pakistan has offered”. Highlighting Engro Corp’s unwavering commitment to Pakistan, he said that Engro would continue to align “our corporate interests with the needs and strengths of the country”.

“We produce electricity from gas that was being flared, developed the Thar project and put forward short- and long-term LNG solutions,” Ali Ansari said. He said that currently Pakistan’s effective power generation stands at 14,000MW which was estimated to increase to 26,000MW by 2020 with an astounding increase in the energy import bill to over $60 billion by the same year.

Chairman Nishat Group Mian Muhammad Mansha said that hotel accommodation will be difficult to find in Lahore as the city is a corridor for not only Pak-India trade but also for Afghanistan and Central Asian countries.

“There are a few high-quality hotels in Lahore and Nishat Hotel will be a welcome addition,” he said.

Located near Expo Centre (Trade and Finance Centre), M.A. Johar Town, the project will be completed in the next two to three years.

Nishat Group to build hotel in Lahore, Pakistan

DRILLING PRODUCTS

AND SOLUTIONS:

Button Bits

Drill Tubes

Valved Hammer

Hyper Hammer

Hyper 301S Hyper Hammer

Recirculation Hammer

Eccentric Overburden System

Concentric Overburden System

Large Diameter Hammer

[U.K] LTD

KARACHI LAHORE ISLAMABAD

RASTGAR & CO1 1 1 - 7 2 7 - 7 7 7

RASTGAR & COMPANY (PVT.) LIMITED

Darul Uloom Plot # 9, Shahrah-e-Darul Uloom, Korangi Industrial Area, Karachi-75180, PakistanSector 28, Fax: +92 21 351231 12 Em ail: ko@ rastgar.com Web: ww w.rastg ar.com

Multiple Groundbreaking Ceremonies for Thar Coal Block II held

The project aims at developing a coal mine in Thar with an annual production capacity of 6.5 million tons, besides building a 300-megawatt power plant in the first phase

Page 20: Pir Wadhai Morr Underpass & Flyover · the Construction of flyover and underpass Highway Bridges 1967 main contractor worked closely with in a record time of 147 days which is two
Page 21: Pir Wadhai Morr Underpass & Flyover · the Construction of flyover and underpass Highway Bridges 1967 main contractor worked closely with in a record time of 147 days which is two

21Pakistan Construction & QuarryMarch 2013www.pcq.com.pk

NEWS

World Bank (WB) has been approached in has been able to secure financing for five consumption during the peak summer April 2013, for early start of the hydropower projects, which were not season to minimize load shedding.construction of Dasu Dam as the feasibility provided enough financing during the last

Similarly, the Ministry of Finance has agreed study for the dam has been completed. It has four years. There is much activity on the to arrange Rs 10 billion financing through the capacity to produce 4,320 megawatts water sector for improving the hydro consortium of banks like National Bank of (MW) power. generation in the country. Updating the Pakistan and Standard Chartered Bank for committee on progress on other dams, both

The WB has agreed to provide $800 million provision of fuel and other resources to the officials informed that consultants to Pakistan for Dasu Dam and later on a seven independent power plants (IPPs), would start their work on Kurram Tangi consortium would be formed by the WB to which at present have been shutdown Dam project next month. Third and newly provide complete financing of up to $2 owing to non-availability of fuel.constructed power house at Sadpara Dam billion. has just stared functioning. To end litigation

On the assurance of WAPDA chairman oil on Golan Gol Hydropower project, an The committee’s meeting was presided supplies on credit to seven IPPs would start agreement has already been reached over by Senator Zahid Khan in the early to make them operational again, and between lending institution of Kuwait and Parliament House was attended by senators when financing from banking consortium its tender would be floated soon.Moula Bakhsh Chandio, Nisar Muhammad would be available this credit would be Khan, Humayun Khan Mandokhel and cleared immediately.He informed that United States has also Khalda Parveen. agreed to provide $31 million for Kurran

The revival of the 7 IPPs would help Tangi Dam project through USAID and plan Federal Water and Power Secretary Rai generate around 1,450 MW power during is to get the project inaugurated by Sikandar, Water and Power Development the summer season and help reduce president of Pakistan within 2013.Authority (WAPDA) Chairman Raghib duration of load shedding. He also informed Abbas, and other senior officials from the that some Rs 93 billion general sales tax They also informed that there is much power sector were also present in the refund of WAPDA is struck up with Federal activity on the construction of Naulong meeting. Board of Revenue as well as around Rs 200 Dam, Drawat Dam and Gabir Dam projects.

billion power dues against private sector of Feasibility study for construction of Munda Abbas informed the committee that Diamer the country.Dam project has also been completed and Bhasha Dam would remain the top priority European Union has agreed to provide of the country, however, owing to The water and power secretary further financing for this vital project, however, challenging situation the government informed that uninterrupted gas supply to they complained that the Planning would go for construction of Dasu Dam captive power plants operated by textile Commission was responsible for delaying project and WB has already assured sector is going on and what he had proposed the initial financing for this project.required financing for it. He further to the government was to stop this supply to informed that at present power shortfall is the textile sector for three months so that Sikandar informed the meeting that during around 4,000 MW to 5,000 MW and this gas would be used for power generation last one month, the ministry had sped up its completion of Dasu Dam project would help by public sector generation companies efforts to bridge the growing shortfall in bridge the power shortfall. He said that this during the summer season.demand and supply of power especially in project would not take so long for the months of April, May and June.

It has been decided in the meeting that the completion as major preparatory work has committee will visit different hydro power already been completed by the authorities. He informed that financing for furnace oil project sites for inspection of progress He said that a formal letter would be import has been a major hurdle on the thereon. It was also decided that the finance despatched to the ministry soon for generation side and with the intervention of and petroleum ministries will be invited in approaching WB through finance and EAD president of Pakistan, the Ministry of the next meeting for increased availability ministries. Finance had agreed to arrange Rs 5.4 billion of gas for power generation during the for the opening of Letter of Credit for oil

He further informed that with the help of upcoming summer season.import through Pakistan State Oil. The Ministry of Water and Power the WAPDA imported oil would be stored for

4,320 MW Dasu Dam to be Constructed in Pakistan

Page 22: Pir Wadhai Morr Underpass & Flyover · the Construction of flyover and underpass Highway Bridges 1967 main contractor worked closely with in a record time of 147 days which is two

22 Pakistan Construction & Quarry March 2013 www.pcq.com.pk

CONSTRUCTIONPAKISTAN

& QUARRY

MONTHLY MAGAZINE

ADVERTISE FOR RESULTS

IN

Phone: +92 51 4305087

Email: [email protected]

www.pcq.com.pk

CONSTRUCTIONPAKISTAN

& QUARRY

Pakistan Construction & Quarry: The only magazine on the Circulation: Senior and middle levels of Major Pakistani construction and quarry industry of Pakistan. The magazine is contracting companies eg: NESPAK, FWO, CDA, LDA, a coffee table essential for everyone associated with the DHA, NLC, Wapda, SNGPL, SSGC, and KPT etc.construction industry.

PCQ fills long existing gap in specialized technical PCQ provides a unique opportunity to the major players of the journals category in Pakistan.construction industry for showcasing State-of-the-art technical advances in construction Equipment, Materials, Services and PCQ brings together buyers sellers of construction Techniques. Manufacturers can now also effortlessly machinery, construction tooling and technology, introduce their top notch varieties in products and construction services, cement and mining professionals, merchandise to their niche clientele. The magazine provides a tender publishers and readers.promising platform for Construction machinery manufacturer, buyers, sellers, contractors, consultants, construction PCQ caters to the needs of worldwide machinery companies, architects etc. Most importantly, it provides an manufacturing companies.opportunity for B2B alliances, leveraging their mutual strengths to the regional corporate world. PCQ serves as a Link between the local and the global

market targeting Pakistan.Since its inception this year, PCQ has already attracted keen participation and interest from the Construction Industry. It is Circulated globally in countries like USA, UK, Germany, an ideal way to explore Construction business and identify Holland, Brazil, Italy, China, Korea, Japan etc.investment opportunities, in turn encouraging various Housing & Construction companies from the sector to participate and seize the numerous opportunities.

ABOUT US

Engine Driven WeldersFull Range

From: 6.6 kW (9 HP) To: 45.6 kW (62.1 HP)

RASTGAR www.rastgar.com

RASTGAR & COMPANY (PVT.) LIMITED

Darul Uloom Plot # 9, Shahrah-e-Darul Uloom, Sector 28, Korangi Industrial Area, Karachi-75180, Pakistan

KARACHI LAHORE ISLAMABAD

Fax: +92 21 35123112 Email: [email protected] Web: www.rastgar.com

RASTGAR & CO1 1 1 - 7 2 7 - 7 7 7

Page 23: Pir Wadhai Morr Underpass & Flyover · the Construction of flyover and underpass Highway Bridges 1967 main contractor worked closely with in a record time of 147 days which is two
Page 24: Pir Wadhai Morr Underpass & Flyover · the Construction of flyover and underpass Highway Bridges 1967 main contractor worked closely with in a record time of 147 days which is two

BAUMA 2013Hall # B3 Booth # 225/322