The Netherlands Belgium Baltic Sea North Sea unster/Hafen Voerde Herdecke Huckingen Sintfeld TenneT 50Hertz Flensburg Arneburg Putlitz Grapzow utzfleth Wedel Reußenk ¨ oge Fehmarn Thyrow Dahme Bitterfeld Senftenberg Sch ¨ onewalde Kirchm ¨ oser Geesthacht/Elbe Grohnde Kirschlengern Brunsb ¨ uttel Brockdorf Berlin Großkayna Braunschweig Salzgitter-Hallendorf Buschhaus Wolfsburg Bernburg Straßfurt orbelitz Druxberge ulzetal Hannover Heyden Hamburg Huntorf Bremen Marl Westfalen Bergkamen Gersteinwerk Hamm-Uentrop unen Herne Poland Rostock Kiel Emsland Ibbenb ¨ uren Schwedt Uckermark Neuhardenberg Eisenh ¨ uttenstadt anschwalde Boxberg Schwarzheide Leipzig Esperstedt-Obhausen Schkopau Hagen-Kabel Gelsenkirchen-Scholven Rheinberg Wilhelmshaven Ostermarsch Wybelsumer Polder Holtriem-Dornum A Simulated-Annealing-Based Approach ACM e-Energy 2017 · May 19, 2017 Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner for Wind Farm Cabling I NSTITUTE OF T HEORETICAL I NFORMATICS · ALGORITHMICS GROUP Czech Republic Belgium France KIT – The Research University in the Helmholtz Association www.kit.edu

Upload: others

Post on 25-Jan-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

The Netherlands

Belgium

Baltic Sea

North Sea

Munster/Hafen

Voerde

Herdecke

Huckingen

Sintfeld

Denmark

TenneT50Hertz

Flensburg

Arneburg

Putlitz

Grapzow

Butzfleth Wedel

Reußenkoge

Fehmarn

Thyrow

Dahme

Bitterfeld Senftenberg

Schonewalde

Kirchmoser

Geesthacht/Elbe

Grohnde

Kirschlengern

BrunsbuttelBrockdorf

Berlin

Großkayna

Braunschweig

Salzgitter-HallendorfBuschhaus

Wolfsburg

BernburgStraßfurt

KorbelitzDruxberge

Sulzetal

HannoverHeyden

Hamburg

Huntorf

Bremen

Marl

WestfalenBergkamen

GersteinwerkHamm-Uentrop

Lunen

Herne

Poland

Rostock

Kiel

Emsland

Ibbenburen

Schwedt

Uckermark

Neuhardenberg

Eisenhuttenstadt

Janschwalde

BoxbergSchwarzheide

LeipzigEsperstedt-Obhausen SchkopauHagen-Kabel

Gelsenkirchen-Scholven

Rheinberg

Wilhelmshaven

Ostermarsch

Wybelsumer Polder

Holtriem-Dornum

A Simulated-Annealing-Based Approach

ACM e-Energy 2017 · May 19, 2017Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner

for Wind Farm Cabling

INSTITUTE OF THEORETICAL INFORMATICS · ALGORITHMICS GROUP

Czech RepublicBelgiumFrance

KIT – The Research University in the Helmholtz Association www.kit.edu

Page 2: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Motivation

Stribog II

Stribog I

Osters Bank 4Osters Bank 3

Osters Bank 2

Ruyter West

Cornelia

Uthland

Riffgrond

Horns Rev Reserved Area

WeißeBank

Horns RevB HR7

Horns RevB HR6

Horns RevB HR5

RuyterOost

Clear-camp

OostFriesland

AmelandPotentiele Zoekgebieden

PNEAtlantis III

PNEAtlantis II

Austern-grund

WitteBank

MeerwindWest

Euklas Diamant

Jules Verne

Nautilus IHTOD 5

HTOD 4 HTOD 3

HTOD 2

HTOD 1

Concordia I

Concordia II

Gaia I

Gaia II

Gaia III

Gaia IV

AiolosApollon

Horizont IHorizont II

Horizont III

SeaStorm II

Seewind III

Seewind IV

AreaC IIIAreaC II

AreaC I

Skua

Bight Power I Bight Power II

Global Tech 2

Kaskasi

Kaskasi II

Nordpassage

H2-20

GodeWind III

BorkumRiffgrund West II

EnBWHe dreiht II

Sandbank 24extension

Sandbank 24extension

?

ProWind 3ProWind 2ProWind 1

Neptune I

Neptune II

Neptune III

HTOD 6 Nemo

Enova OffshoreNSWP 8

Enova OffshoreNSWP 10

Enova OffshoreNSWP 12

Enova OffshoreNSWP 14

Enova OffshoreNSWP 15

Enova OffshoreNSWP 13

Enova OffshoreNSWP 11

Gaia V

Norderland

Norderland

DanTysk DK

PetrelSeagullHeronGannet

SeaStorm I

Nord-OstPassat I

Nord-OstPassat II

Nord-OstPassat III

Aquamarin

EnovaOffshoreNSWP 9

Zee-Energie

Buiten-gaats

GodeWind II

GodeWind I

Sandbank 24

BorkumRiffgrund WestOWP

West

Borkum-Riffgrund II

Borkum-Riffgrund II

Merkur(ehem.

MEG Off-shore I)

InnogyNordsee

3Innogy

Nordsee 2

InnogyNordsee 1

DeltaNordsee 1

DeltaNordsee 2 Gode

Wind IV

DeutscheBucht Veja

Mate

EnBWHe dreiht

EnBWHohe See

Albatros

Albatros FiT

SeaWind 1

Kaikas

Horizont IV

NordlicherGrund

Horns Rev III

Riffgat

Borkum-Riffgrund I

TrianelWindpark

TrianelWindpark

alpha ventus

BARDOffshore 1

GlobalTech 1

Nordsee Ost

MeerwindSud/Ost

Amrumbank West

Butendiek

DanTysk

Horns Rev II

Horns Rev

Schif

ffahr

tsrou

te10

Schifffahrtsroute 4

Schifffahrtsroute 4

Schifffahrtsroute 4Schifffahrtsroute 6

Schifffahrtsroute 6

Sch

ifffa

hrts

rout

e5

German Bight Western ApproachEast Friesland

Terschelling - German Bight

JadeApproach

WeißeBank

HelgolanderBucht

Vorranggebiet 3fur Schifffahrt

VorranggebietSchifffahrtsroute 12

Tief-wasser-reede

Doggerbank

Sudlich Amrumbank

Dollard

Jade-busen

S y l t e r A u ß e n r i f

W e i ß e B a n k

SylWin alphaSylWin beta

DolWin deltaDolWin beta

DolWin alphaDolWin gamma

BorWin alphaBorWin beta

BorWin delta

BorWin epsilonBorWingamma

HelWin alpha BorWin beta

Vorbehaltsgebiet

fur

Rohrleitungen

BorW

in3,4

DolW

in3 BorWin 1,2

DolWin 1,2

BorWin 1,2

Bor

Win

3,4

SylWin 1,2

HelWin 1,2

SylWin 1,2

85 km

160 km

60 km

45 km

75 km

83 km

50 km

141 km 130 km125 km 125 km

Emden

WilhelmshavenBremerhaven

Cuxhaven

Leer

Norden

Norden

Aurich

Esens

Jever

Varel

Groningen

Dokkum

Brundbuttel

Heide

Husum

Niebull

Tondern

Ribe

Varde

Esbjerg

Endrup

Karlsgarde

Buttel

DieleDorpen West

Hagermarsch

Emden/Borssum

Dorpen WestEemshaven

Ameland

Schiermonnikoog

Terschelling

Vlieland

Borkum

Memmert

Juist

NorderneyBaltrum

LangeoogSpiekeroog

Wangerooge

Mellum

Neuwerk

Helgoland

Pellworm

Hooge

Amrum

Fohr

Sylt Sylt

Rømø

Mandø

Fanø

Inhausen

Nordergrunde

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

https://upload.wikimedia.org/wikipedia/commons/a/a1/Map of the offshore wind power farms in the German Bight.png

1

Page 3: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Motivation

Stribog II

Stribog I

Osters Bank 4Osters Bank 3

Osters Bank 2

Ruyter West

Cornelia

Uthland

Riffgrond

Horns Rev Reserved Area

WeißeBank

Horns RevB HR7

Horns RevB HR6

Horns RevB HR5

RuyterOost

Clear-camp

OostFriesland

AmelandPotentiele Zoekgebieden

PNEAtlantis III

PNEAtlantis II

Austern-grund

WitteBank

MeerwindWest

Euklas Diamant

Jules Verne

Nautilus IHTOD 5

HTOD 4 HTOD 3

HTOD 2

HTOD 1

Concordia I

Concordia II

Gaia I

Gaia II

Gaia III

Gaia IV

AiolosApollon

Horizont IHorizont II

Horizont III

SeaStorm II

Seewind III

Seewind IV

AreaC IIIAreaC II

AreaC I

Skua

Bight Power I Bight Power II

Global Tech 2

Kaskasi

Kaskasi II

Nordpassage

H2-20

GodeWind III

BorkumRiffgrund West II

EnBWHe dreiht II

Sandbank 24extension

Sandbank 24extension

?

ProWind 3ProWind 2ProWind 1

Neptune I

Neptune II

Neptune III

HTOD 6 Nemo

Enova OffshoreNSWP 8

Enova OffshoreNSWP 10

Enova OffshoreNSWP 12

Enova OffshoreNSWP 14

Enova OffshoreNSWP 15

Enova OffshoreNSWP 13

Enova OffshoreNSWP 11

Gaia V

Norderland

Norderland

DanTysk DK

PetrelSeagullHeronGannet

SeaStorm I

Nord-OstPassat I

Nord-OstPassat II

Nord-OstPassat III

Aquamarin

EnovaOffshoreNSWP 9

Zee-Energie

Buiten-gaats

GodeWind II

GodeWind I

Sandbank 24

BorkumRiffgrund WestOWP

West

Borkum-Riffgrund II

Borkum-Riffgrund II

Merkur(ehem.

MEG Off-shore I)

InnogyNordsee

3Innogy

Nordsee 2

InnogyNordsee 1

DeltaNordsee 1

DeltaNordsee 2 Gode

Wind IV

DeutscheBucht Veja

Mate

EnBWHe dreiht

EnBWHohe See

Albatros

Albatros FiT

SeaWind 1

Kaikas

Horizont IV

NordlicherGrund

Horns Rev III

Riffgat

Borkum-Riffgrund I

TrianelWindpark

TrianelWindpark

alpha ventus

BARDOffshore 1

GlobalTech 1

Nordsee Ost

MeerwindSud/Ost

Amrumbank West

Butendiek

DanTysk

Horns Rev II

Horns Rev

Schif

ffahr

tsrou

te10

Schifffahrtsroute 4

Schifffahrtsroute 4

Schifffahrtsroute 4Schifffahrtsroute 6

Schifffahrtsroute 6

Sch

ifffa

hrts

rout

e5

German Bight Western ApproachEast Friesland

Terschelling - German Bight

JadeApproach

WeißeBank

HelgolanderBucht

Vorranggebiet 3fur Schifffahrt

VorranggebietSchifffahrtsroute 12

Tief-wasser-reede

Doggerbank

Sudlich Amrumbank

Dollard

Jade-busen

S y l t e r A u ß e n r i f

W e i ß e B a n k

SylWin alphaSylWin beta

DolWin deltaDolWin beta

DolWin alphaDolWin gamma

BorWin alphaBorWin beta

BorWin delta

BorWin epsilonBorWingamma

HelWin alpha BorWin beta

Vorbehaltsgebiet

fur

Rohrleitungen

BorW

in3,4

DolW

in3 BorWin 1,2

DolWin 1,2

BorWin 1,2

Bor

Win

3,4

SylWin 1,2

HelWin 1,2

SylWin 1,2

85 km

160 km

60 km

45 km

75 km

83 km

50 km

141 km 130 km125 km 125 km

Emden

WilhelmshavenBremerhaven

Cuxhaven

Leer

Norden

Norden

Aurich

Esens

Jever

Varel

Groningen

Dokkum

Brundbuttel

Heide

Husum

Niebull

Tondern

Ribe

Varde

Esbjerg

Endrup

Karlsgarde

Buttel

DieleDorpen West

Hagermarsch

Emden/Borssum

Dorpen WestEemshaven

Ameland

Schiermonnikoog

Terschelling

Vlieland

Borkum

Memmert

Juist

NorderneyBaltrum

LangeoogSpiekeroog

Wangerooge

Mellum

Neuwerk

Helgoland

Pellworm

Hooge

Amrum

Fohr

Sylt Sylt

Rømø

Mandø

Fanø

Inhausen

Nordergrunde

TrianelWindpark

Borkum-Riffgrund II

Borkum-

Merkur(ehem.MEG Off-shore I)

alpha Ventus

Borkum-Riffgrund I

Riffgrund II

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

https://upload.wikimedia.org/wikipedia/commons/a/a1/Map of the offshore wind power farms in the German Bight.png

1

Page 4: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Wind Farm Cabling

2

Page 5: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Wind Farm Cabling

PCC (110 kV)

Grid Point

2

Page 6: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Wind Farm Cabling

PCC (110 kV)

Grid Point

2

Page 7: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Wind Farm Cabling

PCC (110 kV)

Grid Point

Wind Turbine (33 kV)

2

Page 8: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Wind Farm Cabling

SubstationPCC (110 kV)

Grid Point

Wind Turbine (33 kV)

2

Page 9: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Wind Farm Cabling

SubstationPCC (110 kV)

Grid Point

Wind Turbine (33 kV)

Transport Cable

2

Page 10: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Wind Farm Cabling

SubstationPCC (110 kV)

Grid Point

Wind Turbine (33 kV)

Transmission Cables

Transport Cable

2

Page 11: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Wind Farm Cabling

Circuit

2

Page 12: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Wind Farm Cabling

Circuit

Collector System

2

Page 13: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Wind Farm Cabling

Circuit

Collector System

Full Farm

2

Page 14: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Wind Farm Cabling

Circuit

Collector System

Full Farm

≤ 2 Wind Turbines; $ 100≤ 6 Wind Turbines; $ 140≤ 9 Wind Turbines; $ 162

Page 15: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Wind Farm Cable Layout Problem

Given VS set of substations, VT set of turbines (each with capacity),for each edge: cable types (each with cost and capacity)

Circuit

Collector System

Full Farm

3

Page 16: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Wind Farm Cable Layout Problem

Given VS set of substations, VT set of turbines (each with capacity),for each edge: cable types (each with cost and capacity)

Circuit

Collector System

Full Farm

3

Page 17: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Wind Farm Cable Layout Problem

Given VS set of substations, VT set of turbines (each with capacity),for each edge: cable types (each with cost and capacity)

Circuit

Collector System

Full Farm

≤ 2 Wind Turbines; $ 100≤ 6 Wind Turbines; $ 140≤ 9 Wind Turbines; $ 162

3

Page 18: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Wind Farm Cable Layout Problem

Given

find

VS set of substations, VT set of turbines (each with capacity),for each edge: cable types (each with cost and capacity)

for each edge: the cable type

Circuit

Collector System

Full Farm

≤ 2 Wind Turbines; $ 100≤ 6 Wind Turbines; $ 140≤ 9 Wind Turbines; $ 162

3

Page 19: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Wind Farm Cable Layout Problem

Given

find

VS set of substations, VT set of turbines (each with capacity),for each edge: cable types (each with cost and capacity)

for each edge: the cable type

total cable costminimizing

Circuit

Collector System

Full Farm

≤ 2 Wind Turbines; $ 100≤ 6 Wind Turbines; $ 140≤ 9 Wind Turbines; $ 162

3

Page 20: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Wind Farm Cable Layout Problem

Given

find

subject to

VS set of substations, VT set of turbines (each with capacity),for each edge: cable types (each with cost and capacity)

for each edge: the cable type

total cable costminimizing

substation capacity constraintsflow conservation constraints

cable capacity constraints Circuit

Collector System

Full Farm

≤ 2 Wind Turbines; $ 100≤ 6 Wind Turbines; $ 140≤ 9 Wind Turbines; $ 162

3

Page 21: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Wind Farm Cable Layout Problem

Given

find

subject to

VS set of substations, VT set of turbines (each with capacity),for each edge: cable types (each with cost and capacity)

for each edge: the cable type

total cable costminimizing

substation capacity constraintsflow conservation constraints

cable capacity constraints Circuit

Collector System

Full Farm

≤ 2 Wind Turbines; $ 100≤ 6 Wind Turbines; $ 140≤ 9 Wind Turbines; $ 162

Wind farm planning problem⇔ Minimum cost flow problem

OPT(NFFP) ≤∑

j∈VSOPT(NSP(j)) ≤

∑j∈VS

∑i∈N OPT(NCP(j , i))

using [Leibfried et al., 2015]

3

Page 22: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Simulated Annealing

Metropolis Algorithm Cooling Schedule

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

4

Page 23: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Simulated Annealing

many local optima

Metropolis Algorithm Cooling Schedule

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

4

Page 24: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Simulated Annealing

many local optima

local search

Metropolis Algorithm Cooling Schedule

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

4

Page 25: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Simulated Annealing

many local optima

escape local optimum

?

Metropolis Algorithm Cooling Schedule

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

4

Page 26: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Simulated Annealing

many local optima

multiple mutations

Metropolis Algorithm Cooling Schedule

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

4

Page 27: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Simulated Annealing

many local optima

multiple mutations

Metropolis Algorithm Cooling Schedule

0.004

0.002

0.006

0.008

0.01

0

Tem

pera

ture

0 5 10 15 20 25 30

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

activity µdynamic, τ = 4 · 10−5standard, τ = 4 · 10−7

Time in min

4

Page 28: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Simulated Annealing

many local optima

multiple mutations

Metropolis Algorithm Cooling Schedule

0.004

0.002

0.006

0.008

0.01

0

Tem

pera

ture

Diversification Intensification

0 5 10 15 20 25 30

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Diversification

activity µdynamic, τ = 4 · 10−5standard, τ = 4 · 10−7

Time in min

4

Page 29: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Benchmark Sets

21

21

21

2121

5

Page 30: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Benchmark Sets

21

21

21

2121

5

Page 31: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Benchmark Sets

21

21

21

2121

5

Page 32: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Benchmark Sets

SubstationTurbineCable type 1Cable type 2Cable type 3

21

21

21

2121

21

5

Page 33: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Benchmark Sets

SubstationTurbineCable type 1Cable type 2Cable type 3

21

21

21

2121

21

5

Page 34: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Benchmark Sets

SubstationTurbineCable type 1Cable type 2Cable type 3

21

21

21

2121

21

5

Page 35: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Multiple Instances of Simulated Annealing

100 200 300 400 500

0

0.4

−0.4

−0.8

0.8 1 Instance

2 Instances

4 Instances

Number of Turbines

betterthan Gurobi

worsethan Gurobi

6

Page 36: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Multiple Instances of Simulated Annealing

100 200 300 400 500

0

0.4

−0.4

−0.8

0.8 1 Instance

2 Instances

4 Instances

Number of Turbines

betterthan Gurobi

worsethan Gurobi

Results depend on a random seed.Multiple instances reduce the overall computation time. This causes a

reduced time spend for the intensification phase.

6

Page 37: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Performance Influence of the

200 300 400 500

0

1

2

3

−1

4

5

6 τ = 1 · 10−5

τ = 2 · 10−5

τ = 4 · 10−5

τ = 8 · 10−5

τ = 16 · 10−5

Number of Turbines

betterthan Gurobi

worsethan Gurobi

Thermal Conductivity and Capacity τ

7

Page 38: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Performance Influence of the

200 300 400 500

0

1

2

3

−1

4

5

6 τ = 1 · 10−5

τ = 2 · 10−5

τ = 4 · 10−5

τ = 8 · 10−5

τ = 16 · 10−5

Number of Turbines

betterthan Gurobi

worsethan Gurobi

Thermal Conductivity and Capacity τ

Parameter tuning is difficult for the cooling schedule.

7

Page 39: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Cooling Schedule Performance

0

0.2

0.4

−0.2

−0.4

−0.8

Standard Cooling Schedule

Dynamic Cooling Schedule

100 200 300 400

Number of Turbines

−0.6

worsethan Gurobi

betterthan Gurobi

8

Page 40: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Cooling Schedule Performance

0

0.2

0.4

−0.2

−0.4

−0.8

Standard Cooling Schedule

Dynamic Cooling Schedule

100 200 300 400

Number of Turbines

−0.6

worsethan Gurobi

betterthan Gurobi

The dynamic outperorms the standard one without parameter tuning.Parameter tuning improve the standard one for larger instances.

8

Page 41: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Performance Influence of the

0.85 0.9 0.95 1−1.5

−1

−0.5

0

0.5

1

1.5

2

Substation Capacity Tightness

betterthan Gurobi

worsethan Gurobi

Substation Capacity Tightness

9

Page 42: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Performance Influence of the

0.85 0.9 0.95 1−1.5

−1

−0.5

0

0.5

1

1.5

2

Substation Capacity Tightness

betterthan Gurobi

worsethan Gurobi

Substation Capacity Tightness

The tighter the substation capacity or the more substations the harderthe instance is to solve. Thus, the solution quality reduces with same

duration.

9

Page 43: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Conclusion & Future Work

Circuit ProblemSubstation ProblemFull Farm Problem

10

Page 44: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Conclusion & Future Work

Circuit

Collector System

Full Farm

Circuit ProblemSubstation ProblemFull Farm Problem

10

Page 45: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Conclusion & Future Work

Circuit

Collector System

Full Farm

P (MST)NP-hard (CMST)

NP-hard (Heuristics)

Circuit ProblemSubstation ProblemFull Farm Problem

10

Page 46: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Conclusion & Future Work

Circuit

Collector System

Full Farm

Circuit

Collector System

Full Farm

P (MST)NP-hard (CMST)

NP-hard (Heuristics)

Circuit ProblemSubstation ProblemFull Farm Problem

10

Page 47: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Conclusion & Future Work

Circuit

Collector System

Full Farm

Circuit

Collector System

Full Farm

NP-hardNP-hardNP-hard

P (MST)NP-hard (CMST)

NP-hard (Heuristics)

Circuit ProblemSubstation ProblemFull Farm Problem

10

Page 48: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Conclusion & Future Work

Circuit

Collector System

Full Farm

Circuit

Collector System

Full Farm

(Clustering)NP-hardNP-hardNP-hard

P (MST)NP-hard (CMST)

NP-hard (Heuristics)

Circuit ProblemSubstation ProblemFull Farm Problem

10

Page 49: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Conclusion & Future Work

}

Circuit

Collector System

Full Farm

Circuit

Collector System

Full Farm

Sim

ulat

edA

nnea

ling(Clustering)NP-hard

NP-hardNP-hard

P (MST)NP-hard (CMST)

NP-hard (Heuristics)

Circuit ProblemSubstation ProblemFull Farm Problem

10

Page 50: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Conclusion & Future Work

}

Circuit

Collector System

Full Farm

Circuit

Collector System

Full Farm

Sim

ulat

edA

nnea

ling(Clustering)NP-hard

NP-hardNP-hard

P (MST)NP-hard (CMST)

NP-hard (Heuristics)

Circuit ProblemSubstation ProblemFull Farm Problem

RESULTS

Number of Turbines

-0.2-0.4

-0.8

Number of Turbines

-0.6

00.20.4

Standard Cooling ScheduleDynamic Cooling Schedule

100 200 300 400 100 200 300 400 500

1 Instance2 Instances4 Instances

0

0.4

-0.4

-0.8

0.8

200 300 400 500

0123

-1

45

τ= 1·10-5τ= 1·10-5τ= 2·10-5τ= 4·10-5

τ=16·10-5

Number of Turbines

6

τ= 8·10-5

0.85 0.9 0.95 1

00.511.52

Substation Capacity Tightness

-0.5

-1.5-1

10

Page 51: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Conclusion & Future Work

}

Circuit

Collector System

Full Farm

Circuit

Collector System

Full Farm

Sim

ulat

edA

nnea

ling(Clustering)NP-hard

NP-hardNP-hard

P (MST)NP-hard (CMST)

NP-hard (Heuristics)

Circuit ProblemSubstation ProblemFull Farm Problem

Number of Turbines

-0.2-0.4

-0.8

Number of Turbines

-0.6

00.20.4

Standard Cooling ScheduleDynamic Cooling Schedule

100 200 300 400 100 200 300 400 500

1 Instance2 Instances4 Instances

0

0.4

-0.4

-0.8

0.8

200 300 400 500

0123

-1

45

τ= 1·10-5τ= 1·10-5τ= 2·10-5τ= 4·10-5

τ=16·10-5

Number of Turbines

6

τ= 8·10-5

0.85 0.9 0.95 1

00.511.52

Substation Capacity Tightness

-0.5

-1.5-1

RESULTS&FUTURE WORK

10

Page 52: for Wind Farm Cabling - KIT - ITI Algorithmik I · for Wind Farm Cabling INSTITUTE OF T HEORETICAL INFORMATICS A LGORITHMICS G ROUP France Belgium Czech Republic KIT The Research

Sebastian Lehmann, Ignaz Rutter, Dorothea Wagner and Franziska Wegner – A Simulated-Annealing-Based Approach for Wind Farm Cabling

Institute of Theoretical InformaticsAlgorithmics Group

Are you a metal fan, too?

https://s-media-cache-ak0.pinimg.com/originals/8f/51/d3/8f51d30e4e60a97fc5b2fada2ecacd85.jpg

11