FORM 1 & 1A
For
AMENDMENTINECFORRESIDENTIALCUMCOMMERCIALPROJECT
(Earlier EC received vide letter No. F. NO. 21-178/2014-IA.III dt. 08.01.2016)
At
PlotbearingS.No‐128,129/1,129/2(a),129/3,129/4,130,131/1,
132atvillageKavesar,Dist.Thane,State:Maharashtra.
Proposed By
SAI UMA CORPORATION
ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 1
APPENDIX‐I
(Seeparagraph–6)FORM1
(I) BASICINFORMATION
Sr.No. Item Details
1 Nameoftheproject/s AmendmentinECforResidentialcumcommercialprojectatthane
2 S.No.intheSchedule 8(a)
3 Proposedcapacity/area/length/tonnagetobehandled/commandarea/leasearea/numberofwellstobedrilled.
TotalPlotArea 27,809.41 m2
Built‐upAreaDetails
BuiltupArea 39,707.84 m2
NONFSI 52,811.75 m2
TotalConstructionArea 92,519.59 m2
Detailed Area Statement is attached asAnnexureI
4 New/Expansion/Modernization Amendment of Residential cum CommercialProject
5 ExistingCapacity/Areaetc. Earlier EC received vide letter No. F. NO. 21‐178/2014‐IA.III dt. 08.01.2016 for 73,247.71m2constructionarea
6 Categoryofprojecti.e.AorB BCategory
7 Doesitattractthegeneralcondition?ifyes,pleasespecify
No
8 Doesitattractthespecificcondition?Ifyes,pleasespecify
No
9 Location
Plot/Survey/KhasraNo. Plot bearing S. No‐128, 129/1, 129/2(a),129/3,129/4,130,131/1,132
Village Kavesar
Tehsil Thane
District Thane
State Maharashtra
10 Nearestrailwaystation/portalongwithdistanceinkms.
ThaneRailwayStation
Distance~8km
ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 2
Sr.No. Item Details
11 NearestTown,city,DistrictHeadquartersalongwithdistanceinkms.
ThaneCity
12 VillagePanchayat,ZillaParishad,MunicipalCorporation,Localbody(completepostaladdresseswithtelephonenos.tobegiven)
ThaneMunicipalCorporation(TMC)
13 Nameoftheapplicant Mr.DhairyaShah
SaiUmaCorporation
14 Registeredaddress SaiUmaCorporation103,104, Rosa Royale, Opp. Crown Tower,Near Gravity Fitness Centre, HiranandaniEstate, Patlipada, G.B. Road, Thane (W)‐410615
15 Addressforcorrespondence:
Name Mr.DhairyaShah
Designation(Owner/Partner/CEO)
Address SaiUmaCorporation103,104, Rosa Royale, Opp. Crown Tower,Near Gravity Fitness Centre, HiranandaniEstate, Patlipada, G.B. Road, Thane (W)‐410615
Pincode 410615
E‐mail [email protected]
TelephoneNo. 022‐25458877
FaxNo.
16 Detailsofalternativesitesexamined,ifany.Locationofthesesitesshouldbeshownonatoposheet.
Village‐District‐State
1.
2.
3.
Weareproposingresidentialproject
17 Interlinkedprojects NotApplicable
18 Whetherseparateapplicationofinterlinkedprojecthasbeensubmitted?
No
19 Ifyes,dateofsubmission NotApplicable
20 IfNo,Reason Standaloneconstructionproject
ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 3
Sr.No. Item Details
21 Whethertheproposalinvolvesapproval/clearanceunder:if,yesdetailsofthesameandtheirstatustobegiven
a) TheForest(Conservation)Act,1980?
b) Thewildlife(protection)Act,1972?
c) TheCRZNotification,1991?
We have applied for NBWL (Wild Life)Clearance.
22 WhetherthereisanyGovernmentOrder/policyrelevant/relatingtothesite?
No
23 Forestlandinvolved(hectares) No forest land involved in proposed projectsite
24 Whetherthereisanylitigationpendingagainsttheprojectand/orlandinwhichtheprojectisproposetobesetup?
a) Nameofthecourtb) CaseNo.c) Orders/Directionsofthe
courtifanyanditsrelevancewiththeproposedproject.
Nosuchlitigationpendingagainsttheproject
Capacity corresponding to sectoral activity (such as production capacity for manufacturing,mining lease area and production capacity for mineral production, area for mineralexploration, length for linear transport infrastructure, generation capacity for powergenerationetc.,)
(II)Activity
1. Construction, operation or decommissioning of the Project involving actions,
whichwillcausephysicalchangesinthelocality(topography,landuse,changesinwaterbodies,etc.)
Sr.No.
Information/Checklistconfirmation
Yes/No
Details thereof (with approximatequantities /rates, wherever possible)withsourceofinformationdata
1.1 Permanentortemporarychangeinlanduse,landcoverortopographyincludingincreaseinintensityoflanduse(withrespecttolocallanduseplan)
Yes LandsituatedinResidentialzone
1.2 Clearanceofexistingland,vegetationandbuildings?
Yes Around 50 trees will be cut duringconstructionphaseoftheproject
ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 4
Sr.No.
Information/Checklistconfirmation
Yes/No
Details thereof (with approximatequantities /rates, wherever possible)withsourceofinformationdata
1.3 Creationofnewlanduses? No We are proposing Residential andcommercialbuilding
1.4 Pre‐constructioninvestigationse.g.borehouses,soiltesting?
No
1.5 Constructionworks?
Yes We are proposing Residential andcommercialbuilding
1.6 Demolitionworks?
No
1.7 TemporarysitesusedforconstructionworksorHousingofconstructionworkers?
Yes Temporary sheds will be provided forworkers
1.8 Abovegroundbuildings,structuresorearthworksincludinglinearstructures,cutandfillorexcavations
Yes Theexcavationwillbedoneforfoundation.
1.9 Undergroundworksincludingminingortunnelling?
No
1.10 Reclamationworks? No
1.11 Dredging?
No
1.12 Offshorestructures? No
1.13 Productionandmanufacturingprocesses?
No
1.14 Facilitiesforstorageofgoodsormaterials?
Yes Onlyconstructionmaterialwillbestored intemporarystoragesite
1.15 Facilitiesfortreatmentordisposalofsolidwasteorliquideffluents?
Yes Mechanical composting for Municipal SolidWasteDisposalandSewageTreatmentPlantforsewagedisposal.
1.16 Facilitiesforlongtermhousingofoperationalworkers?
No
1.17 Newroad,railorseatrafficduringconstructionoroperation?
Yes Internalroads
ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 5
Sr.No.
Information/Checklistconfirmation
Yes/No
Details thereof (with approximatequantities /rates, wherever possible)withsourceofinformationdata
1.18 Newroad,rail,airwaterborneorothertransportinfrastructureincludingneworalteredroutesandstations,ports,airportsetc?
No Existing roadwill beused for the transportpurpose.
1.19 Closureordiversionofexistingtransportroutesorinfrastructureleadingtochangesintrafficmovements?
No
1.20 Newordivertedtransmissionlinesorpipelines?
No
1.21 Impoundment,damming,culverting,realignmentorotherchangestothehydrologyofwatercoursesoraquifers?
No
1.22 Streamcrossings? No
1.23 Abstractionortransfersofwaterformgroundorsurfacewaters?
No
1.24 Changesinwaterbodiesorthelandsurfaceaffectingdrainageorrun‐off?
No There will not be any changes in waterbodiesorthelandsurface
1.25 Transportofpersonnelormaterialsforconstruction,operationordecommissioning?
Yes Construction workers and constructionmaterial
1.26 Long‐termdismantlingordecommissioningorrestorationworks?
No
1.27 Ongoingactivityduringdecommissioningwhichcouldhaveanimpactontheenvironment?
No
1.28 Influxofpeopletoanareaineithertemporarilyorpermanently?
Yes Only Constructionworkerswill stay duringconstructionphaseandofficepersonnel
1.29 Introductionofalienspecies?
No Nointroductionofalienspecieswilloccurasthisispurelyresidentialproject
1.30 Lossofnativespeciesorgeneticdiversity?
No Nothreatofspecieslosswilloccur
1.31 Anyotheractions? No No
ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 6
2 Use ofNatural resources for construction or operation of the Project (such as
land, water, materials or energy, especially any resources which are non‐renewableorinshortsupply):
Sr.No. Information/checklistconfirmation
Yes/No Details thereof (with approximatequantities /rates, wherever possible)withsourceofinformationdata
2.1 Landespeciallyundevelopedoragriculturalland(ha)
No
2.2 Water(expectedsource&competingusers)unit:KLD
Yes TotalWaterdemandwillbe311KLDThe detailed water balance is attached asAnnexureIV
2.3 Minerals(MT) No
2.4 constructionmaterial–stone,aggregates,sand/soil(expectedsource–MT)
Yes Stoneaggregatesdemandwillbesourcedfromnearbylocalvendors
2.5 Forestsandtimber(source–MT)
Yes Onlydoorframes(ifsoplanned)
2.6 Energyincludingelectricityandfuels(source,competingusers)Unit:fuel(MT),energy(MW)
Yes TotalDemandload:3.4MW SourceofElectricity:MSEDCL
2.7 Anyothernaturalresources(useappropriatestandardunits)
No
3. Use,storage,transport,handlingorproductionofsubstancesormaterials,whichcouldbeharmful tohumanhealthor the environmentor raise concernsaboutactualorperceivedriskstohumanhealth.
Sr.No. Information/Checklistconfirmation
Yes/No Detailsthereof(withapproximatequantities/rates,whereverpossible)withsourceofinformationdata
3.1 Useofsubstancesormaterials,whicharehazardous(asperMSIHCrules)tohumanhealthortheenvironment(flora,fauna,andwatersupplies)
Yes Used oil from DG sets will be given toauthorisedrecyclers
3.2 Changes in occurrence ofdisease or affect diseasevectors (e.g. insectorwaterbornediseases)
No
3.3 Affectthewelfareofpeoplee.g.bychanginglivingconditions?
No Proposed Projectwill not effect thewelfareofpeople
3.4 Vulnerablegroupsofpeople No Proposed Project will not affect hospital
ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 7
Sr.No. Information/Checklistconfirmation
Yes/No Detailsthereof(withapproximatequantities/rates,whereverpossible)withsourceofinformationdata
whocouldbeaffectedbytheprojecte.g.hospitalpatients,children,theelderlyetc.,
patients, children etc. as these are locatedawayfromprojectsite
3.5 Anyothercauses No
4. Productionofsolidwastesduringconstructionoroperationordecommissioning(MT/month)
Sr.No. Information/Checklist
confirmationYes/No Detailsthereof(withapproximate
quantities/rates,whereverpossible)withsourceofinformationdata
4.1 Spoil, overburden orminewastes
No
4.2 Municipalwaste(domesticandorcommercialwastes)
Yes TotalSolidWasteGenerationwillbe1172kg/day
4.3 Hazardouswastes(asperHazardousWasteManagementRules)
No Used oil from DG set will be given toauthorisedrecyclers.
4.4 Other industrial processwastes
No No, This is a Construction Project forResidentialBuildings
4.5 Surplusproduct No NotApplicable
4.6 Sewagesludgeorothersludgefromeffluenttreatment
Yes Usedasmanure
4.7 Construction ordemolitionwastes
No NotApplicable
4.8 Redundantmachineryorequipment
No NotApplicable
4.9 Contaminatedsoilsorothermaterials
No NotApplicable
4.10 Agriculturalwastes No NotApplicable4.11 Othersolidwastes No NotApplicable
5. Releaseofpollutantsoranyhazardous,toxicornoxioussubstancestoair(Kg/hr)
Sr.No.Information/Checklistconfirmation
Yes/No
Detailsthereof(withapproximatequantities/rates,whereverpossible)withsourceofinformationdata
5.1 Emissions fromcombustion of fossil fuelsfrom stationary or mobilesources
No NotApplicable
5.2 Emissionsfromproductionprocesses
No NotApplicable
5.3 Emissions from materialshandling including storageortransport
Yes Fugitiveemissionfromhandlingsuchassand,aggregates,cementetc.
ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 8
Sr.No.
Information/Checklistconfirmation
Yes/No
Detailsthereof(withapproximatequantities/rates,whereverpossible)withsourceofinformationdata
5.4 Emissions fromconstruction activitiesincluding plant andequipment
Yes Transportationofconstructionmaterial,DGsetsetc.
5.5 Dustorodoursfromhandlingofmaterialsincludingconstructionmaterials,sewageandwaste
Yes Transportation, loading and unloading ofmaterialwillgeneratedust
5.6 Emissionsfromincinerationofwaste
No NotApplicable
5.7 Emissions from burning ofwasteinopenair(e.g.slashmaterials, constructiondebris)
No NotApplicable
5.8 Emissions from any othersources
No NotApplicable
6. GenerationofNoiseandVibration,andEmissionsofLightandHeat:
Sr.No.Information/Checklistconfirmation
Yes/No
Detailsthereof(withapproximatequantities/rates,whereverpossible)withsourceofinformationdatawithsourceofinformationdata
6.1 Fromoperationofequipmente.g.engines,ventilationplant,crushers
Yes Increase in noise levels due to operation ofconstruction equipments & vehicularmovement emissions from vehicles & DGsets
6.2 From industrial or similarprocesses
No NotApplicable
6.3 Fromconstructionordemolition
Yes Increase in noise levels due to operation ofconstruction equipments & vehicularmovement emissions from vehicles & DGsets
6.4 Fromblastingorpiling No OpenFoundation6.5 Fromconstructionor
operationaltrafficYes Traffic during construction phase is
negligible and during operation phase ismore.
6.6 From lighting or coolingsystems
No NotApplicable
6.7 Fromanyothersources No NotApplicable
7. Risks of contamination of land or water from releases of pollutants into the
groundorintosewers,surfacewaters,groundwater,coastalwatersorthesea:
ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 9
Sr.No. Information/Checklistconfirmation
Yes/No Details thereof (with approximatequantities/rates, wherever possible) withsourceofinformationdata
7.1 Fromhandling,storage,useorspillageofhazardousmaterials
Yes DuetospillageofusedoilfromDGset
7.2 From discharge ofsewage or othereffluentstowaterortheland (expected modeandplaceofdischarge)
No STPwillbeused.SurplusTreatedWaterwillbedischargedinMunicipalSewerLines
7.3 By deposition ofpollutantsemittedtoairinto the land or intowater
No NotApplicable
7.4 Fromanyothersources No NotApplicable
7.5 Is there a risk of longterm build up ofpollutants in theenvironmentfromthesesources?
No NotApplicable
8. RiskofaccidentsduringconstructionoroperationoftheProject,which
couldaffecthumanhealthortheenvironmentSr.No. Information/Checklist
confirmationYes/No Detailsthereof(withapproximate
quantities/rates,whereverpossible)withsourceofinformationdata
8.1 Fromexplosions,spillages,firesetcfromstorage,handling,useorproductionofhazardoussubstances
No NotApplicable
8.2 Fromanyothercauses
No NotApplicable
8.3 Couldtheprojectbeaffectedbynaturaldisasterscausingenvironmentaldamage(e.g.floods,earthquakes,landslides,cloudburstetc)?
No The proposed structure is designed as perSeismicZoneIIIstandards.
ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 10
9. Factorswhichshouldbeconsidered(suchasconsequentialdevelopment)whichcouldleadtoenvironmentaleffectsorthepotentialforcumulativeimpactswithotherexistingorplannedactivitiesinthelocality
Sr.No. Information/Checklist
confirmationYes/No Details thereof (with approximate
quantities/rates, wherever possible) withsourceofinformationdata
9.1
Leadtodevelopmentofsupporting. facilities,ancillarydevelopmentordevelopmentstimulatedbytheprojectwhichcouldhaveimpactontheenvironmente.g.:
•Supportinginfrastructure(roads,powersupply,wasteorwastewatertreatment,etc.)•housingdevelopment•extractiveindustries•supplyindustries•other
No
9.2 Lead to after‐use of thesite,whichcouldhaveanimpact on theenvironment
No NotApplicable
9.3 Set a precedent for laterdevelopments
No NotApplicable
9.4 Havecumulativeeffectsduetoproximitytootherexistingorplannedprojectswithsimilareffects
No NotApplicable
ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 11
(III)EnvironmentalSensitivity
Sr.No.Areas
Name/Identity
Aerialdistance(within15km.)Proposedprojectlocationboundary
1 Areasprotectedunderinternationalconventions,nationalorlocallegislationfortheirecological,landscape,culturalorotherrelatedvalue
Yes SanjayGandhiNationalPark:01km
2 Areaswhichareimportantor sensitive for ecologicalreasons ‐ Wetlands,watercourses or otherwaterbodies,coastalzone,biospheres, mountains,forests
Yes SanjayGandhiNationalPark:01kmUlhasCreek:1.4km
3 Areas used by protected,important or sensitivespecies of flora or faunafor breeding, nesting,foraging, resting, overwintering,migration
Yes SanjayGandhiNationalPark:01km
4 Inland, coastal, marine orundergroundwaters
Yes UlhasCreek:1.4km
5 State,Nationalboundaries No 6 Routesorfacilitiesusedby
thepublicforaccesstorecreationorothertourist,pilgrimareas
No
7 Defenceinstallations No
8 Densely populated orbuilt‐uparea
Yes Fullyurbanisedarea
9 Areasoccupiedbysensitiveman‐madelanduses(hospitals,schools,placesofworship,communityfacilities)
Yes Hospitals, schools, colleges, communityfacilities & places of worship are presentaround the Project site. These places fallunderMunicipalCorporation
10 Areascontainingimportant,highqualityorscarceresources(groundwaterresources,surfaceresources,forestry,agriculture,fisheries,tourism,minerals)
No
11 Areasalreadysubjectedto No
ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 12
Sr.No.
Areas
Name/Identity
Aerialdistance(within15km.)Proposedprojectlocationboundary
pollutionorenvironmentaldamage.(thosewhereexistinglegalenvironmentalstandardsareexceeded)
12 Areassusceptibletonaturalhazardwhichcouldcausetheprojecttopresentenvironmentalproblems(earthquakes,subsidence,landslides,erosion,floodingorextremeoradverseclimaticconditions)
No
ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 13
(IV). ProposedTermsofReferenceforEIAstudies
NOTAPPLICABLEIherebygivenundertakingthatthedata&informationgivenintheapplication&enclosuresare true to thebestofmyknowledge&belief& I amaware that if anypartof thedataandinformation submitted is found to be false or misleading at any stage, the project will berejectedandclearancegive,ifanytotheprojectwillberevokedatourriskandcost.Date:15.11.2016Place:Thane
SaiUmaCorporation
Signatureoftheapplicant Withname&fulladdress (Projectproponent/Authorisedsignatory)NOTE:
1) TheprojectsinvolvingclearanceunderCoastalRegulationZoneNotification,1991shallsubmitwiththeapplication a C.R.Z map duly demarcated by one of the authorized agencies, showing the projectactivities, w.r.t C.R.Z(at the stage of TOR) and the recommendations of the State Coastal Zonemanagement Authority(at the stage of EC). Simultaneous action shall also be taken to obtain therequisiteclearanceundertheprovisionsoftheC.R.ZNotification,1991fortheactivitiestobelocatedintheCRZ.
2) The projects to be located within 10 km of the national Parks, Sanctuaries, Biosphere Reserves,
MigratoryCorridorsofWildAnimals,theprojectproponentshallsubmitthemapdulyauthenticatedbyChiefWildlifeWardenshowingthesefeaturesvis‐avistheprojectlocationandtherecommendationsorcommentsofthechiefWildlifethereon.(atthestageofEC)
3) AllcorrespondencewiththeministryofEnvironment&ForestsincludingsubmissionofapplicationforTOR/Environmental Clearance, subsequent clarifications as may be required from time to time,participation in theEACmeetingonbehalfof theprojectproponent shallbemadeby theauthorisedsignatoryonly.Theauthorisedsignatoryshouldalsosubmitadocumentinsupportofhisclaimofbeinganauthorisedsignatoryforthespecificproject.
ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 14
APPENDIX‐II
(Seeparagraph6)
FORM‐1A(onlyforconstructionprojectslistedunderitem8oftheSchedule)
CHECKLISTOFENVIRONMENTALIMPACTS
(ProjectproponentsarerequiredtoprovidefullinformationandwherevernecessaryattachexplanatorynoteswiththeFormand
submitalongwithproposedenvironmentalmanagementplan&monitoringprogramme)
1. LANDENVIRONMENT
(Attachpanoramicviewoftheprojectsiteandthevicinity)
1.1 Willtheexistinglandusegetsignificantlyalteredfromtheprojectthatisnotconsistentwiththesurroundings?(ProposedlandusemustconformtotheapprovedMasterPlan/DevelopmentPlanofthearea.Changeoflanduseifanyandthestatutoryapprovalfromthecompetentauthoritybesubmitted).AttachMapsof(i)sitelocation,(ii)surroundingfeaturesoftheproposedsite(within500meters)and(iii)thesite(indicatinglevels&contours)toappropriatescales.Ifnotavailableattachonlyconceptualplans.
Theexistinglandusewillnotgetalteredfromtheproject.Asperthezoningstructuretheareacomesunderresidentialarea.
ProposedamendmentisinlinewithD.PofTMC.Followingdocumentsareattachedassupportingdocuments.
1. ConceptualPlanandBuildingDetailsareattachedasANNEXUREII
1.2 Listoutallthemajorprojectrequirementsintermsofthelandarea,builtuparea,waterconsumption,powerrequirement,connectivity,communityfacilities,parkingneeds,etc.
TotalPlotArea 27,809.41 m2
BuiltUpAreaDetails
BuiltupArea 39,707.84 m2
NONFSI 52,811.75 m2
TotalConstructionArea 92,519.59 m2
WaterConsumption
TotalWaterConsumption 311 KLD
EnergyConsumption
ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 15
TotalDemandLoad 3.4 MW
ParkingProvided
Details Parking(Nos)
ParkingProvided(4W) 790
ParkingProvided(2W) 673
Connectivity Proposedsiteisaccessibleby:i) 40mwideDPRoadii) 25mwideDProadLocationplanisattachedasANNEXUREIII
1.3 Whatarethelikelyimpactsoftheproposedactivityontheexistingfacilitiesadjacenttotheproposedsite?(Suchasopenspaces,communityfacilities,detailsoftheexistinglanduse,disturbancetothelocalecology).
The project being a well planned activity willresult in organized open spaces and green areas.The biodiversity in the area will increase due toproposedgreenareas.Community cum recreational facilities will bedevelopedhencenostressontheexistingfacilityisanticipated.
1.4. Willtherebeanysignificantlanddisturbanceresultinginerosion,subsidence&instability?(Detailsofsoiltype,slopeanalysis,vulnerabilitytosubsidence,seismicityetcmaybegiven).
Themainreasonsforerosionareoverexploitationofgroundwater,instableslopes,landslidesetc.Theproposed construction will involve cutting andfilling operations. The project will involveconstruction of roads and development of greenareas,whichwouldreducethechancesoferosionandsubsidence.Subsidence is not anticipated as ground waterwouldnotbeusedasasourceofwatersupply.Asperseismic‐zoningmapofIndia,theprojectsitefallsunderzoneIII.StructuraldesignrequirementswillbeasperzoneIII.
1.5 Willtheproposalinvolvealterationofnaturaldrainagesystems?(Givedetailsonacontourmapshowingthenaturaldrainageneartheproposedprojectsite)
Theproposeddevelopmentisplannedinsuchamannerthatitwillnotaltertheexistingdrainagepatternofthearea.
1.6 Whatarethequantitiesofearthworkinvolvedintheconstructionactivity‐cutting,filling,reclamationetc.(Givedetailsofthequantitiesofearthworkinvolved,transportoffillmaterialsfromoutsidethesite,etc.)
Cuttingandfillingforconstructionactivityarebalanced,sonotransportationofearthwillberequired
ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 16
1.7 Givedetailsregardingwatersupply,wastehandlingetcduringtheconstructionperiod.
SupplySource:ThaneMunicipalCorporation
1.8 Willthelowlyingareas&wetlandsgetaltered?(Providedetailsofhowlowlyingandwetlandsaregettingmodifiedfromtheproposedactivity)
Nowetlandsandlow‐lyingareasonthesite.
1.9 Whetherconstructiondebris&wasteduringconstructioncausehealthhazard?(Givequantitiesofvarioustypesofwastesgeneratedduringconstructionincludingtheconstructionlabourandthemeansofdisposal)
Nohealthhazard.Minorquantityofconstructiondebriswillbegeneratedwhichwillbesentoutside.
2. WATERENVIRONMENT
2.1 Givethetotalquantityofwaterrequirementfortheproposedprojectwiththebreakupofrequirementsforvarioususes.Howwillthewaterrequirementmet?Statethesources&quantitiesandfurnishawaterbalancestatement.
EnclosedasANNEXUREIVSOURCE:TMC
2.2 Whatisthecapacity(dependablefloworyield)oftheproposedsourceofwater?
TheproposedwaterdemandwillbemetfromThaneMunicipalCorporation
2.3 Whatisthequalityofwaterrequired,incase,thesupplyisnotfromamunicipalsource?(Providephysical,chemical,biologicalcharacteristicswithclassofwaterquality)
WaterwillbesourcedbyTMC
2.4 Howmuchofthewaterrequirementcanbemetfromtherecyclingoftreatedwastewater?(Givethedetailsofquantities,sourcesandusage)
TreatedwaterfromSTPwillbeusedforflushingintoiletandgardening
Totalsewagegenerated 291 KLD
TotalSTPcapacity 300 m3
Treatedwaterrecycledforflushing
113 KLD
Treatedwaterforgardening 27 KLD
Sludgegenerated 3 KLD
Excesstreatedwater 148 KLD
ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 17
2.5 Willtherebediversionofwaterfromotherusers?(Pleaseassesstheimpactsoftheprojectonotherexistingusesandquantitiesofconsumption)
Nodiversionisanticipated
2.6 Whatistheincrementalpollutionloadfromwastewatergeneratedfromtheproposedactivity?(Givedetailsofthequantitiesandcompositionofwastewatergeneratedfromtheproposedactivity)
The total sewage of about 291 KLD will begenerated from the complex. The composition ofwaste water is given in the table indicating thequalityofrawwastewaterbeforetreatment
Parameters Values Units
pH 7‐8 mg/l
BOD 250‐300 mg/l
COD 450‐600 mg/l
O&G/ABS 10‐20 mg/l
TSS 100‐200 mg/l
Mitigation measures: Domestic Effluent will betreated in the SewageTreatment plant of capacity300m3. The treated sewage water will be reusedforflushingandgardening.
2.7 Givedetailsofthewaterrequirementsmetfromwaterharvesting?Furnishdetailsofthefacilitiescreated.
Theprojectactivityshallhaverainwaterharvestingonlyofrainfallon terraces.Surfacerainwaterwillbeconnectedtothestormwaterdrainagesystem
2.8. Whatwouldbetheimpactofthelandusechangesoccurringduetotheproposedprojectontherunoffcharacteristics(quantitativeaswellasqualitative)oftheareainthepostconstructionphaseonalongtermbasis?Woulditaggravatetheproblemsoffloodingorwaterlogginginanyway?
ProposeddevelopmentisintunewithD.PofTMC
Theprojectwillhaveproperstormwaterdrainagefacility as per Strom Water Drain Remarks byconcernedauthority.Sotherewillbenoproblemofwaterloggingduetothisproject.
2.9 Whataretheimpactsoftheproposalonthegroundwater?(Willtherebetappingofgroundwater;givethedetailsofgroundwatertable,rechargingcapacity,andapprovalsobtainedfromcompetentauthority,ifany)
In the proposed development there will be notapping of groundwater. Water demand for theconstruction as well as operational phase will bemetfromsourcessuchasTMC.Rainwaterharvesting schemewill bepracticed forgroundwater recharge, which will have a positiveimpactonthegroundwatertable.
ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 18
2.10 Whatprecautions/measuresaretakentopreventtherun‐offfromconstructionactivitiespollutingland&aquifers?(Givedetailsofquantitiesandthemeasurestakentoavoidtheadverseimpacts)
Topreventdegradationandmaintainthequalityof
watersource,adequatecontrolmeasureshavebeen
proposed to check the surface run‐off, as well as
uncontrolledflowofwaterintoanywaterbody.
Avoidexcavationduringmonsoonseason.
Rainwater harvesting can serve as a solution towaterprobleminworstcasescenario.
Following methods can increase efficiency of
rainwaterharvestingandrecharginggroundwater.
Catchdrainageall along theperipheryofplot topreventsurfacerunoff.
Reduceandfiltersurfacerunoff.
Usevegetatedswalesanddepressions to reducerunoff.
2.11 Howisthestormwaterfromwithinthesitemanaged?(Statetheprovisionsmadetoavoidfloodingofthearea,detailsofthedrainagefacilitiesprovidedalongwithasitelayoutindicationcontourlevels)
Duringrainyseason,aftertherainfallsomepartoftherainwaterpercolates into thegroundand joinsground water table, a part is retained as soilmoisture, some part is lost in evapotranspirationand the remaining part overflows as stormwaterrunoff.Thequantityofrunoffreachingthesewersordrainsisconsiderableascomparedwithsanitarysewage.
Theprojectwillhaveproperstormwaterdrainagefacility as per Strom Water Drain Remarks byconcernedauthority.Sotherewillnobeproblemofwaterloggingduetothisproject.
2.12 Willthedeploymentofconstructionlabourersparticularlyinthepeakperiodleadtounsanitaryconditionsaroundtheprojectsite(Justifywithproperexplanation)
No, the deployment of construction labourerswillnot lead to any unsanitary condition. Theconstruction labourers will be provided withtemporary shelter shades within the projectpremises.Theunsanitaryconditionwillberemovedby means of providing readymade septic tanks &soak pits. Solid waste will be disposed off inmunicipalwastedisposalsystem.
2.13 Whaton‐sitefacilitiesareprovidedforthecollection,treatment&safedisposalofsewage?(Givedetailsofthequantitiesofwastewatergeneration,treatmentcapacitieswithtechnology&facilitiesforrecyclinganddisposal)
The Sewage Treatment Plant (STP) is designed totreat the raw waste water generated fromResidential&CommercialbuildingSewagegeneration:291KLDTreatedwatertoberecycledforgardening:27KLDTreatedwaterrecycledforflushing:113KLD
ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 19
2.14 Givedetailsofdualplumbingsystemiftreatedwasteusedisusedforflushingoftoiletsoranyotheruse.
Yes,dualplumbingwillbeprovided
3. VEGETATION
3.1 Isthereanythreatoftheprojecttothebiodiversity?(Giveadescriptionofthelocalecosystemwithit’suniquefeatures,ifany)
Thereisnosensitiveecosystempresentatsitethatwill be disturbed by the project, as existing landuseinsurroundingareaisResidential
3.2 Willtheconstructioninvolveextensiveclearingormodificationofvegetation?(Provideadetailedaccountofthetrees&vegetationaffectedbytheproject)
3.3 Whatarethemeasuresproposedtobetakentominimizethelikelyimpactsonimportantsitefeatures(Givedetailsofproposalfortreeplantation,landscaping,creationofwaterbodiesetcalongwithalayoutplantoanappropriatescale)
About 5426.5 m2 areas are provided for thedevelopment of Green belt in the premises. Thegreen belt will be developed for control ofpollutionandaestheticviewofthecomplex
4. FAUNA
4.1 Istherelikelytobeanydisplacementoffauna‐bothterrestrialandaquaticorcreationofbarriersfortheirmovement?Providethedetails.
No.Theproposedsiteanditssurroundingsdonotsupportanyhabitatforanygroupofwildanimals
4.2 Anydirectorindirectimpactsontheavifaunaofthearea?Providedetails.
No.Therewillbenodirectorindirectimpactontheavifaunaofthearea.
4.3 Prescribemeasuressuchascorridors,fishladdersetctomitigateadverseimpactsonfauna
SincetheProposedProjectwouldnothaveanyadverseimpactonfaunahencemitigationmeasurenotrelevant
ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 20
5. AIRENVIRONMENT
5.1 Willtheprojectincreaseatmosphericconcentrationofgases&resultinheatislands?(Givedetailsofbackgroundairqualitylevelswithpredictedvaluesbasedondispersionmodelstakingintoaccounttheincreasedtrafficgenerationasaresultoftheproposedconstructions)
TheProjectwillresult innegligible increaseintheatmospheric concentrations of gases due to D.G.operations(backuppoweronly)andtheincreasedtraffic.Theproposedactivitywillnot result in theformationofanyheatislands,asitdoesnotinvolveanysignificantchangeinthelandusepatternortheconcretingofareas.
5.2 Whataretheimpactsongenerationofdust,smoke,odorousfumesorotherhazardousgases?Givedetailsinrelationtoallthemeteorologicalparameters.
Diesel generator sets operated for back‐up powersupply are identified as the onlymajor sources ofgaseous and particulate emission. Impact ofvehicular is not significant. SO2, SPM,NOX and COemissions are expected due to fuel combustion ingeneratorsets.
5.3 Willtheproposalcreateshortageofparkingspaceforvehicles?Furnishdetailsofthepresentleveloftransportinfrastructureandmeasuresproposedforimprovementincludingthetrafficmanagementattheentry&exittotheprojectsite.
TotalParkingprovided:Fourwheeler:790Nos.TwoWheeler:673Nos.
5.4 Providedetailsofthemovementpatternswithinternalroads,bicycletracks,pedestrianpathways,footpathsetc.,withareasundereachcategory.
Internalroads,footpaths/pedestrianpathwayshavebeenplannedwithintheproposedcomplex
5.5 Willtherebesignificantincreaseintrafficnoise&vibrations?Givedetailsofthesourcesandthemeasuresproposedformitigationoftheabove.
Considering the addition of vehicles due to theproposed project with the existing roads andvehicles plying on them, there will be marginalincreaseinthenoiselevelsbutwillnotresultinanimpact.
5.6 WhatwillbetheimpactofDGsets&otherequipmentonnoiselevels&vibrationin&ambientairqualityaroundtheprojectsite?Providedetails.
DGsetwillbeusedinconstructionandoperationphaseonlyincaseofpowerfailure.The DG Sets shall be as per the guide lines laiddownbyEPRforspecificnoiseemissionstandards.Measures shall be taken for reduction of noise byusingacousticenclosures.Noise emissions are expected from variousconstructionequipmentandmachinerybutwillnotresultinanimpact.
ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 21
6. AESTHETICS
6.1 Willtheproposedconstructionsinanywayresultintheobstructionofaview,scenicamenityorlandscapes?Aretheseconsiderationstakenintoaccountbytheproponents?
Theproposedlanduseofthesitewouldbemainlyresidential and will not result in obstruction ofview, scenic amenity or landscape. However, thebuildings will be planned in such a way that theorganisedopenareas and landscapedareas are atthecentresothatallcanenjoythegreenareas.
6.2 Willtherebeanyadverseimpactsfromnewconstructionsontheexistingstructures?Whataretheconsiderationstakenintoaccount?
Internal roads, footpaths/ pedestrian pathwayshavebeenplannedwithintheproposedcomplex
6.3 Whetherthereareanylocalconsiderationsofurbanform&urbandesigninfluencingthedesigncriteria?Theymaybeexplicitlyspeltout.
The Project has been designed as per thedepartment of town planning, Government ofMaharashtra.
6.4 Arethereanyanthropologicalorarchaeologicalsitesorartefactsnearby?Stateifanyothersignificantfeaturesinthevicinityoftheproposedsitehavebeenconsidered.
No anthropological or archaeological sites orartefactsarefoundnearthesitearea.
7. SOCIO‐ECONOMICASPECTS
7.1 Willtheproposalresultinanychangestothedemographicstructureoflocalpopulation?Providethedetails.
No.Majorityof the labourwillberecruited locallyand only minimal skilled workers would be fromoutside,which is anticipated to be very small andwill not alter the existing demographic profile ofthearea.
7.2 Givedetailsoftheexistingsocialinfrastructurearoundtheproposedproject.
The Project comes in Residential area and has allbasic infrastructural facilities as schools, medicalestablishments,shops,etc.
7.3 Willtheprojectcauseadverseeffectsonlocalcommunities,disturbancetosacredsitesorotherculturalvalues?Whatarethesafeguardsproposed?
No. The Projectwill have positive impact on localcommunities.
8. BUILDINGMATERIALS
8.1 Mayinvolvetheuseofbuildingmaterialswithhigh‐embodiedenergy.Aretheconstructionmaterialsproducedwithenergyefficientprocesses?(Givedetailsof
Yesthebuildingmaterialswithhighembodiedenergywillbeused
ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 22
energyconservationmeasuresintheselectionofbuildingmaterialsandtheirenergyefficiency)
8.2 Transportandhandlingofmaterialsduringconstructionmayresultinpollution,noise&publicnuisance.Whatmeasuresaretakentominimizetheimpacts?
Adequate mitigative measures will be adopted.Construction equipment with idling controltechnologieswill be used.Regularmaintenance ofthe equipments will be carried out. Theconstruction activities will be carried out duringthe daytime only. The workers exposed to highnoisegeneratingwouldbeprovidedwithearplugsearmuffs.AsperEnvironmentalManagementPlan.
8.3 Arerecycledmaterialsusedinroadsandstructures?Statetheextentofsavingsachieved?
Flyash incementconcrete.Typically20 ‐25%offlyashissubstitutedincement.
8.4 Givedetailsofthemethodsofcollection,segregation&disposalofthegarbagegeneratedduringtheoperationphasesoftheproject.
Thebio‐degradableandnon‐biodegradablewastewillbesegregatedatsourceofwastegeneration.Solidwastegenerated:1172kg/day
9. ENERGYCONSERVATION
9.1 Givedetailsofthepowerrequirements,sourceofsupply,backupsourceetc.Whatistheenergyconsumptionassumedpersquarefootofbuilt‐uparea?Howhaveyoutriedtominimizeenergyconsumption?
Sourceofpowersupply:MSEDCLDGSetwillbeprovidedasemergencybackup.
TotalDemandLoad 3.4 MW
DGSetCapacity2x400 kVA
9.2 Whattypeof,andcapacityof,powerback‐uptoyouplantoprovide?
DG Set will be provided as emergency backup forlighting incommonareas,one liftperbuildingandfirepumpineachbuilding.
Total 2x400 kVA
9.3 Whatarethecharacteristicsoftheglassyouplantouse?Providespecificationsofitscharacteristicsrelatedtobothshortwaveandlongwaveradiation?
Reflective+A12+6mmdoubleglazing
9.4 Whatpassivesolararchitecturalfeaturesarebeingusedinthebuilding?Illustratetheapplicationsmadeintheproposedproject.
The building structure will be designed in such away that solar light can be utilised maximum fordaytime.
ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 23
9.5 Doesthelayoutofstreets&buildingsmaximisethepotentialforsolarenergydevices?Haveyouconsideredtheuseofstreetlighting,emergencylightingandsolarhotwatersystemsforuseinthebuildingcomplex?Substantiatewithdetails.
Solar street lights are proposed in areas suchas/openspaces/commonarea/pathways/RG/etcSolarhotwatersystemswillbeprovided
9.6 Isshadingeffectivelyusedtoreducecooling/heatingloads?WhatprincipleshavebeenusedtomaximizetheshadingofWallsontheEastandtheWestandtheRoof?Howmuchenergysavinghasbeeneffected?
Yes.Shadinghasbeeneffectivelyusedtoreducethecoolingloads.
9.7 Dothestructuresuseenergy‐efficientspaceconditioning,lightingandmechanicalsystems?Providetechnicaldetails.Providedetailsofthetransformersandmotorefficiencies,lightingintensityandair‐conditioningloadassumptions?AreyouusingCFCandHCFCfreechillers?Providespecifications.
Yes. The rooms will be so dimensioned thateffectiveairconditioningcanbecarriedout.Publicareas will be cooled by natural ventilation. Thedesign of the building will be such thatmaximumuse of natural ventilation can be achieved. Thewalls, roofs and openingswill be so designed thatinfluxofheatisminimum.
9.8. Whatarethelikelyeffectsofthebuildingactivityinalteringthemicro‐climates?Provideaselfassessmentonthelikelyimpactsoftheproposedconstructiononcreationofheatisland&inversioneffects?
Heatemission from theproposedconstructioncanbefromthefollowingsources:Heat absorbed from the concrete structures, heatgeneratedfromequipments/appliances,andduetoincreasedpopulationintheproposeddevelopment.However theheatgeneratedwillnotbesignificantandwillbedissipated in the lushgreensandopenareas provided within. Hence it can be concludedthattheheatislandeffectshallnotbeaconcernfortheproposedproject.
9.9. Whatarethethermalcharacteristicsofthebuildingenvelope?(a)roof;(b)externalwalls;and(c)fenestration?GivedetailsofthematerialusedandtheU‐valuesortheRvaluesoftheindividualcomponents.
UvalueinWatts/hr/m2/C
Roof 0.409 Watts/hr/m2/C
Wall 0.44 Watts/hr/m2/C
ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 24
9.10 Whatprecautions&safetymeasuresareproposedagainstfirehazards?Furnishdetailsofemergencyplans.
The fire fighting system shall compromise ofhydrant systemandportable extinguishers. Smokedetectors will be provided along with manual callpoints. External yard hydrants shall be installedaround all buildings in the complex in galvanizedsteelfirehosecabinet(weatherproof).Allexternalyard hydrants shall be at one meter height fromfinishedgroundlevelasperNationalBuildingCode.Externalfirehydrantsshallbelocatedsuchthatnoportion of any building ismore than 45m from ahydrant, and the external hydrants are notvulnerabletomechanicalorvehiculardamage.
9.11 Ifyouareusingglassaswallmaterialprovidesdetailsandspecificationsincludingemissivityandthermalcharacteristics.
NotApplicable
9.12 Whatistherateofairinfiltrationintothebuilding?Providedetailsofhowyouaremitigatingtheeffectsofinfiltration.
Thefollowingmeasureswillbeadoptedtomitigatetheeffectsofinfiltration: Aluminiumwindowswithrubbergasket,sothat
thewindowsaresealed,willbeprovided. Summer cross section ventilation will be
maximum.
9.13 Towhatextentthenon‐conventionalenergytechnologiesareutilisedintheoverallenergyconsumption?Providedetailsoftherenewableenergytechnologiesused.
NotApplicable
10. EnvironmentManagementPlan
TheEnvironmentManagementPlanwouldconsistofallmitigationmeasuresforeachitemwiseactivitytobeundertakenduringtheconstruction,operationandtheentirelifecycletominimizeadverseenvironmentalimpactsasaresultoftheactivitiesoftheproject.Itwouldalsodelineatetheenvironmentalmonitoringplanforcomplianceofvariousenvironmentalregulations.Itwillstatethestepstobetakenincaseofemergencysuchasaccidentsatthesiteincludingfire.
EnclosedasAnnexureV
ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 25
ANNEXUREIAreaStatement
Sr.no Details Area Unit
1. PlotArea 27,809.41 m2
2. FSIArea 39,707.84 m2
3. Non‐FSIArea 52,811.75 m2
4. TotalConstructionArea 92,519.59 m2
ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 26
ANNEXUREIICONCEPTUALPLAN
ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 27
ANNEXUREIIILocationPlan
ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 28
ANNEXUREIV
WaterBalanceStatement
*BasisforwatersupplyistakenfromBIS:NationalBuildingCodeofIndia2005:Part9Page19
ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 29
ANNEXUREV
EnvironmentalManagementPlanduringConstructionPhase
Sr.No.
EnvironmentalComponents
PredictedImpacts
ProbablesourceofImpact
MitigationMeasures Remarks
CONSTRUCTIONPHASE1. AmbientAir
QualityNegativeimpactinsideconstructionsitepremises.Nonegativeimpactoutsidesite.
Dustemissionsfromexcavation,airemissionsfrommachineryandotherconstructionactivitiesatsite.
Dustreductionmeasuressuchasroadwatering.Periodicmaintenanceofconstructionequipment.Useofgoodqualityfuels.UseofPersonalProtectiveEquipments
Impactsaretemporaryduringconstructionphase.Impactswillbeconfinedtoshortdistances,ascoarseparticleswillsettlewithintheshortdistancefromactivities.
2. Noise Negativeimpactnearnoisegenerationsourcesinsidepremises.Nosignificantimpactonambientnoiselevelsinthesurroundingarea.
NoisegeneratedfromconstructionactivitiesandoperationofconstructionequipmentandDGsets
Useofwellmaintainedequipment.Heavyconstructionactivitylimitedtoday‐timehoursonly.Useofnoisemufflersinandconstructionvehicle.Useofearplugs/muffsbyconstructionstaff.
Temporaryimpactsduringconstructionphase.Noblastingorotherhighnoiseactivitiesenvisaged.
3. Water Nosignificantnegativeimpact.
Surfacerunofffromprojectsite.Oil/fuelandwastespills.Improperdebrisdisposal.Dischargeofsewagefromlabourcamp.
Siltfencestoreducerun‐offSecondarycontainmentanddykesinmaterialstorageareas.Sewagetreatmentinseptictanks.
Labourwillbeemployedtoreducesizeoflabourcamps.Noperennialsurfacewaterresourceadjacenttosite.Noexcavationworkwillbe
4. Land Minornegativeimpact
Excavation,Constructiondebris,waste
Reutilizationandrecyclingofconstructiondebris
ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 30
fromlabourcamp.
Wastefromlabourcampswillbecollectedandcompostedonsite.Noncompostablewastewillbetransportedtolandfillsite.Topsoilwillbeconservedandusedforlandscapinginfunctionalphase.
‐
5. Aesthetics Minornegativeimpacts
ConstructionactivitiesandExcavation
Theimpactswillbecompensatedbyextensivetreeplantationandgardeningintheusephase.
Shorttermimpactrestrictedonlyintheinitialstagesofconstruction.
ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 31
ENVIRONMENTALMANAGEMENTPLANDURINGFUNCTIONALPHASE
Sr.No.
EnvironmentalComponents
PredictedImpacts
ProbableSourceOfImpact
MitigationMeasures
Remarks
FUNCTIONALPHASE
1. AmbientAirQuality
MinorNegativeimpact
ParticulateandgaseousemissionsfromDGsetsandvehiclemovement
Useoflowsulphur
goodfuel
Periodic
maintenanceofDG
sets
UseofCNG/LPGas
afuelshouldbe
encouraged.
DGsetswillbeused.
2. Noise Minornegativeimpactinsidepremises.
Noisefromvehiclemovementandoperationofdieselgeneratorsetsduringpowerfailure.
HousingofDGsets
inbuildingswith
appropriate
acoustics.
Traffic
management
measuresto
reducenoise
Appropriatetrees
whichwillactas
noisesbarriers
willbeplantedin
thepremisesand
alongroadside.
‐‐
3. Water Nosignificantadverseimpact
Oil/fuelandwastespillsinvehicleparkingarea.Dischargeofsewage.Dischargeofcontaminatedstormwater
Sewagewaterwill
betreatedand
recycled.
Rainwater
harvestingand
rechargeof
groundwater
aquiferis
proposed.
Good
housekeepingand
stormwater
managementwill
befollowed.
Recycledwaterwillbeusedforgardeningandflushingpurpose.
4. Land Nonegative Storageand Treatmentand Segregationof
ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 32
Sr.No.
EnvironmentalComponents
PredictedImpacts
ProbableSourceOfImpact
MitigationMeasures Remarks
impact disposalofsolidwastes.Dischargeofsewage.Fuelandmaterialspills.
reuseofsewage
water.
Integratedwaste
managementand
spillcontrolplan
Drygarbagewill
besentfor
recyclingandwet
garbagewillbe
composted.
dryandwetgarbagebeforewillbedonebeforedisposal.
5. Biological OverallPositiveimpact
Habitat
disturbance
Greenspaces
insidethe
premiseswillhelp
tocompensatethe
earliereffectfrom
vegetation.
Landscapingand
extensive
plantationinthe
premises.
Landscapingwill
helpinreducing
anyadverse
impactsonair
andnoise
quality.
6. Socio‐economic
Overallpositiveimpact
Increasedjobopportunityinhouseholdmaintenanceandancillaryservices.
‐‐ Positiveandlongtermimpact‐
FUNCTIONALPHASE
7.TrafficPattern
NosignificantImpact
Thecomplexislikelytoaddmoderatelytothetrafficflowconsideredduringpeakhour.
Traffic
Management
practiseswillbe
employed.
Adequateparking
spacewillbe
providedinthe
premises.