FORM 1 & 1A For AMENDMENT IN EC FOR RESIDENTIAL CUM COMMERCIAL PROJECT (Earlier EC received vide letter No. F. NO. 21-178/2014-IA.III dt. 08.01.2016) At Plot bearing S. No‐128, 129/1, 129/2(a), 129/3, 129/4, 130, 131/1, 132 at village Kavesar, Dist. Thane, State: Maharashtra. Proposed By SAI UMA CORPORATION

Upload: others

Post on 29-May-2022

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FORM 1 & 1A - Welcome to Environment

FORM 1 & 1A

For

AMENDMENTINECFORRESIDENTIALCUMCOMMERCIALPROJECT

(Earlier EC received vide letter No. F. NO. 21-178/2014-IA.III dt. 08.01.2016)

At

PlotbearingS.No‐128,129/1,129/2(a),129/3,129/4,130,131/1,

132atvillageKavesar,Dist.Thane,State:Maharashtra.

Proposed By

SAI UMA CORPORATION

Page 2: FORM 1 & 1A - Welcome to Environment

ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 1

APPENDIX‐I

(Seeparagraph–6)FORM1

(I) BASICINFORMATION

Sr.No. Item Details

1 Nameoftheproject/s AmendmentinECforResidentialcumcommercialprojectatthane

2 S.No.intheSchedule 8(a)

3 Proposedcapacity/area/length/tonnagetobehandled/commandarea/leasearea/numberofwellstobedrilled.

TotalPlotArea 27,809.41 m2

Built‐upAreaDetails

BuiltupArea 39,707.84 m2

NONFSI 52,811.75 m2

TotalConstructionArea 92,519.59 m2

Detailed Area Statement is attached asAnnexureI

4 New/Expansion/Modernization Amendment of Residential cum CommercialProject

5 ExistingCapacity/Areaetc. Earlier EC received vide letter No. F. NO. 21‐178/2014‐IA.III dt. 08.01.2016 for 73,247.71m2constructionarea

6 Categoryofprojecti.e.AorB BCategory

7 Doesitattractthegeneralcondition?ifyes,pleasespecify

No

8 Doesitattractthespecificcondition?Ifyes,pleasespecify

No

9 Location

Plot/Survey/KhasraNo. Plot bearing S. No‐128, 129/1, 129/2(a),129/3,129/4,130,131/1,132

Village Kavesar

Tehsil Thane

District Thane

State Maharashtra

10 Nearestrailwaystation/portalongwithdistanceinkms.

ThaneRailwayStation

Distance~8km

Page 3: FORM 1 & 1A - Welcome to Environment

ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 2

Sr.No. Item Details

11 NearestTown,city,DistrictHeadquartersalongwithdistanceinkms.

ThaneCity

12 VillagePanchayat,ZillaParishad,MunicipalCorporation,Localbody(completepostaladdresseswithtelephonenos.tobegiven)

ThaneMunicipalCorporation(TMC)

13 Nameoftheapplicant Mr.DhairyaShah

SaiUmaCorporation

14 Registeredaddress SaiUmaCorporation103,104, Rosa Royale, Opp. Crown Tower,Near Gravity Fitness Centre, HiranandaniEstate, Patlipada, G.B. Road, Thane (W)‐410615

15 Addressforcorrespondence:

Name Mr.DhairyaShah

Designation(Owner/Partner/CEO)

Address SaiUmaCorporation103,104, Rosa Royale, Opp. Crown Tower,Near Gravity Fitness Centre, HiranandaniEstate, Patlipada, G.B. Road, Thane (W)‐410615

Pincode 410615

E‐mail [email protected]

TelephoneNo. 022‐25458877

FaxNo.

16 Detailsofalternativesitesexamined,ifany.Locationofthesesitesshouldbeshownonatoposheet.

Village‐District‐State

1.

2.

3.

Weareproposingresidentialproject

17 Interlinkedprojects NotApplicable

18 Whetherseparateapplicationofinterlinkedprojecthasbeensubmitted?

No

19 Ifyes,dateofsubmission NotApplicable

20 IfNo,Reason Standaloneconstructionproject

Page 4: FORM 1 & 1A - Welcome to Environment

ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 3

Sr.No. Item Details

21 Whethertheproposalinvolvesapproval/clearanceunder:if,yesdetailsofthesameandtheirstatustobegiven

a) TheForest(Conservation)Act,1980?

b) Thewildlife(protection)Act,1972?

c) TheCRZNotification,1991?

We have applied for NBWL (Wild Life)Clearance.

22 WhetherthereisanyGovernmentOrder/policyrelevant/relatingtothesite?

No

23 Forestlandinvolved(hectares) No forest land involved in proposed projectsite

24 Whetherthereisanylitigationpendingagainsttheprojectand/orlandinwhichtheprojectisproposetobesetup?

a) Nameofthecourtb) CaseNo.c) Orders/Directionsofthe

courtifanyanditsrelevancewiththeproposedproject.

Nosuchlitigationpendingagainsttheproject

Capacity corresponding to sectoral activity (such as production capacity for manufacturing,mining lease area and production capacity for mineral production, area for mineralexploration, length for linear transport infrastructure, generation capacity for powergenerationetc.,)

(II)Activity

1. Construction, operation or decommissioning of the Project involving actions,

whichwillcausephysicalchangesinthelocality(topography,landuse,changesinwaterbodies,etc.)

Sr.No.

Information/Checklistconfirmation

Yes/No

Details thereof (with approximatequantities /rates, wherever possible)withsourceofinformationdata

1.1 Permanentortemporarychangeinlanduse,landcoverortopographyincludingincreaseinintensityoflanduse(withrespecttolocallanduseplan)

Yes LandsituatedinResidentialzone

1.2 Clearanceofexistingland,vegetationandbuildings?

Yes Around 50 trees will be cut duringconstructionphaseoftheproject

Page 5: FORM 1 & 1A - Welcome to Environment

ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 4

Sr.No.

Information/Checklistconfirmation

Yes/No

Details thereof (with approximatequantities /rates, wherever possible)withsourceofinformationdata

1.3 Creationofnewlanduses? No We are proposing Residential andcommercialbuilding

1.4 Pre‐constructioninvestigationse.g.borehouses,soiltesting?

No

1.5 Constructionworks?

Yes We are proposing Residential andcommercialbuilding

1.6 Demolitionworks?

No

1.7 TemporarysitesusedforconstructionworksorHousingofconstructionworkers?

Yes Temporary sheds will be provided forworkers

1.8 Abovegroundbuildings,structuresorearthworksincludinglinearstructures,cutandfillorexcavations

Yes Theexcavationwillbedoneforfoundation.

1.9 Undergroundworksincludingminingortunnelling?

No

1.10 Reclamationworks? No

1.11 Dredging?

No

1.12 Offshorestructures? No

1.13 Productionandmanufacturingprocesses?

No

1.14 Facilitiesforstorageofgoodsormaterials?

Yes Onlyconstructionmaterialwillbestored intemporarystoragesite

1.15 Facilitiesfortreatmentordisposalofsolidwasteorliquideffluents?

Yes Mechanical composting for Municipal SolidWasteDisposalandSewageTreatmentPlantforsewagedisposal.

1.16 Facilitiesforlongtermhousingofoperationalworkers?

No

1.17 Newroad,railorseatrafficduringconstructionoroperation?

Yes Internalroads

Page 6: FORM 1 & 1A - Welcome to Environment

ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 5

Sr.No.

Information/Checklistconfirmation

Yes/No

Details thereof (with approximatequantities /rates, wherever possible)withsourceofinformationdata

1.18 Newroad,rail,airwaterborneorothertransportinfrastructureincludingneworalteredroutesandstations,ports,airportsetc?

No Existing roadwill beused for the transportpurpose.

1.19 Closureordiversionofexistingtransportroutesorinfrastructureleadingtochangesintrafficmovements?

No

1.20 Newordivertedtransmissionlinesorpipelines?

No

1.21 Impoundment,damming,culverting,realignmentorotherchangestothehydrologyofwatercoursesoraquifers?

No

1.22 Streamcrossings? No

1.23 Abstractionortransfersofwaterformgroundorsurfacewaters?

No

1.24 Changesinwaterbodiesorthelandsurfaceaffectingdrainageorrun‐off?

No There will not be any changes in waterbodiesorthelandsurface

1.25 Transportofpersonnelormaterialsforconstruction,operationordecommissioning?

Yes Construction workers and constructionmaterial

1.26 Long‐termdismantlingordecommissioningorrestorationworks?

No

1.27 Ongoingactivityduringdecommissioningwhichcouldhaveanimpactontheenvironment?

No

1.28 Influxofpeopletoanareaineithertemporarilyorpermanently?

Yes Only Constructionworkerswill stay duringconstructionphaseandofficepersonnel

1.29 Introductionofalienspecies?

No Nointroductionofalienspecieswilloccurasthisispurelyresidentialproject

1.30 Lossofnativespeciesorgeneticdiversity?

No Nothreatofspecieslosswilloccur

1.31 Anyotheractions? No No

Page 7: FORM 1 & 1A - Welcome to Environment

ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 6

2 Use ofNatural resources for construction or operation of the Project (such as

land, water, materials or energy, especially any resources which are non‐renewableorinshortsupply):

Sr.No. Information/checklistconfirmation

Yes/No Details thereof (with approximatequantities /rates, wherever possible)withsourceofinformationdata

2.1 Landespeciallyundevelopedoragriculturalland(ha)

No

2.2 Water(expectedsource&competingusers)unit:KLD

Yes TotalWaterdemandwillbe311KLDThe detailed water balance is attached asAnnexureIV

2.3 Minerals(MT) No

2.4 constructionmaterial–stone,aggregates,sand/soil(expectedsource–MT)

Yes Stoneaggregatesdemandwillbesourcedfromnearbylocalvendors

2.5 Forestsandtimber(source–MT)

Yes Onlydoorframes(ifsoplanned)

2.6 Energyincludingelectricityandfuels(source,competingusers)Unit:fuel(MT),energy(MW)

Yes TotalDemandload:3.4MW SourceofElectricity:MSEDCL

2.7 Anyothernaturalresources(useappropriatestandardunits)

No

3. Use,storage,transport,handlingorproductionofsubstancesormaterials,whichcouldbeharmful tohumanhealthor the environmentor raise concernsaboutactualorperceivedriskstohumanhealth.

Sr.No. Information/Checklistconfirmation

Yes/No Detailsthereof(withapproximatequantities/rates,whereverpossible)withsourceofinformationdata

3.1 Useofsubstancesormaterials,whicharehazardous(asperMSIHCrules)tohumanhealthortheenvironment(flora,fauna,andwatersupplies)

Yes Used oil from DG sets will be given toauthorisedrecyclers

3.2 Changes in occurrence ofdisease or affect diseasevectors (e.g. insectorwaterbornediseases)

No

3.3 Affectthewelfareofpeoplee.g.bychanginglivingconditions?

No Proposed Projectwill not effect thewelfareofpeople

3.4 Vulnerablegroupsofpeople No Proposed Project will not affect hospital

Page 8: FORM 1 & 1A - Welcome to Environment

ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 7

Sr.No. Information/Checklistconfirmation

Yes/No Detailsthereof(withapproximatequantities/rates,whereverpossible)withsourceofinformationdata

whocouldbeaffectedbytheprojecte.g.hospitalpatients,children,theelderlyetc.,

patients, children etc. as these are locatedawayfromprojectsite

3.5 Anyothercauses No

4. Productionofsolidwastesduringconstructionoroperationordecommissioning(MT/month)

Sr.No. Information/Checklist

confirmationYes/No Detailsthereof(withapproximate

quantities/rates,whereverpossible)withsourceofinformationdata

4.1 Spoil, overburden orminewastes

No

4.2 Municipalwaste(domesticandorcommercialwastes)

Yes TotalSolidWasteGenerationwillbe1172kg/day

4.3 Hazardouswastes(asperHazardousWasteManagementRules)

No Used oil from DG set will be given toauthorisedrecyclers.

4.4 Other industrial processwastes

No No, This is a Construction Project forResidentialBuildings

4.5 Surplusproduct No NotApplicable

4.6 Sewagesludgeorothersludgefromeffluenttreatment

Yes Usedasmanure

4.7 Construction ordemolitionwastes

No NotApplicable

4.8 Redundantmachineryorequipment

No NotApplicable

4.9 Contaminatedsoilsorothermaterials

No NotApplicable

4.10 Agriculturalwastes No NotApplicable4.11 Othersolidwastes No NotApplicable

5. Releaseofpollutantsoranyhazardous,toxicornoxioussubstancestoair(Kg/hr)

Sr.No.Information/Checklistconfirmation

Yes/No

Detailsthereof(withapproximatequantities/rates,whereverpossible)withsourceofinformationdata

5.1 Emissions fromcombustion of fossil fuelsfrom stationary or mobilesources

No NotApplicable

5.2 Emissionsfromproductionprocesses

No NotApplicable

5.3 Emissions from materialshandling including storageortransport

Yes Fugitiveemissionfromhandlingsuchassand,aggregates,cementetc.

Page 9: FORM 1 & 1A - Welcome to Environment

ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 8

Sr.No.

Information/Checklistconfirmation

Yes/No

Detailsthereof(withapproximatequantities/rates,whereverpossible)withsourceofinformationdata

5.4 Emissions fromconstruction activitiesincluding plant andequipment

Yes Transportationofconstructionmaterial,DGsetsetc.

5.5 Dustorodoursfromhandlingofmaterialsincludingconstructionmaterials,sewageandwaste

Yes Transportation, loading and unloading ofmaterialwillgeneratedust

5.6 Emissionsfromincinerationofwaste

No NotApplicable

5.7 Emissions from burning ofwasteinopenair(e.g.slashmaterials, constructiondebris)

No NotApplicable

5.8 Emissions from any othersources

No NotApplicable

6. GenerationofNoiseandVibration,andEmissionsofLightandHeat:

Sr.No.Information/Checklistconfirmation

Yes/No

Detailsthereof(withapproximatequantities/rates,whereverpossible)withsourceofinformationdatawithsourceofinformationdata

6.1 Fromoperationofequipmente.g.engines,ventilationplant,crushers

Yes Increase in noise levels due to operation ofconstruction equipments & vehicularmovement emissions from vehicles & DGsets

6.2 From industrial or similarprocesses

No NotApplicable

6.3 Fromconstructionordemolition

Yes Increase in noise levels due to operation ofconstruction equipments & vehicularmovement emissions from vehicles & DGsets

6.4 Fromblastingorpiling No OpenFoundation6.5 Fromconstructionor

operationaltrafficYes Traffic during construction phase is

negligible and during operation phase ismore.

6.6 From lighting or coolingsystems

No NotApplicable

6.7 Fromanyothersources No NotApplicable

7. Risks of contamination of land or water from releases of pollutants into the

groundorintosewers,surfacewaters,groundwater,coastalwatersorthesea:

Page 10: FORM 1 & 1A - Welcome to Environment

ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 9

Sr.No. Information/Checklistconfirmation

Yes/No Details thereof (with approximatequantities/rates, wherever possible) withsourceofinformationdata

7.1 Fromhandling,storage,useorspillageofhazardousmaterials

Yes DuetospillageofusedoilfromDGset

7.2 From discharge ofsewage or othereffluentstowaterortheland (expected modeandplaceofdischarge)

No STPwillbeused.SurplusTreatedWaterwillbedischargedinMunicipalSewerLines

7.3 By deposition ofpollutantsemittedtoairinto the land or intowater

No NotApplicable

7.4 Fromanyothersources No NotApplicable

7.5 Is there a risk of longterm build up ofpollutants in theenvironmentfromthesesources?

No NotApplicable

8. RiskofaccidentsduringconstructionoroperationoftheProject,which

couldaffecthumanhealthortheenvironmentSr.No. Information/Checklist

confirmationYes/No Detailsthereof(withapproximate

quantities/rates,whereverpossible)withsourceofinformationdata

8.1 Fromexplosions,spillages,firesetcfromstorage,handling,useorproductionofhazardoussubstances

No NotApplicable

8.2 Fromanyothercauses

No NotApplicable

8.3 Couldtheprojectbeaffectedbynaturaldisasterscausingenvironmentaldamage(e.g.floods,earthquakes,landslides,cloudburstetc)?

No The proposed structure is designed as perSeismicZoneIIIstandards.

Page 11: FORM 1 & 1A - Welcome to Environment

ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 10

9. Factorswhichshouldbeconsidered(suchasconsequentialdevelopment)whichcouldleadtoenvironmentaleffectsorthepotentialforcumulativeimpactswithotherexistingorplannedactivitiesinthelocality

Sr.No. Information/Checklist

confirmationYes/No Details thereof (with approximate

quantities/rates, wherever possible) withsourceofinformationdata

9.1

Leadtodevelopmentofsupporting. facilities,ancillarydevelopmentordevelopmentstimulatedbytheprojectwhichcouldhaveimpactontheenvironmente.g.:

•Supportinginfrastructure(roads,powersupply,wasteorwastewatertreatment,etc.)•housingdevelopment•extractiveindustries•supplyindustries•other

No

9.2 Lead to after‐use of thesite,whichcouldhaveanimpact on theenvironment

No NotApplicable

9.3 Set a precedent for laterdevelopments

No NotApplicable

9.4 Havecumulativeeffectsduetoproximitytootherexistingorplannedprojectswithsimilareffects

No NotApplicable

Page 12: FORM 1 & 1A - Welcome to Environment

ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 11

(III)EnvironmentalSensitivity

Sr.No.Areas

Name/Identity

Aerialdistance(within15km.)Proposedprojectlocationboundary

1 Areasprotectedunderinternationalconventions,nationalorlocallegislationfortheirecological,landscape,culturalorotherrelatedvalue

Yes SanjayGandhiNationalPark:01km

2 Areaswhichareimportantor sensitive for ecologicalreasons ‐ Wetlands,watercourses or otherwaterbodies,coastalzone,biospheres, mountains,forests

Yes SanjayGandhiNationalPark:01kmUlhasCreek:1.4km

3 Areas used by protected,important or sensitivespecies of flora or faunafor breeding, nesting,foraging, resting, overwintering,migration

Yes SanjayGandhiNationalPark:01km

4 Inland, coastal, marine orundergroundwaters

Yes UlhasCreek:1.4km

5 State,Nationalboundaries No 6 Routesorfacilitiesusedby

thepublicforaccesstorecreationorothertourist,pilgrimareas

No

7 Defenceinstallations No

8 Densely populated orbuilt‐uparea

Yes Fullyurbanisedarea

9 Areasoccupiedbysensitiveman‐madelanduses(hospitals,schools,placesofworship,communityfacilities)

Yes Hospitals, schools, colleges, communityfacilities & places of worship are presentaround the Project site. These places fallunderMunicipalCorporation

10 Areascontainingimportant,highqualityorscarceresources(groundwaterresources,surfaceresources,forestry,agriculture,fisheries,tourism,minerals)

No

11 Areasalreadysubjectedto No

Page 13: FORM 1 & 1A - Welcome to Environment

ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 12

Sr.No.

Areas

Name/Identity

Aerialdistance(within15km.)Proposedprojectlocationboundary

pollutionorenvironmentaldamage.(thosewhereexistinglegalenvironmentalstandardsareexceeded)

12 Areassusceptibletonaturalhazardwhichcouldcausetheprojecttopresentenvironmentalproblems(earthquakes,subsidence,landslides,erosion,floodingorextremeoradverseclimaticconditions)

No

Page 14: FORM 1 & 1A - Welcome to Environment

ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 13

(IV). ProposedTermsofReferenceforEIAstudies

NOTAPPLICABLEIherebygivenundertakingthatthedata&informationgivenintheapplication&enclosuresare true to thebestofmyknowledge&belief& I amaware that if anypartof thedataandinformation submitted is found to be false or misleading at any stage, the project will berejectedandclearancegive,ifanytotheprojectwillberevokedatourriskandcost.Date:15.11.2016Place:Thane

SaiUmaCorporation

Signatureoftheapplicant Withname&fulladdress (Projectproponent/Authorisedsignatory)NOTE:

1) TheprojectsinvolvingclearanceunderCoastalRegulationZoneNotification,1991shallsubmitwiththeapplication a C.R.Z map duly demarcated by one of the authorized agencies, showing the projectactivities, w.r.t C.R.Z(at the stage of TOR) and the recommendations of the State Coastal Zonemanagement Authority(at the stage of EC). Simultaneous action shall also be taken to obtain therequisiteclearanceundertheprovisionsoftheC.R.ZNotification,1991fortheactivitiestobelocatedintheCRZ.

2) The projects to be located within 10 km of the national Parks, Sanctuaries, Biosphere Reserves,

MigratoryCorridorsofWildAnimals,theprojectproponentshallsubmitthemapdulyauthenticatedbyChiefWildlifeWardenshowingthesefeaturesvis‐avistheprojectlocationandtherecommendationsorcommentsofthechiefWildlifethereon.(atthestageofEC)

3) AllcorrespondencewiththeministryofEnvironment&ForestsincludingsubmissionofapplicationforTOR/Environmental Clearance, subsequent clarifications as may be required from time to time,participation in theEACmeetingonbehalfof theprojectproponent shallbemadeby theauthorisedsignatoryonly.Theauthorisedsignatoryshouldalsosubmitadocumentinsupportofhisclaimofbeinganauthorisedsignatoryforthespecificproject.

Page 15: FORM 1 & 1A - Welcome to Environment

ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 14

APPENDIX‐II

(Seeparagraph6)

FORM‐1A(onlyforconstructionprojectslistedunderitem8oftheSchedule)

CHECKLISTOFENVIRONMENTALIMPACTS

(ProjectproponentsarerequiredtoprovidefullinformationandwherevernecessaryattachexplanatorynoteswiththeFormand

submitalongwithproposedenvironmentalmanagementplan&monitoringprogramme)

1. LANDENVIRONMENT

(Attachpanoramicviewoftheprojectsiteandthevicinity)

1.1 Willtheexistinglandusegetsignificantlyalteredfromtheprojectthatisnotconsistentwiththesurroundings?(ProposedlandusemustconformtotheapprovedMasterPlan/DevelopmentPlanofthearea.Changeoflanduseifanyandthestatutoryapprovalfromthecompetentauthoritybesubmitted).AttachMapsof(i)sitelocation,(ii)surroundingfeaturesoftheproposedsite(within500meters)and(iii)thesite(indicatinglevels&contours)toappropriatescales.Ifnotavailableattachonlyconceptualplans.

Theexistinglandusewillnotgetalteredfromtheproject.Asperthezoningstructuretheareacomesunderresidentialarea.

ProposedamendmentisinlinewithD.PofTMC.Followingdocumentsareattachedassupportingdocuments.

1. ConceptualPlanandBuildingDetailsareattachedasANNEXUREII

1.2 Listoutallthemajorprojectrequirementsintermsofthelandarea,builtuparea,waterconsumption,powerrequirement,connectivity,communityfacilities,parkingneeds,etc.

TotalPlotArea 27,809.41 m2

BuiltUpAreaDetails

BuiltupArea 39,707.84 m2

NONFSI 52,811.75 m2

TotalConstructionArea 92,519.59 m2

WaterConsumption

TotalWaterConsumption 311 KLD

EnergyConsumption

Page 16: FORM 1 & 1A - Welcome to Environment

ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 15

TotalDemandLoad 3.4 MW

ParkingProvided

Details Parking(Nos)

ParkingProvided(4W) 790

ParkingProvided(2W) 673

Connectivity Proposedsiteisaccessibleby:i) 40mwideDPRoadii) 25mwideDProadLocationplanisattachedasANNEXUREIII

1.3 Whatarethelikelyimpactsoftheproposedactivityontheexistingfacilitiesadjacenttotheproposedsite?(Suchasopenspaces,communityfacilities,detailsoftheexistinglanduse,disturbancetothelocalecology).

The project being a well planned activity willresult in organized open spaces and green areas.The biodiversity in the area will increase due toproposedgreenareas.Community cum recreational facilities will bedevelopedhencenostressontheexistingfacilityisanticipated.

1.4. Willtherebeanysignificantlanddisturbanceresultinginerosion,subsidence&instability?(Detailsofsoiltype,slopeanalysis,vulnerabilitytosubsidence,seismicityetcmaybegiven).

Themainreasonsforerosionareoverexploitationofgroundwater,instableslopes,landslidesetc.Theproposed construction will involve cutting andfilling operations. The project will involveconstruction of roads and development of greenareas,whichwouldreducethechancesoferosionandsubsidence.Subsidence is not anticipated as ground waterwouldnotbeusedasasourceofwatersupply.Asperseismic‐zoningmapofIndia,theprojectsitefallsunderzoneIII.StructuraldesignrequirementswillbeasperzoneIII.

1.5 Willtheproposalinvolvealterationofnaturaldrainagesystems?(Givedetailsonacontourmapshowingthenaturaldrainageneartheproposedprojectsite)

Theproposeddevelopmentisplannedinsuchamannerthatitwillnotaltertheexistingdrainagepatternofthearea.

1.6 Whatarethequantitiesofearthworkinvolvedintheconstructionactivity‐cutting,filling,reclamationetc.(Givedetailsofthequantitiesofearthworkinvolved,transportoffillmaterialsfromoutsidethesite,etc.)

Cuttingandfillingforconstructionactivityarebalanced,sonotransportationofearthwillberequired

Page 17: FORM 1 & 1A - Welcome to Environment

ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 16

1.7 Givedetailsregardingwatersupply,wastehandlingetcduringtheconstructionperiod.

SupplySource:ThaneMunicipalCorporation

1.8 Willthelowlyingareas&wetlandsgetaltered?(Providedetailsofhowlowlyingandwetlandsaregettingmodifiedfromtheproposedactivity)

Nowetlandsandlow‐lyingareasonthesite.

1.9 Whetherconstructiondebris&wasteduringconstructioncausehealthhazard?(Givequantitiesofvarioustypesofwastesgeneratedduringconstructionincludingtheconstructionlabourandthemeansofdisposal)

Nohealthhazard.Minorquantityofconstructiondebriswillbegeneratedwhichwillbesentoutside.

2. WATERENVIRONMENT

2.1 Givethetotalquantityofwaterrequirementfortheproposedprojectwiththebreakupofrequirementsforvarioususes.Howwillthewaterrequirementmet?Statethesources&quantitiesandfurnishawaterbalancestatement.

EnclosedasANNEXUREIVSOURCE:TMC

2.2 Whatisthecapacity(dependablefloworyield)oftheproposedsourceofwater?

TheproposedwaterdemandwillbemetfromThaneMunicipalCorporation

2.3 Whatisthequalityofwaterrequired,incase,thesupplyisnotfromamunicipalsource?(Providephysical,chemical,biologicalcharacteristicswithclassofwaterquality)

WaterwillbesourcedbyTMC

2.4 Howmuchofthewaterrequirementcanbemetfromtherecyclingoftreatedwastewater?(Givethedetailsofquantities,sourcesandusage)

TreatedwaterfromSTPwillbeusedforflushingintoiletandgardening

Totalsewagegenerated 291 KLD

TotalSTPcapacity 300 m3

Treatedwaterrecycledforflushing

113 KLD

Treatedwaterforgardening 27 KLD

Sludgegenerated 3 KLD

Excesstreatedwater 148 KLD

Page 18: FORM 1 & 1A - Welcome to Environment

ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 17

2.5 Willtherebediversionofwaterfromotherusers?(Pleaseassesstheimpactsoftheprojectonotherexistingusesandquantitiesofconsumption)

Nodiversionisanticipated

2.6 Whatistheincrementalpollutionloadfromwastewatergeneratedfromtheproposedactivity?(Givedetailsofthequantitiesandcompositionofwastewatergeneratedfromtheproposedactivity)

The total sewage of about 291 KLD will begenerated from the complex. The composition ofwaste water is given in the table indicating thequalityofrawwastewaterbeforetreatment

Parameters Values Units

pH 7‐8 mg/l

BOD 250‐300 mg/l

COD 450‐600 mg/l

O&G/ABS 10‐20 mg/l

TSS 100‐200 mg/l

Mitigation measures: Domestic Effluent will betreated in the SewageTreatment plant of capacity300m3. The treated sewage water will be reusedforflushingandgardening.

2.7 Givedetailsofthewaterrequirementsmetfromwaterharvesting?Furnishdetailsofthefacilitiescreated.

Theprojectactivityshallhaverainwaterharvestingonlyofrainfallon terraces.Surfacerainwaterwillbeconnectedtothestormwaterdrainagesystem

2.8. Whatwouldbetheimpactofthelandusechangesoccurringduetotheproposedprojectontherunoffcharacteristics(quantitativeaswellasqualitative)oftheareainthepostconstructionphaseonalongtermbasis?Woulditaggravatetheproblemsoffloodingorwaterlogginginanyway?

ProposeddevelopmentisintunewithD.PofTMC

Theprojectwillhaveproperstormwaterdrainagefacility as per Strom Water Drain Remarks byconcernedauthority.Sotherewillbenoproblemofwaterloggingduetothisproject.

2.9 Whataretheimpactsoftheproposalonthegroundwater?(Willtherebetappingofgroundwater;givethedetailsofgroundwatertable,rechargingcapacity,andapprovalsobtainedfromcompetentauthority,ifany)

In the proposed development there will be notapping of groundwater. Water demand for theconstruction as well as operational phase will bemetfromsourcessuchasTMC.Rainwaterharvesting schemewill bepracticed forgroundwater recharge, which will have a positiveimpactonthegroundwatertable.

Page 19: FORM 1 & 1A - Welcome to Environment

ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 18

2.10 Whatprecautions/measuresaretakentopreventtherun‐offfromconstructionactivitiespollutingland&aquifers?(Givedetailsofquantitiesandthemeasurestakentoavoidtheadverseimpacts)

Topreventdegradationandmaintainthequalityof

watersource,adequatecontrolmeasureshavebeen

proposed to check the surface run‐off, as well as

uncontrolledflowofwaterintoanywaterbody.

Avoidexcavationduringmonsoonseason.

Rainwater harvesting can serve as a solution towaterprobleminworstcasescenario.

Following methods can increase efficiency of

rainwaterharvestingandrecharginggroundwater.

Catchdrainageall along theperipheryofplot topreventsurfacerunoff.

Reduceandfiltersurfacerunoff.

Usevegetatedswalesanddepressions to reducerunoff.

2.11 Howisthestormwaterfromwithinthesitemanaged?(Statetheprovisionsmadetoavoidfloodingofthearea,detailsofthedrainagefacilitiesprovidedalongwithasitelayoutindicationcontourlevels)

Duringrainyseason,aftertherainfallsomepartoftherainwaterpercolates into thegroundand joinsground water table, a part is retained as soilmoisture, some part is lost in evapotranspirationand the remaining part overflows as stormwaterrunoff.Thequantityofrunoffreachingthesewersordrainsisconsiderableascomparedwithsanitarysewage.

Theprojectwillhaveproperstormwaterdrainagefacility as per Strom Water Drain Remarks byconcernedauthority.Sotherewillnobeproblemofwaterloggingduetothisproject.

2.12 Willthedeploymentofconstructionlabourersparticularlyinthepeakperiodleadtounsanitaryconditionsaroundtheprojectsite(Justifywithproperexplanation)

No, the deployment of construction labourerswillnot lead to any unsanitary condition. Theconstruction labourers will be provided withtemporary shelter shades within the projectpremises.Theunsanitaryconditionwillberemovedby means of providing readymade septic tanks &soak pits. Solid waste will be disposed off inmunicipalwastedisposalsystem.

2.13 Whaton‐sitefacilitiesareprovidedforthecollection,treatment&safedisposalofsewage?(Givedetailsofthequantitiesofwastewatergeneration,treatmentcapacitieswithtechnology&facilitiesforrecyclinganddisposal)

The Sewage Treatment Plant (STP) is designed totreat the raw waste water generated fromResidential&CommercialbuildingSewagegeneration:291KLDTreatedwatertoberecycledforgardening:27KLDTreatedwaterrecycledforflushing:113KLD

Page 20: FORM 1 & 1A - Welcome to Environment

ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 19

2.14 Givedetailsofdualplumbingsystemiftreatedwasteusedisusedforflushingoftoiletsoranyotheruse.

Yes,dualplumbingwillbeprovided

3. VEGETATION

3.1 Isthereanythreatoftheprojecttothebiodiversity?(Giveadescriptionofthelocalecosystemwithit’suniquefeatures,ifany)

Thereisnosensitiveecosystempresentatsitethatwill be disturbed by the project, as existing landuseinsurroundingareaisResidential

3.2 Willtheconstructioninvolveextensiveclearingormodificationofvegetation?(Provideadetailedaccountofthetrees&vegetationaffectedbytheproject)

3.3 Whatarethemeasuresproposedtobetakentominimizethelikelyimpactsonimportantsitefeatures(Givedetailsofproposalfortreeplantation,landscaping,creationofwaterbodiesetcalongwithalayoutplantoanappropriatescale)

About 5426.5 m2 areas are provided for thedevelopment of Green belt in the premises. Thegreen belt will be developed for control ofpollutionandaestheticviewofthecomplex

4. FAUNA

4.1 Istherelikelytobeanydisplacementoffauna‐bothterrestrialandaquaticorcreationofbarriersfortheirmovement?Providethedetails.

No.Theproposedsiteanditssurroundingsdonotsupportanyhabitatforanygroupofwildanimals

4.2 Anydirectorindirectimpactsontheavifaunaofthearea?Providedetails.

No.Therewillbenodirectorindirectimpactontheavifaunaofthearea.

4.3 Prescribemeasuressuchascorridors,fishladdersetctomitigateadverseimpactsonfauna

SincetheProposedProjectwouldnothaveanyadverseimpactonfaunahencemitigationmeasurenotrelevant

Page 21: FORM 1 & 1A - Welcome to Environment

ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 20

5. AIRENVIRONMENT

5.1 Willtheprojectincreaseatmosphericconcentrationofgases&resultinheatislands?(Givedetailsofbackgroundairqualitylevelswithpredictedvaluesbasedondispersionmodelstakingintoaccounttheincreasedtrafficgenerationasaresultoftheproposedconstructions)

TheProjectwillresult innegligible increaseintheatmospheric concentrations of gases due to D.G.operations(backuppoweronly)andtheincreasedtraffic.Theproposedactivitywillnot result in theformationofanyheatislands,asitdoesnotinvolveanysignificantchangeinthelandusepatternortheconcretingofareas.

5.2 Whataretheimpactsongenerationofdust,smoke,odorousfumesorotherhazardousgases?Givedetailsinrelationtoallthemeteorologicalparameters.

Diesel generator sets operated for back‐up powersupply are identified as the onlymajor sources ofgaseous and particulate emission. Impact ofvehicular is not significant. SO2, SPM,NOX and COemissions are expected due to fuel combustion ingeneratorsets.

5.3 Willtheproposalcreateshortageofparkingspaceforvehicles?Furnishdetailsofthepresentleveloftransportinfrastructureandmeasuresproposedforimprovementincludingthetrafficmanagementattheentry&exittotheprojectsite.

TotalParkingprovided:Fourwheeler:790Nos.TwoWheeler:673Nos.

5.4 Providedetailsofthemovementpatternswithinternalroads,bicycletracks,pedestrianpathways,footpathsetc.,withareasundereachcategory.

Internalroads,footpaths/pedestrianpathwayshavebeenplannedwithintheproposedcomplex

5.5 Willtherebesignificantincreaseintrafficnoise&vibrations?Givedetailsofthesourcesandthemeasuresproposedformitigationoftheabove.

Considering the addition of vehicles due to theproposed project with the existing roads andvehicles plying on them, there will be marginalincreaseinthenoiselevelsbutwillnotresultinanimpact.

5.6 WhatwillbetheimpactofDGsets&otherequipmentonnoiselevels&vibrationin&ambientairqualityaroundtheprojectsite?Providedetails.

DGsetwillbeusedinconstructionandoperationphaseonlyincaseofpowerfailure.The DG Sets shall be as per the guide lines laiddownbyEPRforspecificnoiseemissionstandards.Measures shall be taken for reduction of noise byusingacousticenclosures.Noise emissions are expected from variousconstructionequipmentandmachinerybutwillnotresultinanimpact.

Page 22: FORM 1 & 1A - Welcome to Environment

ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 21

6. AESTHETICS

6.1 Willtheproposedconstructionsinanywayresultintheobstructionofaview,scenicamenityorlandscapes?Aretheseconsiderationstakenintoaccountbytheproponents?

Theproposedlanduseofthesitewouldbemainlyresidential and will not result in obstruction ofview, scenic amenity or landscape. However, thebuildings will be planned in such a way that theorganisedopenareas and landscapedareas are atthecentresothatallcanenjoythegreenareas.

6.2 Willtherebeanyadverseimpactsfromnewconstructionsontheexistingstructures?Whataretheconsiderationstakenintoaccount?

Internal roads, footpaths/ pedestrian pathwayshavebeenplannedwithintheproposedcomplex

6.3 Whetherthereareanylocalconsiderationsofurbanform&urbandesigninfluencingthedesigncriteria?Theymaybeexplicitlyspeltout.

The Project has been designed as per thedepartment of town planning, Government ofMaharashtra.

6.4 Arethereanyanthropologicalorarchaeologicalsitesorartefactsnearby?Stateifanyothersignificantfeaturesinthevicinityoftheproposedsitehavebeenconsidered.

No anthropological or archaeological sites orartefactsarefoundnearthesitearea.

7. SOCIO‐ECONOMICASPECTS

7.1 Willtheproposalresultinanychangestothedemographicstructureoflocalpopulation?Providethedetails.

No.Majorityof the labourwillberecruited locallyand only minimal skilled workers would be fromoutside,which is anticipated to be very small andwill not alter the existing demographic profile ofthearea.

7.2 Givedetailsoftheexistingsocialinfrastructurearoundtheproposedproject.

The Project comes in Residential area and has allbasic infrastructural facilities as schools, medicalestablishments,shops,etc.

7.3 Willtheprojectcauseadverseeffectsonlocalcommunities,disturbancetosacredsitesorotherculturalvalues?Whatarethesafeguardsproposed?

No. The Projectwill have positive impact on localcommunities.

8. BUILDINGMATERIALS

8.1 Mayinvolvetheuseofbuildingmaterialswithhigh‐embodiedenergy.Aretheconstructionmaterialsproducedwithenergyefficientprocesses?(Givedetailsof

Yesthebuildingmaterialswithhighembodiedenergywillbeused

Page 23: FORM 1 & 1A - Welcome to Environment

ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 22

energyconservationmeasuresintheselectionofbuildingmaterialsandtheirenergyefficiency)

8.2 Transportandhandlingofmaterialsduringconstructionmayresultinpollution,noise&publicnuisance.Whatmeasuresaretakentominimizetheimpacts?

Adequate mitigative measures will be adopted.Construction equipment with idling controltechnologieswill be used.Regularmaintenance ofthe equipments will be carried out. Theconstruction activities will be carried out duringthe daytime only. The workers exposed to highnoisegeneratingwouldbeprovidedwithearplugsearmuffs.AsperEnvironmentalManagementPlan.

8.3 Arerecycledmaterialsusedinroadsandstructures?Statetheextentofsavingsachieved?

Flyash incementconcrete.Typically20 ‐25%offlyashissubstitutedincement.

8.4 Givedetailsofthemethodsofcollection,segregation&disposalofthegarbagegeneratedduringtheoperationphasesoftheproject.

Thebio‐degradableandnon‐biodegradablewastewillbesegregatedatsourceofwastegeneration.Solidwastegenerated:1172kg/day

9. ENERGYCONSERVATION

9.1 Givedetailsofthepowerrequirements,sourceofsupply,backupsourceetc.Whatistheenergyconsumptionassumedpersquarefootofbuilt‐uparea?Howhaveyoutriedtominimizeenergyconsumption?

Sourceofpowersupply:MSEDCLDGSetwillbeprovidedasemergencybackup.

TotalDemandLoad 3.4 MW

DGSetCapacity2x400 kVA

9.2 Whattypeof,andcapacityof,powerback‐uptoyouplantoprovide?

DG Set will be provided as emergency backup forlighting incommonareas,one liftperbuildingandfirepumpineachbuilding.

Total 2x400 kVA

9.3 Whatarethecharacteristicsoftheglassyouplantouse?Providespecificationsofitscharacteristicsrelatedtobothshortwaveandlongwaveradiation?

Reflective+A12+6mmdoubleglazing

9.4 Whatpassivesolararchitecturalfeaturesarebeingusedinthebuilding?Illustratetheapplicationsmadeintheproposedproject.

The building structure will be designed in such away that solar light can be utilised maximum fordaytime.

Page 24: FORM 1 & 1A - Welcome to Environment

ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 23

9.5 Doesthelayoutofstreets&buildingsmaximisethepotentialforsolarenergydevices?Haveyouconsideredtheuseofstreetlighting,emergencylightingandsolarhotwatersystemsforuseinthebuildingcomplex?Substantiatewithdetails.

Solar street lights are proposed in areas suchas/openspaces/commonarea/pathways/RG/etcSolarhotwatersystemswillbeprovided

9.6 Isshadingeffectivelyusedtoreducecooling/heatingloads?WhatprincipleshavebeenusedtomaximizetheshadingofWallsontheEastandtheWestandtheRoof?Howmuchenergysavinghasbeeneffected?

Yes.Shadinghasbeeneffectivelyusedtoreducethecoolingloads.

9.7 Dothestructuresuseenergy‐efficientspaceconditioning,lightingandmechanicalsystems?Providetechnicaldetails.Providedetailsofthetransformersandmotorefficiencies,lightingintensityandair‐conditioningloadassumptions?AreyouusingCFCandHCFCfreechillers?Providespecifications.

Yes. The rooms will be so dimensioned thateffectiveairconditioningcanbecarriedout.Publicareas will be cooled by natural ventilation. Thedesign of the building will be such thatmaximumuse of natural ventilation can be achieved. Thewalls, roofs and openingswill be so designed thatinfluxofheatisminimum.

9.8. Whatarethelikelyeffectsofthebuildingactivityinalteringthemicro‐climates?Provideaselfassessmentonthelikelyimpactsoftheproposedconstructiononcreationofheatisland&inversioneffects?

Heatemission from theproposedconstructioncanbefromthefollowingsources:Heat absorbed from the concrete structures, heatgeneratedfromequipments/appliances,andduetoincreasedpopulationintheproposeddevelopment.However theheatgeneratedwillnotbesignificantandwillbedissipated in the lushgreensandopenareas provided within. Hence it can be concludedthattheheatislandeffectshallnotbeaconcernfortheproposedproject.

9.9. Whatarethethermalcharacteristicsofthebuildingenvelope?(a)roof;(b)externalwalls;and(c)fenestration?GivedetailsofthematerialusedandtheU‐valuesortheRvaluesoftheindividualcomponents.

UvalueinWatts/hr/m2/C

Roof 0.409 Watts/hr/m2/C

Wall 0.44 Watts/hr/m2/C

Page 25: FORM 1 & 1A - Welcome to Environment

ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 24

9.10 Whatprecautions&safetymeasuresareproposedagainstfirehazards?Furnishdetailsofemergencyplans.

The fire fighting system shall compromise ofhydrant systemandportable extinguishers. Smokedetectors will be provided along with manual callpoints. External yard hydrants shall be installedaround all buildings in the complex in galvanizedsteelfirehosecabinet(weatherproof).Allexternalyard hydrants shall be at one meter height fromfinishedgroundlevelasperNationalBuildingCode.Externalfirehydrantsshallbelocatedsuchthatnoportion of any building ismore than 45m from ahydrant, and the external hydrants are notvulnerabletomechanicalorvehiculardamage.

9.11 Ifyouareusingglassaswallmaterialprovidesdetailsandspecificationsincludingemissivityandthermalcharacteristics.

NotApplicable

9.12 Whatistherateofairinfiltrationintothebuilding?Providedetailsofhowyouaremitigatingtheeffectsofinfiltration.

Thefollowingmeasureswillbeadoptedtomitigatetheeffectsofinfiltration: Aluminiumwindowswithrubbergasket,sothat

thewindowsaresealed,willbeprovided. Summer cross section ventilation will be

maximum.

9.13 Towhatextentthenon‐conventionalenergytechnologiesareutilisedintheoverallenergyconsumption?Providedetailsoftherenewableenergytechnologiesused.

NotApplicable

10. EnvironmentManagementPlan

TheEnvironmentManagementPlanwouldconsistofallmitigationmeasuresforeachitemwiseactivitytobeundertakenduringtheconstruction,operationandtheentirelifecycletominimizeadverseenvironmentalimpactsasaresultoftheactivitiesoftheproject.Itwouldalsodelineatetheenvironmentalmonitoringplanforcomplianceofvariousenvironmentalregulations.Itwillstatethestepstobetakenincaseofemergencysuchasaccidentsatthesiteincludingfire.

EnclosedasAnnexureV

Page 26: FORM 1 & 1A - Welcome to Environment

ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 25

ANNEXUREIAreaStatement

Sr.no Details Area Unit

1. PlotArea 27,809.41 m2

2. FSIArea 39,707.84 m2

3. Non‐FSIArea 52,811.75 m2

4. TotalConstructionArea 92,519.59 m2

Page 27: FORM 1 & 1A - Welcome to Environment

ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 26

ANNEXUREIICONCEPTUALPLAN

Page 28: FORM 1 & 1A - Welcome to Environment

ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 27

ANNEXUREIIILocationPlan

Page 29: FORM 1 & 1A - Welcome to Environment

ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 28

ANNEXUREIV

WaterBalanceStatement

*BasisforwatersupplyistakenfromBIS:NationalBuildingCodeofIndia2005:Part9Page19

Page 30: FORM 1 & 1A - Welcome to Environment

ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 29

ANNEXUREV

EnvironmentalManagementPlanduringConstructionPhase

Sr.No.

EnvironmentalComponents

PredictedImpacts

ProbablesourceofImpact

MitigationMeasures Remarks

CONSTRUCTIONPHASE1. AmbientAir

QualityNegativeimpactinsideconstructionsitepremises.Nonegativeimpactoutsidesite.

Dustemissionsfromexcavation,airemissionsfrommachineryandotherconstructionactivitiesatsite.

Dustreductionmeasuressuchasroadwatering.Periodicmaintenanceofconstructionequipment.Useofgoodqualityfuels.UseofPersonalProtectiveEquipments

Impactsaretemporaryduringconstructionphase.Impactswillbeconfinedtoshortdistances,ascoarseparticleswillsettlewithintheshortdistancefromactivities.

2. Noise Negativeimpactnearnoisegenerationsourcesinsidepremises.Nosignificantimpactonambientnoiselevelsinthesurroundingarea.

NoisegeneratedfromconstructionactivitiesandoperationofconstructionequipmentandDGsets

Useofwellmaintainedequipment.Heavyconstructionactivitylimitedtoday‐timehoursonly.Useofnoisemufflersinandconstructionvehicle.Useofearplugs/muffsbyconstructionstaff.

Temporaryimpactsduringconstructionphase.Noblastingorotherhighnoiseactivitiesenvisaged.

3. Water Nosignificantnegativeimpact.

Surfacerunofffromprojectsite.Oil/fuelandwastespills.Improperdebrisdisposal.Dischargeofsewagefromlabourcamp.

Siltfencestoreducerun‐offSecondarycontainmentanddykesinmaterialstorageareas.Sewagetreatmentinseptictanks.

Labourwillbeemployedtoreducesizeoflabourcamps.Noperennialsurfacewaterresourceadjacenttosite.Noexcavationworkwillbe

4. Land Minornegativeimpact

Excavation,Constructiondebris,waste

Reutilizationandrecyclingofconstructiondebris

Page 31: FORM 1 & 1A - Welcome to Environment

ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 30

fromlabourcamp.

Wastefromlabourcampswillbecollectedandcompostedonsite.Noncompostablewastewillbetransportedtolandfillsite.Topsoilwillbeconservedandusedforlandscapinginfunctionalphase.

5. Aesthetics Minornegativeimpacts

ConstructionactivitiesandExcavation

Theimpactswillbecompensatedbyextensivetreeplantationandgardeningintheusephase.

Shorttermimpactrestrictedonlyintheinitialstagesofconstruction.

Page 32: FORM 1 & 1A - Welcome to Environment

ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 31

ENVIRONMENTALMANAGEMENTPLANDURINGFUNCTIONALPHASE

Sr.No.

EnvironmentalComponents

PredictedImpacts

ProbableSourceOfImpact

MitigationMeasures

Remarks

FUNCTIONALPHASE

1. AmbientAirQuality

MinorNegativeimpact

ParticulateandgaseousemissionsfromDGsetsandvehiclemovement

Useoflowsulphur

goodfuel

Periodic

maintenanceofDG

sets

UseofCNG/LPGas

afuelshouldbe

encouraged.

DGsetswillbeused.

2. Noise Minornegativeimpactinsidepremises.

Noisefromvehiclemovementandoperationofdieselgeneratorsetsduringpowerfailure.

HousingofDGsets

inbuildingswith

appropriate

acoustics.

Traffic

management

measuresto

reducenoise

Appropriatetrees

whichwillactas

noisesbarriers

willbeplantedin

thepremisesand

alongroadside.

‐‐

3. Water Nosignificantadverseimpact

Oil/fuelandwastespillsinvehicleparkingarea.Dischargeofsewage.Dischargeofcontaminatedstormwater

Sewagewaterwill

betreatedand

recycled.

Rainwater

harvestingand

rechargeof

groundwater

aquiferis

proposed.

Good

housekeepingand

stormwater

managementwill

befollowed.

Recycledwaterwillbeusedforgardeningandflushingpurpose.

4. Land Nonegative Storageand Treatmentand Segregationof

Page 33: FORM 1 & 1A - Welcome to Environment

ApplicationformforEnvironmentalClearanceProjectName:ResidentialcumCommercialprojectatThane

MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 32

Sr.No.

EnvironmentalComponents

PredictedImpacts

ProbableSourceOfImpact

MitigationMeasures Remarks

impact disposalofsolidwastes.Dischargeofsewage.Fuelandmaterialspills.

reuseofsewage

water.

Integratedwaste

managementand

spillcontrolplan

Drygarbagewill

besentfor

recyclingandwet

garbagewillbe

composted.

dryandwetgarbagebeforewillbedonebeforedisposal.

5. Biological OverallPositiveimpact

Habitat

disturbance

Greenspaces

insidethe

premiseswillhelp

tocompensatethe

earliereffectfrom

vegetation.

Landscapingand

extensive

plantationinthe

premises.

Landscapingwill

helpinreducing

anyadverse

impactsonair

andnoise

quality.

6. Socio‐economic

Overallpositiveimpact

Increasedjobopportunityinhouseholdmaintenanceandancillaryservices.

‐‐ Positiveandlongtermimpact‐

FUNCTIONALPHASE

7.TrafficPattern

NosignificantImpact

Thecomplexislikelytoaddmoderatelytothetrafficflowconsideredduringpeakhour.

Traffic

Management

practiseswillbe

employed.

Adequateparking

spacewillbe

providedinthe

premises.