FORM - I
(I) Basic Information
S. No Item Details 1 Name of the project/s Seeking amendment to the environmental clearance
(MoEF&CC wide letter no: J-13012/31/2013/IA.1 (T), Dated: 23rd September 2014) issued for the Captive Thermal Power plant of 2X30 MW at Budhni Industrial Area, Dist. Sehore, Madhya Pradesh, by M/s. Trident Ltd.
2 S. No. in the schedule 1 “D”
3 Proposed capacity / area / length / tonnage to be handled / command area / lease area / number of wells to be drilled
Change in configuration of the steam turbine from earlier permitted scenario of 2x30MW to current proposal of 1x60MW without any increase in pollution load and overall captive power plant capacity.
4 New/Expansion/Modernization Seeking amendment in the earlier EC. No construction activities were commenced at site. The project is under basic engineering phase.
5 Existing Capacity/ Area etc. Mixed fuel(Indian & Imported Coal Based) Captive Thermal Power Plant of 2X30 MW
6 Category of Project i.e. ‘A’ or ‘B’ Category ‘A’ (Seeking amendment in the earlier EC) under EIA Notification 2007, section 7ii(b) without increase in pollution load)
7 Does it attract the general condition? If yes, please specify.
The general condition is applicable as Ratapani Wildlife Sanctuary is 7.75 km from the project location.
8 Does it attract the specific condition? If yes, please specify.
No
9 Location In the Existing boundary limit of the Trident Complex 42, 39/1, 39/2, 40/1, 40/2, 41/1, 41/2, Budhni Industrial Area.
Plot / Survey / Khasra No. Village Tehsil Budhni District Sehore State Madhya Pradesh
10 Nearest railway station/airport along with distance in Km.
Railway Station - Budhni – 2.25 km Air Port- Bhopal – 66.80 km
11 Nearest town, city, district headquarters along with distance in Km.
Budni - 02 km Hoshangabad– 06 km Sehore - 110 km
12 Village panchayats, Zilla parished, municipal corporation, local body (complete postal address with telephone nos. to be given)
Nagar Panchayat Budhni, Dist Sehore, (MP)
13 Name of the applicant Mr. Sandeep Bhaskar 14 Registered address Trident Complex, Raikot Group, Barnala -
148101, Punjab, India 15 Address for correspondence
Trident Group Hoshangabad Road, Budhni – Sehore – 466445,(M P).
Name Designation (Owner/Partner/CEO) Address Pin Code E-Mail Phone No Fax No
Mr. Sandeep Bhaskar CEO-Sustainability Trident Group Sanghera – 148101 , Punjab (India) 148101 [email protected] 016150 39999 Ext 2815 Mob:9878997815
16 Details of Alternative Sites Examined, if any, location of these sites should be shown on a topo sheet.
Not applicable as the current proposal is intended for amendment in the earlier EC granted.
17 Interlinked Projects No 18 Whether separate application of
Interlinked project has been submitted?
Not Applicable
19 If yes, date of submission Not Applicable 20 If no, reason - 21 Whether the proposal involves
approval/Clearance under the following acts: if yes, details of the same and their status to be given. (a)The Forest (Conservation) Act,
1980? (b)The Wildlife (Protection) Act,
1972? (c)The C.R.Z Notification, 1991?
Ratapani Wildlife Sanctuary is located about 7.75 km from the project location. Wildlife clearance was obtained from NBWL as per recommendation from State wildlife board and copy of the wildlife clearance is enclosed as Annexure1.
22 Whether there is any government order/ Police relevant/ relating to the site?
Nil
23 Forest land involved (hectares) No 24 Whether there is any litigation
pending against the project and / or land in which the project is proposed to be set up? (a) Name of the Court (b) Case No. (c) Order/ directions of the Court, if
any And its relevance with the proposed project.
No
(II) Activity
1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S. No.
Information/Checklist confirmation
Yes / No
Details thereof with approximate quantities / rates, wherever possible) with source of
information data 1.1 Permanent or temporary change
in land use, land cover or topography including increase intensity of land use (with respect to local land use plan)
No
The site for the proposed CPP is located within the existing textile complex of Trident Group at Budhni.
1.2 Clearance of existing land, vegetation and Buildings? No
The site for the CPP is located within the existing textile complex of Trident Group at Budhni.
1.3 Creation of new land uses? No
The site for the CPP is located within the existing textile complex of Trident Group at Budhni.
1.4 Pre-construction investigations e.g. Bore Houses, Soil testing? Yes
These activities will be undertaken during the detailed engineering phase. The project is in basic engineering stage.
1.5 Construction works? Yes Construction work will be limited to the designated site within the Trident campus.
1.6 Demolition works? No - 1.7 Temporary sites used for
construction works or housing of construction workers?
No Local labors through contractor shall be arranged for the proposed project.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations.
Yes
Structures in the plant will be above the ground. However excavations will be involved. The excavated soil will be filled in low lying areas within the premises.
1.9 Underground works mining or tunneling?
No Not applicable
1.10 Reclamation works? No Not applicable 1.11 Dredging? No Not applicable 1.12 Off shore structures? No Not applicable 1.13 Production and manufacturing
processes?
Yes
Power generation by using mixed fuel viz coal (imported and Indian). No change from the earlier proposal and EC granted. The current proposal is for change in steam turbine configuration without changing the total power generation capacity.
1.14 Facilities for storage of goods or materials?
Yes
All the raw materials will be stored above the ground level. Fly ash will be stored in silos for continuous supply to cement plant/brick manufacturing and for emergency storage, ash dyke will be constructed.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents?
Yes
All the conditions stipulated in the earlier EC will be adhered and implemented during the design, construction and operation phase of the project.
2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply)
S.No. Information / checklist
confirmation Yes / No
Details there of (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha)
No The proposed CPP will be developed within the existing Trident Limited land. No additional land will be acquired.
2.2 Water (expected source & competing users) Unit: KLD
Yes Water consumption will be maintained within the earlier permitted values of 6600 KL/ day and no additional water will be required for change in steam turbine configuration.
2.3 Minerals (MT) Yes The total coal consumption will be maintained within the earlier permitted levels as stated hereunder: When operated on 100% India coal: 0.42 MTPA When operated on 100% Imported coal: 0.2 MTPA
2.4 Construction material - stone, aggregates, and / soil (expected source - MT)
Yes Steel : 3700 MT Bricks : 15 Lacs Sand : 15000 M3
2.5 Forests and timber (Source - MT) No No 2.6 Energy including electricity and
fuels (source, competing users) Unit: fuel (MT), Energy (MW)
Yes Electricity consumption would be 7.2 MW for running the auxiliary of Power Plant and would be met from Power Generation by the Plant itself in the normal conditions. Fuel consumption is as per Serial No 2.3 above
2.7 Any other natural resources (use appropriate standard units)
No Nil
3. Use, storage, transport, handling or production of substances or materials, which
could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S. No.
Information/Checklist confirmation
Yes / No
Details there of (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies)
No There will be some usage of Chemicals [Hypo, acids, coagulant, etc] for treatment of boiler/cooling water. Proper storage and handling arrangement will be provided.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases)
No Not Applicable
3.3 Affect the welfare of people e.g. by changing living conditions?
Yes The proposed project will create about 300 employment opportunities in the area and thereby a substantial improvement is envisaged in the socio-economic status.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc.
No No adverse effect is envisaged due to this project. However, Trident Group has already provided medical facilities in existing complex and numbers of activities are operational as the Group has been operative for so many years.
3.5 Any other causes No No 4. Production of solid wastes during construction or operation or decommissioning
(MT/month)
S. No. Information / Checklist confirmation
Yes / No
Details there of (with approximate quantities/rates, wherever possible) with
source of information data 4.1 Spoil, overburden or mine wastes No The dug soil during excavation will be
used for land scaping in the area. Fly ash generated from the process shall be given to Cement plant / brick manufacturing.
4.2 Municipal waste (domestic and or commercial wastes)
No The domestic waste from the residential colony will be sent to landfill site Budhni city.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules)
No Spent oil, spent resin and other related wastes will be disposed as per guidelines of MoEF.
4.4 Other industrial process wastes Yes Boiler Ash/Lime Waste would be disposed
off to the Cement/Brick Manufacturing industries. Boiler Ash/Lime Waste would be disposed off to the Cement/Brick Manufacturing industries.
4.5 Surplus product No Not applicable 4.6 Sewage sludge or other sludge
from effluent treatment Yes Sludge from STP treatment plant will be
used as manure within the premises. 4.7 Construction or demolition wastes Yes Construction wastes will be disposed off as
per guidelines. 4.8 Redundant machinery or
equipment No No redundant machinery will be kept in
the premises. 4.9 Contaminated soils or other
materials No Nil
4.10 Agricultural wastes No Nil 4.11 Other solid wastes No Fly ash management will be adopted as per
the earlier EC granted.
5. Release of pollutants or any hazardous, toxic or noxious substances to air
S. No.
Information / Checklist confirmation
Yes/ No
Details there of (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources
Yes Proposed boiler will have stack (100 M height) with ESP leading to air emission of 30 mg/Nm3 as per the new power plant emission standards.
5.2 Emissions from production processes
Yes The flue gases from boiler will be treated in ESP and then will be let out into the atmosphere through a stack of 100 M height.
5.3 Emissions from materials handling storage or transport
No During the handling of raw materials like Coal, and waste as fly ash the fugitive emission is envisaged, which shall be reduced by deployment of dust extraction system, water spraying arrangement etc.
5.4 Emissions from construction activities including plant and equipment
Yes Fugitive dust emissions will be generated during construction. Dust curtains will be provided all round the work area to prevent the dust emissions. Water spraying will be done to prevent the dust emanation due to vehicular movement.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste.
Yes Localized effect and shall be control by avenue plantation around the area.
5.6 Emissions from incineration of waste
No Not Applicable
5.7 Emissions from burning of waste in open air e.g. slash materials, construction debris.
No Not Applicable
5.8 Emissions from any other sources No Not Applicable 6. Generation of Noise and Vibration, and Emissions of Light and Heat
S. No. Information/Checklist
confirmation Yes/ No
Details there of (with approximate quantities/rates, wherever possible) with source of information data with source of
information data 6.1 From operation of equipment e.g.,
engines, ventilation plant, crushers
Yes The sources of noise generation will be Boiler, Compressors, etc. All machinery will be purchased as manufactured on OSHA/MoEF guidelines. Noise enclosures will be provided to DG Sets. Earplugs will be provided to workers working in the noise prone areas. Ambient noise levels will be in accordance with MOEF notification dated 14-02-2000 i.e. noise levels will be < 75 dB (A) during daytime and < 70 dB (A) during night time.
6.2 From industrial or similar processes
Yes The sources of noise generation will be Boiler, Compressors, etc. All machinery will
6.3 From construction or demolition Yes Construction equipment will cause some noise. Ear plugs will be provided to construction workers who work near the noise generating equipment.
6.4 From blasting or piling No No blasting is proposed
6.5 From construction or operational traffic
Yes Vehicles used by construction staff are minimal. The noise levels will be in accordance with MoEF notification dated 14-02-2000.
6.6 From lighting or cooling systems No Nil 6.7 From any other sources No Nil
7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea
S. No. Information/Checklist
confirmation Yes / No
Details there of (with approximate quantities / rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials
No Waste oil will be stored in covered HDPE/MS drums and disposed to authorized vendors. Spent resin, oil soak cotton, residue from MEE shall be disposed off to the common disposal site ( TSDF) at Indore (MP).
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge)
No A comprehensive wastewater treatment facility and recycling program will be adopted as per the earlier EC granted for the project.
7.3 By deposition of pollutants emitted to air into the land and into water
No Not applicable
7.4 From any other sources No Nil 7.5 Is there a risk of long term build
up of pollutants in the environment from these sources?
No Nil
8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No. Information/Checklist confirmation Yes / No
Details there of (with approximate quantities/rates, wherever possible)
with source of information data 8.1 From explosions, spillages, fires etc
from storage, handling, use or production of hazardous substances
No Nil
8.2 From any other causes No Nil 8.3 Could the project be affected by
natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloud burst etc)?
No Nil
9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
(III) Environmental Sensitivity
S. No. Areas Name/ Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value.
Yes Eco sensitive zone
of Ratapani wildlife and bird sanctuary
as per the MoEF&CC notification
S.O.4109(E) dated 21/12/2016
Ratapani wildlife sanctuary is located at 7.75 km from the project site.
S. No. Information/Checklist
confirmation
Yes / No
Details there of (with approximate quantities/rates, wherever possible) with source of information data
9.1
Lead to development of supporting. Utilities, ancillary development or development stimulated by the project which could have impact on the environment e.g. Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.) Housing development Extractive industry Supply industry Other
No
No No No No
No such activities are envisaged at this stage As the complex is operational for long time and all such ancillaries and supportive units/ infrastructure has already been developed during the course of time
9.2 Lead to after-use of the site, which could have an impact on the environment.
No Not applicable
9.3 Set a precedent for later developments
Yes With the improvement in the socioeconomic status of the people in the area, later developments are expected.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects
Yes The project is within the existing operational premise which is within the declared Industrial area at Budhni.
S. No. Areas Name/ Identity Aerial distance (within 15km.) Proposed project location boundary
2 Areas which are important or sensitive for Ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests
Yes Eco sensitive zone
of Ratapani wildlife and bird sanctuary
as per the MoEF&CC notification
S.O.4109(E) dated 21/12/2016
Ratapani wildlife sanctuary is located at 7.75 km from the project site.
3 Area used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration
Yes Eco sensitive zone
of Ratapani wildlife and bird sanctuary
as per the MoEF&CC notification
S.O.4109(E) dated 21/12/2016
Ratapani wildlife sanctuary is located at 7.75 km from the project site.
4 Inland, coastal, marine or underground waters
Yes Narmada River
About 2 km from the Project Site
5 State, National boundaries No Not Applicable
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas
No Not applicable
7 Defense installations None - 8 Densely populated or built-up area
Yes Budhni
Budhni is about 1.5 Kms from the Project site.
9 Area occupied by sensitive man-made land uses (Hospitals, schools, places of worship, community facilities)
Yes Budhni is about 1.5 Kms from the Project site.
10 Areas containing important, high quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals)
No Nil