fratt elementary school · (schulte) new elementary school (red apple) close giese es hammes field...
TRANSCRIPT
![Page 1: FRATT ELEMENTARY SCHOOL · (Schulte) New Elementary School (Red Apple) Close Giese ES Hammes Field Improvements Misc. Life Safety, ADA and Deferred Maintenance RUSD Long Step 2 New](https://reader035.vdocuments.net/reader035/viewer/2022070912/5fb3c7f9031ada327e2938e7/html5/thumbnails/1.jpg)
FRATT ELEMENTARY SCHOOL
Three-Pronged Approach for Improving Student Achievement Our long-range plan uses a three-pronged approach for improving student achievement:
• Strong Academics • Resources Aligned to our Vision • Excellent Learning Environments
If passed, the referendum would provide the funding needed to make the following improvements at Fratt: SAFETY & SECURITY:
• Create new secure entrance and office for improved parent access • Replace fire alarm, clock, video and PA systems
LEARNING SPACES:
• Reconfigure existing office into Classroom • Repurpose existing gym for Music and STEM lab • Replace coat hooks with cubbies
BUILDING ADDITIONS:
• Build new gymnasium and student support offices • Add new playground, offices and receiving area
INFRASTRUCTURE:
• Refresh building interiors (LED lighting, flooring, ceilings, casework, paint walls)
• Address building maintenance (doors, roofing, HVAC updates, exterior masonry and concrete, retro-commissioning)
![Page 2: FRATT ELEMENTARY SCHOOL · (Schulte) New Elementary School (Red Apple) Close Giese ES Hammes Field Improvements Misc. Life Safety, ADA and Deferred Maintenance RUSD Long Step 2 New](https://reader035.vdocuments.net/reader035/viewer/2022070912/5fb3c7f9031ada327e2938e7/html5/thumbnails/2.jpg)
Fratt Elementary School
*** CONCEPT ONLY ***