Fritz-Herbert Heinsius Ruhr-Universität Bochum EMC Forward Endcap 28.4.2015 Installation of the Forward Endcap EMC Fritz-Herbert Heinsius Ruhr-Universität Bochum

Upload: others

Post on 18-Jan-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Fritz-Herbert Heinsius€¦ · Fritz-Herbert Heinsius Ruhr-Universität Bochum EMC Forward Endcap 28.4.2015 Installation Procedure • Assembly and beam test at FZJ (PANDA preassembly)

Fritz-Herbert Heinsius Ruhr-Universität Bochum EMC Forward Endcap 28.4.2015

Installation of the Forward Endcap EMC

Fritz-Herbert Heinsius Ruhr-Universität Bochum

Page 2: Fritz-Herbert Heinsius€¦ · Fritz-Herbert Heinsius Ruhr-Universität Bochum EMC Forward Endcap 28.4.2015 Installation Procedure • Assembly and beam test at FZJ (PANDA preassembly)

Fritz-Herbert Heinsius Ruhr-Universität Bochum EMC Forward Endcap 28.4.2015

Installation Procedure •  Assembly and beam

test at FZJ (PANDA preassembly)

•  Transport to FAIR •  Need lab space at

GSI to setup and test all channels: At least 6x8 m2 (+large door) for 3 months

•  Forward endcap size with support structure about 5.8x2.4x3.4 m3

Page 3: Fritz-Herbert Heinsius€¦ · Fritz-Herbert Heinsius Ruhr-Universität Bochum EMC Forward Endcap 28.4.2015 Installation Procedure • Assembly and beam test at FZJ (PANDA preassembly)

Fritz-Herbert Heinsius Ruhr-Universität Bochum EMC Forward Endcap 28.4.2015

Rails for Support Structure •  Rails for precise

mounting of forward endcap EMC

•  6.8 m length possible without crossing forward spectrometer rails

•  Support structure to move endcap EMC into solenoid needs space

•  Question: Space requirement, overlap with forward spectrometer (3.6 m when in parking pos.)

Page 4: Fritz-Herbert Heinsius€¦ · Fritz-Herbert Heinsius Ruhr-Universität Bochum EMC Forward Endcap 28.4.2015 Installation Procedure • Assembly and beam test at FZJ (PANDA preassembly)

Fritz-Herbert Heinsius Ruhr-Universität Bochum EMC Forward Endcap 28.4.2015

Connect Detector to Mounting Support Requirements •  Space in hall •  Crane

Forward endcap EMC with •  Insulation cover & ADCs •  Cooling lines •  Cables & fibres up to patch panel (not shown)

2.4 m

3.5 m

Page 5: Fritz-Herbert Heinsius€¦ · Fritz-Herbert Heinsius Ruhr-Universität Bochum EMC Forward Endcap 28.4.2015 Installation Procedure • Assembly and beam test at FZJ (PANDA preassembly)

Fritz-Herbert Heinsius Ruhr-Universität Bochum EMC Forward Endcap 28.4.2015

Move Detector into Magnet

•  Cables connected –  They pass the

insulation –  Cooling lines up to

mixing boxes next to detector

•  Problem –  Doors are in the way!

Page 6: Fritz-Herbert Heinsius€¦ · Fritz-Herbert Heinsius Ruhr-Universität Bochum EMC Forward Endcap 28.4.2015 Installation Procedure • Assembly and beam test at FZJ (PANDA preassembly)

Fritz-Herbert Heinsius Ruhr-Universität Bochum EMC Forward Endcap 28.4.2015

Doors open: no Space for Cables etc.

Page 7: Fritz-Herbert Heinsius€¦ · Fritz-Herbert Heinsius Ruhr-Universität Bochum EMC Forward Endcap 28.4.2015 Installation Procedure • Assembly and beam test at FZJ (PANDA preassembly)

Fritz-Herbert Heinsius Ruhr-Universität Bochum EMC Forward Endcap 28.4.2015

Larger Opening of Magnet Doors

Need 516 mm more On both sides

Page 8: Fritz-Herbert Heinsius€¦ · Fritz-Herbert Heinsius Ruhr-Universität Bochum EMC Forward Endcap 28.4.2015 Installation Procedure • Assembly and beam test at FZJ (PANDA preassembly)

Fritz-Herbert Heinsius Ruhr-Universität Bochum EMC Forward Endcap 28.4.2015

Doors

Page 9: Fritz-Herbert Heinsius€¦ · Fritz-Herbert Heinsius Ruhr-Universität Bochum EMC Forward Endcap 28.4.2015 Installation Procedure • Assembly and beam test at FZJ (PANDA preassembly)

Fritz-Herbert Heinsius Ruhr-Universität Bochum EMC Forward Endcap 28.4.2015

To be discussed •  Rails on floor for mounting forward endcap EMC

and DISC DIRC •  Larger opening of doors to facilitate mounting of

EMC