Front end Hybrid Industrial Tester L Louvain (L. Bonnet, V. Lemaître, X. Rouby) vincent.[email protected] Vincent Lemaitre tracker week 29.01.03 /www.fynu.ucl.ac.be/themes/he/cms/activities/tracker/hybrids. ation with WTH Aachen (M. Axer, F. Beissel, T. Franke, J. Mnich) RES Strasbourg (JD. Berst, P. Graehling, P.Juillot, C. Maa

Upload: dominick-lamb

Post on 21-Jan-2016

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Front end Hybrid Industrial Tester UCL Louvain (L. Bonnet, V. Lemaître, X. Rouby) vincent. lemaitre@fynu.ucl.ac.be Vincent Lemaitre tracker week 29.01.03

Front end Hybrid Industrial Tester

UCL Louvain (L. Bonnet, V. Lemaître, X. Rouby)

[email protected]

Vincent Lemaitre tracker week 29.01.03

http://www.fynu.ucl.ac.be/themes/he/cms/activities/tracker/hybrids.html

In collaboration with

RWTH Aachen (M. Axer, F. Beissel, T. Franke, J. Mnich)

IRES Strasbourg (JD. Berst, P. Graehling, P.Juillot, C. Maazouzi)

Page 2: Front end Hybrid Industrial Tester UCL Louvain (L. Bonnet, V. Lemaître, X. Rouby) vincent. lemaitre@fynu.ucl.ac.be Vincent Lemaitre tracker week 29.01.03

Current measurements

Comparisons between FHIT & ARC & CMS-like :

I(V250) =f(V250) comparisons between test setups

500

600

700

800

900

1000

2.2 2.3 2.35 2.4 2.45 2.5 2.55 2.6

Voltage [V]I(

V250)

[(m

A]

FHIT

ARC

This problem is solved : FEH needs more current when triggered

FHIT does not send triggers while

measuring current consumption

whereas ARC and CMS-like

system do

Page 3: Front end Hybrid Industrial Tester UCL Louvain (L. Bonnet, V. Lemaître, X. Rouby) vincent. lemaitre@fynu.ucl.ac.be Vincent Lemaitre tracker week 29.01.03

Electrical Test: limits

These limits can be resized with a multiplicative parameter, common for all limit values (available in configuration file).

I125 one APV biased Vmin [42 ; 78 ] mA

Vnom [48 ; 84 ] mA

Vmax [52 ; 88 ] mA

I250 one APV biased Vmin [220 ; 320 ] mA

Vnom [300 ; 400 ] mA

Vmax [320 ; 420 ] mA

From statistics on FHIT measurements intervals = [m-3s; m+3s] where m is the mean of distribution and s the RMS

Page 4: Front end Hybrid Industrial Tester UCL Louvain (L. Bonnet, V. Lemaître, X. Rouby) vincent. lemaitre@fynu.ucl.ac.be Vincent Lemaitre tracker week 29.01.03

Functional Test: limits

Mux test maximal height 255.0 ADC

(Mux output signal height) minimal height 200.0 ADC

minimal difference 5.0 ADC

Pedestal test number of events 1000

cut window (20 % around the mean) 20.0 ADC

Noise test number of events Same data as pedestal test

cut window (around the mean) 20.0 ADC

minimal noise cut 0.2 ADC

maximal noise cut 1.5 ADC

Gain test minimal threshold 20.0 ADC

These are the ARCS parameter All these limits are accessible in the configuration file

Page 5: Front end Hybrid Industrial Tester UCL Louvain (L. Bonnet, V. Lemaître, X. Rouby) vincent. lemaitre@fynu.ucl.ac.be Vincent Lemaitre tracker week 29.01.03

FHITS 1.3

New : version 1.3 (updated interface, as asked by industry)

•Display the # of good and bad hybrids of the current day

•All part-numbers accepted 1663 1674 (new firmware)

Page 6: Front end Hybrid Industrial Tester UCL Louvain (L. Bonnet, V. Lemaître, X. Rouby) vincent. lemaitre@fynu.ucl.ac.be Vincent Lemaitre tracker week 29.01.03

Conversion to XML

conversion to XML : direct contact with CERN people to fit to their wishes

C – routine being written in Louvain ; not necessary @ industry

proposed scenario• production and tests @ industry ( logfile creation )• delivery @ CERN of hybrids and logfiles (on CD-R)

1 delivery = # FEH + 1 CD (+ copies)

• tests @ CERN (with FHIT logfile creation)

• creation of XML files (by running the C – routine) @ CERN• transfer to database

Page 7: Front end Hybrid Industrial Tester UCL Louvain (L. Bonnet, V. Lemaître, X. Rouby) vincent. lemaitre@fynu.ucl.ac.be Vincent Lemaitre tracker week 29.01.03

Number of FHIT set-ups

Laboratory Presently In Addition With ARC in

CERN 1 mono-FHIT Yes

Industry 1 (CT) 1 dual-FHIT No

Industry 2 (1 dual-FHIT) Yes

Strasbourg 1 mono + 1 dual Yes

Aachen 1 mono-FHIT Yes

Louvain 1 mono + 1 dual

Yes

Spares 2 dual-FHIT Yes/No

TOTAL 5 boxes + 8 PCBs 5 boxes + 8 PCBs 3 add. ARC boards

Page 8: Front end Hybrid Industrial Tester UCL Louvain (L. Bonnet, V. Lemaître, X. Rouby) vincent. lemaitre@fynu.ucl.ac.be Vincent Lemaitre tracker week 29.01.03

Test procedure

NAIS

NAIS

ERNI

ERNI

SAMTEC

SAMTEC

FHIT

To be tested

@ Industry

@ CERN

• Industry 1: Naked hybrids (w/o APVs)• Industry 2: Hybrids

• Before bonding pitch adapter LINK to DB (XML)

Test setup

Page 9: Front end Hybrid Industrial Tester UCL Louvain (L. Bonnet, V. Lemaître, X. Rouby) vincent. lemaitre@fynu.ucl.ac.be Vincent Lemaitre tracker week 29.01.03

Mechanics

New mechanics : -Easier to handle -Insure thermal contact (“cooling”)-Probe for test of bias return line

Cooling contact

Fine positioning plugs

Hybrid

Heavy cover with auto-retractile probe

Pad on hybrid for test of bias return line

Page 10: Front end Hybrid Industrial Tester UCL Louvain (L. Bonnet, V. Lemaître, X. Rouby) vincent. lemaitre@fynu.ucl.ac.be Vincent Lemaitre tracker week 29.01.03

Summary

• Difference between set-ups for Current Measurement is understood

• First estimate of Limits for ET and FT have been evaluate (to be continued) • Most recent release of software distributed (FHITS 1.3)

-improved display-all part number included (firmware)

• Agreed procedure for loading FHIT data into DB (almost operational)

• Proposal for the number of FHIT set up

• Test procedure including thermal contact of hybrid and test of bias return line.