fs2013 january

68
Financial Statements For the Period September 1, 2012 January 31, 2013 For the Meeting of the Board of Trustees February 14, 2013 for Houston Community College System & Houston Community College Public Facility Corporation

Upload: houstoncommunitycollege

Post on 26-Jun-2015

221 views

Category:

Education


1 download

TRANSCRIPT

Page 1: Fs2013 january

Financial StatementsFor the Period

September 1, 2012 ‐ January 31, 2013

For the Meeting of the Board of Trustees ‐ February 14, 2013

for

Houston Community College System&

Houston Community College Public Facility Corporation

Page 2: Fs2013 january

Memorandum Management Discussion & Analysis

Summary HCCS Unrestricted Revenue & Expenditures 1

Exemptions & Wavier Detail 2

Fund Balances Balance Sheet By Fund   3

Adjusted Budgets by Division 4

Actual YTD by College  4

Cash Flow Analysis 5

Contact Hours Reimbursement 10

Enrollment Data 11Charts Revenue & Expenditure YTD thru January 31, 2013 12

Revenue and Expenditures with Trendlines 13

Revenue Source Comparison By Year 14

Expenditure Source Comparison By Year 15

Designated Funds Budget Summary / Cash Position 16

Capital Projects & Unexpended Plant Fund Projects 17

    Unexpended 2004 CIP Projects 18

    Plant Fund Maintenance Tax Notes 2006 (Central Utility Plant Project) 26

Maintenance Tax Notes/Sr. Lien Bonds 2008 27

Maintenance Tax Notes 2010  29

Maintenance Tax Notes 2011 30

Bonds/Notes Schedule of Bonds & Maintenance Tax Notes 32

Auxiliary Sources and Uses of Auxiliary Funds 33

Restricted Funds Grants, Contracts and Student Aid 35

Position Control 2013 Positions 41

Pos. Control Charts FTE (Full‐Time Equivalent) Monthly Comparison 46

Duplicated Headcount Monthly Comparison 55

Unduplicated Headcount Monthly Comparison 56

Statement of Net Assets PFC 1

Statement of Cash Flows  (Cash Basis‐ Interim Period) PFC 2

Public Safety Institute PFC 3

Westgate PFC 4

Hayes Road ‐ Alief Project PFC 5

Northline Mall Project PFC 6

Houston Community College ‐ Public Facility Corporation

Table of ContentsFor the Period September 1, 2012 ‐ January 31, 2013

For the Meeting of the Board of Trustees

Houston Community College System

Page 3: Fs2013 january

MEMORANDUM  

To:    Houston Community College System          Board of Trustees 

 

    Via:    Dr. Mary Spangler, Chancellor  

From:    Dr. Art Tyler, Deputy Chancellor     Chief Operating Officer  

Date:    February 14, 2013  

Re:  Financial Report for Month Ended January 31, 2013     

 

Enclosed please find the preliminary financial reports for the month ending January 31, 2013 for your review.  The financial report is an internal management report submitted to the Board of Trustees to compare actual financial activities to the approved budgets, strategic priorities, and financial policies for the reported fiscal year.   

 

Operating Fund net revenue through January 31, 2013 is $182,729,640 which is 4.9% below last year.  Expenditures year‐to‐date total $109,235,151 which is 1.6% less than the same time last year, for a net of $73,494,489. 

 

The reserves for the month of January 2013 are $62,432,031 or 21.5% of revenues (see page IV).  Thus, we continue to project a healthy fiscal strength for the college. 

Page 4: Fs2013 january

Managements Discussion and Analysis

Thru January 31, 2013

Revenues

Expenditures 

Utilities costs totaled $3,147,974 year‐to‐date.   We will continue to monitor these costs.  Total utilities cost at 

fiscal year end is projected to $12,335,836.

Instructional and Other Materials expenses totaled $2,727,660 year‐to‐date, which is 15.9% above last year.  

COMPASS Internet Units, TCCTA Adobe Master Collection and additional support for Moodlerooms, Inc 

contributed to the increase.  Expenses in this area are projected to be $11,004,039.

Total revenues and expenditures by expense type for the Operating Fund for 2012‐2013 are reported on page one, 

behind the tab Detailed Financial Statements. Highlights of financial activities year‐to‐date are as follows:

State Appropriations received year to date totaled $30,904,179, 0.4% below last year. Total appropriations 

received are expected to be $70,014,007.  This amount was reduced by $218,031 due to a formula reallocation 

to align with the Legislative Budget Board data and methodology.

Ad Valorem Tax collections totaled $60,406,443 year‐to‐date.  The year‐to‐date total is 8.6% below last year.  

The decrease is due to a decrease in the proportion of taxes applied to operation and an increase in taxes applied 

to debt service.  We project total tax revenue for the fiscal year will be $102,195,871.

Tuition and Fees net revenue year to date totaled $86,658,826 which is 4.6% lower than the same time last year.  

Enrollment numbers for Fall 2012 declined 6.5% compared to last year.  There is a 10% decline in international 

students compared to last year.  We are projecting tuition and fees revenue to be $108,419,136.  

i

Insurance/Risk Management payments totaled $6,518,335 year‐to‐date, 5.9% above last year.  The increase is 

due to an increase in insurance premiums.  Total expenses for the year are expected to be within budget at 

$6,871,709.

Tuition & Fee‐Extended Learning receipts totaled $3,799,996 year to date, 9.7% above last year.  Total tuition 

and fees‐Extended Learning at fiscal year end are expected to be $6,436,926.

Rental and Leases expenses totaled $1,135,365 year‐to‐date, which is 60.2% below the previous year.  The 

decrease is due to the completion of IT projects. Total expenses at  year end are projected to be $3,738,794.

Total revenue collections, net of exemptions and waivers, totaled $182,729,640 year‐to‐date.  This is a 4.6% decrease below last year. 

Total Salaries are $67,219,863 year‐to‐date, 0.3% above the previous year.  Total salaries at year end are 

expected to be $163,630,047.

Benefits costs totaled $7,287,713 year‐to‐date, 27.9% above last year.  This increase is due namely to  the 

reduction in the state's contribution to TRS and ORP and an increase in health insurance premiums. Total 

benefits at fiscal year end are expected to be $18,204,301.

Contract Services expense totaled $7,534,508 year‐to‐date, 17.6% above last year.  The increase is mainly due to 

IT hiring temporary personnel for projects, additional security staff at the District and using contract interpreters 

to fill the personnel shortages.  Fiscal year end expenses are projected to be $23,762,625.

Page 5: Fs2013 january

Managements Discussion and Analysis

Thru January 31, 2013

Budget Priorities funding allocated for the year are detailed below through January 31, 2013. 

Contingency/Budget Priorities

Capital Outlay & Equipment

Position Management

Other

Total Contingency/Budget Priorities

Grants

Unexpended Plant Fund  

Public Facility Corporation

Budget expenditures for grant‐funded projects so far this year total $6,072,072.

Budgeted

1,445,240           5,052,096           (3,606,856)        

11,372,376$      10,239,009$      1,133,367$       

Expensed Remaining

6,127,136$        292,725$           

The college has received $1,282,431 in new grant awards since the beginning of the current fiscal year. 

5,834,411$       

3,800,000           4,894,188           (1,094,188)        

Capital Outlay expenses totaled $3,867,690 year‐to‐date.  Expenditures are projected to $8,491,374.

Transfers/Debt activities totaled $6,151,581 year‐to‐date, a 56.3% decrease compared to last year. The decrease 

is due to a transfer in FY2012 to purchase the Westheimer/Eldridge land.  Items in this expense category include 

all student revenue bond payments, transfers for scholarship matching funds, and transfers to the Unexpended 

Plant Fund.  Total expenses are expected to be $34,018,395.

Total operating fund expenditures year‐to‐date total $109,235,151, a 1.6% decrease below last year.  

The Public Facility Corporation tracks the progress of the PFC ‐ Public Safety Institute, Katy Campus (Westgate), 

Alief and Northline Mall deferred maintenance, new construction and renovation projects.  Expenditures year‐to‐

date total $100.8 million, 98.7% of budget. See pages PFC 1‐6 for details. 

ii

Total grant awards (federal, state & private) year‐to‐date total, $44,964,927.

Cash Position ‐ The use of the Unexpended Plant Fund Excluding 2004 CIP for deferred maintenance projects was 

discontinued in FY 2009.  All deferred maintenance expense is captured in the operating account.  See page 16 

for prior year encumbrances. 

Unexpended Plant Fund Projects include current construction, deferred maintenance, and property acquisition 

projects for a budget of $46,298,898.  Funds for these projects are 100% committed.  See page 17 for more 

details.

The 2004 CIP budgets are $263,779,995 and are 100% committed. The spending categories in the schedule have 

now been revised for more ease of reference to the Board approved budget.  Please see page 18 for the 

summary and pages 20 through 24 for details.

The Maintenance Tax Note 2006 tracks the financial progress of the Central Utility Plant.  Commitments year‐to‐

date total $12.5 million, 99.87% of budget.  See page 26 for the details. 

Page 6: Fs2013 january

Managements Discussion and Analysis

Thru January 31, 2013

Balance Sheet – Operating Fund   

Cash and Investments

Cash

Investments

    Total

Fund Balance

Audited Fund Balance, August 31, 2012

Projected Revenue @ 08/31/2013

Total Projected Revenue

Projected Expenses @ 08/31/2013

FY 2012 Purchase Order Roll 

Total Projected Expenses @ 08/31/2013

Ending Fund Balance (Beg. Fund Balance + Revenue ‐ Expenses)

Required Reserve for FY 2013 (11% Projected Revenues)

Added Reserves

Additional Expenditures Funded From Reserves:

FY2012‐2013 Salary Increases

Total Expenses Paid From Reserves

Added Reserves

Required Reserve for FY 2013 (11% Projected Revenues)

Current Reserves

% of Total Operating Revenue

January 2013 January 2012

119,412,332$         107,721,379$        

290,018,310              

356,682,895$            

290,018,310$            

2,395,994                   

9,961,159                ‐                                

129,373,491$         107,721,379$        

66,664,585$              

30,530,017$              

31,902,014$              

62,432,031$              

21.5%

Budget

292,414,304$            

64,268,591$              

31,902,014$              

32,366,577$              

Expense to Date  Balance 

The projected reserves at January 31, 2013 of $62,432,031 is an estimate at this time and represents 21.5% of 

expected general fund revenue for this fiscal year, which is within our financial stability policy requiring us to maintain 

a fund balance of 9% ‐11% of general fund revenues as of August 31.  

iii

(1,836,560)         ‐                           (1,836,560)                 

(1,836,560)$       ‐$                         (1,836,560)                 

Page 7: Fs2013 january

g

YTD Adjusted Budget

YTD Actuals Thru 

January 31, 2013

YTD Actuals Thru 

January 31, 2012

2012‐2013 Inc/(Dec) 

vs. 2011‐2012

Actuals % 

Inc/(Dec)YTD vs. 

PriorYTD

Projected Actuals 

2012‐2013

Projected 2012‐2013 

Inc/(Dec) vs. Adj 

Budget

Projected 2012‐

2013 Inc/(Dec) vs. 

Adj Budget %

REVENUES

State Appropriations 70,232,038$           30,904,179$      31,042,116$      (137,937)$          ‐0.44% 70,014,007$      (218,031)$           ‐0.31%Ad Valorem Taxes 102,195,871           60,406,443        66,062,158       (5,655,715)        ‐8.56% 102,195,871     ‐                       0.00%Tuition, Net 43,067,676             33,828,115        35,374,189       (1,546,074)        ‐4.37% 41,904,849       (1,162,827)         ‐2.70%Fees 71,520,739             52,830,711        55,453,535       (2,622,824)        ‐4.73% 66,514,287       (5,006,452)         ‐7.00%Other Local Income* 2,517,960                740,104             459,024             281,080            61.23% 2,517,960         ‐                       0.00%Tuition & Fee, Net

 ‐‐ Extended Learning6,188,581                3,799,996            3,465,585           334,411              9.65% 6,436,926           248,345                4.01%

Grant Revenue 434,410                   220,092               187,822               32,270                 17.18% 434,410               ‐                         0.00%

Total Revenues 296,157,275           182,729,640       192,044,428       (9,314,788)          ‐4.85% 290,018,310$     (6,138,965)$         ‐2.07%

EXPENSES

Faculty‐FT  53,313,858             23,962,808        23,726,804       236,004            0.99% 53,313,858       ‐                       0.00%

Faculty‐PT 30,975,626             11,646,435        11,810,609       (164,175)           ‐1.39% 30,975,626       ‐                       0.00%

Librarian/Counselor‐FT  4,843,031                2,092,105          2,659,527         (567,422)           ‐21.34% 4,843,031         ‐                       0.00%

Librarian/Counselor‐PT 831,510                  269,499             211,685             57,814               27.31% 831,510             ‐                       0.00%

Staff‐FT 64,615,884             26,401,920        25,647,843       754,076            2.94% 64,615,884       ‐                       0.00%Staff‐PT 10,241,463             2,847,096          2,952,524         (105,428)           ‐3.57% 9,050,138         (1,191,325)           ‐11.63%

     Sub‐total Salaries 164,821,372           67,219,863          67,008,993         210,870              0.31% 163,630,047       (1,191,325)           ‐0.72%

Employee Benefits 18,204,301             7,287,713          5,696,463         1,591,250         27.93% 18,204,301       ‐                       0.00%

Supplies Gen Exp 5,669,572                1,900,806          1,665,423         235,383            14.13% 5,387,680         (281,892)             ‐4.97%

Travel 971,271                  255,974             230,854             25,120               10.88% 971,271             ‐                       0.00%

Marketing Costs 1,660,357                552,205             503,627             48,578               9.65% 1,466,130         (194,227)             ‐11.70%

Rental & Leases 3,738,794                1,135,365          2,854,485         (1,719,120)        ‐60.23% 3,738,794         ‐                       0.00%

Insurance/Risk Mgmt 6,871,709                6,518,335          6,154,010         364,325            5.92% 6,871,709         ‐                       0.00%

Contract Services 23,762,625             7,534,508          6,408,406         1,126,103         17.57% 23,762,625       ‐                       0.00%

Utilities 12,889,610             3,147,974          2,806,326         341,648            12.17% 12,335,836       (553,774)             ‐4.30%

Other Departmental Expenses 1,857,788                760,955             638,486             122,469            19.18% 1,445,530         (412,258)             ‐22.19%

Instructional & Other Materials 11,004,039             2,727,660          2,353,727         373,934            15.89% 11,004,039       ‐                       0.00%

Maintenance & Repair 1,252,399                174,522             243,203             (68,681)             ‐28.24% 1,252,399         ‐                       0.00%

Transfers/Debt 34,018,395             6,151,581          14,068,061       (7,916,480)        ‐56.27% 34,018,395       ‐                       0.00%

Contingency (2,561,820)              ‐                          ‐                          ‐                           0.00% (2,561,820)        ‐                       0.00%Capital Outlay 11,996,863             3,867,690          340,107             3,527,583         1037.20% 8,491,374         (3,505,489)           ‐29.22%

     Total Expenses  296,157,275           109,235,151     110,972,171     (1,737,020)        ‐1.57% 290,018,310     (6,138,965)         ‐2.07%

REVENUES H/(L) Vs EXPENSES 0                              73,494,489        81,072,258       (7,577,769)        0                         0                         

* Includes interest & dividends income, fines & penalties and parking fines

1

HOUSTON COMMUNITY COLLEGE2012‐2013 Revenues & Expenditures  HCCS CURRENT UNRESTRICTED

Page 8: Fs2013 january

FY 2011‐12 FY 2012‐13

Tuition

Budget:Adjusted Budget FY 2012‐13 43,067,676$           

Exemptions & Waivers (5,721,101)              

Adjusted Budget FY 2012‐13, Net 37,346,575$           

Revenues Received:Tuition 48,824,432              41,458,096              39,549,216             

Waivers & Exemptions:Dual Credit (5,170,736)              (4,717,186)              (4,170,229)              

Other (1,693,502)              (1,366,721)              (1,550,872)              

Total Waivers & Exemptions (6,864,238)              (6,083,907)              (5,721,101)              

Total Tuition Revenue, Net 41,960,194$          35,374,189$          33,828,115$           

Tuition ‐ Extended Learning

Budget:Budget FY 2012‐13 6,188,581$             

Exemptions & Waivers (934,716)                 

Budget FY 2012‐13, Net 5,253,865$             

Revenues Received:

Tuition 8,853,381                4,564,179                4,734,712               

Waivers & Exemptions:Corrections (2,612,080)            (1,098,594)            (934,716)                

Total EL Tuition Revenue, Net 6,241,301$            3,465,585$            3,799,996$             

Exemptions & Waivers

Dept of Corrections 2,612,080$              1,098,594$              934,716$                

Dual Credit Waiver 5,170,736                4,717,186                4,170,229               

Other:

Employee Fee Exemptions 84,810                     66,617                     54,730                     

Firemen 42,521                     37,689                     24,272                     

Hazelwood 906,036                   709,985                   957,575                   

Deaf & Blind 309,603                   260,017                   222,232                   

High Ranking Hi SCH Grad 868                           868                           1,798                       

Child of Disabled Vet ETC 431                           1,839                       4,737                       

Nonres Military Per & Dep 2,390                       1,593                       ‐                           

Emp of State Coll & Univ ‐                           ‐                           319                          

Nonres Teach/Research Asst 13,905                     10,188                     10,001                     

Nonres Competitive Scholar ‐                           ‐                           1,062                       

Senior Citizens 18,730                     15,211                     12,904                     

Scholarship Distribution 1,450                       1,450                       ‐                           

Apprenticeship Waivers (28)                           ‐                           ‐                           

Special Fees Waiver HFD 117                           117                           ‐                           

A VISA Waiver (Non‐Alien Waiver) 1,110                       1,110                   ‐                           

Refugee Waiver (1,554)                      (1,110)                      (162)                         

Foster Children‐Resident 294,543                   246,482                   249,386                   

Fire Academy Waiver 157                           157                           ‐                           

Undocumented Students 2,171                       1,283                       ‐                           

TX Tomorrow Waiver 2,874                       2,875                       ‐                           

Peace Officer Exemption 13,368                     10,350                     12,018                     

Total Other Exemptions 1,693,502                1,366,721                1,550,872               

Grand Total Exemptions & Waivers 9,476,318$            7,182,501$            6,655,817$             

Note:   As of December 31, 2008, the financial statements reflect all expenses incurred for Exemptions and Waivers as net of tuition and fee revenue.  Prior to this date Exemptions & Waivers were shown as an expenditure and revenue was shown as gross revenue.

2

Exemptions & Waivers

Thur January 31, 2013

Account

 End of Year 

Activity 

Year‐to‐Date 

Activity thru 

1/31/2012

 Year‐to‐Date 

Activity thru 

1/31/2013 

Page 9: Fs2013 january

     Unrestricted  Auxiliary  Restricted  Total 

Unexpended 

Plant Renewal 

 Retirement of 

Debt 

Investment in 

Plant  Total 

Consolidation & 

Elimination  Total All Funds 

ASSETSCurrent Assets:

Cash &  cash equivalents 119,412,332$      9,572,304$        ‐$                         128,984,636$     4,707,869$         25,209,338         ‐$                          29,917,207$            ‐$                              158,901,843$         

Restricted cash & cash equivalents ‐                             ‐                           13,176,664       13,176,664        121,981,918      681,379               ‐                           122,663,297           ‐                                135,839,961          

Short term Investments ‐                             ‐                           ‐                          ‐                           ‐                           ‐                           ‐                           ‐                                ‐                                ‐                                

Accounts/Other receivable (net) 23,002,398          2,227,732           16,866,939       42,097,069        62,003                738,381               ‐                           800,384                   ‐                                42,897,453            

Deferred charges ‐                             669,701              ‐                          669,701              ‐                           ‐                           ‐                           ‐                                ‐                                669,701                  

Prepaids 26,219                  80,899                ‐                          107,118              1,762,224           ‐                           ‐                           1,762,224                ‐                                1,869,342               

Total Current Assets 142,440,949        12,550,636        30,043,603       185,035,188      128,514,014      26,629,098         ‐                           155,143,112           ‐                                340,178,300          

Non‐current Assets:

Deferred charges, net ‐                             ‐                           ‐                          ‐                           3,548,100           ‐                           2,601,880           6,149,980                ‐                                6,149,980               

Restricted long‐term investments ‐                             ‐                           ‐                          ‐                           2,761,399           2,614,856            ‐                           5,376,255                ‐                                5,376,255               

Long‐term investments 9,961,159             ‐                           ‐                          9,961,159           ‐                           ‐                           ‐                           ‐                                ‐                                9,961,159               

Capital Assets, net ‐                             ‐                           ‐                          ‐                           80,787,576        ‐                           656,943,708      737,731,284           ‐                                737,731,284          

Total Non‐current Assets 9,961,159             ‐                           ‐                          9,961,159           87,097,075        2,614,856            659,545,588      749,257,519           ‐                                759,218,678          

Total Assets 152,402,108$      12,550,636$      30,043,603$      194,996,347$     215,611,089$     29,243,954$       659,545,588$     904,400,631$          ‐$                              1,099,396,978$      

LIABILITIESCurrent Liabilities:

Accounts payable 10,768,973          479,391              15,263,102       26,511,466        1,378,921           ‐                           ‐                           1,378,921                ‐                                27,890,387            

Accrued liabilities 379,949                6,503                   31,449                 417,901                142,635                558,933               ‐                             701,568                     ‐                                  1,119,469                 

Compensated absences 2,351,464             ‐                           ‐                          2,351,464           ‐                           ‐                           ‐                           ‐                                ‐                                2,351,464               

Funds held for others 4,084                    107,889              537,018             648,991              189,209              ‐                           ‐                           189,209                   ‐                                838,200                  

Deferred revenue 3,132                    289,929              982,714             1,275,775           1,474,661           ‐                           (1,600,060)         (125,399)                  ‐                                1,150,376               

Notes payable‐current portion ‐                             ‐                           ‐                          ‐                           4,655,000           ‐                           2,595,000           7,250,000                ‐                                7,250,000               

Bonds payable‐current portion ‐                             ‐                           ‐                          ‐                           ‐                           ‐                           14,175,000        14,175,000             ‐                                14,175,000            

Capital lease obligations‐current ‐                             ‐                           ‐                          ‐                           ‐                           ‐                           ‐                           ‐                                ‐                                ‐                                

Total Current Liabilities 13,507,602          883,712$            16,814,283       31,205,597        7,840,426           558,933               15,169,940        23,569,299             ‐                                54,774,896            

Non‐current Liabilities:

Deposits ‐                             ‐                           ‐                          ‐                           ‐                           ‐                           ‐                           ‐                                ‐                                ‐                                

Notes payable ‐                             ‐                           ‐                          ‐                           139,850,892      ‐                           37,761,145        177,612,037           ‐                                177,612,037          

Bonds payable ‐                             ‐                           ‐                          ‐                           61,575,522        1,279,420            270,416,919      333,271,860           ‐                                333,271,860          

Capital lease obligations ‐                             ‐                           ‐                          ‐                           ‐                           ‐                           108,309,832      108,309,832           ‐                                108,309,832          

Total Non‐current Liabilities ‐                             ‐                           ‐                          ‐                           201,426,414      1,279,420            416,487,895      619,193,729           ‐                                619,193,729          

Total Liabilities 13,507,602$        883,712$            16,814,283$      31,205,597$       209,266,840$     1,838,353$         431,657,835$     642,763,028$          ‐$                              673,968,622$         

 Fund Balance‐ 

August 31, 2012 Audited  66,664,585          11,747,296         9,080,325            87,492,206          3,738,684             10,061,216         235,429,798        249,229,698             ‐                                  336,721,904            

Revenues Over Expenditures

     Unrestricted 72,229,921          (80,371)               72,149,550        72,149,550            

     Restricted 4,148,995          4,148,995           4,148,995               

     Net Investment in Plant     2,605,567           17,344,385         (7,542,045)         12,407,907             12,407,907            

Total Fund Balances 138,894,506$      11,666,925$      13,229,320$      163,790,751$     6,344,251$         27,405,601$       227,887,753$     261,637,605$          ‐$                              425,428,356$         

 Total Liabilities &  Fund Balances  152,402,108$      12,550,637$      30,043,603$      194,996,348$     215,611,089$     29,243,954$       659,545,588$     904,400,633$          ‐$                              1,099,396,978$      

      3 

PLANT & BOND FUNDS

Houston Community CollegeBalance Sheet By Fund

For Month Ended January 31, 2013

CURRENT & LOAN FUNDS

Page 10: Fs2013 january

 CENTRAL 

 NORTH

WEST 

 NORTH

EAST 

 SOUTH

WEST   SOUTH EAST   COLEMAN 

 EXTENDED 

LEARNING 

 CHAN‐

CELLOR 

DEPUTY CHAN‐

CELLOR 

INSTITU‐

TIONAL 

EFFECTIVE‐

NESS 

 INSTRUC‐

TION 

 INFO

TECH 

 STUDENT 

SUCCESS   SYSTEM   HCCS 

 % of 

Adjusted 

Budget 

EXPENSES

Faculty‐FT  10,224,009      10,167,313      7,400,874         12,048,481     4,870,824       5,929,986       2,368,137       ‐                  ‐                    ‐                   219,042          85,192            ‐                  ‐                  53,313,858      18.00%

Faculty‐PT 4,755,214         6,329,732         4,071,911         5,783,823        3,780,981       1,798,714       3,660,277       ‐                  ‐                    ‐                   794,215          759                 ‐                  ‐                  30,975,626      10.46%

Librarian/Counselor‐FT  1,079,064         1,115,400         889,929            731,058           514,757          84,180            2,887              ‐                  ‐                    ‐                   340,010          ‐                  85,746            ‐                  4,843,031        1.64%

Librarian/Counselor‐PT 87,030              194,185            119,380            194,206           73,152            33,248            ‐                  ‐                  ‐                    ‐                   19,773            ‐                  110,536          ‐                  831,510           0.28%

Staff‐FT 5,507,578         4,556,969         4,783,934         5,653,479        3,838,559       2,419,520       3,660,465       3,667,855       15,211,232    102,108           3,458,611       7,420,529       4,335,045       ‐                  64,615,884      21.82%

Staff‐PT 1,983,788         1,673,318         743,949            1,570,359        1,255,559       441,322          728,620          279,028          577,572           ‐                   323,474          235,344          429,130          ‐                  10,241,463      3.46%

     Sub‐total Salaries 23,636,683      24,036,917      18,009,977      25,981,406     14,333,832    10,706,970    10,420,386    3,946,883       15,788,804    102,108           5,155,125       7,741,824       4,960,457       ‐                  164,821,372    55.65%

Employee Benefits ‐                     ‐                     ‐                     4                       ‐                  ‐                  ‐                  ‐                  ‐                    ‐                   ‐                  ‐                  ‐                  18,204,297    18,204,301      6.15%

Supplies Gen Exp 248,336            378,619            198,148            265,340           222,948          335,507          203,596          317,946          1,316,807        ‐                   158,047          254,809          (14,748)           1,784,217       5,669,572        1.91%

Travel 103,010            90,362              34,396              64,098             56,101            90,117            89,555            132,509          120,510           ‐                   54,671            103,241          32,701            ‐                  971,271           0.33%

Marketing Costs 49,979              46,485              103,659            36,566             76,207            38,323            382,284          81,220            843,634           ‐                   ‐                  2,000              ‐                  ‐                  1,660,357        0.56%

Rental & Leases 34,418              136,822            1,312,100         549,432           41,484            508,719          38,680            24,980            224,371           ‐                   ‐                  858,067          9,721              ‐                  3,738,794        1.26%

Insurance/Risk Mgmt 794                    ‐                     ‐                     154                  ‐                  ‐                  ‐                  ‐                  ‐                    ‐                   ‐                  676                 ‐                  6,870,085       6,871,709        2.32%

Contract Services 321,130            298,926            65,841              40,985             163,144          348,228          357,814          484,593          13,179,447    ‐                   163,035          2,349,496       31,883            5,958,103       23,762,625      8.02%

Utilities 5,025                ‐                     4,600                ‐                   ‐                  ‐                  ‐                  ‐                  1,575,778        ‐                   ‐                  1,400,000       ‐                  9,904,207       12,889,610      4.35%

Other Departmental Expenses 83,222              45,283              42,777              43,845             134,897          115,214          56,936            320,103          185,328           ‐                   143,258          255,783          139,291          291,851          1,857,788        0.63%

Instructional & Other Materials 483,101            371,333            143,862            341,093           81,429            363,773          1,077,972       36,261            132,117           ‐                   1,061,562       6,632,444       279,092          ‐                  11,004,039      3.72%

Maintenance & Repair 138,595            28,896              44,817              33,463             15,772            86,050            158,950          1,265              724,314           ‐                   8,472              8,870              416                 2,519              1,252,399        0.42%

Transfers/Debt ‐                     845,619            5,636,142         1,155,001        ‐                  ‐                  ‐                  ‐                  3,264               ‐                   ‐                  ‐                  ‐                  26,378,369    34,018,395      11.49%

Contingency 250                    25,768              47,410              2,621               40,000            42,080            ‐                  83,000            121,218           ‐                   50,000            50,000            38,697            (3,062,864)     (2,561,820)       ‐0.87%

Capital Outlay 571,641            248,857            289,118            111,859           247,679          559,924          32,259            61,150            4,875,905        ‐                   1,089              868,373          1,873              4,127,136       11,996,863      4.05%

Total Budget 25,676,184      26,553,887      25,932,847      28,625,867     15,413,493    13,194,905    12,818,432    5,489,910       39,091,497    102,108           6,795,259       20,525,583    5,479,383       70,457,920    296,157,275    100.00%

  4 

 CENTRAL 

 NORTH

WEST 

 NORTH

EAST 

 SOUTH

WEST   SOUTH EAST   COLEMAN 

 EXTENDED 

LEARNING 

 CHAN‐

CELLOR 

DEPUTY CHAN‐

CELLOR 

INSTITU‐

TIONAL 

EFFECTIVE‐

NESS 

 INSTRUC‐

TION 

 INFO

TECH 

 STUDENT 

SUCCESS   SYSTEM   HCCS 

 % of 

Actuals 

EXPENSES

Faculty‐FT  4,670,747         4,581,658         3,286,590         5,450,285        2,215,062       2,642,627       1,051,483       ‐                  ‐                    ‐                   28,099            36,257            ‐                  ‐                  23,962,808      21.94%

Faculty‐PT 1,865,449         2,394,071         1,587,896         2,318,077        1,458,233       600,411          1,304,490       ‐                  ‐                    ‐                   117,808          ‐                  ‐                  ‐                  11,646,435      10.66%

Librarian/Counselor‐FT  443,591            471,747            393,224            316,913           257,416          22,356            2,886              ‐                  ‐                    ‐                   149,063          ‐                  34,909            ‐                  2,092,105        1.92%

Librarian/Counselor‐PT 27,152              64,716              48,737              69,505             23,165            11,574            ‐                  ‐                  ‐                    ‐                   ‐                  ‐                  24,650            ‐                  269,499           0.25%

Staff‐FT 2,240,782         1,794,872         1,927,234         2,290,204        1,547,273       993,983          1,512,932       1,514,030       6,363,453        42,545             1,425,021       3,000,251       1,749,340       ‐                  26,401,920      24.17%

Staff‐PT 507,976            520,138            268,227            474,722           355,719          107,875          231,186          50,694            142,608           ‐                   44,226            54,231            89,495            ‐                  2,847,096        2.61%

     Sub‐total Salaries 9,755,698         9,827,202         7,511,907         10,919,706     5,856,868       4,378,825       4,102,977       1,564,724       6,506,061        42,545             1,764,217       3,090,738       1,898,394       ‐                  67,219,863      61.54%

Employee Benefits ‐                     ‐                     ‐                     3                       ‐                  ‐                  ‐                  ‐                  ‐                    ‐                   ‐                  ‐                  ‐                  7,287,710       7,287,713        6.67%

Supplies Gen Exp 83,639              91,340              88,758              90,953             73,423            82,194            87,371            108,746          342,507           ‐                   70,901            45,919            48,348            686,707          1,900,806        1.74%

Travel 8,822                29,372              6,809                14,161             7,248              20,307            33,141            54,272            22,095             ‐                   26,966            20,542            12,240            ‐                  255,974           0.23%

Marketing Costs 3,042                15,566              9,650                23,037             20,376            1,346              66,198            62,986            350,004           ‐                   ‐                  ‐                  ‐                  ‐                  552,205           0.51%

Rental & Leases 30,938              37,107              416,556            387,390           10,143            157,897          4,537              4,695              78,143             ‐                   ‐                  5,543              2,415              ‐                  1,135,365        1.04%

Insurance/Risk Mgmt ‐                     ‐                     ‐                     ‐                   ‐                  ‐                  ‐                  ‐                  ‐                    ‐                   ‐                  ‐                  ‐                  6,518,335       6,518,335        5.97%

Contract Services 24,513              20,467              17,127              12,730             40,909            255,228          22,728            72,233            3,807,758        ‐                   52,548            445,107          29,076            2,734,086       7,534,508        6.90%

Utilities 1,168                ‐                     1,300                ‐                   ‐                  ‐                  ‐                  ‐                  281,592           ‐                   ‐                  641,629          ‐                  2,222,286       3,147,974        2.88%

Other Departmental Expenses 11,557              16,912              11,719              13,324             3,344              24,403            25,813            188,676          39,853             ‐                   54,061            59,811            22,978            288,503          760,955           0.70%

Instructional & Other Materials 126,431            56,191              32,369              79,880             15,525            59,505            198,631          ‐                  7,390               ‐                   308,475          1,612,162       231,101          ‐                  2,727,660        2.50%

Maintenance & Repair 15,022              1,870                6,192                1,964               1,774              3,880              23,934            678                 110,470           ‐                   4,853              3,885              ‐                  ‐                  174,522           0.16%

Transfers/Debt ‐                     221,329            1,651,966         664,709           ‐                  ‐                  ‐                  ‐                  ‐                    ‐                   ‐                  ‐                  ‐                  3,613,577       6,151,581        5.63%

Contingency ‐                     ‐                     ‐                     ‐                   ‐                  ‐                  ‐                  ‐                  ‐                    ‐                   ‐                  ‐                  ‐                  ‐                  ‐                    0.00%

Capital Outlay 19,781              21,888              13,545              46,856             8,263              ‐                  27,977            27,261            3,655,253        ‐                   ‐                  46,867            ‐                  ‐                  3,867,690        3.54%

Total Expense 10,080,612      10,339,244      9,767,897         12,254,712     6,037,873       4,983,586       4,593,305       2,084,270       15,201,126    42,545             2,282,022       5,972,204       2,244,552       23,351,204    109,235,151    100.00%% of Adjusted 

Budget by Division 39.26% 38.94% 37.67% 42.81% 39.17% 37.77% 35.83% 37.97% 38.89% 41.67% 33.58% 29.10% 40.96% 33.14% 36.88% 100.00%

Remaining Balance 15,595,572      16,214,643      16,164,950      16,371,155     9,375,620       8,211,319       8,225,127       3,405,640       23,890,371    59,563             4,513,237       14,553,379    3,234,831       47,106,716    186,922,124   

HOUSTON COMMUNITY COLLEGE2012‐2013 Expenditures

YTD Adjusted Budget by Division

YTD Actuals by Division

Page 11: Fs2013 january

Sept. Oct. Nov. Dec. Jan. Feb. Mar. Apr. May June July  Aug.

Central                                 FY2013 8.77% 17.29% 26.04% 33.04% 39.26%

                                              FY2012 8.89% 17.89% 27.03% 35.01% 41.49% 49.28% 58.01% 66.97% 74.34% 81.43% 88.98% 94.59%

Northwest                          FY2013 8.26% 17.69% 26.42% 33.44% 38.94%

                                              FY2012 8.55% 18.72% 27.39% 33.69% 38.31% 46.70% 55.31% 66.77% 74.43% 81.57% 89.43% 95.09%

Northeast                           FY2013 6.80% 19.95% 27.15% 32.73% 37.67%

                                              FY2012 6.70% 20.76% 27.75% 33.82% 40.16% 46.70% 53.35% 76.04% 82.19% 88.46% 94.27% 98.45%

Southwest                          FY2013 8.59% 19.46% 28.35% 35.52% 42.81%

                                              FY2012 8.58% 19.19% 28.11% 36.68% 43.63% 50.96% 58.38% 71.97% 79.03% 85.23% 92.21% 96.87%

Southeast                            FY2013 7.94% 16.74% 25.87% 33.20% 39.17%

                                              FY2012 8.68% 17.97% 27.56% 35.39% 41.33% 49.39% 57.90% 67.21% 74.92% 81.69% 89.81% 95.46%

Coleman                              FY2013 8.06% 17.28% 24.93% 31.55% 37.77%

                                              FY2012 8.26% 17.29% 25.18% 32.46% 39.63% 47.52% 55.02% 63.80% 71.21% 79.83% 87.22% 93.29%

Extended Learning            FY2013 7.79% 15.60% 23.76% 31.35% 35.83%

5                                               FY2012 7.97% 15.68% 23.55% 30.39% 37.09% 45.43% 53.07% 60.96% 69.35% 76.72% 84.68% 91.63%

Chancellor                           FY2013 7.14% 13.81% 24.51% 30.61% 37.97%

                                              FY2012 8.66% 16.11% 23.27% 30.27% 39.34% 45.84% 53.37% 61.08% 68.18% 74.82% 81.30% 89.24%

Deputy Chancellor             FY2013 4.52% 10.80% 17.79% 31.74% 38.89%

                                              FY2012 4.52% 10.28% 16.85% 22.58% 31.70% 38.52% 45.34% 51.71% 59.06% 69.23% 76.82% 80.46%

Institute Effectiveness      FY2013 8.33% 16.67% 25.00% 33.33% 41.67%

                                              FY2012 5.76% 15.21% 22.37% 29.85% 38.13% 45.15% 52.82% 59.23% 67.73% 76.94% 85.77% 94.82%

Instruction                          FY2013 6.55% 15.59% 22.53% 28.70% 33.58%

                                              FY2012 6.73% 16.23% 22.67% 28.96% 35.81% 42.78% 52.10% 59.22% 65.59% 72.63% 82.25% 89.27%

Info Tech                              FY2013 5.56% 12.11% 16.63% 20.99% 29.10%

                                              FY2012 20.14% 33.96% 40.28% 45.47% 52.99% 59.23% 64.92% 71.03% 76.35% 82.70% 88.44% 99.49%

Student Success                 FY2013 7.33% 14.68% 23.02% 30.31% 40.96%

                                              FY2012 8.33% 15.89% 23.44% 30.58% 40.76% 48.76% 56.63% 65.19% 72.58% 80.37% 90.28% 98.41%

System                                 FY2013 12.41% 18.87% 22.34% 27.24% 33.14%

                                              FY2012 22.23% 25.94% 29.46% 32.09% 36.45% 39.69% 43.39% 63.98% 68.16% 71.84% 79.45% 88.27%

Total HCCS                           FY2013 8.55% 16.77% 23.49% 30.55% 36.88%

                                              FY2012 12.05% 20.09% 26.81% 32.55% 38.82% 45.08% 51.63% 65.11% 71.48% 77.90% 85.35% 91.73%

Houston Community College

Cash Flow Analysis ‐ Monthly Percentage of Budget UsedFY2013 vs. FY2012

Page 12: Fs2013 january

Adjusted Budget 

FY2012

YTD Actuals Thru 

January 31, 2012 % of Budget Used

Adjusted Budget 

FY2013

YTD Actuals Thru 

January 31, 2013 % of Budget Used

EXPENSES

Faculty‐FT  11,459,772          5,181,181        45.21% 10,224,009        4,670,747          45.68%

Faculty‐PT 3,645,705             1,503,489        41.24% 4,755,214           1,865,449          39.23%

Librarian/Counselor‐FT  1,079,656             455,554           42.19% 1,079,064           443,591             41.11%

Librarian/Counselor‐PT 90,023                  19,261              21.40% 87,030                27,152                31.20%

Staff‐FT 5,345,412             2,213,287        41.41% 5,507,578           2,240,782          40.69%

Staff‐PT 1,808,997             561,457           31.04% 1,983,788           507,976             25.61%

     Sub‐total Salaries 23,429,565          9,934,229        42.40% 23,636,683        9,755,698          41.27%

Employee Benefits ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Supplies Gen Exp 223,128                62,152              27.85% 248,336              83,639                33.68%

Travel 100,978                24,445              24.21% 103,010              8,822                 8.56%

Marketing Costs 54,479                  19,653              36.07% 49,979                3,042                 6.09%

Rental & Leases 80,498                  39,000              48.45% 34,418                30,938                89.89%

Insurance/Risk Mgmt 794                        ‐                    0.00% 794                       ‐                     0.00%

Contract Services 331,583                93,745              28.27% 321,130              24,513                7.63%

Utilities ‐                         ‐                    ‐                 5,025                  1,168                 0.00%

Other Departmental Expenses 81,606                  8,949                10.97% 83,222                11,557                13.89%

Instructional & Other Materials 453,469                147,298           32.48% 483,101              126,431             26.17%

Maintenance & Repair 103,684                17,330              16.71% 138,595              15,022                10.84%

Transfers/Debt ‐                         ‐                    ‐                 ‐                        ‐                     ‐                      

Contingency 19,140                  ‐                    0.00% 250                       ‐                     ‐                      

Capital Outlay 118,876                24,338              20.47% 571,641              19,781                3.46%

     Total Expenses  24,997,800          10,371,139      41.49% 25,676,184        10,080,612        39.26%

Adjusted Budget 

FY2012

YTD Actuals Thru 

January 31, 2012 % of Budget Used

Adjusted Budget 

FY2013

YTD Actuals Thru 

January 31, 2013 % of Budget Used

EXPENSES

Faculty‐FT  10,624,530          4,652,643        43.79% 10,167,313        4,581,658          45.06%

Faculty‐PT 4,853,257             1,669,818        34.41% 6,329,732           2,394,071          37.82%

Librarian/Counselor‐FT  1,067,207             418,139           39.18% 1,115,400           471,747             42.29%

Librarian/Counselor‐PT 145,675                44,339              30.44% 194,185              64,716                33.33%

Staff‐FT 3,990,751             1,557,821        39.04% 4,556,969           1,794,872          39.39%

Staff‐PT 1,450,283             440,730           30.39% 1,673,318           520,138             31.08%

     Sub‐total Salaries 22,131,703          8,783,491        39.69% 24,036,917        9,827,202          40.88%

Employee Benefits ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Supplies Gen Exp 262,957                39,971              15.20% 378,619              91,340                24.12%

Travel 85,012                  24,154              28.41% 90,362                29,372                32.51%

Marketing Costs 41,176                  17,501              42.50% 46,485                15,566                33.49%

Rental & Leases 128,563                31,258              24.31% 136,822              37,107                27.12%

Insurance/Risk Mgmt ‐                         ‐                    0.00% ‐                        ‐                     0.00%

Contract Services 286,574                77,932              27.19% 298,926              20,467                6.85%

Utilities ‐                         ‐                    ‐                 ‐                        ‐                     0.00%

Other Departmental Expenses 35,380                  11,914              33.67% 45,283                16,912                37.35%

Instructional & Other Materials 200,442                35,237              17.58% 371,333              56,191                15.13%

Maintenance & Repair 24,520                  1,965                8.01% 28,896                1,870                 6.47%

Transfers/Debt 883,899                242,943           27.49% 845,619              221,329             ‐                      

Contingency 24,267                  ‐                    0.00% 25,768                ‐                     ‐                      

Capital Outlay 142,508                21,883              15.36% 248,857              21,888                8.80%

     Total Expenses  24,247,001          9,288,248        38.31% 26,553,887        10,339,244        38.94%

Central College

Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used

Northwest College

Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used

6

Page 13: Fs2013 january

Adjusted Budget 

FY2012

YTD Actuals Thru 

January 31, 2012 % of Budget Used

Adjusted Budget 

FY2013

YTD Actuals Thru 

January 31, 2013 % of Budget Used

EXPENSES

Faculty‐FT  7,893,616             3,537,201        44.81% 7,400,874           3,286,590          44.41%

Faculty‐PT 2,916,159             1,305,287        44.76% 4,071,911           1,587,896          39.00%

Librarian/Counselor‐FT  1,100,054             470,022           42.73% 889,929              393,224             44.19%

Librarian/Counselor‐PT 115,648                34,234              29.60% 119,380              48,737                40.83%

Staff‐FT 4,570,881             1,896,388        41.49% 4,783,934           1,927,234          40.29%

Staff‐PT 695,846                255,862           36.77% 743,949              268,227             36.05%

     Sub‐total Salaries 17,292,204          7,498,994        43.37% 18,009,977        7,511,907          41.71%

Employee Benefits ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Supplies Gen Exp 304,857                100,672           33.02% 198,148              88,758                44.79%

Travel 34,484                  8,490                24.62% 34,396                6,809                 19.79%

Marketing Costs 46,417                  14,782              31.85% 103,659              9,650                 9.31%

Rental & Leases 1,256,625             584,374           46.50% 1,312,100           416,556             31.75%

Insurance/Risk Mgmt ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Contract Services 43,826                  9,686                22.10% 65,841                17,127                26.01%

Utilities 4,600                    950                   20.65% 4,600                  1,300                 0.00%

Other Departmental Expenses 43,724                  9,204                21.05% 42,777                11,719                27.40%

Instructional & Other Materials 148,381                53,754              36.23% 143,862              32,369                22.50%

Maintenance & Repair 49,836                  33,540              67.30% 44,817                6,192                 13.82%

Transfers/Debt 5,640,942             1,697,155        30.09% 5,636,142           1,651,966          ‐                      

Contingency 33,706                  ‐                    0.00% 47,410                ‐                     ‐                      

Capital Outlay 48,101                  7,731                16.07% 289,118              13,545                4.68%

     Total Expenses  24,947,703          10,019,333      40.16% 25,932,847        9,767,897          37.67%

Adjusted Budget 

FY2012

YTD Actuals Thru 

January 31, 2012 % of Budget Used

Adjusted Budget 

FY2013

YTD Actuals Thru 

January 31, 2013 % of Budget Used

EXPENSES

Faculty‐FT  13,482,199          6,140,118        45.54% 12,048,481        5,450,285          45.24%

Faculty‐PT 4,906,656             2,247,062        45.80% 5,783,823           2,318,077          40.08%

Librarian/Counselor‐FT  1,397,239             667,288           47.76% 731,058              316,913             43.35%

Librarian/Counselor‐PT 202,844                68,874              33.95% 194,206              69,505                35.79%

Staff‐FT 5,158,151             2,250,075        43.62% 5,653,479           2,290,204          40.51%

Staff‐PT 1,520,645             618,039           40.64% 1,570,359           474,722             30.23%

     Sub‐total Salaries 26,667,733          11,991,457      44.97% 25,981,406        10,919,706        42.03%

Employee Benefits ‐                         ‐                    ‐                 4                           3                         ‐                 

Supplies Gen Exp 238,911                75,322              31.53% 265,340              90,953                34.28%

Travel 64,579                  13,417              20.78% 64,098                14,161                22.09%

Marketing Costs 37,367                  22,445              60.07% 36,566                23,037                63.00%

Rental & Leases 783,102                483,784           61.78% 549,432              387,390             70.51%

Insurance/Risk Mgmt 113                        ‐                    ‐                 154                       ‐                     0.00%

Contract Services 45,520                  17,921              39.37% 40,985                12,730                31.06%

Utilities ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Other Departmental Expenses 42,877                  15,117              35.26% 43,845                13,324                30.39%

Instructional & Other Materials 232,117                77,439              33.36% 341,093              79,880                23.42%

Maintenance & Repair 25,564                  4,474                17.50% 33,463                1,964                 5.87%

Transfers/Debt 2,484,173             687,010           27.66% 1,155,001           664,709             57.55%

Contingency 14,861                  ‐                    0.00% 2,621                  ‐                     0.00%

Capital Outlay 89,000                  16,025              18.01% 111,859              46,856                41.89%

     Total Expenses  30,725,917          13,404,412      43.63% 28,625,867        12,254,712        42.81%

7

Northeast College

Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used

Southwest College

Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used

Page 14: Fs2013 january

Adjusted Budget 

FY2012

YTD Actuals Thru 

January 31, 2012 % of Budget Used

Adjusted Budget 

FY2013

YTD Actuals Thru 

January 31, 2013 % of Budget Used

EXPENSES

Faculty‐FT  5,677,926             2,536,486        44.67% 4,870,824           2,215,062          45.48%

Faculty‐PT 2,681,672             1,093,609        40.78% 3,780,981           1,458,233          38.57%

Librarian/Counselor‐FT  694,643                297,019           42.76% 514,757              257,416             50.01%

Librarian/Counselor‐PT 79,814                  19,017              23.83% 73,152                23,165                31.67%

Staff‐FT 3,430,477             1,366,992        39.85% 3,838,559           1,547,273          40.31%

Staff‐PT 1,017,526             359,454           35.33% 1,255,559           355,719             28.33%

     Sub‐total Salaries 13,582,059          5,672,576        41.77% 14,333,832        5,856,868          40.86%

Employee Benefits ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Supplies Gen Exp 190,319                79,465              41.75% 222,948              73,423                32.93%

Travel 50,563                  6,583                13.02% 56,101                7,248                 12.92%

Marketing Costs 103,335                30,296              29.32% 76,207                20,376                26.74%

Rental & Leases 177,160                96,359              54.39% 41,484                10,143                24.45%

Insurance/Risk Mgmt ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Contract Services 134,789                81,085              60.16% 163,144              40,909                25.08%

Utilities ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Other Departmental Expenses 147,793                10,336              6.99% 134,897              3,344                 2.48%

Instructional & Other Materials 61,933                  15,294              24.70% 81,429                15,525                19.07%

Maintenance & Repair 15,172                  2,505                16.51% 15,772                1,774                 11.25%

Transfers/Debt ‐                         ‐                    ‐                 ‐                        ‐                     ‐                      

Contingency 32,436                  ‐                    0.00% 40,000                ‐                     0.00%

Capital Outlay 82,501                  30,459              36.92% 247,679              8,263                 3.34%

     Total Expenses  14,578,060          6,024,959        41.33% 15,413,493        6,037,873          39.17%

Adjusted Budget 

FY2012

YTD Actuals Thru 

January 31, 2012 % of Budget Used

Adjusted Budget 

FY2013

YTD Actuals Thru 

January 31, 2013 % of Budget Used

EXPENSES

Faculty‐FT  6,699,090             2,872,662        42.88% 5,929,986           2,642,627          44.56%

Faculty‐PT 1,186,011             395,777           33.37% 1,798,714           600,411             33.38%

Librarian/Counselor‐FT  186,866                77,970              41.73% 84,180                22,356                26.56%

Librarian/Counselor‐PT 29,835                  11,939              40.02% 33,248                11,574                34.81%

Staff‐FT 2,356,886             976,927           41.45% 2,419,520           993,983             41.08%

Staff‐PT 363,638                114,931           31.61% 441,322              107,875             24.44%

     Sub‐total Salaries 10,822,326          4,450,206        41.12% 10,706,970        4,378,825          40.90%

Employee Benefits ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Supplies Gen Exp 324,086                66,377              20.48% 335,507              82,194                24.50%

Travel 78,102                  19,247              24.64% 90,117                20,307                22.53%

Marketing Costs 43,823                  ‐                    0.00% 38,323                1,346                 3.51%

Rental & Leases 488,309                179,612           36.78% 508,719              157,897             31.04%

Insurance/Risk Mgmt ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Contract Services 324,761                174,032           53.59% 348,228              255,228             73.29%

Utilities ‐                         ‐                    ‐                 ‐                        ‐                     0.00%

Other Departmental Expenses 62,983                  28,907              45.90% 115,214              24,403                21.18%

Instructional & Other Materials 345,957                74,172              21.44% 363,773              59,505                16.36%

Maintenance & Repair 60,454                  12,775              21.13% 86,050                3,880                 4.51%

Transfers/Debt ‐                         ‐                    ‐                 ‐                        ‐                     ‐                      

Contingency 50,001                  ‐                    0.00% 42,080                ‐                     0.00%

Capital Outlay 30,205                  ‐                    0.00% 559,924              ‐                     0.00%

     Total Expenses  12,631,007          5,005,328        39.63% 13,194,905        4,983,586          37.77%

Southeast College

Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used

Coleman College

Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used

8

Page 15: Fs2013 january

Adjusted Budget 

FY2012

YTD Actuals Thru 

January 31, 2012 % of Budget Used

Adjusted Budget 

FY2013

YTD Actuals Thru 

January 31, 2013 % of Budget Used

EXPENSES

Faculty‐FT  2,343,939             1,057,064        45.10% 2,368,137           1,051,483          44.40%

Faculty‐PT 3,261,934             1,205,627        36.96% 3,660,277           1,304,490          35.64%

Librarian/Counselor‐FT  67,910                  28,296              41.67% 2,887                  2,886                 99.97%

Librarian/Counselor‐PT ‐                         ‐                    0.00% ‐                        ‐                     0.00%

Staff‐FT 3,719,909             1,524,189        40.97% 3,660,465           1,512,932          41.33%

Staff‐PT 669,758                184,722           27.58% 728,620              231,186             31.73%

     Sub‐total Salaries 10,063,450          3,999,897        39.75% 10,420,386        4,102,977          39.37%

Employee Benefits ‐                         ‐                    ‐                 ‐                        ‐                     0.00%

Supplies Gen Exp 206,098                45,154              21.91% 203,596              87,371                42.91%

Travel 64,430                  16,911              26.25% 89,555                33,141                37.01%

Marketing Costs 206,496                104,619           50.66% 382,284              66,198                17.32%

Rental & Leases 49,890                  8,216                16.47% 38,680                4,537                 11.73%

Insurance/Risk Mgmt ‐                         ‐                    ‐                 ‐                        ‐                     0.00%

Contract Services 85,780                  27,472              32.03% 357,814              22,728                6.35%

Utilities ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Other Departmental Expenses 51,493                  16,372              31.80% 56,936                25,813                45.34%

Instructional & Other Materials 1,116,675             177,177           15.87% 1,077,972           198,631             18.43%

Maintenance & Repair 104,400                35,339              33.85% 158,950              23,934                15.06%

Transfers/Debt ‐                         ‐                    ‐                 ‐                        ‐                     ‐                      

Contingency ‐                         ‐                    ‐                 ‐                        ‐                     ‐                      

Capital Outlay 11,181                  4,971                0.00% 32,259                27,977                86.72%

     Total Expenses  11,959,893          4,436,128        37.09% 12,818,432        4,593,305          35.83%

Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used

9

Division of Extended Learning

Page 16: Fs2013 january

2006-07 2007-08 2008-09 2009-10 2010-11 2011-12Academic 12,077,904 12,739,232 14,345,992 16,652,752 17,802,080 17,354,256

Technical 4,378,250 4,422,336 4,883,890 5,680,164 5,924,078 5,822,072

Continuing Education 2,091,365 1,847,195 1,810,761 1,880,857 1,914,445 1,798,940

Total Fundable Contact Hrs 18,547,519 19,008,763 21,040,643 24,213,773 25,640,603 24,975,268

Source: Certified CBM004 & CBM00C.

10

HOUSTON COMMUNITY COLLEGEAnnual Fundable Contact Hours 

FY 2006-07 thru FY 2011-12

0

5000000

10000000

15000000

20000000

25000000

30000000

2006‐07 2007‐08 2008‐09 2009‐10 2010‐11 2011‐12

Continuing Education Technical Academic

+5.9%+15.1%

+10.7%+2.5%

‐2.6%

Page 17: Fs2013 january

HOUSTON COMMUNITY COLLEGEUnduplicated Headcount Comparison Semester‐To‐Semester (FY 2009‐10 thru FY 2012‐13)

Fall Semester (Unduplicated Enrollment ‐ All Students)

Spring Semester (Unduplicated Enrollment ‐ All Students)*

Summer Semester (Unduplicated Enrollment ‐ All Students)

* As of February 07, 2013.

11

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

45,000

50,000

-62

-52

-42

-32

-22

-12 -2 8 18 28 38 48 58 68

Sum 12

Sum 11

Sum 10

First Class Day

Census Day

Sum 12 Enrollment:‐0.0%  (Sum12 to 11)‐4.1% (Sum12 to 10)

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000-1

10

-100 -90

-80

-70

-60

-50

-40

-30

-20

-10 0 10 20 30 40 50 60 70 80 90 100

110

120

130

Fall 12

Fall 11

Fall 10

Fall 12 Enrollment:‐6.5%  (Fall12 to 11)‐3.9% (Fall12 to 10)

First Class Day

Census Day

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

-69

-59

-49

-39

-29

-19 -9 1

11 21 31 41

Spr 13

Spr 12

Spr 11

Census Day

First Class Day

Spr 13 Enrollment:‐0.7% (Spr13 to 12)‐2.2% (Spr13 to 11)

Page 18: Fs2013 january

HOUSTON COMMUNITY COLLEGERevenues & Expenditures Comparison Year to Date Thru January 31, 2013

2009 Positions

Revenues Expenditures Rev H/(L) Exp

YTD Actuals Thru January 31, 2013 182,729,640         109,235,151        73,494,489       

YTD Actuals Thru January 31, 2012 192,044,428         110,972,171        81,072,258       

(9,314,788)            (1,737,020)          

12

 ‐

 20,000,000

 40,000,000

 60,000,000

 80,000,000

 100,000,000

 120,000,000

 140,000,000

 160,000,000

 180,000,000

 200,000,000

Revenues Expenditures

Page 19: Fs2013 january

` HOUSTON COMMUNITY COLLEGEMonthly Revenues & Expenditures Comparison Year to Date By Month

Revenues SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 58,227,650  9,431,856  25,352,097  36,128,428 60,245,426

2011‐2012 61,685,752  9,480,515  24,214,599  37,832,575 66,013,487 35,495,964 10,116,378 16,794,724  15,263,177 9,332,949 7,924,181 9,726,145

2009 Positions

Expenditures SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 28,324,834  24,699,442  20,905,041  21,510,456 20,451,195

2011‐2012 37,698,782  23,302,047  20,581,833  17,164,427 19,407,583 18,185,253 18,965,252 39,130,360  18,696,899 18,586,628 21,489,075 18,505,226

13

 ‐ 5,000,000

 10,000,000 15,000,000 20,000,000 25,000,000 30,000,000 35,000,000 40,000,000 45,000,000 50,000,000 55,000,000 60,000,000 65,000,000 70,000,000

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐ 5,000,000

 10,000,000 15,000,000 20,000,000 25,000,000 30,000,000 35,000,000 40,000,000 45,000,000 50,000,000 55,000,000 60,000,000 65,000,000 70,000,000

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 20: Fs2013 january

HOUSTON COMMUNITY COLLEGERevenues Comparison Year to Date Thru January 31, 2013 by Source

2009 Positions

State 

Appropriations Ad Valorem Taxes Tuition, Net Fees

Other Local 

Income* Extended Learning Grant Revenue Total Revenues

YTD Actuals Thru January 31, 2013 30,904,179  60,406,443 33,828,115 52,830,711 740,104 3,799,996 220,092 182,729,640

YTD Actuals Thru January 31, 2012 31,042,116  66,062,158 35,374,189 55,453,535 459,024 3,465,585 187,822 192,044,428

(137,937)  (5,655,715) (1,546,074) (2,622,824) 281,080 334,411 32,270 (9,314,788)

14

 ‐

 10,000,000

 20,000,000

 30,000,000

 40,000,000

 50,000,000

 60,000,000

 70,000,000

StateAppropriations

Ad Valorem Taxes Tuition, Net Fees Other LocalIncome*

Extended Learning Grant Revenue

Page 21: Fs2013 january

HOUSTON COMMUNITY COLLEGEExpense Comparison Year to Date Thru January 31, 2013 by Source

2009 Positions

YTD Actuals Thru Faculty‐FT  Faculty‐PT

Librarian/

Counselor‐FT 

Librarian/

Counselor‐PT Staff‐FT Staff‐PT

Employee 

Benefits

Supplies Gen 

Exp Travel

Marketing 

Costs

Rental & 

Leases

Insurance/

Risk Mgmt

Contract 

Services Utilities

Other 

Departmental 

Expenses

Instructional & 

Other 

Materials

Maintenance & 

Repair

Transfers/

Debt Capital Outlay      Total Expenses 

 January 31, 2013  23,962,808  11,646,435  2,092,105  269,499  26,401,920  2,847,096  7,287,713  1,900,806  255,974  552,205  1,135,365  6,518,335  7,534,508  3,147,974  760,955  2,727,660  174,522  6,151,581  3,867,690  109,235,151 

 January 31, 2012  23,726,804  11,810,609  2,659,527  211,685  25,647,843  2,952,524  5,696,463  1,665,423  230,854  503,627  2,854,485  6,154,010  6,408,406  2,806,326  638,486  2,353,727  243,203  14,068,061  340,107  110,972,171 

236,004  (164,175)  (567,422)  57,814  754,076  (105,428)  1,591,250  235,383  25,120  48,578  (1,719,120)  364,325  1,126,103  341,648  122,469  373,934  (68,681)  (7,916,480)  3,527,583  (1,737,020) 

15

 ‐

 1,000,000

 2,000,000

 3,000,000

 4,000,000

 5,000,000

 6,000,000

 7,000,000

 8,000,000

 9,000,000

 10,000,000

 11,000,000

 12,000,000

 13,000,000

 14,000,000

 15,000,000

 16,000,000

 17,000,000

 18,000,000

 19,000,000

 20,000,000

 21,000,000

 22,000,000

 23,000,000

 24,000,000

 25,000,000

 26,000,000

 27,000,000

 28,000,000

 29,000,000

 30,000,000

Page 22: Fs2013 january

TOTAL 

Unexpended Plant Funds

Total Unexpended Plant Fund Balances per Books (860,671)$           

  Spending/Encumbrances/Reserve for Future Use

‐ Encumbrances/PO Issued General Unexpended FY13 860,671               

Total  Plant Fund PO 860,671$             

     Anticipated Unexpended Plant Shortfall ‐$                         

HOUSTON COMMUNITY COLLEGEUnexpended Plant Fund Excluding 2004 CIP

Cash Position to January 31, 2013

16

Page 23: Fs2013 january

Description of Use

Total Budget to 

Date

Total 

Expenditures      

To Date

Encumbrances To 

Date Unexpended

DEFERRED MAINTENANCE FY05

System Administration 604,863$                604,863$                ‐$                              ‐$                             

Subtotal 604,863$               604,863$               ‐$                              ‐$                           

DEFERRED MAINTENANCE  FY06

System Administration 649,625$                649,624$                ‐$                              ‐$                             

Northwest College 412,743                412,743                ‐                               ‐                            

Coleman College 190,738                190,736                ‐                               ‐                            

Subtotal 1,253,106$            1,253,103$            ‐$                              ‐$                           

DEFERRED MAINTENANCE  FY07

System Administration 775,610$                775,610$                ‐$                              ‐$                             

Central College 373,917                373,917                ‐                               ‐                            

Northwest College 599,383                599,383                ‐                               ‐                            

Northeast College 1,059,733             1,059,733             ‐                               ‐                            

Southwest College 74,607                  74,607                  ‐                               ‐                            

Southeast College 38,742                  38,742                  ‐                               ‐                            

Coleman College 9,900                    9,900                    ‐                               ‐                            

Subtotal 2,931,893$            2,931,892$            ‐$                              ‐$                           

DEFERRED MAINTENANCE  FY08

System Administration 10,195$                  10,195$                  ‐$                              ‐$                             

Central College 478,637                478,637                ‐                               ‐                            

Northwest College 1,217,755             1,217,755             ‐                               ‐                            

Northeast College 494,886                494,886                ‐                               ‐                            

Southwest College 42,063                  42,063                  ‐                               ‐                            

Coleman College 73,813                  73,813                  ‐                               ‐                            

Subtotal 2,317,348$            2,317,349$            ‐$                              ‐$                           

OTHER GENERAL PROJECTS

Minor Construction 657,807$               657,807$               ‐$                              ‐$                           

System 11,649,808           11,013,081           636,727                 ‐                            

Central College 3,112,802             2,978,874             133,928                 ‐                            

Northwest College 4,060,039             4,047,984             12,055                   ‐                            

Northeast College 626,331                622,548                3,783                     ‐                            

Southwest College 1,124,363             1,059,209             65,154                   ‐                            

Southeast College 1,995,204             1,989,030             6,174 ‐                            

Coleman College 1,341,159             1,341,159             ‐                            

Subtotal 24,567,513$         23,709,692$         857,821$                ‐$                           

SURPLUS PROPERTY

Palmetto Property ‐ Purchase 495,154$               495,154$               ‐$                              ‐$                           

Dixie Property‐ Refund 20,000                  20,000                  ‐                               ‐                            

 288 Property‐ Purchase 1,142,402             1,139,552             2,850                     ‐                            

Warehouse Property 12,966,619           12,966,619           ‐                               ‐                            

Subtotal 14,624,175$         14,621,325$         2,850$                    ‐$                           

Total Anticipated Uses 46,298,898$          45,438,224$          860,671$                ‐$                             

UNEXPENDED PLANT FUND PROJECTSas of January 31, 2013

17

HOUSTON COMMUNITY COLLEGE

Page 24: Fs2013 january

 

Total Budget 

to Date

Total 

Expenditures   

To Date

Encumbrances 

To Date

% of 

Expen‐ 

ditures Unexpended

% of 

Total 

BudgetSources:

Central College 2001A Bond 25,318,535$      

2003 Limited Tax Bond and Premium 150,748,497      

Actural Interest Earned 2003 Limited Tax Bonds 20,868,074         

2005 Limited Tax and Building Bond 1,875,000           

2003/2005 LTD Bond Issuance Cost (2,068,522)          

2006 Jr Lien Bond Std Revenue Bond 30,000,000         

Bond Issuance Cost (913,149)             

Actual Interest Earned 2006 Jr Lien Bonds 2,608,533           

Transferred to Fund 7305/Hayes Road (3,169,049)          

2008 Maintenance Tax Notes 56,912,320         

2008 MTN Bond Issuance Cost (1,056,912)          

Actual Interest Earned 2008 MTN 1,654,029           

2008 Sr. Lien Bond             1,714,953 

Transferred to Residual CIP Funds         (20,712,314)

Total Available with Reclassification 263,779,995$    

Uses:

Construction 119,646,470$     119,628,602$     17,868$                100% ‐$                          0%

CPMS PGAL  11,121,809          11,121,809          ‐                             100% ‐                             0%

Facility Planning 1,677,989            1,677,989            ‐                             100% ‐                             0%

Architect Fees and Engineering 7,604,912            7,505,762            99,149                  100% ‐                             0%

Other Costs including Bldg/Land Purchase 2,273,077            2,258,218            14,859                  100% ‐                             0%

Inspectors 890,000               890,000               ‐                             100% ‐                             0%

Design Standard 103,370               103,370               ‐                             100% ‐                             0%

Site Improvement and Infrastructure Development 52,571,865          51,712,101          859,764                100% ‐                             0%

IT Infrastructure Master Plan 29,727,117          29,074,477          652,640                100% ‐                             0%

Furniture and Fixtures 14,351,860          13,908,378          443,482                100% 0                            0%

Small Business 567,383               567,383               ‐                             100% ‐                             0%

Administrative Services 3,390,213            3,260,901            129,312                100% (0)                           0%

Material Testing 574,120               537,606               36,513                  100% ‐                             0%

Contingency for Construction 6,616                    0% 6,616                    100%

Surveying 471,813               460,552               11,260                  100% ‐                             0%

Design and Geotech 110,911               110,111               800                        100% ‐                             0%

Signage 70,000                  70,000                  100% ‐                             0%

Blue Light Security 126,000               115,200               10,800                  100% ‐                             0%

PGAL Website Development 181,208               181,208               ‐                             100% ‐                             0%

System Architect Furniture Consultant 11,367                  11,367                  100% ‐                             0%

Northline Demolition‐Pizza Hut 226,246               226,246               100% ‐                             0%

Police Cars 342,223               341,613               610                        100% ‐                             0%

Bering St. Property 50,687                  50,687                  100% ‐                             0%

General Repairs & Maintenance 2,079,239            2,079,239            100% ‐                             0%

Land Purchase 1,919,729            1,919,729            100% ‐                             0%

Amatuer Sports Complex ‐ Willie Gay Hall 2,235,647            2,221,947            13,700                  100% ‐                             0%

Total Construction Cost 252,331,872$     250,034,497$     2,290,760$          100% 6,616$                  0%

Note: Expenditures Not In Construction Schedule

Deferred Maintenance 5,000,000$          5,000,000$          ‐$                           100% ‐$                          0%

IT Development 6,448,123            6,448,122            ‐                             100% ‐                             0%

263,779,995$     261,482,619$     2,290,761$          100% 6,616$                  0%

Anticipated Budget Shortfall/Surplus (0)                          

*Footnote on next page

HOUSTON COMMUNITY COLLEGE2004 CIP Projectsas of January 31, 2013

18

Page 25: Fs2013 january

2003/2005 Limited Tax Bonds 2003 2005 TotalBond counsel fees 150,000 57,000 207,000Underwriters' discount 814,813 57,000 871,813Insurance premium 558,764 558,764Financial advisory fee 205,391 68,081 273,472Rating agencies fees 114,350 16,000 130,350Printing costs 10,386 4,506 14,892CPA consent letter fee 1,500 1,500 3,000Verification fees 3,500 3,500Paying agent fee 300 5,432 5,732

1,855,504 213,018 2,068,522

2006 Jr Lien Revenue BondsBond counsel fees 79,500Underwriters' discount 509,509Insurance premium 117,904Financial advisory fee 137,910Rating agencies fees 54,850Printing costs 3,502CPA consent letter fee 1,500Verification fees 3,500Paying agent fee 4,974

913,149

2008 Maintenance Tax NotesBond counsel fees 63,500Underwriters' discount 342,526Insurance premium 498,600Financial advisory fee 95,105Rating agencies fees 47,100Printing costs 9,617Paying agent fee 463

1,056,912

19

HOUSTON COMMUNITY COLLEGE2004 CIP Projects Footnotes

as of January 31, 2013

Page 26: Fs2013 january

Total Budget to 

Date

Total 

Expenditures   

To Date

Encumbrances 

To Date Unexpended

Central ‐ San Jacinto:*

Construction Cost 1,241,868$         1,241,868$         ‐$                         

CPMS PGAL 111,440              111,440              ‐                         ‐                          

Facilities Space Programming 393,715              393,715              ‐                         ‐                          

Material Testing  ‐                           ‐                           ‐                         ‐                          

IT Infrastructure Capital Projects 10,000                5,687                  4,314                 ‐                          

Design Standards 3,904                  3,904                  ‐                          

  Total Central ‐ San Jacinto 1,785,007$          1,780,694$          4,314$               ‐$                          

Central ‐ Learning Hub/Science Bldg:*

Construction Cost 21,504,724$       21,499,805$       4,919$               -$ CPMS PGAL 1,967,801           1,967,801           ‐                          

Facilities Space Programming 148,096              148,096              ‐                         ‐                          

Architect and Engineering 1,242,506           1,242,506           ‐                          

Furniture, Fixtures & Equipment 2,049,869           2,019,706           30,163              ‐                          

Inspectors 187,000              187,000              ‐                          

Project Software 7,614                  7,614                  ‐                          

Design Standards 15,086                15,086                ‐                          

Site Infrastructure Improvements 5,688,424           5,103,620           584,804            ‐                          

IT Infrastructure Master Plan 2,751,121           2,726,528           24,593              ‐                          

Design Geotech 10,150                10,150                ‐                          

Material Testing  32,994                32,356                638                    ‐                          

Surveying  69,453                64,118                5,335                 ‐                          

Blue Light Security 18,000                16,200                1,800                 ‐                          

  Total Central ‐ Learning Hub/Science 

Bldg:*

35,692,838$        35,040,586$        652,252$           ‐$                          

NEC ‐ Learning Hub:*

Construction Cost 14,001,119$       14,001,119$       ‐                          

CPMS PGAL 1,187,440           1,187,440           ‐                          

Facilities Space Programming 145,889              145,889              ‐                          

Architect and Engineering 723,556              723,556              ‐                          

Furniture, Fixtures & Equipment 1,660,682           1,651,908           8,774                 ‐                          

Other Costs including Bldg/Land Purchase ‐                           ‐                          

Inspectors 205,000              205,000              ‐                         ‐                          

Project Software ‐                           ‐                          

Design Standards 9,015                  9,015                  ‐                          

Site Infrastructure Improvements 92,682                92,682                ‐                         ‐                          

IT Infrastructure Master Plan 1,250,254           1,249,836           418                    ‐                          

Design Geotech ‐                           ‐                          

Material Testing  131,870              123,607              8,263                 ‐                          

Surveying  71,081                71,081                ‐                          

  Total NEC ‐ Learning Hub 19,478,588$        19,461,133$        17,455$             ‐$                          

HOUSTON COMMUNITY COLLEGE2004 CIP Projectsas of January 31, 2013

20

 *Note 1  Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception. 

Page 27: Fs2013 january

Total Budget to 

Date

Total 

Expenditures   

To Date

Encumbrances 

To Date Unexpended

HOUSTON COMMUNITY COLLEGE2004 CIP Projectsas of January 31, 2013

NEC ‐ Science Engineering & Technology:*

Construction Cost 11,627,061$       11,626,428$       633$                   ‐$                         

CPMS PGAL 857,203              857,203              ‐                         ‐                          

Facilities Space Programming 52,058                52,058                ‐                          

Architect and Engineering 635,906              635,906              ‐                          

Furniture, Fixtures & Equipment 644,019              607,016              37,003              ‐                          

Other Costs including Bldg/Land Purchase 84,400                73,800                10,600              ‐                          

Inspectors ‐                           ‐                          

Project Software ‐                           ‐                          

Design Standards 6,818                  6,818                  ‐                          

Site Infrastructure Improvements 15,423,461        15,357,930        65,531              ‐                          

IT Infrastructure Master Plan 1,173,585           1,160,824           12,761              ‐                          

Design Geotech 28,500                28,500                ‐                          

Material Testing  95,465                95,465                ‐                         ‐                          

Surveying  15,960                10,035                5,925                 ‐                          

Blue Light Security 18,000                16,200                1,800                 ‐                          

  Total NEC ‐ Science Eng & Technology 30,662,436$        30,528,183$        134,253$           ‐$                          

NEC ‐ Pinemont:

CPMS PGAL 6,269$                 6,269$                 ‐$                        ‐$                         

Facilities Space Programming 71,292                71,292                ‐                         ‐                          

Other Costs including Bldg/Land Purchase

102,156              102,156             

‐                          ‐                            

Surveying  22,483                22,483                ‐                         ‐                          

  Total NEC ‐ Pinemont 202,200$              202,200$              ‐$                        ‐$                          

SEC - Felix Fraga (Drennan):*Construction Cost 12,419,858$       12,417,829$       2,029$               ‐$                         

CPMS PGAL 1,216,969           1,216,969           ‐                          

Facilities Space Programming 227,023              227,023              ‐                          

Architect and Engineering 850,383              835,511              14,872              ‐                          

Furniture, Fixtures & Equipment 1,007,615           977,469              30,146              ‐                          

Other Costs including Bldg/Land Purchase 62,466 62,466                ‐                          

Inspectors - ‐                          

Project Software - ‐                          

Design Standards 6,873                  6,873                  ‐                          

Site Infrastructure Improvements 5,992,274           5,959,525           32,749              ‐                          

IT Infrastructure Master Plan 1,279,923           1,268,405           11,518              ‐                          

Design Geotech 19,000                18,200                800                    ‐                          

Material Testing  150,272              137,662              12,610              ‐                          

Surveying  27,674                27,674                ‐                          

HUB/Small Business Program ‐                           ‐                           ‐                         ‐                          

HUB/Small Business Program ‐                           ‐                          

Bering St Property 50,687                50,687                ‐                          

Signage ‐                           ‐                          

Blue Light Security 18,000                16,200                1,800                 ‐                           Total SEC - Felix Fraga (Drennan):* 23,329,017$        23,222,493$        106,524$           ‐$                          

21

 *Note 1  Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception. 

Page 28: Fs2013 january

Total Budget to 

Date

Total 

Expenditures   

To Date

Encumbrances 

To Date Unexpended

HOUSTON COMMUNITY COLLEGE2004 CIP Projectsas of January 31, 2013

SEC ‐ Felix Morales:*

Construction Cost 3,653,330$         3,653,330$         ‐$                         

CPMS PGAL 667,905              667,905              ‐                          

Facilities Space Programming 62,181                62,181                ‐                          

Architect and Engineering 367,853              351,968              15,885              ‐                          

Furniture, Fixtures & Equipment 929,072              898,276              30,796              ‐                          

Inspectors ‐                           ‐                          

Project Software ‐                           ‐                          

Design Standards 3,117                  3,117                  ‐                          

Site Infrastructure Improvements 98,015                96,070                1,945                 ‐                          

IT Infrastructure Master Plan 1,164,463           1,008,321           156,142            ‐                          

Design Geotech ‐                           ‐                          

Material Testing  10,009                5,808                  4,201                 ‐                          

Surveying  1,225                  1,225                  ‐                          

  Total SEC ‐ Felix Morales 6,957,169$          6,748,200$          208,969$           ‐$                          

SEC ‐ Learning Hub:*

Construction Cost 16,555,351$       16,550,039$       5,312$               ‐$                         

CPMS PGAL 1,744,048           1,744,048           ‐                          

Facilities Space Programming 126,588              126,588              ‐                          

Architect and Engineering 875,415              875,415              ‐                          

Furniture, Fixtures & Equipment 2,006,195           1,838,307           167,888            ‐                          

 Other Costs including Bldg/Land Purchase  32,480                  28,221                  4,259                  ‐                            

Inspectors 258,000              258,000              ‐                         ‐                          

Project Software ‐                           ‐                          

Design Standards 9,367                  9,367                  ‐                          

Site Infrastructure Improvements 12,138,518        12,011,404        127,114            ‐                          

IT Infrastructure Master Plan 2,177,705           2,157,010           20,695              ‐                          

Administrative Services ‐                           ‐                          

Design Geotech 9,525                  9,525                  ‐                         ‐                          

Material Testing  122,370              115,883              6,487                 ‐                          

Surveying  144,094              144,094              ‐                          

Blue Light Security 18,000                18,000                - ‐                          

  Total SEC ‐ Learning Hub 36,217,654$        35,885,901$        331,755$           ‐$                          

22

 *Note 1  Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception. 

Page 29: Fs2013 january

Total Budget to 

Date

Total 

Expenditures   

To Date

Encumbrances 

To Date Unexpended

HOUSTON COMMUNITY COLLEGE2004 CIP Projectsas of January 31, 2013

SW ‐ Missouri City:*

Construction Cost 8,891,630$         8,891,630$         ‐$                         

CPMS PGAL 601,635              601,635              ‐                         ‐                          

Facilities Space Programming 194,111              194,111              ‐                          

Architect and Engineering 989,044              958,905              30,139              ‐                          

Furniture, Fixtures & Equipment 1,053,411           1,011,146           42,265              ‐                          

 Library & Bookstore  1,991,575           1,991,575           ‐                          

Inspectors ‐                           ‐                          

Project Software ‐                           ‐                          

Design Standards 4,999                  4,999                  ‐                          

Site Infrastructure Improvements 5,061,234           5,061,234           ‐                         ‐                          

IT Infrastructure Capital Projects 2,259,481           2,246,083           13,398              ‐                          

Design Geotech ‐                           ‐                          

Material Testing  ‐                           ‐                          

Surveying  48,311                48,311                ‐                          

Blue Light Security 18,000                16,200                1,800                 ‐                          

  Total SW ‐ Missouri City 21,113,430$        21,025,828$        87,602$             ‐$                          

SW ‐ West Loop Phase I:*

Construction Cost 9,033,809$         9,031,922$         1,887$               ‐$                         

CPMS PGAL 1,033,865           1,033,865           ‐                          

Facilities Space Programming 76,260                76,260                ‐                          

Architect and Engineering 718,694              718,694              ‐                          

Furniture, Fixtures & Equipment 2,166,396           2,154,214           12,182              ‐                          

Design Standards 8,170                  8,170                  ‐                          

IT Infrastructure Capital Projects 2,893,767           2,864,190           29,577              ‐                          

Design Geotech 22,116                22,116                ‐                          

Material Testing  21,141                21,140                1                        ‐                          

Surveying  14,995                14,995                ‐                         ‐                          

Exterior Signage 70,000                70,000                ‐                         ‐                          

Blue Light Security 18,000                16,200                1,800                 ‐                          

  Total SW ‐ West Loop Phase I 16,077,212$        16,031,765$        45,447$             ‐$                          

23

 *Note 1  Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception. 

Page 30: Fs2013 january

Total Budget to 

Date

Total 

Expenditures   

To Date

Encumbrances 

To Date Unexpended

HOUSTON COMMUNITY COLLEGE2004 CIP Projectsas of January 31, 2013

SW ‐ Learning Hub ‐ Stafford:*

Construction Cost 20,717,717$       20,714,629$       3,088$               ‐$                         

CPMS PGAL 1,727,234           1,727,234           ‐                          

Facilities Space Programming 180,778              180,778              ‐                          

Architect and Engineering 1,193,942           1,155,688           38,254              ‐                          

Furniture, Fixtures & Equipment 2,834,604           2,750,339           84,265              ‐                          

Inspectors 240,000              240,000              ‐                          

Project Software ‐                           ‐                          

Design Standards 15,845                15,845                ‐                          

Site Infrastructure Improvements 8,077,256           8,029,635           47,621              ‐                          

IT Infrastructure Capital Projects 2,610,585           2,535,820           74,765              ‐                          

Design Geotech 21,620                21,620                ‐                          

Material Testing  ‐                           ‐                          

Surveying  56,536                56,536                ‐                          

Blue Light Security 18,000                16,200                1,800                 ‐                          

  Total SW ‐ Learning Hub ‐ Stafford 37,694,118$        37,444,325$        249,793$           ‐$                          

System ‐ Network:

IT Infrastructure Capital Projects 12,162,330$       11,853,556$       308,774$           ‐                          

Administrative Services 3,390,213           3,260,901           129,312            ‐                          

PGAL Website Development 181,209              181,208              1                        ‐                          

HUB/Small Business Program 567,383              567,383              ‐                         ‐                          

 System Architect Furniture Consultant 

11,367                11,367               

‐                            

 Ft. Bend Library Inflation Cost Increase 

‐                          

‐                            

Northline Demolition‐Pizza Hut 226,246              226,246              ‐                          

Police Cars 342,223              341,613              610                    ‐                          

General Repairs & Maintenance 2,079,239           2,079,239           ‐                          

Land Purchase 1,919,729           1,919,729           ‐                          

Amatuer Sports Complex ‐ Willie Gay Hall 2,235,647           2,221,947           13,700              ‐                          

  Total ‐ System ‐ Network 23,115,586$        22,663,189$        452,395$           ‐$                          

Construction Contingency 6,616$                 ‐$                           ‐$                        6,616                   

Subtotal Above 252,331,871$      250,034,496$      2,290,759$        6,615$                 

100.00% 99.09% 0.91% 0.00%

EXPENDITURES NOT IN CONSTRUCTION SCHEDULE

Deferred Maintenance 5,000,000$         5,000,000$         ‐$                        ‐$                         

IT Development 6,448,123           6,448,122           ‐                         ‐                          

GRAND TOTAL 263,779,994$      261,482,618$      2,290,759$        6,615$                 

100.00% 99.13% 0.87% 0.00%

24

 *Note 1  Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception. 

Page 31: Fs2013 january

 

Total Budget to 

Date

Total 

Expenditures to 

Date  Encumbrances  Unexpended

Sources:Transferred CIP Funds 20,712,314

Uses:

Central Learning Hub/Science Bldg:

Site Infrastructure Improvements 6,599,554$         160,772$               87,657$                6,351,125$        

NEC ‐ Science Engineering & Technology:

Site Infrastructure Improvements 292,209 55,284 236,925                ‐                         

SEC ‐ Learning Hub:

Site Infrastructure Improvements 1,998,804 327,477                1,671,327             ‐                         

Material Testing 23,368 8,790                    14,578                  ‐                         

System ‐ Network:

IT Infrastructure Capital Projects 7,569,405 7,022,021            511,908                35,476              

Site Infrastructure Improvements 96,600 17,390                  79,210                  ‐                         

 

 Construction Contingency 942,305 ‐                             942,305            

Contingency 3,190,069           ‐                             3,190,069         

Total Construction Cost 20,712,314$       7,591,733$           2,601,606$           10,518,976$     

Anticipated Budget Shortfall/Surplus ‐                          

25

HOUSTON COMMUNITY COLLEGE SYSTEMResidual CIP Funds

as of  1/31/13

Page 32: Fs2013 january

Total Budget 

to Date

Total 

Revenues /  

Expenditures 

To Date

Encumbrances To 

Date Unexpended

Sources of funds:

Proceeds from 

2006 Tax Maintenance Notes 12,000,000$   

Discount (88,756)            

Bond Issuance Cost (256,244)          

Interest Income 835,363           

Funds Available 12,490,363$  

Uses of funds:

Site Infrastructure 341,092$          327,728$          13,364$                 ‐$                     

Project Management 450,479            450,479            ‐                              ‐                       

Construction 8,805,292         8,805,292         ‐                              ‐                       

Design Phase 1,117,820         1,117,820         ‐                              ‐                       

Architecture 17,822              17,822              ‐                       

Material Testing & Inspection 6,399                6,399                ‐                              ‐                       

Land/Demolition 420,541            420,541            ‐                              ‐                       

Survey 9,473                9,473                ‐                              ‐                       

Construction‐Maintenance 1,259,003         1,247,114         11,889                   ‐                       

Contingency 62,441              46,700              15,741            

Grand Total Uses 12,490,363$    12,449,368$    25,253$                 15,741$          

Net Available 0$                    

26

HOUSTON COMMUNITY COLLEGEMaintenance Tax Notes 2006 (Central Utility Plant Project)

as of January 31, 2013

 Note: Budgets are adjusted as contracts are awarded; otherwise, budget is preliminary from inception. 

Page 33: Fs2013 january

Total Budget to 

Date

Total Revenues 

/  Expenditures 

To Date

Encumbrances To 

Date Unexpended

Sources:

2008 Maintenance Tax Notes 39,780,489$     

2008 Maintenance Tax Notes‐Phase 1 Infrastructure 15,078,286      

Transferred to CIP Residual Fund (7170) (17,522,242)     

Interest Earned To date 1,678,530        

Funds Available for Projects 39,015,063$     

Uses:

Site Infrastructure Improvements 5,679,383$        5,056,693$       622,690$              ‐$                       

Architectural/Engineering Fees 165,537            151,654           13,883                  ‐                         

IT Infrastructure Master Plan 19,553,388       19,235,543      317,845                ‐                         

Furniture, Fixtures & Equipment 5,043,248         4,572,572        470,676                ‐                         

Material Testing 33,351               29,035              4,316                    ‐                         

Construction 5,437,915         5,425,796        12,119                  ‐                         

Construction Management  132,478            132,478           ‐                         

Campus Security 243,116            242,415           600                       101                   

Truck Driving School 99,200               99,200              ‐                         

Land 517,306            517,306           ‐                         

Energy  Services 8,860                 8,860                ‐                         

Design GEOTECH 5,189                 5,189                ‐                             ‐                         

Surveying 16,310               16,310              ‐                             ‐                         

Contracted Services 2,079,239         2,079,239        ‐                             ‐                         

Residual Funds for Completion of CIP Projects 543                    543                   

Total  39,015,063$      37,572,290$    1,442,129$           644$                  

Bond Issuance Cost:

Bond counsel fees 63,500$            

Underwriters' discount 342,526           

Insurance premium 498,600           

Financial advisory fee 95,105              

Rating agencies fees 47,100              

Printing costs 9,617                

CPA consent letter fee 463                   

Total 1,056,912$       

HOUSTON COMMUNITY COLLEGE SYSTEM 2008 Maintenance Tax Notes & Senior Lien Bonds

as of January 31, 2013

Fund 7203 

Fund 7203 ‐ Maintenance Tax Notes

27

Page 34: Fs2013 january

Total Budget to 

Date

Total Revenues 

/  Expenditures 

To Date

Encumbrances To 

Date Unexpended

Source:

2008 Senior Lien Bonds:

Southeast Workforce Project 14,300,000$     

  Emergency Preparedness 1,000,000        

Interest Earned To date 470,275           

Funds Available for Projects 15,770,275$     

Uses:

Operation and Maintenance 77,034               77,034              ‐                    

Major Repairs and Renovation 821,560            820,726           834                       ‐                    

South East Work Force Project 3,712,405         3,444,075        268,330                ‐                    

Land  Purchase (Rosalie Property) 2,314,967         2,314,967        ‐                    

Material Engineering and Testing 8,380                 3962 4,418                    ‐                    

Construction of Workforce Building 7,262,398         7,000,777        261,621                ‐                    

Residual Funds for All Projects 1,573,531         1,573,531        

15,770,275$      13,661,541$    535,203$              1,573,531$       

Bond Issuance Cost:

Bond counsel fees 123,267$          

Underwriters' discount 336,128           

Insurance premium 620,827           

Financial advisory fee 100,981           

Rating agencies fees 51,750              

Printing costs 5,880                

Paying agent fee 460                   

Verification fee 5,000                

Escrow agent fee 4,600                

1,248,893$       

28

Fund 7308 ‐ Senior Lien Bonds

HOUSTON COMMUNITY COLLEGE SYSTEM 2008 Maintenance Tax Notes & Senior Lien Bonds

Fund 7308as of January 31, 2013

Page 35: Fs2013 january

Total Budget to 

Date

Total Revenues 

/  Expenditures 

To Date

Encumbrances To 

Date Unexpended

Central 

San Jacinto Memorial 21,391,231$      8,664,508        4,312,753            8,413,970$       

J.B. Whitely Bldg.  4,540,000         926,079           1,195,622            2,418,299        

Theater One 1,699,500         197,271           19,457                  1,482,772        

Staff Instructional Services 1,005,286         185,224           8,406                    811,656           

Curriculum Innovation Center 190,000            ‐                        142,264                47,736              

Fine Arts Parking Structure 190,000            171,082           5,100                    13,818              

Crawford Annex 68,200               18,138              ‐                             50,062              

Learning Hub/Science Bldg. 122,214            15,953              106,261                ‐                         

Planned Parenthood Renovation 1,608,769         1,605,024        3,746                    ‐                         

  Total Central  30,815,200$      11,783,278$     5,793,609$           13,238,313$     

Northeast 

Automotive Tech. Training Ctr. 4,000,000$        630,213$          198,676$              3,171,111$       

Pinemont  66,558               39,237              ‐                             27,321              

Codwell Hall  438,000            204,117           227,057                6,826                

Codwell Hall Shower (Temp) 150,000            ‐                        150,000           

Roland Smith Truck Driving Ctr.  140,000            54,406              ‐                             85,594              

Northline 120,000            11,636              2,789                    105,575           

Public Safety Institute 115,000            11,668              89,483                  13,849              

NE Science and Tech. Bldg 49,500               ‐                        49,500              

NE Learning Hub 47,500               6,309                ‐                             41,191              

  Total Northeast 5,126,558$        957,585$          518,006$              3,650,967$       

Southeast 

Angela Morales 599,000$           413,199$          139,922$              45,879$            

Office City 38,500               ‐                        ‐                             38,500              

  Total Southeast 637,500$           413,199$          139,922$              84,379$            

Southwest

Stafford Campus (7 Bldgs) 4,245,006$        4,017,611$       227,289$              105$                  

Scarcella Center 924,756            377,919           61,080                  485,757           

Alief 138,680            132,664           ‐                             6,016                

Academic Ctr Sienna Plantation 93,500               89,294              4,102                    104                   

Stafford Learning Hub 54,000               ‐                        54,000              

Applied Technology Center 50,000               1,715                ‐                             48,285              

Greenbriar Annex 30,000               22,033              414                       7,553                

  Total Southwest 5,535,942$        4,641,237$       292,885$              601,820$          

System

System Building  2,368,630$        1,784,588$       584,041$              ‐$                       

Teaching Enhancement Renovations 2,737,135         1,074,963        186,325                1,475,847        

Surface Parking & Civil Infrastructure 2,400,000         1,585,705        31,308                  782,987           

Parking Structure 2,394,235         2,286,034        108,201$              ‐                         

  Total System 9,900,000$        6,731,289$       909,875$              2,258,834$       

Grand Total 52,015,200$      24,526,589$    7,654,296$           19,834,313$     

HOUSTON COMMUNITY COLLEGE SYSTEM2010 Maintenance Tax Notes

as of January 31, 2013

29

Page 36: Fs2013 january

 

Total Budget to 

Date

Total 

Revenues /  

Expenditures 

To Date

 Encumbrances 

To Date  Unexpended

Sources:

2011 Maintenance Tax Notes 40,000,000

Uses:

San Jacinto College Renovation

Constuction 35,000,000$       4,118,976$     30,881,024$      ‐$                       

Architect & Engineering ‐                       ‐                         

Site Infrastructure Improvements ‐                       ‐                         

Inspection ‐                         

IT Infrastructure ‐                       ‐                         

Furniture ‐                       ‐                         

Contingency 5,000,000           5,000,000          

40,000,000$       4,118,976      30,881,024       5,000,000          

30

HOUSTON COMMUNITY COLLEGE SYSTEM2011 Maintenance Tax Notes: Fund 7207

As of  January 31, 2013

Page 37: Fs2013 january

 

Total Budget to 

Date

Total 

Revenues /  

Expenditures 

To Date

 Encumbrances 

To Date  Unexpended

Sources:

2011A Maintenance Tax Notes 21,000,000

Uses:

Alief ‐ Hayes Road 5,246,372$         5,246,372$        

Architect & Engineering 1,208,820           716,254          492,566             ‐                         

Constuction 7,413,661           108,364          7,305,297          ‐                         

Site Infrastructure Improvements 6,402                   6,402              ‐                            ‐                         

IT Infrastructure ‐                       ‐                            ‐                         

Inspection 122,800              ‐                       122,800             ‐                         

Furniture 1,945                   ‐                       1,945                   ‐                         

14,000,000$       831,020          7,922,608          5,246,372          

SW ‐ West Loop 3,598,743 3,598,743          

Architect & Engineering 13,000                 ‐                       13,000               ‐                         

Constuction 388,257              332,368          55,889               ‐                         

Site Infrastructure Improvements ‐                       ‐                            ‐                         

IT Infrastructure

Furniture

4,000,000 332,368          68,889               3,598,743          

SE ‐ Workforce Bldg

Architect & Engineering 96,720                 18,944            77,776               ‐                         

Constuction ‐                       ‐                            ‐                         

Site Infrastructure Improvements ‐                       ‐                            ‐                         

IT Infrastructure ‐                       ‐                            ‐                         

Furniture ‐                       ‐                            ‐                         

96,720 18,944            77,776               ‐                         

3100 Main System Bldg

Architect & Engineering 10,000 ‐                       10,000               ‐                         

Constuction 361,491 ‐                       361,491             ‐                         

Site Infrastructure Improvements ‐                       ‐                            ‐                         

IT Infrastructure ‐                       ‐                            ‐                         

Furniture 79,483 ‐                       79,483               ‐                         

Painting 11,597 ‐                       11,597               ‐                         

462,571 ‐                       462,571             ‐                         

Contingency 2,440,709 2,440,709          

Total Construction Cost 21,000,000$       1,182,332$     8,531,844$        11,285,824$      

31

HOUSTON COMMUNITY COLLEGE SYSTEM2011A Maintenance Tax Notes: Fund 7208

As of  January 31, 2013

Page 38: Fs2013 january

Description Date Issued

 Original Bond 

Amount

Principal 

Payments

Principal 

Balance

Principal & 

Interest FY12

Final Due 

Date Call Dates

Foot‐

note

2005 Senior Lien Revenue/Refunding Bonds 04/15/05 51,285,000 (13,540,000) 37,745,000 6,676,363 04/15/20 04/15/15 (A)

2006 Junior Lien Revenue/Refunding Bonds 11/01/06 72,815,000 (15,360,000) 57,455,000 6,274,230 04/15/30 04/15/16 (A)  (B)

2008 Senior Lien Revenue Bonds 05/14/08 54,540,000 (6,115,000) 48,425,000 4,075,100 04/15/30 04/15/18 (A)

2010 Senior Lien Revenue Bonds 07/29/10 27,250,000 (875,000)           26,375,000 2,124,275 04/15/31 04/15/20 (A) 

2011 Junior Lien Revenue Refunding Bonds 03/10/11 33,940,000 (2,350,000)       31,590,000 4,150,431 04/15/25 04/15/21 (A)

2011T Senior Lien Revenue Bond 11/15/11 16,000,000 16,000,000 388,800           04/15/21 11/15/13 (A)

2003 Limited Tax Bonds 12/01/03 144,155,000 (142,960,000) 1,195,000 782,175 02/15/14 (C)

2011 Limited Tax Refunding Bonds 10/20/11 109,490,000 109,490,000 5,308,300 02/15/28 02/15/21 (C)

2006 Maintenance Tax Notes 02/01/06 12,000,000 (2,660,000) 9,340,000 890,550 02/15/26 02/15/16 (C)

2008 Maintenance Tax Notes 03/01/08 54,975,000 (7,735,000) 47,240,000 4,171,426 02/15/28 02/15/18 (C)

2009 Maintenance Tax Notes 09/01/09 13,830,000 (1,445,000) 12,385,000 1,242,569 02/15/25 02/15/19 (C)

2010 Maintenance Tax Notes 07/29/10 47,645,000 (1,840,000)       45,805,000 3,998,400        02/15/29 02/15/20 (C)

2011 Maintenance Tax Notes 03/10/11 41,560,000 (1,295,000)       40,265,000 3,293,775 02/15/31 02/15/21 (C) 

2011A Maintenance Tax Notes 10/12/11 19,590,000 19,590,000 1,583,875 02/15/31 02/15/21 (C) 

PFC Series 2005A Lease Revenue Bonds 06/01/05 11,605,000 (2,485,000) 9,120,000 837,663 04/15/28 04/15/15 (A)

PFC Series 2005C Lease Revenue Bonds 12/01/05 19,155,000 (3,155,000) 16,000,000 1,313,456 04/15/30 04/15/15 (A)

PFC Series 2006 Lease Revenue Bonds 10/01/06 36,950,000 (5,135,000) 31,815,000 2,484,773 04/15/31 04/15/16 (A)  (D)

PFC Series 2007 Lease Revenue Bonds 02/01/07 58,885,000 (6,285,000) 52,600,000 4,321,500 04/15/31 04/15/17 (A) 825,670,000 (213,235,000) 612,435,000 53,917,660

Note: This schedule represents all bonds and maintenance tax notes with outstanding principal balances as of 1/31/13; 

             previously retired debt issues are not shown (i.e. 1997, 1998, 1999, 2001, 2001A, 2003 LTD, 2005 LTD)

Footnotes:

(A)  Funded from current operations, Fund 1110

(B)  Approximately $3.4 MM annually through 8/31/17 to be funded from student technology fees, Fund 8110; remainder from 

       current operations

(C)  Funded from real estate taxes, Fund 8300

(D) $1,329,772 of interest expense to be funded from real estate taxes

Schedule of Bonds and Maintenance Tax Notes

For the Month Ended January 31, 2013

Houston Community College

32

Page 39: Fs2013 january

3101‐3100 Main 

Leasing

3102‐Conference 

Training Center 3103‐HCC‐TV 

Auxiliary

3105‐HCCS ‐ PFC 

Leasing 3110‐Auxiliary

3111‐ Auxiliary 

Student Services

3201‐Cafe Club 

NEO 3100 Main

3202‐Fitness 

Center‐Central

3204‐Heinen 

Theater

3207‐

International 

Initiatives

3208‐Saudi 

Consulting 

Services 3209‐Qatar Subtotal

Fund Balance 8/31/12 16,575,935$       (744,125)$         36,165$          898,968$           (6,225,160)$       (724,173)$           (1,362,924)$       (76,298)$           33,917               (82,495)               203,712             807,349        9,340,870        

FY2013 Revenue  2,235,416               66,850                   11,515                   1,289,270               161                          207,308                   6,642                     9,375                     23,333                     3,044,434        6,894,303            

 Salaries  106,605                   52                           201,860                   89,283                     107,289                   597                         480                         4,000                       2,424,191        2,934,358            

 Benefits  28,679                     4                             51,094                     18,541                     24,463                     3                             389,542           512,326               

 Supplies Gen Exp  13,813                     6,306                     498,914                   4,389                       3,281                     1,052                     4,390                       3,092                535,237               

 Travel  25,244                     3,084                       10,393             38,721                 

 Marketing Costs  ‐                            

 Rental & Leases  1,337                     19,065                     640                          21,042                 

 Contract Services  448,298                   460,992                   1,805                     84,855             995,949               

 Utilities  163,653                   163,653               

 Departmental Expenses  750                          2,377,394               270                         6,647                2,385,061            

 Instructional & Other Materials  600                          4,033                       2,454                       1,291                     2,817                       11,196                 

 Maintenance & Repair  55                             83,297                     660                         84,013                 

 Indirect Cost Expenditures  ‐                            

 Exemptions and Waivers  738                          150                          888                       

 Capital Outlay  345,978                   345,978               

 Transfer  ‐                                ‐                            

Net Income /(Loss) FY13 1,127,039           59,151              ‐                       11,515               (2,350,119)          (107,663)             (15,225)               2,761                 3,817                 8,892                  ‐                         125,714        (1,134,119)      

17,702,974         (684,974)           36,165            910,483             (8,575,279)          (831,836)             (1,378,149)          (73,537)             37,733               (73,603)               203,712             933,063        8,206,752        

*Discretionary Funds

33

HOUSTON COMMUNITY COLLEGE SYSTEMAuxiliary Budget By Fund

as of January 31, 2013

Auxiliary Funds*

Net Fund Balance 

Page 40: Fs2013 january

HOUSTON COMMUNITY COLLEGE SYSTEMAuxiliary Budget By Fund

as of January 31, 2013

3110‐ Student 

Vending 

Commission

3111‐Auxiliary 

Student 

Activities

3112‐Auxiliary 

Student Athletic 

Fee Subtotal Grand Total

Fund Balance 8/31/12 227,335            594,123          1,584,968         2,406,426           11,747,296        

FY2013 Revenue  45,639                   924,512              691,455                 1,661,605               8,555,908          

 Salaries  700                        88,453                   89,153                     89,153               

 Benefits  18,283                   18,283                     18,283               

 Supplies Gen Exp  11,599                   245,973              145,627                 403,200                   403,200             

 Travel  483                        5,214                  20,556                   26,253                     26,253               

 Marketing Costs  ‐                                ‐                          

 Rental & Leases  ‐                                ‐                          

 Contract Services  7,999                  37,164                   45,163                     45,163               

 Utilities  ‐                                ‐                          

 Departmental 

Expenses 

2,750                     1,500                  8,480                     12,730                     12,730               

 Instructional & 

Other Materials 

‐                                ‐                          

 Maintenance & 

Repair 

‐                                ‐                          

 Indirect Cost 

Expenditures 

‐                                ‐                          

 Exemptions and 

Waivers 

7,827                     5,250                  13,077                     13,077               

 Capital Outlay  ‐                                ‐                          

 Transfer  ‐                                ‐                          

Net Income /(Loss) FY13 22,280              658,575          372,893             1,053,747           (80,372)              

249,615            1,252,698       1,957,861         3,460,173           11,666,925        

*Funds can only be used for services related to students

34

Net Fund Balance 

Student Auxiliary Funds ‐ Restricted*

Page 41: Fs2013 january

Federal Grantor Perform‐ Federal

Pass‐through Grantor ance CFDA Total Budget Total AwardProgram Title Period Number Expenditures Amount Amount** Ends Starts

U. S. Department of Education

Direct Programs:

Higher Education ‐ Institutional Aid 5 yrs. 84.031A 44,629               450,183            1,542,133         9/30/2014 10/1/2009

TRIO ‐ Student Support Services 5 yrs. 84.042 144,919            436,682            2,065,270         8/31/2015 9/1/2010

TRIO ‐ Upward Bound ‐ Southeast 4 yrs. 84.047 1,399                 16,669               1,172,562         ^   8/31/2012 9/1/2007

TRIO ‐ Upward Bound ‐ Southeast 5 yrs. 84.047 107,376            291,335            1,465,615          8/31/2017 9/1/2012

TRIO ‐ Upward Bound ‐ Central 5 yrs. 84.047A 171,520            410,055            2,845,845         5/31/2017 6/1/2012

Astra Stem Grant 3 yrs. 84.120A 43,770               293,375            881,873            9/30/2014 10/1/2011

Vast Academy TPSID 5 yrs. 84.407A 175,453            862,617            2,498,250         9/30/2015 10/1/2010

Pass‐Through From:

Texas Educational Agency

Adult Education ‐ State Grant Program 1 yr. 84.002 2,134,531         5,084,289         5,542,104         6/30/2013 7/1/2012

Adult Education ‐ State Grant Program 1 yr. 84.002 31,995               96,974               102,000            6/30/2013 7/1/2012

University of St. Thomas

Higher Education ‐ Institutional Aid 5 yrs. 84.031C 165,038            870,174            3,243,025         9/30/2016 10/1/2011

 Texas Higher Education Coordinating Board 

Vocational Education ‐ Basic Grants to States 1 yr. 84.048 194,938            1,171,019         1,171,019         8/31/2013 9/1/2012

College Access Challenge Grant Program 1 yr. 4 mos. 84.378A 15,000               26,707               208,548            8/13/2012 4/6/2011

College Access Challenge Grant Program 1 yr.  84.378A 53,376               169,803            171,798            8/13/2013 8/14/2012

Total Department of Education 3,283,944$        10,179,883$      22,910,042$     

U.S. Department of Agriculture

Direct Programs:

Hispanic Serving Institutions Education Grants 2 yrs. 10.223 7,974                 36,414               298,538            ^   8/31/2013 8/1/2009

Hispanic Serving Institutions Education Grants 2 yrs. 10.223 5,355                 26,428               244,000            ^   8/14/2013 8/15/2010

    Hispanic Serving Institutions Education Grants 2 yrs. 10.223 39,114               135,610            445,000            ^   8/31/2013 9/1/2010

Hispanic Serving Institutions Education Grants 2 yrs. 10.223 50,207               202,726            245,000            8/31/2013 9/1/2011

Pass‐Through From:

Texas A & M University‐Corpus Christi 2 yrs 10.223 8,439                 30,435               48,700               ^   8/31/2013 9/1/2010

Total Department of Agriculture 111,089$           431,613$           1,281,238$       

* Scholarship grants are not included in this schedule.

** Award amount for the total grant period.  For example, if grant is for three years, the award amount will cover the three years.

^ No Cost Extension

35

HOUSTON COMMUNITY COLLEGE

as of January 31, 2013

Date Grant

Schedule of Federal Awards *

FY12 ‐ 13

Page 42: Fs2013 january

Federal Grantor Perform‐ Federal

Pass‐through Grantor ance CFDA Total Budget Total Award

Program Title Period Number Expenditures Amount Amount** Ends Starts

U.S. Department of Housing and Urban Development

Direct Programs:

Pass‐Through From:

Child Care Council of Greater Hous. Inc

Community Development Block Grant‐Entitlement Grant 1 yr 14.218 10,787               17,309               32,000               ^12/31/12 8/1/2011

Total Department of Housing And Urban Development 10,787$             17,309$             32,000$            

Department of Labor

DOL‐Logistics Technician Training 3yrs. 57,196$             159,097            327,404            6/30/2013 7/1/2010

Pass‐Through From:

Texas Workforce Commission

Recovery ‐ WIA Dislocated Worker Formula Grant 1 yr. 17 10,261 61,804 243,163 9/30/2012 7/1/2011

Total Department of Labor 67,458$             220,901$           570,567$          

Department of State

Pass‐Through From:

Northern Virginia Community College 1 yr 19 45,626               73,538               109,830            5/31/2013 3/8/2012

Total Department of State 45,626$             73,538$             109,830$          

National Science Foundation

Direct Programs:

 Education and Human Resources 4 yrs. 47.076 48,502               64,204               423,300            1/31/2013 2/15/2009

Pass‐Through From:

University of Houston System

Education and Human Resources 5 yrs. 47.076 9,600                 47,212               190,000            8/31/2013 9/1/2011

Total National Science Foundation 58,102$             111,415$           613,300$          

* Scholarship grants are not included in this schedule.

** Award amount for the total grant period.  For example, if grant is for three years, the award amount will cover the three years.

36

as of January 31, 2013

HOUSTON COMMUNITY COLLEGE

Schedule of Federal Awards *

Date Grant

FY12 ‐ 13

Page 43: Fs2013 january

Federal Grantor Perform‐ Federal

Pass‐through Grantor ance CFDA Total Budget Total Award

Program Title Period Number Expenditures Amount Amount** Ends Starts

U. S. Department of Energy

Energy Sector Grant (SECO) 8 mos 81.041 37,180               63,836 460,480 ^  9/30/2012 5/10/2010

Solar Energy Technical Program 13 mos 81.087 88,340 591,069            750,000            12/30/14 11/1/2012

Pass Through From:

City of San Antonio 4.5 mos. 81.117

Energy Efficiency & Rene Energy Info Dissen Outrea,Train,&Tech Analy/Assist 2,452 15,000               15,000               02/14/13 9/1/2012

Total U. S. Department of Energy 127,972$           669,905$           1,225,480$       

U. S. Department of Health and Human Services

Direct Programs:

Head Start 5 yrs. 93.600 14,472 34,617               936,660            9/29/2013 9/30/2008

Head Start 5 yrs. 93.600 53,231 187,332            936,660            9/29/2013 9/30/2008

Pass‐Through From:

Texas Education Agency

Temporary Assistance for Needy Families 1 yr. 93.558 10,178               10,200               208,614            8/31/2012 9/1/2011

Temporary Assistance for Needy Families 1 yr. 93.558 76,635               244,749            244,749            8/31/2013 9/1/2012

YMCA of Greater Houston

Refugee and Entrant Assistance ‐ Targeted Assistance Grants 1 yr. 93.584 19,869               82,578               374,938            9/30/2012 10/1/2011

Refugee and Entrant Assistance ‐ Targeted Assistance Grants 1 yr. 93.584 96,874               342,105            342,105            9/30/2013 10/1/2012

Pitt Community College

Health Information Tech Professionals 2 yrs. 93.721 161,454            461,664            1,287,568         4/1/2013 4/2/2010

University of Texas at Austin

Block Grants for Prevention and Treatment of Substance Abus 1 yr. 93.959 ‐                           9,015                 22,000               9/29/2012 9/30/2011

Total Department of Health and Human Services 432,713$           1,372,259$        4,353,294$       

U. S. Department of Homeland Security

Direct Programs:

 Homeland Security 2 yrs. 97.062 11,471               58,856               250,000            ^12/31/12 9/1/2010

Total Department of Homeland Security 11,471$             58,856$             250,000$          

Total  Federal Financial Assistance 4,149,160$        13,135,679$      31,345,751$     

* Scholarship grants are not included in this schedule.

**Award amount for the total grant period.  For example, if grant is for three years, the award amount will cover the three years.

^ No Cost Extension

HOUSTON COMMUNITY COLLEGE

Schedule of Federal Awards *

as of January 31, 2013

FY12 ‐ 13

37

Date Grant

Page 44: Fs2013 january

Perform‐

ance Total Budget Total Award

Program Title ‐ State Grantor Period Expenditures Amount Amount** Ends Starts

Texas Education Agency

Adult Education 1 yr. 24,642$             24,615$             1,165,635$        8/31/2012 9/1/2011

Adult Education 1 yr. 531,746            1,165,635         1,165,635         8/31/2013 9/1/2012

Drop‐Out Recovery Program 18mos 960                     43,998               194,000            2/28/2013 8/1/2011

Drop‐Out Recovery Performance Pay 1 yr. 23,983               181,784            181,784            until expended 6/1/2011

Temporary Assistance for Needy Families 1 yr. 16,311               16,869               111,445            8/31/2012 9/1/2011

    Temporary Assistance for Needy Families 1 yr. 41,088               131,283            131,283            8/31/2013 9/1/2012

       Total Texas Education Agency 638,730$           1,564,185$        2,949,782$       

Texas Higher Education Coordinating Board

Adult Basic Education Innovation Grant 1 yr. 90,244$             158,314            500,000            8/31/2013 9/1/2012

Collegiate G‐Force Mentorship 1 yr. 100                     27,148               50,000               8/31/2013 9/1/2009

First Year Experience 13 mos. 5,577                 8,709                 50,000               until expended 7/18/2011

Nursing Shortage Reduction Program 4 yrs. 2,844                 112,280            157,314            8/31/2014 9/1/2010

Nursing Shortage Under 70 Program 1 yr. 15,849               383,891            383,891            8/31/2013 9/1/2012

Rider 58 ATCP School Grant 8 1/2 mos. ‐                           13,960               46,360               until expended 12/18/2009

Pass‐Through From:

University of Tex Health Science Center

Navigator Grant 1 yr. 30,410               51,452               129,195            ^11/30/2012 6/1/2011

       Total Texas Higher Education Coordinating Board 145,023$           755,754$           1,316,760$       

Texas Workforce Commission

Skills Development ‐ Skills for Small Business Initiatives 1 yr. 410                     18,791               20,000               5/31/2013 6/1/2012

The Methodist 14 mos. 157,416            902,965            902,965            10/31/2013 8/20/2012

Pass‐Through From:

       Total Texas Workforce Commission 157,826$           921,756$           922,965$          

Total State Financial Assistance 941,579$           3,241,694$        5,189,507$       

* Scholarship grants are not included in this schedule.**Award amount for the total grant period.  For example, if grant is for three years, the award amount will cover the three years.

Date Grant

as of January 31, 2013

Schedule of State Awards *

FY12 ‐ 13

38

HOUSTON COMMUNITY COLLEGE

Page 45: Fs2013 january

Program Title ‐ Private Grantor Period Expenditures Budget Award Amount** Ends Starts

Achieving the Dream ‐ Intiative 1 yr.‐cont. ‐                           9,433                 20,000               until expended 12/1/2009

Achieving the Dream ‐ Gates Foundation 3 yrs. 183,812            262,135            743,000            ^12/31/2012 7/1/2009

Adult Education/We Can Work 1 yr. ‐                           ‐                         11,500               until expended 1/1/2010

American Chemical Society 8 mos 138                     248                    500                    until expended 9/1/2011

AT&T High School Success Grant 1 yr. 7 mos. ‐                           25,216               35,000               until expended 1/31/2010

Bank of America  2 yrs. ‐                           316                    50,000               until expended 5/1/2008

Baylor Summer Interns 1 yr. ‐                      1,638                 60,000               until expended 5/1/2010

Brown Foundation 1 yr.‐cont. ‐                      ‐                         100,000            until expended 2/1/2008

Bulletproof Vest Partnership Program 1 yr.‐cont. ‐                      ‐                         5,345                 until expended 9/1/2004

Capital Idea project 1 yr. 56,899               73,794               341,000            until expended 8/1/2010

Carnegie FDTN 1 yr 11,599               30,901               67,500               12/31/2012 1/1/2012

Citibank ‐ College Connection Program 1 yr. ‐                      20,475               41,718               until expended 8/15/2007

Civic Ventures 1 yr. 1 mo. 1,233                 1,246                 25,000               until expended 7/1/2010

Dow Male Minority Initiative Summer Prog. 1 yr. ‐                      12,588               23,986               1/2/2013 1/2/2012

Early College High School (Southeast) ‐ Gates/Dell 5 yrs. ‐                           6,779                 400,000            until expended 6/10/2005

Financial Empowerment Strat. Student Success 2 yrs. 1,181                 60,808               63,050               12/31/2013 1/1/2012

Goldman Sachs Grant ‐ Phase I 5 yrs. 517,101            1,955,011         1,955,011         5/31/2016 1/3/2011

Gulf Coast Pass 3 yrs. 48,056               602,625            1,175,000         12/31/2014 1/1/2012

Hammill FDTN ‐ Veterans Grants 2 yrs. ‐                           11                      18,191               until expended 9/1/2010

Houston Endowment Grant 3 yrs. ‐                           814                    267,000            until expended 11/16/2005

Houston Pathways Initiative 2 yrs. 35,058               345,471            1,580,000         8/31/2013 3/26/2009

Interlocal Metro (PSI) 10 yrs. ‐                           45,000               200,000            8/23/2017 8/23/2008

Interlocal Stafford ‐ City of Stafford 1 yr. 32,000               161,986            161,986            until expended 10/1/2010

KBR Veterans Orientation 1 yr.‐cont. ‐                           5,540                 19,685               until expended 9/1/2008

Kresge Fdtn‐Coordinator/Evaluation 1 yr. 25,155               17,221               82,450               until expended 9/1/2011

Kresge Fdtn‐Parent Academy 1 yr. 20,824               40,254               89,320               until expended 9/1/2011

Kresge Fdtn‐Veterans Grant 1 yr. 41,686               136,698            136,698            until expended 9/1/2011

MDRC ‐ Learning Community Demonstration Grant ‐ Northeast 4 yrs. ‐                           26,495               60,233               until expended 11/1/2007

MDRC ‐ Learning Community Demonstration Grant ‐ Southeast 4 yrs. ‐                           738                    75,000               until expended 11/1/2007

MDRC ‐ Learning Community Demonstration Grant ‐ Central 4 yrs. ‐                           385                    33,000               until expended 11/1/2007

Metlife Caregiving for Older Americans 1 yr.‐cont. ‐                           18,012               23,855               until expended 7/1/2007

Microsoft Elevate America 1 yr. 3,033                 31,985               34,969               3/20/2013 3/20/2012

* Scholarship grants are not included in this schedule.

** Award amount for the total grant period.  For example, if grant is for three years, the award amount will cover the three years.

FY12 ‐ 13

39

HOUSTON COMMUNITY COLLEGE

Schedule of Local Government and Private Awards *

as of January 31, 2013

Page 46: Fs2013 january

Program Title ‐ Private Grantor Period Expenditures Budget Award Amount** Ends Starts

Mobile Go Center ‐ Valero 1 yr.‐cont. ‐                           494                    7,293                 until expended 9/1/2007

National Articulation & Transfer Network Council(NATN) 1 yr.‐cont. ‐                           29,273               29,273               until expended 4/1/2005

North Forest GED Preparation 3 mos 244                     6,799                 25,000               until expended 10/1/2011

St. Luke's Episcopal Health Charities Immunization Fellowship 2 yrs. ‐                           4,178                 142,650            until expended 9/10/2008

Susan B Komen Breast Cancer Initiative 1 yr. ‐                           6,610                 123,230            until expended 4/1/2010

Texas Pioneer Foundation Grant 1 yr. 390                     2,851                 23,117               12/31/2012 1/26/2012

Vast Job Developer 1 yr. 2,924                 20,299               94,898               until expended 11/1/2009

Verizon Foundation Grant 1 yr. ‐                           510                    12,510               until expended 1/1/2010

Walmart ‐ Minority Male Initiative 1 yr. ‐                           25,215               40,000               until expended 9/1/2009

Washington Mutual 1 yr.‐cont. ‐                           16,717               31,700               until expended 9/1/2006Total Private Financial Assistance 981,333$           4,006,769$        8,429,669$       

* Scholarship grants are not included in this schedule.

** Award amount for the total grant period.  For example, if grant is for three years, the award amount will cover the three years.

40

         HOUSTON COMMUNITY COLLEGE ‐ Schedule of Local Government and Private Awards *

Schedule of Local Government and Private Awards * continued

as of January 31, 2013

FY12 ‐ 13

Page 47: Fs2013 january

CHANCELLOR

9         

DEPUTY CHANCELLOR

20       

New Postions

4       NewPosition‐ExternalReplacement‐External 3       Replacement‐Internal

Willie Williams

HR‐Payroll Payroll Support Specialist

Shirley Parish

New Position‐Hired Internal

Keith Harris

Interim HRIS Manager

Police Trianee

Brittany Kaighen

Interim 2          Deputy Chancell NewPosition‐Internal7       4       

Oct

Nov

Police Department

Manager

Oct

Interim 1          

Police Trianee

Antonio Hill

Karen Edwards

New Position‐Budger 12‐13‐Hired External Nov

Inventory Control Supervisor

JanHuman Resources

Repl Juanita Mei‐Hired External

Nov

HR‐Compensation

Deputy Chancellor

James Lindsey

Jan

Nov

Human Resources

Accounting Specialist

Nov

Business Affairs

New Position‐Budger 12‐13‐Hired External

Aracelia Saucedo

OctPolice Department

Repl John Chen‐Hired External‐Temp

Houston College Community

2012‐2013 Positions

Employee Name Department Month

SepBarlett Sheinberg Resource & Economic Dev

Procurement

CommentsJob Title

Nov

Nov

Wanda Pleasant New Position‐Budget 12‐13‐Hired External

Michael Schurwon Procurement Jan

Supvervisor

Procurement

New Position‐Budget 12‐13‐Hired External

Procurement

New Position‐Budget 12‐13‐Hired External

Supvervisor New Position‐Budget 12‐13‐Hired External

Interim Dir., Resource & Economic Dev New Position‐Budget 12‐13‐Hired Internal

1        NewPosition‐External‐         1       

Nov

Nov

Buyer

Procurement

Nov

Procurement

Nov

Procurement

Sr. Buyer

Buyer New Position‐Budget 12‐13‐Hired External

Thomas Richardson

Kerry Doucette

Reginald Harmon

Alfred Kessellie, II

Freddy Conde

Mimi Lemmons Procurement Sr. Buyer

Accounts Payable

NovNew Position‐Budget 12‐13‐Hired External

Sr. Buyer Repl Shiela Perla‐Hired External

Edwin Johnson Police Department

Jan

My'Keshia Robinson

Ules Harris

Victor Camargo

Bapakaye Tamuno

Executive Secretary

Police Department

Oct

Jeremy Hardeway

Security Officer Repl Kenneth Bridges‐Hired External

Oct

Police Trianee

NewPosition‐Internal 6       

Repl Grayland Jones‐Hired External

Replacement‐InternalChancellor Replacement‐External

Patricia Thompson

Sr. Buyer New Position‐Budget 12‐13‐Hired External

Interim Chief HR Officer

Repl Tasharra Pickens‐Hired Internal

Repl Majid Iqbal‐Hired External

New Position‐Budger 12‐13‐Hired External

Police Department Security Officer

New Position‐Budger 12‐13‐Hired External

Repl Willie Williams‐Hired Internal

Oct

Sep

Police Department Corporal Repl Timothy Ramirez‐Hired Internal

Repl Willie Rostan‐Hired External Oct

Repl Anthony Maxie‐Hired Internal

Repl Alice Binkley‐Hired Internal

Security Officer

Maria Alarcon

VC, Administrative Special Projects

Sep

Police Department Corporal New Position‐Budger 11‐12‐Hired Internal Sep

Police Department

Shirley Voisin

Repl Victor Fisher‐Hired External

Police Department

Police Department

Police Department

Tobin Anderson

Navidad Martinez

Sep

Corporal

Oct

Business Services

Corporal New Position‐Budger 11‐12‐Hired Internal

Security Officer

Police Department

Security OfficerKatherine McCabe

Repl Norma Jackson‐Hired Internal

41

Page 48: Fs2013 january

VICE CHANCELLOR INSTRUCTION

7         

VICE CHANCELLOR STUDENT SUCCESS

13       

VICE CHANCELLOR INFORMATION TECHNOLOGY

2         

New Postions

Israel Salazar

Transcript Evaluator

Replacement‐External ‐        

2        NewPosition‐External 6       

Scott Godley

Manuel Ramos

Nov

TLR

NewPosition‐Internal

Larke Clishe

Replacement‐Internal

Advisor

Leila Abdullahi

New Position‐Budget 12‐13‐Hired External

Jan

Recording Imaging Nov

Interim ‐           

Leslie Dye

Randi Sprouse

Jan

Jan

Dec

‐        NewPosition‐Internal NewPosition‐External1       

Kimberly Davis Oct

Advisor

System Support

New Position‐Hired External

6       

Application Dev

Instructional Designer

Dir., Outreach & Student Development

Wanda Taft

Sr. Network Analyst New Position‐Hired Internal‐Temp

Interim

Repl David Lin‐Hired Internal

New Position‐Hired External

1       

Nov

Instructional

VA/Student Support Svcs Advisor New Position‐Budget 12‐13‐Hired Internal

JanRepl Helen McMillan‐Hired External‐Temp

Liliana Silva

Kevin Lacey

DSO/Advisor

Student Information Representative

Oct

VCSS

Jan

International Student

Clairta Duron Student Information Svcs

New Position‐Budget 12‐13‐Hired External

Ashley Martin

Jesse Shelton

Distance Education

Mona Terrell Registrar

Gabrielle Kay

Outreach & Student Dev

Dec

Transcript Evaluator

New Position‐Budget 12‐13‐Hired Internal

Workforce Initiatives Program Manager

New Position‐Budget 12‐13‐Hired External

Nov

New Position‐Hired External

Instructor

New Position‐Hired External

Paul Donaldson

Touhid Chowdhury

Student Information Svcs Advisor Repl Laura Collins‐Hired External Sep     

New Position‐Budget 12‐13‐Hired Internal

Online Student Services

New Position‐Budget 12‐13‐Hired Internal

Instructional Designer

New Position‐Budget 12‐13‐Hired External

Registrar

Transcript Evaluator

Henry Thomas

Oct

Transcript Evaluator

Repl Shantay Grays‐Hired External

New Position‐Budget 12‐13‐Hired External

Oct

Admissions

DSO/Advisor

Oct

Registrar

Nov

James Heironimus Police In‐Service

Distance Education Advisor New Position‐Budget 12‐13‐Hired External

Insternational Student

DOEL English Language Skills Instructor

Repl Deshaunta Stewart‐Hired Internal

Jan

Sep     

New Position‐Hired External

New Position‐Budget 12‐13‐Hired Internal‐Temp

Oct

Student Records Specialist

Registrar

VC Instr

Replacement‐Internal NewPosition‐Internal

International Student

Replacement‐External

Tamara Jones

System Analyst

‐         ‐           

Katie Herod

Interim

Sep

Replacement‐External ‐           1       

3       

VCIT ‐        Replacement‐Internal ‐        NewPosition‐External

42

Houston College Community

2012‐2013 Positions

Employee Name Department Job Title Comments Month

Page 49: Fs2013 january

CENTRAL

8         

NORTHWEST

26       

New Postions

Construction

Oct

Repl Mallikarjun Shintri‐Hired External‐Temp Oct

COO

New Position‐Hired External

NewPosition‐External 4       

Nov

4       

Northwest

Bharat Sutaria

New Position‐Budget 12‐13‐Hired Internal

Jan

‐        

Repl Samuel sannl‐Hired External

Repl Bonnie Gallup‐Hired External‐Temp

Repl Laura Wilborn‐Hired External

Nov

Sep 

Oct

New Position‐Budget 12‐13‐Hired Internal

Nov

Thomas Tankersley

Student Services New Position‐Budget 12‐13‐Hired InternalGoddrick Austin

Brigid Wilson

Technician Services

Student Services

Eva Foster English

1       

Child Care

Rodney Sam

Sep

Sherin Isaac

Eva Foster Instructor

Repl Joaquin Torres‐Hired External‐Temp

Nellie Bradley

Repl Carlana Brooks‐Hired External‐Temp

Fine Arts

Admissions

1          Interim

Instructor

Steven Cohan

Rima Adil

Repl Manhal Chbat‐Hired External‐Temp

Financial Aid

Repl Kimberly Crocker Montgomery‐Hire External‐Temp

Oct

Senior Advisor Oct

Student Life Coordinator

Student Services

Repl Diane Wilborn‐Hired External

Instructor

Senior Advisor

Repl Rima Adil‐Hired External‐Temp

Sep 

‐           Replacement‐Internal InterimReplacement‐External

Nov

NovStudent Services

Secretary II

18     NewPosition‐Internal

Corey Aeck Advisor

3       

Olivia Blake COO 

Contrice Kendall Student Services Advisor New Position‐Budget 12‐13‐Hired Internal Nov

Repl James Bishop‐Hire External‐Temp

Sherhonda Le

Laleh Golestani

InstructorEngineering

Nov

Hardware/Software Technician

English

Repl Adriana Jimenez‐Hired External

Student Services

Oct

Nov

Public Relations

Enrollment Service Assistant

Advisor

Courtney Martinez

Lusinda Eshelman

Advisor

Financial Aid Associate

Testing AssociateInstruction‐Testing

Student Recruiter

Public Relations

Oct

Instructor

New Position‐Budget 12‐13‐Hired External

Sandra Brooks Enrollment Service Assistant Repl Makeba Brown‐Hired External‐Temp

Fidel Simmons

Sep 

NewPosition‐External 1       

Christine Moore

Instructor

Director of Public Relations

Student Services Interim Dean of Student Dev

Child Care specialist II

Oct

Nov

Oct

Repl Johnny Watson‐Hired External‐Temp

Repl Frank Colmenero‐Hired External

Library Assistant I Repl Marion Kennedy‐Hired External

Repl Cheryl Johnson‐Hired Internal

Oct

Cashier II

Paul Brady

Anthony Hilliard

Central NewPosition‐Internal

Sep 

Anika Chowdhury

Repl Nellie Bradley‐Hired Internal‐Temp

Accounting

New Position‐Budget 12‐13‐Hired Internal

Sep 

Replacement‐Internal 2       

Community Outreach CoordinatorCOO

Sep 

Replacement‐External

Biology

JanLibrarian Repl Marcia Braun‐Hired Internal

ADA Counselor

Jason Wilson

InstructorVAST

Job Title Comments

Dora Whiteside

Repl Denny Smith‐Hired External

Month

Sonya Sneed

Library

Jan

Library

Jaime Flores Student Services

James Connery

Repl Stella Villarreal‐Hired External‐Temp

Instructor

Student Services

New Position‐Budget 12‐13‐Hired Internal

Erica Hubbard

Student Services Advisor New Position‐Budget 12‐13‐Hired External Jan

Walter Oduk Technician Services Hardware/Software Technician Repl Joseph Ogbechie‐Hired External Jan

Gina Calderone Philosophy Instructor Repl Thomas UrbanHired External‐Temp Jan

Deborah Adesokan Counseling Advisor Repl Christine Battle Moore‐Hired External‐Temp Jan

Student Services

Repl Kinaya Palmer‐Hired InternalSaqueena Sutton

Jan

43

Houston College Community

2012‐2013 Positions

Employee Name Department

Page 50: Fs2013 january

NORTHEAST

12       

SOUTHWEST

20       

New Postions

Dean Instruction

William Nicholson

Oct

Dec

Sep

Sep

Sep

David Jones

Instructor

Secretary II

Sazar Ali Jan

Juanna Shin

Wendy Robbins

Repl Homer Stewart‐Hired External

Student Services

Jose Cruz

Kelli Caraway

NORTHEAST

COO

Southwest

Instructor

SepIfeanyi Oramulu

Hosein Tahvillian Electronic Engineering

Ronald Dewlen

Instructor Repl Homer Stewart‐Hired External‐Temp

Retention Specialist Repl Joseph Willis‐Hired Internal

Lesley Savoy‐Green Enrollment Services AssociateStudent Services Repl Alonia Whitmore‐Hired Internal

New Position‐Budget 12‐13‐Hired Internal

Nicki Norman

Electronic Engineering Instructor Repl Nicky Haddock‐Hired External Sep

Repl Pratap Talusani‐Hired External

Student Services

Student Services

Technology

Instructional

Sep

COO

Instructor

Repl Bridgette Bauman‐Hired External

Betty Keller

Repl John Jagdish‐Hired External‐Temp

Office Manager

Advisor Repl Ana Canek‐Hired Internal

Cybele Ayaquica

Hoang Nguyen

Nov

Sep

Process Technology

Senior Advisor

Digital Communication

Lucille Gore

Oct

Nov

Lanny Kwan

Christine Moore

Brandi Gaza

Dashiel Geyen

Aketa Guillory

Wendy Robbins

Counseling

Repl Belinda Defalco‐Hired Internal

Physical Science Instructor Repl Abdallah Cherif‐Hired Internal

Digital Communication

Jan

New Position‐Budget 12‐13‐Hired External

New Position‐Budget 12‐13‐Hired External

Repl Martha Barrera‐Hired External

Advisor

Lorraine Donovan

Student Dev/Advising

Oct

David Stacy

Nicol Alexander

Gholam Pahlavan

Emilio Mendoza

Sabiha Mir

Todd Duplantis

Wendy Allen

Oct

Instructor

Replacement‐ExternalReplacement‐Internal

Secretary II Repl Dipal Parekh‐Hired External‐Temp

LibrarianLibrary

Repl Kelli Caraway‐Hired Internal

Student Development

Student Development

3        4       NewPosition‐External11     NewPosition‐Internal

Johanne Huber Digital Communication Instructor

‐           2        Interim

Dec

Repl Lloyd Schuh‐Hired External

Repl Bill Hord‐Hired External

Repl Margo Reece‐Hired ExternalInstructor

JanNew Position‐Budget 12‐13‐Hired External

Jan

Jan

Nov

Jan

Nov

Advisor

Senior Advisor

Repl Ian Mayer‐Hired External‐Temp

Jan

Instructor

Nov

Nov

Jan

Student Dev/Advising Advisor

Digital Communication

Instructor

1       

New Position‐Budget 12‐13‐Hired Internal

Interim‐        NewPosition‐External

New Position‐Budget 12‐13‐Hired External

Student Dev/Advising

Academic

Student Dev/Advising

Instructor

Senior Advisor

Repl Adballah Cherif‐Hired External‐Temp

Counselor

Campus Service Technician

English

Senior Advisor

Computer Science

Public Relations

Repl Margo Reece‐Hired External‐Temp

Technology

Oct

Repl Paul Roberts‐Hired External‐Temp

7        NewPosition‐Internal

Student Dev/Advising

Digital Communication Instructor

Director, Public Relations

‐           

Sep

Nov

Replacement‐Internal Replacement‐External4       

New Position‐Budget 12‐13‐Hired Internal

Repl Margie Ricks‐Hired External‐Temp

Nov

Student Services OctAdvising Manager

New Position‐Budget 12‐13‐Hired Internal

Repl Lois Avery‐Hired External

Khansaa Almansor

Repl Barbara Smith‐Hired Internal

Houston College Community

2012‐2013 Positions

Employee Name Department Job Title Comments Month

44

Page 51: Fs2013 january

SOUTHEAST

4         

COLEMAN

11        

EXTENDED LEARNING, DIVISION OF‐          

Adm. Totals Replacement‐Internal Replacement‐External NewPosition‐Internal NewPosition‐External Interim 51       

College Totals Replacement‐Internal Replacement‐External NewPosition‐Internal NewPosition‐External Interim 81       

Grand Total Replacement‐Internal Replacement‐External NewPosition‐Internal NewPosition‐External Interim 132     

Over all Total

New Postions

45

Houston College Community

2012‐2013 Positions

Employee Name Department Job Title Comments Month

Rita Callahan

Micalyn Flagg

Ashley Nichols

Daniel Guzman

Southeast

Nancy Garcia

LaTrista Funchez Student Services

Secretary II

Repl Vivian Flores‐Hired External

Nov

Financial Aid

Christy Muniz

Repl Tara Webb‐Hired External

Oct

7        22    

18     62     14     32     4          

10     1          

NewPosition‐Internal 1        NewPosition‐External

‐         NewPosition‐Internal ‐         NewPosition‐External ‐         Interim ‐           

12     7       

3          6       

Interim ‐           7       

Ex. Learning

2       

Replacement‐Internal

Replacement‐External

‐         Replacement‐External

David Pereida

Advisor

132  

51    

Replacement‐InternalColeman

11    

Carmela Blackshear

Veronica Mckissic

Jason Smith

Repl Lorenzo Walker‐Hired Internal

Student Services

Virginia Otieno

John Smith 

Advisor

Natural Sciences

Jan

Repl Maria Reyes‐Hired External

Repl Independencia Delacruz‐Hired External

Learning Success Coordinator

Jan

SepChlinical Simulation Lab Technician

‐        

Instructor

Caroline Couto‐Ortiz

Charmaine Lewinson‐Evans

Repl Verlicia Pope‐Hired External

Student Services

‐        Replacement‐Internal

Nov

Repl Sharon McCowan‐Hired External

Health Science SepNew Position‐Budget 12‐13‐Hired ExternalDental Hygiene Operations Assistant

Simulation Center

Sep

Sep

4       

Jan

Student Services

Student Services

Student Services

Jan

1       

NovVocaitonal Nursing

Advisor

Repl Roxine Simms‐Hired External‐Temp

‐        

Nov

Health Science

Instructor

Interim ‐           

Repl Carmen Gentry‐Hired Internal

Instructor

Vocaitonal Nursing

Replacement‐External NewPosition‐Internal

Vocaitonal Nursing

New Position‐Budget 12‐13‐Hired Internal

NewPosition‐External

Instructor

Repl Linda Williams‐Hired External‐Temp

Repl Pearlie Watts‐Hired External

Vocaitonal Nursing Instructor

Enrollment Service Associate Repl Rory Gupta‐Hired External

Financial Aid Associate

New Position‐Hired External

Student Life Coordinator

Oct

Oct

Page 52: Fs2013 january

HOUSTON COMMUNITY COLLEGEFTE Comparison Year‐To‐Date Thru January 31, 2013 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 1,361    1,514    1,534    1,487    828      

2011‐2012 1,451    1,582    1,598    1,564    823       1,530    1,573    1,598    1,576    1,003    1,098    955      

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 1,401    1,426    1,449    1,351    1,438   

2011‐2012 1,429    1,415    1,425    1,327    1,407    1,429    1,396    1,404    1,410    1,397    1,391    1,429   

F

T

E

F

T

E

46

 ‐

 200

 400

 600

 800

 1,000

 1,200

 1,400

 1,600

 1,800

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 200

 400

 600

 800

 1,000

 1,200

 1,400

 1,600

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 53: Fs2013 january

CENTRAL COLLEGEFTE Comparison Year‐To‐Date Thru January 31, 2013 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 238       270       272       270       153      

2011‐2012 254       293       296       293       159       279       298       300       291       184       204       178      

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 155       159       164       145       161      

2011‐2012 161       158       165       145       155       163       157       157       158       156       154       161      

47

F

T

E

F

T

E

 ‐

 50

 100

 150

 200

 250

 300

 350

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

 140

 160

 180

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 54: Fs2013 january

COLEMAN COLLEGEFTE Comparison Year‐To‐Date Thru January 31, 2013 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 108       107       113       110       78         

2011‐2012 115       112       113       109       82          109       107       110       110       99          98          84         

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 56          55          55          52          58         

2011‐2012 58          58          59          55          56          58          55          55          57          54          54          55         

F

T

E

F

T

E

48

 ‐

 20

 40

 60

 80

 100

 120

 140

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 10

 20

 30

 40

 50

 60

 70

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 55: Fs2013 january

NORTHWEST COLLEGEFTE Comparison Year‐To‐Date Thru January 31, 2013 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 281       310       310       306       156      

2011‐2012 267       292       293       307       155       323       330       334       335       198       224       190      

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 131       135       143       125       142      

2011‐2012 104       106       108       108       129       138       122       129       130       132       131       138      

F

T

E

F

T

E

49

 ‐

 50

 100

 150

 200

 250

 300

 350

 400

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

 140

 160

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 56: Fs2013 january

NORTHEAST COLLEGEFTE Comparison Year‐To‐Date Thru January 31, 2013 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 187       208       212       205       119      

2011‐2012 200       211       216       207       112       204       212       212       211       129       137       124      

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 126       125       128       118       124      

2011‐2012 127       126       128       118       121       128       124       127       126       126       126       128      

F

T

E

F

T

E

50

 ‐

 50

 100

 150

 200

 250

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

 140

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 57: Fs2013 january

SOUTHWEST COLLEGEFTE Comparison Year‐To‐Date Thru January 31, 2013 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 318       385       375       370       187      

2011‐2012 380       433       435       422       183       377       382       386       382       229       252       217      

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 152       154       161       142       154      

2011‐2012 185       184       182       145       146       155       144       150       152       151       147       153      

51

F

T

E

F

T

E

 ‐

 50

 100

 150

 200

 250

 300

 350

 400

 450

 500

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

 140

 160

 180

 200

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 58: Fs2013 january

SOUTHEAST COLLEGEFTE Comparison Year‐To‐Date Thru January 31, 2013 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 130       160       164       163       74         

2011‐2012 143       168       173       169       77          161       178       183       179       101       120       95         

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 96          103       104       95          102      

2011‐2012 99          96          97          86          94          98          91          95          96          99          96          101      

F

T

E

F

T

E

52

 ‐

 20

 40

 60

 80

 100

 120

 140

 160

 180

 200

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

 140

 160

 180

 200

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

 140

 160

 180

 200

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 59: Fs2013 january

Division of Extended Learning (DOEL)FTE Comparison Year‐To‐Date Thru January 31, 2013 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 90          67          79          57          58         

2011‐2012 85          69          68          56          55          72          63          67          64          59          57          64         

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 79          81          81          76          80         

2011‐2012 78          79          79          75          79          80          77          79          79          79          78          81         

F

T

E

F

T

E

53

 ‐

 10

 20

 30

 40

 50

 60

 70

 80

 90

 100

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 10

 20

 30

 40

 50

 60

 70

 80

 90

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 60: Fs2013 january

DISTRICTFTE Comparison Year‐To‐Date Thru January 31, 2013 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 8            7            8            5            3           

2011‐2012 7            4            4            1            ‐             5            4            5            3            4            4            3           

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 606       612       614       598       617      

2011‐2012 616       609       608       595       627       609       625       612       614       601       605       612      

F

T

E

F

T

E

54

 ‐

 1

 2

 3

 4

 5

 6

 7

 8

 9

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 100

 200

 300

 400

 500

 600

 700

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 61: Fs2013 january

HOUSTON COMMUNITY COLLEGEDuplicated Headcount Comparison Year‐To‐Date Thru January 31, 2013 by Type

FACULTY HEADCOUNT

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

12‐13 FT 787       795       795       797       794      

12‐13 PT 1,992    2,361    2,491    2,224    409      

12‐13 Total Fac 2,779    3,156    3,286    3,021    1,203    ‐             ‐             ‐             ‐             ‐             ‐             ‐            

11‐12 FT 792       797       793       788       793       785       784       782       783       768       757       794      

11‐12 PT 1,911    2,334    2,390    2,331    275       2,387    2,391    2,351    2,367    1,075    1,372    679      

11‐12 Total Fac 2,703    3,131    3,183    3,119    1,068    3,172    3,175    3,133    3,150    1,843    2,129    1,473   

STAFF HEADCOUNT

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

12‐13 FT 1,238    1,250    1,264    1,260    1,263   

12‐13 PT 840       833       851       842       703      

12‐13 Total Staff 2,078    2,083    2,115    2,102    1,966    ‐             ‐             ‐             ‐             ‐             ‐             ‐            

11‐12 FT 1,256    1,256    1,238    1,235    1,253    1,242    1,249    1,235    1,240    1,201    1,240    1,250   

11‐12 PT 877       879       883       839       629       822       834       828       846       767       790       790      

11‐12 Total Staff 2,133    2,135    2,121    2,074    1,882    2,064    2,083    2,063    2,086    1,968    2,030    2,040   

55

 

S

t

a

f

f

 

Headcount

 

F

a

c

u

l

t

y

Headcount

 ‐

 500

 1,000

 1,500

 2,000

 2,500

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 200

 400

 600

 800

 1,000

 1,200

 1,400

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 62: Fs2013 january

HOUSTON COMMUNITY COLLEGEUnduplicated* Headcount Comparison Year‐To‐Date Thru January 31, 2013 by Type

UNDUPLICATED HEADCOUNT

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

12‐13 Total  4,475    4,446    4,551    4,726    3,085   

11‐12 Total  4,543    4,902    4,917    4,833    2,891    4,728    4,814    4,805    4,806    3,373    3,575    3,303   

* Includes Full‐time and Part‐time Faculties, Librarians, Counselors, and Staffs 

56

Unduplicated* Headcount

 ‐

 500

 1,000

 1,500

 2,000

 2,500

 3,000

 3,500

 4,000

 4,500

 5,000

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 63: Fs2013 january

Non‐current assets:

Restricted cash 6,806$                  

Restricted investment in trust accounts 2,243,597

Lease receivable from HCCS 172,194,009        

Deferred charges ‐ bond issuance costs 2,046,534            

Capital Assets:

Land ‐                         

Other Structures ‐                         

Furniture & equipment ‐                         

Leasehold improvements ‐                         

Construction in process 911,290            

911,290                

TOTAL ASSETS 177,402,236$      

Current liabilities:

Accounts payable ‐ HCC 144,304$             

Accounts payable ‐                             

Accrued liabilities ‐ interest ‐                             

Current bond payable 3,880,000            

Total current liabilities 4,024,304$          

Non‐current liabilities:

Deposits 440                       

Arbitrage payable ‐                             

Unearned interest income (23 years) ‐ HCC 70,298,500          

Premium on bonds 2,209,548            

Bonds payable 105,655,000        

Total non‐current liabilities 178,163,488$      

TOTAL LIABILITIES 182,187,792        

TOTAL NET ASSETS ‐ restricted (4,785,557)$         

PFC 1

Houston Community College ‐ Public Facility CorporationStatement of Net Assets

Cash Basis ‐ Interim Period

as of January 31, 2013

ASSETS

LIABILITIES

Page 64: Fs2013 january

Cash Flows from Capital Financing Activities

Receipt from HCCS for lease payment 2,538,004$     

Purchases of capital assets (871,057)          

Payment on capital debt ‐ principal and interest (2,538,696)      

Net cash provided (used by) in financing activities (871,749)          

Cash Flows from Investing Activities

  Interest income 1,440

Increase (decrease) in restricted cash and 

restricted investment in trust accounts (870,308)          

Restricted cash and restricted investment in 

trust accounts ‐ beginning of year 3,120,712        

Restricted cash and restricted investment in 

trust accounts ‐ end of period 2,250,404$     

Houston Community College System Public Facility CorporationStatement of Cash Flows

Cash Basis ‐ Interim Period

Five Month Ended as of January 31, 2013

PFC 2

Page 65: Fs2013 january

Total Budget to 

Date

Total Revenues 

/  Expenditures 

To Date

Encumbrances 

To Date Unexpended

Sources of funds:

Proceeds from 

2005C Lease Revenue Bond 19,155,000$   

Discount (170,064)        Land Purchase (4,212,644)    Bond Issuance Cost (606,201)        Interest Expense (524,785)        

13,641,306$  Interest Income 1,003,675      Vendor Contract Refund 102,706         Transfer to Payment Account (1,354,990)    

Funds Available 13,392,697$  

Uses of funds:4,092$             4,092$             ‐$ ‐$                   

11,550,643    11,550,643    ‐                      ‐                    Maintenance 393,940          171,324          222,616         ‐                    

6,443              6,443              ‐                    563,928          563,928          ‐                    

7,200              7,200              ‐                      ‐                    27,403            26,326            1,077              ‐                    24,940            24,940            ‐                    44,695            44,695            ‐                      ‐                    

596,787          596,787          ‐                      ‐                    

172,626            8,100                164,526         

Grand Total Uses 13,392,697$   13,004,478$   223,693$        164,526$     

Net Available ‐$                     

  PFC requires GMP before inception.

Total Proceeds from Bond

Houston Community College ‐ Public Facility CorporationPublic Safety Instituteas of January 31, 2013

PFC 3

Bank Service ChargesConstruction

Waste Water Management *Geo Technical Services*

Survey*Architect

Engineering ServicesFFE

Contingency

 * Included in GMP 

Site Infrasturcture

Page 66: Fs2013 january

Total Budget to 

Date

Total Revenues 

/  Expenditures 

to Date

Encumbrances    

to Date Unexpended

Sources of funds:

Proceeds from 

 2005 A Bonds  11,605,000$   

 Premium Received             492,931 

 Accrued Interest Received               53,425 

 Interest Income                    998 

 Bond Issuance Costs           (391,474)

 Repayment of Loans     (11,392,147)

Funds Available 368,733$        

Uses of funds:

Debt Service 53,425$            53,425$          ‐$                        ‐$                       

Renovation & Construction  169,759            169,759          ‐                          ‐                         

Demolish & Renovate Office 56,244              56,244            ‐                          ‐                         

Furniture & Fixtures 46,857              46,857            ‐                          ‐                         

Legal Fees 42,448              42,448            ‐                         

Grand Total Uses 368,733$         368,733$       ‐$                        ‐$                      

Net Available ‐$                     

Note 1: PFC requires GMP before inception.

Houston Community College ‐ Public Facility CorporationWestgate (Katy)

as of January 31, 2013

PFC 4

Page 67: Fs2013 january

Total Budget to 

Date

Total Revenues 

/  Expenditures 

To Date

Encumbrances 

To Date Unexpended

Sources of funds:

Principal Amount on Bonds 36,950,000$   

Discount on Bonds (546,238)          

Underwriter's Discount (209,273)

Accrued Interest on Bonds 98,080             

Amount Available 36,292,569$   

Issuance Costs (490,131)          

 Accrued and Capitalized Interest (1,449,023)      

Repair and Replacement (1,000,000)      

Title Fees Capitalized (81,379)            

Amount Available for Project 33,272,036$   

Repayment to HCC (188,006)          

Project Account Balance 33,084,030$   

Administrative & Legal Fees (29,486)            

Interest Income 836,555           

Transfer Cost Issuance 85,509             

Interest Expense on Notes (135,299)          

Funds Available 33,841,309$  

Uses of funds:

Land & Building 17,807,972$    17,807,972$    ‐$                     ‐$                

Maintenance Rehabilitation & 

Deferred Maintenance

12,856,469      12,856,469      ‐                  

CPMS PGAL 211,959            211,959            ‐                  

Facilities Space Programming 214,620            214,620            ‐                  

Furniture, Fixtures & Equipment 1,040,112         1,006,277         14,273            19,562       

Site Infrastructure 971,369            854,984            4,859               111,526     

Architect and Engineering 517,509            428,355            4,632               84,522       

Repair & Maintenance Contingency   ‐ 

per bond requirement

221,299            83,089              2,000               136,210     

Grand Total Uses 33,841,309$   33,463,726$   25,764$          351,820$  

Net Available ‐$                     

  PFC requires GMP before inception.

Houston Community College ‐ Public Facility CorporationHayes Road ‐ Alief Project

as of January 31, 2013

PFC 5

Page 68: Fs2013 january

Total Budget to 

Date

Total Revenues 

/  Expenditures 

To Date

Encumbrances 

To Date Unexpended

Sources of funds:

Principal Amount of 2007 Series Bonds 58,885,000$   

Premium on Bonds 3,094,498        

Underwriter's Discount (346,244)          

Accrued Interest Income‐ Bonds 173,733           

Total Amount Available 61,806,987$   

Issuance Cost (839,837)          

Accrued  and Capitalized Interest (4,632,122)      

Repair and Maintenance Account ‐                        

Amount Available for Project 56,335,028$   

Interest Income on Trust Account 2,496,540        

Interest Expense on Notes (414,601)          

Transfer to Trustee Payment Account (4,712,985)      

Vendor Contract Refunds 230,035           

Sale of Land 569,890           

Funds Available 54,503,907$  

Uses of funds:

Land & Building 10,671,234$    10,671,234$    ‐$                     ‐$                    

Construction Cost‐ Building 18,200,000      18,200,000      ‐                       ‐                      

Construction‐Demolition 494,972            ‐                         ‐                       494,972         

Constuction‐ Site 640,988            636,957            4,030              ‐                      

Site Improvement 14,221,039      13,888,128      332,911          ‐                      

Site Demolition & Abatement 791,298            791,298            ‐                      

CPMS PGAL 1,391,958         1,391,958         ‐                       ‐                      

Site and Infrastructure Design 2,334,840         2,334,840         ‐                       ‐                      

Facilities Space Programming 29,274              29,274              ‐                       ‐                      

Architect and Engineering 1,256,727         1,256,727         ‐                      

Furniture, Fixtures & Equipment 1,828,332         1,818,281         10,051            ‐                      

Library 66,564              66,182              382                 ‐                      

Inspections 214,981            214,981            ‐                       ‐                      

Design Geotech 17,500              17,500              ‐                       ‐                      

Material Testing  24,503              24,503              ‐                       ‐                      

Communications IT‐ PGAL 253,614            253,614            ‐                      

IT Telephone & Communications 790,467            790,467            ‐                      

Surveying  62,398              59,124              3,274              ‐                      

Administrative Expenses 34,505              34,505              ‐                      

Preconstruction Costs 886,377            886,377            ‐                      

Contingency 292,338            186                    ‐                       292,154         

Grand Total Uses 54,503,907$   53,366,135$   350,647$       787,126$     

  PFC requires GMP before inception.

as of January 31, 2013

PFC 6

Houston Community College ‐ Public Facility CorporationNorthline Mall Project