fs2013 may

77
Financial Statements For the Period September 1, 2012 May 31, 2013 For the Meeting of the Board of Trustees June 25, 2013 for Houston Community College System & Houston Community College Public Facility Corporation

Upload: houstoncommunitycollege

Post on 18-Dec-2014

127 views

Category:

Economy & Finance


1 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Fs2013 may

Financial StatementsFor the Period

September 1, 2012 ‐ May 31, 2013

For the Meeting of the Board of Trustees ‐ June 25, 2013

for

Houston Community College System&

Houston Community College Public Facility Corporation

Page 2: Fs2013 may

Memorandum Management Discussion & Analysis

Summary HCCS Unrestricted Revenue & Expenditures 1

Exemptions & Waivers Detail 3

Fund Balances Balance Sheet By Fund   4

Adjusted Budgets by Division 5

Actual YTD by College  5

Cash Flow Analysis 6

Contact Hours Reimbursement 11

Enrollment Data 12

Charts Revenue & Expenditure YTD thru May 31, 2013 13

Revenue and Expenditures with Trendlines 14

Revenue Source Comparison By Year 15

Expenditure Source Comparison By Year 16

Designated Funds Budget Summary / Cash Position 17

Capital Projects & Unexpended Plant Fund Projects 18

    Unexpended 2004 CIP Projects 19

2013 CIP Projects 25

CIP Footnotes 31

CIP Residual Funds 32

    Plant Fund Maintenance Tax Notes 2006 (Central Utility Plant Project) 33

Maintenance Tax Notes/Sr. Lien Bonds 2008 34

Maintenance Tax Notes 2010  36

Maintenance Tax Notes 2011 37

Bonds/Notes Schedule of Bonds & Maintenance Tax Notes 39

Auxiliary Sources and Uses of Auxiliary Funds 40

Restricted Funds Grants, Contracts and Student Aid 42

Position Control 2013 Positions 48

Pos. Control Charts FTE (Full‐Time Equivalent) Monthly Comparison 54

Duplicated Headcount Monthly Comparison 63

Unduplicated Headcount Monthly Comparison 64

Table of ContentsFor the Period September 1, 2012 ‐ May 31, 2013

For the Meeting of the Board of Trustees

Houston Community College System

Page 3: Fs2013 may

Statement of Net Assets PFC 1

Statement of Cash Flows  (Cash Basis‐ Interim Period) PFC 2

Public Safety Institute PFC 3

Westgate PFC 4

Hayes Road ‐ Alief Project PFC 5

Northline Mall Project PFC 6

Houston Community College ‐ Public Facility Corporation

Table of Contents For the Period September 1, 2012 ‐ May 31, 2013

For the Meeting of the Board of Trustees

Page 4: Fs2013 may

MEMORANDUM  

To:    Houston Community College System          Board of Trustees 

 

    Via:    Renee Byas, Acting Chancellor  

From:    Dr. Art Tyler, Deputy Chancellor     Chief Operating Officer  

Date:    June 17, 2013  

Re:  Financial Report for Month Ended May 31, 2013     

 

Enclosed please find the preliminary financial reports for the month ending May 31, 2013 for your review.  The financial report is an internal management report submitted to the Board of Trustees to compare actual financial activities to the approved budgets, strategic priorities, and financial policies for the reported fiscal year.   

 

Operating Fund net revenue through May 31, 2013 is $264,424,056 which is 1.4% below last year.  Expenditures year‐to‐date total $206,380,368 which is 1% less than the same time last year, for a net of $58,043,688. 

 

The reserves for the month of May 2013 are $68,743,935 or 23.7% of revenues (see page III).  Thus, we continue to project a healthy fiscal strength for the college. 

Page 5: Fs2013 may

Managements Discussion and Analysis

Thru May 31, 2013

Revenues

Expenditures 

Contract Services expense totaled $15,014,072 year‐to‐date, 18% above last year.  The increase is mainly due to 

IT hiring temporary personnel for projects, additional security staff at the District and using contract interpreters 

to fill the personnel shortages.  Fiscal year end expenses are projected to be $24,189,793.

Utilities costs totaled $5,880,346 year‐to‐date.   We will continue to monitor these costs.  Total utilities cost at 

fiscal year end is projected to $8,490,022.

Instructional and Other Materials expenses totaled $4,558,092 year‐to‐date, which is 36.3% above last year.  

COMPASS Internet Units, TCCTA Adobe Master Collection and additional support for Moodlerooms, Inc 

contributed to the increase.  Expenses in this area are projected to be $9,731,147.

i

Insurance/Risk Management payments totaled $6,519,144 year‐to‐date, 7.1% above last year.  The increase is 

due to an increase in insurance premiums.  Total expenses for the year are expected to be within budget at 

$6,871,709.

Tuition & Fee‐Extended Learning receipts totaled $5,754,735 year to date, 2.4% above last year.  Total tuition 

and fees‐Extended Learning at fiscal year end are expected to be $6,435,235.

Rental and Leases expenses totaled $1,734,546 year‐to‐date, which is 52.6% below the previous year.  The 

decrease is due to the completion of IT projects. Total expenses at  year end are projected to be $3,733,119.

Total revenue collections, net of exemptions and waivers, totaled $264,424,056 year‐to‐date.  This is a 1.4% decrease below last year. 

Total Salaries are $121,932,790 year‐to‐date, 1% above the previous year.  Total salaries at year end are 

expected to be $162,577,648.

Benefits costs totaled $13,499,589 year‐to‐date, 33.5% above last year.  This increase is due namely to  the 

reduction in the state's contribution to TRS and ORP and an increase in health insurance premiums. Total 

benefits at fiscal year end are expected to be $18,152,880.

Total revenues and expenditures by expense type for the Operating Fund for 2012‐2013 are reported on page one, 

behind the tab Detailed Financial Statements. Highlights of financial activities year‐to‐date are as follows:

State Appropriations received year to date totaled $50,459,091, 0.4% below last year. Total appropriations 

received are expected to be $70,014,007.  This amount was reduced by $218,031 due to a formula reallocation 

to align with the Legislative Budget Board data and methodology.

Ad Valorem Tax collections totaled $103,556,327 year‐to‐date.  The year‐to‐date total is 0.1% above last year.  

The proportion of tax revenue applied to operations decreased this year due to the increase in tax revenue 

applied to debt service.  However, this decrease in tax revenue to operations is offset by the increase in tax 

revenue due to increases in property valuations. We project total tax revenue for the fiscal year will be 

$105,811,761.

Tuition and Fees net revenue year to date totaled $102,550,407 which is 4% lower than the same time last year.  

Enrollment numbers for Fall 2012 declined 6.5% compared to last year.  There is a 10% decline in international 

students compared to last year.  We are projecting tuition and fees revenue to be $105,322,631.  

Page 6: Fs2013 may

Managements Discussion and Analysis

Thru May 31, 2013

Budget Priorities funding allocated for the year are detailed below through May 31, 2013. 

Contingency/Budget Priorities

Capital Outlay & Equipment

Position Management

Other

Total Contingency/Budget Priorities

Grants

Unexpended Plant Fund  

Total grant awards (federal, state & private) year‐to‐date total, $45,619,820.

Cash Position ‐ The use of the Unexpended Plant Fund Excluding 2004 CIP for deferred maintenance projects was 

discontinued in FY 2009.  All deferred maintenance expense is captured in the operating account.  See page 17 

for prior year encumbrances. 

Unexpended Plant Fund Projects include current construction, deferred maintenance, and property acquisition 

projects for a budget of $47,469,321.  Funds for these projects are 100% committed.  See page 18 for more 

details.

The 2004 CIP budgets are $263,779,995 and are 100% committed. The spending categories in the schedule have 

now been revised for more ease of reference to the Board approved budget.  Please see page 19 for the 

summary and pages 20 through 24 for details.

The Maintenance Tax Note 2006 tracks the financial progress of the Central Utility Plant.  Commitments year‐to‐

date total $12.5 million, 99.87% of budget.  See page 33 for the details. 

ii

Capital Outlay expenses totaled $2,398,636 year‐to‐date.  Expenditures are projected to $6,081,035.

Transfers/Debt activities totaled $27,756,872 year‐to‐date, a 21.7% decrease compared to last year. The 

decrease is due to a transfer in FY2012 to purchase the Westheimer/Eldridge land.  Items in this expense 

category include all student revenue bond payments, transfers for scholarship matching funds, and transfers to 

the Unexpended Plant Fund.  Total expenses are expected to be $35,304,211.

Total operating fund expenditures year‐to‐date total $206,380,368, a 1% increase above last year.  

The college has received $919,564 in new grant awards since the beginning of the current fiscal year. 

5,821,511$       

3,800,000          

Budgeted

1,445,240           3,258,377           (1,813,137)        

Expensed Remaining

6,127,136$        305,625$           

6,130,453           (2,330,453)        

The 2013 CIP budgets are $425,022,066 and are 2.4% committed to‐date. Please see page 25 for the summary 

and pages 26 through 30 for details.

Budget expenditures for grant‐funded projects so far this year total $11,489,736.

11,372,376$      9,694,455$        1,677,921$       

Page 7: Fs2013 may

Managements Discussion and Analysis

Thru May 31, 2013

Public Facility Corporation

Balance Sheet – Operating Fund   

Cash and Investments

Cash

Investments

    Total

Fund Balance

Audited Fund Balance, August 31, 2012

Projected Revenue @ 08/31/2013

Total Projected Revenue

Projected Expenses @ 08/31/2013

FY 2012 Purchase Order Roll 

Total Projected Expenses @ 08/31/2013

Ending Fund Balance (Beg. Fund Balance + Revenue ‐ Expenses)

Required Reserve for FY 2013 (11% Projected Revenues)

Added Reserves

Required Reserve for FY 2013 (11% Projected Revenues)

Current Reserves

% of Total Operating Revenue

The projected reserves at May 31, 2013 of $68,743,935 is an estimate at this time and represents 23.7% of expected 

general fund revenue for this fiscal year, which is within our financial stability policy requiring us to maintain a fund 

balance of 9% ‐11% of general fund revenues as of August 31.  

iii

Note: Salary increases are included in the total expense projection for fiscal year end.  The $1.8M set aside from reserves has been released to the fund balance and is reflected in the current reserve calculations.

31,949,060$              

68,743,935$              

23.7%

288,366,653$            

68,743,935$              

31,949,060$              

36,794,875$              

290,446,003              

357,110,588$            

285,970,659$            

2,395,994                   

13,922,294              2,998,094               

123,095,017$         93,136,995$          

66,664,585$              

The Public Facility Corporation tracks the progress of the PFC ‐ Public Safety Institute, Katy Campus (Westgate), 

Alief and Northline Mall deferred maintenance, new construction and renovation projects.  Expenditures year‐to‐

date total $100.8 million, 98.7% of budget. See pages PFC 1‐6 for details. 

May 2013 May 2012

109,172,723$         90,138,901$          

Page 8: Fs2013 may

YTD Adjusted Budget

YTD Actuals Thru 

May 31, 2013

YTD Actuals Thru 

May 31, 2012

2012‐2013 Inc/(Dec) 

vs. 2011‐2012

Actuals % 

Inc/(Dec)YTD vs. 

PriorYTD

Projected Actuals 

2012‐2013

Projected 2012‐2013 

Inc/(Dec) vs. Adj 

Budget

Projected 2012‐

2013 Inc/(Dec) vs. 

Adj Budget %

REVENUES

State Appropriations 70,232,038$           50,459,091$      50,684,310$      (225,219)$          ‐0.44% 70,014,007$      (218,031)$           ‐0.31%Ad Valorem Taxes 102,195,871           103,556,327     103,442,731     113,596            0.11% 105,811,761     3,615,890           3.54%Tuition, Net 43,067,676             39,639,661        41,427,600       (1,787,939)        ‐4.32% 41,042,849       (2,024,827)         ‐4.70%Fees 71,520,739             62,910,746        65,428,051       (2,517,305)        ‐3.85% 64,279,782       (7,240,958)         ‐10.12%Other Local Income* 2,517,960                1,724,272          1,136,970         587,302            51.66% 2,517,960         ‐                       0.00%Tuition & Fee, Net

 ‐‐ Extended Learning6,188,581                5,754,735            5,618,228           136,507              2.43% 6,345,235           156,654                2.53%

Grant Revenue 434,410                   379,224               365,517               13,707                 3.75% 434,410               ‐                         0.00%

Total Revenues 296,157,275           264,424,056       268,103,407       (3,679,350)          ‐1.37% 290,446,003$     (5,711,272)$         ‐1.93%

EXPENSES

Faculty‐FT  53,228,674             41,693,738        41,212,828       480,910            1.17% 53,281,172       52,498                0.10%

Faculty‐PT 31,311,734             23,240,849        23,272,513       (31,665)             ‐0.14% 31,212,804       (98,930)               ‐0.32%

Librarian/Counselor‐FT  4,731,891                3,610,519          4,507,653         (897,134)           ‐19.90% 4,731,891         ‐                       0.00%

Librarian/Counselor‐PT 874,639                  455,714             405,510             50,205               12.38% 852,907             (21,732)               ‐2.48%

Staff‐FT 65,055,458             47,681,479        45,962,085       1,719,394         3.74% 64,928,910       (126,548)             ‐0.19%Staff‐PT 10,197,797             5,250,492          5,289,012         (38,520)             ‐0.73% 7,569,964         (2,627,833)           ‐25.77%

     Sub‐total Salaries 165,400,193           121,932,790       120,649,601       1,283,189           1.06% 162,577,648       (2,822,545)           ‐1.71%

Employee Benefits 18,152,880             13,499,589        10,112,491       3,387,098         33.49% 18,152,880       ‐                       0.00%

Supplies Gen Exp 5,823,431                3,660,611          3,256,046         404,565            12.43% 5,387,680         (435,751)             ‐7.48%

Travel 1,090,047                634,105             553,391             80,715               14.59% 1,030,126         (59,921)               ‐5.50%

Marketing Costs 1,758,791                907,883             736,357             171,526            23.29% 1,466,130         (292,661)             ‐16.64%

Rental & Leases 2,855,658                1,734,546          3,657,624         (1,923,078)        ‐52.58% 3,733,119         877,461              30.73%

Insurance/Risk Mgmt 6,871,653                6,519,144          6,086,343         432,801            7.11% 6,871,709         56                        0.00%

Contract Services 24,282,921             15,014,072        12,720,551       2,293,521         18.03% 24,189,793       (93,128)               ‐0.38%

Utilities 12,895,476             5,880,346          5,325,238         555,108            10.42% 8,490,022         (4,405,454)         ‐34.16%

Other Departmental Expenses 2,185,756                1,430,302          1,055,733         374,569            35.48% 1,690,849         (494,907)             ‐22.64%

Instructional & Other Materials 10,080,136             4,558,092          3,343,217         1,214,875         36.34% 9,731,147         (348,989)             ‐3.46%

Maintenance & Repair 1,479,084                453,380             543,596             (90,215)             ‐16.60% 1,264,310         (214,774)             ‐14.52%

Transfers/Debt 35,304,211             27,756,872        35,442,504       (7,685,632)        ‐21.68% 35,304,211       ‐                       0.00%

Contingency (2,252,728)              ‐                          ‐                          ‐                           0.00% ‐                          2,252,728           ‐100.00%Capital Outlay 10,229,766             2,398,636          855,977             1,542,659         180.22% 6,081,035         (4,148,731)           ‐40.56%

     Total Expenses  296,157,275           206,380,368     204,338,669     2,041,699         1.00% 285,970,659     (10,186,616)       ‐3.44%

REVENUES H/(L) Vs EXPENSES 0                              58,043,688        63,764,737       (5,721,050)        4,475,344         4,475,344          

* Includes interest & dividends income, fines & penalties and parking fines

1

HOUSTON COMMUNITY COLLEGE2012‐2013 Revenues & Expenditures  HCCS CURRENT UNRESTRICTED

Page 9: Fs2013 may

Approved Budget Adjusted Budget

YTD Actuals Thru 

May 31, 2013

Encumbrances Thru 

May 31, 2013

Total Actuals & 

Encumbrances Thru 

May 31, 2013

Balance as of May 

31, 2013

YTD Actuals Thru 

May 31, 2012

Encumbrances Thru 

May 31, 2012

Total Actuals & 

Encumbrances Thru 

May 31, 2012

2012‐2013 Inc/(Dec) 

vs. 2011‐2012

Actuals & 

Encumbrances % 

Inc/(Dec)YTD vs. 

PriorYTD

EXPENSES

Faculty‐FT  53,228,674              53,281,172          41,693,738        10,013,439          51,707,177        1,573,995           41,212,828        10,467,264        51,680,092        27,084               0.05%

Faculty‐PT 31,311,734              31,212,804          23,240,849        1,612,296            24,853,145        6,359,659           23,272,513        1,297,401          24,569,915        283,230             1.15%

Librarian/Counselor‐FT  4,731,891                4,731,891            3,610,519          803,349                4,413,867          318,024               4,507,653          1,185,293          5,692,946          (1,279,078)        ‐22.47%

Librarian/Counselor‐PT 874,639                   852,907               455,714              165,049                620,763              232,144               405,510             157,506             563,016             57,747               10.26%

Staff‐FT 65,055,458              64,928,910          47,681,479        13,190,309          60,871,788        4,057,122           45,962,085        14,615,152        60,577,237        294,551             0.49%

Staff‐PT 10,197,797              7,569,964            5,250,492          2,038,527            7,289,019          280,945               5,289,012          2,020,777          7,309,788          (20,770)              ‐0.28%

     Sub‐total Salaries 165,400,193           162,577,648       121,932,790        27,822,968            149,755,758        12,821,890          120,649,601       29,743,393          150,392,994       (637,236)             ‐0.42%

Employee Benefits 18,152,880              18,152,880          13,499,589        2,546                    13,502,135        4,650,745           10,112,491        11,496                10,123,987        3,378,148         33.37%

Supplies Gen Exp 5,823,431                5,387,680            3,660,611          824,096                4,484,707          902,973               3,256,046          670,233             3,926,280          558,428             14.22%

Travel 1,090,047                1,030,126            634,105              540                        634,645              395,481               553,391             1,600                  554,991             79,655               14.35%

Marketing Costs 1,758,791                1,466,130            907,883              381,075                1,288,957          177,173               736,357             380,989             1,117,346          171,611             15.36%

Rental & Leases 2,855,658                3,733,119            1,734,546          362,657                2,097,203          1,635,916           3,657,624          645,131             4,302,755          (2,205,552)        ‐51.26%

Insurance/Risk Mgmt 6,871,653                6,871,709            6,519,144          ‐                             6,519,144          352,565               6,086,343          ‐                           6,086,343          432,801             7.11%

Contract Services 24,282,921              24,189,793          15,014,072        5,615,853            20,629,925        3,559,868           12,720,551        5,123,595          17,844,146        2,785,779         15.61%

Utilities 12,895,476              8,490,022            5,880,346          77,750                  5,958,097          2,531,925           5,325,238          64,599                5,389,837          568,260             10.54%

Other Departmental Expenses 2,185,756                1,690,849            1,430,302          133,072                1,563,374          127,475               1,055,733          111,943             1,167,676          395,698             33.89%

Instructional & Other Materials 10,080,136              9,731,147            4,558,092          2,835,337            7,393,429          2,337,718           3,343,217          724,182             4,067,399          3,326,030         81.77%

Maintenance & Repair 1,479,084                1,264,310            453,380              437,061                890,441              373,869               543,596             344,283             887,878             2,563                 0.29%

Transfers/Debt 35,304,211              35,304,211          27,756,872        ‐                             27,756,872        7,547,339           35,442,504        ‐                           35,442,504        (7,685,632)        ‐21.68%

Contingency (2,252,728)               ‐                            ‐                           ‐                           ‐                            ‐                           ‐                           ‐                          0.00%

Capital Outlay 10,229,766              6,081,035            2,398,636          2,334,775            4,733,411          1,347,624           855,977             1,500,295          2,356,272          2,377,139         100.89%

     Total Expenses  296,157,275           285,970,659       206,380,368      40,827,730          247,208,098      38,762,561         204,338,669     39,321,739        243,660,408     3,547,690         1.46%

2

HOUSTON COMMUNITY COLLEGE2012‐2013 Revenues and Expenditures & Encumbrances  HCCS CURRENT UNRESTRICTED

Page 10: Fs2013 may

FY 2011‐12 FY 2012‐13

Tuition

Budget:Adjusted Budget FY 2012‐13 43,067,676$           

Exemptions & Waivers (6,651,629)              

Adjusted Budget FY 2012‐13, Net 36,416,047$           

Revenues Received:Tuition 48,824,432              48,180,336              46,291,291             

Waivers & Exemptions:Dual Credit (5,170,736)               (5,108,218)               (4,726,200)              

Other (1,693,502)               (1,644,518)               (1,925,429)              

Total Waivers & Exemptions (6,864,238)               (6,752,736)               (6,651,629)              

Total Tuition Revenue, Net 41,960,194$          41,427,600$          39,639,662$           

Tuition ‐ Extended Learning

Budget:Budget FY 2012‐13 6,188,581$             

Exemptions & Waivers (1,890,966)              

Budget FY 2012‐13, Net 4,297,615$             

Revenues Received:

Tuition 8,853,381                7,659,258                7,645,701                

Waivers & Exemptions:

Corrections (2,612,080)             (2,041,030)             (1,890,966)             

Total EL Tuition Revenue, Net 6,241,301$             5,618,228$             5,754,735$             

Exemptions & Waivers

Dept of Corrections 2,612,080$              2,041,030$              1,890,966$             

Dual Credit Waiver 5,170,736                5,108,218                4,726,200                

Other:

Employee Fee Exemptions 84,810                      81,106                      67,293                     

Firemen 42,521                      42,334                      25,382                     

Hazelwood 906,036                   880,679                   1,228,103                

Deaf & Blind 309,603                   302,327                   255,379                   

High Ranking Hi SCH Grad 868                           868                           2,418                        

Child of Disabled Vet ETC 431                           572                           3,519                        

Nonres Military Per & Dep 2,390                        2,390                        ‐                            

Emp of State Coll & Univ ‐                            ‐                            319                           

Nonres Teach/Research Asst 13,905                      13,348                      10,443                     

Nonres Competitive Scholar ‐                            ‐                            2,301                        

Senior Citizens 18,730                      17,307                      15,090                     

Scholarship Distribution 1,450                        1,450                        ‐                            

Apprenticeship Waivers (28)                            (28)                            (38)                            

Special Fees Waiver HFD 117                           117                           ‐                            

A VISA Waiver (Non‐Alien Waiver) 1,110                        1,110                  ‐                            

Refugee Waiver (1,554)                       (1,110)                       (162)                          

Foster Children‐Resident 294,543                   284,274                   300,257                   

Fire Academy Waiver 157                           157                           ‐                            

Undocumented Students 2,171                        1,281                        ‐                            

TX Tomorrow Waiver 2,874                        2,875                        ‐                            

Peace Officer Exemption 13,368                      13,461                      14,275                     

Stipends ‐                            ‐                            850                           

Total Other Exemptions 1,693,502                1,644,518                1,925,429                

Grand Total Exemptions & Waivers 9,476,318$             8,793,766$             8,542,595$             

Note:   As of December 31, 2008, the financial statements reflect all expenses incurred for Exemptions and Waivers as net of tuition and fee revenue.  Prior to this date Exemptions & Waivers were shown as an expenditure and revenue was shown as gross revenue.

3

Exemptions & Waivers

Thur May 31, 2013

Account

 End of Year 

Activity 

Year‐to‐Date 

Activity thru 

5/31/2012

 Year‐to‐Date 

Activity thru 

5/31/2013 

Page 11: Fs2013 may

     Unrestricted  Auxiliary  Restricted  Total 

Unexpended 

Plant Renewal 

 Retirement of 

Debt 

Investment in 

Plant  Total 

Consolidation & 

Elimination  Total All Funds 

ASSETSCurrent Assets:

Cash &  cash equivalents 109,172,723$      9,622,386$        ‐$                         118,795,109$     ‐$                          14,871,781         ‐$                          14,871,781$            ‐$                              133,666,890$         

Restricted cash & cash equivalents ‐                             ‐                           15,003,006       15,003,006        504,373,877      27,240,641         ‐                           531,614,518           ‐                                546,617,524          

Short term Investments ‐                             ‐                           ‐                          ‐                           ‐                           ‐                           ‐                           ‐                                ‐                                ‐                                

Accounts/Other receivable (net) 18,718,461          1,036,892           2,793,621          22,548,974        ‐                           628,243               ‐                           628,243                   ‐                                23,177,217            

Deferred charges 389,590                393,022              ‐                          782,612              ‐                           ‐                           ‐                           ‐                                ‐                                782,612                  

Prepaids 52,625                  15,346                ‐                          67,971                881,382              ‐                           ‐                           881,382                   ‐                                949,353                  

Total Current Assets 128,333,399        11,067,646        17,796,627       157,197,672      505,255,259      42,740,665         ‐                           547,995,924           ‐                                705,193,596          

Non‐current Assets:

Deferred charges, net ‐                             ‐                           ‐                          ‐                           3,548,100           ‐                           2,601,880           6,149,980                ‐                                6,149,980               

Restricted long‐term investments ‐                             ‐                           ‐                          ‐                           17,585,568        2,578,527            ‐                           20,164,095             ‐                                20,164,095            

Long‐term investments 13,922,294          ‐                           ‐                          13,922,294        ‐                           ‐                           ‐                           ‐                                ‐                                13,922,294            

Capital Assets, net ‐                             ‐                           ‐                          ‐                           88,266,879        ‐                           668,886,540      757,153,419           ‐                                757,153,419          

Total Non‐current Assets 13,922,294          ‐                           ‐                          13,922,294        109,400,547      2,578,527            671,488,420      783,467,494           ‐                                797,389,788          

Total Assets 142,255,693$      11,067,646$      17,796,627$      171,119,966$     614,655,806$     45,319,192$       671,488,420$     1,331,463,418$       ‐$                              1,502,583,383$      

LIABILITIESCurrent Liabilities:

Accounts payable 7,488,178             308,287              2,642,885          10,439,350        97,346                ‐                           ‐                           97,346                     ‐                                10,536,696            

Accrued liabilities 228,681                ‐                            27,199                 255,880                142,635                ‐                            ‐                             142,635                     ‐                                  398,515                    

Compensated absences 2,351,464             ‐                           ‐                          2,351,464           ‐                           ‐                           ‐                           ‐                                ‐                                2,351,464               

Funds held for others 107,889              543,594             651,483              189,209              ‐                           ‐                           189,209                   ‐                                840,692                  

Deferred revenue 4,289,350             316,851              1,221,947          5,828,148           1,599,275           ‐                           (1,600,060)         (785)                         ‐                                5,827,363               

Notes payable‐current portion ‐                             ‐                           ‐                          ‐                           ‐                           ‐                           ‐                           ‐                                ‐                                ‐                                

Bonds payable‐current portion ‐                             ‐                           ‐                          ‐                           ‐                           ‐                           ‐                           ‐                                ‐                                ‐                                

Capital lease obligations‐current ‐                             ‐                           ‐                          ‐                           ‐                           ‐                           ‐                           ‐                                ‐                                ‐                                

Total Current Liabilities 14,357,673          733,027$            4,435,625          19,526,325        2,028,465           ‐                           (1,600,060)         428,405                   ‐                                19,954,730            

Non‐current Liabilities:

Deposits ‐                             ‐                           ‐                          ‐                           ‐                           ‐                           ‐                           ‐                                ‐                                ‐                                

Notes payable ‐                             ‐                           ‐                          ‐                           139,850,892      ‐                           37,761,145        177,612,037           ‐                                177,612,037          

Bonds payable ‐                             ‐                           ‐                          ‐                           465,221,463      27,838,473         294,379,496      787,439,431           ‐                                787,439,431          

Capital lease obligations ‐                             ‐                           ‐                          ‐                           ‐                           ‐                           104,429,832      104,429,832           ‐                                104,429,832          

Total Non‐current Liabilities ‐                             ‐                           ‐                          ‐                           605,072,355      27,838,473         436,570,472      1,069,481,300        ‐                                1,069,481,300       

Total Liabilities 14,357,673$        733,027$            4,435,625$        19,526,325$       607,100,820$     27,838,473$       434,970,412$     1,069,909,705$       ‐$                              1,089,436,028$      

 Fund Balance‐ 

August 31, 2012 Audited  66,664,585          11,747,296         9,080,325            87,492,206          3,738,684             10,061,216         235,429,798        249,229,698             ‐                                  336,721,904            

Revenues Over Expenditures

     Unrestricted 61,233,435          (1,412,678)         59,820,757        59,820,757            

     Restricted 4,280,677          4,280,677           4,280,677               

     Net Investment in Plant     3,816,304           7,419,502            1,088,210           12,324,016             12,324,016            

Total Fund Balances 127,898,020$      10,334,618$      13,361,002$      151,593,640$     7,554,988$         17,480,718$       236,518,008$     261,553,714$          ‐$                              413,147,355$         

 Total Liabilities &  Fund Balances  142,255,693$      11,067,645$      17,796,627$      171,119,965$     614,655,806$     45,319,191$       671,488,420$     1,331,463,419$       ‐$                              1,502,583,383$      

      4 

PLANT & BOND FUNDS

Houston Community CollegeBalance Sheet By Fund

For Month Ended May 31, 2013

CURRENT & LOAN FUNDS

Page 12: Fs2013 may

 CENTRAL 

 NORTH

WEST 

 NORTH

EAST 

 SOUTH

WEST   SOUTH EAST   COLEMAN 

 EXTENDED 

LEARNING 

 CHAN‐

CELLOR 

DEPUTY CHAN‐

CELLOR 

INSTITU‐

TIONAL 

EFFECTIVE‐

NESS 

 INSTRUC‐

TION 

 INFO

TECH 

 STUDENT 

SUCCESS   SYSTEM   HCCS 

 % of 

Adjusted 

Budget 

EXPENSES

Faculty‐FT  10,195,480      10,163,100      7,400,874         12,026,069     4,877,743       5,882,175       2,368,137       ‐                  ‐                    ‐                   315,096          ‐                  ‐                  ‐                  53,228,674      17.97%

Faculty‐PT 4,787,396         6,308,132         4,079,151         5,764,304        3,808,888       2,033,363       3,743,342       ‐                  ‐                    ‐                   787,158          ‐                  ‐                  ‐                  31,311,734      10.57%

Librarian/Counselor‐FT  926,123            1,117,866         921,929            731,058           522,092          84,180            2,887              ‐                  ‐                    ‐                   340,010          ‐                  85,746            ‐                  4,731,891        1.60%

Librarian/Counselor‐PT 95,927              194,185            119,380            214,206           83,152            34,980            ‐                  ‐                  ‐                    ‐                   22,273            ‐                  110,536          ‐                  874,639           0.30%

Staff‐FT 5,629,964         4,634,247         4,800,256         5,688,119        3,857,557       2,400,022       3,738,173       4,527,546       14,500,024    102,108           4,270,642       6,619,904       4,286,896       ‐                  65,055,458      21.97%

Staff‐PT 1,947,687         1,668,906         761,730            1,601,871        1,223,419       395,385          783,120          279,749          568,193           ‐                   346,597          207,010          414,130          ‐                  10,197,797      3.44%

     Sub‐total Salaries 23,582,577      24,086,436      18,083,320      26,025,627     14,372,851    10,830,105    10,635,659    4,807,295       15,068,217    102,108           6,081,776       6,826,914       4,897,308       ‐                  165,400,193    55.85%

Employee Benefits ‐                     ‐                     ‐                     4                       ‐                  ‐                  ‐                  ‐                  ‐                    ‐                   ‐                  ‐                  ‐                  18,152,876    18,152,880      6.13%

Supplies Gen Exp 279,705            399,036            216,997            315,072           255,037          348,356          227,717          332,859          1,149,111        ‐                   223,223          329,758          (33,985)           1,780,545       5,823,431        1.97%

Travel 104,309            116,155            31,841              62,656             44,227            119,517          94,943            152,518          125,839           ‐                   106,940          93,846            37,256            ‐                  1,090,047        0.37%

Marketing Costs 49,679              46,070              79,202              37,907             78,882            36,623            405,734          159,994          862,700           ‐                   ‐                  2,000              ‐                  ‐                  1,758,791        0.59%

Rental & Leases 31,920              136,358            1,311,353         519,565           41,484            483,719          34,310            71,622            186,266           ‐                   3,750              26,760            8,551              ‐                  2,855,658        0.96%

Insurance/Risk Mgmt 794                    ‐                     ‐                     98                     ‐                  ‐                  ‐                  ‐                  ‐                    ‐                   ‐                  676                 ‐                  6,870,085       6,871,653        2.32%

Contract Services 310,385            307,331            50,877              31,317             144,472          345,172          397,302          551,201          13,185,798    ‐                   167,345          2,777,235       56,383            5,958,103       24,282,921      8.20%

Utilities 3,331                ‐                     4,600                ‐                   ‐                  ‐                  ‐                  ‐                  1,583,338        ‐                   ‐                  1,400,000       ‐                  9,904,207       12,895,476      4.35%

Other Departmental Expenses 72,347              45,342              40,541              39,732             123,850          130,570          63,346            355,326          196,703           ‐                   191,998          256,691          258,094          411,216          2,185,756        0.74%

Instructional & Other Materials 487,851            378,372            170,314            300,512           96,599            359,831          907,224          132,531          31,312             ‐                   1,081,957       5,855,541       278,092          ‐                  10,080,136      3.40%

Maintenance & Repair 131,243            32,002              59,183              27,067             11,772            86,074            159,700          1,265              944,405           ‐                   6,460              14,780            2,614              2,519              1,479,084        0.50%

Transfers/Debt ‐                     845,619            5,636,142         1,155,001        ‐                  ‐                  ‐                  ‐                  3,264               ‐                   ‐                  ‐                  494,389          27,169,796    35,304,211      11.92%

Contingency 50                       7,354                40,000              2,621               25,000            8,280              ‐                  68,000            20,446             ‐                   25,699            50,000            8,197              (2,508,375)     (2,252,728)       ‐0.76%

Capital Outlay 587,371            231,370            277,410            115,059           228,237          591,021          33,459            62,350            2,955,040        ‐                   1,387              976,810          56,016            4,114,236       10,229,766      3.45%

Total Budget 25,641,562      26,631,445      26,001,780      28,632,238     15,422,411    13,339,268    12,959,394    6,694,961       36,312,439    102,108           7,890,535       18,611,011    6,062,915       71,855,208    296,157,275    100.00%

  5 

 CENTRAL 

 NORTH

WEST 

 NORTH

EAST 

 SOUTH

WEST   SOUTH EAST   COLEMAN 

 EXTENDED 

LEARNING 

 CHAN‐

CELLOR 

DEPUTY CHAN‐

CELLOR 

INSTITU‐

TIONAL 

EFFECTIVE‐

NESS 

 INSTRUC‐

TION 

 INFO

TECH 

 STUDENT 

SUCCESS   SYSTEM   HCCS 

 % of 

Actuals 

EXPENSES

Faculty‐FT  8,080,695         8,025,682         5,707,064         9,526,616        3,838,819       4,549,155       1,843,129       ‐                  ‐                    ‐                   122,579          ‐                  ‐                  ‐                  41,693,738      20.20%

Faculty‐PT 3,693,761         4,831,285         3,047,109         4,475,961        3,079,033       1,279,870       2,525,825       ‐                  ‐                    ‐                   308,004          ‐                  ‐                  ‐                  23,240,849      11.26%

Librarian/Counselor‐FT  741,115            801,372            694,140            570,404           410,948          57,641            2,886              ‐                  ‐                    ‐                   271,662          ‐                  60,351            ‐                  3,610,519        1.75%

Librarian/Counselor‐PT 45,868              114,299            92,601              123,013           33,439            18,075            ‐                  ‐                  ‐                    ‐                   ‐                  ‐                  28,420            ‐                  455,714           0.22%

Staff‐FT 4,108,938         3,326,752         3,457,378         4,163,100        2,836,620       1,790,641       2,775,035       3,256,441       10,761,928    76,580             3,146,699       4,796,272       3,185,095       ‐                  47,681,479      23.10%

Staff‐PT 920,094            943,759            509,394            868,099           672,458          196,597          449,022          95,425            231,337           ‐                   127,801          92,273            144,235          ‐                  5,250,492        2.54%

     Sub‐total Salaries 17,590,470      18,043,149      13,507,686      19,727,192     10,871,316    7,891,978       7,595,897       3,351,866       10,993,265    76,580             3,976,744       4,888,545       3,418,101       ‐                  121,932,790    59.08%

Employee Benefits ‐                     ‐                     ‐                     3                       ‐                  ‐                  ‐                  ‐                  ‐                    ‐                   ‐                  ‐                  ‐                  13,499,586    13,499,589      6.54%

Supplies Gen Exp 164,261            205,411            152,421            192,699           155,185          163,524          159,036          206,910          673,136           ‐                   163,864          113,663          89,938            1,220,565       3,660,611        1.77%

Travel 44,035              74,558              15,034              34,843             17,711            70,233            54,116            121,866          61,921             ‐                   76,931            37,030            25,826            ‐                  634,105           0.31%

Marketing Costs 7,949                30,859              24,770              28,043             31,045            26,944            112,681          99,978            545,614           ‐                   ‐                  ‐                  ‐                  ‐                  907,883           0.44%

Rental & Leases 31,898              51,707              695,869            456,575           15,320            286,965          7,667              23,699            149,828           ‐                   1,245              11,358            2,415              ‐                  1,734,546        0.84%

Insurance/Risk Mgmt ‐                     ‐                     ‐                     ‐                   ‐                  ‐                  ‐                  ‐                  ‐                    ‐                   ‐                  ‐                  ‐                  6,519,144       6,519,144        3.16%

Contract Services 101,315            90,614              28,882              17,323             73,878            282,652          86,893            128,830          8,302,611        ‐                   105,165          1,182,681       44,023            4,569,204       15,014,072      7.27%

Utilities 2,080                ‐                     3,200                ‐                   ‐                  ‐                  ‐                  ‐                  494,185           ‐                   ‐                  941,522          ‐                  4,439,359       5,880,346        2.85%

Other Departmental Expenses 28,578              33,550              30,166              18,027             18,024            59,725            40,629            258,350          123,521           ‐                   128,581          132,404          157,611          401,134          1,430,302        0.69%

Instructional & Other Materials 306,923            165,841            88,832              223,526           43,867            149,264          370,895          ‐                  11,625             ‐                   563,371          2,398,676       235,273          ‐                  4,558,092        2.21%

Maintenance & Repair 34,910              14,382              24,849              5,898               6,225              28,328            77,144            724                 246,031           ‐                   6,459              6,234              2,198              ‐                  453,380           0.22%

Transfers/Debt ‐                     845,382            5,634,237         1,155,000        ‐                  ‐                  ‐                  ‐                  ‐                    ‐                   ‐                  ‐                  ‐                  20,122,252    27,756,872      13.45%

Contingency ‐                     ‐                     ‐                     ‐                   ‐                  ‐                  ‐                  ‐                  ‐                    ‐                   ‐                  ‐                  ‐                  ‐                  ‐                    0.00%

Capital Outlay 506,618            107,579            90,937              85,277             61,128            77,846            30,569            28,853            918,426           ‐                   ‐                  491,403          ‐                  ‐                  2,398,636        1.16%

Total Expense 18,819,038      19,663,033      20,296,884      21,944,405     11,293,700    9,037,459       8,535,527       4,221,076       22,520,162    76,580             5,022,360       10,203,516    3,975,386       50,771,244    206,380,368    100.00%% of Adjusted 

Budget by Division 73.39% 73.83% 78.06% 76.64% 73.23% 67.75% 65.86% 63.05% 62.02% 75.00% 63.65% 54.83% 65.57% 70.66% 69.69% 100.00%

Remaining Balance 6,822,524         6,968,412         5,704,896         6,687,833        4,128,711       4,301,809       4,423,867       2,473,885       13,792,277    25,528             2,868,175       8,407,495       2,087,529       21,083,964    89,776,907     

HOUSTON COMMUNITY COLLEGE2012‐2013 Expenditures

YTD Adjusted Budget by Division

YTD Actuals by Division

Page 13: Fs2013 may

Sept. Oct. Nov. Dec. Jan. Feb. Mar. Apr. May June July  Aug.

Central                                 FY2013 8.77% 17.29% 26.04% 33.04% 39.26% 47.17% 57.14% 65.82% 73.39%

                                              FY2012 8.89% 17.89% 27.03% 35.01% 41.49% 49.28% 58.01% 66.97% 74.34% 81.43% 88.98% 94.59%

Northwest                          FY2013 8.26% 17.69% 26.42% 33.44% 38.94% 47.07% 55.52% 66.24% 73.83%

                                              FY2012 8.55% 18.72% 27.39% 33.69% 38.31% 46.70% 55.31% 66.77% 74.43% 81.57% 89.43% 95.09%

Northeast                           FY2013 6.80% 19.95% 27.15% 32.73% 37.67% 43.91% 50.45% 72.27% 78.06%

                                              FY2012 6.70% 20.76% 27.75% 33.82% 40.16% 46.70% 53.35% 76.04% 82.19% 88.46% 94.27% 98.45%

Southwest                          FY2013 8.59% 19.46% 28.35% 35.52% 42.81% 50.66% 58.75% 69.07% 76.64%

                                              FY2012 8.58% 19.19% 28.11% 36.68% 43.63% 50.96% 58.38% 71.97% 79.03% 85.23% 92.21% 96.87%

Southeast                            FY2013 7.94% 16.74% 25.87% 33.20% 39.17% 47.32% 56.36% 65.24% 73.23%

                                              FY2012 8.68% 17.97% 27.56% 35.39% 41.33% 49.39% 57.90% 67.21% 74.92% 81.69% 89.81% 95.46%

Coleman                              FY2013 8.06% 17.28% 24.93% 31.55% 37.77% 46.07% 53.62% 60.80% 67.75%

                                              FY2012 8.26% 17.29% 25.18% 32.46% 39.63% 47.52% 55.02% 63.80% 71.21% 79.83% 87.22% 93.29%

Extended Learning            FY2013 7.79% 15.60% 23.76% 31.35% 35.83% 43.18% 50.20% 58.35% 65.86%

6                                               FY2012 7.97% 15.68% 23.55% 30.39% 37.09% 45.43% 53.07% 60.96% 69.35% 76.72% 84.68% 91.63%

Chancellor                           FY2013 7.14% 13.81% 24.51% 30.61% 37.97% 44.47% 51.04% 57.47% 63.05%

                                              FY2012 8.66% 16.11% 23.27% 30.27% 39.34% 45.84% 53.37% 61.08% 68.18% 74.82% 81.30% 89.24%

Deputy Chancellor             FY2013 4.52% 10.80% 17.79% 31.74% 38.89% 45.25% 43.00% 54.57% 62.02%

                                              FY2012 4.52% 10.28% 16.85% 22.58% 31.70% 38.52% 45.34% 51.71% 59.06% 69.23% 76.82% 80.46%

Institute Effectiveness      FY2013 8.33% 16.67% 25.00% 33.33% 41.67% 50.00% 58.33% 66.67% 75.00%

                                              FY2012 5.76% 15.21% 22.37% 29.85% 38.13% 45.15% 52.82% 59.23% 67.73% 76.94% 85.77% 94.82%

Instruction                          FY2013 6.55% 15.59% 22.53% 28.70% 33.58% 42.38% 49.16% 55.69% 63.65%

                                              FY2012 6.73% 16.23% 22.67% 28.96% 35.81% 42.78% 52.10% 59.22% 65.59% 72.63% 82.25% 89.27%

Info Tech                              FY2013 5.56% 12.11% 16.63% 20.99% 29.10% 35.17% 39.77% 47.07% 54.83%

                                              FY2012 20.14% 33.96% 40.28% 45.47% 52.99% 59.23% 64.92% 71.03% 76.35% 82.70% 88.44% 99.49%

Student Success                 FY2013 7.33% 14.68% 23.02% 30.31% 40.96% 44.53% 49.81% 58.28% 65.57%

                                              FY2012 8.33% 15.89% 23.44% 30.58% 40.76% 48.76% 56.63% 65.19% 72.58% 80.37% 90.28% 98.41%

System                                 FY2013 12.41% 18.87% 22.34% 27.24% 33.14% 37.21% 42.87% 66.35% 70.66%

                                              FY2012 22.23% 25.94% 29.46% 32.09% 36.45% 39.69% 43.39% 63.98% 68.16% 71.84% 79.45% 88.27%

Total HCCS                           FY2013 8.55% 16.77% 23.49% 30.55% 36.88% 43.38% 49.23% 63.07% 69.69%

                                              FY2012 12.05% 20.09% 26.81% 32.55% 38.82% 45.08% 51.63% 65.11% 71.48% 77.90% 85.35% 91.73%

Houston Community College

Cash Flow Analysis ‐ Monthly Percentage of Budget UsedFY2013 vs. FY2012

Page 14: Fs2013 may

Adjusted Budget 

FY2012

YTD Actuals Thru 

5/31/2012 % of Budget Used

Adjusted Budget 

FY2013

YTD Actuals Thru 

5/31/2013 % of Budget Used

EXPENSES

Faculty‐FT  10,358,989          8,194,426        79.10% 10,195,480        8,080,695          79.26%

Faculty‐PT 4,887,224             3,811,155        77.98% 4,787,396           3,693,761          77.16%

Librarian/Counselor‐FT  1,079,656             799,786           74.08% 926,123              741,115             80.02%

Librarian/Counselor‐PT 88,599                  32,456              36.63% 95,927                45,868                47.82%

Staff‐FT 5,314,141             3,963,481        74.58% 5,629,964           4,108,938          72.98%

Staff‐PT 1,853,529             1,010,149        54.50% 1,947,687           920,094             47.24%

     Sub‐total Salaries 23,582,138          17,811,454      75.53% 23,582,577        17,590,470        74.59%

Employee Benefits ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Supplies Gen Exp 268,356                124,630           46.44% 279,705              164,261             58.73%

Travel 103,982                58,091              55.87% 104,309              44,035                42.22%

Marketing Costs 52,043                  34,514              66.32% 49,679                7,949                 16.00%

Rental & Leases 80,498                  65,000              80.75% 31,920                31,898                99.93%

Insurance/Risk Mgmt 794                        444                   55.97% 794                       ‐                     0.00%

Contract Services 269,193                194,024           72.08% 310,385              101,315             32.64%

Utilities ‐                         ‐                    ‐                 3,331                  2,080                 0.00%

Other Departmental Expenses 66,885                  19,087              28.54% 72,347                28,578                39.50%

Instructional & Other Materials 463,206                303,081           65.43% 487,851              306,923             62.91%

Maintenance & Repair 156,421                36,666              23.44% 131,243              34,910                26.60%

Transfers/Debt ‐                         ‐                    ‐                 ‐                        ‐                     ‐                      

Contingency ‐                         ‐                    0.00% 50                         ‐                     ‐                      

Capital Outlay 118,664                58,121              48.98% 587,371              506,618             86.25%

     Total Expenses  25,162,180          18,705,113      74.34% 25,641,562        18,819,038        73.39%

Adjusted Budget 

FY2012

YTD Actuals Thru 

5/31/2012 % of Budget Used

Adjusted Budget 

FY2013

YTD Actuals Thru 

5/31/2013 % of Budget Used

EXPENSES

Faculty‐FT  9,630,467             7,508,383        77.96% 10,163,100        8,025,682          78.97%

Faculty‐PT 5,859,857             4,479,681        76.45% 6,308,132           4,831,285          76.59%

Librarian/Counselor‐FT  1,067,837             773,953           72.48% 1,117,866           801,372             71.69%

Librarian/Counselor‐PT 145,675                93,377              64.10% 194,185              114,299             58.86%

Staff‐FT 3,942,494             2,903,213        73.64% 4,634,247           3,326,752          71.79%

Staff‐PT 1,441,357             851,844           59.10% 1,668,906           943,759             56.55%

     Sub‐total Salaries 22,087,687          16,610,451      75.20% 24,086,436        18,043,149        74.91%

Employee Benefits ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Supplies Gen Exp 289,408                96,473              33.33% 399,036              205,411             51.48%

Travel 86,615                  60,065              69.35% 116,155              74,558                64.19%

Marketing Costs 41,630                  28,249              67.86% 46,070                30,859                66.98%

Rental & Leases 128,854                42,580              33.05% 136,358              51,707                37.92%

Insurance/Risk Mgmt 15                          ‐                    0.00% ‐                        ‐                     0.00%

Contract Services 288,336                162,728           56.44% 307,331              90,614                29.48%

Utilities ‐                         ‐                    ‐                 ‐                        ‐                     0.00%

Other Departmental Expenses 50,578                  27,567              54.50% 45,342                33,550                73.99%

Instructional & Other Materials 207,912                95,209              45.79% 378,372              165,841             43.83%

Maintenance & Repair 23,961                  10,423              43.50% 32,002                14,382                44.94%

Transfers/Debt 883,899                864,216           97.77% 845,619              845,382             ‐                      

Contingency 5,667                    ‐                    0.00% 7,354                  ‐                     ‐                      

Capital Outlay 144,121                43,661              30.29% 231,370              107,579             46.50%

     Total Expenses  24,238,683          18,041,624      74.43% 26,631,445        19,663,033        73.83%

Central College

Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used

Northwest College

Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used

7

Page 15: Fs2013 may

Adjusted Budget 

FY2012

YTD Actuals Thru 

5/31/2012 % of Budget Used

Adjusted Budget 

FY2013

YTD Actuals Thru 

5/31/2013 % of Budget Used

EXPENSES

Faculty‐FT  6,990,203             5,434,958        77.75% 7,400,874           5,707,064          77.11%

Faculty‐PT 3,924,680             3,326,017        84.75% 4,079,151           3,047,109          74.70%

Librarian/Counselor‐FT  1,070,440             818,477           76.46% 921,929              694,140             75.29%

Librarian/Counselor‐PT 113,216                79,287              70.03% 119,380              92,601                77.57%

Staff‐FT 4,537,242             3,399,027        74.91% 4,800,256           3,457,378          72.02%

Staff‐PT 716,527                471,127           65.75% 761,730              509,394             66.87%

     Sub‐total Salaries 17,352,308          13,528,894      77.97% 18,083,320        13,507,686        74.70%

Employee Benefits ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Supplies Gen Exp 286,185                217,339           75.94% 216,997              152,421             70.24%

Travel 39,462                  19,363              49.07% 31,841                15,034                47.21%

Marketing Costs 57,459                  32,155              55.96% 79,202                24,770                31.27%

Rental & Leases 1,297,276             930,345           71.72% 1,311,353           695,869             53.06%

Insurance/Risk Mgmt ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Contract Services 44,979                  20,853              46.36% 50,877                28,882                56.77%

Utilities 3,800                    1,900                50.00% 4,600                  3,200                 0.00%

Other Departmental Expenses 43,746                  22,002              50.30% 40,541                30,166                74.41%

Instructional & Other Materials 139,955                88,422              63.18% 170,314              88,832                52.16%

Maintenance & Repair 50,992                  42,714              83.77% 59,183                24,849                41.99%

Transfers/Debt 5,640,942             5,639,337        99.97% 5,636,142           5,634,237          ‐                      

Contingency 12,607                  ‐                    0.00% 40,000                ‐                     ‐                      

Capital Outlay 48,101                  19,493              40.53% 277,410              90,937                32.78%

     Total Expenses  25,017,812          20,562,818      82.19% 26,001,780        20,296,884        78.06%

Adjusted Budget 

FY2012

YTD Actuals Thru 

5/31/2012 % of Budget Used

Adjusted Budget 

FY2013

YTD Actuals Thru 

5/31/2013 % of Budget Used

EXPENSES

Faculty‐FT  12,218,531          9,623,518        78.76% 12,026,069        9,526,616          79.22%

Faculty‐PT 6,210,765             5,001,677        80.53% 5,764,304           4,475,961          77.65%

Librarian/Counselor‐FT  1,283,769             1,015,620        79.11% 731,058              570,404             78.02%

Librarian/Counselor‐PT 170,058                121,263           71.31% 214,206              123,013             57.43%

Staff‐FT 5,146,606             3,891,579        75.61% 5,688,119           4,163,100          73.19%

Staff‐PT 1,586,897             1,037,007        65.35% 1,601,871           868,099             54.19%

     Sub‐total Salaries 26,616,625          20,690,664      77.74% 26,025,627        19,727,192        75.80%

Employee Benefits ‐                         ‐                    ‐                 4                           3                         ‐                 

Supplies Gen Exp 277,712                150,148           54.07% 315,072              192,699             61.16%

Travel 54,664                  30,244              55.33% 62,656                34,843                55.61%

Marketing Costs 47,540                  31,089              65.40% 37,907                28,043                73.98%

Rental & Leases 755,577                610,521           80.80% 519,565              456,575             87.88%

Insurance/Risk Mgmt 154                        56                     ‐                 98                         ‐                     0.00%

Contract Services 46,736                  23,937              51.22% 31,317                17,323                55.31%

Utilities ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Other Departmental Expenses 39,240                  19,791              50.43% 39,732                18,027                45.37%

Instructional & Other Materials 211,422                116,878           55.28% 300,512              223,526             74.38%

Maintenance & Repair 30,587                  10,675              34.90% 27,067                5,898                 21.79%

Transfers/Debt 2,484,173             2,484,044        99.99% 1,155,001           1,155,000          100.00%

Contingency 7,024                    ‐                    0.00% 2,621                  ‐                     0.00%

Capital Outlay 96,837                  68,883              71.13% 115,059              85,277                74.12%

     Total Expenses  30,668,291          24,236,931      79.03% 28,632,238        21,944,405        76.64%

8

Northeast College

Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used

Southwest College

Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used

Page 16: Fs2013 may

Adjusted Budget 

FY2012

YTD Actuals Thru 

5/31/2012 % of Budget Used

Adjusted Budget 

FY2013

YTD Actuals Thru 

5/31/2013 % of Budget Used

EXPENSES

Faculty‐FT  4,852,256             3,814,360        78.61% 4,877,743           3,838,819          78.70%

Faculty‐PT 3,525,403             2,866,507        81.31% 3,808,888           3,079,033          80.84%

Librarian/Counselor‐FT  714,338                536,632           75.12% 522,092              410,948             78.71%

Librarian/Counselor‐PT 79,814                  37,266              46.69% 83,152                33,439                40.21%

Staff‐FT 3,366,604             2,450,472        72.79% 3,857,557           2,836,620          73.53%

Staff‐PT 1,054,322             624,449           59.23% 1,223,419           672,458             54.97%

     Sub‐total Salaries 13,592,738          10,329,686      75.99% 14,372,851        10,871,316        75.64%

Employee Benefits ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Supplies Gen Exp 213,445                143,542           67.25% 255,037              155,185             60.85%

Travel 53,933                  17,812              33.03% 44,227                17,711                40.05%

Marketing Costs 68,782                  52,283              76.01% 78,882                31,045                39.36%

Rental & Leases 171,869                153,990           89.60% 41,484                15,320                36.93%

Insurance/Risk Mgmt 105                        105                   ‐                 ‐                        ‐                     ‐                 

Contract Services 138,324                96,559              69.81% 144,472              73,878                51.14%

Utilities ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Other Departmental Expenses 148,315                25,061              16.90% 123,850              18,024                14.55%

Instructional & Other Materials 61,020                  38,745              63.50% 96,599                43,867                45.41%

Maintenance & Repair 14,562                  6,285                43.16% 11,772                6,225                 52.88%

Transfers/Debt ‐                         ‐                    ‐                 ‐                        ‐                     ‐                      

Contingency 30,436                  ‐                    0.00% 25,000                ‐                     0.00%

Capital Outlay 76,053                  51,375              67.55% 228,237              61,128                26.78%

     Total Expenses  14,569,582          10,915,443      74.92% 15,422,411        11,293,700        73.23%

Adjusted Budget 

FY2012

YTD Actuals Thru 

5/31/2012 % of Budget Used

Adjusted Budget 

FY2013

YTD Actuals Thru 

5/31/2013 % of Budget Used

EXPENSES

Faculty‐FT  6,085,189             4,725,720        77.66% 5,882,175           4,549,155          77.34%

Faculty‐PT 1,849,491             1,197,682        64.76% 2,033,363           1,279,870          62.94%

Librarian/Counselor‐FT  165,915                137,243           82.72% 84,180                57,641                68.47%

Librarian/Counselor‐PT 29,835                  22,192              74.38% 34,980                18,075                51.67%

Staff‐FT 2,322,216             1,735,536        74.74% 2,400,022           1,790,641          74.61%

Staff‐PT 336,915                196,706           58.38% 395,385              196,597             49.72%

     Sub‐total Salaries 10,789,561          8,015,079        74.29% 10,830,105        7,891,978          72.87%

Employee Benefits ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Supplies Gen Exp 353,629                141,869           40.12% 348,356              163,524             46.94%

Travel 80,949                  42,470              52.46% 119,517              70,233                58.76%

Marketing Costs 23,823                  2,020                8.48% 36,623                26,944                73.57%

Rental & Leases 488,309                328,831           67.34% 483,719              286,965             59.32%

Insurance/Risk Mgmt ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Contract Services 330,784                196,613           59.44% 345,172              282,652             81.89%

Utilities ‐                         ‐                    ‐                 ‐                        ‐                     0.00%

Other Departmental Expenses 81,332                  46,125              56.71% 130,570              59,725                45.74%

Instructional & Other Materials 334,733                156,347           46.71% 359,831              149,264             41.48%

Maintenance & Repair 53,617                  23,457              43.75% 86,074                28,328                32.91%

Transfers/Debt ‐                         ‐                    ‐                 ‐                        ‐                     ‐                      

Contingency 38,881                  ‐                    0.00% 8,280                  ‐                     0.00%

Capital Outlay 30,205                  23,352              0.00% 591,021              77,846                0.00%

     Total Expenses  12,605,823          8,976,163        71.21% 13,339,268        9,037,459          67.75%

Southeast College

Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used

Coleman College

Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used

9

Page 17: Fs2013 may

Adjusted Budget 

FY2012

YTD Actuals Thru 

5/31/2012 % of Budget Used

Adjusted Budget 

FY2013

YTD Actuals Thru 

5/31/2013 % of Budget Used

EXPENSES

Faculty‐FT  2,315,379             1,827,565        78.93% 2,368,137           1,843,129          77.83%

Faculty‐PT 3,422,385             2,394,283        69.96% 3,743,342           2,525,825          67.48%

Librarian/Counselor‐FT  67,910                  50,932              75.00% 2,887                  2,886                 99.97%

Librarian/Counselor‐PT ‐                         ‐                    0.00% ‐                        ‐                     0.00%

Staff‐FT 3,615,266             2,712,717        75.04% 3,738,173           2,775,035          74.24%

Staff‐PT 661,802                351,523           53.12% 783,120              449,022             57.34%

     Sub‐total Salaries 10,082,742          7,337,021        72.77% 10,635,659        7,595,897          71.42%

Employee Benefits ‐                         ‐                    ‐                 ‐                        ‐                     0.00%

Supplies Gen Exp 188,808                113,223           59.97% 227,717              159,036             69.84%

Travel 69,128                  33,283              48.15% 94,943                54,116                57.00%

Marketing Costs 199,496                130,937           65.63% 405,734              112,681             27.77%

Rental & Leases 40,659                  16,787              41.29% 34,310                7,667                 22.35%

Insurance/Risk Mgmt ‐                         ‐                    ‐                 ‐                        ‐                     0.00%

Contract Services 93,980                  27,876              29.66% 397,302              86,893                21.87%

Utilities ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Other Departmental Expenses 57,370                  29,121              50.76% 63,346                40,629                64.14%

Instructional & Other Materials 993,777                444,057           44.68% 907,224              370,895             40.88%

Maintenance & Repair 118,803                83,350              70.16% 159,700              77,144                48.31%

Transfers/Debt ‐                         ‐                    ‐                 ‐                        ‐                     ‐                      

Contingency ‐                         ‐                    ‐                 ‐                        ‐                     ‐                      

Capital Outlay 15,565                  9,798                0.00% 33,459                30,569                91.36%

     Total Expenses  11,860,328          8,225,454        69.35% 12,959,394        8,535,527          65.86%

Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used

10

Division of Extended Learning

Page 18: Fs2013 may

2006-07 2007-08 2008-09 2009-10 2010-11 2011-12Academic 12,077,904 12,739,232 14,345,992 16,652,752 17,802,080 17,354,256

Technical 4,378,250 4,422,336 4,883,890 5,680,164 5,924,078 5,822,072

Continuing Education 2,091,365 1,847,195 1,810,761 1,880,857 1,914,445 1,798,940

Total Fundable Contact Hrs 18,547,519 19,008,763 21,040,643 24,213,773 25,640,603 24,975,268

Source: Certified CBM004 & CBM00C.

11

HOUSTON COMMUNITY COLLEGEAnnual Fundable Contact Hours 

FY 2006-07 thru FY 2011-12

0

5,000,000

10,000,000

15,000,000

20,000,000

25,000,000

30,000,000

2006‐07 2007‐08 2008‐09 2009‐10 2010‐11 2011‐12

Continuing Education Technical Academic

+5.9%+15.1%

+10.7%+2.5%

‐2.6%

Page 19: Fs2013 may

HOUSTON COMMUNITY COLLEGEUnduplicated Headcount Comparison Semester‐To‐Semester (FY 2010‐11 thru FY 2012‐13)

Fall Semester (Unduplicated Enrollment ‐ All Students)

Spring Semester (Unduplicated Enrollment ‐ All Students)

Summer Semester (Unduplicated Enrollment ‐ All Students)*

* As of June 17, 2013.

12

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000-1

10

-100 -90

-80

-70

-60

-50

-40

-30

-20

-10 0 10 20 30 40 50 60 70 80 90 100

110

120

130

Fall 12

Fall 11

Fall 10

Fall 12 Enrollment:‐6.5%  (Fall12 to 11)‐3.9% (Fall12 to 10)

First Class Day

Census Day

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

-69

-59

-49

-39

-29

-19 -9 1 11 21 31 41 51 61 71 81 91

101

111

121

131

Spr 13

Spr 12

Spr 11

Census Day

First Class Day

Spr 13 Enrollment:+0.1% (Spr13 to 12)‐5.8% (Spr13 to 11)

0

5000

10000

15000

20000

25000

30000

35000

40000

45000

-62

-52

-42

-32

-22

-12 -2 8 18 28 38 48

Sum 13

Sum 12

Sum 11

First Class Day

Census Day

Sum 13 Enrollment:‐4.3%  (Sum13 to 12)‐5.8% (Sum13 to 11)

Page 20: Fs2013 may

HOUSTON COMMUNITY COLLEGERevenues & Expenditures Comparison Year to Date Thru May 31, 2013

2009 Positions

Revenues Expenditures Rev H/(L) Exp

YTD Actuals Thru May 31, 2013 264,424,056         206,380,368        58,043,688       

YTD Actuals Thru May 31, 2012 268,103,407         204,338,669        63,764,737       

(3,679,350)            2,041,699            

13

 ‐

 50,000,000

 100,000,000

 150,000,000

 200,000,000

 250,000,000

 300,000,000

Revenues Expenditures

Page 21: Fs2013 may

` HOUSTON COMMUNITY COLLEGEMonthly Revenues & Expenditures Comparison Year to Date By Month

Revenues SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 58,227,650  9,431,856  25,352,097  36,128,428 60,245,426 41,908,473 9,764,951 17,027,931  14,879,839

2011‐2012 61,685,752  9,480,515  24,214,599  37,832,575 66,013,487 35,495,964 10,116,378 16,794,724  15,263,177 9,332,949 7,924,181 9,726,145

2009 Positions

Expenditures SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 28,324,834  24,699,442  20,905,041  21,510,456 20,451,195 19,565,831 17,598,083 41,691,992  20,176,089

2011‐2012 37,698,782  23,302,047  20,581,833  17,164,427 19,407,583 18,185,253 18,965,252 39,130,360  18,696,899 18,586,628 21,489,075 18,505,226

14

 ‐ 5,000,000

 10,000,000 15,000,000 20,000,000 25,000,000 30,000,000 35,000,000 40,000,000 45,000,000 50,000,000 55,000,000 60,000,000 65,000,000 70,000,000

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐ 5,000,000

 10,000,000 15,000,000 20,000,000 25,000,000 30,000,000 35,000,000 40,000,000 45,000,000 50,000,000 55,000,000 60,000,000 65,000,000 70,000,000

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 22: Fs2013 may

HOUSTON COMMUNITY COLLEGERevenues Comparison Year to Date Thru May 31, 2013 by Source

2009 Positions

State 

Appropriations Ad Valorem Taxes Tuition, Net Fees

Other Local 

Income* Extended Learning Grant Revenue Total Revenues

YTD Actuals Thru May 31, 2013 50,459,091  103,556,327 39,639,661 62,910,746 1,724,272 5,754,735 379,224 264,424,056

YTD Actuals Thru May 31, 2012 50,684,310  103,442,731 41,427,600 65,428,051 1,136,970 5,618,228 365,517 268,103,407

(225,219)  113,596 (1,787,939) (2,517,305) 587,302 136,507 13,707 (3,679,350)

15

 ‐

 20,000,000

 40,000,000

 60,000,000

 80,000,000

 100,000,000

 120,000,000

StateAppropriations

Ad Valorem Taxes Tuition, Net Fees Other LocalIncome*

Extended Learning Grant Revenue

Page 23: Fs2013 may

HOUSTON COMMUNITY COLLEGEExpense Comparison Year to Date Thru May 31, 2013 by Source

2009 Positions

YTD Actuals Thru Faculty‐FT  Faculty‐PT

Librarian/

Counselor‐FT 

Librarian/

Counselor‐PT Staff‐FT Staff‐PT

Employee 

Benefits

Supplies Gen 

Exp Travel

Marketing 

Costs

Rental & 

Leases

Insurance/

Risk Mgmt

Contract 

Services Utilities

Other 

Departmental 

Expenses

Instructional & 

Other 

Materials

Maintenance & 

Repair

Transfers/

Debt Capital Outlay      Total Expenses 

 May 31, 2013  41,693,738  23,240,849  3,610,519  455,714  47,681,479  5,250,492  13,499,589  3,660,611  634,105  907,883  1,734,546  6,519,144  15,014,072  5,880,346  1,430,302  4,558,092  453,380  27,756,872  2,398,636  206,380,368 

 May 31, 2012  41,212,828  23,272,513  4,507,653  405,510  45,962,085  5,289,012  10,112,491  3,256,046  553,391  736,357  3,657,624  6,086,343  12,720,551  5,325,238  1,055,733  3,343,217  543,596  35,442,504  855,977  204,338,669 

480,910  (31,665)  (897,134)  50,205  1,719,394  (38,520)  3,387,098  404,565  80,715  171,526  (1,923,078)  432,801  2,293,521  555,108  374,569  1,214,875  (90,215)  (7,685,632)  1,542,659  2,041,699 

16

 ‐

 1,000,000

 2,000,000

 3,000,000

 4,000,000

 5,000,000

 6,000,000

 7,000,000

 8,000,000

 9,000,000

 10,000,000

 11,000,000

 12,000,000

 13,000,000

 14,000,000

 15,000,000

 16,000,000

 17,000,000

 18,000,000

 19,000,000

 20,000,000

 21,000,000

 22,000,000

 23,000,000

 24,000,000

 25,000,000

 26,000,000

 27,000,000

 28,000,000

 29,000,000

 30,000,000

Page 24: Fs2013 may

TOTAL 

Unexpended Plant Funds

Total Unexpended Plant Fund Balances per Books (1,762,170)$        

  Spending/Encumbrances/Reserve for Future Use

‐ Encumbrances/PO Issued General Unexpended FY13 1,762,170            

Total  Plant Fund PO 1,762,170$         

     Anticipated Unexpended Plant Shortfall ‐$                         

HOUSTON COMMUNITY COLLEGEUnexpended Plant Fund Excluding 2004 CIP

Cash Position to May 31, 2013

17

Page 25: Fs2013 may

Description of Use

Total Budget to 

Date

Total 

Expenditures      

To Date

Encumbrances To 

Date Unexpended

DEFERRED MAINTENANCE FY05

System Administration 604,863$                604,863$                ‐$                              ‐$                             

Subtotal 604,863$               604,863$               ‐$                              ‐$                           

DEFERRED MAINTENANCE  FY06

System Administration 649,625$                649,624$                ‐$                              ‐$                             

Northwest College 412,743                412,743                ‐                               ‐                            

Coleman College 190,738                190,736                ‐                               ‐                            

Subtotal 1,253,106$            1,253,103$            ‐$                              ‐$                           

DEFERRED MAINTENANCE  FY07

System Administration 775,610$                775,610$                ‐$                              ‐$                             

Central College 373,917                373,917                ‐                               ‐                            

Northwest College 599,383                599,383                ‐                               ‐                            

Northeast College 1,059,733             1,059,733             ‐                               ‐                            

Southwest College 74,607                  74,607                  ‐                               ‐                            

Southeast College 38,742                  38,742                  ‐                               ‐                            

Coleman College 9,900                    9,900                    ‐                               ‐                            

Subtotal 2,931,893$            2,931,892$            ‐$                              ‐$                           

DEFERRED MAINTENANCE  FY08

System Administration 10,195$                  10,195$                  ‐$                              ‐$                             

Central College 478,637                478,637                ‐                               ‐                            

Northwest College 1,217,755             1,217,755             ‐                               ‐                            

Northeast College 494,886                494,886                ‐                               ‐                            

Southwest College 42,063                  42,063                  ‐                               ‐                            

Coleman College 73,813                  73,813                  ‐                               ‐                            

Subtotal 2,317,348$            2,317,349$            ‐$                              ‐$                           

OTHER GENERAL PROJECTS

Minor Construction 657,807$               657,807$               ‐$                              ‐$                           

System 11,770,991           11,109,070           661,921                 ‐                            

Central College 3,218,637             3,108,754             109,883                 ‐                            

Northwest College 4,060,039             4,051,428             8,611                     ‐                            

Northeast College 1,106,793             622,548                484,245                 ‐                            

Southwest College 1,587,304             1,098,820             488,484                 ‐                            

Southeast College 1,995,204             1,989,030             6,174 ‐                            

Coleman College 1,341,161             1,341,159             2 ‐                            

Subtotal 25,737,936$         23,978,616$         1,759,320$             ‐$                           

SURPLUS PROPERTY

Palmetto Property ‐ Purchase 495,154$               495,154$               ‐$                              ‐$                           

Dixie Property‐ Refund 20,000                  20,000                  ‐                            

 288 Property‐ Purchase 1,142,402             1,139,552             2,850                     ‐                            

Warehouse Property 12,966,619           12,966,619           ‐                               ‐                            

Subtotal 14,624,175$         14,621,325$         2,850$                    ‐$                           

Total Anticipated Uses 47,469,321$          45,707,148$          1,762,170$             ‐$                             

UNEXPENDED PLANT FUND PROJECTSas of May 31, 2013

18

HOUSTON COMMUNITY COLLEGE

Page 26: Fs2013 may

 

Total Budget 

to Date

Total 

Expenditures   

To Date

Encumbrances 

To Date

% of 

Expen‐ 

ditures Unexpended

% of 

Total 

BudgetSources:

Central College 2001A Bond 25,318,535$      

2003 Limited Tax Bond and Premium 150,748,497      

Actural Interest Earned 2003 Limited Tax Bonds 20,868,074         

2005 Limited Tax and Building Bond 1,875,000           

2003/2005 LTD Bond Issuance Cost (2,068,522)          

2006 Jr Lien Bond Std Revenue Bond 30,000,000         

Bond Issuance Cost (913,149)             

Actual Interest Earned 2006 Jr Lien Bonds 2,608,533           

Transferred to Fund 7305/Hayes Road (3,169,049)          

2008 Maintenance Tax Notes 56,912,320         

2008 MTN Bond Issuance Cost (1,056,912)          

Actual Interest Earned 2008 MTN 1,654,029           

2008 Sr. Lien Bond             1,714,953 

Transferred to Residual CIP Funds         (20,712,314)

Total Available with Reclassification 263,779,995$    

Uses:

Construction 119,641,496$     119,628,602$     12,893$                100% ‐$                          0%

CPMS PGAL  11,121,809          11,121,809          ‐                             100% ‐                             0%

Facility Planning 1,677,989            1,677,989            ‐                             100% ‐                             0%

Architect Fees and Engineering 7,536,519            7,505,762            30,757                  100% ‐                             0%

Other Costs including Bldg/Land Purchase 2,273,077            2,258,218            14,859                  100% ‐                             0%

Inspectors 890,000               890,000               ‐                             100% ‐                             0%

Design Standard 103,370               103,370               ‐                             100% ‐                             0%

Site Improvement and Infrastructure Development 52,585,331          51,996,578          585,790                100% 2,964                    0%

IT Infrastructure Master Plan 29,596,689          29,173,797          422,892                100% 0                            0%

Furniture and Fixtures 14,213,151          13,908,378          304,774                100% (0)                           0%

Small Business 567,383               567,383               ‐                             100% ‐                             0%

Administrative Services 3,408,768            3,348,779            59,989                  100% (0)                           0%

Material Testing 574,120               537,606               36,513                  100% 0                            0%

Contingency for Construction 322,040               0% 322,040               100%

Surveying 471,813               460,552               11,260                  100% 0                            0%

Design and Geotech 110,911               110,111               800                        100% ‐                             0%

Signage 70,000                  70,000                  100% ‐                             0%

Blue Light Security 126,000               120,600               5,400                    100% ‐                             0%

PGAL Website Development 181,208               181,208               ‐                             100% ‐                             0%

System Architect Furniture Consultant 11,367                  11,367                  100% ‐                             0%

Northline Demolition‐Pizza Hut 226,246               226,246               100% ‐                             0%

Police Cars 342,223               341,613               610                        100% ‐                             0%

Bering St. Property 50,687                  50,687                  100% ‐                             0%

General Repairs & Maintenance 2,079,239            2,079,239            100% ‐                             0%

Land Purchase 1,919,729            1,919,729            100% ‐                             0%

Amateur Sports Complex ‐ Willie Gay Hall 2,230,710            2,220,887            7,000                    100% 2,823                    0%

Total Construction Cost 252,331,872$     250,510,512$     1,493,537$          100% 327,827$             0%

Note: Expenditures Not In Construction Schedule

Deferred Maintenance 5,000,000$          5,000,000$          ‐$                           100% ‐$                          0%

IT Development 6,448,123            6,448,122            ‐                             100% ‐                             0%

263,779,995$     261,958,634$     1,493,538$          100% 327,827$             0%

Anticipated Budget Shortfall/Surplus (0)                          

*Footnote on next page

HOUSTON COMMUNITY COLLEGE2004 CIP Projectsas of May 31, 2013

19

Page 27: Fs2013 may

Total Budget to 

Date

Total 

Expenditures   

To Date

Encumbrances 

To Date Unexpended

Central ‐ San Jacinto:*

Construction Cost 1,241,868$         1,241,868$         ‐$                         

CPMS PGAL 111,440              111,440              ‐                         ‐                          

Facilities Space Programming 393,715              393,715              ‐                         ‐                          

Material Testing  ‐                           ‐                           ‐                         ‐                          

IT Infrastructure Capital Projects 10,000                5,687                  4,314                 ‐                          

Design Standards 3,904                  3,904                  ‐                          

  Total Central ‐ San Jacinto 1,785,007$          1,780,694$          4,314$               ‐$                          

Central ‐ Learning Hub/Science Bldg:*

Construction Cost 21,504,724$       21,499,805$       4,919$               -$ CPMS PGAL 1,967,801           1,967,801           ‐                          

Facilities Space Programming 148,096              148,096              ‐                         ‐                          

Architect and Engineering 1,242,506           1,242,506           ‐                          

Furniture, Fixtures & Equipment 2,049,869           2,019,706           30,163              ‐                          

Inspectors 187,000              187,000              ‐                          

Project Software 7,614                  7,614                  ‐                          

Design Standards 15,086                15,086                ‐                          

Site Infrastructure Improvements 5,688,425           5,363,937           324,488            ‐                          

IT Infrastructure Master Plan 2,751,121           2,726,528           24,593              ‐                          

Design Geotech 10,150                10,150                ‐                          

Material Testing  32,994                32,356                638                    ‐                          

Surveying  69,453                64,118                5,335                 ‐                          

Blue Light Security 18,000                17,100                900                    ‐                          

  Total Central ‐ Learning Hub/Science 

Bldg:*

35,692,839$        35,301,803$        391,036$           ‐$                          

NEC ‐ Learning Hub:*

Construction Cost 14,001,119$       14,001,119$       ‐                          

CPMS PGAL 1,187,440           1,187,440           ‐                          

Facilities Space Programming 145,889              145,889              ‐                          

Architect and Engineering 723,556              723,556              ‐                          

Furniture, Fixtures & Equipment 1,660,682           1,651,908           8,774                 ‐                          

Other Costs including Bldg/Land Purchase ‐                           ‐                          

Inspectors 205,000              205,000              ‐                         ‐                          

Project Software ‐                           ‐                          

Design Standards 9,015                  9,015                  ‐                          

Site Infrastructure Improvements 92,682                92,682                ‐                         ‐                          

IT Infrastructure Master Plan 1,250,254           1,249,836           418                    ‐                          

Design Geotech ‐                           ‐                          

Material Testing  131,870              123,607              8,263                 ‐                          

Surveying  71,081                71,081                ‐                          

  Total NEC ‐ Learning Hub 19,478,588$        19,461,133$        17,455$             ‐$                          

HOUSTON COMMUNITY COLLEGE2004 CIP Projectsas of May 31, 2013

20

 *Note 1  Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception. 

Page 28: Fs2013 may

Total Budget to 

Date

Total 

Expenditures   

To Date

Encumbrances 

To Date Unexpended

HOUSTON COMMUNITY COLLEGE2004 CIP Projectsas of May 31, 2013

NEC ‐ Science Engineering & Technology:*

Construction Cost 11,627,061$       11,626,428$       633$                   ‐$                         

CPMS PGAL 857,203              857,203              ‐                         ‐                          

Facilities Space Programming 52,058                52,058                ‐                          

Architect and Engineering 635,906              635,906              ‐                          

Furniture, Fixtures & Equipment 644,019              607,016              37,003              ‐                          

Other Costs including Bldg/Land Purchase 84,400                73,800                10,600              ‐                          

Inspectors ‐                           ‐                          

Project Software ‐                           ‐                          

Design Standards 6,818                  6,818                  ‐                          

Site Infrastructure Improvements 15,423,461        15,357,930        65,531              ‐                          

IT Infrastructure Master Plan 1,160,897           1,160,824           73                      ‐                          

Design Geotech 28,500                28,500                ‐                          

Material Testing  95,465                95,465                ‐                         ‐                          

Surveying  15,960                10,035                5,925                 ‐                          

Blue Light Security 18,000                17,100                900                    ‐                          

  Total NEC ‐ Science Eng & Technology 30,649,748$        30,529,083$        120,665$           ‐$                          

NEC ‐ Pinemont:

CPMS PGAL 6,269$                 6,269$                 ‐$                        ‐$                         

Facilities Space Programming 71,292                71,292                ‐                         ‐                          

Other Costs including Bldg/Land Purchase 102,156              102,156              ‐                          ‐                            

Surveying  22,483                22,483                ‐                         ‐                          

  Total NEC ‐ Pinemont 202,200$              202,200$              ‐$                        ‐$                          

SEC ‐ Felix Fraga (Drennan):*

Construction Cost 12,419,858$       12,417,829$       2,029$               ‐$                         

CPMS PGAL 1,216,969           1,216,969           ‐                          

Facilities Space Programming 227,023              227,023              ‐                          

Architect and Engineering 850,383              835,511              14,872              ‐                          

Furniture, Fixtures & Equipment 1,007,615           977,469              30,146              ‐                          

Other Costs including Bldg/Land Purchase 62,466 62,466                ‐                          

Inspectors - ‐                          

Project Software - ‐                          

Design Standards 6,873                  6,873                  ‐                          

Site Infrastructure Improvements 5,993,954           5,959,525           34,429              ‐                          

IT Infrastructure Master Plan 1,279,923           1,268,405           11,518              ‐                          

Design Geotech 19,000                18,200                800                    ‐                          

Material Testing  150,272              137,662              12,610              ‐                          

Surveying  27,674                27,674                ‐                          

HUB/Small Business Program ‐                           ‐                           ‐                         ‐                          

HUB/Small Business Program ‐                           ‐                          

Bering St Property 50,687                50,687                ‐                          

Signage ‐                           ‐                          

Blue Light Security 18,000                17,100                900                    ‐                            Total SEC ‐ Felix Fraga (Drennan):* 23,330,697$        23,223,393$        107,304$           ‐$                          

21

 *Note 1  Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception. 

Page 29: Fs2013 may

Total Budget to 

Date

Total 

Expenditures   

To Date

Encumbrances 

To Date Unexpended

HOUSTON COMMUNITY COLLEGE2004 CIP Projectsas of May 31, 2013

SEC ‐ Felix Morales:*

Construction Cost 3,653,330$         3,653,330$         ‐$                         

CPMS PGAL 667,905              667,905              ‐                          

Facilities Space Programming 62,181                62,181                ‐                          

Architect and Engineering 367,853              351,968              15,885              ‐                          

Furniture, Fixtures & Equipment 929,072              898,276              30,796              ‐                          

Inspectors ‐                           ‐                          

Project Software ‐                           ‐                          

Design Standards 3,117                  3,117                  ‐                          

Site Infrastructure Improvements 98,015                96,070                1,945                 ‐                          

IT Infrastructure Master Plan 1,164,463           1,008,321           156,142            ‐                          

Design Geotech ‐                           ‐                          

Material Testing  10,009                5,808                  4,201                 ‐                          

Surveying  1,225                  1,225                  ‐                          

  Total SEC ‐ Felix Morales 6,957,169$          6,748,200$          208,969$           ‐$                          

SEC ‐ Learning Hub:*

Construction Cost 16,555,351$       16,550,039$       5,312$               ‐$                         

CPMS PGAL 1,744,048           1,744,048           ‐                          

Facilities Space Programming 126,588              126,588              ‐                          

Architect and Engineering 875,415              875,415              ‐                          

Furniture, Fixtures & Equipment 2,006,195           1,838,307           167,888            ‐                          

 Other Costs including Bldg/Land Purchase  32,480                  28,221                  4,259                  ‐                            

Inspectors 258,000              258,000              ‐                         ‐                          

Project Software ‐                           ‐                          

Design Standards 9,367                  9,367                  ‐                          

Site Infrastructure Improvements 12,152,267        12,026,514        122,789            2,964                 

IT Infrastructure Master Plan 2,177,705           2,157,010           20,695              ‐                          

Administrative Services ‐                           ‐                          

Design Geotech 9,525                  9,525                  ‐                         ‐                          

Material Testing  122,370              115,883              6,487                 ‐                          

Surveying  144,094              144,094              ‐                          

Blue Light Security 18,000                18,000                - ‐                          

  Total SEC ‐ Learning Hub 36,231,403$        35,901,011$        327,430$           2,964$                 

22

 *Note 1  Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception. 

Page 30: Fs2013 may

Total Budget to 

Date

Total 

Expenditures   

To Date

Encumbrances 

To Date Unexpended

HOUSTON COMMUNITY COLLEGE2004 CIP Projectsas of May 31, 2013

SW ‐ Missouri City:*

Construction Cost 8,891,630$         8,891,630$         ‐$                         

CPMS PGAL 601,635              601,635              ‐                         ‐                          

Facilities Space Programming 194,111              194,111              ‐                          

Architect and Engineering 958,905              958,905              ‐                         ‐                          

Furniture, Fixtures & Equipment 1,011,146           1,011,146           ‐                         ‐                          

 Library & Bookstore  1,991,575           1,991,575           ‐                          

Inspectors ‐                           ‐                          

Project Software ‐                           ‐                          

Design Standards 4,999                  4,999                  ‐                          

Site Infrastructure Improvements 5,061,234           5,061,234           ‐                         ‐                          

IT Infrastructure Capital Projects 2,246,083           2,246,083           ‐                         ‐                          

Design Geotech ‐                           ‐                          

Material Testing  ‐                           ‐                          

Surveying  48,311                48,311                ‐                          

Blue Light Security 18,000                17,100                900                    ‐                          

  Total SW ‐ Missouri City 21,027,628$        21,026,728$        900$                   ‐$                          

SW ‐ West Loop Phase I:*

Construction Cost 9,031,922$         9,031,922$         ‐$                        ‐$                         

CPMS PGAL 1,033,865           1,033,865           ‐                          

Facilities Space Programming 76,260                76,260                ‐                          

Architect and Engineering 718,694              718,694              ‐                          

Furniture, Fixtures & Equipment 2,154,214           2,154,214           ‐                         ‐                          

Design Standards 8,170                  8,170                  ‐                          

IT Infrastructure Capital Projects 2,864,190           2,864,190           ‐                         ‐                          

Design Geotech 22,116                22,116                ‐                          

Material Testing  21,141                21,140                ‐                         ‐                          

Surveying  14,995                14,995                ‐                         ‐                          

Exterior Signage 70,000                70,000                ‐                         ‐                          

Blue Light Security 18,000                17,100                900                    ‐                          

  Total SW ‐ West Loop Phase I 16,033,566$        16,032,665$        900$                   ‐$                          

23

 *Note 1  Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception. 

Page 31: Fs2013 may

Total Budget to 

Date

Total 

Expenditures   

To Date

Encumbrances 

To Date Unexpended

HOUSTON COMMUNITY COLLEGE2004 CIP Projectsas of May 31, 2013

SW ‐ Learning Hub ‐ Stafford:*

Construction Cost 20,714,629$       20,714,629$       ‐$                        ‐$                         

CPMS PGAL 1,727,234           1,727,234           ‐                          

Facilities Space Programming 180,778              180,778              ‐                          

Architect and Engineering 1,155,688           1,155,688           ‐                         ‐                          

Furniture, Fixtures & Equipment 2,750,339           2,750,339           ‐                         ‐                          

Inspectors 240,000              240,000              ‐                          

Project Software ‐                           ‐                          

Design Standards 15,845                15,845                ‐                          

Site Infrastructure Improvements 8,075,292           8,038,685           36,607              ‐                          

IT Infrastructure Capital Projects 2,535,820           2,535,820           ‐                         ‐                          

Design Geotech 21,620                21,620                ‐                          

Material Testing  ‐                           ‐                          

Surveying  56,536                56,536                ‐                          

Blue Light Security 18,000                17,100                900                    ‐                          

  Total SW ‐ Learning Hub ‐ Stafford 37,491,782$        37,454,275$        37,507$             ‐$                          

System ‐ Network:

IT Infrastructure Capital Projects 12,162,330$       11,952,876$       209,454$           ‐                          

Administrative Services 3,408,768           3,348,779           59,989              ‐                          

PGAL Website Development 181,209              181,208              1                        ‐                          

HUB/Small Business Program 567,383              567,383              ‐                         ‐                          

 System Architect Furniture Consultant  11,367                11,367                ‐                           Ft. Bend Library Inflation Cost Increase  ‐                           ‐                          Northline Demolition‐Pizza Hut 226,246              226,246              ‐                          

Police Cars 342,223              341,613              610                    ‐                          

General Repairs & Maintenance 2,079,239           2,079,239           ‐                          

Land Purchase 1,919,729           1,919,729           ‐                          

Amateur Sports Complex ‐ Willie Gay Hall 2,230,710           2,220,887           7,000                 2,823                 

  Total ‐ System ‐ Network 23,129,204$        22,849,327$        277,052$           2,823$                 

Construction Contingency 322,040$             ‐$                           ‐$                        322,040               

Subtotal Above 252,331,871$      250,510,511$      1,493,532$        327,827$             

100.00% 99.28% 0.59% 0.13%

EXPENDITURES NOT IN CONSTRUCTION SCHEDULE

Deferred Maintenance 5,000,000$         5,000,000$         ‐$                        ‐$                         

IT Development 6,448,123           6,448,122           ‐                         ‐                          

GRAND TOTAL 263,779,994$      261,958,633$      1,493,532$        327,827$             

100.00% 99.31% 0.57% 0.12%

24

 *Note 1  Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception. 

Page 32: Fs2013 may

 

Total Budget to 

Date

Total 

Expenditures To 

Date

 Encumbrances 

May 31, 2013  Unexpended

Sources:

Bond Proceeds 454,167,571$      

Capitalized Interest (26,559,053)         

Issuance Cost & Underwriters' Discount (2,608,518)           

Interest Earned 149,137               

Total Available with Reclassification 425,149,137$      

Uses:

Land 8,119,373$            8,119,373$       ‐$                          ‐$                        

Construction Cost 1,633,824             ‐                     1,633,824          ‐                     

Architect and Engineering 128,880                73,027              55,853                ‐                     

Site Infrastructure Improvements 2,160                     ‐                     2,160                  ‐                     

Inspection ‐                         ‐                     ‐                      ‐                     

Material Testing 203,520                ‐                     203,520              ‐                     

IT Infrastructure Capital Projects ‐                         ‐                     ‐                      ‐                     

Furniture, Fixtures & Equipment ‐                         ‐                     ‐                      ‐                     

Contingency for Construction(Int. Earned) 149,137                ‐                     ‐                      149,137            

Small Business 3,500,000             ‐                     ‐                      3,500,000         

Administrative Services 2,000,000             ‐                     ‐                      2,000,000         

Construction Auditor 660,000                ‐                     ‐                      660,000            

Total Construction Cost 16,396,894$          8,192,400$       1,895,356$         6,309,137$        

Anticipated Budget Shortfall/Surplus 408,752,243        

25

HOUSTON COMMUNITY COLLEGE SYSTEM2013 CIP ProjectsAs of May 31, 2013

Page 33: Fs2013 may

Total Budget to 

Date

Total Revenues 

/  Expenditures 

To Date

Encumbrances 

May 31, 2013 Unexpended

Central Campus: 23,159,388               23,159,388          

Land ‐                            

Construction Cost ‐                            

Architect and Engineering ‐                            

Site Infrastructure Improvements ‐                            

Inspection ‐                            

Material Testing  ‐                            

IT Infrastructure Capital Projects ‐                            

Furniture, Fixtures & Equipment ‐                            

Small Business 110,588                     110,588                

Administrative Services 36,494                       36,494                  

Construction Auditor 193,529                     193,529                

Contingency ‐                              Total Central Campus 23,500,000$             ‐$                       ‐$                          23,500,000$        

South Campus Workforce Building 24,142,734$             24,142,734$        

Land ‐                    ‐                      ‐                        

Construction Cost ‐                    ‐                      ‐                        

Architect and Engineering ‐                    ‐                      ‐                        

Site Infrastructure Improvements 2,160                         ‐                    2,160                  ‐                        

Inspection ‐                    ‐                      ‐                        

Material Testing ‐                        

IT Infrastructure Capital Projects ‐                    ‐                      ‐                        

Furniture, Fixtures & Equipment ‐                    ‐                      ‐                        

Small Business 115,294                     ‐                      115,294                

Administrative Services 38,047                       ‐                      38,047                  

Construction Auditor 201,765                     ‐                      201,765                

Contingency ‐                    ‐                      ‐                          Total South Campus 24,500,000$             ‐$                       2,160$                 24,497,840$        

Northline 19,710,118$             19,710,118$        

Land ‐                            

Construction Cost ‐                            

Architect and Engineering ‐                            

Site Infrastructure Improvements ‐                            

Inspection ‐                            

Material Testing ‐                            

IT Infrastructure Capital Projects ‐                            

Furniture, Fixtures & Equipment ‐                            

Small Business 94,118                       94,118                  

Administrative Services 31,059                       31,059                  

Construction Auditor 164,706                     164,706                

Contingency ‐                              Total Northline 20,000,000$             ‐$                       ‐$                          20,000,000$        

HOUSTON COMMUNITY COLLEGE SYSTEM2013 CIP ProjectsAs of May 31, 2013

26

Page 34: Fs2013 may

Total Budget to 

Date

Total Revenues 

/  Expenditures 

To Date

Encumbrances 

May 31, 2013 Unexpended

HOUSTON COMMUNITY COLLEGE SYSTEM2013 CIP ProjectsAs of May 31, 2013

Northforest Workforce & Early College 29,484,143$             29,484,143$        

Land 8,102,273                  8,102,273        ‐                            ‐                            

Construction Cost 1,633,824                  ‐                        1,633,824          ‐                            

Architect and Engineering ‐                        ‐                            ‐                            

Site Infrastructure Improvements ‐                        ‐                            ‐                            

Inspection ‐                        ‐                            ‐                            

Material Testing 199,996                     ‐                        199,996              ‐                            

IT Infrastructure Capital Projects ‐                        ‐                            ‐                            

Furniture, Fixtures & Equipment ‐                        ‐                            ‐                            

Small Business 188,235                     ‐                            188,235                

Administrative Services 62,118                       ‐                            62,118                  

Construction Auditor 329,412                     ‐                            329,412                

Contingency ‐                        ‐                            ‐                              Total Northforest & Early College 40,000,000$             8,102,273$      1,833,820$         30,063,908$        

Acres Homes 12,797,976$             ‐$                          12,797,976$        

Land 13600 13600 ‐                            ‐                            

Construction Cost ‐                        ‐                            ‐                            

Architect and Engineering ‐                        ‐                            ‐                            

Site Infrastructure Improvements ‐                        ‐                            ‐                            

Inspection ‐                        ‐                            ‐                            

Material Testing ‐                            

IT Infrastructure Capital Projects ‐                        ‐                            ‐                            

Furniture, Fixtures & Equipment ‐                        ‐                            ‐                            

Small Business 61,176                       ‐                            61,176                  

Administrative Services 20,188                       ‐                            20,188                  

Construction Auditor 107,059                     ‐                            107,059                

Contingency ‐                        ‐                            ‐                              Total ‐ Pinemont  13,000,000$             13,600$            ‐$                          12,986,400$        

Alief Campus 9,851,535$               9,851,535$          

Land ‐                    ‐                      ‐                        

Construction Cost ‐                    ‐                      ‐                        

Architect and Engineering ‐                    ‐                      ‐                        

Site Infrastructure Improvements ‐                    ‐                      ‐                        

Inspection ‐                    ‐                      ‐                        

Material Testing 3,524                         ‐                    3,524                  ‐                        

IT Infrastructure Capital Projects ‐                    ‐                      ‐                        

Furniture, Fixtures & Equipment ‐                    ‐                      ‐                        

Small Business 47,059                       ‐                      47,059                  

Administrative Services 15,529                       ‐                      15,529                  

Construction Auditor 82,353                       ‐                      82,353                  

Contingency ‐                    ‐                      ‐                          Total ‐ Alief  10,000,000$             ‐$                       3,524$                 9,996,476$          

27

Page 35: Fs2013 may

Total Budget to 

Date

Total Revenues 

/  Expenditures 

To Date

Encumbrances 

May 31, 2013 Unexpended

HOUSTON COMMUNITY COLLEGE SYSTEM2013 CIP ProjectsAs of May 31, 2013

Westside Campus 52,231,812$             52,231,812$        

Land ‐                        

Construction Cost ‐                        

Architect and Engineering ‐                        

Site Infrastructure Improvements ‐                        

Inspection ‐                        

Material Testing ‐                        

IT Infrastructure Capital Projects ‐                        

Furniture, Fixtures & Equipment ‐                        

Small Business 249,412                     249,412                

Administrative Services 82,306                       82,306                  

Construction Auditor 436,471                     436,471                

Contingency ‐                          Total ‐ Westside  53,000,000$             ‐$                       ‐$                          53,000,000$        

Southeast Campus 26,115,906$             26,115,906$        

Land ‐                        

Construction Cost ‐                        

Architect and Engineering ‐                        

Site Infrastructure Improvements ‐                        

Inspection ‐                        

Material Testing ‐                        

IT Infrastructure Capital Projects ‐                        

Furniture, Fixtures & Equipment ‐                        

Small Business 124,706                     124,706                

Administrative Services 41,153                       41,153                  

Construction Auditor 218,235                     218,235                

Contingency ‐                          Total ‐ Southeast 26,500,000$             ‐$                       ‐$                          26,500,000$        

Felix Fraga Campus 15,639,214$             15,639,214$        

Land ‐                    ‐                      ‐                        

Construction Cost ‐                    ‐                      ‐                        

Architect and Engineering 128,880                     73,027             55,853                ‐                        

Site Infrastructure Improvements ‐                    ‐                      ‐                        

Inspection ‐                    ‐                      ‐                        

Material Testing ‐                        

IT Infrastructure Capital Projects ‐                    ‐                      ‐                        

Furniture, Fixtures & Equipment ‐                    ‐                      ‐                        

Small Business 75,294                       ‐                      75,294                  

Administrative Services 24,847                       ‐                      24,847                  

Construction Auditor 131,765                     ‐                      131,765                

Contingency ‐                    ‐                      ‐                          Total ‐ Felix Fraga  16,000,000$             73,027$            55,853$               15,871,120$        

28

Page 36: Fs2013 may

Total Budget to 

Date

Total Revenues 

/  Expenditures 

To Date

Encumbrances 

May 31, 2013 Unexpended

HOUSTON COMMUNITY COLLEGE SYSTEM2013 CIP ProjectsAs of May 31, 2013

Westloop Campus 17,739,106$             ‐$                          17,739,106$        

Land ‐                        

Construction Cost ‐                        

Architect and Engineering ‐                        

Site Infrastructure Improvements ‐                        

Inspection ‐                        

Material Testing ‐                        

IT Infrastructure Capital Projects ‐                        

Furniture, Fixtures & Equipment ‐                        

Small Business 84,706                       84,706                  

Administrative Services 27,953                       27,953                  

Construction Auditor 148,235                     148,235                

Contingency ‐                          Total ‐ Westloop  18,000,000$             ‐$                       ‐$                          18,000,000$        

Braes Oak Campus 11,826,071$             11,826,071$        

Land ‐                        

Construction Cost ‐                        

Architect and Engineering ‐                        

Site Infrastructure Improvements ‐                        

Inspection ‐                        

Material Testing ‐                        

IT Infrastructure Capital Projects ‐                        

Furniture, Fixtures & Equipment ‐                        

Small Business 56,471                       56,471                  

Administrative Services 18,635                       18,635                  

Construction Auditor 98,824                       98,824                  

Contingency ‐                          Total ‐ Braes Oak 12,000,000$             ‐$                       ‐$                          12,000,000$        

Stafford Campus 26,608,659$             26,608,659$        

Land ‐                    ‐                      ‐                        

Construction Cost ‐                        ‐                            ‐                        

Architect and Engineering ‐                        

Site Infrastructure Improvements ‐                        

Inspection ‐                        ‐                            ‐                        

Material Testing ‐                        ‐                            ‐                        

IT Infrastructure Capital Projects ‐                        ‐                            ‐                        

Furniture, Fixtures & Equipment ‐                        ‐                            ‐                        

Small Business 127,059                     127,059                

Administrative Services 41,929                       41,929                  

Construction Auditor 222,353                     222,353                

Contingency ‐                        ‐                            ‐                          Total ‐ Stafford Campus 27,000,000$             ‐$                       ‐$                          27,000,000$        

29

Page 37: Fs2013 may

Total Budget to 

Date

Total Revenues 

/  Expenditures 

To Date

Encumbrances 

May 31, 2013 Unexpended

HOUSTON COMMUNITY COLLEGE SYSTEM2013 CIP ProjectsAs of May 31, 2013

Missouri City  21,188,376$             ‐$                       ‐$                          21,188,376$        

Land ‐                        ‐                            ‐                            

Construction Cost ‐                        ‐                            ‐                            

Architect and Engineering ‐                            

Site Infrastructure Improvements ‐                            

Inspection ‐                        ‐                            ‐                            

Material Testing ‐                        ‐                            ‐                            

IT Infrastructure Capital Projects ‐                        ‐                            ‐                            

Furniture, Fixtures & Equipment ‐                        ‐                            ‐                            

Small Business 101,176                     101,176                

Administrative Services 33,388                       33,388                  

Construction Auditor 177,059                     177,059                

Contingency ‐                            21,500,000$             ‐$                       ‐$                          21,500,000$        

  Total ‐ Missouri City

Coleman 118,257,206$           ‐$                       ‐$                          118,257,206$      

Land 3500 3500 ‐                            ‐                            

Construction Cost ‐                        ‐                            ‐                            

Architect and Engineering ‐                        ‐                            ‐                            

Site Infrastructure Improvements ‐                        ‐                            ‐                            

Inspection ‐                        ‐                            ‐                            

Material Testing ‐                            

IT Infrastructure Capital Projects ‐                        ‐                            ‐                            

Furniture, Fixtures & Equipment ‐                        ‐                            ‐                            

Small Business 564,706                     ‐                            564,706                

Administrative Services 186,353                     ‐                            186,353                

Construction Auditor 988,235                     ‐                            988,235                

Contingency ‐                            ‐                              Total ‐ Coleman 120,000,000$           3,500$              ‐$                          119,996,500$      

Construction Contingency 149,137$                   ‐$                       ‐$                          149,137$              

GRAND TOTAL 425,149,137$           8,192,400$      1,895,356$         415,061,381$      

30

Page 38: Fs2013 may

2003/2005 Limited Tax Bonds 2003 2005 TotalBond counsel fees 150,000 57,000 207,000Underwriters' discount 814,813 57,000 871,813Insurance premium 558,764 558,764Financial advisory fee 205,391 68,081 273,472Rating agencies fees 114,350 16,000 130,350Printing costs 10,386 4,506 14,892CPA consent letter fee 1,500 1,500 3,000Verification fees 3,500 3,500Paying agent fee 300 5,432 5,732

1,855,504 213,018 2,068,522

2006 Jr Lien Revenue BondsBond counsel fees 79,500Underwriters' discount 509,509Insurance premium 117,904Financial advisory fee 137,910Rating agencies fees 54,850Printing costs 3,502CPA consent letter fee 1,500Verification fees 3,500Paying agent fee 4,974

913,149

2008 Maintenance Tax NotesBond counsel fees 63,500Underwriters' discount 342,526Insurance premium 498,600Financial advisory fee 95,105Rating agencies fees 47,100Printing costs 9,617Paying agent fee 463

1,056,912

Limited Tax General Obligation Bonds, Series 2013Bond counsel fees 698,040Underwriters' discount 1,213,220Financial advisory fee 462,628Rating agencies fees 190,000Printing costs 2,273CPA consent letter fee 4,000Paying agent fee 500

2,570,661

31

HOUSTON COMMUNITY COLLEGE2004 & 2013 CIP Projects Footnotes

as of May 31, 2013

Page 39: Fs2013 may

 

Total Budget to 

Date

Total 

Expenditures to 

Date  Encumbrances  Unexpended

Sources:Transferred CIP Funds 20,712,314

Uses:

Central Learning Hub/Science Bldg:

Site Infrastructure Improvements 6,599,554$         231,100$               19,008$                6,349,446$        

South Campus:

Site Infrastructure Improvements 11,000 3,300                    7,700                     ‐                         

NEC ‐ Science Engineering & Technology:

Site Infrastructure Improvements 367,959 166,404 201,555                ‐                         

SEC ‐ Learning Hub:

Site Infrastructure Improvements 2,002,604 1,350,020            652,584                ‐                         

Material Testing 23,368 16,689                  6,679                     ‐                         

Katy Campus:

Architecture 155,200 155,200                ‐                         

System ‐ Network:

IT Infrastructure Capital Projects 7,569,405 7,431,911            102,018                35,476              

Site Infrastructure Improvements 96,600 53,130                  43,470                  ‐                         

 

 Construction Contingency 851,755 ‐                             851,755            

Contingency* 3,034,869           ‐                             3,034,869         

Total Construction Cost 20,712,314$       9,252,556$           1,188,213$           10,271,546$     

Anticipated Budget Shortfall/Surplus (0)                        

*All of these funds, except for the Coningency of $3,034,869, arose from Maintenance Tax Notes which are intended

 for infrastructure and maintenance and repairs (capital‐related). The unexpended balance of $10,271,546 can be used

 throughout the district.

32

HOUSTON COMMUNITY COLLEGE SYSTEMResidual CIP Funds

as of  5/31/13

Page 40: Fs2013 may

Total Budget 

to Date

Total 

Revenues /  

Expenditures 

To Date

Encumbrances To 

Date Unexpended

Sources of funds:

Proceeds from 

2006 Tax Maintenance Notes 12,000,000$   

Discount (88,756)            

Bond Issuance Cost (256,244)          

Interest Income 835,385           

Funds Available 12,490,385$  

Uses of funds:

Site Infrastructure 341,092$          327,728$          13,364$                 ‐$                     

Project Management 450,479            450,479            ‐                              ‐                       

Construction 8,805,292         8,805,292         ‐                              ‐                       

Design Phase 1,117,820         1,117,820         ‐                              ‐                       

Architecture 17,822              17,822              ‐                       

Material Testing & Inspection 6,399                6,399                ‐                              ‐                       

Land/Demolition 420,541            420,541            ‐                              ‐                       

Survey 9,473                9,473                ‐                              ‐                       

Construction‐Maintenance 1,259,003         1,247,114         11,889                   ‐                       

Contingency 62,463              46,700              15,763            

Grand Total Uses 12,490,385$    12,449,368$    25,253$                 15,763$          

Net Available 0$                    

33

HOUSTON COMMUNITY COLLEGEMaintenance Tax Notes 2006 (Central Utility Plant Project)

as of May 31, 2013

 Note: Budgets are adjusted as contracts are awarded; otherwise, budget is preliminary from inception. 

Page 41: Fs2013 may

Total Budget to 

Date

Total Revenues 

/  Expenditures 

To Date

Encumbrances To 

Date Unexpended

Sources:

2008 Maintenance Tax Notes 39,780,489$     

2008 Maintenance Tax Notes‐Phase 1 Infrastructure 15,078,286      

Transferred to CIP Residual Fund (7170) (17,522,242)     

Interest Earned To date 1,679,086        

Funds Available for Projects 39,015,619$     

Uses:

Site Infrastructure Improvements 5,679,383$        5,345,516$       333,867$              ‐$                       

Architectural/Engineering Fees 165,537            151,654           13,883                  ‐                         

IT Infrastructure Master Plan 19,553,388       19,243,543      309,845                ‐                         

Furniture, Fixtures & Equipment 5,043,248         4,572,572        470,676                ‐                         

Material Testing 33,351               29,035              4,316                    ‐                         

Construction 5,437,915         5,425,796        12,119                  ‐                         

Construction Management  132,478            132,478           ‐                         

Campus Security 243,116            242,415           600                       101                   

Truck Driving School 99,200               99,200              ‐                         

Land 517,306            517,306           ‐                         

Energy  Services 8,860                 8,860                ‐                         

Design GEOTECH 5,189                 5,189                ‐                             ‐                         

Surveying 16,310               16,310              ‐                             ‐                         

Contracted Services 2,079,239         2,079,239        ‐                             ‐                         

Residual Funds for Completion of CIP Projects 1,099                 1,099                

Total  39,015,619$      37,869,113$    1,145,306$           1,200$               

Bond Issuance Cost:

Bond counsel fees 63,500$            

Underwriters' discount 342,526           

Insurance premium 498,600           

Financial advisory fee 95,105              

Rating agencies fees 47,100              

Printing costs 9,617                

CPA consent letter fee 463                   

Total 1,056,912$       

HOUSTON COMMUNITY COLLEGE SYSTEM 2008 Maintenance Tax Notes & Senior Lien Bonds

as of May 31, 2013

Fund 7203 

Fund 7203 ‐ Maintenance Tax Notes

34

Page 42: Fs2013 may

Total Budget to 

Date

Total Revenues 

/  Expenditures 

To Date

Encumbrances To 

Date Unexpended

Source:

2008 Senior Lien Bonds:

Southeast Workforce Project 14,300,000$     

  Emergency Preparedness 1,000,000        

Interest Earned To date 470,785           

Funds Available for Projects 15,770,785$     

Uses:

Operation and Maintenance 77,034               77,034              ‐                    

Major Repairs and Renovation 821,560            820,726           834                       ‐                    

South East Work Force Project 3,838,668         3,731,266        107,402                ‐                    

Land  Purchase (Rosalie Property) 2,314,967         2,314,967        ‐                    

Material Engineering and Testing 8,380                 4802 3,578                    ‐                    

Construction of Workforce Building 7,267,592         6,861,855        405,737                ‐                    

Residual Funds for All Projects 1,442,584         1,442,584        

15,770,785$      13,810,650$    517,551$              1,442,584$       

Bond Issuance Cost:

Bond counsel fees 123,267$          

Underwriters' discount 336,128           

Insurance premium 620,827           

Financial advisory fee 100,981           

Rating agencies fees 51,750              

Printing costs 5,880                

Paying agent fee 460                   

Verification fee 5,000                

Escrow agent fee 4,600                

1,248,893$       

35

Fund 7308 ‐ Senior Lien Bonds

HOUSTON COMMUNITY COLLEGE SYSTEM 2008 Maintenance Tax Notes & Senior Lien Bonds

Fund 7308as of May 31, 2013

Page 43: Fs2013 may

Total Budget to 

Date

Total Revenues 

/  Expenditures 

To Date

Encumbrances To 

Date Unexpended

Central 

San Jacinto Memorial 21,391,231$      9,839,481        3,631,101            7,920,650$       

J.B. Whitely Bldg.  4,540,000         1,452,872        768,045                2,319,083        

Theater One 1,699,500         216,728           20,979                  1,461,793        

Staff Instructional Services 846,921            203,839           ‐                             643,082           

Curriculum Innovation Center 249,549            41,456              208,094                ‐                         

Fine Arts Parking Structure 190,000            171,082           5,100                    13,818              

Crawford Annex 68,200               18,138              ‐                             50,062              

Learning Hub/Science Bldg. 132,214            119,753           12,461                  ‐                         

Planned Parenthood Renovation 1,697,585         1,605,024        92,562                  ‐                         

  Total Central  30,815,200$      13,668,372$     4,738,342$           12,408,488$     

Northeast 

Automotive Tech. Training Ctr. 4,000,000$        666,144$          166,363$              3,167,493$       

Pinemont  66,558               39,237              ‐                             27,321              

Codwell Hall  438,000            353,429           77,746                  6,826                

Codwell Hall Shower (Temp) 150,000            ‐                        150,000           

Roland Smith Truck Driving Ctr.  140,000            54,406              ‐                             85,594              

Northline 120,000            14,425              22,412                  83,163              

Public Safety Institute 115,000            86,245              14,906                  13,849              

NE Science and Tech. Bldg 49,500               ‐                        49,500              

NE Learning Hub 47,500               6,309                ‐                             41,191              

  Total Northeast 5,126,558$        1,220,194$       281,426$              3,624,937$       

Southeast 

Angela Morales 599,000$           562,862$          616$                      35,521$            

Office City 38,500               ‐                        ‐                             38,500              

  Total Southeast 637,500$           562,862$          616$                      74,021$            

Southwest

Stafford Campus (7 Bldgs) 4,279,423$        4,212,447$       66,451$                 525$                  

Scarcella Center 890,339            448,740           101,921                339,679           

Alief 138,680            132,664           ‐                             6,016                

Academic Ctr Sienna Plantation 93,500               89,294              4,102                    104                   

Stafford Learning Hub 54,000               ‐                        11,406                  42,594              

Applied Technology Center 50,000               1,715                ‐                             48,285              

Greenbriar Annex 30,000               22,033              414                       7,553                

  Total Southwest 5,535,942$        4,906,894$       184,293$              444,756$          

System

System Building  2,385,798$        2,179,517$       206,281$              ‐$                       

Teaching Enhancement Renovations 2,719,072         1,208,545        304,700                1,205,827        

Surface Parking & Civil Infrastructure 2,400,000         1,587,410        29,602                  782,987           

Parking Structure 2,395,130         2,291,206        103,924$              ‐                         

  Total System 9,900,000$        7,266,678$       644,508$              1,988,814$       

Grand Total 52,015,200$      27,625,000$    5,849,185$           18,541,016$     

HOUSTON COMMUNITY COLLEGE SYSTEM2010 Maintenance Tax Notes

as of May 31, 2013

36

Page 44: Fs2013 may

 

Total Budget to 

Date

Total Revenues 

/  Expenditures 

To Date

 Encumbrances 

To Date  Unexpended

Sources:

2011 Maintenance Tax Notes 40,000,000

Uses:

San Jacinto College Renovation

Construction 35,000,000$       13,113,872$      21,886,128$      ‐$                       

Architect & Engineering ‐                         ‐                         

Site Infrastructure Improvements ‐                         ‐                         

Inspection ‐                         

IT Infrastructure ‐                         ‐                         

Furniture ‐                         ‐                         

Contingency 5,000,000           5,000,000         

40,000,000$       13,113,872       21,886,128       5,000,000         

37

HOUSTON COMMUNITY COLLEGE SYSTEM2011 Maintenance Tax Notes: Fund 7207

As of  May 31, 2013

Page 45: Fs2013 may

  Total Budget to Date

Total Revenues /  

Expenditures To 

Date

 Encumbrances To 

Date  Unexpended

Sources:

2011A Maintenance Tax Notes 21,000,000

Uses:Alief ‐ Hayes Road 3,644,476$                 3,644,476$               

Architect & Engineering 1,208,820                   1,081,951                 126,869                      ‐                                  Construction 7,988,362                   2,925,568                 5,062,793                  ‐                                  Site Infrastructure Improvements 6,402                           6,402                         ‐                                   ‐                                  Material Testing 21,647                         11,296                      10,351                       IT Infrastructure 78,620                         ‐                                  78,620                        ‐                                  Inspection 122,800                       38,400                      84,400                        ‐                                  Furniture 928,874                       1,945                         926,929                      ‐                                  

14,000,000$               4,065,561                 6,289,963                  3,644,476                 

NE ‐ North ForestArchitect & Engineering 136,695                       99,568                      37,127                        ‐                                  Construction ‐                                  ‐                                   ‐                                  Site Infrastructure Improvements ‐                                  ‐                                   ‐                                  IT Infrastructure ‐                                  ‐                                   ‐                                  Furniture ‐                                  ‐                                   ‐                                  

136,695 99,568                      37,127                        ‐                                 

SW ‐ West Loop 2,574,374 2,574,374                 Architect & Engineering 13,000                         10,000                      3,000                           ‐                                  Construction 952,984                       358,358                    594,626                      ‐                                  Site Infrastructure Improvements ‐                                  ‐                                   ‐                                  IT Infrastructure ‐                                  ‐                                   ‐                                  Furniture ‐                                  ‐                                   ‐                                  Painting 262,257                       70,428                      191,829                      ‐                                  

3,802,616 438,786                    789,455                      2,574,374                 

SW ‐ Alief BissonnetArchitect & Engineering 186,225                       27,850                      158,375                      ‐                                  Construction 6,083                           ‐                                  6,083                           ‐                                  Site Infrastructure Improvements 5,076                           ‐                                  5,076                           ‐                                  IT Infrastructure ‐                                  ‐                                   ‐                                  Furniture ‐                                  ‐                                   ‐                                  

197,384 27,850                      169,534                      ‐                                 

SE ‐ Workforce BldgArchitect & Engineering 112,320                       85,528                      26,792                        ‐                                  Construction ‐                                  ‐                                   ‐                                  Site Infrastructure Improvements ‐                                  ‐                                   ‐                                  IT Infrastructure ‐                                  ‐                                   ‐                                  Furniture ‐                                  ‐                                   ‐                                  

112,320 85,528                      26,792                        ‐                                 

3100 Main System BldgArchitect & Engineering 10,000 6,000                         4,000                           ‐                                  Construction 361,491 122,564                    238,927                      ‐                                  Site Infrastructure Improvements ‐                                  ‐                                   ‐                                  IT Infrastructure ‐                                  ‐                                   ‐                                  Furniture 79,483 71,535                      7,948                           ‐                                  Painting 11,597 10,437                      1,160                           ‐                                  

462,571 210,536                    252,035                      ‐                                 

Contingency 2,288,414 2,288,414                 

Total Construction Cost 21,000,000$                4,927,830$                7,564,906$                 8,507,264$               

38

HOUSTON COMMUNITY COLLEGE SYSTEM2011A Maintenance Tax Notes: Fund 7208

As of  May 31, 2013

Page 46: Fs2013 may

Description Date Issued

Original Bond 

Amount

Principal 

Payments Principal Balance

Principal & 

Interest FY12

Final Due 

Date Call Dates

Foot‐

note

2005 Senior Lien Revenue/Refunding Bonds 04/15/05 51,285,000 (18,240,000) 33,045,000 6,676,363 04/15/20 04/15/15 (A)

2006 Junior Lien Revenue/Refunding Bonds 11/01/06 72,815,000 (18,885,000) 53,930,000 6,274,230 04/15/30 04/15/16 (A)  (B)

2008 Senior Lien Revenue Bonds 05/14/08 54,540,000 (7,810,000) 46,730,000 4,075,100 04/15/30 04/15/18 (A)

2010 Senior Lien Revenue Bonds 07/29/10 27,250,000 (1,775,000)        25,475,000 2,124,275 04/15/31 04/15/20 (A) 

2011 Junior Lien Revenue Refunding Bonds 03/10/11 33,940,000 (4,965,000)        28,975,000 4,150,431 04/15/25 04/15/21 (A)

2011T Senior Lien Revenue Bond 11/15/11 16,000,000 16,000,000 388,800           04/15/21 11/15/13 (A)

2003 Limited Tax Bonds 12/01/03 144,155,000 (143,700,000) 455,000 782,175 02/15/14 (C)

2011 Limited Tax Refunding Bonds 10/20/11 109,490,000 109,490,000 5,308,300 02/15/28 02/15/21 (C)

2013 Limited Tax General Obligation Bonds 03/19/13 398,775,000 398,775,000 7,663,284 02/15/43 02/15/15 (E)

2006 Maintenance Tax Notes 02/01/06 12,000,000 (3,165,000) 8,835,000 890,550 02/15/26 02/15/16 (C)

2008 Maintenance Tax Notes 03/01/08 54,975,000 (9,825,000) 45,150,000 4,171,426 02/15/28 02/15/18 (C)

2009 Maintenance Tax Notes 09/01/09 13,830,000 (2,200,000) 11,630,000 1,242,569 02/15/25 02/15/19 (C)

2010 Maintenance Tax Notes 07/29/10 47,645,000 (3,720,000)        43,925,000 3,998,400        02/15/29 02/15/20 (C)

2011 Maintenance Tax Notes 03/10/11 41,560,000 (2,645,000)        38,915,000 3,293,775 02/15/31 02/15/21 (C) 

2011A Maintenance Tax Notes 10/12/11 19,590,000 (670,000)           18,920,000 1,583,875 02/15/31 02/15/21 (C) 

PFC Series 2005A Lease Revenue Bonds 06/01/05 11,605,000 (2,880,000) 8,725,000 837,663 04/15/28 04/15/15 (A)

PFC Series 2005C Lease Revenue Bonds 12/01/05 19,155,000 (3,755,000) 15,400,000 1,313,456 04/15/30 04/15/15 (A)

PFC Series 2006 Lease Revenue Bonds 10/01/06 36,950,000 (6,290,000) 30,660,000 2,484,773 04/15/31 04/15/16 (A)  (D)

PFC Series 2007 Lease Revenue Bonds 02/01/07 58,885,000 (8,015,000) 50,870,000 4,321,500 04/15/31 04/15/17 (A) 1,224,445,000 (238,540,000) 985,905,000 61,580,944

Note: This schedule represents all bonds and maintenance tax notes with outstanding principal balances as of 5/31/13; 

             previously retired debt issues are not shown (i.e. 1997, 1998, 1999, 2001, 2001A, 2003 LTD, 2005 LTD)

Footnotes:

(A)  Funded from current operations, Fund 1110

(B)  Approximately $3.4 MM annually through 8/31/17 to be funded from student technology fees, Fund 8110; remainder from 

       current operations

(C)  Funded from real estate taxes, Fund 8300

(D) $1,329,772 of interest expense to be funded from real estate taxes

(E) Funded from capitalized interest

Schedule of Bonds and Maintenance Tax Notes

For the Month Ended May 31, 2013

Houston Community College

39

Page 47: Fs2013 may

3101‐3100 Main 

Leasing

**3102‐

Conference 

Training Center3103‐HCC‐TV 

Auxiliary

3105‐HCCS ‐ PFC 

Leasing **3110‐Auxiliary

3111‐ Auxiliary 

Student Services

3201‐Cafe Club 

NEO 3100 Main

3202‐Fitness 

Center‐Central

3204‐Heinen 

Theater

3207‐

International 

Initiatives

3208‐Saudi 

Consulting 

Services 3209‐Qatar Subtotal

Fund Balance 8/31/12 16,575,935$       (744,125)$         36,165$          898,968$           (6,225,160)$       (724,173)$           (1,362,924)$       (76,298)$           33,917               (82,495)               203,712             807,349        9,340,870        

FY2013 Revenue  3,991,372               78,086                   ‐                           16,819                   2,541,225               365                          386,184                   11,087                   15,738                   46,666                     ‐                              5,394,352        12,481,894         

 Salaries  171,271                   52                           372,527                   194,702                   195,746                   597                         1,600                     4,000                       4,203,491        5,143,986            

 Benefits  44,223                     4                             83,640                     42,756                     45,430                     3                             754,840           970,896               

 Supplies Gen Exp  16,002                     20,924                   231,920                   9,346                       5,926                     4,661                     5,809                       19,815             314,402               

 Travel  45,727                     44,225                     3,084                       30,874             123,910               

 Marketing Costs  411,870                   411,870               

 Rental & Leases  4,008                     33,440                     938                          38,387                 

 Contract Services  1,291,045               709,229                   925                         124,210           2,125,408            

 Utilities  305,502                   913                          306,415               

 Departmental Expenses  2,750                       3,312,171               270                         7,050                       481                   3,322,722            

 Instructional & Other Materials  600                          778                          168,244                   2,817                       172,439               

 Maintenance & Repair  4,088                       5,251                       1,245                     1,952                     12,536                 

 Insurance/Risk Mgmt  ‐                            

 Exemptions and Waivers  1,738                       150                          1,888                    

 Transfer  ‐                            

 Capital Outlay  784,436                   784,436               

 Total Expense  2,615,829               24,989                  ‐                           ‐                              5,207,128               281,683                  425,867                  7,771                     9,408                     22,910                     ‐                              5,133,711       13,729,294         

Contribution to Fund Balance 1,375,543           53,097              ‐                       16,819               (2,665,903)          (281,318)             (39,682)               3,316                 6,330                 23,756                ‐                         260,641        (1,247,401)      

17,951,478         (691,028)           36,165            915,787             (8,891,063)          (1,005,491)          (1,402,607)          (72,982)             40,246               (58,739)               203,712             1,067,990    8,093,470        

*Restricted by limitations; must comply with laws, statues and regulations.

**Common Area Expense

40

HOUSTON COMMUNITY COLLEGE SYSTEMAuxiliary Budget By Fund

as of May 31, 2013

Auxiliary Funds*

Net Fund Balance 

Page 48: Fs2013 may

HOUSTON COMMUNITY COLLEGE SYSTEMAuxiliary Budget By Fund

as of May 31, 2013

3110‐ Student 

Vending 

Commission

3111‐Auxiliary 

Student 

Activities

3112‐Auxiliary 

Student Athletic 

Fee Subtotal Grand Total

Fund Balance 8/31/12 227,335            594,123          1,584,968         2,406,426           11,747,296        

FY2013 Revenue  103,084                1,088,473           865,939                 2,057,496               14,539,390        

 Salaries  5,830                     11,211                146,215                 163,256                   5,307,242          

 Benefits  12                        26,542                   26,555                     997,451             

 Supplies Gen Exp  29,933                   507,575              219,374                 756,882                   1,071,284          

 Travel  5,074                     44,631                66,386                   116,091                   240,001             

 Marketing Costs  ‐                                411,870             

 Rental & Leases  ‐                                38,387               

 Contract Services  1,800                     57,292                104,523                 163,615                   2,289,023          

 Utilities  ‐                                306,415             

 Departmental 

Expenses 

9,434                     9,834                  8,480                     27,748                     3,350,470          

 Instructional & 

Other Materials 

‐                                172,439             

 Maintenance & 

Repair 

140                        140                          12,676               

 Insurance ‐ Risk 

Mgmt 

70                           207                      6,944                     7,221                       7,221                  

 Exemptions and 

Waivers 

9,379                     15,400                24,779                     26,667               

 Transfer  935,555                 935,555                   935,555             

 Capital Outlay  932                         932                          785,368             

 Total Expense  61,660                  646,163              1,514,951             2,222,774               15,952,068            

Contribution to Fund Balance 41,424              442,311          (649,012)           (165,277)             (1,412,678)         

268,759            1,036,434       935,956             2,241,149           10,334,618        

*Funds can only be used for services related to students

41

Net Fund Balance 

Student Auxiliary Funds ‐ Restricted*

Page 49: Fs2013 may

Federal Grantor Perform‐ Federal

Pass‐through Grantor ance CFDA Total Budget Total AwardProgram Title Period Number Expenditures Amount Amount** Ends Starts

U. S. Department of Education

Direct Programs:

Higher Education ‐ Institutional Aid 5 yrs. 84.031A 88,692               450,183            1,542,133         9/30/2014 10/1/2009

TRIO ‐ Student Support Services 5 yrs. 84.042 305,309            436,682            2,065,270         8/31/2015 9/1/2010

TRIO ‐ Upward Bound ‐ Southeast 4 yrs. 84.047 1,399                 16,669               1,172,562         ^^ 8/31/2012 9/1/2007

TRIO ‐ Upward Bound ‐ Southeast 5 yrs. 84.047 196,796            291,335            1,465,615          8/31/2017 9/1/2012

TRIO ‐ Upward Bound ‐ Central 5 yrs. 84.047A 371,316            949,456            2,845,845         5/31/2017 6/1/2012

Astra Stem Grant 3 yrs. 84.120A 80,015               293,375            881,873            9/30/2014 10/1/2011

Vast Academy TPSID 5 yrs. 84.407A 326,059            862,617            2,498,250         9/30/2015 10/1/2010

Pass‐Through From:

Texas Educational Agency

Adult Education ‐ State Grant Program 1 yr. 84.002 3,850,578         5,508,680         5,542,104         6/30/2013 7/1/2012

Adult Education ‐ State Grant Program 1 yr. 84.002 83,622               128,780            128,780            6/30/2013 7/1/2012

University of St. Thomas

Higher Education ‐ Institutional Aid 5 yrs. 84.031C 451,174            870,174            3,243,025         9/30/2016 10/1/2011

 Texas Higher Education Coordinating Board 

Vocational Education ‐ Basic Grants to States 1 yr. 84.048 440,272            1,171,019         1,171,019         8/31/2013 9/1/2012

College Access Challenge Grant Program 1 yr. 4 mos. 84.378A 15,000               26,707               208,548            ^^ 8/31/2012 4/6/2011

College Access Challenge Grant Program 1 yr.  84.378A 112,853            169,803            171,798            8/13/2013 8/14/2012

Total Department of Education 6,323,084$        11,175,480$      22,936,822$     

U.S. Department of Agriculture

Direct Programs:

Hispanic Serving Institutions Education Grants 2 yrs. 10.223 13,013               36,414               298,538            ^   8/31/2013 8/1/2009

Hispanic Serving Institutions Education Grants 2 yrs. 10.223 13,084               26,428               244,000            ^   8/14/2013 8/15/2010

    Hispanic Serving Institutions Education Grants 2 yrs. 10.223 59,134               135,610            445,000            ^   8/31/2013 9/1/2010

Hispanic Serving Institutions Education Grants 2 yrs. 10.223 72,869               202,726            245,000            8/31/2013 9/1/2011

Pass‐Through From:

Texas A & M University‐Corpus Christi 2 yrs 10.223 14,224               30,435               48,700               ^   8/31/2013 9/1/2010

Total Department of Agriculture 172,323$           431,613$           1,281,238$       

* Scholarship grants are not included in this schedule.

** Award amount for the total grant period.  For example, if grant is for three years, the award amount will cover the three years.

^ No Cost Extension

^^ Grant is Over

42

HOUSTON COMMUNITY COLLEGE

as of May 31, 2013

Date Grant

Schedule of Federal Awards *

FY12 ‐ 13

Page 50: Fs2013 may

Federal Grantor Perform‐ Federal

Pass‐through Grantor ance CFDA Total Budget Total Award

Program Title Period Number Expenditures Amount Amount** Ends Starts

U.S. Department of Housing and Urban Development

Direct Programs:

Pass‐Through From:

Child Care Council of Greater Hous. Inc

Community Development Block Grant‐Entitlement Grant 1 yr 14.218 10,787               17,309               32,000               ^^12/31/12 8/1/2011

Total Department of Housing And Urban Development 10,787$             17,309$             32,000$            

Department of Justice

Direct Program: Bulletproof Vest Partnership Program 1 yr‐cont. 16.607 ‐                           ‐                         11,078               until expended 9/1/2004

Total Department of Justice ‐$                         ‐$                        11,078$            

Department of Labor

DOL‐Logistics Technician Training 3yrs. 84,750$             159,097            327,404            6/30/2013 7/1/2010

Pass‐Through From:

Harris County Department of Education

Integrated Career Awareness 10 mos. 17 13,631 53,800 53,800 6/30/2013 8/1/2012

Texas Workforce Commission

Recovery ‐ WIA Dislocated Worker Formula Grant 1 yr. 17 10,261 61,804 243,163 ^^9/30/2012 7/1/2011

Total Department of Labor 108,642$           274,701$           624,367$          

Department of State

Pass‐Through From:

Northern Virginia Community College 1 yr 19 67,642               73,538               109,830            5/31/2013 3/8/2012

Total Department of State 67,642$             73,538$             109,830$          

Institute of Museum & Library Services

Libraries for ALL 1 yr 45 13,693               75,000               75,000               8/31/2013 9/1/2012

Total Department of State 13,693$             75,000$             75,000$            

National Science Foundation

Direct Programs:

 Education and Human Resources 4 yrs. 47.076 48,502               64,204               423,300            ^5/31/2013 2/15/2009

Pass‐Through From:

University of Houston System

Education and Human Resources 5 yrs. 47.076 28,950               47,212               190,000            8/31/2013 9/1/2011

Total National Science Foundation 77,452$             111,415$           613,300$          

* Scholarship grants are not included in this schedule.

** Award amount for the total grant period.  For example, if grant is for three years, the award amount will cover the three years.

^ No Cost Extension

^^ Grant is Over

43

as of May 31, 2013

HOUSTON COMMUNITY COLLEGE

Schedule of Federal Awards *

Date Grant

FY12 ‐ 13

Page 51: Fs2013 may

Federal Grantor Perform‐ Federal

Pass‐through Grantor ance CFDA Total Budget Total Award

Program Title Period Number Expenditures Amount Amount** Ends Starts

U. S. Department of Energy

Energy Sector Grant (SECO) 8 mos 81.041 37,180               63,836 460,480 ^^9/30/2012 5/10/2010

Solar Energy Technical Program 13 mos 81.087 155,346 591,069            750,000            12/30/14 11/1/2012

Pass Through From:

City of San Antonio 4.5 mos. 81.117

Energy Efficiency & Rene Energy Info Dissen Outrea,Train,&Tech Analy/Assist 14,465 15,000               15,000               02/14/13 9/1/2012

Total U. S. Department of Energy 206,991$           669,905$           1,225,480$       

U. S. Department of Health and Human Services

Direct Programs:

Head Start 5 yrs. 93.600 14,472 16,045               936,660            9/29/2013 9/30/2008

Head Start 5 yrs. 93.600 119,294 207,477            936,660            9/29/2013 9/30/2008

Pass‐Through From:

Texas Education Agency

Temporary Assistance for Needy Families 1 yr. 93.558 10,178               10,200               208,614            ^^8/31/2012 9/1/2011

Temporary Assistance for Needy Families 1 yr. 93.558 180,057            253,850            244,749            8/31/2013 9/1/2012

YMCA of Greater Houston

Refugee and Entrant Assistance ‐ Targeted Assistance Grants 1 yr. 93.584 19,869               82,578               374,938            ^^9/30/2012 10/1/2011

Refugee and Entrant Assistance ‐ Targeted Assistance Grants 1 yr. 93.584 205,464            342,105            342,105            9/30/2013 10/1/2012

Pitt Community College

Health Information Tech Professionals 2 yrs. 93.721 262,192            498,372            1,287,568         9/30/2013 4/2/2010

University of Texas at Austin

Total Department of Health and Human Services 811,525$           1,410,627$        4,331,294$       

U. S. Department of Homeland Security

Direct Programs:

 Homeland Security 2 yrs. 97.062 16,497               58,856               250,000            ^^12/31/12 9/1/2010

Total Department of Homeland Security 16,497$             58,856$             250,000$          

Total  Federal Financial Assistance 7,808,636$        14,298,444$      31,490,408$     

* Scholarship grants are not included in this schedule.

**Award amount for the total grant period.  For example, if grant is for three years, the award amount will cover the three years.

^ No Cost Extension

^^ Grant is Over

HOUSTON COMMUNITY COLLEGE

Schedule of Federal Awards *

as of May 31, 2013

FY12 ‐ 13

44

Date Grant

Page 52: Fs2013 may

Perform‐

ance Total Budget Total Award

Program Title ‐ State Grantor Period Expenditures Amount Amount** Ends Starts

Texas Education Agency

Adult Education 1 yr. 24,618$             24,615$             1,165,635$        ^^  8/31/2012 9/1/2011

Adult Education 1 yr. 1,022,173         1,292,271         1,165,635         8/31/2013 9/1/2012

Drop‐Out Recovery Program 18mos 960                     43,998               194,000            2/28/2013 8/1/2011

Drop‐Out Recovery Performance Pay 1 yr. 48,266               181,784            181,784            until expended 6/1/2011

Temporary Assistance for Needy Families 1 yr. 16,311               16,869               111,445            ^^  8/31/2012 9/1/2011

    Temporary Assistance for Needy Families 1 yr. 85,036               122,182            131,283            8/31/2013 9/1/2012

       Total Texas Education Agency 1,197,363$        1,681,720$        2,949,782$       

Texas Higher Education Coordinating Board

Adult Basic Education Innovation Grant 1 yr. 139,465$           158,314            500,000            8/31/2013 9/1/2012

Collegiate G‐Force Mentorship 1 yr. 6,470                 27,148               50,000               8/31/2013 9/1/2009

First Year Experience 13 mos. 5,577                 8,709                 50,000               until expended 7/18/2011

Nursing Shortage Reduction Program 4 yrs. 37,147               112,280            157,314            8/31/2014 9/1/2010

Nursing Shortage Under 70 Program 1 yr. 65,673               383,891            383,891            8/31/2013 9/1/2012

Rider 58 ATCP School Grant 8 1/2 mos. ‐                           13,960               46,360               until expended 12/18/2009

Pass‐Through From:

University of Tex Health Science Center

Navigator Grant 1 yr. 30,466               51,452               129,195            ^^11/30/2012 6/1/2011

       Total Texas Higher Education Coordinating Board 284,798$           755,754$           1,316,760$       

Texas Workforce Commission

Skills Development ‐ Skills for Small Business Initiatives 1 yr. 410                     18,791               20,000               5/31/2013 6/1/2012

Ben E Keith Co. 1 yr. 48,576               69,380               103,469            2/28/2014 2/11/2013

The Methodist 14 mos. 383,872            902,965            902,965            10/31/2013 8/20/2012

VITAS 13 mos. 16,779               389,051            389,051            4/30/2014 3/1/2013

Pass‐Through From:

       Total Texas Workforce Commission 449,637$           1,380,187$        1,415,485$       

Total State Financial Assistance 1,931,798$        3,817,660$        5,682,027$       

* Scholarship grants are not included in this schedule.** Award amount for the total grant period.  For example, if grant is for three years, the award amount will cover the three years.

^ No Cost Extension^^ Grant is Over

Date Grant

as of May 31, 2013

Schedule of State Awards *

FY12 ‐ 13

45

HOUSTON COMMUNITY COLLEGE

Page 53: Fs2013 may

Program Title ‐ Private Grantor Period Expenditures Budget Award Amount** Ends Starts

Achieving the Dream ‐ Initiative 1 yr.‐cont. ‐                           9,433                 20,000               until expended 12/1/2009

Achieving the Dream ‐ Gates Foundation 3 yrs. 195,852            262,135            743,000            ^^12/31/2012 7/1/2009

Adult Education/We Can Work 1 yr. ‐                           ‐                         11,500               until expended 1/1/2010

American Chemical Society 8 mos 177                     248                    500                    until expended 9/1/2011

AT&T High School Success Grant 1 yr. 7 mos. ‐                           25,216               35,000               until expended 1/31/2010

Bank of America  2 yrs. ‐                           316                    50,000               until expended 5/1/2008

Baylor Summer Interns 1 yr. ‐                      1,638                 60,000               until expended 5/1/2010

Brown Foundation 1 yr.‐cont. ‐                      ‐                         100,000            until expended 2/1/2008

Capital Idea project 1 yr. 83,587               73,794               341,000            until expended 8/1/2010

Carnegie FDTN 1 yr 14,599               30,901               67,500               until expended 1/1/2012

Citibank ‐ College Connection Program 1 yr. 835                     20,475               41,718               until expended 8/15/2007

Civic Ventures 1 yr. 1 mo. 1,233                 1,246                 25,000               until expended 7/1/2010

Dow Male Minority Initiative Summer Prog. 1 yr. ‐                      12,588               23,986               until expended 1/2/2012

Early College High School (Southeast) ‐ Gates/Dell 5 yrs. ‐                           6,779                 400,000            until expended 6/10/2005

Financial Empowerment Strat. Student Success 2 yrs. 11,014               60,808               63,050               12/31/2013 1/1/2012

Goldman Sachs Grant ‐ Phase I 5 yrs. 935,888            1,955,011         1,955,011         5/31/2016 1/3/2011

Gulf Coast Pass 3 yrs. 183,279            602,625            1,175,000         12/31/2014 1/1/2012

Hammill FDTN ‐ Veterans Grants 2 yrs. ‐                           11                      18,191               until expended 9/1/2010

Houston Endowment Grant 3 yrs. ‐                           814                    267,000            until expended 11/16/2005

Houston Pathways Initiative 2 yrs. 86,695               345,471            1,580,000         8/31/2013 3/26/2009

Interlocal Metro (PSI) 10 yrs. ‐                           45,000               200,000            8/23/2017 8/23/2008

Interlocal Stafford ‐ City of Stafford 1 yr. 57,600               161,986            161,986            until expended 10/1/2010

KBR Veterans Orientation 1 yr.‐cont. ‐                           5,540                 19,685               until expended 9/1/2008

Kresge Fdtn‐Coordinator/Evaluation 1 yr. 43,279               17,221               82,450               until expended 9/1/2011

Kresge Fdtn‐Parent Academy 1 yr. 45,850               89,881               89,881               until expended 9/1/2011

Kresge Fdtn‐Veterans Grant 1 yr. 72,580               136,698            136,698            until expended 9/1/2011

MDRC ‐ Learning Community Demonstration Grant ‐ Northeast 4 yrs. ‐                           26,495               60,233               until expended 11/1/2007

MDRC ‐ Learning Community Demonstration Grant ‐ Southeast 4 yrs. ‐                           738                    75,000               until expended 11/1/2007

MDRC ‐ Learning Community Demonstration Grant ‐ Central 4 yrs. ‐                           385                    33,000               until expended 11/1/2007

Metlife Caregiving for Older Americans 1 yr.‐cont. ‐                           18,012               23,855               until expended 7/1/2007

Microsoft Elevate America 1 yr. 3,261                 31,985               34,969               until expended 3/20/2012

* Scholarship grants are not included in this schedule.

**Award amount for the total grant period.  For example, if grant is for three years, the award amount will cover the three years.

^ No Cost Extension

^^ Grant is Over

FY12 ‐ 13

46

HOUSTON COMMUNITY COLLEGE

Schedule of Local Government and Private Awards *

as of May 31, 2013

Page 54: Fs2013 may

Program Title ‐ Private Grantor Period Expenditures Budget Award Amount** Ends Starts

Mobile Go Center ‐ Valero 1 yr.‐cont. ‐                           494                    7,293                 until expended 9/1/2007

National Articulation & Transfer Network Council(NATN) 1 yr.‐cont. ‐                           29,273               29,273               until expended 4/1/2005

North Forest GED Preparation 3 mos 330                     6,799                 25,000               until expended 10/1/2011

St. Luke's Episcopal Health Charities Immunization Fellowship 2 yrs. ‐                           4,178                 142,650            until expended 9/10/2008

Susan B Komen Breast Cancer Initiative 1 yr. ‐                           6,610                 123,230            until expended 4/1/2010

Texas Pioneer Foundation Grant 1 yr. 694                     22,851               23,117               8/31/2013 1/26/2012

TG‐ATD Texas Peer Coaching 4,950                 10,000               10,000               8/31/2013 9/1/2012

Vast Job Developer 1 yr. 7,266                 20,299               94,898               until expended 11/1/2009

Verizon Foundation Grant 1 yr. ‐                           510                    12,510               until expended 1/1/2010

Verizon‐Simmons CAST 14 mos. 333                     12,500               12,500               12/18/2013 10/12/2012

Walmart ‐ Minority Male Initiative 1 yr. ‐                           25,215               40,000               until expended 9/1/2009

Washington Mutual 1 yr.‐cont. ‐                           16,717               31,700               until expended 9/1/2006Total Private Financial Assistance 1,749,301$        4,098,897$        8,447,385$       

* Scholarship grants are not included in this schedule.

**Award amount for the total grant period.  For example, if grant is for three years, the award amount will cover the three years.

^ No Cost Extension

^^ Grant is Over

47

         HOUSTON COMMUNITY COLLEGE ‐ Schedule of Local Government and Private Awards *

Schedule of Local Government and Private Awards * continued

as of May 31, 2013

FY12 ‐ 13

Page 55: Fs2013 may

Salary

CHANCELLOR97,613$

51,923$

70,469$

70,469$

46,448$

46,000$

46,000$

45,000$

46,000$

55,000$

55,000$

50,000$

45,555$

71,761$

58,000$

39,900$

96,000$

75,000$

60,000$

19     1,126,138$       

DEPUTY CHANCELLOR45,857$

45,857$

45,857$

48,150$

24,473$

25,000$

24,473$

24,473$

27,000$

61,074$

45,746$

39,504$

66,578$

34,908$

34,908$

37,943$

65,540$

49,500$

169,195$

142,503$

48,806$

New Postions

Houston College Community Systems

2012‐2013 Positions

Employee Name Department Job Title Comments Month

Wanda Pleasant Procurement Sr. Buyer

Alfred Kessellie, II Procurement Supervisor New Position‐Budget 12‐13‐Hired External Nov

Kerry Doucette Procurement Supervisor New Position‐Budget 12‐13‐Hired External Nov

New Position‐Budget 12‐13‐Hired External Nov

48

Michael Schurwon Procurement Sr. Buyer New Position‐Budget 12‐13‐Hired External Jan

Barlett Sheinberg Resource & Economic Dev Interim Dir., Resource & Economic Dev New Position‐Budget 12‐13‐Hired Internal Sep

Thomas Richardson Procurement Buyer New Position‐Budget 12‐13‐Hired External Nov

Mimi Lemmons Procurement Sr. Buyer New Position‐Budget 12‐13‐Hired External Nov

Andrea Stroller Foundation Alumni Specialist New Position‐Budget 12‐13‐Hired External Nov

Freddy Conde Procurement Buyer New Position‐Budget 12‐13‐Hired External Nov

Armand Villacorte Procurement Sr. Buyer New Position‐Budget 12‐13‐Hired External Jan

Reginald Harmon Procurement Sr. Buyer Repl Sheila Perla‐Hired External Nov

Victor Camargo Business Services Inventory Control Supervisor New Position‐Budget 12‐13‐Hired External Nov

Christopher Burton Procurement Dir., Procurement Operations Repl Jeffery Bonnardel‐Hired External Apr

Ching Hua Procurement Sr. Buyer New Position‐Budget 12‐13‐Hired External Mar

Olivia Harris Records Retention Records Retention Technician New Position‐Budget 12‐13‐Hired External Apr

Sharon Flowers General Counsel Legal Assistant New Position‐Budget 12‐13‐Hired External Feb

Sandra Garica General Counsel Assistant General Counsel I Repl Jessica Saldivar‐Hired External Mar

Susana Rodriquez Internal Audit Sr., Internal Auditor New Position‐Budget 12‐13‐Hired External May

Frank Khan Internal Audit Internal Auditor New Position‐Budget 12‐13‐Hired External May

1        New Position‐External 14     Interim 1        

Edwin Johnson Police Department Corporal Repl Anthony Maxie‐Hired Internal Sep

Chancellor Replacement‐Internal ‐         Replacement‐External 3        New Position‐Internal

Shirley Voisin Police Department Corporal New Position‐Budget 11‐12‐Hired Internal Sep

My'Keshia Robinson Police Department Security Officer Repl Victor Fisher‐Hired External Oct

Tobin Anderson Police Department Corporal Repl Timothy Ramirez‐Hired Internal Sep

Navidad Martinez Police Department Corporal New Position‐Budget 11‐12‐Hired Internal Sep

James Lindsey Police Department Security Officer Repl Grayland Jones‐Hired External Oct

Antonio Hill Police Department Security Officer Repl Kenneth Bridges‐Hired External Oct

Ules Harris Police Department Security Officer Repl Majid Iqbal‐Hired External Oct

Katherine McCabe Police Department Security Officer Repl Willie Rostan‐Hired External Oct

Maria Alarcon Accounts Payable Accounting Specialist Repl Norma Jackson‐Hired Internal Oct

Manhal Chbat QEP Instructor New Position‐Hired Internal Jan

Patricia Thompson HR‐Compensation Manager Repl John Chen‐Hired External‐Temp Oct

Aracelia Saucedo Business Affairs Executive Secretary Repl Alice Binkley‐Hired Internal Oct

Bapakaye Tamuno Police Department Police Trainee New Position‐Budget 12‐13‐Hired External Nov

Shirley Parish Human Resources Interim HRIS Manager Repl Tasharra Pickens‐Hired Internal Nov

Jeremy Hardeway Police Department Police Trainee New Position‐Budget 12‐13‐Hired External Nov

Keith Harris Police Department Police Trainee New Position‐Budget 12‐13‐Hired External Nov

Karen Edwards Human Resources Interim Chief HR Officer Repl Willie Williams‐Hired Internal Jan

William Thomson Student Financial Svs Accountant II New Position‐Budget 12‐13‐Hired Internal Feb

Brittany Kaighen HR‐Payroll Payroll Support Specialist Repl Juanita Mei‐Hired External Jan

Willie Williams Deputy Chancellor VC, Administrative Special Projects New Position‐Hired Internal Jan

Page 56: Fs2013 may

Salary

Houston College Community Systems

2012‐2013 Positions

Employee Name Department Job Title Comments Month

DEPUTY CHANCELLOR continued47,492$

37,943$

142,000$

32,500$

66,130$

101,000$

38,000$

85,680$

37,943$

66,130$

51,132$

55,000$

61,074$

31,579$

37,740$

36     1,998,688$       

VICE CHANCELLOR INSTRUCTION52,423$

41,427$

53,320$

43,557$

36,220$

52,000$

35,000$

43,174$

48,010$

35,982$

34,500$

64,500$

32,538$

101,000$

35,000$

35,000$

45,967$

47,743$

18     

837,361$          

VICE CHANCELLOR STUDENT SUCCESS65,000$

38,000$

39,960$

37,000$

35,500$

37,000$

New Postions

49

Exec. Dir of International Initiatives FebRicardo Solis International Initiatives See Original hire on Deputy Chancellor (Title Change)

Maya Durnovo Economic Dev & Entrep AVC, Economic Dev & Entrep. Initiatives New Position‐Budget 12‐13‐Hired Internal Feb

Alobidey Mohammed Broadcasting  Media Videographer Repl Joseph Smith‐Hired External Feb

Delphine Campbell Student Financial Svcs Accountant II New Position‐Budget 12‐13‐Hired Internal Feb

Hector Silva Police Department Peace Officer Repl Tobin Anderson‐Hired External Feb

Shante Kelley Business Affairs Accounting Specialist Repl Polly Cooper‐Hired Internal Feb

Lesa Spivey Community Relations Dir, Community Relations & Small Bus. Dev New Position‐Budget 12‐13‐Hired Internal Feb

Jonathan Brook Police Department Lieutenant New Position‐Budget 10‐11‐Hired External Feb

Ricardo Solis Economic Development Exec. Dir of Economic Development New Position‐Budget 12‐13‐Hired External‐Temp Feb

Alden Tiggs Audio Visual AutoCAD Specialist Repl Alden Tiggs‐Hired External Apr

James Leftwich  Office Fiscal Planning & Budgeting Sr., Financial Analyst Repl Dawn Wilton‐Hired External Apr

Samoan Scott Police Department Peace Officer Repl Edwin Johnson‐Hired External Mar

Alfred Postel Police Department Lieutenant Repl James Young‐Hired Internal Mar

Gisselia Torre Business Affairs Accounting Specialist Repl Delphine Campbell‐Hired Internal May

Diana Sanders Communications Interim, Dir., Public & Media Relations Repl Lesa Spivey‐Hired Internal Apr

Roy Castleberry Business Services Distribution Rep II Repl Elbert Newsome‐Hired External Apr

Kimberly Davis Instructional Instructional Designer New Position‐Hired External Oct

Scott Godley Workforce Initiatives Program Manager Repl Deshaunta Stewart‐Hired Internal Oct

New Position‐Internal 8        New Position‐External 6        Interim 2        Deputy Chancell Replacement‐Internal 8        Replacement‐External 12    

Latrish Tarhini DOEL English Language Skills Instructor New Position‐Budget 12‐13‐Hired External Nov

Jesse Shelton TLR Instructional Designer New Position‐Budget 12‐13‐Hired External Nov

Somaye Najafi‐Shostari ESL English Language Skills Instructor New Position‐Budget 12‐13‐Hired External Oct

Manuel Ramos DOEL English Language Skills Instructor New Position‐Budget 12‐13‐Hired External Nov

James Heironimus Police In‐Service Instructor New Position‐Budget 12‐13‐Hired External Jan

Anamaria Lopez Opeerations of CTCE Financial Aid Associate Repl Shanetta Burke‐Hired Internal Feb

Israel Salazar Distance Education Advisor New Position‐Budget 12‐13‐Hired External Nov

Touhid Chowdhury Distance Education Advisor New Position‐Budget 12‐13‐Hired Internal Dec

Patricia Hernandez Academic Resource Dev Secretary II New Position‐Budget 12‐13‐Hired Internal Feb

Shirley Santibanez SCE CE Records Specialist Repl Rosa Huerta‐Hired External Mar

Marion Davis Business Dvlp&Outreach Student Recruiter Repl Scott Godley‐Hired External Feb

Thomas Tynan Continuing Education Director Program Construction Repl Fred Woolridge‐Hired External Feb

Mekussa Martinez  Operations CTCE Operations Compliance Specialist Repl Karmesha Sargent‐Hired External Feb

Veronica Medina Research & Inn Research Analyst I, Data Warehouse Repl Hazel Milan‐Hired Internal Apr

Linh Tran Instructional Executive Secretary Repl Gail Beach‐Hired Internal Apr

‐         New Position‐External 10     Interim ‐         

Paul Donaldson Outreach & Student Dev Dir., Outreach & Student Development Repl Shantay Grays‐Hired External Sep     

VC Instr Replacement‐Internal 4        Replacement‐External 4        New Position‐Internal

Randi Sprouse Registrar Transcript Evaluator New Position‐Hired External Oct

Leslie Dye Registrar Transcript Evaluator New Position‐Hired External Oct

Larke Clishe Student Information Svcs Advisor Repl Laura Collins‐Hired External Sep     

Henry Thomas Registrar Transcript Evaluator New Position‐Hired External Oct

Mona Terrell Registrar Transcript Evaluator New Position‐Hired External Oct

Page 57: Fs2013 may

Salary

Houston College Community Systems

2012‐2013 Positions

Employee Name Department Job Title Comments Month

VICE CHANCELLOR STUDENT SUCCESS continued34,374$

27,165$

34,374$

45,546$

40,000$

40,000$

34,006$

34,374$

14     

542,299$          

VICE CHANCELLOR INFORMATION TECHNOLOGY61,074$

60,000$

63,240$

114,000$

48,000$

67,002$

59,382$

52,200$

53,013$

9        

577,911$          

CENTRAL82,681$

45,555$

56,000$

34,996$

48,954$

25,513$

28,000$

58,077$

41,839$

34,374$

55,000$

45,000$

36,000$

77,794$

14     

669,783$          

NORTHWEST41,447$

44,339$

53,244$

31,312$

New Postions

50

Kevin Lacey International Student Recording Imaging New Position‐Budget 12‐13‐Hired Internal‐Temp Nov

Cassandra Millhouse Financial Aid Financial Aid Associate Repl Victoria Thomas‐Hired Internal‐Temp Nov

Ashley Martin VA/Student Support Svcs Advisor New Position‐Budget 12‐13‐Hired Internal Nov

Leila Abdullahi International Student DSO/Advisor New Position‐Budget 12‐13‐Hired External Jan

Clairta Duron Student Information Svcs Student Information Representative New Position‐Budget 12‐13‐Hired Internal Jan

Liliana Silva Admissions Student Records Specialist New Position‐Budget 12‐13‐Hired Internal Dec

Gabrielle Kay International Student DSO/Advisor New Position‐Budget 12‐13‐Hired External Jan

Tamara Jones Advisor Online Student Services Repl Helen McMillan‐Hired External‐Temp Jan

New Position‐Internal 4        New Position‐External 6        Interim ‐         VCSS Replacement‐Internal ‐         Replacement‐External 4       

Katie Herod System Support Sr. Network Analyst New Position‐Hired Internal‐Temp Jan

Bieu Nguyen Administrative Services Director, Administrative Services Repl Celia Gee‐Hired External Feb

Wanda Taft Application Dev System Analyst Repl David Lin‐Hired Internal Sep

Hazel Milan Inst Research & Innovation Research Analyst II‐Special Projects Repl Emily Leffler‐Hired Internal Oct

LaMont Humphrey Communications Multi‐Media Coordinator New Position‐Hired Internal Apr

Ijeoma Ezebuilo Application Dev Business Analyst II Repl Wanda Taft‐Hired External Apr

Demeita Johnson Administrative Services Contract Analyst Repl Amando Jasso‐Hired External  Apr

Kimberly Monroe Application Dev Sr. Programmer Analyst/PS Student Repl Zulma Alvarado‐Hired Internal Apr

Karmesha Sargent Application Dev Business Analyst II Repl Juan Medrano‐Hired Internal May

New Position‐Internal 2        New Position‐External 1        Interim ‐         VCIT Replacement‐Internal 4        Replacement‐External 2       

Dora Whiteside Student Services ADA Counselor New Position‐Hired External Oct

James Connery Construction Instructor Repl Johnny Watson‐Hired External‐Temp Oct

Jason Wilson Student Services Interim Dean of Student Dev Repl Cheryl Johnson‐Hired Internal Sep

Sonya Sneed Student Services Student Life Coordinator Repl Danny Smith‐Hired External Oct

Saqueena Sutton Child Care Child Care Specialist II Repl Kinaya Palmer‐Hired Internal Jan

Erica Hubbard Library Librarian Repl Marcia Braun‐Hired Internal Jan

Brigid Wilson VAST Instructor Repl Frank Colmenero‐Hired External Nov

Rodney Sam Library Library Assistant I Repl Marion Kennedy‐Hired External Jan

Senta Eastern Counseling Counselor Repl Dora Whiteside‐Hired External Feb

Karl Mayes Student Services Advisor Repl Mirna Romero‐Hired External Mar

Kevin Hamby Interior Design Instructor Repl Benjamin Johnston‐Hired External Jan

Isabel Zamora Student Services Financial Aid Associate Repl Maria Dabrowski‐Hired Enternal Feb

Meishon Bell Student Services Advisor Repl Touhid Chowdury‐Hired External Mar

Debra McGaughey Public Relations Director of Public Relations Repl Lamont Humphrey‐Hired Internal Apr

‐         New Position‐External 1        Interim 1        

Eva Foster English Instructor Repl Joaquin Torres‐Hired External‐Temp Sep 

Central Replacement‐Internal 2        Replacement‐External 10     New Position‐Internal

Anika Chowdhury COO Cashier II Repl Stella Villarreal‐Hired External‐Temp Sep 

Steven Cohan Biology Instructor Repl Manhal Chbat‐Hired External‐Temp Sep 

Nellie Bradley Public Relations Director of Public Relations Repl Kimberly Crocker Montgomery‐Hire External‐Temp Sep 

Page 58: Fs2013 may

Salary

Houston College Community Systems

2012‐2013 Positions

Employee Name Department Job Title Comments Month

NORTHWEST continued27,709$

44,615$

41,004$

43,469$

39,270$

41,004$

43,469$

34,374$

27,165$

38,678$

35,053$

38,300$

43,452$

39,960$

35,000$

35,000$

38,000$

39,000$

35,780$

45,008$

58,255$

42,631$

38,000$

101,501$

33,000$

30,500$

43,469$

34,374$

27,708$

79,112$

89,364$

43,469$

34,374$

44,615$

39,171$

30,153$

35,000$

27,165$

44,615$

42,613$

35,276$

34,374$

46     

$       1,924,391 

New Postions

51

Sandra Brooks Admissions Enrollment Service Assistant Repl Makeba Brown‐Hired External‐Temp Sep 

Natalia Noland English Instructor New Position‐Budget 12‐13‐Hired External Oct

Christine Moore Student Services Senior Advisor New Position‐Budget 12‐13‐Hired Internal Oct

Rima Adil COO Community Outreach Coordinator Repl Nellie Bradley‐Hired Internal‐Temp Sep 

Anthony Hilliard Fine Arts Instructor Repl Bonnie Gallup‐Hired External‐Temp Oct

Laleh Golestani Instruction‐Testing Testing Associate Repl Rima Adil‐Hired External‐Temp Oct

Lusinda Eshelman Student Services Enrollment Service Assistant Repl Carlana Brooks‐Hired External‐Temp Oct

Paul Brady Accounting Instructor Repl Mallikarjun Shintri‐Hired External‐Temp Oct

Vimlarani Chopra Biology Instructor Repl Ida Huard‐Hire External Dec

Sherin Isaac Student Services Advisor Repl Laura Wilborn‐Hired External Nov

Goddrick Austin Student Services Senior Advisor New Position‐Budget 12‐13‐Hired Internal Nov

Bharat Sutaria Engineering Instructor New Position‐Budget 12‐13‐Hired External‐Temp Oct

Thomas Tankersley Technician Services Hardware/Software Technician Repl Samuel Sannl‐Hired External Oct

Pamela Walls Student Services Advisor New Position‐Budget 12‐13‐Hired Internal Nov

Jaime Flores Student Services Advisor New Position‐Budget 12‐13‐Hired Internal Nov

Sherhonda Le Financial Aid Financial Aid Associate Repl Diane Wilborn‐Hired External Nov

Courtney Martinez Public Relations Student Recruiter New Position‐Budget 12‐13‐Hired Internal Nov

Corey Aeck Student Services Advisor New Position‐Budget 12‐13‐Hired Internal Nov

Manhal Chbat Biology Instructor Repl Steven Cohan‐Hired Internal Dec

Contrice Kendall Student Services Advisor New Position‐Budget 12‐13‐Hired Internal Nov

Olivia Blake COO  Secretary II Repl Adriana Jimenez‐Hired External Nov

Mark Tiller Student Services Associate Dean, Instruction New Position‐Budget 12‐13‐Hired Internal Jan

Walter Oduk Technician Services Hardware/Software Technician Repl Joseph Ogbechie‐Hired External Jan

Eva Foster English Instructor Repl James Bishop‐Hired External‐Temp Jan

Fidel Simmons Student Services Advisor New Position‐Budget 12‐13‐Hired External Jan

Deborah Adesokan Counseling Advisor Repl Christine Battle Moore‐Hired External‐Temp Jan

Sandra Brooks Student Services Enrollment Service Assistant Repl Augie Sanchez‐Hired Internal Jan

Shahrooz Torkian Far Technician Services Hardware/Software Technician Repl Pradip Patel‐Hired External Jan

Gina Calderone Philosophy Instructor Repl Thomas Urban Hired External‐Temp Jan

Richard Mottram English Instructor Repl Betty Shine‐Hired External‐Temp Mar

Brandon Davidson Student Services Advisor New Position‐Budget 12‐13‐Hired External Mar

Evelyn Velasquez Workforce Development Interim Dean, Workforce Repl Maya Durnovo‐Hired Internal Feb

Robert Harris Student Development Interim Associate Dean, Student Dev Repl Maria Cisneros‐Hired External Feb

Jonathan Smith Technician Services Hardware/Software Technician New Position‐Hired External‐Temp Apr

Giang Pham COO Procurement Liaison Repl Jackie Nguyen‐Hired External Apr

Susan Thompson Student Services Program Director Repl Bartlett Sheinberg‐Hired External‐Temp Apr

Samuel Thomas Biology Lab Assistant Senior Repl Kristy Mueck‐Hired Internal Apr

Gerald Faler, Jr. Student Services Enrollment Service Associate Repl Corey Aeck‐Hired Internal May

Latasha Henderson Student Services Enrollment Service Associate Repl Liza Chau‐Hired Internal May

Lisa Padilla Student Services Enrollment Service Assistant Repl Carlana Brooks‐Hired External May

Antonio Nutall COO Evening Campus Manager II New Position‐Hired External    May

John Harrell II Student Services Enrollment Service Associate Repl Makeba Brown‐Hired External‐Temp May

7        New Position‐External 7        Interim 2        Northwest Replacement‐Internal 6        Replacement‐External 23     New Position‐Internal

Page 59: Fs2013 may

Salary

Houston College Community Systems

2012‐2013 Positions

Employee Name Department Job Title Comments Month

NORTHEAST99,000$

38,344$

40,124$

48,010$

37,981$

47,085$

37,061$

45,762$

38,415$

31,312$

38,000$

35,982$

38,678$

41,810$

52,200$

43,544$

36,791$

40,214$

41,004$

60,000$

27,165$

21     

918,482$          

SOUTHWEST13,810$

47,647$

38,678$

24,800$

48,954$

49,511$

57,000$

42,631$

45,555$

60,500$

35,000$

41,810$

41,141$

40,695$

40,000$

47,085$

39,824$

84,866$

31,906$

36,791$

43,557$

27,165$

New Postions

52

Ronald Dewlen Instructional Dean Instruction Repl Lois Avery‐Hired External Sep

Hosein Tahvilian Electronic Engineering Instructor Repl Pratap Talusani‐Hired External Sep

Nicki Norman Student Services Office Manager Repl Barbara Smith‐Hired Internal Sep

Ifeanyi Oramulu Technology Instructor Repl Homer Stewart‐Hired External‐Temp Sep

Khansaa Almansor Electronic Engineering Instructor Repl Nicky Haddock‐Hired External Sep

David Jones Student Services Advising Manager New Position‐Budget 12‐13‐Hired Internal Oct

Lesley Savoy‐Green Student Services Enrollment Services Associate Repl Alonia Whitmore‐Hired Internal Oct

William Nicholson Technology Instructor Repl John Jagdish‐Hired External‐Temp Sep

Betty Keller Student Services Retention Specialist Repl Joseph Willis‐Hired Internal Sep

Hoang Nguyen Student Services Advisor Repl Ana Canek‐Hired Internal Dec

Sazar Ali Process Technology Instructor Repl Homer Stewart‐Hired External Jan

Cybele Ayaquica COO Secretary II Repl Bridgette Bauman‐Hired External Nov

Jose Cordero Student Services Advisor Repl David Jones‐Hired External Nov

Randall Murphy Psychology Instructor Repl Tamara LeDuc‐Hired External Feb

Gregory Dock Automotive Instructor Repl Martin See‐Hired External Feb

Kristin Wallace Business Administration Instructor Repl Philip Palese‐Hired External Jan

Leroy Chevalier COO Manager Weekend/Evening Repl Keffus Falls‐Hired External‐Temp Feb

Ayesha Farr Counselor Counseling New Position‐Budget 12‐13‐Hired External Feb

Francis Pollo Testing Testing Assistant/Proctor Repl Lesley Savoy Green‐Hired External Feb

Shawket Alnakkash Petroleum Engineering Instructor New Position‐Budget 12‐13‐Hired External Feb

Farrish Betton Petroleum Engineering Instructor New Position‐Budget 12‐13‐Hired External Feb

1        New Position‐External 3        Interim ‐         

Lorraine Donovan Academic Instructor Repl Adballah Cherif‐Hired External‐Temp Sep

Northeast Replacement‐Internal 4        Replacement‐External 13     New Position‐Internal

Jose Cruz COO Campus Service Technician Repl Belinda Defalco‐Hired Internal Oct

Jennifer Williams English Instructor Repl Panqing Wu‐Hired External Oct

Kelli Caraway Student Dev/Advising Senior Advisor New Position‐Budget 12‐13‐Hired Internal Oct

Brandi Gaza English Instructor Repl Margie Ricks‐Hired External‐Temp Oct

Wendy Allen Digital Communication Instructor Repl Paul Roberts‐Hired External‐Temp Nov

David Stacy Student Dev/Advising Senior Advisor New Position‐Budget 12‐13‐Hired External Nov

Christine Moore Student Dev/Advising Senior Advisor New Position‐Budget 12‐13‐Hired Internal Oct

Dashiel Geyen Counseling Counselor New Position‐Budget 12‐13‐Hired Internal Nov

Wendy Robbins Digital Communication Instructor Repl Margo Reece‐Hired External‐Temp Nov

Sabiha Mir Student Development Advisor New Position‐Budget 12‐13‐Hired External Nov

Todd Duplantis Public Relations Director, Public Relations Repl Martha Barrera‐Hired External Nov

Aketa Guillory Student Dev/Advising Advisor New Position‐Budget 12‐13‐Hired External Nov

Wendy Robbins Digital Communication Instructor Repl Margo Reece‐Hired External Jan

Nicol Alexander Digital Communication Instructor Repl Lloyd Schuh‐Hired External Jan

Emilio Mendoza Student Development Advisor Repl Kelli Caraway‐Hired Internal Dec

Lucille Gore Student Dev/Advising Senior Advisor New Position‐Budget 12‐13‐Hired External Jan

Johanne Huber Digital Communication Instructor Repl Ian Mayer‐Hired External‐Temp Jan

Juanna Shin Library Librarian Repl Bill Hord‐Hired External Jan

Gholam Pahlavan Physical Science Instructor Repl Abdallah Cherif‐Hired Internal Jan

Lanny Kwan Computer Science Secretary II Repl Dipal Parekh‐Hired External‐Temp Jan

Ansonia Jones Student Services Enrollment Service Assistant Repl Ngoc Tien Nguyen‐Hired External Feb

Page 60: Fs2013 may

Salary

Houston College Community Systems

2012‐2013 Positions

Employee Name Department Job Title Comments Month

SOUTHWEST continued35,406$

26,000$

27,000$

45,225$

35,044$

43,173$

39,187$

44,615$

30     

1,234,576$       

SOUTHEAST39,960$

32,538$

35,000$

42,000$

4        

149,498$          

COLEMAN35,754$

56,900$

62,781$

30,000$

65,272$

65,272$

44,615$

38,000$

35,000$

35,500$

53,618$

52,200$

63,993$

13     New Postions 638,905$          

Adm. Totals Replacement‐Internal Replacement‐External New Position‐Internal New Position‐External Interim 96      

College Totals Replacement‐Internal Replacement‐External New Position‐Internal New Position‐External Interim 128   

Grand Total Replacement‐Internal Replacement‐External New Position‐Internal New Position‐External Interim 224   

Over all Total 10,618,032$    

53

Grand Total Salaries

Lliya Lliev COO A/V Technician New Position‐Budget 12‐13‐Hired External Feb

Ramiro Monsivais Castorena COO A/V Technician New Position‐Budget 12‐13‐Hired External Feb

Ashley Martin Student Development Advisor Repl Hoang Minh Thi Nguyen‐Hired Internal Feb

Rhonda Tripeaux Student Services Advisor Repl Johnny Martinez‐Hired Internal Apr

Rita Majidi COO Budget Analyst Repl Patrick Muhammad‐Hired External‐Temp Apr

Zhiqin Jiang Drafting & Design  Instructor Repl Seymour Tatar‐Hired External Feb

Sherry Hill Student Services Financial Aid Associate Repl Thomas Sneed‐Hired Internal Apr

Melaine Knight Public Relations Community Outreach Cordinator Repl Susie Molina‐Hired External May

2        New Position‐External 6        Interim ‐         

Micalyn Flagg Financial Aid Financial Aid Associate Repl Verlicia Pope‐Hired External Oct

Southwest Replacement‐Internal 6        Replacement‐External 16     New Position‐Internal

LaTrista Funchez Student Services Student Life Coordinator Repl Tara Webb‐Hired External Nov

Nancy Garcia Natural Sciences Secretary II New Position‐Hired External Oct

Christy Muniz Student Services Advisor Repl Vivian Flores‐Hired External Oct

New Position‐Internal ‐         New Position‐External 1        Interim ‐         Southeast Replacement‐Internal ‐         Replacement‐External 3       

Charmaine Lewinson‐Evans Vocational Nursing Instructor Repl Pearlie Watts‐Hired External Sep

Caroline Couto‐Ortiz Health Science Dental Hygiene Operations Assistant New Position‐Budget 12‐13‐Hired External Sep

Daniel Guzman Simulation Center Clinical Simulation Lab Technician New Position‐Budget 12‐13‐Hired Internal Sep

Ashley Nichols Vocational Nursing Instructor Repl Sharon McCowan‐Hired External Sep

Veronica Mckissic Student Services Learning Success Coordinator Repl Roxine Simms‐Hired External‐Temp Nov

Carmela Blackshear Student Services Advisor Repl Carmen Gentry‐Hired Internal Jan

Rita Callahan Vocational Nursing Instructor Repl Maria Reyes‐Hired External Nov

Jason Smith Vocational Nursing Instructor Repl Independencia Delacruz‐Hired External Nov

Virginia Otieno Health Science Instructor Repl Linda Williams‐Hired External‐Temp Jan

Hope Pamplin Student Services Counselor, Disability Services New Position‐Budget 12‐13‐Hired External‐Temp Feb

David Pereida Student Services Advisor Repl Lorenzo Walker‐Hired Internal Jan

John Smith  Student Services Enrollment Service Associate Repl Rory Gupta‐Hired External Jan

Turquessa Francis Occupational Therapy Instructor Repl Naydean Blair‐Hired External Apr

Coleman Replacement‐Internal 2        Replacement‐External 8        New Position‐Internal

224  

36     98     26     57     6        

20     73     11     20     3        

1        New Position‐External 2        Interim ‐         

16     25     15     37     3        

Page 61: Fs2013 may

HOUSTON COMMUNITY COLLEGEFTE Comparison Year‐To‐Date Thru May 31, 2013 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 1,361    1,514    1,534    1,487    828       1,480    1,533    1,575    1,548   

2011‐2012 1,451    1,582    1,598    1,564    823       1,530    1,573    1,598    1,576    1,003    1,098    955      

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 1,401    1,426    1,449    1,351    1,438    1,456    1,383    1,476    1,447   

2011‐2012 1,429    1,415    1,425    1,327    1,407    1,429    1,396    1,404    1,410    1,397    1,391    1,429   

F

T

E

F

T

E

54

 ‐

 200

 400

 600

 800

 1,000

 1,200

 1,400

 1,600

 1,800

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 200

 400

 600

 800

 1,000

 1,200

 1,400

 1,600

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 62: Fs2013 may

CENTRAL COLLEGEFTE Comparison Year‐To‐Date Thru May 31, 2013 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 238       270       272       270       153       256       274       281       278      

2011‐2012 254       293       296       293       159       279       298       300       291       184       204       178      

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 155       159       164       145       161       164       153       169       159      

2011‐2012 161       158       165       145       155       163       157       157       158       156       154       161      

55

F

T

E

F

T

E

 ‐

 50

 100

 150

 200

 250

 300

 350

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

 140

 160

 180

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 63: Fs2013 may

COLEMAN COLLEGEFTE Comparison Year‐To‐Date Thru May 31, 2013 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 108       107       113       110       78          106       107       109       104      

2011‐2012 115       112       113       109       82          109       107       110       110       99          98          84         

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 56          55          55          52          58          58          55          58          55         

2011‐2012 58          58          59          55          56          58          55          55          57          54          54          55         

F

T

E

F

T

E

56

 ‐

 20

 40

 60

 80

 100

 120

 140

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 10

 20

 30

 40

 50

 60

 70

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 64: Fs2013 may

NORTHWEST COLLEGEFTE Comparison Year‐To‐Date Thru May 31, 2013 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 281       310       310       306       156       306       316       319       317      

2011‐2012 267       292       293       307       155       323       330       334       335       198       224       190      

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 131       135       143       125       142       145       129       151       147      

2011‐2012 104       106       108       108       129       138       122       129       130       132       131       138      

F

T

E

F

T

E

57

 ‐

 50

 100

 150

 200

 250

 300

 350

 400

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

 140

 160

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 65: Fs2013 may

NORTHEAST COLLEGEFTE Comparison Year‐To‐Date Thru May 31, 2013 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 187       208       212       205       119       199       211       218       215      

2011‐2012 200       211       216       207       112       204       212       212       211       129       137       124      

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 126       125       128       118       124       128       119       128       128      

2011‐2012 127       126       128       118       121       128       124       127       126       126       126       128      

F

T

E

F

T

E

58

 ‐

 50

 100

 150

 200

 250

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

 140

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 66: Fs2013 may

SOUTHWEST COLLEGEFTE Comparison Year‐To‐Date Thru May 31, 2013 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 318       385       375       370       187       364       376       381       377      

2011‐2012 380       433       435       422       183       377       382       386       382       229       252       217      

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 152       154       161       142       154       163       150       168       160      

2011‐2012 185       184       182       145       146       155       144       150       152       151       147       153      

59

F

T

E

F

T

E

 ‐

 50

 100

 150

 200

 250

 300

 350

 400

 450

 500

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

 140

 160

 180

 200

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 67: Fs2013 may

SOUTHEAST COLLEGEFTE Comparison Year‐To‐Date Thru May 31, 2013 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 130       160       164       163       74          158       174       180       179      

2011‐2012 143       168       173       169       77          161       178       183       179       101       120       95         

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 96          103       104       95          102       105       95          106       105      

2011‐2012 99          96          97          86          94          98          91          95          96          99          96          101      

F

T

E

F

T

E

60

 ‐

 20

 40

 60

 80

 100

 120

 140

 160

 180

 200

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

 140

 160

 180

 200

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

 140

 160

 180

 200

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 68: Fs2013 may

Division of Extended Learning (DOEL)FTE Comparison Year‐To‐Date Thru May 31, 2013 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 90          67          79          57          58          73          67          77          70         

2011‐2012 85          69          68          56          55          72          63          67          64          59          57          64         

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 79          81          81          76          80          86          82          88          87         

2011‐2012 78          79          79          75          79          80          77          79          79          79          78          81         

F

T

E

F

T

E

61

 ‐

 10

 20

 30

 40

 50

 60

 70

 80

 90

 100

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 10

 20

 30

 40

 50

 60

 70

 80

 90

 100

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 69: Fs2013 may

DISTRICTFTE Comparison Year‐To‐Date Thru May 31, 2013 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 8            7            8            5            3            9            9            10          8           

2011‐2012 7            4            4            1            ‐             5            4            5            3            4            4            3           

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 606       612       614       598       617       609       600       609       605      

2011‐2012 616       609       608       595       627       609       625       612       614       601       605       612      

F

T

E

F

T

E

62

 ‐

 2

 4

 6

 8

 10

 12

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 100

 200

 300

 400

 500

 600

 700

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 70: Fs2013 may

HOUSTON COMMUNITY COLLEGEDuplicated Headcount Comparison Year‐To‐Date Thru May 31, 2013 by Type

FACULTY HEADCOUNT

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

12‐13 FT 787       795       795       797       794       796       797       796       796      

12‐13 PT 1,992    2,361    2,491    2,224    409       2,207    2,291    2,383    2,311   

12‐13 Total Fac 2,779    3,156    3,286    3,021    1,203    3,003    3,088    3,179    3,107    ‐             ‐             ‐            

11‐12 FT 792       797       793       788       793       785       784       782       783       768       757       794      

11‐12 PT 1,911    2,334    2,390    2,331    275       2,387    2,391    2,351    2,367    1,075    1,372    679      

11‐12 Total Fac 2,703    3,131    3,183    3,119    1,068    3,172    3,175    3,133    3,150    1,843    2,129    1,473   

STAFF HEADCOUNT

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

12‐13 FT 1,238    1,250    1,264    1,260    1,263    1,279    1,277    1,289    1,276   

12‐13 PT 840       833       851       842       703       801       820       851       858      

12‐13 Total Staff 2,078    2,083    2,115    2,102    1,966    2,080    2,097    2,140    2,134    ‐             ‐             ‐            

11‐12 FT 1,256    1,256    1,238    1,235    1,253    1,242    1,249    1,235    1,240    1,201    1,240    1,250   

11‐12 PT 877       879       883       839       629       822       834       828       846       767       790       790      

11‐12 Total Staff 2,133    2,135    2,121    2,074    1,882    2,064    2,083    2,063    2,086    1,968    2,030    2,040   

63

 

S

t

a

f

f

 

Headcount

 

F

a

c

u

l

t

y

Headcount

 ‐

 500

 1,000

 1,500

 2,000

 2,500

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 200

 400

 600

 800

 1,000

 1,200

 1,400

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 71: Fs2013 may

HOUSTON COMMUNITY COLLEGEUnduplicated* Headcount Comparison Year‐To‐Date Thru May 31, 2013 by Type

UNDUPLICATED HEADCOUNT

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

12‐13 Total  4,475    4,446    4,551    4,726    3,085    4,629    4,717    4,550    4,775   

11‐12 Total  4,543    4,902    4,917    4,833    2,891    4,728    4,814    4,805    4,806    3,373    3,575    3,303   

* Includes Full‐time and Part‐time Faculties, Librarians, Counselors, and Staffs 

64

Unduplicated* Headcount

 ‐

 500

 1,000

 1,500

 2,000

 2,500

 3,000

 3,500

 4,000

 4,500

 5,000

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 72: Fs2013 may

Non‐current assets:

Restricted cash 6,810$                  

Restricted investment in trust accounts 2,104,722

Lease receivable from HCCS 165,775,579        

Deferred charges ‐ bond issuance costs 2,046,534            

Capital Assets:

Land ‐                         

Other Structures ‐                         

Furniture & equipment ‐                         

Leasehold improvements ‐                         

Construction in process 1,050,663        

1,050,663            

TOTAL ASSETS 170,984,308$      

Current liabilities:

Accounts payable ‐ HCC 144,304$             

Accounts payable ‐                             

Accrued liabilities ‐ interest ‐                             

Current bond payable ‐                             

Total current liabilities 144,304$             

Non‐current liabilities:

Deposits 440                       

Arbitrage payable ‐                             

Unearned interest income (23 years) ‐ HCC 70,933,173          

Premium on bonds 2,209,548            

Bonds payable 105,655,000        

Total non‐current liabilities 178,798,161$      

TOTAL LIABILITIES 178,942,465        

TOTAL NET ASSETS ‐ restricted (7,958,157)$         

PFC 1

Houston Community College ‐ Public Facility CorporationStatement of Net Assets

Cash Basis ‐ Interim Period

as of May 31, 2013

ASSETS

LIABILITIES

Page 73: Fs2013 may

Cash Flows from Capital Financing Activities

Receipt from HCCS for lease payment 8,956,434$     

Purchases of capital assets (1,010,431)      

Payment on capital debt ‐ principal and interest (8,957,391)      

Net cash provided (used by) in financing activities (1,011,388)      

Cash Flows from Investing Activities

  Interest income 2,208

Increase (decrease) in restricted cash and 

restricted investment in trust accounts (1,009,180)      

Restricted cash and restricted investment in 

trust accounts ‐ beginning of year 3,120,712        

Restricted cash and restricted investment in 

trust accounts ‐ end of period 2,111,532$     

Houston Community College System Public Facility CorporationStatement of Cash Flows

Cash Basis ‐ Interim Period

Nine Month Ended as of May 31, 2013

PFC 2

Page 74: Fs2013 may

Total Budget to 

Date

Total Revenues 

/  Expenditures 

To Date

Encumbrances 

To Date Unexpended

Sources of funds:

Proceeds from 

2005C Lease Revenue Bond 19,155,000$   

Discount (170,064)        Land Purchase (4,212,644)    Bond Issuance Cost (606,201)        Interest Expense (524,785)        

13,641,306$  Interest Income 1,003,814      Vendor Contract Refund 102,706         Transfer to Payment Account (1,354,990)    

Funds Available 13,392,836$  

Uses of funds:4,092$             4,092$             ‐$ ‐$                   

11,550,643    11,550,643    ‐                      ‐                    Maintenance 408,920          310,192          98,728           ‐                    

6,443              6,443              ‐                    563,928          563,928          ‐                    

7,200              7,200              ‐                      ‐                    27,403            26,326            1,077              ‐                    24,940            24,940            ‐                    44,695            44,695            ‐                      ‐                    

596,787          596,787          ‐                      ‐                    

157,785            8,100                149,685         

Grand Total Uses 13,392,836$   13,143,346$   99,805$          149,685$     

Net Available ‐$                     

  PFC requires GMP before inception.

Total Proceeds from Bond

Houston Community College ‐ Public Facility CorporationPublic Safety Institute

as of May 31, 2013

PFC 3

Bank Service ChargesConstruction

Waste Water Management *Geo Technical Services*

Survey*Architect

Engineering ServicesFFE

Contingency

 * Included in GMP 

Site Infrasturcture

Page 75: Fs2013 may

Total Budget to 

Date

Total Revenues 

/  Expenditures 

to Date

Encumbrances    

to Date Unexpended

Sources of funds:

Proceeds from 

 2005 A Bonds  11,605,000$   

 Premium Received             492,931 

 Accrued Interest Received               53,425 

 Interest Income                    998 

 Bond Issuance Costs           (391,474)

 Repayment of Loans     (11,392,147)

Funds Available 368,733$        

Uses of funds:

Debt Service 53,425$            53,425$          ‐$                        ‐$                       

Renovation & Construction  169,759            169,759          ‐                          ‐                         

Demolish & Renovate Office 56,244              56,244            ‐                          ‐                         

Furniture & Fixtures 46,857              46,857            ‐                          ‐                         

Legal Fees 42,448              42,448            ‐                         

Grand Total Uses 368,733$         368,733$       ‐$                        ‐$                      

Net Available ‐$                     

Note 1: PFC requires GMP before inception.

Houston Community College ‐ Public Facility CorporationWestgate (Katy)as of May 31, 2013

PFC 4

Page 76: Fs2013 may

Total Budget to 

Date

Total Revenues 

/  Expenditures 

To Date

Encumbrances 

To Date Unexpended

Sources of funds:

Principal Amount on Bonds 36,950,000$   

Discount on Bonds (546,238)          

Underwriter's Discount (209,273)

Accrued Interest on Bonds 98,080             

Amount Available 36,292,569$   

Issuance Costs (490,131)          

 Accrued and Capitalized Interest (1,449,023)      

Repair and Replacement (1,000,000)      

Title Fees Capitalized (81,379)            

Amount Available for Project 33,272,036$   

Repayment to HCC (188,006)          

Project Account Balance 33,084,030$   

Administrative & Legal Fees (29,486)            

Interest Income 836,806           

Transfer Cost Issuance 85,509             

Interest Expense on Notes (135,299)          

Funds Available 33,841,560$  

Uses of funds:

Land & Building 17,807,972$    17,807,972$    ‐$                     ‐$                

Maintenance Rehabilitation & 

Deferred Maintenance

12,856,469      12,856,469      ‐                  

CPMS PGAL 211,959            211,959            ‐                  

Facilities Space Programming 214,620            214,620            ‐                  

Furniture, Fixtures & Equipment 1,006,277         1,006,277         ‐                       ‐                  

Site Infrastructure 859,844            854,984            4,859               ‐                  

Architect and Engineering 428,355            428,355            ‐                       ‐                  

Repair & Maintenance Contingency   ‐ 

per bond requirement

456,064            83,089              ‐                       372,975     

Grand Total Uses 33,841,560$   33,463,726$   4,859$            372,975$  

Net Available ‐$                     

  PFC requires GMP before inception.

Houston Community College ‐ Public Facility CorporationHayes Road ‐ Alief Project

as of May 31, 2013

PFC 5

Page 77: Fs2013 may

Total Budget to 

Date

Total Revenues 

/  Expenditures 

To Date

Encumbrances 

To Date Unexpended

Sources of funds:

Principal Amount of 2007 Series Bonds 58,885,000$   

Premium on Bonds 3,094,498        

Underwriter's Discount (346,244)          

Accrued Interest Income‐ Bonds 173,733           

Total Amount Available 61,806,987$   

Issuance Cost (839,837)          

Accrued  and Capitalized Interest (4,632,122)      

Repair and Maintenance Account ‐                        

Amount Available for Project 56,335,028$   

Interest Income on Trust Account 2,498,635        

Interest Expense on Notes (414,601)          

Transfer to Trustee Payment Account (4,715,080)      

Vendor Contract Refunds 230,035           

Sale of Land 569,890           

Funds Available 54,503,907$  

Uses of funds:

Land & Building 10,671,234$    10,671,234$    ‐$                     ‐$                    

Construction Cost‐ Building 18,200,000      18,200,000      ‐                       ‐                      

Construction‐Demolition 494,972            ‐                         ‐                       494,972         

Constuction‐ Site 640,988            636,957            4,030              ‐                      

Site Improvement 14,221,544      13,888,633      332,911          ‐                      

Site Demolition & Abatement 791,298            791,298            ‐                      

CPMS PGAL 1,391,958         1,391,958         ‐                       ‐                      

Site and Infrastructure Design 2,334,840         2,334,840         ‐                       ‐                      

Facilities Space Programming 29,274              29,274              ‐                       ‐                      

Architect and Engineering 1,256,727         1,256,727         ‐                      

Furniture, Fixtures & Equipment 1,828,332         1,818,281         10,051            ‐                      

Library 66,564              66,182              382                 ‐                      

Inspections 214,981            214,981            ‐                       ‐                      

Design Geotech 17,500              17,500              ‐                       ‐                      

Material Testing  24,503              24,503              ‐                       ‐                      

Communications IT‐ PGAL 253,614            253,614            ‐                      

IT Telephone & Communications 790,467            790,467            ‐                      

Surveying  62,398              59,124              3,274              ‐                      

Administrative Expenses 34,505              34,505              ‐                      

Preconstruction Costs 886,377            886,377            ‐                      

Contingency 291,833            186                    ‐                       291,649         

Grand Total Uses 54,503,907$   53,366,640$   350,647$       786,621$     

  PFC requires GMP before inception.

as of May 31, 2013

PFC 6

Houston Community College ‐ Public Facility CorporationNorthline Mall Project