Sarawak Shell Bhd M MALAYSIA MARINE AND HEAVY ENGINEERING SDN BHD FABRICATION OF SCDR-A TOPSIDES AND E11K-A PROJECT CONTRACT N o . 591397 CLOSE OUT REPORT 0 05-Oct-07 Issue for approval R. Khairul Ardani Othman Sabran Felixberto Clerigo REV DATE DESCRIPTION Prepared by Planning Eng’r Reviewed by PM Approved by CSR This document contains information that has been prepared by MMHE SDN BHD and all information contained herein shall be held in confidence. Disclosure, reproduction, or other use of this document is prohibited without the prior written consent of MMHE SDN BHD

Upload: syaza-shaharuddin

Post on 26-Nov-2014

188 views

Category:

Documents


34 download

TRANSCRIPT

Page 1: Full Version of SCDR-A Close-Out Report(Dated051107)

Sarawak Shell Bhd

MMAALLAAYYSSIIAA MMAARRIINNEE AANNDD HHEEAAVVYY EENNGGIINNEEEERRIINNGG SSDDNN BBHHDD

FABRICATION OF SCDR-A TOPSIDES AND E11K-A PROJECT

CONTRACT No. 591397

CCLLOOSSEE OOUUTT RREEPPOORRTT

0 05-Oct-07 Issue for approval

R. Khairul Ardani Othman Sabran Felixberto Clerigo

REV DATE DESCRIPTION Prepared by Planning Eng’r

Reviewed by PM

Approved by CSR

This document contains information that has been prepared by MMHE SDN BHD and all information contained herein shall be held in confidence. Disclosure, reproduction, or other use of this document is prohibited without the prior written consent of MMHE SDN BHD

Page 2: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items Close-Out Report

Sarawak Shell Bhd.

TABLE OF CONTENTS

No. CHAPTER PAGE

A. CONSTRUCTION 1 - 13 PROJECT OVERVIEW 1

1. Overall Project Schedule 1

1.1 Overall Schedule 1 1.2 Overall S-curve 1

2. Contract Summary 2

3. Contract Representative 2

3.1 SSB Representative 2 3.2 MMHE Representative 2

4. Contract Cost Summary 2

5. Organization 2

5.1 Project Organizational Chart 2

6. Manpower 2

6.1 Manpower Histogram 2

7. Subcontractor 3

8. Fabrication 3

8.1 Introduction 3 8.2 Fabrication Yard 3 8.3 Structural Works 4 - 5 8.4 Piping Works 5 8.5 Mechanical Works 6 8.6 Electrical & Instrumentation Works 7 8.7 Blasting & Painting Works 8

9. Statistics 8 10. Testing & Pre-Commissioning 9 -10 11. Inter-Departmental Assessment 11-12 12. Lesson Learnt 13

Page 3: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items Close-Out Report

Sarawak Shell Bhd.

B. QHSE 14 - 20

1. Health, Safety and Environment 14

1.1 Overall HSE Statistics 14 1.2 HSE Targets 15 1.3 Induction Training 15 1.4 Fabrication Yard Orientation and Security 15 1.5 Housekeeping 15 1.6 Drills 15 1.7 Project HSE Meeting 16 1.8 Daily Toolbox Meeting 16 1.9 Weekly HSE Talk 16-17 1.10 HSE Walkabout 17-18 1.11 Friday HSE Video Show 18 1.12 QHSE Day Celebration 18 1.13 HSE Incentives 18 1.14 HSE Violation 18 1.15 D&A Program 18 1.16 Safety Campaigns 19 1.17 HSE Workshop 19 1.18 Incident / Injury 19

2. Inter-Departmental Assessment 20

C. PROCUREMENT 21 - 23

1.0 Statistics 21-23 2.0 Lesson Learnt 23

D. ENGINEERING 24 - 26

1.0 Statistics 24 2.0 Inter-Departmental Assessment 25 3.0 Lesson Learnt 26

Page 4: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items Close-Out Report

Sarawak Shell Bhd.

E. QA/QC 26 - 27

1.0 Statistics 27 2.0 Lesson Learnt 27

F. COST CONTROLLER 28 - 31

1.0 Statistics 28 2.0 Change Orders 29 3.0 Budget Cost Over-run, Reasons and mitigating Action 29 4.0 Project Cash Flow Status & Lesson Learnt 30 5.0 Inter-Departmental Assessment 30 6.0 Lesson Learnt 31

G. APPENDIXES

Appendix 1 - Schedule Bar Chart Appendix 2 - Overall S-Curve

Appendix 3 - Manpower Histogram

Appendix 4 - Progress Calculation Level-IV

Appendix 5 - Project Organizational Chart Appendix 6 - Subcontractor Evaluation Sheet Appendix 7 - Fabrication Yard Appendix 8 - RFQ / CO / VOP Log

Appendix 9 - Erection Sequence

Appendix 10 - Progress Photographs

Page 5: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items Close-Out Report

Sarawak Shell Bhd.

Project : Fabrication of SCDR-A Topsides & Pre-fabrication for E11K-A Tie-ins

Department: Construction

Scope: SCDR-A Topsides: The scope of work consists of Construction, Engineering, Procurement

and supply of materials, Fabrication, Inspection, Testing, and On-Shore Commissioning, Loadout & Seafastening of the SCDR-A Topsides and Associated Appurtenances.

E11K-A TIE-INS: The scope of work consists of Construction, Engineering, Procurement, Supply of Materials, Fabrication, Inspection, Testing, and Packing, Loadout & Seafastening of ship loose items for SCDR-A pipeline tie-in works at the existing E11K-A Platform.

Project Background: The Shallow Clastics field covers an area of ca. 600km.sq., (40-km x 15-km) consisting of alternating sand shale sequences in which eight-gas bearing intervals have been identified to date. The field comprises two en-enchelon ENE-WSW trending culminations that overlie the F13 and E11 carbonate fields in the northern and mid part of the field, respectively. SCDR-A will be place on the SW area of the Shallow Clastics field with four highly deviated wells and one back-up well and tied back to the E11K-A Platform via a single 6.4-km, 14-inch (0.35-m) carbon steel pipeline. The gas and condensate from the SW area of the reservoir will be transported wet as a multiphase mixture to the E11K-A facilities, where the fluids will be separated, dehydrated and re-combined prior to export to MLNG DUA. The SCDR-A is an unmanned drilling riser topsides design for a “minimum facilities” concept. The minimum facilities consists of Flow lines, Wet Gas System, Wellhead Desander System, Vents and Drains Systems, Fresh Water System, Pedestal Crane, Process Control System, IPS, Fire and Gas System, Telecommunication System, etc.

1.0 OVERALL PROJECT SCHEDULE

1.1 Overall Schedule See Appendix 1 - Schedule Bar Chart

1.2 Overall S-Curve See Appendix 2 – Overall S-Curve

1 of 31

Page 6: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items Close-Out Report

Sarawak Shell Bhd.

2.0 CONTRACT SUMMARY 2.1 Contract No. : 591397 2.2 Contract Title : Fabrication of SCDR-A Topsides 2.3 Scope of Work : The Scope of work consists of Construction,

Engineering, Procurement and supply of materials, Fabrication, Inspection, Testing, & On-Shore Pre-Commissioning, Loadout & Seafastening of the SCDR-A Topsides and Associated Appurtenances.

2.4 Contract Duration Contractual Start Date : 12 October 2006 Contractual Duration : 58 weeks MCD : 28 August 2007 Sailaway : 05 Sept 2007 (Planned), 27 Sept 07 (Actual)

2.5 Type of Contract : Lump Sump 2.6 Contract Value : RM 75,667,000.00

3.0 CONTRACT REPRESENTATIVE 3.1 SARAWAK SHELL BERHAD (SSB)

Company Representative : Tjitske Monster Designation : Project Manager Company Site Representative : Felixberto Clerigo Designation : Client Site Representative

3.2 MALAYSIA MARINE & HEAVY ENGINEERING SDN BHD (MMHE) Contractor Representative : Mohamed Za’aba Abbas

Designation : General Manager, Engineering & Construction Contractor Site Representative : Othman Bin Sabran Designation : Project Manager

4.0 CONTRACT COST SUMMARY

4.1 Original Contract Value : RM 75,667,000.00 4.2 Change Order : RM ………………. 4.3 Final Contract Price : RM ………………. 5.0 MANPOWER 5.1 Manpower Histogram See Appendix 3 – Manpower Histogram

6.0 PROGRESS CALCULATION 6.1 Progress Calculation Sheet Level-IV See Appendix 4 – Progress Calculation Level-IV

7.0 ORGANIZATION CHART 7.1 Project Organizational Chart See Appendix 5 – Project Organizational Chart

2 of 31

Page 7: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items Close-Out Report

Sarawak Shell Bhd.

8.0 SUBCONTRACTOR

Discipline Company Planned Award Date

Actual Award Date

Planned Mob Date

Actual Mob Date

Structural Kejuruteraan Wijaya Sdn Bhd 11-Oct-06 03-Nov-06 12-Oct-06 09-Nov-06

Blasting/Painting BB Tech Services Sdn Bhd 05-Dec-06 22-Feb-07 06-Dec-06 02-Mar-07

HVAC Dynac 15-Nov-06 15-Dec-06 16-Nov-06 21-Dec-06

Piping Jurunature Sdn Bhd 05-Jan-07 07-Feb-07 06-Jan-07 12-Feb-07

Mechanical Jurunature Sdn Bhd 13-Jan-07 07-Feb-07 14-Jan-07 12-Feb-07

Electrical Asadra (M) Sdn Bhd 20-Feb-07 26-Feb-07 21-Feb-07 02-Mar-07

Instrument Asadra (M) Sdn Bhd 20-Feb-07 26-Feb-07 21-Feb-07 02-Mar-07

Architectural Arrow Platform (M) Sdn Bhd 16-Mar-07 26-Feb-07 17-Mar-07 08-Mar-07

GRE Piping Amerstrand Engineering 17-Mar-07 08-Feb-07 18-Mar-07 14-Feb-07

PFP Jurunature Sdn Bhd 24-May-07 15-May-07 28-May-07 19-May-07

Weighing UES Logistics (M) Sdn Bhd 25-Jun-07 25-June-07 26-Jun-07 07-Jun-07

Load Out Asian Lift PTE Ltd. 10-Aug-07 30-July-07 11-Aug-07 09-Sep-07

See Appendix 6 - Subcontractors Evaluation Sheets

9.0 Fabrication

9.1 Introduction

The SCDR-A Topsides Project structure was consists of Cellar Deck, Mezzanine Deck, Main Deck, Wellhead Platform, Intermediate Platform and Flare Boom. The total weight is approximately 1,700 metric tons. In additional to that, there is fabrication of ship loose items for SCDR-A pipeline tie-in works at existing E11K-A Platform.

9.2 Fabrication Yard

See Appendix 7 - Fabrication Area.

3 of 31

Page 8: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items Close-Out Report

Sarawak Shell Bhd.

9.3 Structural Works

9.3.1 All structural steel materials were sweep blast and apply primer prior to delivery to the fabrication shop. Upon completion of pre-fabrication, these materials were blasted again and applied approved epoxy or main coating/ primer epoxy glass flake prime prior to erection in situ. These materials were segregated color coded according to material types and components for easy issuance to sub-contractor. This segregation of materials also applied to surplus materials whether pre-issued by SSB or by MMHE.

9.3.2 Prepared, fabricated skidding beams, skid shoes w/ weighing beam and cast additional concrete block supports. Checked also in consideration soil bearing pressure of place where it was erected if enough to resist / bare total weight of the structure.

9.3.3 After preparation of skidding beam and concrete block supports, concrete blocks, skid beams and skid shoes were installed by using crawler crane. Erection and final assembly on top of skid beams was done using crawler or hydraulic cranes.

9.3.4 All pre-fabrication of haunches, plate girders, primary beams & secondary beams, and structural out fittings i.e. handrails, stairways and service platform was done @ Engineering workshop no.8, All the pre-fabricated were blasted and applied main coat prior to erection to minimized blasting works at site and minimize the working time for all discipline without disturbance of blasting works.

9.3.5 During assembly of Cellar deck one (1) trailer was utilized. Haunches and girders were transported from fabrication area to erection site by using trailer & forklifts. Fabricated and assembled the cellar deck in-situ by providing temporary skidding support frame. Installed equipment / vessel if available else hold some braces.

9.3.6 Fabricated truss rows and braces for mezzanine deck / main deck erection. Column and braces in row A and row B are erected/welded in cellar deck panel. Installed all outfitting items including equipments before erection of wellhead access platform, mezzanine deck and main deck.

9.3.7 Fabricated Mezzanine Deck building walls / panels and roof, Wellhead access platform and Intermediate Platform. Fabricated primary and secondary beams @ Engineering Workshop no.8. Sub-assemble was done @ fabrication no. 1.

9.3.8 Fabricated and assembled Main Deck. Fabricated haunches, plate girders including primary and secondary beams @ Engineering workshop no. 8. Assembled Main Deck in-situ at the rear side of cellar deck. Erected Mezzanine Deck ( 5 parts ) building wall / panel and roof and followed by erection of Wellhead Access Platform. All these said erection sequence was carried out before the erection of Main Deck ( 2 parts ).

9.3.9 Fabricated and assembled pedestal crane diesel storage tank @ fabrication # 1. Assembled pedestal crane was lifted and transported to a designated up-righting area not far from assembly area by using two (1) no. of crawler crane and (1) no. of 45 toner mobile crane. After up righting, the assembled pedestal column was transported and installed using one (1) crawler crane. The height of the pedestal crane was considered on the capacity of the crane to be used.

9.3.10 After the erection of Main Deck and Pedestal Crane was completed, the Intermediate Deck ( 3 part ) was erected.

4 of 31

Page 9: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items Close-Out Report

Sarawak Shell Bhd.

9.3.11 Fabricated and assembled Vent Boom at designated area also in fabrication # 1. Diagonal and horizontal braces were lifted and transported from assembly area and installed to its final location, using two ( 2 ) cranes.

8.4 PIPING WORKS

8.4.1 Fabrication: All spools fabrication was done inside the workshops and full tractability of the piping materials including off-cut was maintained. Welding was done by qualified welders and in accordance with the WPS. Visual inspection of the elements was done prior to NDE test as per the NDT procedure (RT was performed at night). Pipe spools that required Post Weld Heat Treatment was done as per the PWHT procedure. After the NDE clearance, the spools were hydrotested or sent to the Blasting & Painting area.

8.4.2 Installation: Prior to spools installations, all NDE were cleared, all spools internals were hydro-jetted and blown dry and the entire opening have temporary covers to prevent the ingress of foreign materials. Lifting belts were utilized instead of wire slings during installation. Flange or field welded joints were one progressively away from the equipment nozzle connections. Final bolt tightening on equipment tie-in was done after equipment alignments have been accepted.

8.4.3 Hydro Test The following were address before hydro test commenced:

All pipe supports installed. All NDE & PWHT accepted. All valves permitted to be included on the package were in full open

position. Flushing completed. Valve greasing was carried out.

The test pressure of each package was as shown in the hydro test packages. The extent of the package that hydrotested was barricaded and with warning signboard during hydro test.

Hydro test results were recorded on pressure recorders and all data/charts were clearly marked and compiled at the completion of the Flushing and Hydro-testing activities. A Flushing and Hydro-Test Procedure was developed. After hydrostatic testing, the piping systems was thoroughly drained to remove all the water and following by air-drying.

8.4.4 Reinstatement Test Reinstatement test was carried out after hydro-test. The following activities were completed before the reinstatement test commenced:

All temporary components used during the hydro test were removed. All piping, valves, instrument, equipment and line elements were installed. The piping system within the reinstatement package was made up to the

final operating condition.

All reinstatement packages was developed and line checks was carried out prior to reinstatement testing, which include sequence of building up test pressure up to the specific test pressure and the sequence for depressurizing including safety requirement was observed during the actual testing.

5 of 31

Page 10: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items Close-Out Report

Sarawak Shell Bhd.

8.5 MECHANICAL WORKS

8.5.1 MMHE subcontracted or purchased the equipment from approved vendors.

8.5.2 All mechanical supports/sitting fabrication works was done inside the workshop

taking into account the as-built measurement of the equipment skid supports and the deck levelness. Specific installation heavy lift procedure for major equipment was developed.

8.5.3 Prior to delivery, MMHE ensured that the equipment was inspected and tested

either at vendor premises or upon delivery at MMHE.

8.5.4 MMHE completed all required testing & inspection prior to installation.

8.5.5 Major equipment, which required PTW or special permit for lifting, were erected to location pending its availability.

8.5.6 Equipments, which are sensitive to moist, humidity, extreme heat or duct, MMHE

provided adequate protection. The preservation covered throughout the fabrication period.

8.5.7 Major Mechanical equipments installed are, but not limited to the following:

8.5.7.1 Pedestal Crane 8.5.7.2 Centrifugal Pumps (4 nos.) 8.5.7.3 CO2 Vent Snuffing Unit 8.5.7.4 Corrosion Inhibitor Injection Skid 8.5.7.5 Close Drain Vessel 8.5.7.6 Condensate Pod 8.5.7.7 Fresh Water Tank 8.5.7.8 Flush Water Tank 8.5.7.9 Swing Jib Cranes (2 nos.) 8.5.7.10 Launcher / Receiver 8.5.7.11 Sand Bins (2 nos.) 8.5.7.12 Desander Skids (5 nos.) 8.5.7.13 Wellhead (5 nos.)

Major HVAC equipments installed are, but not limited to the following:

8.5.7.14 Air handling Unit (2 nos.) 8.5.7.15 Air Cooled Condensate Unit (4 nos.) 8.5.7.16 Fan Coil Unit (Battery Room 2 nos.) 8.5.7.17 Electric Duct Heater (3 nos.) 8.5.7.18 Exhaust Fan (4 nos.) 8.5.7.19 External & Internal Ducting

6 of 31

Page 11: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items Close-Out Report

Sarawak Shell Bhd.

8.6 ELECTRICAL & INSTRUMENTATION WORKS

8.6.1 MMHE subcontracted or purchased the equipment from approved vendors. 8.6.2 Prior to delivery, MMHE ensured that the equipments and devices were inspected

and tested either at vendor premises or upon delivery at MMHE. 8.6.3 MMHE completed all required testing & inspection prior to installation. 8.6.4 Equipments and devices with sensitive control devices and electronic devices

were stored in an enclosed air condition storage area prior to installation. The preservation covered throughout the fabrication period.

8.6.5 All E&I supports, brackets and stands were fabricated inside the workshop as per

approved IFC dwgs. All supports, brackets & stands were full seal welded and painted in accordance with SSB specifications unless shown otherwise on the IFC dwgs.

8.6.6 All fabricated E&I supports, brackets & stands accepted by SSB were installed in

accordance with latest IFC dwgs. Full welding was done only after confirmation if no obstruction/alteration within the areas concerned.

8.6.7 All E&I equipment were installed strictly on accordance with manufacturer’s

instruction and specification. Specific installation heavy lift procedure for major equipment was developed.

8.6.8 The major E&I equipments installed are, but not limited to the following:

Electrical

• Power Transformer • 6.6KV Ring Main Unit • LV Distribution Board (8 nos.) • AC Uninterruptible Power Supply (UPS) • Interposing Relay Panels (2 nos.) – (1 no. ship loose for E11-KA) • 400V Switchboard • Splitter Box

Instrumentation • Wellhead Control Panel • Distributed Control System (DCS) • AVA System • GPA/PA System Cabinet • Sand Monitoring System • Hydraulic Actuated Valves • Wet Gas Metering System • IPS System

7 of 31

Page 12: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items Close-Out Report

Sarawak Shell Bhd.

8.7 BLASTING & PAINTING WORKS

8.7.1 All raw fabricated materials (i.e. supports, brackets, stands, etc) were blasted

and applied approved Epoxy or Main Coating / Primer Epoxy Glass Flake prior to erection.

8.7.2 For tubular, diagonal braces and columns were blasted and applied main coat

prior to erection.

8.7.3 All main steel assembled at ground level were spot blast on the welded connection and welded attachment area and painted by the main coating prior to lifting of the deck to its position.

8.7.4 The finished coat was applied right after the primary steel box-up and damage

portion thereafter was repaired and cosmetic painted during and after all interdisciplinary components are installed, prior to MCD.

9.0 STATISTICS

9.1 PMT Evaluation

Risk No Discipline

Identified De-risked

Change Notification

Issued

Site Technical Query Issued

1 Mechanical 11 11 8 31

2 Structural 6 6 33 67

3 E&I 20 12 5 38

4 Architectural 2 2 6 14

5 Piping 9 9 9 23

6 HVAC 2 2 2 2

7 B & P 3 7

8 QA 1 1 4 8

9 T&C 1

8 of 31

Page 13: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items Close-Out Report

Sarawak Shell Bhd.

10.0 TESTING & PRE-COMMISSIONING

10.1 Testing & Pre-commissioning outline the final inspection and onshore pre-commissioning

of the package system including the equipment installation works on SCDR-A Topsides Project.

Onshore pre-commissioning proved that all equipment available have been installed and connected in accordance with IFC drawings and operation is in line with the design concept.

All inspection and test results are recorded on the SSB format of check sheets, Shell EP Asia Pacific (EPA) format. The check sheet overview for each system is provided in the detailed procedure. MMHE assigned personnel that performed the testing, inspection & onshore pre-commissioning of various types of system and equipment, followed the approved detailed procedure.

MMHE requested all tests and witnessed by SSB Commissioning Team. MMHE recorded all test and counter signed by SSB Representative after testing was completed.

Original copy of check sheets were handed over progressively throughout the pre-commissioning period and were kept in accordance with the commissioning system numbering for final documentation.

10.2 General Scopes of Testing & Pre-commissioning are the following:

10.2.1 Bench calibration of instrument items upon deliver prior to installation.

10.2.2 Function test of electrical protection relays such as earth fault relays, overload relays and etc.

10.2.3 Cable continuity check and megger testing.

10.2.4 Loop checking and static function test of all control panels.

10.2.5 Cleaning the package during and after the pre-commissioning.

10.2.6 System function test inclusive of over-all testing and shutdown matrices.

10.2.7 Alignment check for rotating equipment.

10.2.8 Preparation of pre-commissioning check sheets and test reports for compilation and final documentation.

10.2.9 Flushing and reinstatement leak testing for system.

10.2.10 Full commissioning of HVAC, Pedestal Crane, etc. and maximize the commissioning works onshore wherever possible.

9 of 31

Page 14: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items Close-Out Report

Sarawak Shell Bhd.

10.3 Testing & Pre-commissioning Systems are the following:

10.3.1 System 01 : Gas and Condensate Production

10.3.2 System 12 : HVAC and Pressurization

10.3.3 System 13 : Diesel Fuel

10.3.4 System 18 : Drains

10.3.5 System 19 : Vents

10.3.6 System 20 : Material Handling

10.3.7 System 22 : Portable Emergency Equipment

10.3.8 System 23 : Fire Water

10.3.9 System 24 : Fresh Water

10.3.10 System 25 : Flush Water

10.3.11 System 27 : Electrical Generation and Distribution

10.3.12 System 28 : Uninterruptible Power Supplies

10.3.13 System 29 : Lighting and Small Power

10.3.14 System 30 : Navigational Aids

10.3.15 System 32 : Bonding, Earthing and Lighting Protection

10.3.16 System 33 : Distributed Control System (DCS)

10.3.17 System 34 : Fire and Gas Detection

10.3.18 System 35 : GPA

10.3.19 System 36 : AVA

10.3.20 System 37 : Telecommunications

10.3.21 System 39 : Instrument Protective System

10 of 31

Page 15: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items Close-Out Report

Sarawak Shell Bhd.

11.0 Inter-departmental Assessment

Assessment No Item

Excellent Good Fair Poor 1 Procurement

Remarks/ Improvement Opportunity:

No. Remarks Improvement Opportunity

1. Longer duration taken for PO awarding. Reduce the red tape.

2. Materials delivery beyond the planned schedule, as a result Fabrication and Testing & Commissioning works has been delayed (e.g. : Launcher Receiver End Closure, E&I materials). Prior to this also delivery of those materials/equipment need to accelerate, resulting cost increase.

To firm up the PO earlier and closely monitor the delivery of materials.

3. Some of materials/equipment delivered not meet targeted quality (e.g.: Closed Drain Vessel & Condensate Pod – Too many punch list and affecting others disciplines activities).

To revisit the vendor list and technical person / PMT should evaluate the proposed vendor/supplier before award PO.

4. Materials specification changes not highlighted to PMT and Client. As results too many re-test conducted & time consumed & cost impact (e.g.: Piping Duplex 8” seamless changes to welded type).

Should consult with design team, PMT and client before conclude to deviate from original specification.

5. The quality of procurement reporting is poor. To provide a detail and correct information on the procurement report.

2 Design & Engineering

Remarks/ Improvement Opportunity:

No. Remarks Improvement Opportunity

1. TBE response is slow, resulting PO awarding delayed.

To improve the evaluating period.

2. Design quality is poor. Inter clash check in between designs disciplines is almost nil, resulting too many major clashing at site.

Design should improve in quality of designing & be very strong in justifying related queries and should work as a team among design team when finalizing the drawings.

Design team should be the frontline in

11 of 31

Page 16: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items Close-Out Report

Sarawak Shell Bhd.

advising the project team at beginning stage for any materials shortage or clashes or any related activities, which are not highlighted by the client’s consultant.

3. Too many unplanned PR. Cost and time impact.

To improve the quality on justifying the details drawings.

3 Cost Controller

Remarks/ Improvement Opportunity:

No. Remarks Improvement Opportunity

1. Cost controller has a very structured administration and procedures. All related site changes and contractual requirement is well monitored and organized.

4 Planner

Remarks/ Improvement Opportunity:

No. Remarks Improvement Opportunity

1. Package planning details week. Package planning should be in detail and incorporate all the activities related to the project. Also to be more proactive in determining the impact of the schedule delivered.

12 of 31

Page 17: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items Close-Out Report

Sarawak Shell Bhd.

C. Lessons Learnt

1) Design team should be the frontline in advising the project team at beginning stage for any

materials shortage or clashes or any related activities that are not highlighted by the client’s consultant. The time frame for justification and advising the project team also should be at a high-speed mode. Not to copy and paste only the client’s entire only consultant drawing details.

Design should improve in quality of designing & be very strong in justifying related queries and should work as a team among design team when finalizing the drawings.

2) Procurement department should improve in delivery the PO and should transparent in reporting the delivery of materials.

3) Material Control should tally the information materials delivery to project team to avoid too many urgent releases given during project implemented.

4) Planning should detail out all activities and proactive in advising the impact of planned work delivered.

13 of 31

Page 18: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items Close-Out Report

Sarawak Shell Bhd.

Department: QHSE

Project HSE Targets:

It is MMHE committed desire to continually improve the overall Health Safety and environmental performance and to further enhance a proactive safety culture and consciousness at all levels involved in this Project.

Since beginning of the project on 21st July, 2006 through first cut of steel on 12th October, 2006 until the Mechanical Completion Day (MCD) date on 28th August 2007, Loadout on 12th September, 2007 and Sail away of SCDR-A Topsides on 27th September, 2007, has achieved 462,640 man-hours, 405 days without Incident.

1.0 HEALTH, SAFETY AND ENVIRONMENT

1.1 Overall HSE Statistic as of 27/09/07

Category Accumulative Total Man-hours without LTI 462,640 Near Miss 0 First Aid 0 Occupational Health 0 MTC 0 RWC 0 No. of Fire/Explosion Incident 0 Property/Equipment Damage 0 LTI 0 Permanent Total Disability 0 Fatality 0 Total Recordable Occupational Illness 0 TRCF 0 Cost of Accidents 0 No. of Days LTI Free 405 No. of Unsafe Act walkabout findings 1364 No. of Unsafe Condition walkabout findings 1162 Total UCUX submission 2257

Legend:

TRCF : Total Recordable Case Frequency MTC : Medical Treatment Case RWC : Restricted Work Case LTI : Lost Time Injury

14 of 31

Page 19: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items Close-Out Report

Sarawak Shell Bhd.

1.2 Project HSE Targets

The HSE Targets for the project were:

1.2.1 Carry out all works during the project so as to achieve the highest standards in HSE with a zero LTI.

1.2.2 Maintain the TRCF below 1.35 throughout the project.

1.2.3 Eliminate any occupational related diseases while carrying out all works during the project.

1.2.4 Generate less waste / scrap and to eliminate chemical spillage.

1.2.5 Proper handling and management of hazardous waste as ISO 14001 and SSB requirement.

1.2.6 Carry out remedial action promptly for all identified hazards so as to reduce the risk of injury to personnel and damage to environment, plant and equipment.

1.2.7 Establish and maintain a safe and healthy working environment.

1.2.8 Establish a pro-active system in HSE Management System as OHSAS 18001.

1.2.9 Identify and record all hazards including near miss by utilizing the SSB System.

1.3 Induction Training All employees and subcontractors were required to attend NOSP (NIOSH OSFAM Safety Passport) induction training to familiarize themselves with the HSE requirements of the project. The induction program covered topics such as the safe work procedures, work instructions, emergency procedures and assembly points were aim to make personnel aware of the HSE regulations and system to assist them in carrying out their work in a safe manner at all times regarding their own safety, that of their colleagues, the environment and SSB personnel. The number trained is 325 personnel.

1.4 Fabrication Yard Orientations and Security

All PMT, Subcontractors and Client project personnel were required to attend work site safety orientation programs, which lasted for three and a half hours. The orientation covered topics like sites rules, emergency response procedures, assembly points, security procedures and the safety culture expected of each personnel. At the SCDR-A project site we adopted the Proactive Intervention Culture (PIC) ‘Budaya Tegur Menegur’ safety culture where anyone can intervene and stop work or advise anyone seen doing unsafe practices. So far project has inducted 1046 personnel.

1.5 Housekeeping

The project workforce carried out daily housekeeping and cleaning activities at site before/after work and weekly “Gotong Royong” on Saturday. These programs were aimed at increasing job efficiency, improving safety performance, reducing risks of fire / explosion and preventing trip / fall accidents

1.6 Drills

The project executed two drills, the first on 14th February 2007 for First Aid, Rescue and Evacuation Drill and on 17th July 2007, and the second one on Rescue, Evacuation and Fire Drill. Both exercises successfully done as per our expectation.

15 of 31

Page 20: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items Close-Out Report

Sarawak Shell Bhd.

1.7 Project HSE Meeting

MMHE together with SSB and subcontractors convene an HSE meeting once a week on every Monday at 0930hrs. The number is 49. The following items were discussed at each meeting:

1.7.1 Review incident injury reports lessoned learnt and discuss recommended appropriate controls and interventions.

1.7.2 Review any issue raised by the HSE Management Committee.

1.7.3 Review the progress towards achieving key performance indicators.

1.7.4 Discuss health, safety and environment issues.

1.7.5 Update HSE Plan/programmed.

1.8 Daily Toolbox Meeting Toolbox meeting were held at site on a daily basis and all MMHE personnel, subcontractors and vendors attended it. The Toolbox Meetings lasted for about twenty minutes and usually included items such as:

1.8.1 Pre job discussion.

1.8.2 Hazard identification at work site.

1.8.3 PTW briefing.

1.8.4 Areas of safety concern to the workers.

1.8.5 Project safety rules and policies.

1.8.6 Systems and procedures.

1.8.7 Reviews of injury and incident reports.

Toolbox Meetings were also being used as an educational forum to improve employee’s knowledge and understanding of health and safety systems, rules and requirement.

1.9 Weekly HSE Talk MMHE PMT, Subcontractor’s Management and HSE take turns to conduct the HSE Talk every Monday. The duration of the HSE talk will take approximately 15-30 minutes depending on the contents of the safety topic. The topic of the HSE Talk are predominantly focused on the risks, known hazards, unsafe acts or practices related to the daily activities. The HSE talk also acted as a tool for management and workers inter communication to convey information and to mobilize action on current aspect of health safety and the protection of the environment. All MMHE employees and subcontractors who are involved with the fabrication of SCDR-A were required to attend the talk and attendance was taken. Any absenteeism without good reason is considered non-compliance to HSE Plan. To ensure sufficient space to accommodate all the workers and to protect the place from rain and sun, we erected a zinc roof shed with a staged podium to ensure this important gathering is always carried out despite the weather conditions.

16 of 31

Page 21: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items Close-Out Report

Sarawak Shell Bhd.

The following are the topics discussed during HSE Talk:

No TOPIC PRESENTER DATE 01 WORKSITE HAZARDS ABD. MANAN A. BAKAR, HSE EXEC. 16/10/06 02 HSE PLAN BRIEFING ABD. MANAN A. BAKAR, HSE EXEC. 23/10/06 03 WORKER HSE RESPONSIBILITY RAHIM MOHAMAD,HSE SUPV. 30/10/06 04 PREJOB HSE SITEPREPARATION MOHAMMAD ABDULLAH, HSE COOR. 06/11/06 05 TOOL & EQUIPMENT INSP. YAHYA ABU, TOOLCENTRE, MMHE 13/11/06 06 WORKSITE HOUSEKEEPNG ANDY DARING, SP, KWSB, 20/11/06 07 HOTWORKS HAZARDS NADARAJAN, HSE SUPV. 27/11/06 08 SCAFFOLDING SAFETY ROSLI SHAHUDIN, SCAFFOLDING FORE. 04/12/06 09 ELECTRICALSAFETY ZUBAIRI, CHARGEMAN,TSD, 11/12/06 10 ELECTRICALSAFETY SITI SYAKIRA & YUNUS, E&I SUPV. 18/12/06 11 WORKING AT HEIGHT TAY SIN YING, PRO. ENGINEER, KWSB. 27/12/06 12 P.P.E. MD. SALLEHUDDIN SAMIUN, E&I TE MMHE 04/01/07 13 HEARING PROTECTION AMIRUSHAM ABD.RAHIM, PIPING TE, MMHE 08/01/07 14 GENERAL WORKSITE SAFETY ABD. MANAN ABU BAKAR, HSE EXEC. 15/01/07 15 RADIOGRAPHY SAFETY IBRAHIM AWANG, PM , ESCON 22/01/07 16 AAA PROGRAM W. M. FARIS W. MAHMUD, MECH. SUPV. PMT 29/02/07 17 RESPIRATORY PROTECTION MAZLINA ABD. HAMID, HEALTH EXEC., QHSE 5/02/07 18 DRIVING SAFETY ABD. MANAN ABU BAKAR, HSE EXEC. 12/02/07 19 HOTWORK SAFETY M. YUSAA M. NOOR, SSB, HSE ADVISOR 21/02/07 20 PIPING INSTALLATION MOHD TAIB HASSAN, JN SAFETY PROMOTER 26/02/07 21 AVIAN FLU KHAIRUL AFFENDI, HE LEAD, QHSE 05/03/07 22 B&P SAFETY HUSAINI HUSSIN, PM, BB TECH 12/03/07 23 THINK BEFORE YOU THROW LIZA RAMLI, ENVI. EXEC., QHSE 19/03/07 24 ELECTRICAL HAZARDS SHAIFUDDIN ABDULLAH, PM, ASADRA 26/03/07 25 B&P HAZARDS ZOL MAHDON, SUPV, BB TECH. 2/04/07 26 HOUSEKEEPING AT SITE AHMAD RAMIZU, PRO. MANAGER, KWSB 11/04/07 27 LIFTING HAZARDS. KRISHNAN PONNAN, LIFTING SUPV. WSD, 16/04/07 28 EFFECT OF CHEMICALS NOOR FARHANA, SAFETY PRO. ASADRA. 23/04/07 29 HSE PENALTY & VIOLATION MD. IBRAHIM MUSTAFA, QHSE, MMHE 30/04/07 30 GENERAL H/KEEPING NORAZLI ASAAD, PE,SSB 07/05/07 31 MECH. & EQUIPMENT SAFETY MD HAZWAN MD DIN, IPT, MMHE 14/05/07 32 GRE SHAVING SAMSUDDIN BANDOG, AESB SAFETY 21/05/07 33 LOTO & SYSTEM HAZARDS ABD HALIM BAJURI, T&C LEAD 28/05/07 34 GRATING MANAGEMENT YUNUS, E&I, PMT 4/06/07 35 GENERAL SAFETY ABD MANAN ABU BAKAR, QHSE 11/06/07 36 SCAFFOLDING ABD JALAL, WSD, MMHE 18/06/07 37 E&I SAFEYY SAIFUDDIN ABDULLAH, PM, ASADRA 25/06/07 38 PFP PROCEDURE ALIAS A. BAKAR, PFP, JURUNATURE 2/7/07 39 HYDROTEST SOP FAUZI ISHAK,PIPING SUPV. MMHE 9/7/07 40 HOTWORK SAFETY ANDY DARING, SP, KWSB, 16/07/07 41 QUALITY & SAFETY JUMIATUL IKLAS, QA ENGINEER 23/07/07 42 HEAT STRESS ABD MANAN ABU BAKAR, HSE EXECUTIVE 30/07/07 43 NOISE INDUCEMENT HAZARDS MAZLINA ABD. HAMID, HEALTH EXEC., QHSE 06/08/07 44 DENGUE & AEDES MD. IBRAHIM MUSTAFA, QHSE, MMHE 13/08/07 45 LUNG DISEASES ABD MANAN ABU BAKAR, HSE EXECUTIVE 20/08/07 46 WORKING ON BARGE/LOADOUT MOHD RIDZUAN HASSAN, CON. SUPT. PMT 27/08/07 47 PROJECT CLOSING REPORT BRIEFING OTHMAN SABRAN, PROJECT MANAGER, PMT 03/09/07 48 SSB CLOSING REPORT BRIEFING FELIXBERTO CLERIGO, CSR, SSB 10/09/07

1.10 HSE Walkabout

Safety Audits / “Walkabout” were conducted on every Monday at 8:30 a.m. It was participated by a group of personnel, which consists of SSB Company Site Representative (CSR), MMHE Project Manager, Subcontractor Project Managers, Discipline Superintendent, HSE Executive, HSE Supervisor, Discipline Engineers, Discipline Supervisors and Subcontractors Supervisors. Any hazards or unsafe act/conditions will be highlighted and action will be taken to eliminate or rectify immediately, unresolved findings will be discussed during the HSE meeting for further action.

17 of 31

Page 22: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items Close-Out Report

Sarawak Shell Bhd.

The purpose of the Walkabout is to ensure the work site is safe and in compliance with HSE rules and regulations. The findings will be discussed in the HSE Weekly meeting. Apart from the regular Monday Safety Walkabout, we have also implemented a twice-daily safety task force walkabout among the subcontractors which was conducted by the MMHE and subcontractor safety promoters at all work locations. The findings and action taken were discussed in daily safety promoters meeting and submitted on a daily basis for records.

1.11 Friday HSE Video Show

HSE education for all personnel involved in the project plays an important role in promoting safety work practices, Although the HSE plan only requires once every two weeks but we conducted on a weekly basis, however we have exceeded this requirement. We were able to screen the 30 minutes safety video shows every Friday, 520 personnel have attended. This was made possible by having our own TV and VCD player specifically dedicated for the SCDR-A project. SSB staff generously lent the audiovisual items.

1.12 QHSE DAY Celebrations

Two QHSE day celebrations were held during the onshore fabrication. The first milestone achievement was celebrated on 10/05/07.after achieving 250,000 man-hours while the 375,000 milestone was recorded on 14/07/07.

1.13 HSE Incentives

HSE incentives in both cash vouchers and non monetary form such as t-shirts, caps and mugs were handed out to the workforce on every Monday morning talk for the most number of U-See, U-Act submitted during the week or month, HSE quiz. Apart from that we also hand out tokens to those who were selected on the spot for good HSE practices where PMT and clients top management were making their visits to site. The number of tokens given is 215.

1.14 HSE Violations

So far we have issued 51 SAC and 7 SVC to non-compliant at site. The objective is to discourage workforce not to commit un-safe work practices.

1.15 D&A Programmed

The objective is to maintain a safe, healthy and productive work environment, the use and abuse (sales, possession, trafficking & influence) of drug and alcohol. The number tested so far, 341 all negative.

18 of 31

Page 23: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items Close-Out Report

Sarawak Shell Bhd.

1.16 SAFETY CAMPAIGNS

Two campaigns the first one PPE Awareness Campaign was launched on 10//05//07 and the second, PTW Management Campaign on 25/06/07. A unique feature towards a pro-active HSE management was the launch of “HSE Commitment by Contractors and PMT Signing Ceremony”. we were serious about Safety and would ensure that they would carry out their work in safe manner and complete it on time. Beside the campaigns, all SCDR-A Project workforces have to wear coverall at all time as per the contract.

1.17 HSE Workshops

HSE workshops were held during the course of the project for supervisors, workers and HSE personnel. The workshops focused on the Hazard Identification (HIRAC), proactive interventions (PIC) and refocusing on the HSE objectives for the project with an eye on Improving HSE performances. MMHE HSE Executive and SSB HSE Advisor jointly animated the workshop.

1.19 Incident / Injury

All types of incident and injuries, including LTI, MTC, RWC, first aid, near miss, property and environmental damage were required to be promptly reported within 24 hours to MMHE/SSB representative verbally and writing. Since the project commenced on the First Cut of Steel, 12th September 2006 until MCD date on 28th August 2007 and Sailaway on 27th September, 2007, SCDR-A Topsides has achieved our vision of “Nobody Gets Hurt” and the target of ZERO INCIDENT.

19 of 31

Page 24: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items Close-Out Report

Sarawak Shell Bhd.

2.0 Inter-Departmental Assessment

Assessment No Item

Excellent Good Fair Poor

1 Procurement

Remarks/ Improvement Opportunity:

1. Attended PIC course as per project requirements. 2. Comply with cover-all & PPE issue @ site. 3. No safety non-compliance.

2 Design & Engineering

Remarks/ Improvement Opportunity:

1. Attended PIC course as per project requirements. 2. Comply with cover-all & PPE issue @ site. 3. No safety non-compliance.

3 Cost Controller

Remarks/ Improvement Opportunity:

1. Attended PIC course as per project requirements. 2. Comply with cover-all & PPE issue @ site. 3. No safety non-compliance.

4 Construction

Remarks/ Improvement Opportunity: To improve mindset and behavior of PMT and to achieve the objective of world-class safety performance, as per strategy to support MMHE corporate agenda. To upgrade submission of UCUX, SAC/SVC, PTW management, active participation in daily Tool Box Talk, HSE meeting and pro-active site safety intervention & immediate rectification. PMT have contributed great teamwork to enhance the project housekeeping programmed.

5 Planner

Remarks/ Improvement Opportunity:

1. Attended PIC course as per project requirements.

2. Comply with cover-all & PPE issue @ site.

3. No safety non-compliance.

20 of 31

Page 25: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items Close-Out Report

Sarawak Shell Bhd.

Department: Procurement

Overview: Project is an EPCC and a lump sum procurement contract by MMHE. Client Sarawak Shell Berhad. Target MCD is on 28 August 2007. Sail away by 5 September 2007. This project is a Topside Drilling Flatform and Satellite Tie-in Flatform. Location is 200 Kilometers offshore Miri-Sarawak. The Design consultant is MMC Oil & Gas Engineering Sdn. Bhd.

1.0 Long Lead Items

No Item PR Date PO Date FRD Actual

Delivery Date

Reason for Delay

1 External Door Type D1 and D2 and D3 25/08/06 23/01/07 22/12/06 18/04/07

Technical clarification from Design delay due to engineer’s transition. PA was hold. Manage to capture installation on site

2 External Door Type D4 ,D4A,D5, and D6 25/08/07 23/01/07 22/12/06 05/02/07

Technical clarification from Design delay due to engineer’s transition. PA was hold. Manage to capture installation on site.

3 Pedestal Crane engine driven 05/08/06 19/10/06 15/05/07 10/07/07

Delay on delivery of package due technical queries / procurement of materials to proceed on production by vendor. Manage to coup up schedule for installation on site.

4 Flush / Closed water Tank 5/8/06 19/10/06 15/05/07 10/06/07

Delay cutting of Po’s & delivery due to budgetary issue. Still manage to meet schedule on site installation

5 Open Drain Caisson Pump 05/08/06 19/10/06 15/05/07 01/06/07

Delay cutting of Po’s & delivery due to budgetary issue. Still manage to meet schedule on site installation

6 Diesel Transfer Pump 05/08/06 19/10/06 15/05/07 10/06/07

Delay cutting of Po’s & delivery due to budgetary issue. Still manage to meet schedule on site installation

7 Sonic Vent Tip Package 07/08/06 23/01/07 07/05/07 10/07/07

Delayed of cutting of PO’s due to budgetary issue / technical clarification by design. Still managed to install as per site schedule.

8. Corrosion Inhibitor Injection Skids 07/08/06 18/10/06 08/03/07 03/05/07

Delayed of cutting of PO’s due to budgetary issue / technical clarification by design. Still managed to install as per site schedule.

9 Closed Drain Vessel 07/08/06 21/11/06 22/01/07 26/04/07

Delayed of cutting of PO’s due to budgetary issue / technical clarification by design. Still managed to install as per site schedule.

21 of 31

Page 26: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items Close-Out Report

Sarawak Shell Bhd.

10 Condensate POD 07/08/06 21/11/06 22/01/07 26/04/07 Managed to capture installation on site.

11 Fresh Water Tank 07/08/06 06/11/06 20/12/06 10/05/07 Managed to capture installation on site.

12 Flush Water Tank 07/08/06 06/11/06 20/12/06 24/04/07 Managed to capture installation on site.

13 Swing Jib Crane 07/08/06 13/10/06 10/05/07 15/05/07 Managed to capture installation on site.

14 Pig Trap Enclosure 16/08/06 06/02/07 26/03/07 13/08/07 Due late production from vendor principal

15 Pig Receiver 18/08/06 23/01/07 20/06/07 01/10/07 E11K-A ship loose material.

16 Globe/ Check / Gate Valve 17/08/06 29/01/07 11/12/06 14/07/07 Managed to capture

installation on site.

17 Gate Valve 17/08/06 29/01/07 11/12/06 14/07/07 Managed to capture installation on site.

18 Check Valve 17/08/06 29/01/07 11/12/06 14/07/07 Managed to capture installation on site.

19 Check Valve 17/08/06 26/01/07 11/12/06

Staggered delivery by Vendor (Metronet). Remaining to complete the delivery by 30 August 2007

20 PipeWld. Dn300 23/08/06 29/12/06 11/12/06 Managed to capture installation on site.

21 Wellhead Control Panel 10/08/06 26/02/06 18/03/07 10/07/07 Delayed on delivery. Managed to capture installation on site.

22 Sand Monitoring Systems 11/08/06 29/01/07 18/03/07 22/05/07 Delayed on delivery. Managed to capture installation on site.

23 Choke Valve Hydraulic 15/08/06 04/12/06 01/03/07 16/06/07 Delayed on delivery. Managed to capture installation on site.

24 Ultrasonic Gas Flow meter 15/08/06 01/03/07 To deliver by 30 August 2007

25 GPA/PA System Cabinet 23/08/06 29/12/06 01/03/07 06/05/07 Delayed on delivery. Managed to capture installation on site.

26 Flame Detector (IR Point) 23/08/06 31/01/07 01/03/07 06/05/07 Delayed on delivery. Managed to capture installation on site.

27 ESD Break glass Station 23/08/06 22/12/06 01/03/07 15/04/07 Delayed on delivery. Managed to capture installation on site.

28 Restriction Orifice Plate 29/08/06 29/01/07 01/03/07 30/07/07 Delayed on delivery. Managed to capture installation on site.

29 Level Gauge (using pressure gauge) 30/08/06 27/03/07 01/02/07 15/08/07

Delayed on delivery. Managed to capture installation on site.

30 Pig Signaler 14/09/06 19/04/06 01/02/07 15/11/ 07 To install Offshore

31 Pressure Gauges 14/09/06 05/04/07 01/02/07 07/08/07 Delayed on delivery. Managed to capture installation on site.

32 Level Gauges Reflex 14/09/06 16/04/07 01/02/06 08/08/07 Delayed on delivery. Managed to capture installation on site.

33 Instrument Junction Boxes 18/11/06 12/04/07 30/04/07 11/07/07 Delayed on delivery. Manage to capture installation on site

22 of 31

Page 27: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items Close-Out Report

Sarawak Shell Bhd.

34 Fire & Gas Junction Box 18/11/06 12/04/07 30/;04/07 11/07/07 Delayed on delivery. Managed to capture installation on site.

35 Cable Glands Instrument 23/11/06 01/ 06/07 08/02/07 21/06/07 Delayed for some qty. due additional requirement on site.

36 Cable Ladders & Trays Instrument 02/11/06 15/06/07 08/02/07 25/06/07

Delayed for some qty. due additional requirement on site.

37 Multi Cable Transit 25/11/06 03/04/07 15/04/07 25/04/07 Managed to capture installation on site.

38 Power Transformer 10/08/06 09/11/06 01/11/06 05/05/07 Delayed for some qty. due additional requirement on site.

39 Ring Main Unit 10/08/06 28/12/06 01/04/07 18/06/07 Delayed for some qty. due additional requirement on site.

40 Interposing Relay Panel 11/08/06 26/02/07 16/11/06 19/05/07 Delayed for some qty. due additional requirement on site.

41 Power Distribution Board (small) 11/08/06 06/12/06 16/11/06 05/04/07

Delayed on PO cut due budgetary issue & tech clarification. Managed to capture installation on site.

42 Ring Main Unit 10/08/06 28/12/06 01/04/07 18/06/07

Delayed on PO cut due budgetary issue & tech clarification. Managed to capture installation on site.

43 Navigational Aids System 12/08/06 07/12/06 01/11/06 05/05/07

Delayed on PO cut due budgetary issue & tech clarification. Managed to capture installation on site.

44 Normal Fluorescent Lighting Fixture 230/8/06 31/01/06 15/1/2007 07/06/07

Delayed on PO cut due budgetary issue & tech clarification. Managed to capture installation on site.

45 Emergency florescent Lighting Fixture 23/08/06 31/01/06 15/01/07 09/06/07 Managed to capture

installation on site.

46 Electrical Cable 24/08/06 23/01/07 16/04/07 14/04/07 Plan PR captured delivery on site. Delay due to additional requirement on site.

47 Cable ladders & Trays electrical 30/08/06 07/12/06 30/01/07 06/02/07

Plan PR captured delivery on site. Delay due to additional requirement on site.

48 Electrical Cable Glands 07/09/06 09/12/06 16/04/07 14/04/07 Plan PR captured delivery on site. Delay due to additional requirement on site.

49 Junction Boxes Electrical 08/09/06 26/03/07 12/02/06 29/06/07 Plan PR captured delivery on site. Delay due to additional requirement on site.

2.0 Lessons Learnt

Fifty percent (50%) of the long lead items did not meet the field requirement date from PR. Due to long process on technical clarification from Design, Budgetary issues, holding the circulation of PA’s / PO’s. Hence Procurement and PMT managed to capture installation of items in the project. To avoid happening again, need to shorten period on TBE’s and PA’s circulation for approval. Additional items / Shortfall materials, which nearly capture the total quantity of Plan PR’s, should be avoided. Procurement is facing a difficulties on ordering as wells as capturing the delivery timing of items.

23 of 31

Page 28: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items Close-Out Report

Sarawak Shell Bhd.

Department: Design & Engineering

Scope: D & E scope include, but not limited to, review and checking of Client-supplied AFC drawings, PDMS and ACADD models, MTO’s, COG, Structural analysis and other calculations related to the execution and final completion of the project. Scope also covers procurement and technical evaluation of contractual scope of supply such as Structural steel, Piping bulk materials, manual valves except ball valves 2” and above and other materials required in the Contracts; deliverables such as fabrication drawings for all disciplines and reference drawings from Client-supplied AFC drawings and soft copies.

Overview: The Shallow Clastics field, located 140-km NW of Bintulu, was discovered in 1969 by wells F13-1 and E11-1. The field is one of the eleven fields under the MLNG-DUA PSC, which took effect on 30 June 1993. Under the terms of this PSC, Sarawak Shell Berhad as a joint venture arrangement with PETRONAS Carigali Sendirian Berhad will operate the Shallow Clastics field until PSC expiry on 26 May 2015. Shallow Clastics Phase 3 is the development of the SW area of the Shallow Clastics field. SCDR-A will be placed on the SW area of the Shallow Clastics field with four highly deviated wells and one back up well and tied back to the E11K-A platform via a single 6.4-km, 14” carbon steel pipeline. The gas and condensate from the SW area reservoir will be transported wet as a multiphase mixture to the E11K-A facilities, where the fluids will be separated and re-combined prior to export to MLNG-DUA.

1.0 Statistics

No Subject

Mec

hani

cal

Stru

ctur

al

Elec

trica

l

Inst

rum

enta

tion

Arc

hite

ctur

al

Pipi

ng

1 No. of shop drawing original estimation 100 174 365 684 11 598

2 No. of shop drawing additional from Original estimate due to change order 6 nil nil nil nil 3

3 No. of shop drawing additional from original due to MMHE nil nil nil 278 nil 2

4 Man-hour 27648 8112 10900 7152 2700 10818

5 No. drawing days delay nil nil nil nil nil nil

6 No. of site-clash nil nil nil 50 nil 8

7 No. of client deliverable delay nil nil nil nil nil nil

8 No. of PR issued on time 50 26 45 43 7 33

9 No. of Change Notifications issued nil nil nil nil nil 1

10 No. of Site Technical Query issued 31 61 29 9 13 19

24 of 31

Page 29: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items Close-Out Report

Sarawak Shell Bhd.

2.0 Inter-departmental Assessment

Assessment

No Item Excellent Good Fair Poor

2.1 Procurement

Remarks/ Improvement Opportunity: PR’s raised from various disciplines should be acted upon promptly, thus ensuring a window wherein delivery of long-lead items will be captured within the project time frame. Queries to Vendors should be expedited judiciously so as to enhance early completion of Technical Evaluations and issuance of Purchase Orders, thus giving vendors lead time to meet delivery schedules.

2.2 Construction

Remarks/ Improvement Opportunity

1. PMT to inform of any clash, material shortfall, rejected purchased items and other problems involving D & E before giving information to Client in order to resolve these problems internally so as not to create unnecessary remarks and reprimands from the Client.

2. QC to expedite issuance of “Red-line” mark-ups so as not to rush D & E in the generation of “AS-BUILTS” in the dying days of the project.

3. PR’s for additional materials required by the Project not covered by the MTO should be raised by PMT to expedite speedy processing.

4. Close interaction between PMT and D & E is a must to avoid confusion, finger-pointing and blaming once problems arise.

2.3 Cost Controller

Remarks/ Improvement Opportunity D & E to inform Cost Control Engineer of any addition or deletion of materials in the form Material Change Notice (MCN) to keep him updated of any V.O.’s.

2.4 Planner

Remarks/ Improvement Opportunity

Planner to furnish D & E updated planning package every now and then.

25 of 31

Page 30: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items Close-Out Report

Sarawak Shell Bhd.

3.0 Lessons Learnt

3.1 PDMS model should be clash- checked after exportation of BOCAD to ensure a clash-

free piping configuration.

3.2 Thorough review and checking of Client and Yard supplied materials to avoid last minute procurement of shortfall materials.

3.3 Close interaction between PMT and D & E to ensure the capturing of potential problems at site such as shortage of construction materials, clashes, obstructions and tripping hazards, etc.

3.4 Inter-disciplinary coordination should be encourage to avoid inter-disciplinary clashes at site during installation of piping, supports, cable trays, pad eyes, etc.

3.5 Early issuance by QC of “RED-LINES” to avoid cramming on document preparation during project close-out preparations.

Department: QA/QC

Project Quality Target:

• Zero LTI (Lost Time Injury) • Piping repair rate less than 0.5 % • Structural repair rate less than 1 %

Objective of Project Quality Plan:

1. To maintain a comprehensive Quality Management System which control such as project management, design engineering, procurement, fabrication process and pre-commissioning.

2. Ensuring that project quality meets total Sarawak Shell Berhad (SSB) satisfaction and statutory requirements

3. Minimizing potential quality problem areas, thus improving cost effectiveness and efficiency.

4. Ensure regular monitoring, reviews, inspections and audits to verify the implementation compliance to the contractual requirements.

26 of 31

Page 31: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items Close-Out Report

Sarawak Shell Bhd.

1.0 Statistics

No Subject Status

1 Project Specific Procedures Total : 54, Approved: 54 , Outstanding: 0

2 Quality Action Note (QAN) issued Total: 106, Close: 106, Outstanding: 0

3 Non-conformance report (NCR) issued Total: 15, Close: 15, Outstanding; 0

4 Weld Repair Rate

Structural:

Length Tested (RT+UT) : 1,376,332 mm. Defect length : 4,413 mm. Defect rate : 0.32 % Major Type of Defect : Slag, Lack of Fusion, & Porosity Piping:

Length Tested (RT+UT) : 579051 mm Defect length : 206 mm. Defect rate : 0.04 % Major Type of Defect : Porosity and Lack of Fusion

2.0 Lessons Learnt

Vendor supplied and delivered the equipments (Closed drain vessel and Condensate Pod) to MMHE yard without completion of Non Destructive Test and improper compilation of Manufacturer Data Record. Rectification should be done by Project Team in order to fulfill the Code requirements and Client specifications. The repair activities such as re-alignment on nozzle, re-Radiography, re-Hydro test and repainted. These kinds of repairs consume a lot material, consumables, schedule and cost as well.

Recommendation:

• Site visit for ensuring capability and performance of the selected vendor / supplier for the project critical equipment /mechanical package

• To conduct pre-execution audit prior to fabrication commencement to give more confidence on availability and readiness of drawing, material, project personnel/manpower, tools and yard facilities.

• Procurement to update vendor data monitoring registry to achieve final documentation compilation in schedule.

• To increase the frequency of inspection to vendor yard for earlier detection if any malfunction or non-conformances occurred during fabrication phase.

27 of 31

Page 32: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items Close-Out Report

Sarawak Shell Bhd.

Department: Cost Controller

Project Overview: Generally SCDR-A Topsides is a profitable project but the project was largely hit by the price escalation on Stainless Steel and Duplex Stainless Steel related materials/equipment.

Few materials and equipment delayed of delivery due some prolonged settlement on over-budgeted issues thus contribute to most of negative progress of the project and catch-up progress by means of acceleration is inevitable.

Massive repetitive works as a result of clashing/obstruction is the “ugly” side of the project.

1.0 Statistics

No Subject Value (RM)

1 Original Contract Value 75,667,000.00 2 Adjusted Contract Value (incl. variations and re-measurement) 76,859,000.00 3 Total Project Profit 2,240,000.00 4 Liquidation Damages to Vendors and 3rd Party Consultants (If any) Nil 5 Liquidation Damages by Client (If any) Nil 6 Project Job Cost Summary i. Mechanical 9,954,000.00 ii. E&I 11,890,000.00 iii. Structural 3,190,000.00 Blasting/Corrosion Protection 183,000.00 Architectural 800,000.00 Pressure Vessel/Tank 898,000.00 iv. Piping/Valves 11,740,000.00 Testing/Commissioning 200,000.00 Sea fastening/Grillage 27,000.00 Service to Client 103,000.00 v. Project Management Team 649,000.00 Grating 545,000.00 Fire Fighting & Safety Equipment 37,000.00 Ship loose 100,000.00 Handling Client Supplied Materials 100,000.00 Documentations 100,000.00 Consumables/miscellaneous 253,000.00 vi. Subcontractor 22,330,000.00 vii. Direct Expenses 4,128,000.00

28 of 31

Page 33: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items Close-Out Report

Sarawak Shell Bhd.

2.0 Change Orders

• To attach the following reports from the COP Register See Appendix 8 - RFQ/CO/VOP Log

3.0 Budget Cost Overran, Reasons and Mitigating Action

3.1 Material/ disciplines

3.1.1 Material procured last minutes to cater miss-out and modification works

entails ex-stock material is secured at higher price.

Design MTO to be doubled check by Construction to cater for potential unavoidable clashing/modification, site routing etc

3.1.2 Procured materials from VDP – Price to be concluded based on bidding

price (price that had been used for submission of ITB to Client) as long as the price is still valid. No re tendering is necessary.

3.1.3 Price escalation especially SS and DSS based materials. Further negotiation.

3.1.4 Delayed delivery project materials i.e. DSS pipe materials entails project to

be accelerated to regain the progress would cost extra money to the project in terms of acceleration.

3.2 Subcontract Works/ disciplines 3.2.1 Procure project materials thru CO mechanism for faster delivery to catch-up

the schedule. Procurement, Design and Construction to double-checked actual materials and to cater potential site routing/re-routing, clashing or site obstruction.

3.2.2 Repetitive/Modification

To officially highlights Client of any hindrance at site fabrication with regard to final location etc. so as to minimize the repetitive works. PDMS review to be conducted regularly.

3.2.3 VO to the contractor for additional work of punch list clearance of vendor

package i.e. Pedestal Crane, Vessel/ Procurement Dept. to ensure recovery prior VO to be executed.

29 of 31

Page 34: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items Close-Out Report

Sarawak Shell Bhd.

4.0 Project Cash flow Status and lesson learnt

4.1 Payment Certificate accorded with massive materials documentation i.e. GRIN, MAC, and PO.

Material Control Coordinator to promptly extend a copy of duly approved material documentation i.e. GRIN, MAC to Quantity Surveyor to ensure expeditious preparation of Payment Certificate.

5.0 Inter-departmental Assessment

Assessment

No Item Excellent Good Fair Poor

1 Procurement

Remarks/ Improvement Opportunity:

1. VDP: Price imposed by vendor is expensive/to further negotiate.

2. Package equipment delivered with punch list: Procurement to ensure the cost recovery of punch list cleared by subcontractor / to monitor closely to ensure the completion of equipment package prior to the delivery.

3. Delayed of materials delivery i.e. DSS entails the project progress delayed.

2 Design & Engineering

Remarks/ Improvement Opportunity:

Plenty of material purchase at last minutes to cater for shortage of materials due to miss-out, site routing, clashing and modifications. / MTO provided by Design to be doubled check by Construction to ensure sufficiency prior to issue PR.

3 Construction

Remarks/ Improvement Opportunity:

1) To check detail drawing provided by design against the site condition for which items to be installed/erected just to minimize the potential clashing prior to fabrication and installation.

2) To double checked MTO provided by design prior to issue PR as to ensure that the materials be secured sufficiently. Material ordered on urgent basis entails materials be obtained ex-stock and expensive.

3) .To officially highlights Client of any hindrance at site fabrication with regard to final location etc. to minimize the repetitive works on regular basis

4) Site Instruction (SI) issued to sub-contractor to be substantiated with technical justification i.e. mark-up drawing, STQ, e-mail etc. to ensure the change control and monitoring being facilitated.

30 of 31

Page 35: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items Close-Out Report

Sarawak Shell Bhd.

6.0 Lessons Learnt

6.1 To regularly conduct PDMS review against AFC document issued by Client to at least

minimize site clashing/obstruction 6.2 To double-checked MTO provided by design prior to issue PR as to ensure that the

materials be secured sufficiently. Material ordered on urgent basis entails materials be obtained ex-stock and expensive

6.3 To check detail drawing provided by design against the site condition for which items

to be installed/erected just to minimize the potential clashing prior to fabrication and installation.

6.4 To officially highlights Client of any hindrance at site fabrication with regard to final

location etc. to minimize the repetitive works on regular basis 6.5 Site Instruction (SI) issued to sub-contractor to be substantiated with technical

justification i.e. drawing, STQ, e-mail etc. to ensure the change control and monitoring being facilitated.

6.6 Material Control Coordinator to promptly extend a copy of duly approved material

documentation i.e. GRIN, MAC to Quantity Surveyor to ensure expeditious preparation of Payment Certificate.

FABRICATION ERECTION SEQUENCE See Appendix 9 – Erection Sequence PROGRESS PHOTOGRAPHS See Appendix 10 - Progress Photographs

31 of 31

Page 36: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items

Close-Out Report

Sarawak Shell Bhd.

APPENDIX 1 - SCHEDULE BARCHART

Page 37: Full Version of SCDR-A Close-Out Report(Dated051107)

Activity ID Activity Name RemDur

%Comp

BL Early Start BL EarlyFinish

Actual Start Actual Finish TotalFloat

Fabrication of SCDFabrication of SCDR-A Topsides & Existing E11K-A Platform 0 19-Jul-06 05-Sep-07 19-Jul-06 A 05-Oct-07 A 0

PROJECT MILESTPROJECT MILESTONE 0 19-Jul-06 05-Sep-07 19-Jul-06 A 05-Oct-07 A 0

MIL1000 Contract Award 0 100% 19-Jul-06 19-Jul-06 AMIL1010 Client to Issue AFC Dwgs & MTO 0 100% 04-Aug-06 04-Aug-06 AMIL1020 Start of Fabrication Works (1st Cut of Steel) 0 100% 12-Oct-06 12-Oct-06 AMIL1060 Latest Box-Up 0 0% 27-Apr-07 04-May-07 AMIL1030 MCD for Topsides 0 0% 28-Aug-07 03-Sep-07 AMIL1040 SCDR-A Topsides Ready for Sailaway 0 0% 05-Sep-07 27-Sep-07 AMIL1070 MCD for Shiploose Items 0 0% 07-Aug-07 01-Oct-07 AMIL1050 E11K-A Ready for Sailaway (Shiploose Items) 0 0% 11-Aug-07 05-Oct-07 A

PRELIMINARIESPRELIMINARIES 0 19-Jul-06 23-Aug-07 19-Jul-06 A 05-Oct-07 A 0

Construction FacilitieConstruction Facilities 0 19-Jul-06 05-Jul-07 19-Jul-06 A 11-Jul-07 A 0PRE1130 Set-up Contractor's Facilities 0 100% 19-Jul-06 06-Dec-06 19-Jul-06 A 20-Dec-06 APRE1180 Set-up SSB's site Office and Facilities 0 100% 19-Jul-06 18-Dec-06 19-Jul-06 A 29-Dec-06 APRE1210 Set-up EDMS system, including lease line. 0 100% 07-Oct-06 12-Jan-07 07-Oct-06 A 19-Jan-07 APRE1220 Set-up Completion Management System 0 100% 07-Oct-06 09-Mar-07 07-Oct-06 A 02-Mar-07 APRE1430 Set-up Video conferencing Facilities 0 100% 07-Oct-06 06-Nov-06 01-Nov-06 A 24-Nov-06 APRE1440 Welder Qualification Test 0 100% 12-Oct-06 28-Dec-06 08-Nov-06 A 26-Jan-07 APRE1170 Facilities for 3rd Parties 0 100% 07-Feb-07 05-Jul-07 12-Feb-07 A 11-Jul-07 A

Project ManagementProject Management 0 01-Aug-06 15-May-07 01-Aug-06 A 18-May-07 A 0PRE1450 Mobilise Project Management Team, Supervision and Staff 0 100% 01-Aug-06 20-Dec-06 01-Aug-06 A 16-Mar-07 APRE1690 Mobilise Pre-Commissioning Team 0 100% 07-Apr-07 15-May-07 07-Apr-07 A 18-May-07 A

Procedures PreparatProcedures Preparation 0 01-Aug-06 06-Jul-07 01-Aug-06 A 06-Jul-07 A 0PRE1480 Prepare/Submit/Approve Planning Package 0 100% 01-Aug-06 31-Oct-06 01-Aug-06 A 18-Oct-06 APRE1490 Prepare/Submit/Approve HSE Procedures 0 100% 01-Aug-06 06-Nov-06 01-Aug-06 A 01-Nov-06 APRE1500 Prepare/Submit/Approve QA/QC Procedures 0 100% 01-Aug-06 06-Nov-06 01-Aug-06 A 04-Dec-06 APRE1510 Prepare/Submit/Approve Engineering Procedures 0 100% 01-Aug-06 02-Jan-07 01-Aug-06 A 06-Jul-07 APRE1670 Prepare/Submit/Approve Fabrication Procedures 0 100% 01-Aug-06 25-Jan-07 01-Aug-06 A 30-Mar-07 APRE1680 Prepare/Submit/Approve Precomm Procedures 0 100% 24-Apr-07 06-Jul-07 14-Nov-06 A 19-Feb-07 APRE1520 Prepare/Submit/Approve Weighing Procedures 0 100% 25-Jan-07 05-Apr-07 29-Jan-07 A 06-Jul-07 A

Insurance & BondInsurance & Bond 0 21-Sep-06 21-Feb-07 21-Sep-06 A 29-Jun-07 A 0PRE1530 Submit/Accept Performance Bond 0 100% 21-Sep-06 18-Nov-06 21-Sep-06 A 16-Oct-06 APRE1540 Submit/Accept Insurances 0 100% 21-Sep-06 16-Oct-06 21-Sep-06 A 20-Feb-07 APRE1550 Submit/Accept CIDB Tax 0 100% 21-Sep-06 21-Feb-07 11-Jun-07 A 29-Jun-07 A

Final DocumentationsFinal Documentations 0 07-May-07 23-Aug-07 07-May-07 A 05-Oct-07 A 0PRE1560 Prepare & Submit Final Documentation (Manual/Closeout R... 0 100% 07-May-07 23-Aug-07 07-May-07 A 05-Oct-07 A

Sub-Contractors SeleSub-Contractors Selection 0 01-Aug-06 10-Aug-07 01-Aug-06 A 29-Jun-07 A 0PRE1260 Prepare Tender/Evaluate for STRUCTURAL Subcontractor 0 100% 01-Aug-06 11-Oct-06 01-Aug-06 A 01-Nov-06 APRE1270 Prepare Tender/Evaluate for BLASTING & PAINTING Subcontr... 0 100% 26-Sep-06 05-Dec-06 02-Oct-06 A 21-Feb-07 APRE1280 Prepare Tender/Evaluate for PIPING Subcontractor 0 100% 06-Oct-06 05-Jan-07 06-Oct-06 A 06-Feb-07 APRE1330 Prepare Tender/Evaluate for HVAC Subcontractor 0 100% 06-Oct-06 15-Nov-06 11-Oct-06 A 15-Dec-06 APRE1290 Prepare Tender/Evaluate for MECHANICAL Subcontractor 0 100% 23-Oct-06 13-Jan-07 30-Oct-06 A 06-Feb-07 APRE1300 Prepare Tender/Evaluate for ELECTRICAL Subcontractor 0 100% 17-Nov-06 20-Feb-07 27-Nov-06 A 24-Feb-07 APRE1310 Prepare Tender/Evaluate for INSTRUMENT Subcontractor 0 100% 17-Nov-06 20-Feb-07 27-Nov-06 A 24-Feb-07 APRE1320 Prepare Tender/Evaluate for ARCHITECTURAL Subcontractor 0 100% 02-Jan-07 16-Mar-07 06-Jan-07 A 26-Feb-07 A

Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct ov2007

Contract No : 591397Client : Sarawak Shell Berhad

Page 1 of 12

Primary BaselineActual WorkRemaining WorkCritical Remaining WorkMilestone

Job No : #2006351C / Planning Ref : PN5103-0A    

SCHEDULE OF SCDR-A TOPSIDES AND E11K-A SHIPLOOSE ITEMS

Closeout Report

Date Revision Checked Approved04-Sep-06 Rev. A0 - For Reviewed and Approval18-Oct-06 Rev. 0 - For Approval

Page 38: Full Version of SCDR-A Close-Out Report(Dated051107)

Activity ID Activity Name RemDur

%Comp

BL Early Start BL EarlyFinish

Actual Start Actual Finish TotalFloat

PRE1405 Prepare Tender/Evaluate for GRE PIPING Subcontractor 0 100% 27-Jan-07 17-Mar-07 22-Jan-07 A 07-Feb-07 APRE1505 Prepare Tender/Evaluate for WEIGHING Subcontractor 0 100% 27-Apr-07 25-Jun-07 07-May-07 A 25-Jun-07 APRE1605 Prepare Tender/Evaluate for LOAD-OUT Subcontractor 0 100% 18-Jun-07 10-Aug-07 04-Jun-07 A 29-Jun-07 A

Award Sub-ContractoAward Sub-Contractor & Mobilization 0 11-Oct-06 18-Aug-07 03-Nov-06 A 10-Sep-07 A 0PRE1265 Award & Mobilization of STRUCTURAL Subcontractor 0 100% 11-Oct-06 19-Oct-06 03-Nov-06 A 09-Nov-06 APRE1335 Award & Mobilization of HVAC Subcontractor 0 100% 15-Nov-06 23-Nov-06 15-Dec-06 A 22-Dec-06 APRE1285 Award & Mobilization of PIPING Subcontractor 0 100% 05-Jan-07 13-Jan-07 07-Feb-07 A 12-Feb-07 APRE1295 Award & Mobilization of MECHANICAL Subcontractor 0 100% 13-Jan-07 22-Jan-07 07-Feb-07 A 13-Feb-07 APRE1355 Award & Mobilization of GRE PIPING Subcontractor 0 100% 17-Mar-07 26-Mar-07 08-Feb-07 A 14-Feb-07 APRE1275 Award & Mobilization of BLASTING & PAINTING Subcontractor 0 100% 05-Dec-06 13-Dec-06 22-Feb-07 A 02-Mar-07 APRE1305 Award & Mobilization of ELECTRICAL Subcontractor 0 100% 20-Feb-07 28-Feb-07 26-Feb-07 A 02-Mar-07 APRE1315 Award & Mobilization of INSTRUMENT Subcontractor 0 100% 20-Feb-07 28-Feb-07 26-Feb-07 A 02-Mar-07 APRE1325 Award & Mobilization of ARCHITECTURAL Subcontractor 0 100% 16-Mar-07 24-Mar-07 27-Feb-07 A 08-Mar-07 APRE1365 Award & Mobilization of WEIGHING Subcontractor 0 100% 25-Jun-07 02-Jul-07 25-Jun-07 A 05-Jul-07 APRE1375 Award & Mobilization of LOAD-OUT Subcontractor 0 100% 10-Aug-07 18-Aug-07 29-Jun-07 A 10-Sep-07 A

ENGINEERINGENGINEERING 0 04-Aug-06 06-Aug-07 04-Aug-06 A 05-Oct-07 A 0

Review MaterialsReview Materials 0 04-Aug-06 02-Jan-07 04-Aug-06 A 02-Mar-07 A 0PRE1340 Prepare/Submit/Approve of STRUCTURAL MTO 0 100% 04-Aug-06 08-Nov-06 04-Aug-06 A 27-Nov-06 APRE1341 Prepare/Submit/Approve of PIPING MTO 0 100% 04-Aug-06 02-Dec-06 04-Aug-06 A 13-Dec-06 APRE1342 Prepare/Submit/Approve of MECHANICAL MTO 0 100% 04-Aug-06 27-Oct-06 04-Aug-06 A 28-Nov-06 APRE1343 Prepare/Submit/Approve of ELECTRICAL MTO 0 100% 04-Aug-06 27-Nov-06 04-Aug-06 A 29-Nov-06 APRE1344 Prepare/Submit/Approve of INSTRUMENT MTO 0 100% 04-Aug-06 27-Nov-06 04-Aug-06 A 29-Nov-06 APRE1345 Prepare/Submit/Approve of ARCHITECTURAL MTO 0 100% 18-Oct-06 18-Dec-06 18-Oct-06 A 22-Dec-06 APRE1346 Prepare/Submit/Approve of HVAC MTO 0 100% 23-Nov-06 02-Jan-07 15-Dec-06 A 02-Mar-07 A

Construction DrawinConstruction Drawings 0 04-Aug-06 06-Aug-07 04-Aug-06 A 05-Oct-07 A 0PRE1350 Prepare/Submit/Approve STRUCTURAL Shop Drawings 0 100% 04-Aug-06 23-Feb-07 04-Aug-06 A 02-Mar-07 APRE1360 Prepare/Submit/Approve PIPING Shop Drawings 0 100% 04-Aug-06 13-Mar-07 04-Aug-06 A 09-Mar-07 APRE1370 Prepare/Submit/Approve MECHANICAL Shop Drawings 0 100% 02-Oct-06 02-Mar-07 02-Oct-06 A 07-Mar-07 APRE1380 Prepare/Submit/Approve ELECTRICAL Shop Drawings 0 100% 18-Oct-06 02-Apr-07 18-Oct-06 A 11-May-07 APRE1390 Prepare/Submit/Approve INSTRUMENT Shop Drawings 0 100% 18-Oct-06 07-Apr-07 18-Oct-06 A 27-Apr-07 APRE1410 Prepare/Submit/Approve HVAC Shop Drawings 0 100% 13-Dec-06 17-Mar-07 18-Dec-06 A 30-Mar-07 APRE1400 Prepare/Submit/Approve ARCHITECTURAL Shop Drawings 0 100% 30-Dec-06 23-Apr-07 22-Dec-06 A 20-Apr-07 APRE1420 Prepare/Submit/Approve AS-BUILT Drawings 0 100% 29-Mar-07 06-Aug-07 02-Apr-07 A 05-Oct-07 APRE1720 Prepare/Submit/Approve SEAFASTENING Drawings 0 100% 01-Mar-07 28-May-07 06-Aug-07 A 27-Aug-07 A

PROCUREMENTPROCUREMENT 0 07-Aug-06 23-Aug-07 07-Aug-06 A 05-Oct-07 A 0

Client Supply MaterilsClient Supply Materils 0 17-Aug-06 23-Aug-07 13-Sep-06 A 10-Sep-07 A 0PRO1000 Rec'v/Accept Structural Steel : Type I and II Plates 0 100% 17-Aug-06 05-Sep-06 13-Sep-06 A 30-Sep-06 APRO1010 Rec'v/Accept Structural Steel : Type I and II Beams 0 100% 17-Aug-06 05-Sep-06 13-Sep-06 A 30-Sep-06 APRO1020 Rec'v/Accept Structural Steel : Type I and II Round Tubulars 0 100% 17-Aug-06 05-Sep-06 13-Sep-06 A 30-Sep-06 APRO1110 Rec'v/Accept Wet Gas Metering Skid (Operational Metering) 0 100% 01-Jun-07 19-Jun-07 29-Nov-06 A 15-Dec-06 APRO1090 Rec'v/Accept Telecommunication Equipment 0 100% 18-Apr-07 05-May-07 13-Dec-06 A 27-Dec-06 APRO1120 Rec'v/Accept 14" CS Pipeline (pipeline spools, bends, major ... 0 100% 30-Jun-07 17-Jul-07 23-Dec-06 A 08-Jan-07 APRO1070 Rec'v/Accept AC Uninterruptible Power Supply (UPS) 0 100% 09-Apr-07 25-Apr-07 30-Dec-06 A 15-Jan-07 APRO1140 Rec'v/Accept Fittings & Accessories for Subsea Cable Cone... 0 100% 03-Jul-07 20-Jul-07 27-Jan-07 A 16-Feb-07 APRO1030 Rec'v/Accept All Ball Valves : Manual & Actuated Valves 2" (... 0 100% 02-Apr-07 19-Apr-07 16-Feb-07 A 15-May-07 APRO1100 Rec'v/Accept Wellhead Desander Skids 0 100% 18-May-07 05-Jun-07 03-Mar-07 A 16-Mar-07 APRO1060 Rec'v/Accept IPS, FGS and Wellhead Control System (WHCS) 0 100% 04-Apr-07 21-Apr-07 06-Mar-07 A 18-May-07 APRO1040 Rec'v/Accept Motor Operated Valves 0 100% 02-Apr-07 19-Apr-07 30-Mar-07 A 13-Apr-07 APRO1050 Rec'v/Accept Distributed Control System (DCS) & Audio Visu... 0 100% 04-Apr-07 21-Apr-07 31-Mar-07 A 06-Apr-07 APRO1080 Rec'v/Accept 400V Switchboard 0 100% 09-Apr-07 25-Apr-07 14-May-07 A 18-May-07 APRO1130 Rec'v/Accept Seafastening Mat'l, Lifting Slings and Shackles 0 100% 07-Aug-07 23-Aug-07 07-Aug-07 A 10-Sep-07 A

MMHE Supply MateriMMHE Supply Materials 0 07-Aug-06 08-Aug-07 07-Aug-06 A 05-Oct-07 A 0

Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct ov2007

Contract No : 591397Client : Sarawak Shell Berhad

Page 2 of 12

Page 39: Full Version of SCDR-A Close-Out Report(Dated051107)

Activity ID Activity Name RemDur

%Comp

BL Early Start BL EarlyFinish

Actual Start Actual Finish TotalFloat

Purchase Request toPurchase Request to Purchase Order 0 07-Aug-06 08-Feb-07 07-Aug-06 A 25-May-07 A 0StructuralStructural 0 11-Sep-06 19-Dec-06 11-Sep-06 A 20-Apr-07 A 0

PRO1600 PR/PO of Structural Tubulars 0 100% 11-Sep-06 30-Oct-06 11-Sep-06 A 08-Nov-06 APRO1610 PR/PO of Structural Beams 0 100% 15-Sep-06 06-Nov-06 15-Sep-06 A 21-Nov-06 APRO1620 PR/PO of Structural Plates 0 100% 22-Sep-06 15-Nov-06 02-Oct-06 A 08-Jan-07 APRO1640 PR/PO of Miscellaneous Sections (angles, chanels, SHS etc.) 0 100% 29-Sep-06 24-Nov-06 04-Oct-06 A 29-Dec-06 APRO1630 PR/PO of Ancillary Steel (grating, stair tread, etc.) 0 100% 07-Oct-06 30-Nov-06 07-Oct-06 A 12-Jan-07 APRO1650 PR/PO of Fire/Blast Walls 0 100% 16-Oct-06 11-Dec-06 16-Oct-06 A 09-Mar-07 APRO1670 PR/PO of All Remaining Structural Mat'l 0 100% 23-Oct-06 19-Dec-06 30-Oct-06 A 02-Mar-07 APRO1660 PR/PO of Passive Fire Projection (PFP) 0 100% 19-Oct-06 16-Dec-06 13-Nov-06 A 20-Apr-07 A

PipingPiping 0 07-Sep-06 27-Dec-06 07-Sep-06 A 02-Mar-07 A 0PRO1690 PR/PO of Carbon Steel (CS) Pipes & Fitting 0 100% 07-Sep-06 04-Nov-06 07-Sep-06 A 23-Oct-06 APRO1700 PR/PO of Stainless Steel (SS) Pipes & Fitting 0 100% 11-Sep-06 11-Nov-06 11-Sep-06 A 27-Dec-06 APRO1710 PR/PO of Duplex Stainless Steel (DSS) Pipes & Fitting 0 100% 13-Sep-06 22-Nov-06 13-Sep-06 A 19-Dec-06 APRO1730 PR/PO of Valves 0 100% 16-Sep-06 05-Dec-06 16-Sep-06 A 02-Feb-07 APRO1720 PR/PO of GRE Pipes & Fitting 0 100% 22-Sep-06 11-Nov-06 22-Sep-06 A 28-Nov-06 APRO1750 PR/PO of Pipe Bends & Barred Tees 0 100% 03-Oct-06 28-Nov-06 02-Oct-06 A 08-Dec-06 APRO1740 PR/PO of Piping Specialty Items 0 100% 03-Oct-06 23-Nov-06 03-Oct-06 A 05-Dec-06 APRO1760 PR/PO of Associated Fittings & Acc. for Launcher 0 100% 18-Oct-06 18-Dec-06 10-Oct-06 A 09-Feb-07 APRO1770 PR/PO of All Remaining Piping Mat'l 0 100% 27-Oct-06 27-Dec-06 13-Nov-06 A 02-Mar-07 A

MechanicalMechanical 0 07-Aug-06 16-Nov-06 07-Aug-06 A 31-Jan-07 A 0PRO1910 PR/PO of Padestal Crane 0 100% 07-Aug-06 02-Oct-06 07-Aug-06 A 16-Oct-06 APRO1780 PR/PO of Flush Water Tank 0 100% 12-Aug-06 30-Oct-06 12-Aug-06 A 08-Nov-06 APRO1790 PR/PO of Fresh Water Tank 0 100% 12-Aug-06 30-Oct-06 12-Aug-06 A 08-Nov-06 APRO1800 PR/PO of Closed Drain Vessel 0 100% 15-Aug-06 13-Oct-06 15-Aug-06 A 21-Nov-06 APRO1810 PR/PO of Condensate Pod 0 100% 15-Aug-06 11-Oct-06 15-Aug-06 A 21-Nov-06 APRO1880 PR/PO of HP Vent Tip 0 100% 17-Aug-06 03-Nov-06 17-Aug-06 A 23-Jan-07 APRO1890 PR/PO of CO2 Vent Snuffing System 0 100% 17-Aug-06 03-Nov-06 17-Aug-06 A 23-Jan-07 APRO1930 PR/PO of Corrosion Inhibitor Injection Package 0 100% 18-Aug-06 17-Oct-06 18-Aug-06 A 18-Oct-06 APRO1900 PR/PO of Manual Operated Trolley Hoists 0 100% 21-Aug-06 07-Oct-06 21-Aug-06 A 06-Nov-06 APRO1920 PR/PO of Swing Jib Cranes with Manual Operated Hoist 0 100% 21-Aug-06 17-Oct-06 21-Aug-06 A 18-Oct-06 APRO1840 PR/PO of Flush Water Pump 0 100% 22-Aug-06 20-Oct-06 22-Aug-06 A 31-Oct-06 APRO1850 PR/PO of Fresh Water Pump 0 100% 22-Aug-06 20-Oct-06 22-Aug-06 A 31-Oct-06 APRO1830 PR/PO of Open Drain Caisson Pump 0 100% 23-Aug-06 19-Oct-06 23-Aug-06 A 30-Oct-06 APRO1860 PR/PO of Closed Drain Transfer Pump 0 100% 23-Aug-06 19-Oct-06 23-Aug-06 A 30-Oct-06 APRO1820 PR/PO of Diesel Transfer Pump 0 100% 24-Aug-06 28-Oct-06 24-Aug-06 A 01-Nov-06 APRO1870 PR/PO of All Remaining Pumps 0 100% 26-Aug-06 06-Nov-06 26-Aug-06 A 05-Dec-06 APRO1940 PR/PO of All Remaining Mechanical Items 0 100% 29-Aug-06 16-Nov-06 29-Aug-06 A 31-Jan-07 A

ElectricalElectrical 0 12-Aug-06 09-Jan-07 12-Aug-06 A 24-Apr-07 A 0PRO1960 PR/PO of Power Transformer 0 100% 12-Aug-06 30-Oct-06 12-Aug-06 A 06-Nov-06 APRO1970 PR/PO of 6.6KV Ring Main Unit 0 100% 18-Aug-06 14-Nov-06 18-Aug-06 A 27-Dec-06 APRO1980 PR/PO of LV Distribution Board 0 100% 18-Aug-06 14-Nov-06 18-Aug-06 A 05-Dec-06 APRO2010 PR/PO of Electrical / Control Cables, Fitting & MCT's 0 100% 29-Aug-06 08-Nov-06 29-Aug-06 A 06-Mar-07 APRO2000 PR/PO of Cable Trays, Ladder & Accessories 0 100% 11-Sep-06 14-Nov-06 11-Sep-06 A 06-Dec-06 APRO2020 PR/PO of Junction Boxes and Control Panels 0 100% 22-Sep-06 15-Dec-06 22-Sep-06 A 09-Feb-07 APRO2040 PR/PO of Light Fitting, Photocells Mounting and Accessories 0 100% 29-Sep-06 21-Dec-06 29-Sep-06 A 08-Mar-07 APRO2030 PR/PO of Remote Control Units and Safety Switches 0 100% 14-Oct-06 30-Dec-06 14-Oct-06 A 24-Apr-07 APRO1990 PR/PO of Powered Navigational Aids System 0 100% 18-Oct-06 29-Dec-06 18-Oct-06 A 08-Dec-06 APRO2050 PR/PO of Earthing Accessories 0 100% 02-Nov-06 15-Dec-06 19-Oct-06 A 09-Mar-07 APRO2060 PR/PO of All Other Electrical Items 0 100% 10-Nov-06 09-Jan-07 22-Nov-06 A 09-Mar-07 A

InstrumentInstrument 0 21-Aug-06 19-Dec-06 21-Aug-06 A 20-Apr-07 A 0PRO2260 PR/PO of Control, Ball and Operated Valves 0 100% 21-Aug-06 07-Nov-06 21-Aug-06 A 04-Jan-07 APRO2270 PR/PO of Ultra Sonic Flare Gas Meter 0 100% 23-Aug-06 02-Nov-06 23-Aug-06 A 07-Feb-07 A

Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct ov2007

Contract No : 591397Client : Sarawak Shell Berhad

Page 3 of 12

Page 40: Full Version of SCDR-A Close-Out Report(Dated051107)

Activity ID Activity Name RemDur

%Comp

BL Early Start BL EarlyFinish

Actual Start Actual Finish TotalFloat

PRO2070 PR/PO of Wellhead Control Panel 0 100% 24-Aug-06 11-Nov-06 24-Aug-06 A 06-Feb-07 APRO2120 PR/PO of Ultrasonic Flowmeters 0 100% 26-Aug-06 28-Oct-06 26-Aug-06 A 01-Dec-06 APRO2160 PR/PO of Choke Valves 0 100% 29-Aug-06 08-Nov-06 29-Aug-06 A 21-Nov-06 APRO2090 PR/PO of GPA/PAPA 0 100% 07-Sep-06 11-Nov-06 07-Sep-06 A 03-Jan-07 APRO2080 PR/PO of Sand Monitoring System 0 100% 13-Sep-06 17-Nov-06 13-Sep-06 A 27-Dec-06 APRO2150 PR/PO of Pressure Gauges 0 100% 20-Sep-06 14-Nov-06 20-Sep-06 A 10-Apr-07 APRO2170 PR/PO of Pig Signallers 0 100% 28-Oct-06 04-Dec-06 11-Oct-06 A 20-Apr-07 APRO2130 PR/PO of Level Gauges (Reflex Type) 0 100% 14-Oct-06 29-Nov-06 14-Oct-06 A 04-Apr-07 APRO2140 PR/PO of Level Gauges (Using Pressure Gauge) 0 100% 14-Oct-06 29-Nov-06 14-Oct-06 A 04-Apr-07 APRO2100 PR/PO of Restriction Orifice Plates 0 100% 31-Oct-06 12-Dec-06 16-Oct-06 A 06-Apr-07 APRO2110 PR/PO of Orifice Plates 0 100% 31-Oct-06 12-Dec-06 16-Oct-06 A 09-Feb-07 APRO2180 PR/PO of IR Flame Detector 0 100% 02-Nov-06 12-Dec-06 16-Oct-06 A 10-Jan-07 APRO2190 PR/PO of IR Point Gas Detector 0 100% 02-Nov-06 08-Dec-06 16-Oct-06 A 09-Feb-07 APRO2200 PR/PO of IR Open Path Gas Detector 0 100% 02-Nov-06 08-Dec-06 16-Oct-06 A 19-Jan-07 APRO2210 PR/PO of Smoke Detector 0 100% 02-Nov-06 08-Dec-06 16-Oct-06 A 22-Dec-06 APRO2220 PR/PO of Hydrogen Gas Detector 0 100% 02-Nov-06 08-Dec-06 16-Oct-06 A 22-Dec-06 APRO2240 PR/PO of Acoustic Leak Detector 0 100% 02-Nov-06 11-Dec-06 16-Oct-06 A 22-Dec-06 APRO2250 PR/PO of Heat Detector 0 100% 02-Nov-06 08-Dec-06 16-Oct-06 A 22-Dec-06 APRO2230 PR/PO of ESD Break Glass Station 0 100% 08-Nov-06 11-Dec-06 18-Oct-06 A 22-Dec-06 APRO2300 PR/PO of Instrument Cable, Junction Boxes & MCT's 0 100% 19-Sep-06 14-Nov-06 30-Oct-06 A 20-Apr-07 APRO2280 PR/PO of Field Instrument & Mounting Stands & Supports etc. 0 100% 16-Sep-06 08-Nov-06 13-Nov-06 A 02-Mar-07 APRO2290 PR/PO of Cable Tray & Ladders 0 100% 22-Sep-06 18-Nov-06 13-Nov-06 A 15-Jan-07 APRO2310 PR/PO of Instrument Tubing, Fittings & Valves 0 100% 28-Sep-06 22-Nov-06 13-Nov-06 A 12-Feb-07 APRO2320 PR/PO of All Remaining Instrumentation Items 0 100% 10-Nov-06 19-Dec-06 22-Nov-06 A 16-Mar-07 A

ArchitecturalArchitectural 0 24-Nov-06 06-Jan-07 03-Oct-06 A 23-Jan-07 A 0PRO1680 PR/PO of Architectural Mat'l (floor/wall/ceiling panels, doors ... 0 100% 24-Nov-06 06-Jan-07 03-Oct-06 A 23-Jan-07 A

HVACHVAC 0 11-Dec-06 15-Jan-07 20-Dec-06 A 26-Feb-07 A 0PRO1950 PR/PO of HVAC System Package 0 100% 11-Dec-06 15-Jan-07 20-Dec-06 A 26-Feb-07 A

SafetySafety 0 29-Nov-06 29-Jan-07 10-Oct-06 A 11-May-07 A 0PRO2340 PR/PO of Safety Signs 0 100% 29-Nov-06 04-Jan-07 10-Oct-06 A 11-May-07 APRO2330 PR/PO of Safety Equipment and Fire Protection Equipment 0 100% 02-Dec-06 29-Jan-07 12-Oct-06 A 02-Feb-07 A

Others MaterialsOthers Materials 0 02-Dec-06 08-Feb-07 25-Dec-06 A 25-May-07 A 0PRO2350 PR/PO of Any Other Materials not included above 0 100% 02-Dec-06 08-Feb-07 25-Dec-06 A 25-May-07 A

Purchase Order to DPurchase Order to Delivery 0 03-Oct-06 23-Jul-07 17-Oct-06 A 05-Oct-07 A 0StructuralStructural 0 30-Oct-06 04-Apr-07 09-Nov-06 A 10-May-07 A 0

PRO2360 PO to Del of Structural Tubulars 0 100% 30-Oct-06 29-Nov-06 09-Nov-06 A 01-Dec-06 APRO2370 PO to Del of Structural Beams 0 100% 07-Nov-06 12-Dec-06 22-Nov-06 A 16-Jan-07 APRO2400 PO to Del of Miscellaneous Sections (angles, chanels, SHS etc.) 0 100% 24-Nov-06 10-Jan-07 18-Dec-06 A 12-Jan-07 APRO2390 PO to Del of Ancillary Steel (grating, stair tread, etc.) 0 100% 30-Nov-06 27-Jan-07 20-Dec-06 A 26-Jan-07 APRO2380 PO to Del of Structural Plates 0 100% 15-Nov-06 30-Dec-06 02-Jan-07 A 02-Feb-07 APRO2410 PO to Del of Fire/Blast Walls 0 100% 11-Dec-06 13-Mar-07 07-Feb-07 A 10-May-07 APRO2420 PO to Del of Passive Fire Projection (PFP) 0 100% 16-Dec-06 04-Apr-07 21-Feb-07 A 28-Apr-07 APRO2430 PO to Del of All Remaining Structural Mat'l 0 100% 19-Dec-06 14-Feb-07 02-Mar-07 A 22-Mar-07 A

PipingPiping 0 06-Nov-06 30-May-07 24-Oct-06 A 10-Sep-07 A 0PRO2450 PO to Del of Carbon Steel (CS) Pipes & Fitting 0 100% 06-Nov-06 15-Jan-07 24-Oct-06 A 04-Jan-07 APRO2480 PO to Del of GRE Pipes & Fitting 0 100% 11-Nov-06 28-Feb-07 29-Nov-06 A 03-Apr-07 APRO2500 PO to Del of Piping Specialty Items 0 100% 11-Dec-06 23-Mar-07 06-Dec-06 A 02-Apr-07 APRO2510 PO to Del of Pipe Bends & Barred Tees 0 100% 19-Dec-06 30-May-07 09-Dec-06 A 25-Apr-07 APRO2470 PO to Del of Duplex Stainless Steel (DSS) Pipes & Fitting 0 100% 22-Nov-06 26-May-07 20-Dec-06 A 10-Sep-07 APRO2460 PO to Del of Stainless Steel (SS) Pipes & Fitting 0 100% 11-Nov-06 13-Feb-07 28-Dec-06 A 06-Feb-07 APRO2490 PO to Del of Valves 0 100% 18-Dec-06 04-May-07 02-Feb-07 A 27-Apr-07 APRO2520 PO to Del of Associated Fittings & Acc. for Launcher 0 100% 05-Jan-07 27-Apr-07 10-Feb-07 A 04-May-07 APRO2530 PO to Del of All Remaining Piping Mat'l 0 100% 27-Dec-06 12-Apr-07 02-Mar-07 A 06-Jul-07 A

Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct ov2007

Contract No : 591397Client : Sarawak Shell Berhad

Page 4 of 12

Page 41: Full Version of SCDR-A Close-Out Report(Dated051107)

Activity ID Activity Name RemDur

%Comp

BL Early Start BL EarlyFinish

Actual Start Actual Finish TotalFloat

MechanicalMechanical 0 03-Oct-06 23-Jul-07 17-Oct-06 A 06-Aug-07 A 0PRO2670 PO to Del of Padestal Crane 0 100% 03-Oct-06 12-Jul-07 17-Oct-06 A 07-Jul-07 APRO2680 PO to Del of Swing Jib Cranes with Manual Operated Hoist 0 100% 17-Oct-06 30-Apr-07 19-Oct-06 A 16-May-07 APRO2690 PO to Del of Corrosion Inhibitor Injection Package 0 100% 17-Oct-06 14-Jun-07 19-Oct-06 A 30-Apr-07 APRO2590 PO to Del of Open Drain Caisson Pump 0 100% 19-Oct-06 30-May-07 31-Oct-06 A 31-May-07 APRO2600 PO to Del of Flush Water Pump 0 100% 20-Oct-06 21-Jun-07 01-Nov-06 A 18-Jun-07 APRO2610 PO to Del of Fresh Water Pump 0 100% 20-Oct-06 21-Jun-07 01-Nov-06 A 18-Jun-07 APRO2620 PO to Del of Closed Drain Transfer Pump 0 100% 19-Oct-06 09-Jun-07 01-Nov-06 A 02-Apr-07 APRO2580 PO to Del of Diesel Transfer Pump 0 100% 28-Oct-06 26-Jun-07 02-Nov-06 A 18-Jun-07 APRO2660 PO to Del of Manual Operated Trolley Hoists 0 100% 07-Oct-06 22-May-07 07-Nov-06 A 05-May-07 APRO2540 PO to Del of Flush Water Tank 0 100% 30-Oct-06 17-May-07 09-Nov-06 A 21-Apr-07 APRO2550 PO to Del of Fresh Water Tank 0 100% 30-Oct-06 28-Apr-07 09-Nov-06 A 14-May-07 APRO2560 PO to Del of Closed Drain Vessel 0 100% 13-Oct-06 04-Jul-07 22-Nov-06 A 23-Apr-07 APRO2570 PO to Del of Condensate Pod 0 100% 11-Oct-06 04-Jun-07 22-Nov-06 A 22-Apr-07 APRO2630 PO to Del of All Remaining Pumps 0 100% 07-Nov-06 13-Jul-07 06-Dec-06 A 06-Jul-07 APRO2640 PO to Del of HP Vent Tip 0 100% 03-Nov-06 01-Jul-07 24-Jan-07 A 10-Jul-07 APRO2650 PO to Del of CO2 Vent Snuffing System 0 100% 03-Nov-06 01-Jul-07 24-Jan-07 A 10-Jul-07 APRO2700 PO to Del of All Remaining Mechanical Items 0 100% 16-Nov-06 23-Jul-07 02-Feb-07 A 06-Aug-07 A

ElectricalElectrical 0 30-Oct-06 10-Jul-07 07-Nov-06 A 06-Jul-07 A 0PRO2720 PO to Del of Power Transformer 0 100% 30-Oct-06 10-Jul-07 07-Nov-06 A 28-Apr-07 APRO2740 PO to Del of LV Distribution Board 0 100% 14-Nov-06 04-Apr-07 06-Dec-06 A 14-Apr-07 APRO2760 PO to Del of Cable Trays, Ladder & Accessories 0 100% 14-Nov-06 15-Feb-07 07-Dec-06 A 06-Feb-07 APRO2750 PO to Del of Powered Navigational Aids System 0 100% 29-Dec-06 18-May-07 09-Dec-06 A 14-Apr-07 APRO2730 PO to Del of 6.6KV Ring Main Unit 0 100% 14-Nov-06 14-Jun-07 28-Dec-06 A 11-Jun-07 APRO2780 PO to Del of Junction Boxes and Control Panels 0 100% 15-Dec-06 07-Apr-07 10-Feb-07 A 29-Jun-07 APRO2810 PO to Del of Earthing Accessories 0 100% 15-Dec-06 13-Mar-07 23-Feb-07 A 05-Mar-07 APRO2770 PO to Del of Electrical / Control Cables, Fitting & MCT's 0 100% 09-Nov-06 28-Mar-07 07-Mar-07 A 02-Apr-07 APRO2800 PO to Del of Light Fitting, Photocells Mounting and Accessories 0 100% 21-Dec-06 26-Mar-07 09-Mar-07 A 08-Jun-07 APRO2820 PO to Del of All Other Electrical Items 0 100% 10-Jan-07 22-May-07 09-Mar-07 A 06-Jul-07 APRO2790 PO to Del of Remote Control Units and Safety Switches 0 100% 30-Dec-06 25-Apr-07 24-Apr-07 A 14-May-07 A

InstrumentInstrument 0 28-Oct-06 29-Jun-07 22-Nov-06 A 05-Oct-07 A 0PRO2920 PO to Del of Choke Valves 0 100% 09-Nov-06 29-Jun-07 22-Nov-06 A 16-Jun-07 APRO2880 PO to Del of Ultrasonic Flowmeters 0 100% 28-Oct-06 27-Feb-07 01-Dec-06 A 28-Feb-07 APRO2970 PO to Del of Smoke Detector 0 100% 09-Dec-06 26-Apr-07 23-Dec-06 A 17-Mar-07 APRO2980 PO to Del of Hydrogen Gas Detector 0 100% 09-Dec-06 26-Apr-07 23-Dec-06 A 08-Feb-07 APRO2990 PO to Del of ESD Break Glass Station 0 100% 11-Dec-06 10-May-07 23-Dec-06 A 14-Apr-07 APRO3000 PO to Del of Acoustic Leak Detector 0 100% 11-Dec-06 27-Apr-07 23-Dec-06 A 27-Apr-07 APRO3010 PO to Del of Heat Detector 0 100% 09-Dec-06 26-Apr-07 23-Dec-06 A 17-Mar-07 APRO2840 PO to Del of Sand Monitoring System 0 100% 17-Nov-06 20-Apr-07 28-Dec-06 A 28-May-07 APRO2850 PO to Del of GPA/PAPA 0 100% 11-Nov-06 21-Mar-07 04-Jan-07 A 26-Mar-07 APRO3020 PO to Del of Control, Ball and Operated Valves 0 100% 08-Nov-06 04-May-07 05-Jan-07 A 15-Jun-07 APRO2940 PO to Del of IR Flame Detector 0 100% 12-Dec-06 28-Apr-07 11-Jan-07 A 05-May-07 APRO3050 PO to Del of Cable Tray & Ladders 0 100% 18-Nov-06 07-Feb-07 15-Jan-07 A 08-Feb-07 APRO2960 PO to Del of IR Open Path Gas Detector 0 100% 09-Dec-06 26-Apr-07 20-Jan-07 A 11-Jun-07 APRO2830 PO to Del of Wellhead Control Panel 0 100% 11-Nov-06 03-Apr-07 07-Feb-07 A 10-Jul-07 APRO3030 PO to Del of Ultra Sonic Flare Gas Meter 0 100% 02-Nov-06 26-Apr-07 08-Feb-07 A 18-Sep-07 APRO2870 PO to Del of Orifice Plates 0 100% 12-Dec-06 23-May-07 10-Feb-07 A 21-Apr-07 APRO2950 PO to Del of IR Point Gas Detector 0 100% 09-Dec-06 26-Apr-07 10-Feb-07 A 04-Jun-07 APRO3070 PO to Del of Instrument Tubing, Fittings & Valves 0 100% 22-Nov-06 20-Mar-07 13-Feb-07 A 01-Mar-07 APRO3060 PO to Del of Instrument Cable, Junction Boxes & MCT's 0 100% 14-Nov-06 16-Feb-07 17-Feb-07 A 06-Jul-07 APRO3040 PO to Del of Field Instrument & Mounting Stands & Supports ... 0 100% 09-Nov-06 26-Mar-07 02-Mar-07 A 02-Apr-07 APRO2910 PO to Del of Pressure Gauges 0 100% 14-Nov-06 06-Mar-07 28-May-07 A 04-Sep-07 APRO2860 PO to Del of Restriction Orifice Plates 0 100% 12-Dec-06 17-May-07 27-Jul-07 A 23-Aug-07 A

Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct ov2007

Contract No : 591397Client : Sarawak Shell Berhad

Page 5 of 12

Page 42: Full Version of SCDR-A Close-Out Report(Dated051107)

Activity ID Activity Name RemDur

%Comp

BL Early Start BL EarlyFinish

Actual Start Actual Finish TotalFloat

PRO2900 PO to Del of Level Gauges (Using Pressure Gauge) 0 100% 29-Nov-06 09-Apr-07 30-Jul-07 A 28-Aug-07 APRO2890 PO to Del of Level Gauges (Reflex Type) 0 100% 29-Nov-06 09-Apr-07 07-Aug-07 A 27-Aug-07 APRO3080 PO to Del of All Remaining Instrumentation Items 0 100% 19-Dec-06 13-Jun-07 11-Aug-07 A 24-Aug-07 APRO2930 PO to Del of Pig Signallers 0 100% 04-Dec-06 14-Mar-07 01-Oct-07 A 05-Oct-07 A

ArchitecturalArchitectural 0 08-Jan-07 12-Mar-07 26-Jan-07 A 12-Jul-07 A 0PRO2440 PO to Del of Architectural Mat'l (floor/wall/ceiling panels, do... 0 100% 08-Jan-07 12-Mar-07 26-Jan-07 A 12-Jul-07 A

HVACHVAC 0 15-Jan-07 12-Mar-07 26-Feb-07 A 30-Mar-07 A 0PRO2710 PO to Del of HVAC System Package 0 100% 15-Jan-07 12-Mar-07 26-Feb-07 A 30-Mar-07 A

SafetySafety 0 04-Jan-07 09-Jul-07 02-Feb-07 A 10-Aug-07 A 0PRO3090 PO to Del of Safety Equipment and Fire Protection Equipment 0 100% 29-Jan-07 09-Jul-07 02-Feb-07 A 30-Jul-07 APRO3100 PO to Del of Safety Signs 0 100% 04-Jan-07 21-May-07 30-Jul-07 A 10-Aug-07 A

Others MaterialsOthers Materials 0 08-Feb-07 16-Jul-07 06-Aug-07 A 24-Aug-07 A 0PRO3110 PO to Del of Any Other Materials not included above 0 100% 08-Feb-07 16-Jul-07 06-Aug-07 A 24-Aug-07 A

Materials Receiving Materials Receiving Inspection 0 29-Nov-06 08-Aug-07 01-Dec-06 A 05-Oct-07 A 0StructuralStructural 0 29-Nov-06 20-Apr-07 01-Dec-06 A 10-May-07 A 0

PRO3120 Receive/Accept of Structural Tubulars 0 100% 29-Nov-06 14-Dec-06 01-Dec-06 A 12-Jan-07 APRO3130 Receive/Accept of Structural Beams 0 100% 12-Dec-06 03-Jan-07 08-Jan-07 A 26-Jan-07 APRO3140 Receive/Accept of Structural Plates 0 100% 30-Dec-06 20-Jan-07 09-Jan-07 A 23-Feb-07 APRO3160 Receive/Accept of Miscellaneous Sections (angles, chanels,... 0 100% 11-Jan-07 31-Jan-07 10-Jan-07 A 30-Jan-07 APRO3150 Receive/Accept of Ancillary Steel (grating, stair tread, etc.) 0 100% 27-Jan-07 15-Feb-07 17-Jan-07 A 02-Mar-07 APRO3190 Receive/Accept of All Remaining Structural Mat'l 0 100% 14-Feb-07 09-Mar-07 12-Feb-07 A 23-Mar-07 APRO3170 Receive/Accept of Fire/Blast Walls 0 100% 13-Mar-07 03-Apr-07 01-Mar-07 A 10-May-07 APRO3180 Receive/Accept of Passive Fire Projection (PFP) 0 100% 04-Apr-07 20-Apr-07 28-Apr-07 A 04-May-07 A

PipingPiping 0 15-Jan-07 18-Jun-07 05-Jan-07 A 28-Sep-07 A 0PRO3210 Receive/Accept of Carbon Steel (CS) Pipes & Fitting 0 100% 15-Jan-07 14-Feb-07 05-Jan-07 A 28-Feb-07 APRO3220 Receive/Accept of Stainless Steel (SS) Pipes & Fitting 0 100% 13-Feb-07 10-Mar-07 06-Feb-07 A 23-Mar-07 APRO3260 Receive/Accept of Piping Specialty Items 0 100% 23-Mar-07 14-Apr-07 26-Mar-07 A 09-Apr-07 APRO3240 Receive/Accept of GRE Pipes & Fitting 0 100% 28-Feb-07 26-Mar-07 04-Apr-07 A 13-Apr-07 APRO3280 Receive/Accept of Associated Fittings & Acc. for Launcher 0 100% 27-Apr-07 17-May-07 09-Apr-07 A 11-May-07 APRO3250 Receive/Accept of Valves 0 100% 04-May-07 31-May-07 18-Apr-07 A 28-Sep-07 APRO3270 Receive/Accept of Pipe Bends & Barred Tees 0 100% 30-May-07 18-Jun-07 25-Apr-07 A 04-May-07 APRO3230 Receive/Accept of Duplex Stainless Steel (DSS) Pipes & Fitting 0 100% 17-May-07 07-Jun-07 27-Apr-07 A 03-Aug-07 APRO3290 Receive/Accept of All Remaining Piping Mat'l 0 100% 12-Apr-07 09-May-07 01-May-07 A 29-Jun-07 A

MechanicalMechanical 0 28-Apr-07 08-Aug-07 02-Apr-07 A 24-Aug-07 A 0PRO3380 Receive/Accept of Closed Drain Transfer Pump 0 100% 09-Jun-07 25-Jun-07 02-Apr-07 A 13-Apr-07 APRO3300 Receive/Accept of Flush Water Tank 0 100% 17-May-07 01-Jun-07 21-Apr-07 A 27-Apr-07 APRO3330 Receive/Accept of Condensate Pod 0 100% 04-Jun-07 16-Jun-07 22-Apr-07 A 27-Apr-07 APRO3320 Receive/Accept of Closed Drain Vessel 0 100% 04-Jul-07 17-Jul-07 23-Apr-07 A 27-Apr-07 APRO3450 Receive/Accept of Corrosion Inhibitor Injection Package 0 100% 14-Jun-07 28-Jun-07 30-Apr-07 A 04-May-07 APRO3420 Receive/Accept of Manual Operated Trolley Hoists 0 100% 23-May-07 09-Jun-07 05-May-07 A 11-May-07 APRO3310 Receive/Accept of Fresh Water Tank 0 100% 28-Apr-07 12-May-07 14-May-07 A 18-May-07 APRO3440 Receive/Accept of Swing Jib Cranes with Manual Operated... 0 100% 30-Apr-07 17-May-07 16-May-07 A 25-May-07 APRO3350 Receive/Accept of Open Drain Caisson Pump 0 100% 30-May-07 13-Jun-07 31-May-07 A 08-Jun-07 APRO3390 Receive/Accept of All Remaining Pumps 0 100% 13-Jul-07 28-Jul-07 04-Jun-07 A 15-Jun-07 APRO3340 Receive/Accept of Diesel Transfer Pump 0 100% 26-Jun-07 07-Jul-07 10-Jun-07 A 14-Jun-07 APRO3360 Receive/Accept of Flush Water Pump 0 100% 21-Jun-07 03-Jul-07 10-Jun-07 A 14-Jun-07 APRO3370 Receive/Accept of Fresh Water Pump 0 100% 21-Jun-07 03-Jul-07 10-Jun-07 A 14-Jun-07 APRO3430 Receive/Accept of Padestal Crane 0 100% 12-Jul-07 25-Jul-07 07-Jul-07 A 11-Jul-07 APRO3400 Receive/Accept of HP Vent Tip 0 100% 01-Jul-07 14-Jul-07 10-Jul-07 A 11-Jul-07 APRO3410 Receive/Accept of CO2 Vent Snuffing System 0 100% 01-Jul-07 13-Jul-07 10-Jul-07 A 11-Jul-07 APRO3460 Receive/Accept of All Remaining Mechanical Items 0 100% 23-Jul-07 08-Aug-07 27-Jul-07 A 24-Aug-07 A

ElectricalElectrical 0 15-Feb-07 19-Jul-07 07-Feb-07 A 30-Jun-07 A 0PRO3520 Receive/Accept of Cable Trays, Ladder & Accessories 0 100% 15-Feb-07 05-Mar-07 07-Feb-07 A 13-Apr-07 A

Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct ov2007

Contract No : 591397Client : Sarawak Shell Berhad

Page 6 of 12

Page 43: Full Version of SCDR-A Close-Out Report(Dated051107)

Activity ID Activity Name RemDur

%Comp

BL Early Start BL EarlyFinish

Actual Start Actual Finish TotalFloat

PRO3570 Receive/Accept of Earthing Accessories 0 100% 13-Mar-07 03-Apr-07 05-Mar-07 A 09-Mar-07 APRO3530 Receive/Accept of Electrical / Control Cables, Fitting & MCT's 0 100% 28-Mar-07 14-Apr-07 19-Mar-07 A 13-Apr-07 APRO3500 Receive/Accept of LV Distribution Board 0 100% 04-Apr-07 23-Apr-07 14-Apr-07 A 27-Apr-07 APRO3510 Receive/Accept of Powered Navigational Aids System 0 100% 18-May-07 01-Jun-07 14-Apr-07 A 20-Apr-07 APRO3480 Receive/Accept of Power Transformer 0 100% 10-Jul-07 19-Jul-07 28-Apr-07 A 04-May-07 APRO3560 Receive/Accept of Light Fitting, Photocells Mounting and Ac... 0 100% 30-Mar-07 26-Apr-07 09-May-07 A 22-Jun-07 APRO3550 Receive/Accept of Remote Control Units and Safety Switches 0 100% 25-Apr-07 14-May-07 14-May-07 A 15-Jun-07 APRO3540 Receive/Accept of Junction Boxes and Control Panels 0 100% 07-Apr-07 25-Apr-07 21-May-07 A 30-Jun-07 APRO3580 Receive/Accept of All Other Electrical Items 0 100% 23-May-07 13-Jun-07 08-Jun-07 A 29-Jun-07 APRO3490 Receive/Accept of 6.6KV Ring Main Unit 0 100% 14-Jun-07 01-Jul-07 12-Jun-07 A 29-Jun-07 A

InstrumentInstrument 0 07-Feb-07 18-Jul-07 08-Feb-07 A 05-Oct-07 A 0PRO3740 Receive/Accept of Hydrogen Gas Detector 0 100% 26-Apr-07 12-May-07 08-Feb-07 A 23-Feb-07 APRO3810 Receive/Accept of Cable Tray & Ladders 0 100% 07-Feb-07 28-Feb-07 09-Feb-07 A 02-Mar-07 APRO3820 Receive/Accept of Instrument Cable, Junction Boxes & MCT's 0 100% 16-Feb-07 14-Mar-07 22-Feb-07 A 20-Jul-07 APRO3640 Receive/Accept of Ultrasonic Flowmeters 0 100% 27-Feb-07 19-Mar-07 28-Feb-07 A 16-Mar-07 APRO3830 Receive/Accept of Instrument Tubing, Fittings & Valves 0 100% 20-Mar-07 11-Apr-07 01-Mar-07 A 09-Mar-07 APRO3730 Receive/Accept of Smoke Detector 0 100% 26-Apr-07 09-May-07 17-Mar-07 A 23-Mar-07 APRO3770 Receive/Accept of Heat Detector 0 100% 26-Apr-07 11-May-07 17-Mar-07 A 23-Mar-07 APRO3610 Receive/Accept of GPA/PAPA 0 100% 21-Mar-07 16-Apr-07 26-Mar-07 A 20-Apr-07 APRO3800 Receive/Accept of Field Instrument & Mounting Stands & Su... 0 100% 26-Mar-07 19-Apr-07 31-Mar-07 A 06-Apr-07 APRO3750 Receive/Accept of ESD Break Glass Station 0 100% 10-May-07 24-May-07 14-Apr-07 A 20-Apr-07 APRO3630 Receive/Accept of Orifice Plates 0 100% 24-May-07 09-Jun-07 21-Apr-07 A 27-Apr-07 APRO3760 Receive/Accept of Acoustic Leak Detector 0 100% 27-Apr-07 12-May-07 27-Apr-07 A 15-May-07 APRO3780 Receive/Accept of Control, Ball and Operated Valves 0 100% 04-May-07 24-May-07 01-May-07 A 29-Jun-07 APRO3700 Receive/Accept of IR Flame Detector 0 100% 28-Apr-07 12-May-07 05-May-07 A 11-May-07 APRO3600 Receive/Accept of Sand Monitoring System 0 100% 21-Apr-07 08-May-07 28-May-07 A 05-Jun-07 APRO3710 Receive/Accept of IR Point Gas Detector 0 100% 26-Apr-07 10-May-07 04-Jun-07 A 08-Jun-07 APRO3720 Receive/Accept of IR Open Path Gas Detector 0 100% 26-Apr-07 10-May-07 12-Jun-07 A 22-Jun-07 APRO3680 Receive/Accept of Choke Valves 0 100% 29-Jun-07 18-Jul-07 16-Jun-07 A 29-Jun-07 APRO3670 Receive/Accept of Pressure Gauges 0 100% 06-Mar-07 24-Mar-07 25-Jun-07 A 04-Sep-07 APRO3590 Receive/Accept of Wellhead Control Panel 0 100% 03-Apr-07 25-Apr-07 10-Jul-07 A 12-Jul-07 APRO3840 Receive/Accept of All Remaining Instrumentation Items 0 100% 13-Jun-07 03-Jul-07 03-Aug-07 A 24-Aug-07 APRO3650 Receive/Accept of Level Gauges (Reflex Type) 0 100% 09-Apr-07 27-Apr-07 17-Aug-07 A 27-Aug-07 APRO3660 Receive/Accept of Level Gauges (Using Pressure Gauge) 0 100% 09-Apr-07 26-Apr-07 17-Aug-07 A 27-Aug-07 APRO3620 Receive/Accept of Restriction Orifice Plates 0 100% 17-May-07 02-Jun-07 23-Aug-07 A 27-Aug-07 APRO3790 Receive/Accept of Ultra Sonic Flare Gas Meter 0 100% 26-Apr-07 11-May-07 17-Sep-07 A 18-Sep-07 APRO3690 Receive/Accept of Pig Signallers 0 100% 14-Mar-07 02-Apr-07 02-Oct-07 A 05-Oct-07 A

ArchitecturalArchitectural 0 12-Mar-07 07-Apr-07 26-Mar-07 A 13-Jul-07 A 0PRO3200 Receive/Accept of Architectural Mat'l (floor/wall/ceiling pa... 0 100% 12-Mar-07 07-Apr-07 26-Mar-07 A 13-Jul-07 A

HVACHVAC 0 12-Mar-07 02-Apr-07 05-Mar-07 A 13-Apr-07 A 0PRO3470 Receive/Accept of HVAC System Package 0 100% 12-Mar-07 02-Apr-07 05-Mar-07 A 13-Apr-07 A

SafetySafety 0 22-May-07 30-Jul-07 02-Apr-07 A 17-Aug-07 A 0PRO3850 Receive/Accept of Safety Equipment and Fire Protection Eq... 0 100% 09-Jul-07 30-Jul-07 02-Apr-07 A 10-Aug-07 APRO3860 Receive/Accept of Safety Signs 0 100% 22-May-07 04-Jun-07 06-Aug-07 A 17-Aug-07 A

Others MaterialsOthers Materials 0 16-Jul-07 31-Jul-07 16-Jul-07 A 31-Jul-07 A 0PRO3870 Receive/Accept of Any Other Materials not included above 0 100% 16-Jul-07 31-Jul-07 16-Jul-07 A 31-Jul-07 A

FABRICATION OF FABRICATION OF SCDR-A TOPSIDES 0 22-Sep-06 20-Aug-07 22-Sep-06 A 05-Oct-07 A 0

StructuralStructural 0 12-Oct-06 18-Jun-07 08-Nov-06 A 10-Sep-07 A 0FabricationFabrication 0 12-Oct-06 23-May-07 08-Nov-06 A 31-Aug-07 A 0

FAB1370 Fabricate and Arrange Temp. Supports 0 100% 12-Oct-06 06-Dec-06 08-Nov-06 A 22-Dec-06 AFAB1380 Fab/Assem Cellar Deck (In-Situ) 0 100% 14-Nov-06 21-Feb-07 10-Nov-06 A 27-Mar-07 AFAB1390 Fabricate Columns, Diagonals & Braces 0 100% 22-Dec-06 27-Feb-07 18-Dec-06 A 02-Mar-07 AFAB1400 Fabricate Main Deck 0 100% 29-Dec-06 27-Mar-07 26-Dec-06 A 07-May-07 A

Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct ov2007

Contract No : 591397Client : Sarawak Shell Berhad

Page 7 of 12

Page 44: Full Version of SCDR-A Close-Out Report(Dated051107)

Activity ID Activity Name RemDur

%Comp

BL Early Start BL EarlyFinish

Actual Start Actual Finish TotalFloat

FAB1410 Fabricate Mezzanine Deck 0 100% 10-Jan-07 10-Mar-07 08-Jan-07 A 30-Mar-07 AFAB1540 Fabricate Wellhead Access Platform 0 100% 18-Jan-07 06-Mar-07 18-Jan-07 A 15-Mar-07 AFAB1440 Fabricate Framing for Switchgear, ILE Rooms, W.Shelter & W... 0 100% 24-Jan-07 15-Mar-07 27-Jan-07 A 18-May-07 AFAB1430 Fabricate Handrails 0 100% 05-Feb-07 29-Mar-07 30-Jan-07 A 06-Apr-07 AFAB1470 Fabricate Intermediate Platform 0 100% 31-Jan-07 12-Mar-07 06-Feb-07 A 30-Mar-07 AFAB1420 Fabricate Stairways & Ladder 0 100% 15-Feb-07 07-Apr-07 21-Feb-07 A 25-May-07 AFAB1450 Fabricate Gratings 0 100% 24-Feb-07 17-Apr-07 26-Feb-07 A 15-Jun-07 AFAB1760 Fabricate Crane Padestal and Boom Rest 0 100% 02-Apr-07 02-May-07 05-Mar-07 A 15-May-07 AFAB1460 Fabricate Vent Boom 0 100% 09-Mar-07 10-May-07 12-Mar-07 A 18-May-07 AFAB1510 Fabricate Lifting Padeyes 0 100% 02-May-07 23-May-07 25-Jun-07 A 31-Aug-07 A

InstallationInstallation 0 05-Feb-07 18-Jun-07 29-Jan-07 A 10-Sep-07 A 0FAB1480 Erect Column and Braces (on Cellar Deck) 0 100% 05-Feb-07 27-Mar-07 29-Jan-07 A 11-May-07 AFAB1740 Erect Wellhead Access Platform 0 100% 20-Mar-07 11-Apr-07 16-Mar-07 A 13-Apr-07 AFAB1490 Erect Mezzanine Deck 0 100% 27-Mar-07 23-Apr-07 21-Mar-07 A 07-May-07 AFAB1560 Install Framing for Switchgear, ILE Rooms, W.Shelter & Worksh... 0 100% 29-Mar-07 28-Apr-07 23-Mar-07 A 05-Jun-07 AFAB1570 Erect Intermediate Platform 0 100% 26-Mar-07 14-Apr-07 12-Apr-07 A 04-May-07 AFAB1530 Install Gratings 0 100% 05-Apr-07 02-May-07 21-Apr-07 A 10-Aug-07 AFAB1520 Install Handrails 0 100% 10-Apr-07 09-May-07 23-Apr-07 A 03-Aug-07 AFAB1550 Install Stairways & Ladder 0 100% 18-Apr-07 16-May-07 25-Apr-07 A 24-Aug-07 AFAB1500 Erect Main Deck 0 100% 28-Apr-07 22-May-07 04-May-07 A 22-Jun-07 AFAB1750 Install Crane Padestal and Boom Rest 0 100% 16-May-07 07-Jun-07 14-May-07 A 29-Jun-07 AFAB1580 Install Vent Boom 0 100% 01-Jun-07 18-Jun-07 22-Jun-07 A 06-Jul-07 AFAB1590 Install Lifting Padeyes 0 100% 24-May-07 14-Jun-07 17-Aug-07 A 10-Sep-07 A

Blasting/PaintingBlasting/Painting 0 22-Sep-06 31-Jul-07 22-Sep-06 A 25-Sep-07 A 0FAB1600 Auto Blast/Prime Structural Mat'l Type I and II 0 100% 22-Sep-06 17-Nov-06 22-Sep-06 A 28-Nov-06 AFAB1620 Blast/Prime Structural Mat'l Type III 0 100% 14-Dec-06 14-Mar-07 12-Dec-06 A 16-Mar-07 AFAB1630 Blast/Paint Pipe Supports 0 100% 31-Jan-07 27-Mar-07 01-Mar-07 A 25-May-07 AFAB1640 Blast/Paint Mezzanine Deck 0 100% 10-Mar-07 27-Mar-07 04-Mar-07 A 20-Apr-07 AFAB1660 Blast/Paint Electrical Supports 0 100% 15-Mar-07 02-Apr-07 05-Mar-07 A 20-Apr-07 AFAB1680 Blast/Paint Instrument Supports 0 100% 15-Mar-07 02-Apr-07 05-Mar-07 A 20-Apr-07 AFAB1710 Blast/Paint Pipe Spools 0 100% 28-Feb-07 11-Apr-07 05-Mar-07 A 27-Jul-07 AFAB1780 Blast/Paint Wellhead Access Platform 0 100% 06-Mar-07 20-Mar-07 07-Mar-07 A 23-Mar-07 AFAB1700 Blast/Paint Handrails 0 100% 02-Apr-07 19-Apr-07 10-Mar-07 A 15-Jun-07 AFAB1790 Blast/Paint Intermediate Platform 0 100% 12-Mar-07 26-Mar-07 15-Mar-07 A 18-May-07 AFAB1610 Blast/Paint Cellar Deck 0 100% 27-Mar-07 28-Apr-07 26-Mar-07 A 22-Jun-07 AFAB1650 Blast/Paint Main Deck 0 100% 27-Mar-07 26-Apr-07 02-Apr-07 A 25-May-07 AFAB1690 Blast/Paint Stairways & Ladder 0 100% 07-Apr-07 24-Apr-07 09-Apr-07 A 22-May-07 AFAB1670 Blast/Paint Framing for Switchgear, ILE Rooms, W.Shelter & W... 0 100% 15-Mar-07 29-Mar-07 13-Apr-07 A 23-May-07 AFAB2110 Touch-Up Painting 0 100% 11-Apr-07 31-Jul-07 14-Apr-07 A 25-Sep-07 AFAB1770 Blast/Paint Crane Padestal and Boom Rest 0 100% 02-May-07 16-May-07 24-Apr-07 A 24-May-07 AFAB2130 Apply Fire/Blast Walls 0 100% 10-May-07 01-Jun-07 14-May-07 A 01-Jun-07 AFAB1720 Blast/Paint Vent Boom 0 100% 10-May-07 01-Jun-07 21-May-07 A 25-May-07 AFAB2120 Apply Passive Fire Proofing 0 100% 01-Jun-07 15-Jun-07 18-Jun-07 A 06-Jul-07 AFAB1730 Blast/Paint Lifting Padeyes 0 100% 14-Jun-07 27-Jun-07 24-Aug-07 A 08-Sep-07 A

PipingPiping 0 13-Jan-07 15-Aug-07 12-Feb-07 A 21-Sep-07 A 0FabricationFabrication 0 13-Jan-07 31-Jul-07 12-Feb-07 A 10-Aug-07 A 0

FAB2100 Fabricate Pipe Supports 0 100% 13-Jan-07 28-Mar-07 12-Feb-07 A 30-Mar-07 AFAB2630 Fabricate CS Pipe Spools 0 100% 14-Feb-07 25-Apr-07 26-Feb-07 A 15-May-07 AFAB2840 Fabricate SS Pipe Spools 0 100% 10-Mar-07 03-May-07 07-Mar-07 A 18-May-07 AFAB2860 Fabricate GRE Pipe Spools 0 100% 26-Mar-07 15-May-07 05-Apr-07 A 15-Jun-07 AFAB2870 Fabricate Piping Specialty Items 0 100% 14-Apr-07 28-May-07 14-Apr-07 A 18-May-07 AFAB2850 Fabricate DSS Pipe Spools 0 100% 07-Jun-07 31-Jul-07 23-Apr-07 A 10-Aug-07 A

InstallationInstallation 0 24-Jan-07 15-Aug-07 01-Mar-07 A 21-Sep-07 A 0

Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct ov2007

Contract No : 591397Client : Sarawak Shell Berhad

Page 8 of 12

Page 45: Full Version of SCDR-A Close-Out Report(Dated051107)

Activity ID Activity Name RemDur

%Comp

BL Early Start BL EarlyFinish

Actual Start Actual Finish TotalFloat

FAB2820 Install Pipe Supports Below Cellar Deck 0 100% 24-Jan-07 12-Mar-07 01-Mar-07 A 25-May-07 AFAB2990 Install Pipe Supports Below Main Deck 0 100% 27-Feb-07 25-Apr-07 06-Mar-07 A 08-Jun-07 AFAB2830 Install CS Pipe Spools 0 100% 08-Mar-07 22-May-07 05-Apr-07 A 06-Jul-07 AFAB2880 Install SS Pipe Spools 0 100% 06-Apr-07 14-May-07 06-Apr-07 A 06-Jul-07 AFAB2900 Install GRE Pipe Spools 0 100% 16-Apr-07 12-Jun-07 23-Apr-07 A 27-Jul-07 AFAB2910 Install Piping Specialty Items 0 100% 10-May-07 01-Jul-07 07-May-07 A 25-May-07 AFAB2930 Install Associated Fitting & Acc for Launcher 0 100% 17-May-07 13-Jun-07 14-May-07 A 15-Jun-07 AFAB2950 Hydrotest/Reinstatement 0 100% 09-Jun-07 15-Aug-07 16-May-07 A 21-Sep-07 AFAB2920 Install Pipe Bends & Barred Tees 0 100% 17-Jul-07 06-Aug-07 21-May-07 A 25-May-07 AFAB2940 Valve Installation 0 100% 21-May-07 13-Jul-07 21-May-07 A 14-Sep-07 AFAB2890 Install DSS Pipe Spools 0 100% 30-Jun-07 11-Aug-07 25-Jun-07 A 15-Aug-07 AFAB2960 Pipe Insulation 0 100% 09-Jul-07 06-Aug-07 10-Jul-07 A 07-Aug-07 A

MechanicalMechanical 0 15-Feb-07 20-Aug-07 22-Feb-07 A 04-Sep-07 A 0FAB2415 Fabricate Equipment Supports 0 100% 15-Feb-07 06-Apr-07 22-Feb-07 A 27-Apr-07 AFAB3070 Install Equipment Supports 0 100% 28-Mar-07 23-May-07 26-Mar-07 A 12-Jun-07 AFAB3300 Install Wellhead Desander Skids 0 100% 05-Jun-07 28-Jun-07 26-Mar-07 A 13-Apr-07 AFAB3110 Install Corrosion Inhibitor Injection Package 0 100% 28-Jun-07 13-Jul-07 04-May-07 A 11-May-07 AFAB3190 Install Flush Water Tank 0 100% 01-Jun-07 18-Jun-07 14-May-07 A 25-May-07 AFAB3210 Install Closed Drain Vessel 0 100% 17-Jul-07 07-Aug-07 16-May-07 A 08-Jun-07 AFAB3180 Install Swing Jib Cranes with Manual Operated Hoist 0 100% 23-May-07 14-Jun-07 28-May-07 A 08-Jun-07 AFAB3130 Install Condensate Pod 0 100% 16-Jun-07 03-Jul-07 29-May-07 A 08-Jun-07 AFAB3200 Install Fresh Water Tank 0 100% 21-May-07 07-Jun-07 31-May-07 A 08-Jun-07 AFAB3120 Install Diesel Transfer Pump 0 100% 07-Jul-07 31-Jul-07 11-Jun-07 A 02-Jul-07 AFAB3140 Install Open Drain Caisson Pump 0 100% 13-Jun-07 01-Jul-07 15-Jun-07 A 29-Jun-07 AFAB3090 Install Flush Water Pump 0 100% 03-Jul-07 28-Jul-07 18-Jun-07 A 22-Jun-07 AFAB3100 Install Fresh Water Pump 0 100% 03-Jul-07 28-Jul-07 18-Jun-07 A 22-Jun-07 AFAB3220 Install All Remaining Pumps 0 100% 28-Jul-07 11-Aug-07 18-Jun-07 A 29-Jun-07 AFAB3160 Install Manual Operated Trolley Hoists 0 100% 09-Jun-07 25-Jun-07 25-Jun-07 A 06-Jul-07 AFAB3150 Install Closed Drain Transfer Pump 0 100% 25-Jun-07 13-Jul-07 27-Jun-07 A 13-Jul-07 AFAB3080 Install HP Vent Tip 0 100% 14-Jul-07 02-Aug-07 12-Jul-07 A 10-Aug-07 AFAB3170 Install CO2 Vent Snuffing System 0 100% 13-Jul-07 02-Aug-07 12-Jul-07 A 13-Jul-07 AFAB3230 Install Padestal Crane 0 100% 25-Jul-07 10-Aug-07 12-Jul-07 A 27-Jul-07 AFAB3240 Install All Remaining Mechanical Items 0 100% 08-Aug-07 20-Aug-07 11-Aug-07 A 04-Sep-07 A

ElectricalElectrical 0 28-Feb-07 03-Aug-07 02-Mar-07 A 07-Sep-07 A 0FAB2970 Fabricate Electrical Supports 0 100% 28-Feb-07 06-Apr-07 02-Mar-07 A 11-May-07 AFAB2980 Install Electrical Supports 0 100% 26-Mar-07 05-May-07 15-Mar-07 A 15-Jun-07 AFAB3250 Install Cable Trays, Ladder & Accessories 0 100% 13-Apr-07 04-Jun-07 16-Apr-07 A 29-Jun-07 AFAB3260 Install Electrical / Control Cables, Fitting & MCT's 0 100% 14-Apr-07 24-May-07 16-Apr-07 A 08-Jun-07 AFAB3370 Install Earthing Accessories 0 100% 23-Apr-07 05-Jul-07 23-Apr-07 A 10-Aug-07 AFAB3340 Install LV Distribution Board 0 100% 27-Apr-07 23-May-07 14-May-07 A 25-May-07 AFAB3280 Cable Pulling 0 100% 02-May-07 15-Jun-07 21-May-07 A 27-Jul-07 AFAB3400 Install AC Uninterruptible Power Supply (UPS) 0 100% 03-May-07 23-May-07 22-May-07 A 05-Jun-07 AFAB3750 Install 400V Switchboard 0 100% 07-May-07 30-May-07 22-May-07 A 06-Jun-07 AFAB3310 Install Power Transformer 0 100% 19-Jul-07 03-Aug-07 28-May-07 A 15-Jun-07 AFAB3350 Install Powered Navigational Aids System 0 100% 27-Jun-07 17-Jul-07 02-Jun-07 A 08-Jun-07 AFAB3360 Glanding & Termination 0 100% 22-May-07 28-Jun-07 04-Jun-07 A 07-Aug-07 AFAB3270 Install Light Fitting, Photocells Mounting and Accessories 0 100% 14-May-07 20-Jun-07 11-Jun-07 A 29-Jun-07 AFAB3320 Install 6.6KV Ring Main Unit 0 100% 04-Jul-07 25-Jul-07 29-Jun-07 A 13-Jul-07 AFAB3290 Install Junction Boxes and Control Panels 0 100% 11-May-07 14-Jun-07 30-Jun-07 A 13-Jul-07 AFAB3330 Install Remote Control Units and Safety Switches 0 100% 01-Jun-07 30-Jun-07 02-Jul-07 A 07-Sep-07 AFAB3380 Install All Other Electrical Items 0 100% 13-Jun-07 20-Jul-07 02-Jul-07 A 13-Jul-07 A

InstrumentInstrument 0 28-Feb-07 08-Aug-07 02-Mar-07 A 05-Oct-07 A 0FAB3020 Fabricate Instrument Supports 0 100% 28-Feb-07 03-Apr-07 02-Mar-07 A 11-May-07 A

Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct ov2007

Contract No : 591397Client : Sarawak Shell Berhad

Page 9 of 12

Page 46: Full Version of SCDR-A Close-Out Report(Dated051107)

Activity ID Activity Name RemDur

%Comp

BL Early Start BL EarlyFinish

Actual Start Actual Finish TotalFloat

FAB3030 Install Instrument Supports 0 100% 27-Mar-07 02-May-07 09-Mar-07 A 22-Jun-07 AFAB3390 Install Cable Tray & Ladders 0 100% 05-Apr-07 22-May-07 16-Apr-07 A 24-Aug-07 AFAB3040 Instrument Calibration 0 100% 10-May-07 26-Jun-07 07-May-07 A 03-Aug-07 AFAB3410 Install Instrument Cable, Junction Boxes & MCT's 0 100% 16-May-07 27-Jun-07 09-May-07 A 09-May-07 AFAB3450 Install Ultrasonic Flowmeters 0 100% 18-May-07 05-Jun-07 14-May-07 A 25-May-07 AFAB3550 Install Smoke Detector 0 100% 30-May-07 14-Jun-07 14-May-07 A 03-Aug-07 AFAB3710 Install F&G System 0 100% 21-Apr-07 12-May-07 14-May-07 A 18-May-07 AFAB3430 Install Field Instrument & Mounting Stands & Supports etc. 0 100% 08-May-07 28-May-07 15-May-07 A 10-Aug-07 AFAB3050 Cable pulling 0 100% 04-May-07 16-Jun-07 22-May-07 A 19-Sep-07 AFAB3520 Install IR Flame Detector 0 100% 26-May-07 12-Jun-07 28-May-07 A 10-Aug-07 AFAB3500 Install Distributed Control System (DCS) and (AVA) 0 100% 21-Apr-07 22-May-07 28-May-07 A 15-Jun-07 AFAB3480 Install GPA/PAPA 0 100% 24-May-07 23-Jun-07 31-May-07 A 03-Aug-07 AFAB3560 Install Hydrogen Gas Detector 0 100% 30-May-07 12-Jun-07 31-May-07 A 08-Jun-07 AFAB3600 Install IPS System 0 100% 21-Apr-07 14-May-07 02-Jun-07 A 15-Jun-07 AFAB3530 Install IR Point Gas Detector 0 100% 26-May-07 13-Jun-07 04-Jun-07 A 10-Aug-07 AFAB3510 Install ESD Break Glass Station 0 100% 12-Jun-07 25-Jun-07 04-Jun-07 A 22-Jun-07 AFAB3570 Install Acoustic Leak Detector 0 100% 28-May-07 15-Jun-07 04-Jun-07 A 08-Jun-07 AFAB3440 Install Sand Monitoring System 0 100% 05-Jun-07 25-Jun-07 06-Jun-07 A 29-Jun-07 AFAB3580 Install Heat Detector 0 100% 31-May-07 15-Jun-07 11-Jun-07 A 22-Jun-07 AFAB3540 Install IR Open Path Gas Detector 0 100% 26-May-07 12-Jun-07 18-Jun-07 A 03-Aug-07 AFAB3730 Install Telecommunication Equipment 0 100% 07-May-07 07-Jun-07 18-Jun-07 A 03-Aug-07 AFAB3490 Install Control, Ball and Operated Valves 0 100% 25-May-07 29-Jun-07 25-Jun-07 A 17-Aug-07 AFAB3060 Glanding & Termination 0 100% 07-Jun-07 02-Jul-07 25-Jun-07 A 20-Sep-07 AFAB3720 Install Wellhead Control System (WHCS) 0 100% 21-Apr-07 19-May-07 29-Jun-07 A 13-Jul-07 AFAB3630 Install Instrument Tubing, Fittings & Valves 0 100% 10-May-07 05-Jun-07 02-Jul-07 A 10-Aug-07 AFAB3420 Install Wellhead Control Panel 0 100% 25-Apr-07 24-May-07 13-Jul-07 A 20-Jul-07 AFAB3660 Install Pressure Gauges 0 100% 19-May-07 06-Jun-07 16-Jul-07 A 27-Jul-07 AFAB3740 Install Wet Gas Metering Skid (Operational Metering) 0 100% 19-Jun-07 09-Jul-07 16-Jul-07 A 10-Aug-07 AFAB3650 Install Level Gauges (Using Pressure Gauge) 0 100% 18-May-07 04-Jun-07 27-Jul-07 A 06-Aug-07 AFAB3620 Install Orifice Plates 0 100% 18-Jun-07 01-Jul-07 27-Jul-07 A 03-Aug-07 AFAB3640 Install Level Gauges (Reflex Type) 0 100% 21-May-07 06-Jun-07 30-Jul-07 A 06-Aug-07 AFAB3610 Install Restriction Orifice Plates 0 100% 11-Jun-07 25-Jun-07 03-Aug-07 A 10-Aug-07 AFAB3670 Install All Remaining Instrumentation Items 0 100% 03-Jul-07 04-Aug-07 03-Aug-07 A 31-Aug-07 AFAB3470 Install Choke Valves 0 100% 18-Jul-07 08-Aug-07 06-Aug-07 A 18-Aug-07 AFAB3590 Install Ultra Sonic Flare Gas Meter 0 100% 22-May-07 12-Jun-07 19-Sep-07 A 22-Sep-07 AFAB3460 Install Pig Signallers 0 100% 24-May-07 12-Jun-07 02-Oct-07 A 05-Oct-07 A

ArchitecturalArchitectural 0 24-Mar-07 26-Jul-07 15-Mar-07 A 24-Aug-07 A 0FAB2760 Switchgear, Transformer & Battery Room 0 100% 24-Mar-07 07-May-07 15-Mar-07 A 03-Aug-07 AFAB2770 Instrument Local Equipment Room 0 100% 21-Apr-07 04-Jul-07 21-Apr-07 A 10-Aug-07 AFAB2780 Weather Shelter & Workshop 0 100% 21-Jun-07 26-Jul-07 21-May-07 A 24-Aug-07 A

HVACHVAC 0 02-Apr-07 19-Jul-07 12-Mar-07 A 03-Aug-07 A 0FAB2790 Switchgear, Transformer & Battery Room 0 100% 02-Apr-07 12-May-07 12-Mar-07 A 03-Aug-07 AFAB2800 Instrument Local Equipment Room 0 100% 30-Apr-07 26-Jun-07 01-May-07 A 27-Jul-07 AFAB2810 Weather Shelter & Workshop 0 100% 12-Jun-07 19-Jul-07 21-May-07 A 27-Jul-07 A

SafetySafety 0 04-Jun-07 15-Aug-07 11-Jun-07 A 31-Aug-07 A 0FAB3680 Install of Safety Equipment and Fire Protection Equipment 0 100% 30-Jul-07 15-Aug-07 11-Jun-07 A 24-Aug-07 AFAB3690 Install of Safety Signs 0 100% 04-Jun-07 20-Jun-07 17-Aug-07 A 31-Aug-07 A

Others MaterialsOthers Materials 0 31-Jul-07 16-Aug-07 03-Aug-07 A 17-Aug-07 A 0FAB3700 Install of Any Other Materials not included above 0 100% 31-Jul-07 16-Aug-07 03-Aug-07 A 17-Aug-07 A

ONSHORE PRE-COONSHORE PRE-COMMISSIONING 0 21-May-07 28-Aug-07 23-May-07 A 28-Sep-07 A 0

COM1020 Precom UPS System 0 100% 08-Jun-07 06-Jul-07 23-May-07 A 20-Jul-07 ACOM1010 Precom Lighting and Small Power 0 100% 30-Jun-07 28-Jul-07 04-Jun-07 A 28-Sep-07 ACOM1130 Precom Earthing and Bonding System 0 100% 21-May-07 22-Jun-07 11-Jun-07 A 03-Aug-07 A

Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct ov2007

Contract No : 591397Client : Sarawak Shell Berhad

Page 10 of 12

Page 47: Full Version of SCDR-A Close-Out Report(Dated051107)

Activity ID Activity Name RemDur

%Comp

BL Early Start BL EarlyFinish

Actual Start Actual Finish TotalFloat

COM1160 Precom Navigation Aid System 0 100% 17-Jul-07 02-Aug-07 18-Jun-07 A 27-Jul-07 ACOM1040 Precom Materials Handling 0 100% 10-Aug-07 28-Aug-07 02-Jul-07 A 17-Aug-07 ACOM1060 Precom HVAC 0 100% 26-Jun-07 28-Jul-07 09-Jul-07 A 28-Sep-07 ACOM1190 Precom Gas and Condensate System 0 100% 28-Jul-07 28-Aug-07 09-Jul-07 A 28-Sep-07 ACOM1030 Precom Fresh Water System 0 100% 28-Jul-07 17-Aug-07 23-Jul-07 A 28-Sep-07 ACOM1050 Precom Electrical Power Generation & Distribution (EDG) 0 100% 25-Jul-07 18-Aug-07 23-Jul-07 A 28-Sep-07 ACOM1140 Precom Drain System 0 100% 23-Jul-07 16-Aug-07 23-Jul-07 A 17-Aug-07 ACOM1170 Precom Diesel Fuel System 0 100% 31-Jul-07 16-Aug-07 23-Jul-07 A 28-Sep-07 ACOM1210 Precom Flush Water System 0 100% 28-Jul-07 16-Aug-07 23-Jul-07 A 17-Aug-07 ACOM1070 Precom IPS System 0 100% 04-Jul-07 30-Jul-07 27-Jul-07 A 28-Sep-07 ACOM1090 Precom Fire and Gas System (F&G) 0 100% 30-Jun-07 01-Aug-07 27-Jul-07 A 28-Sep-07 ACOM1110 Precom GPA System 0 100% 23-Jun-07 17-Jul-07 27-Jul-07 A 28-Sep-07 ACOM1200 Precom Sand Monitoring System 0 100% 11-Jul-07 30-Jul-07 30-Jul-07 A 17-Aug-07 ACOM1080 Precom DCS and AVA System 0 100% 30-Jul-07 28-Aug-07 03-Aug-07 A 28-Sep-07 ACOM1120 Precom Telecomunication System 0 100% 16-Jun-07 14-Jul-07 03-Aug-07 A 24-Aug-07 ACOM1150 Precom Vent System 0 100% 02-Aug-07 18-Aug-07 03-Aug-07 A 28-Sep-07 ACOM1180 Precom Corrosion Inhibitor Injection System 0 100% 13-Jul-07 03-Aug-07 03-Aug-07 A 24-Aug-07 ACOM1100 Precom Wellhead Control System (WHCS) 0 100% 28-Jun-07 30-Jul-07 17-Aug-07 A 28-Sep-07 A

WEIGHING, LOADWEIGHING, LOADOUT & SEAFASTENING 0 02-Jul-07 04-Sep-07 02-Jul-07 A 18-Sep-07 A 0

CVE1000 Civil Engineering and Infrastructure Works 0 100% 02-Jul-07 16-Aug-07 02-Jul-07 A 16-Aug-07 AWGH1000 1st Weighing of Topsides 0 100% 02-Jul-07 06-Jul-07 04-Jul-07 A 06-Jul-07 AWGH1010 Final Weighing of Topsides 0 100% 10-Aug-07 15-Aug-07 22-Aug-07 A 23-Aug-07 ALOA1000 Loadout Topsides 0 100% 29-Aug-07 31-Aug-07 11-Sep-07 A 11-Sep-07 ALOA1010 Seafastening Topsides 0 100% 31-Aug-07 04-Sep-07 11-Sep-07 A 18-Sep-07 A

E11K-A SHIPLOOSE11K-A SHIPLOOSE ITEMS 0 21-Aug-06 24-Jul-07 21-Aug-06 A 31-Aug-07 A 0

ENGINEERINGENGINEERING 0 21-Aug-06 25-Jan-07 21-Aug-06 A 06-Apr-07 A 0PRE1700 Prepare/Submit/Approve of MTO 0 100% 21-Aug-06 25-Nov-06 21-Aug-06 A 06-Apr-07 APRE1710 Prepare/Submit/Approve of Shop Drawings 0 100% 03-Oct-06 25-Jan-07 06-Nov-06 A 30-Mar-07 A

PROCUREMENTPROCUREMENT 0 05-Oct-06 05-Jun-07 03-Oct-06 A 24-Aug-07 A 0Purchase Request toPurchase Request to Purchase Order 0 05-Oct-06 22-Jan-07 03-Oct-06 A 27-Apr-07 A 0

PRO4450 PR/PO of Pipe Matl's 0 100% 05-Oct-06 30-Nov-06 03-Oct-06 A 23-Feb-07 APRO4470 PR/PO of Mechanical Matl's 0 100% 26-Oct-06 20-Dec-06 10-Oct-06 A 23-Feb-07 APRO4490 PR/PO of Electrical Matl's 0 100% 25-Nov-06 22-Jan-07 16-Oct-06 A 09-Mar-07 APRO4500 PR/PO of Instrument Matl's 0 100% 25-Nov-06 22-Jan-07 20-Oct-06 A 27-Apr-07 APRO4440 PR/PO of Structural Matl's 0 100% 08-Nov-06 03-Jan-07 25-Dec-06 A 06-Apr-07 A

Purchase Order to DPurchase Order to Delivery 0 30-Nov-06 24-May-07 08-Jan-07 A 24-May-07 A 0PRO4510 PO to Del Pipe Matl's 0 100% 30-Nov-06 14-Apr-07 08-Jan-07 A 20-Apr-07 APRO4520 PO to Del Electrical Matl's 0 100% 22-Jan-07 23-May-07 29-Jan-07 A 24-May-07 APRO4530 PO to Del Instrument Matl's 0 100% 22-Jan-07 24-May-07 29-Jan-07 A 24-May-07 APRO4460 PO to Del Structural Matl's 0 100% 03-Jan-07 15-May-07 22-Feb-07 A 15-May-07 APRO4540 PO to Del Mechanical Matl's 0 100% 20-Dec-06 19-May-07 22-Feb-07 A 18-May-07 A

Materials Receiving Materials Receiving Inspection 0 14-Apr-07 05-Jun-07 09-Apr-07 A 24-Aug-07 A 0PRO4590 Receive/Accept of Pipe Matl's 0 100% 14-Apr-07 04-May-07 09-Apr-07 A 24-Aug-07 APRO4600 Receive/Accept of Electrical Matl's 0 100% 24-May-07 05-Jun-07 16-Apr-07 A 17-Aug-07 APRO4610 Receive/Accept of Instrument Matl's 0 100% 25-May-07 05-Jun-07 16-Apr-07 A 24-Aug-07 APRO4620 Receive/Accept of Mechanical Matl's 0 100% 21-May-07 30-May-07 08-May-07 A 01-Jun-07 APRO4580 Receive/Accept of Structural Matl's 0 100% 15-May-07 23-May-07 16-May-07 A 25-May-07 A

FABRICATIONFABRICATION 0 04-May-07 24-Jul-07 07-May-07 A 31-Aug-07 A 0StructuralStructural 0 24-May-07 05-Jul-07 24-May-07 A 06-Jul-07 A 0

SHP1000 Fab. Misc Structural Members E11K-A 0 100% 24-May-07 05-Jul-07 24-May-07 A 06-Jul-07 AMechanicalMechanical 0 30-May-07 04-Jul-07 31-May-07 A 08-Jun-07 A 0

SHP1120 Fab. Mechanical Items 0 100% 30-May-07 04-Jul-07 31-May-07 A 08-Jun-07 A

Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct ov2007

Contract No : 591397Client : Sarawak Shell Berhad

Page 11 of 12

Page 48: Full Version of SCDR-A Close-Out Report(Dated051107)

Activity ID Activity Name RemDur

%Comp

BL Early Start BL EarlyFinish

Actual Start Actual Finish TotalFloat

PipingPiping 0 04-May-07 13-Jul-07 07-May-07 A 24-Aug-07 A 0SHP1010 Fabricate Pipe Supports 0 100% 04-May-07 11-Jun-07 07-May-07 A 29-Jun-07 ASHP1030 Fabricate CS Pipe Spools 0 100% 04-May-07 07-Jun-07 07-May-07 A 06-Jul-07 ASHP1160 Fabricate Duplex Pipe Spools 0 100% 26-May-07 21-Jun-07 21-May-07 A 17-Aug-07 ASHP1040 Testing & Preservation of Pipe Spools 0 100% 16-Jun-07 06-Jul-07 22-May-07 A 24-Aug-07 ASHP1170 Fabricate SS Pipe Spools 0 100% 13-Jun-07 01-Jul-07 18-Jun-07 A 02-Jul-07 ASHP1180 Fabricate GRE Pipe Spools 0 100% 26-Jun-07 13-Jul-07 28-Jun-07 A 14-Jul-07 A

ElectricalElectrical 0 05-Jun-07 11-Jul-07 30-May-07 A 31-Aug-07 A 0SHP1050 Fabricate Electrical Supports 0 100% 05-Jun-07 29-Jun-07 30-May-07 A 22-Jun-07 ASHP1140 Electrical Shiploose Items 0 100% 21-Jun-07 11-Jul-07 25-Jun-07 A 31-Aug-07 A

InstrumentInstrument 0 05-Jun-07 11-Jul-07 09-Jun-07 A 31-Aug-07 A 0SHP1060 Fabricate Instrument Supports 0 100% 05-Jun-07 29-Jun-07 09-Jun-07 A 06-Jul-07 ASHP1150 Instrument Shiploose Items 0 100% 21-Jun-07 11-Jul-07 25-Jun-07 A 31-Aug-07 A

Blasting/PaintingBlasting/Painting 0 11-Jun-07 24-Jul-07 12-Jun-07 A 03-Aug-07 A 0SHP1070 Blasting/Painting Pipe Supports 0 100% 11-Jun-07 28-Jun-07 12-Jun-07 A 29-Jun-07 ASHP1090 Blasting/Painting Electrical Supports 0 100% 29-Jun-07 09-Jul-07 23-Jun-07 A 29-Jun-07 ASHP1080 Blasting/Painting Pipe Spools 0 100% 06-Jul-07 24-Jul-07 25-Jun-07 A 03-Aug-07 ASHP1100 Blasting/Painting Instrument Supports 0 100% 29-Jun-07 09-Jul-07 25-Jun-07 A 29-Jun-07 ASHP1130 Blasting/Painting Mechanical Items 0 100% 04-Jul-07 13-Jul-07 04-Jul-07 A 13-Jul-07 ASHP1110 Blasting/Painting Structural Members 0 100% 05-Jul-07 17-Jul-07 05-Jul-07 A 20-Jul-07 A

LOADOUT & SEAFLOADOUT & SEAFASTENING SHIPLOOSE 0 08-Aug-07 11-Aug-07 04-Oct-07 A 05-Oct-07 A 0

LOA1020 Loadout & Seafastening Shiploose Items 0 100% 08-Aug-07 11-Aug-07 04-Oct-07 A 05-Oct-07 A

Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct ov2007

Contract No : 591397Client : Sarawak Shell Berhad

Page 12 of 12

Page 49: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items

Close-Out Report

Sarawak Shell Bhd.

APPENDIX 2 - OVERALL S-CURVE

Page 50: Full Version of SCDR-A Close-Out Report(Dated051107)

14-J

ul-0

6

21-J

ul-0

6

28-J

ul-0

6

04-A

ug-0

6

11-A

ug-0

6

18-A

ug-0

6

25-A

ug-0

6

01-S

ep-0

6

08-S

ep-0

6

15-S

ep-0

6

22-S

ep-0

6

29-S

ep-0

6

06-O

ct-0

6

13-O

ct-0

6

20-O

ct-0

6

27-O

ct-0

6

03-N

ov-0

6

10-N

ov-0

6

17-N

ov-0

6

24-N

ov-0

6

01-D

ec-0

6

08-D

ec-0

6

15-D

ec-0

6

22-D

ec-0

6

29-D

ec-0

6

05-J

an-0

7

12-J

an-0

7

19-J

an-0

7

26-J

an-0

7

02-F

eb-0

7

09-F

eb-0

7

16-F

eb-0

7

23-F

eb-0

7

02-M

ar-0

7

09-M

ar-0

7

16-M

ar-0

7

23-M

ar-0

7

30-M

ar-0

7

06-A

pr-0

7

13-A

pr-0

7

20-A

pr-0

7

27-A

pr-0

7

04-M

ay-0

7

11-M

ay-0

7

18-M

ay-0

7

25-M

ay-0

7

01-J

un-0

7

08-J

un-0

7

15-J

un-0

7

22-J

un-0

7

29-J

un-0

7

06-J

ul-0

7

13-J

ul-0

7

20-J

ul-0

7

27-J

ul-0

7

03-A

ug-0

7

10-A

ug-0

7

17-A

ug-0

7

24-A

ug-0

7

31-A

ug-0

7

07-S

ep-0

7

14-S

ep-0

7

21-S

ep-0

7

28-S

ep-0

7

05-O

ct-0

7

Early Plan (Rev. 0) 0.00

0.01

0.04

0.11

0.41

0.73

1.14

1.52

1.97

2.44

2.97

3.52

4.24

5.04

5.91

6.38

7.28

8.15

9.08

10.1

6

11.1

9

12.1

9

13.1

3

14.0

2

14.8

0

15.8

8

17.2

6

18.9

3

20.8

6

23.0

6

25.4

9

28.1

2

30.4

2

32.9

0

35.4

4

37.9

3

40.4

1

43.1

4

45.6

0

48.7

5

51.9

8

55.1

9

57.7

4

61.1

8

64.5

3

68.0

0

70.6

8

74.0

3

77.2

6

80.0

0

82.4

2

85.2

3

87.5

2

89.8

4

92.2

4

94.8

2

96.9

7

98.7

4

99.1

4

99.4

7

100.

00

100.

00

100.

00

100.

00

100.

00

Late Plan (Rev. 0) 0.00

0.00

0.00

0.00

0.02

0.08

0.21

0.34

0.55

0.88

1.28

1.65

2.10

2.59

3.14

3.42

4.02

4.69

5.42

6.17

6.90

7.81

8.90

9.96

10.8

3

11.6

5

12.5

8

13.5

7

14.7

9

16.2

1

17.7

1

19.3

9

20.9

4

22.9

5

25.4

6

28.1

0

30.6

0

33.2

9

35.8

3

38.6

8

41.4

4

44.0

1

46.5

9

49.6

6

52.8

0

55.6

7

58.0

3

61.0

7

64.0

2

66.9

1

70.3

6

74.8

6

78.5

7

82.3

3

85.7

0

88.8

2

91.8

3

94.6

9

97.5

5

99.3

0

100.

00

100.

00

100.

00

100.

00

100.

00

Actual (Rev.0) 0.00

0.01

0.03

0.11

0.39

0.72

1.15

2.39

2.92

3.23

3.51

3.79

4.30

5.01

6.22

6.51

7.24

8.03

8.69

9.71

10.6

0

11.5

3

12.3

6

13.3

1

14.2

3

15.3

7

16.5

2

18.0

2

19.9

6

21.8

8

25.0

2

27.3

9

29.1

1

31.7

3

35.0

9

37.7

4

39.4

0

42.3

0

44.9

7

47.4

2

49.9

1

51.9

5

54.6

3

56.7

5

60.4

6

64.2

7

67.1

2

70.5

0

73.5

2

75.7

8

78.6

8

82.3

0

85.3

2

87.1

5

89.1

6

91.4

3

93.6

3

95.7

6

97.1

9

97.8

2

98.1

2

99.0

4

99.2

4

99.6

2

100.

00

Weekly Plan 0.00

0.01

0.03

0.08

0.30

0.32

0.42

0.38

0.45

0.47

0.53

0.55

0.72

0.79

0.88

0.46

0.90

0.87

0.93

1.08

1.03

1.00

0.94

0.89

0.78

1.08

1.37

1.67

1.93

2.20

2.43

2.63

2.30

2.48

2.54

2.49

2.48

2.73

2.46

3.15

3.22

3.21

2.55

3.44

3.36

3.46

2.69

3.34

3.24

2.73

2.42

2.81

2.29

2.32

2.41

2.57

2.15

1.77

0.40

0.34

0.53

0.00

0.00

0.00

0.00

Weekly Actual 0.00

0.01

0.02

0.08

0.27

0.34

0.42

1.24

0.53

0.31

0.28

0.28

0.51

0.71

1.21

0.29

0.73

0.79

0.66

1.02

0.89

0.93

0.83

0.95

0.92

1.14

1.15

1.50

1.94

1.92

3.14

2.37

1.72

2.62

3.36

2.65

1.66

2.90

2.67

2.45

2.49

2.04

2.68

2.12

3.71

3.81

2.85

3.38

3.02

2.26

2.90

3.62

3.02

1.83

2.01

2.27

2.20

2.13

1.43

0.63

0.30

0.92

0.20

0.38

0.38

Contract No : 591397Job No : #2006351CPlanning Ref : PN5103-0 (M)Rev. No : 0

OVERALL S-CURVE( Manhrs Based )

MALAYSIA MARINE AND HEAVY ENGINEERING SDN. BHD.

0

10

20

30

40

50

60

70

80

90

100

Perc

enta

ge

Early Plan (Rev. 0) Late Plan (Rev. 0) Actual (Rev.0)

FABRICATION OF SCDR-A TOPSIDES & E11K-A SHIPLOOSE

Page 51: Full Version of SCDR-A Close-Out Report(Dated051107)

14-J

ul-0

6

21-J

ul-0

6

28-J

ul-0

6

04-A

ug-0

6

11-A

ug-0

6

18-A

ug-0

6

25-A

ug-0

6

01-S

ep-0

6

08-S

ep-0

6

15-S

ep-0

6

22-S

ep-0

6

29-S

ep-0

6

06-O

ct-0

6

13-O

ct-0

6

20-O

ct-0

6

27-O

ct-0

6

03-N

ov-0

6

10-N

ov-0

6

17-N

ov-0

6

24-N

ov-0

6

01-D

ec-0

6

08-D

ec-0

6

15-D

ec-0

6

22-D

ec-0

6

29-D

ec-0

6

05-J

an-0

7

12-J

an-0

7

19-J

an-0

7

26-J

an-0

7

02-F

eb-0

7

09-F

eb-0

7

16-F

eb-0

7

23-F

eb-0

7

02-M

ar-0

7

09-M

ar-0

7

16-M

ar-0

7

23-M

ar-0

7

30-M

ar-0

7

06-A

pr-0

7

13-A

pr-0

7

20-A

pr-0

7

27-A

pr-0

7

04-M

ay-0

7

11-M

ay-0

7

18-M

ay-0

7

25-M

ay-0

7

01-J

un-0

7

08-J

un-0

7

15-J

un-0

7

22-J

un-0

7

29-J

un-0

7

06-J

ul-0

7

13-J

ul-0

7

20-J

ul-0

7

27-J

ul-0

7

03-A

ug-0

7

10-A

ug-0

7

17-A

ug-0

7

24-A

ug-0

7

31-A

ug-0

7

07-S

ep-0

7

14-S

ep-0

7

21-S

ep-0

7

28-S

ep-0

7

05-O

ct-0

7

Early Plan (Rev. 0) 0.00

0.01

0.04

0.12

0.42

0.74

1.16

1.55

2.01

2.48

3.02

3.57

4.31

5.10

5.99

6.45

7.36

8.24

9.18

10.2

6

11.2

9

12.3

0

13.2

5

14.1

5

14.9

3

16.0

2

17.4

1

19.1

0

21.0

6

23.3

1

25.7

8

28.4

6

30.8

0

33.3

3

35.9

2

38.4

6

40.9

8

43.7

6

46.2

7

49.4

8

52.7

6

56.0

2

58.6

1

62.0

2

65.3

4

68.7

6

71.3

1

74.4

6

77.5

5

80.0

9

82.3

7

85.0

7

87.3

4

89.6

9

92.1

4

94.7

6

96.9

2

98.7

1

99.1

2

99.4

6

100.

00

100.

00

100.

00

100.

00

100.

00

Late Plan (Rev. 0) 0.00

0.00

0.00

0.00

0.02

0.09

0.21

0.34

0.56

0.90

1.30

1.68

2.13

2.63

3.18

3.47

4.07

4.75

5.50

6.25

6.99

7.91

9.02

10.0

9

10.9

7

11.8

1

12.7

4

13.7

4

14.9

8

16.4

2

17.9

4

19.6

4

21.2

1

23.2

5

25.8

0

28.4

8

31.0

3

33.7

6

36.3

5

39.2

5

42.0

5

44.6

6

47.2

8

50.4

0

53.5

8

56.4

5

58.8

0

61.8

3

64.7

0

67.4

3

70.7

5

75.1

3

78.7

1

82.3

5

85.6

0

88.6

9

91.7

0

94.5

9

97.5

0

99.2

9

100.

00

100.

00

100.

00

100.

00

100.

00

Actual (Rev.0) 0.00

0.01

0.04

0.12

0.42

0.74

1.16

2.46

3.00

3.30

3.55

3.86

4.39

5.06

6.29

6.59

7.32

8.13

8.79

9.82

10.7

1

11.6

3

12.4

8

13.4

3

14.3

7

15.5

2

16.6

9

18.2

1

20.1

8

22.1

3

25.3

2

27.7

2

29.4

8

32.1

3

35.5

6

38.2

6

39.9

4

42.8

9

45.6

1

48.1

0

50.6

2

52.6

9

55.4

2

57.4

2

61.1

8

64.9

5

67.7

9

71.0

5

73.9

6

76.1

3

78.8

2

82.3

2

85.3

6

87.2

1

89.2

4

91.5

6

93.7

9

95.9

7

97.2

0

97.8

0

98.1

0

99.0

4

99.2

4

99.6

3

100.

00

Weekly Plan 0.00

0.01

0.03

0.08

0.30

0.32

0.42

0.38

0.46

0.47

0.54

0.56

0.73

0.80

0.88

0.47

0.91

0.88

0.94

1.08

1.03

1.01

0.94

0.90

0.78

1.09

1.39

1.69

1.96

2.24

2.47

2.68

2.34

2.52

2.59

2.54

2.52

2.78

2.51

3.21

3.28

3.27

2.59

3.41

3.32

3.41

2.55

3.15

3.09

2.54

2.27

2.71

2.26

2.35

2.45

2.62

2.16

1.79

0.41

0.34

0.54

0.00

0.00

0.00

0.00

Weekly Actual 0.00

0.01

0.03

0.08

0.30

0.32

0.42

1.30

0.54

0.30

0.25

0.31

0.53

0.67

1.23

0.30

0.73

0.81

0.66

1.03

0.89

0.92

0.85

0.95

0.94

1.15

1.17

1.52

1.97

1.95

3.19

2.40

1.76

2.65

3.43

2.70

1.68

2.95

2.72

2.49

2.52

2.07

2.73

2.00

3.76

3.77

2.84

3.26

2.91

2.17

2.69

3.50

3.04

1.85

2.03

2.32

2.23

2.18

1.23

0.60

0.30

0.94

0.20

0.39

0.37

Contract No : 591397Job No : #2006351CPlanning Ref : PN5103-0 (M)Rev. No : 0

Overall SCDR-A S-CURVE( Manhrs Based )

MALAYSIA MARINE AND HEAVY ENGINEERING SDN. BHD.

0

10

20

30

40

50

60

70

80

90

100

Perc

enta

ge

Early Plan (Rev. 0) Late Plan (Rev. 0) Actual (Rev.0)

FABRICATION OF SCDR-A TOPSIDES

Page 52: Full Version of SCDR-A Close-Out Report(Dated051107)

14-J

ul-0

6

21-J

ul-0

6

28-J

ul-0

6

04-A

ug-0

6

11-A

ug-0

6

18-A

ug-0

6

25-A

ug-0

6

01-S

ep-0

6

08-S

ep-0

6

15-S

ep-0

6

22-S

ep-0

6

29-S

ep-0

6

06-O

ct-0

6

13-O

ct-0

6

20-O

ct-0

6

27-O

ct-0

6

03-N

ov-0

6

10-N

ov-0

6

17-N

ov-0

6

24-N

ov-0

6

01-D

ec-0

6

08-D

ec-0

6

15-D

ec-0

6

22-D

ec-0

6

29-D

ec-0

6

05-J

an-0

7

12-J

an-0

7

19-J

an-0

7

26-J

an-0

7

02-F

eb-0

7

09-F

eb-0

7

16-F

eb-0

7

23-F

eb-0

7

02-M

ar-0

7

09-M

ar-0

7

16-M

ar-0

7

23-M

ar-0

7

30-M

ar-0

7

06-A

pr-0

7

13-A

pr-0

7

20-A

pr-0

7

27-A

pr-0

7

04-M

ay-0

7

11-M

ay-0

7

18-M

ay-0

7

25-M

ay-0

7

01-J

un-0

7

08-J

un-0

7

15-J

un-0

7

22-J

un-0

7

29-J

un-0

7

06-J

ul-0

7

13-J

ul-0

7

20-J

ul-0

7

27-J

ul-0

7

03-A

ug-0

7

10-A

ug-0

7

17-A

ug-0

7

24-A

ug-0

7

31-A

ug-0

7

07-S

ep-0

7

14-S

ep-0

7

21-S

ep-0

7

28-S

ep-0

7

05-O

ct-0

7

Early Plan (Rev. 0) 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

14.7

3

21.8

1

27.9

2

34.0

1

40.1

2

46.2

2

63.8

1

63.8

1

74.8

3

100.

00

100.

00

100.

00

100.

00

100.

00

Late Plan (Rev. 0) 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.78

18.4

2

24.5

2

30.6

1

36.7

2

42.8

1

48.9

2

70.7

0

100.

00

100.

00

100.

00

100.

00

100.

00

Actual (Rev.0) 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

21.8

1

27.9

2

34.0

1

40.1

2

46.2

2

51.9

6

51.9

6

63.8

1

63.8

1

97.6

2

100.

00

100.

00

100.

00

Weekly Plan 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

14.7

3

7.09

6.10

6.09

6.10

6.10

17.5

9

0.00

11.0

1

25.1

7

0.00

0.00

0.00

0.00

Weekly Actual 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

21.8

1

6.11

6.09

6.11

6.10

5.74

0.00

11.8

5

0.00

33.8

1

2.38

0.00

0.00

Contract No : 591397Job No : #2006351CPlanning Ref : PN5103-0 (M)Rev. No : 0

Weighing, Loadout & Seafastening S-CURVE( Manhrs Based )

MALAYSIA MARINE AND HEAVY ENGINEERING SDN. BHD.

0

10

20

30

40

50

60

70

80

90

100

Perc

enta

ge

Early Plan (Rev. 0) Late Plan (Rev. 0) Actual (Rev.0)

FABRICATION OF SCDR-A TOPSIDES

Page 53: Full Version of SCDR-A Close-Out Report(Dated051107)

14-J

ul-0

6

21-J

ul-0

6

28-J

ul-0

6

04-A

ug-0

6

11-A

ug-0

6

18-A

ug-0

6

25-A

ug-0

6

01-S

ep-0

6

08-S

ep-0

6

15-S

ep-0

6

22-S

ep-0

6

29-S

ep-0

6

06-O

ct-0

6

13-O

ct-0

6

20-O

ct-0

6

27-O

ct-0

6

03-N

ov-0

6

10-N

ov-0

6

17-N

ov-0

6

24-N

ov-0

6

01-D

ec-0

6

08-D

ec-0

6

15-D

ec-0

6

22-D

ec-0

6

29-D

ec-0

6

05-J

an-0

7

12-J

an-0

7

19-J

an-0

7

26-J

an-0

7

02-F

eb-0

7

09-F

eb-0

7

16-F

eb-0

7

23-F

eb-0

7

02-M

ar-0

7

09-M

ar-0

7

16-M

ar-0

7

23-M

ar-0

7

30-M

ar-0

7

06-A

pr-0

7

13-A

pr-0

7

20-A

pr-0

7

27-A

pr-0

7

04-M

ay-0

7

11-M

ay-0

7

18-M

ay-0

7

25-M

ay-0

7

01-J

un-0

7

08-J

un-0

7

15-J

un-0

7

22-J

un-0

7

29-J

un-0

7

06-J

ul-0

7

13-J

ul-0

7

20-J

ul-0

7

27-J

ul-0

7

03-A

ug-0

7

10-A

ug-0

7

17-A

ug-0

7

24-A

ug-0

7

31-A

ug-0

7

07-S

ep-0

7

14-S

ep-0

7

21-S

ep-0

7

28-S

ep-0

7

05-O

ct-0

7

Early Plan (Rev. 0) 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.88

1.94

3.22

5.87

9.70

14.3

1

24.7

8

34.4

5

44.4

3

55.3

3

67.8

9

79.0

6

91.6

0

97.5

6

100.

00

100.

00

100.

00

100.

00

100.

00

100.

00

Late Plan (Rev. 0) 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.37

2.50

5.26

10.1

6

22.6

1

40.4

8

65.0

2

89.5

0

100.

00

100.

00

100.

00

100.

00

100.

00

100.

00

Actual (Rev.0) 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.59

0.59

1.03

1.03

1.03

10.2

5

16.6

6

18.3

4

21.0

9

28.6

0

38.1

8

51.1

6

74.7

6

89.9

0

92.5

0

95.4

3

95.4

3

96.8

4

99.0

4

100.

00

Weekly Plan 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.88

1.06

1.27

2.65

3.83

4.61

10.4

7

9.67

9.98

10.9

0

12.5

5

11.1

7

12.5

4

5.97

2.44

0.00

0.00

0.00

0.00

0.00

Weekly Actual 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.59

0.00

0.44

0.00

0.00

9.22

6.41

1.68

2.75

7.51

9.58

12.9

8

23.6

0

15.1

4

2.60

2.93

0.00

1.41

2.20

0.96

Contract No : 591397Job No : #2006351CPlanning Ref : PN5103-0 (M)Rev. No : 0

Pre-Commissioning S-CURVE( Manhrs Based )

MALAYSIA MARINE AND HEAVY ENGINEERING SDN. BHD.

0

10

20

30

40

50

60

70

80

90

100

Perc

enta

ge

Early Plan (Rev. 0) Late Plan (Rev. 0) Actual (Rev.0)

FABRICATION OF SCDR-A TOPSIDES

Page 54: Full Version of SCDR-A Close-Out Report(Dated051107)

14-J

ul-0

6

21-J

ul-0

6

28-J

ul-0

6

04-A

ug-0

6

11-A

ug-0

6

18-A

ug-0

6

25-A

ug-0

6

01-S

ep-0

6

08-S

ep-0

6

15-S

ep-0

6

22-S

ep-0

6

29-S

ep-0

6

06-O

ct-0

6

13-O

ct-0

6

20-O

ct-0

6

27-O

ct-0

6

03-N

ov-0

6

10-N

ov-0

6

17-N

ov-0

6

24-N

ov-0

6

01-D

ec-0

6

08-D

ec-0

6

15-D

ec-0

6

22-D

ec-0

6

29-D

ec-0

6

05-J

an-0

7

12-J

an-0

7

19-J

an-0

7

26-J

an-0

7

02-F

eb-0

7

09-F

eb-0

7

16-F

eb-0

7

23-F

eb-0

7

02-M

ar-0

7

09-M

ar-0

7

16-M

ar-0

7

23-M

ar-0

7

30-M

ar-0

7

06-A

pr-0

7

13-A

pr-0

7

20-A

pr-0

7

27-A

pr-0

7

04-M

ay-0

7

11-M

ay-0

7

18-M

ay-0

7

25-M

ay-0

7

01-J

un-0

7

08-J

un-0

7

15-J

un-0

7

22-J

un-0

7

29-J

un-0

7

06-J

ul-0

7

13-J

ul-0

7

20-J

ul-0

7

27-J

ul-0

7

03-A

ug-0

7

10-A

ug-0

7

17-A

ug-0

7

24-A

ug-0

7

31-A

ug-0

7

07-S

ep-0

7

14-S

ep-0

7

21-S

ep-0

7

28-S

ep-0

7

05-O

ct-0

7

Early Plan (Rev. 0) 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.07

0.16

0.25

0.41

0.48

0.63

0.79

1.15

1.76

2.35

2.93

3.47

4.06

4.68

5.75

7.16

8.98

11.2

4

13.9

0

16.8

8

20.0

5

22.8

1

25.7

7

28.8

9

31.9

7

35.0

2

38.4

5

41.5

3

45.3

7

49.3

1

53.4

2

56.6

8

60.8

9

65.1

2

69.3

6

72.4

8

76.4

0

80.2

1

83.1

2

85.5

9

87.8

1

89.7

8

91.8

0

94.1

3

96.7

2

98.7

8

99.8

9

100.

00

100.

00

100.

00

100.

00

100.

00

100.

00

100.

00

Late Plan (Rev. 0) 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.07

0.12

0.20

0.33

0.48

0.63

0.78

1.14

1.75

2.34

2.83

3.27

3.80

4.42

5.40

6.68

8.14

9.92

11.6

2

13.9

8

17.0

8

20.3

4

23.4

0

26.7

8

30.0

4

33.7

1

37.2

8

40.5

1

43.8

4

47.7

9

51.7

7

55.1

0

57.7

6

61.1

5

64.4

8

67.7

9

71.8

9

77.3

8

81.6

7

85.4

7

89.1

3

92.2

3

94.7

7

96.8

4

99.0

1

100.

00

100.

00

100.

00

100.

00

100.

00

100.

00

Actual (Rev.0) 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.03

0.04

0.14

0.35

0.39

0.55

0.74

1.12

1.79

2.19

2.66

3.13

3.83

4.57

5.58

6.73

8.29

10.4

4

12.5

7

16.0

2

18.9

8

20.8

3

23.7

7

27.7

2

31.1

5

33.2

3

36.7

6

40.2

6

43.1

9

46.4

3

48.7

0

51.9

0

54.3

6

59.0

8

64.0

2

67.8

7

72.1

0

75.7

6

78.4

5

81.2

4

85.1

7

88.2

6

90.4

2

92.5

9

94.9

9

97.0

3

98.4

1

99.1

2

99.2

8

99.4

9

99.6

6

99.6

9

100.

00

100.

00

Weekly Plan 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.07

0.09

0.09

0.15

0.08

0.15

0.15

0.37

0.61

0.60

0.58

0.54

0.59

0.63

1.06

1.41

1.83

2.26

2.66

2.97

3.17

2.76

2.96

3.12

3.08

3.05

3.43

3.07

3.84

3.93

4.12

3.25

4.21

4.23

4.24

3.12

3.92

3.81

2.91

2.47

2.22

1.97

2.02

2.33

2.59

2.06

1.11

0.11

0.00

0.00

0.00

0.00

0.00

0.00

Weekly Actual 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.03

0.01

0.10

0.21

0.04

0.16

0.19

0.38

0.67

0.40

0.47

0.47

0.70

0.74

1.01

1.15

1.56

2.15

2.13

3.45

2.96

1.85

2.94

3.95

3.43

2.08

3.53

3.50

2.93

3.24

2.27

3.20

2.46

4.72

4.94

3.85

4.23

3.66

2.69

2.79

3.93

3.09

2.16

2.17

2.40

2.04

1.38

0.71

0.16

0.21

0.17

0.03

0.31

0.00

Contract No : 591397Job No : #2006351CPlanning Ref : PN5103-0 (M)Rev. No : 0

Fabrication S-CURVE( Manhrs Based )

MALAYSIA MARINE AND HEAVY ENGINEERING SDN. BHD.

0

10

20

30

40

50

60

70

80

90

100

Perc

enta

ge

Early Plan (Rev. 0) Late Plan (Rev. 0) Actual (Rev.0)

FABRICATION OF SCDR-A TOPSIDES

Page 55: Full Version of SCDR-A Close-Out Report(Dated051107)

14-J

ul-0

6

21-J

ul-0

6

28-J

ul-0

6

04-A

ug-0

6

11-A

ug-0

6

18-A

ug-0

6

25-A

ug-0

6

01-S

ep-0

6

08-S

ep-0

6

15-S

ep-0

6

22-S

ep-0

6

29-S

ep-0

6

06-O

ct-0

6

13-O

ct-0

6

20-O

ct-0

6

27-O

ct-0

6

03-N

ov-0

6

10-N

ov-0

6

17-N

ov-0

6

24-N

ov-0

6

01-D

ec-0

6

08-D

ec-0

6

15-D

ec-0

6

22-D

ec-0

6

29-D

ec-0

6

05-J

an-0

7

12-J

an-0

7

19-J

an-0

7

26-J

an-0

7

02-F

eb-0

7

09-F

eb-0

7

16-F

eb-0

7

23-F

eb-0

7

02-M

ar-0

7

09-M

ar-0

7

16-M

ar-0

7

23-M

ar-0

7

30-M

ar-0

7

06-A

pr-0

7

13-A

pr-0

7

20-A

pr-0

7

27-A

pr-0

7

04-M

ay-0

7

11-M

ay-0

7

18-M

ay-0

7

25-M

ay-0

7

01-J

un-0

7

08-J

un-0

7

15-J

un-0

7

22-J

un-0

7

29-J

un-0

7

06-J

ul-0

7

13-J

ul-0

7

20-J

ul-0

7

27-J

ul-0

7

03-A

ug-0

7

10-A

ug-0

7

17-A

ug-0

7

24-A

ug-0

7

31-A

ug-0

7

07-S

ep-0

7

14-S

ep-0

7

21-S

ep-0

7

28-S

ep-0

7

05-O

ct-0

7

Early Plan (Rev. 0) 0.00

0.00

0.00

0.00

0.07

0.38

1.86

3.47

5.38

7.46

10.2

7

13.0

4

16.7

8

20.7

0

24.7

4

26.8

0

30.8

3

34.8

6

38.1

0

40.7

6

43.1

4

45.6

5

47.7

2

49.0

5

49.9

6

50.8

4

51.5

7

52.5

0

53.2

0

53.9

6

54.5

9

55.4

2

56.2

5

57.3

0

58.3

5

59.4

1

60.8

1

62.3

9

64.3

2

67.8

1

71.3

1

73.3

7

75.0

6

77.6

7

79.1

3

81.4

6

83.3

9

85.4

0

86.8

8

88.6

5

90.4

1

92.4

1

94.8

1

98.0

1

99.2

4

99.5

5

99.7

3

99.8

7

100.

00

100.

00

100.

00

100.

00

100.

00

100.

00

100.

00

Late Plan (Rev. 0) 0.00

0.00

0.00

0.00

0.07

0.17

0.29

0.54

1.15

2.60

4.57

6.26

8.16

10.5

0

12.9

3

14.2

2

17.1

6

20.5

1

23.8

4

27.0

1

29.7

3

32.6

9

35.9

1

38.9

7

41.5

1

43.6

7

45.7

4

47.2

6

48.7

7

50.4

3

51.8

5

52.9

0

53.7

4

54.4

4

55.0

1

55.8

1

56.6

4

57.4

1

57.6

9

57.9

8

58.3

4

59.0

8

60.0

8

61.9

6

64.8

4

68.8

1

72.2

9

77.1

0

80.5

7

82.4

0

84.8

6

87.8

3

90.7

2

94.4

6

96.3

5

97.0

7

98.5

9

99.2

3

99.5

3

99.8

6

100.

00

100.

00

100.

00

100.

00

100.

00

Actual (Rev.0) 0.00

0.00

0.00

0.00

0.07

0.38

1.86

5.91

12.5

8

13.7

0

15.5

8

16.1

9

22.1

2

23.3

1

25.7

8

27.8

9

29.2

0

32.4

5

34.9

4

37.2

3

40.3

7

41.4

0

43.3

6

44.8

6

45.9

3

47.4

1

48.2

7

49.7

8

50.9

9

51.4

1

52.5

3

54.1

8

55.8

1

57.2

9

59.7

3

61.7

8

62.5

6

65.8

2

67.6

9

69.8

5

70.7

8

74.6

6

79.0

1

79.9

5

83.0

5

84.4

8

84.5

5

85.4

8

88.3

6

89.7

6

90.3

7

93.4

4

97.0

7

97.2

3

97.5

6

97.9

5

98.6

4

98.9

5

99.1

2

99.3

0

99.4

6

99.7

2

99.7

6

99.7

6

100.

00

Weekly Plan 0.00

0.00

0.00

0.00

0.07

0.31

1.48

1.61

1.91

2.08

2.81

2.76

3.75

3.92

4.04

2.06

4.03

4.03

3.24

2.66

2.38

2.51

2.08

1.33

0.91

0.89

0.73

0.93

0.70

0.76

0.63

0.83

0.83

1.05

1.05

1.06

1.40

1.58

1.93

3.49

3.50

2.06

1.69

2.61

1.46

2.33

1.93

2.00

1.48

1.77

1.76

2.00

2.40

3.20

1.22

0.32

0.18

0.14

0.13

0.00

0.00

0.00

0.00

0.00

0.00

Weekly Actual 0.00

0.00

0.00

0.00

0.07

0.31

1.48

4.05

6.67

1.12

1.88

0.61

5.93

1.19

2.47

2.11

1.31

3.25

2.49

2.29

3.14

1.03

1.96

1.50

1.07

1.48

0.86

1.51

1.21

0.42

1.12

1.65

1.63

1.48

2.44

2.05

0.78

3.26

1.87

2.16

0.93

3.88

4.35

0.94

3.10

1.43

0.07

0.93

2.88

1.40

0.61

3.07

3.63

0.16

0.33

0.39

0.69

0.31

0.17

0.18

0.16

0.26

0.04

0.00

0.24

Contract No : 591397Job No : #2006351CPlanning Ref : PN5103-0 (M)Rev. No : 0

Procurement S-CURVE( Manhrs Based )

MALAYSIA MARINE AND HEAVY ENGINEERING SDN. BHD.

0

10

20

30

40

50

60

70

80

90

100

Perc

enta

ge

Early Plan (Rev. 0) Late Plan (Rev. 0) Actual (Rev.0)

FABRICATION OF SCDR-A TOPSIDES

Page 56: Full Version of SCDR-A Close-Out Report(Dated051107)

14-J

ul-0

6

21-J

ul-0

6

28-J

ul-0

6

04-A

ug-0

6

11-A

ug-0

6

18-A

ug-0

6

25-A

ug-0

6

01-S

ep-0

6

08-S

ep-0

6

15-S

ep-0

6

22-S

ep-0

6

29-S

ep-0

6

06-O

ct-0

6

13-O

ct-0

6

20-O

ct-0

6

27-O

ct-0

6

03-N

ov-0

6

10-N

ov-0

6

17-N

ov-0

6

24-N

ov-0

6

01-D

ec-0

6

08-D

ec-0

6

15-D

ec-0

6

22-D

ec-0

6

29-D

ec-0

6

05-J

an-0

7

12-J

an-0

7

19-J

an-0

7

26-J

an-0

7

02-F

eb-0

7

09-F

eb-0

7

16-F

eb-0

7

23-F

eb-0

7

02-M

ar-0

7

09-M

ar-0

7

16-M

ar-0

7

23-M

ar-0

7

30-M

ar-0

7

06-A

pr-0

7

13-A

pr-0

7

20-A

pr-0

7

27-A

pr-0

7

04-M

ay-0

7

11-M

ay-0

7

18-M

ay-0

7

25-M

ay-0

7

01-J

un-0

7

08-J

un-0

7

15-J

un-0

7

22-J

un-0

7

29-J

un-0

7

06-J

ul-0

7

13-J

ul-0

7

20-J

ul-0

7

27-J

ul-0

7

03-A

ug-0

7

10-A

ug-0

7

17-A

ug-0

7

24-A

ug-0

7

31-A

ug-0

7

07-S

ep-0

7

14-S

ep-0

7

21-S

ep-0

7

28-S

ep-0

7

05-O

ct-0

7

Early Plan (Rev. 0) 0.00

0.00

0.00

0.00

1.94

3.88

5.81

7.42

9.36

11.2

9

13.2

3

14.8

3

17.0

6

19.4

0

22.0

6

23.8

2

27.1

6

30.4

5

33.5

9

36.7

3

39.9

4

42.8

7

45.8

5

49.0

5

51.6

4

54.3

3

57.6

2

60.9

1

64.2

0

67.4

8

70.7

7

74.0

5

76.8

4

79.6

7

82.3

7

84.8

4

86.6

4

88.3

9

89.8

6

91.1

1

92.2

4

93.0

7

93.6

4

94.3

3

95.0

1

95.7

0

96.1

4

96.5

4

96.9

4

97.3

5

97.7

5

98.2

2

98.6

2

99.0

3

99.4

3

99.8

4

100.

00

100.

00

100.

00

100.

00

100.

00

100.

00

100.

00

100.

00

100.

00

Late Plan (Rev. 0) 0.00

0.00

0.00

0.00

0.12

0.56

1.35

2.11

3.50

4.94

6.53

8.14

10.0

8

12.0

1

13.9

5

14.9

2

16.7

6

18.5

1

20.7

9

23.4

2

26.2

8

29.2

3

32.0

3

34.8

1

37.1

9

39.5

6

42.6

9

46.3

9

50.1

1

53.5

8

56.8

8

60.1

7

62.9

5

66.2

4

69.5

2

72.8

1

76.1

0

79.4

3

82.4

5

85.6

0

87.7

0

89.8

1

91.4

1

92.5

5

93.2

3

93.9

2

94.4

9

95.1

7

95.8

6

96.5

5

97.0

7

97.5

4

97.9

5

98.3

5

98.7

5

99.1

6

99.5

6

99.9

7

100.

00

100.

00

100.

00

100.

00

100.

00

100.

00

100.

00

Actual (Rev.0) 0.00

0.00

0.00

0.00

1.94

5.88

8.81

13.6

3

14.9

1

16.7

7

17.7

0

19.9

3

21.1

8

25.4

8

26.0

8

26.8

7

29.3

2

32.4

0

32.9

4

35.6

2

38.0

3

42.8

0

45.4

4

48.3

8

51.3

3

54.1

6

56.9

2

60.3

9

64.5

2

69.0

9

74.8

9

76.3

5

78.7

1

81.6

0

86.1

9

86.6

2

87.4

0

88.4

9

88.9

8

90.0

0

90.8

8

91.2

5

91.4

2

91.5

9

91.8

3

92.0

2

92.1

1

92.9

5

93.0

4

93.5

2

93.5

9

93.7

0

93.8

8

94.0

9

94.2

8

94.7

5

95.0

8

95.1

7

95.8

2

97.1

7

97.2

4

98.2

2

99.0

8

99.0

8

100.

00

Weekly Plan 0.00

0.00

0.00

0.00

1.94

1.94

1.94

1.60

1.94

1.94

1.94

1.60

2.22

2.35

2.66

1.75

3.34

3.29

3.14

3.14

3.21

2.93

2.98

3.20

2.59

2.70

3.29

3.29

3.29

3.29

3.29

3.29

2.78

2.84

2.69

2.47

1.81

1.75

1.47

1.25

1.13

0.83

0.57

0.69

0.69

0.69

0.43

0.40

0.40

0.40

0.41

0.47

0.40

0.40

0.41

0.40

0.16

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Weekly Actual 0.00

0.00

0.00

0.00

1.94

3.94

2.93

4.82

1.28

1.86

0.93

2.23

1.25

4.30

0.60

0.79

2.45

3.08

0.54

2.68

2.41

4.77

2.64

2.94

2.95

2.83

2.76

3.47

4.13

4.57

5.80

1.46

2.36

2.89

4.59

0.43

0.78

1.09

0.49

1.02

0.88

0.37

0.17

0.17

0.24

0.19

0.09

0.84

0.09

0.48

0.07

0.11

0.18

0.21

0.19

0.47

0.33

0.09

0.65

1.35

0.07

0.98

0.86

0.00

0.92

Contract No : 591397Job No : #2006351CPlanning Ref : PN5103-0 (M)Rev. No : 0

Engineering S-CURVE( Manhrs Based )

MALAYSIA MARINE AND HEAVY ENGINEERING SDN. BHD.

0

10

20

30

40

50

60

70

80

90

100

Perc

enta

ge

Early Plan (Rev. 0) Late Plan (Rev. 0) Actual (Rev.0)

FABRICATION OF SCDR-A TOPSIDES

Page 57: Full Version of SCDR-A Close-Out Report(Dated051107)

14-J

ul-0

6

21-J

ul-0

6

28-J

ul-0

6

04-A

ug-0

6

11-A

ug-0

6

18-A

ug-0

6

25-A

ug-0

6

01-S

ep-0

6

08-S

ep-0

6

15-S

ep-0

6

22-S

ep-0

6

29-S

ep-0

6

06-O

ct-0

6

13-O

ct-0

6

20-O

ct-0

6

27-O

ct-0

6

03-N

ov-0

6

10-N

ov-0

6

17-N

ov-0

6

24-N

ov-0

6

01-D

ec-0

6

08-D

ec-0

6

15-D

ec-0

6

22-D

ec-0

6

29-D

ec-0

6

05-J

an-0

7

12-J

an-0

7

19-J

an-0

7

26-J

an-0

7

02-F

eb-0

7

09-F

eb-0

7

16-F

eb-0

7

23-F

eb-0

7

02-M

ar-0

7

09-M

ar-0

7

16-M

ar-0

7

23-M

ar-0

7

30-M

ar-0

7

06-A

pr-0

7

13-A

pr-0

7

20-A

pr-0

7

27-A

pr-0

7

04-M

ay-0

7

11-M

ay-0

7

18-M

ay-0

7

25-M

ay-0

7

01-J

un-0

7

08-J

un-0

7

15-J

un-0

7

22-J

un-0

7

29-J

un-0

7

06-J

ul-0

7

13-J

ul-0

7

20-J

ul-0

7

27-J

ul-0

7

03-A

ug-0

7

10-A

ug-0

7

17-A

ug-0

7

24-A

ug-0

7

31-A

ug-0

7

07-S

ep-0

7

14-S

ep-0

7

21-S

ep-0

7

28-S

ep-0

7

05-O

ct-0

7

Early Plan (Rev. 0) 0.00

0.15

0.58

1.72

3.92

6.12

8.32

10.1

3

12.3

3

14.5

3

16.8

0

19.0

0

21.7

1

25.0

0

28.4

2

29.9

4

32.9

5

35.5

3

37.9

7

40.7

7

43.2

4

45.7

2

48.0

7

49.9

2

50.9

2

51.8

3

53.0

6

54.0

9

54.9

0

55.6

4

56.6

8

58.4

2

60.0

4

61.9

7

63.3

3

64.6

5

66.3

3

67.6

5

68.5

7

70.2

1

71.9

6

73.7

8

75.4

1

77.8

3

80.1

7

82.1

1

83.7

1

85.6

6

87.6

0

89.5

9

91.7

5

94.1

2

94.9

5

95.7

6

96.5

6

97.3

7

98.1

7

99.1

8

100.

00

100.

00

100.

00

100.

00

100.

00

100.

00

100.

00

Late Plan (Rev. 0) 0.00

0.00

0.00

0.00

0.00

0.43

1.22

1.99

2.92

4.44

6.08

7.74

9.94

12.1

4

14.3

4

15.4

4

17.6

6

20.2

6

22.9

1

25.5

9

28.2

7

31.0

1

33.9

2

36.5

8

38.6

9

41.0

5

43.2

3

45.4

8

47.4

9

49.2

8

50.9

9

52.5

8

53.8

5

54.8

1

55.6

8

56.7

2

57.5

4

57.9

8

58.4

3

59.1

5

60.4

9

61.9

9

62.9

7

64.1

8

65.4

0

67.2

8

69.2

6

71.9

3

74.6

0

77.3

1

80.0

2

82.9

3

85.1

4

87.0

8

89.0

2

90.9

6

92.8

9

94.8

3

96.8

6

98.8

4

100.

00

100.

00

100.

00

100.

00

100.

00

Actual (Rev.0) 0.00

0.15

0.58

1.72

3.92

7.12

10.3

2

13.6

6

15.2

1

16.6

5

17.7

3

19.1

0

20.6

6

22.6

1

27.6

7

28.0

4

32.8

6

35.1

7

37.2

8

39.6

7

41.8

9

44.0

4

46.2

2

47.6

7

49.2

4

50.6

2

51.7

4

52.0

7

52.5

1

53.5

5

56.6

9

57.6

4

59.5

0

63.0

3

64.2

0

65.2

4

66.6

6

68.0

2

68.8

4

71.2

8

72.6

1

74.2

8

75.6

7

78.1

8

80.3

4

82.1

7

83.7

8

85.5

1

86.5

0

88.3

0

92.0

2

94.7

2

94.7

2

95.4

0

95.4

0

95.4

0

95.4

0

95.4

0

95.4

0

95.4

0

95.4

4

95.4

4

95.4

4

96.5

8

100.

00

Weekly Plan 0.00

0.15

0.43

1.14

2.20

2.20

2.20

1.82

2.20

2.20

2.26

2.20

2.71

3.29

3.42

1.53

3.00

2.59

2.44

2.80

2.47

2.49

2.35

1.85

1.00

0.91

1.23

1.03

0.81

0.74

1.04

1.74

1.62

1.94

1.36

1.32

1.68

1.32

0.92

1.64

1.75

1.82

1.63

2.41

2.34

1.94

1.60

1.94

1.94

1.99

2.16

2.37

0.83

0.81

0.81

0.81

0.81

1.01

0.82

0.00

0.00

0.00

0.00

0.00

0.00

Weekly Actual 0.00

0.15

0.43

1.14

2.20

3.20

3.20

3.34

1.55

1.44

1.08

1.37

1.56

1.95

5.06

0.37

4.82

2.31

2.11

2.39

2.22

2.15

2.18

1.45

1.57

1.38

1.12

0.33

0.44

1.04

3.14

0.95

1.86

3.53

1.17

1.04

1.42

1.36

0.82

2.44

1.33

1.67

1.39

2.51

2.16

1.83

1.61

1.73

0.99

1.80

3.72

2.70

0.00

0.68

0.00

0.00

0.00

0.00

0.00

0.00

0.04

0.00

0.00

1.14

3.42

Contract No : 591397Job No : #2006351CPlanning Ref : PN5103-0 (M)Rev. No : 0

Preliminaries S-CURVE( Manhrs Based )

MALAYSIA MARINE AND HEAVY ENGINEERING SDN. BHD.

0

10

20

30

40

50

60

70

80

90

100

Perc

enta

ge

Early Plan (Rev. 0) Late Plan (Rev. 0) Actual (Rev.0)

FABRICATION OF SCDR-A TOPSIDES

Page 58: Full Version of SCDR-A Close-Out Report(Dated051107)

14-J

ul-0

6

21-J

ul-0

6

28-J

ul-0

6

04-A

ug-0

6

11-A

ug-0

6

18-A

ug-0

6

25-A

ug-0

6

01-S

ep-0

6

08-S

ep-0

6

15-S

ep-0

6

22-S

ep-0

6

29-S

ep-0

6

06-O

ct-0

6

13-O

ct-0

6

20-O

ct-0

6

27-O

ct-0

6

03-N

ov-0

6

10-N

ov-0

6

17-N

ov-0

6

24-N

ov-0

6

01-D

ec-0

6

08-D

ec-0

6

15-D

ec-0

6

22-D

ec-0

6

29-D

ec-0

6

05-J

an-0

7

12-J

an-0

7

19-J

an-0

7

26-J

an-0

7

02-F

eb-0

7

09-F

eb-0

7

16-F

eb-0

7

23-F

eb-0

7

02-M

ar-0

7

09-M

ar-0

7

16-M

ar-0

7

23-M

ar-0

7

30-M

ar-0

7

06-A

pr-0

7

13-A

pr-0

7

20-A

pr-0

7

27-A

pr-0

7

04-M

ay-0

7

11-M

ay-0

7

18-M

ay-0

7

25-M

ay-0

7

01-J

un-0

7

08-J

un-0

7

15-J

un-0

7

22-J

un-0

7

29-J

un-0

7

06-J

ul-0

7

13-J

ul-0

7

20-J

ul-0

7

27-J

ul-0

7

03-A

ug-0

7

10-A

ug-0

7

17-A

ug-0

7

24-A

ug-0

7

31-A

ug-0

7

07-S

ep-0

7

14-S

ep-0

7

21-S

ep-0

7

28-S

ep-0

7

05-O

ct-0

7

Early Plan (Rev. 0) 0.00

0.00

0.00

0.00

0.00

0.00

0.07

0.18

0.32

0.45

0.58

0.69

1.00

1.57

2.13

2.43

3.06

3.71

4.40

5.08

5.83

6.51

7.18

7.83

8.33

8.85

9.42

10.0

1

10.4

6

10.5

9

10.7

0

10.8

2

10.9

2

11.0

3

11.1

5

11.2

6

11.3

8

11.4

9

11.5

9

11.7

1

12.1

4

12.6

8

13.1

3

17.8

8

23.1

1

29.1

2

38.8

6

51.8

9

62.4

4

74.9

7

85.1

5

93.0

5

96.7

4

97.4

8

97.6

5

97.6

5

99.1

3

100.

00

100.

00

100.

00

100.

00

100.

00

100.

00

100.

00

100.

00

Late Plan (Rev. 0) 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.05

0.18

0.32

0.43

0.56

0.69

0.85

0.98

1.25

1.52

1.78

2.10

2.46

2.85

3.14

3.28

3.59

3.90

4.28

4.61

4.91

5.50

6.09

6.68

7.04

7.46

7.88

8.29

8.71

9.13

9.47

9.89

10.3

0

10.7

2

11.3

0

12.1

4

12.9

9

16.0

9

18.7

6

22.2

0

29.2

7

40.6

5

50.3

9

61.4

9

70.9

8

81.4

8

90.6

5

95.3

2

98.7

7

100.

00

100.

00

100.

00

100.

00

100.

00

100.

00

100.

00

100.

00

Actual (Rev.0) 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.66

0.87

0.88

0.89

0.90

0.92

1.07

2.45

2.67

2.88

3.28

3.62

3.94

5.33

6.19

6.50

6.99

7.37

7.48

7.65

8.40

8.76

8.93

9.71

10.1

2

10.5

7

11.0

7

11.2

7

11.5

3

11.6

5

12.1

2

12.5

1

12.6

3

13.7

6

13.8

6

13.9

4

22.1

5

23.7

9

29.5

6

33.3

7

42.4

7

51.0

6

57.8

2

71.5

9

81.1

0

83.1

3

84.1

5

84.6

5

84.8

7

85.4

0

85.4

0

96.5

6

98.6

7

99.0

1

99.0

1

99.0

6

99.1

9

100.

00

Weekly Plan 0.00

0.00

0.00

0.00

0.00

0.00

0.07

0.11

0.13

0.13

0.12

0.11

0.32

0.56

0.56

0.29

0.64

0.65

0.69

0.69

0.75

0.67

0.67

0.65

0.50

0.51

0.58

0.59

0.45

0.12

0.11

0.12

0.10

0.11

0.12

0.11

0.12

0.11

0.10

0.12

0.43

0.54

0.45

4.74

5.23

6.02

9.74

13.0

2

10.5

5

12.5

3

10.1

8

7.90

3.69

0.74

0.17

0.00

1.48

0.87

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Weekly Actual 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.66

0.21

0.01

0.01

0.01

0.02

0.15

1.38

0.22

0.21

0.40

0.34

0.32

1.39

0.86

0.31

0.49

0.38

0.11

0.17

0.75

0.36

0.17

0.78

0.41

0.45

0.50

0.20

0.26

0.12

0.47

0.39

0.12

1.13

0.10

0.08

8.21

1.64

5.77

3.81

9.10

8.59

6.76

13.7

7

9.51

2.03

1.02

0.50

0.22

0.53

0.00

11.1

6

2.11

0.34

0.00

0.05

0.13

0.81

Contract No : 591397Job No : #2006351CPlanning Ref : PN5103-0 (M)Rev. No : 0

OverAll S-Curve E11K-A Shiploose Items( Manhrs Based )

MALAYSIA MARINE AND HEAVY ENGINEERING SDN. BHD.

0

10

20

30

40

50

60

70

80

90

100

Perc

enta

ge

Early Plan (Rev. 0) Late Plan (Rev. 0) Actual (Rev.0)

FABRICATION OF E11K-A SHIPLOOSE ITEMS

Page 59: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items

Close-Out Report

Sarawak Shell Bhd.

APPENDIX 3 - MANPOWER HISTOGRAM

Page 60: Full Version of SCDR-A Close-Out Report(Dated051107)

Manpower Indirect 1 2 3 8 7 10 28 19 30 25 39 30 35 35 43 36 44 41 50 43 47 47 63 49 69 51 73 55 39 28 75 54 72 55 64 56 62 56 58 56 57 56 53 54 46 46 33 41 33 44 40 58 39 58 38 60 37 60 39 58 44 56 39 46 43 50 38 48 36 50 35 48 33 47 31 45 39 42 39 46 34 45 28 40 36 40 31 41 37 45 30 44 32 42 27 43 29 42 30 40 34 40 27 39 28 39 17 37 10 37 8 35 7 33 6 30 27 17 15 15 15

Project Management 1 2 3 6 7 8 14 9 14 10 14 13 11 14 14 15 14 17 14 19 14 22 17 24 21 26 21 30 10 11 19 29 16 30 15 31 17 31 15 31 15 31 15 30 12 25 6 21 6 22 8 27 6 28 5 30 5 30 6 28 11 26 10 21 12 22 9 20 8 23 10 22 8 22 6 21 10 21 11 25 11 24 10 21 15 21 15 22 12 26 10 25 12 23 12 24 12 23 13 21 15 21 5 20 5 20 5 20 5 20 5 20 6 20 5 20 20 14 12 12 12

Proc Coord 1 1 1 5 2 8 12 8 13 10 15 10 16 10 22 10 22 10 29 10 31 10 32 10 16 9 32 10 32 10 26 10 21 10 19 10 20 10 17 10 11 9 8 9 7 9 8 10 9 10 9 10 9 10 9 10 10 10 10 8 10 10 10 10 11 10 12 11 13 11 15 11 19 10 20 11 17 11 14 10 16 10 12 10 20 10 17 10 17 10 12 10 14 10 14 10 16 10 19 10 20 10 10 9 2 9 1 8 1 7 1 4 3 1 1 1 1

Corrd+Designer+etc 1 1 14 5 14 7 14 9 12 11 14 11 14 14 14 14 12 15 16 15 17 15 20 15 13 8 25 15 24 15 23 15 23 15 23 15 21 15 22 14 23 12 19 11 20 13 24 21 24 20 24 20 23 20 23 20 23 20 20 17 20 18 19 18 18 17 13 15 12 14 10 13 9 11 8 10 6 10 4 9 5 9 5 9 5 9 3 9 3 9 3 9 3 9 3 9 3 9 3 9 3 9 3 8 3 8 1 7 6 6 4 2 2 2 2

Manpower Direct 5 3 6 7 6 13 10 17 5 10 10 13 10 17 24 25 40 51 39 54 38 51 35 58 38 54 41 46 69 61 92 85 119

102

147

111

174

121

194

137

207

159

180

140

193

157

203

195

201

197

199

202

224

210

201

223

251

245

257

254

269

244

212

217

283

209

285

211

290

263

223

262

283

254

280

263

231

272

203

268

221

269

189

265

186

248

209

249

232

224

195

195

160

166

31 153

32 140

50 113

84 41 17

Struct Fitter 0 2 1 1 1 2 1 2 4 7 10 16 15 16 15 15 16 14 17 14 15 15 12 27 22 35 30 44 38 54 39 61 40 68 42 70 47 57 34 56 32 49 30 35 28 27 22 28 22 23 21 28 20 22 20 18 19 14 17 17 14 11 16 8 18 4 17 6 13 4 13 2 14 2 14 2 14 14 10 10 10 8 8 8 6 6 4 3 1

Struct Welder 0 1 1 1 1 1 5 2 12 7 12 8 11 10 10 11 10 10 11 10 20 12 26 20 33 27 41 29 46 32 52 46 55 49 44 30 44 40 39 42 28 34 24 32 28 31 27 31 31 29 24 28 19 22 15 16 19 20 14 21 10 23 5 22 6 20 4 20 2 20 1 20 1 20 19 16 15 14 12 12 12 10 10 6 4 2

Rigger 2 0 4 1 5 0 3 1 4 1 4 3 3 6 5 6 5 6 6 5 6 5 6 6 5 10 7 14 7 18 8 23 8 27 8 29 8 32 12 28 19 29 22 27 29 25 27 22 24 25 27 22 25 29 24 27 22 24 20 17 19 21 20 17 16 16 20 12 21 18 22 21 22 18 23 16 22 17 21 14 21 14 18 18 17 19 17 13 14 5 10 1 8 6 4 4 2 1

Painter 5 3 6 5 6 9 6 10 3 5 6 6 6 5 6 4 1 2 1 1 5 4 5 3 4 3 4 4 5 4 7 4 7 5 8 8 7 8 7 7 6 10 11 19 20 36 26 51 35 47 37 29 40 33 41 30 42 24 41 4 34 5 21 7 17 5 17 4 15 2 15 2 15 5 19 4 17 3 17 4 12 2 9 2 8 1 8 8 8 6 6 4 4 4 2

Mechanical Tech 0 1 1 1 1 1 1 1 1 2 1 2 2 1 2 1 2 1 2 1 2 1 2 5 7 8 7 17 7 23 7 24 8 21 8 16 8 16 9 18 9 25 10 31 12 21 7 10 7 4 4 4 2 1 1

Mechanical Fitter 0 1 3 2 3 2 3 2 3 2 3 2 3 2 2 1 4 1 3 1 3 1 3 1 3 1 3 3 10 5 11 14 11 21 11 20 11 12 11 10 11 10 10 11 12 15 17 43 17 59 14 47 12 2 7 5 3 1 1

Pipe Fitter 2 3 5 5 7 6 10 9 13 10 15 12 20 11 20 12 22 12 19 14 27 17 31 20 29 20 18 17 23 17 20 18 21 25 18 24 22 23 22 25 20 24 16 24 21 22 18 21 14 19 16 17 13 16 8 14 2 10 10 8 3 3 2

Pipe Welder 1 2 5 5 7 2 9 7 12 8 14 9 20 10 19 10 21 11 17 12 27 14 31 17 30 17 19 15 24 16 22 17 23 18 18 19 21 18 20 18 16 17 13 17 20 16 17 16 15 14 18 14 16 13 11 12 2 9 9 7 4 4 2 1

Hydrotest/Leaktest 5 5 6 6 6 9 8 9 8 10 8 8 8 8 8 8 9 8 9 8 9 6 7 7 6 4 2 2

Electrical 0 3 2 3 2 3 2 4 2 5 2 4 3 18 5 22 5 26 5 47 5 61 10 63 17 37 16 41 16 37 16 18 16 13 17 11 18 12 20 10 20 13 21 8 16 0 11 9 9 6 5 4 3 1

Electrical (F) 1 6 5 6 5 6 5 9 6 9 8 6 10 9 10 10 10 10 9 13 9 15 9 16 9 9 9 11 9 11 9 6 9 6 9 4 9 4 10 3 10 3 12 2 8 0 6 5 5 5 4 2 1

Instrument 0 2 1 2 1 2 2 3 2 4 2 11 5 11 6 27 6 29 4 47 4 58 8 62 14 57 13 69 14 48 16 31 17 23 18 8 17 3 18 3 18 6 17 6 17 4 16 12 12 10 6 4 3 1

Instrument (F) 1 5 4 5 4 5 4 7 5 7 7 7 8 7 10 12 10 10 8 12 8 14 9 16 9 14 9 18 10 14 10 10 10 9 10 3 10 2 9 1 9 2 10 2 7 1 7 6 6 5 4 2 1

Architectural 2 2 10 4 11 5 13 6 13 6 20 5 18 5 15 8 9 7 9 9 8 8 9 8 9 10 10 10 18 11 19 10 9 10 9 10 8 8 4 2 1 1

HVAC 2 3 7 5 13 11 13 11 13 12 16 13 25 13 14 13 12 12 10 12 12 12 16 12 20 12 15 12 9 11 8 11 7 11 9 3 2 1 1

Scaffolder 1 2 10 2 12 2 9 2 7 2 6 1 5 3 5 4 5 5 5 6 7 8 10 9 9 10 12 8 10 8 7 8 12 7 15 7 14 8 14 7 17 10 22 8 20 7 18 6 20 7 22 7 21 5 25 2 23 3 20 2 22 1 24 1 23 2 22 2 22 3 20 4 18 4 12 3 12 1 10 12 12 12 6 2 1

Helper (Marker/Grinder) 0 0 1 0 1 0 2 0 3 2 6 4 12 4 13 4 10 3 12 3 12 4 10 7 11 9 18 12 17 14 21 16 23 17 25 18 24 16 22 16 24 14 26 12 29 10 32 9 30 8 31 10 29 11 32 11 34 7 30 6 27 4 24 4 23 2 27 3 24 3 25 2 24 2 21 3 22 2 21 3 20 3 19 2 17 1 17 0 15 14 12 10 8 6 3

Testing & PreCommissioning 4 2 4 4 5 6 13 6 19 6 24 6 33 6 40 7 41 13 45 14 51 20 46 20 51 20 24 18 10 16 12 4 4 4

Weighing Technician 21 7 2 5 23

LoadOut and Seafastening 8 12 2 12 2 12 4 12 4 15 4 13 4 4 22 16 50 20 25

Total Wkly Manpower 1 2 3 8 7 10 28 19 30 25 39 30 35 35 43 36 44 41 50 43 52 50 68 56 75 64 83 72 44 38 85 67 82 72 88 81 101

107

97 110

95 107

89 112

84 100

73 87 102

105

132

143

158

160

185

171

211

181

233

195

251

215

220

186

236

207

242

243

237

247

235

250

257

257

232

268

289

287

296

300

303

289

240

257

319

249

316

252

327

308

254

306

315

296

307

306

261

314

233

308

255

309

216

304

214

287

227

286

243

261

203

230

167

199

38 183

32 167

50 130

99 56 32

Total Indirect Manhrs

42

1

08

1

21

4

32

3

19

5

40

1,2

60

1,0

26

1,3

47

1,3

50

1,7

65

1,6

20

1,5

96

1,8

90

1,9

20

1,9

44

1,9

81

2,2

14

2,2

53

2,3

22

2,1

10

2,5

38

2,8

14

2,6

46

3,0

98

2,7

54

3,2

77

2,9

70

1,7

37

1,2

60

3,3

79

2,4

30

3,2

50

2,4

75

2,8

81

2,5

20

2,7

84

2,5

20

2,6

17

2,5

20

2,5

68

2,5

20

2,3

98

2,4

30

2,0

60

2,0

70

1,4

67

1,8

45

1,4

71

1,9

80

1,7

90

2,6

10

1,7

60

2,6

10

1,6

96

2,7

00

1,6

69

2,7

00

1,7

54

2,6

10

1,9

75

2,5

20

1,7

76

2,0

70

1,9

19

2,2

50

1,7

12

2,1

60

1,6

32

2,2

50

1,5

93

2,1

60

1,4

96

2,1

15

1,4

17

2,0

25

1,7

35

1,8

90

1,7

61

2,0

70

1,5

43

2,0

25

1,2

72

1,8

00

1,5

99

1,8

00

1,4

13

1,8

45

1,6

50

2,0

25

1,3

60

1,9

80

1,4

33

1,8

90

1,1

96

1,9

35

1,3

08

1,8

90

1,3

58

1,8

00

1,5

17

1,8

00

1,2

05

1,7

55

1,2

57

1,7

55

7

86

1,6

65

4

66

1,6

65

3

41

1,5

75

3

33

1,4

85

2

74

1,3

50

-

1,2

15

-

7

65

-

6

75

-

6

75

6

75

Total Direct Manhrs

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

214

162

259

378

269

702

448

918

224

450

448

585

448

765

1,

076

1,

125

1,

778

2,

295

1,

748

2,

430

1,

693

2,

295

1,

586

2,

610

1,

729

2,

416

1,

836

2,

070

3,

122

2,

745

4,

133

3,

825

5,

369

4,

590

6,

628

4,

995

7,

818

5,

445

8,

734

6,

165

9,

308

7,

155

8,

116

6,

300

8,

681

7,

065

9,

156

8,

775

9,

036

8,

865

8,

966

9,

090

10,

072

9,

450

9,

025

10,

035

11,

285

11,

025

11,

550

11,

430

12,

087

10,

980

9,

549

9,

765

12,

751

9,

405

12,

821

9,

495

13,

048

11,

835

10,

050

11,

790

12,

751

11,

430

12,

622

11,

835

10,

415

12,

240

9,

149

12,

060

9,

940

12,

105

8,

507

11,

925

8,

364

11,

160

9,

418

11,

205

10,

448

10,

080

8,

783

8,

775

7,

191

7,

470

1,

416

6,

885

1,

425

6,

300

2,

231

5,

085

-

3,

780

-

1,

845

765

Total Overall Manhrs

42

108

121

432

319

540

1,

260

1,

026

1,

347

1,

350

1,

765

1,

620

1,

596

1,

890

1,

920

1,

944

1,

981

2,

214

2,

253

2,

322

2,

324

2,

700

3,

073

3,

024

3,

367

3,

456

3,

725

3,

888

1,

961

1,

710

3,

827

3,

015

3,

698

3,

240

3,

957

3,

645

4,

562

4,

815

4,

365

4,

950

4,

261

4,

815

3,

984

5,

040

3,

789

4,

486

3,

303

3,

915

4,

593

4,

725

5,

923

6,

435

7,

129

7,

200

8,

324

7,

695

9,

487

8,

145

10,

488

8,

775

11,

283

9,

675

9,

892

8,

370

10,

600

9,

315

10,

868

10,

935

10,

668

11,

115

10,

559

11,

250

11,

568

11,

565

10,

442

12,

060

13,

020

12,

915

13,

311

13,

500

13,

630

13,

005

10,

821

11,

565

14,

350

11,

205

14,

234

11,

340

14,

698

13,

860

11,

410

13,

770

14,

184

13,

320

13,

818

13,

770

11,

723

14,

130

10,

507

13,

860

11,

457

13,

905

9,

712

13,

680

9,

621

12,

915

10,

204

12,

870

10,

914

11,

745

9,

124

10,

350

7,

524

8,

955

1,

690

8,

235

1,

425

7,

515

2,

231

5,

850

-

4,

455

-

2,

520

1,

440

Legend Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Plan

Act

ual

Act

ual

Contract No : 591397Job No : #2006351C

Planning Ref : PN5103-0 (M)

Rev. No : 0

28-S

ep-0

7

14-S

ep-0

7

31-A

ug-0

7

17-A

ug-0

7

3-A

ug-0

7

13-J

ul-0

7

29-J

un-0

7

22-J

un-0

7

8-Ju

n-07

18-M

ay-0

7

11-M

ay-0

7

4-M

ay-0

7

20-A

pr-0

7

27-A

pr-0

7

6-A

pr-0

7

23-M

ar-0

7

16-M

ar-0

7

2-M

ar-0

7

23-F

eb-0

7

9-Fe

b-07

26-J

an-0

7

5-Ja

n-07

22-D

ec-0

6

8-D

ec-0

6

1-D

ec-0

6

27-O

ct-0

6

1-Se

p-06

10-N

ov-0

6

8-Se

p-06

15-S

ep-0

6

22-S

ep-0

6

20-O

ct-0

6

MALAYSIA MARINE AND HEAVY ENGINEERING SDN. BHD.OVERALL MANPOWER HISTOGRAM

21-J

ul-0

6

28-J

ul-0

6

4-A

ug-0

6

11-A

ug-0

6

18-A

ug-0

6

25-A

ug-0

6

29-S

ep-0

6

6-O

ct-0

6

13-O

ct-0

6

3-N

ov-0

6

17-N

ov-0

6

24-N

ov-0

6

29-D

ec-0

6

15-D

ec-0

6

12-J

an-0

7

19-J

an-0

7

2-Fe

b-07

16-F

eb-0

7

9-M

ar-0

7

30-M

ar-0

7

13-A

pr-0

7

1-Ju

n-07

25-M

ay-0

7

15-J

un-0

7

6-Ju

l-07

27-J

ul-0

7

20-J

ul-0

7

10-A

ug-0

7

24-A

ug-0

7

21-S

ep-0

7

7-Se

p-07

FABRICATION OF SCDR-A TOPSIDES

0

50

100

150

200

250

300

350

21-J

ul-0

6

28-J

ul-0

6

4-A

ug-0

6

11-A

ug-0

6

18-A

ug-0

6

25-A

ug-0

6

1-S

ep-0

6

8-S

ep-0

6

15-S

ep-0

6

22-S

ep-0

6

29-S

ep-0

6

6-O

ct-0

6

13-O

ct-0

6

20-O

ct-0

6

27-O

ct-0

6

3-N

ov-0

6

10-N

ov-0

6

17-N

ov-0

6

24-N

ov-0

6

1-D

ec-0

6

8-D

ec-0

6

15-D

ec-0

6

22-D

ec-0

6

29-D

ec-0

6

5-Ja

n-07

12-J

an-0

7

19-J

an-0

7

26-J

an-0

7

2-Fe

b-07

9-Fe

b-07

16-F

eb-0

7

23-F

eb-0

7

2-M

ar-0

7

9-M

ar-0

7

16-M

ar-0

7

23-M

ar-0

7

30-M

ar-0

7

6-A

pr-0

7

13-A

pr-0

7

20-A

pr-0

7

27-A

pr-0

7

4-M

ay-0

7

11-M

ay-0

7

18-M

ay-0

7

25-M

ay-0

7

1-Ju

n-07

8-Ju

n-07

15-J

un-0

7

22-J

un-0

7

29-J

un-0

7

6-Ju

l-07

13-J

ul-0

7

20-J

ul-0

7

27-J

ul-0

7

3-A

ug-0

7

10-A

ug-0

7

17-A

ug-0

7

24-A

ug-0

7

31-A

ug-0

7

7-S

ep-0

7

14-S

ep-0

7

21-S

ep-0

7

28-S

ep-0

7

MA

NPO

WER

PER

WEE

K

Project Management Proc Coord Corrd+Designer+etc Struct Fitter Struct Welder Rigger Painter Mechanical Tech Mechanical FitterPipe Fitter Pipe Welder Hydrotest/Leaktest Electrical Electrical (F) Instrument Instrument (F) Architectural HVACScaffolder Helper (Marker/Grinder) Testing & PreCommissioning Weighing Technician LoadOut and Seafastening

Page 61: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items

Close-Out Report

Sarawak Shell Bhd.

APPENDIX 4 - PROGRESS CALCULATION LEVEL-IV

Page 62: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A TOPSIDES ##### ###### 12-Oct-07Activity Break Down Level IVPROG. COD : 28-Sep-07

ACT ID ACTIVITY NAME MHRS WTG

PLANNED START

PLANNED FINISH MHRS BASIS OF

QTY (UNIT)LVL 4 WTG EST QTY EARLY

PLAN MID PLAN LATE PLAN ACTUAL VARpg g pj p

Fabrication of SCDR-A Topsides & Existing E11K-A Platform 100.00 19-Jul-06 04-Sep-07 424,227 100.00 100.00 100.00 100.00 0.00 PRELIMINARIES 6.61 19-Jul-06 23-Aug-07 28,043 100.00 100.00 100.00 100.00 0.00 Construction Facilities 2.17 19-Jul-06 05-Jul-07 9,209 % Comp 100.00 100.00 100.00 100.00 0.00PRE1130 Set-up Contractor's Facilities 0.28 19-Jul-06 06-Dec-06 1,200 Physical 100% 0 100.00 100.00 100.00 100.00 100.00 0.00PRE1170 Facilities for 3rd Parties 1.36 07-Feb-07 05-Jul-07 5,760 Physical 100% 0 100.00 100.00 100.00 100.00 100.00 0.00PRE1180 Set-up SSB's site Office and Facilities 0.28 19-Jul-06 18-Dec-06 1,200 Physical 100% 0 100.00 100.00 100.00 100.00 100.00 0.00PRE1210 Set-up EDMS system, including lease line. 0.08 07-Oct-06 12-Jan-07 320 Physical 100% 0 100.00 100.00 100.00 100.00 100.00 0.00PRE1220 Set-up Completion Management System 0.07 07-Oct-06 09-Mar-07 285 Physical 100% 0 100.00 100.00 100.00 100.00 100.00 0.00PRE1430 Set-up Video conferencing Facilities 0.03 07-Oct-06 06-Nov-06 134 Physical 100% 0 100.00 100.00 100.00 100.00 100.00 0.00PRE1440 Welder Qualification Test 0.07 12-Oct-06 28-Dec-06 310 Physical 100% 0 100.00 100.00 100.00 100.00 100.00 0.00

Project Management 1.13 01-Aug-06 15-May-07 4,789 100.00 100.00 100.00 100.00 0.00

PRE1450 Mobilise Project Management Team, Supervision and Staff 0.87 01-Aug-06 20-Dec-06 3,675 Nos. 100% 40 100.00 100.00 100.00 100.00 0.00PRE1690 Mobilise Pre-Commissioning Team 0.26 07-Apr-07 15-May-07 1,114 Nos. 100% 35 100.00 100.00 100.00 100.00 0.00 Procedures Preparation 1.03 01-Aug-06 06-Jul-07 4,365 100.00 100.00 100.00 100.00 0.00

PRE1480 Prepare/Submit/Approve Planning Package 0.15 01-Aug-06 31-Oct-06 649 % Compl 100% 1 100.00 100.00 100.00 100.00 0.00PRE1490 Prepare/Submit/Approve HSE Procedures 0.16 01-Aug-06 06-Nov-06 695 % Compl 100% 2 100.00 100.00 100.00 100.00 0.00

- HSE Manual % Compl 50% 1 100.00- Project HSE Plan % Compl 50% 1 100.00

PRE1500 Prepare/Submit/Approve QA/QC Procedures 0.16 01-Aug-06 06-Nov-06 695 % Compl 100% 21 100.00 100.00 100.00 100.00 0.00- Site Project Quality Plan % Compl 5% 1 100.00- Welder Qualification & Testing Procedure % Compl 5% 1 100.00- Post Weld Heat Treatment (PWHT) Procedure % Compl 5% 1 100.00- Weld Distortion Control Procedure % Compl 5% 1 100.00- Weld Repair & Buttering Procedure % Compl 5% 1 100.00- Welding Consumable Control Procedure % Compl 5% 1 100.00- WPS Procedure for Structural % Compl 5% 1 100.00- WPS Procedure for Piping % Compl 5% 1 100.00- Standard NDT Procedure % Compl 5% 1 100.00- Fairing Procedure % Compl 5% 1 100.00- Leveling & Dimensional Control Proc. % Compl 5% 1 100.00- Control of Non Conformance Product Procedure % Compl 5% 1 100.00- Document Control Procedure % Compl 5% 1 100.00- ITP for Structural % Compl 5% 1 100.00- ITP for Piping % Compl 5% 1 100.00- ITP for Blasting & Painting % Compl 5% 1 100.00- ITP for Mechanical % Compl 5% 1 100.00- ITP for Instrumentation % Compl 5% 1 100.00- ITP for Electrical % Compl 5% 1 100.00- Radiograph Safety and Emergency Procedure % Compl 5% 1 100.00- Positive Material Identification % Compl 5% 1 100.00

PRE1510 Prepare/Submit/Approve Engineering Procedures 0.19 01-Aug-06 02-Jan-07 797 % Compl 100% 4 100.00 100.00 100.00 100.00 0.00- Engineering Control Procedure % Compl 25% 1 100.00- Weight Control Procedure % Compl 25% 1 100.00- General Lifting Procedure % Compl 25% 1 100.00- Loadout and Seafastening Procedure % Compl 25% 1 100.00

PRE1520 Prepare/Submit/Approve Weighing Procedures 0.07 25-Jan-07 05-Apr-07 278 % Compl 100% 1 100.00 100.00 100.00 100.00 0.00PRE1670 Prepare/Submit/Approve Fabrication Procedures 0.20 01-Aug-06 25-Jan-07 834 % Compl 100% 18 100.00 100.00 100.00 100.00 0.00

- Project Execution Plan % Compl 6% 1 100.00- Planning & Control Procedure % Compl 6% 1 100.00- Structural Fabrication & Erection Procedure % Compl 6% 1 100.00- Piping Fabrication & Erection Procedure % Compl 6% 1 100.00- Electrical And Instrumentation Installation Procedure % Compl 6% 1 100.00- Mechanical Equipment Installation Procedure % Compl 6% 1 100.00- Surface Preparation, Painting and Repair/B/P Procedure % Compl 6% 1 100.00- Hydrotest / Flushing & Reinstatement Procedure % Compl 6% 1 100.00- Valve Leak Test Procedure % Compl 6% 1 100.00- Chemical Cleaning Procedure % Compl 6% 1 100.00- Contract Administration & Change Order Procedure % Compl 6% 1 100.00- Fabrication and Installation of GRE Piping % Compl 6% 1 100.00- Bolt Tensioning Procedure % Compl 6% 1 100.00- Inspection & Maintenance of Lifting Equipment Procedure % Compl 6% 1 100.00- Insulation Procedure % Compl 6% 1 100.00- Scaffolding Installation Procedure % Compl 6% 1 100.00- Duplex Fabrication Procedure % Compl 6% 1 100.00

1 1 11 1 1

1 1 11 1 1

1 1 11 1 1

1 1 11 1 1

1 1 11 1 1

1 1 11 1 1

1 1 11 1 1

1 1 11 1 1

18 18 181 1 1

1 1 11 1 1

1 1 11 1 1

4 4 41 1 1

1 1 1

1 1 11 1 1

1 1 11 1 1

1 1 11 1 1

1 1 11 1 1

1 1 11 1 1

1 1 11 1 1

1 1 11 1 1

1 1 11 1 1

1 1 11 1 1

1 1 11 1 1

1 1 121 21 21

2 2 21 1 1

30% 60% 10%1 1 1

35Prepare Submitted Approved

No. of Personel Mobilized

100%40

PROGRESS MEASUREMENT

CUMM PROGRESS THIS WEEK

1 of 22

Page 63: Full Version of SCDR-A Close-Out Report(Dated051107)

PROG. COD : 28-Sep-07

ACT ID ACTIVITY NAME MHRS WTG

PLANNED START

PLANNED FINISH MHRS BASIS OF

QTY (UNIT)LVL 4 WTG EST QTY EARLY

PLAN MID PLAN LATE PLAN ACTUAL VARPROGRESS MEASUREMENT

CUMM PROGRESS THIS WEEK

- Coating System Qualification Test Procedure % Compl 6% 1 100.00PRE1680 Prepare/Submit/Approve Precomm Procedures 0.10 24-Apr-07 06-Jul-07 417 % Compl 100% 4 100.00 100.00 100.00 100.00 0.00

- Instrument Calibration Procedure % Compl 25% 1 100.00- Lube Oil Flushing Procedure % Compl 25% 1 100.00- Reinstatement Leak Test Procedure % Compl 25% 1 100.00- Testing and Precommissioning Procedure % Compl 25% 1 100.00

Insurance & Bond 0.16 21-Sep-06 21-Feb-07 695 100.00 100.00 100.00 100.00 0.00

PRE1530 Submit/Accept Performance Bond 0.05 21-Sep-06 18-Nov-06 218 % Compl 100% 1 100.00 100.00 100.00 100.00 0.00PRE1540 Submit/Accept Insurances 0.05 21-Sep-06 16-Oct-06 227 % Compl 100% 1 100.00 100.00 100.00 100.00 0.00PRE1550 Submit/Accept CIDB Tax 0.06 21-Sep-06 21-Feb-07 250 % Compl 100% 1 100.00 100.00 100.00 100.00 0.00 Final Documentations 0.75 07-May-07 23-Aug-07 3,200 100.00 100.00 100.00 100.00 0.00

PRE1560 Prepare & Submit Final Documentation (Manual/Closeout Report/ 0.75 07-May-07 23-Aug-07 3,200 % Compl 100% 1 100.00 100.00 100.00 100.00 0.00 Sub-Contractors Selection 1.07 01-Aug-06 10-Aug-07 4,545 100.00 100.00 100.00 100.00 0.00

PRE1260 Prepare Tender/Evaluate for STRUCTURAL Subcontractor 0.17 01-Aug-06 11-Oct-06 720 % Compl 100% 1 100.00 100.00 100.00 100.00 0.00PRE1270 Prepare Tender/Evaluate for BLASTING & PAINTING Subcontractor 0.08 26-Sep-06 05-Dec-06 360 % Compl 100% 1 100.00 100.00 100.00 100.00 0.00PRE1280 Prepare Tender/Evaluate for PIPING Subcontractor 0.17 06-Oct-06 05-Jan-07 710 % Compl 100% 1 100.00 100.00 100.00 100.00 0.00PRE1290 Prepare Tender/Evaluate for MECHANICAL Subcontractor 0.10 23-Oct-06 13-Jan-07 420 % Compl 100% 1 100.00 100.00 100.00 100.00 0.00PRE1300 Prepare Tender/Evaluate for ELECTRICAL Subcontractor 0.14 17-Nov-06 20-Feb-07 610 % Compl 100% 1 100.00 100.00 100.00 100.00 0.00PRE1310 Prepare Tender/Evaluate for INSTRUMENT Subcontractor 0.14 17-Nov-06 20-Feb-07 610 % Compl 100% 1 100.00 100.00 100.00 100.00 0.00PRE1320 Prepare Tender/Evaluate for ARCHITECTURAL Subcontractor 0.08 02-Jan-07 16-Mar-07 325 % Compl 100% 1 100.00 100.00 100.00 100.00 0.00PRE1330 Prepare Tender/Evaluate for HVAC Subcontractor 0.06 06-Oct-06 15-Nov-06 235 % Compl 100% 1 100.00 100.00 100.00 100.00 0.00PRE1405 Prepare Tender/Evaluate for GRE PIPING Subcontractor 0.05 27-Jan-07 17-Mar-07 220 % Compl 100% 1 100.00 100.00 100.00 100.00 0.00PRE1505 Prepare Tender/Evaluate for WEIGHING Subcontractor 0.04 27-Apr-07 25-Jun-07 175 % Compl 100% 1 100.00 100.00 100.00 100.00 0.00PRE1605 Prepare Tender/Evaluate for LOAD-OUT Subcontractor 0.04 18-Jun-07 10-Aug-07 160 % Compl 100% 1 100.00 100.00 100.00 100.00 0.00 Award Sub-Contractor & Mobilization 0.29 11-Oct-06 18-Aug-07 1,240 100.00 100.00 100.00 100.00 0.00

PRE1265 Award & Mobilization of STRUCTURAL Subcontractor 0.03 11-Oct-06 19-Oct-06 120 % Compl 100% 1 100.00 100.00 100.00 100.00 0.00PRE1275 Award & Mobilization of BLASTING & PAINTING Subcontractor 0.03 05-Dec-06 13-Dec-06 110 % Compl 100% 1 100.00 100.00 100.00 100.00 0.00PRE1285 Award & Mobilization of PIPING Subcontractor 0.03 05-Jan-07 13-Jan-07 120 % Compl 100% 1 100.00 100.00 100.00 100.00 0.00PRE1295 Award & Mobilization of MECHANICAL Subcontractor 0.03 13-Jan-07 22-Jan-07 110 % Compl 100% 1 100.00 100.00 100.00 100.00 0.00PRE1305 Award & Mobilization of ELECTRICAL Subcontractor 0.03 20-Feb-07 28-Feb-07 120 % Compl 100% 1 100.00 100.00 100.00 100.00 0.00PRE1315 Award & Mobilization of INSTRUMENT Subcontractor 0.03 20-Feb-07 28-Feb-07 120 % Compl 100% 1 100.00 100.00 100.00 100.00 0.00PRE1325 Award & Mobilization of ARCHITECTURAL Subcontractor 0.03 16-Mar-07 24-Mar-07 110 % Compl 100% 1 100.00 100.00 100.00 100.00 0.00PRE1335 Award & Mobilization of HVAC Subcontractor 0.03 15-Nov-06 23-Nov-06 120 % Compl 100% 1 100.00 100.00 100.00 100.00 0.00PRE1355 Award & Mobilization of GRE PIPING Subcontractor 0.03 17-Mar-07 26-Mar-07 110 % Compl 100% 1 100.00 100.00 100.00 100.00 0.00PRE1365 Award & Mobilization of WEIGHING Subcontractor 0.02 25-Jun-07 02-Jul-07 100 % Compl 100% 1 100.00 100.00 100.00 100.00 0.00PRE1375 Award & Mobilization of LOAD-OUT Subcontractor 0.02 10-Aug-07 18-Aug-07 100 % Compl 100% 1 100.00 100.00 100.00 100.00 0.00 ENGINEERING 7.53 04-Aug-06 06-Aug-07 31,954 100.00 100.00 100.00 100.00 0.00 Review Materials 1.22 04-Aug-06 02-Jan-07 5,183 100.00 100.00 100.00 100.00 0.00

PRE1340 Prepare/Submit/Approve of STRUCTURAL MTO 0.18 04-Aug-06 08-Nov-06 762 Nos. 100% 15 100.00 100.00 100.00 100.00 0.00PRE1341 Prepare/Submit/Approve of PIPING MTO 0.23 04-Aug-06 02-Dec-06 967 Nos. 100% 15 100.00 100.00 100.00 100.00 0.00PRE1342 Prepare/Submit/Approve of MECHANICAL MTO 0.16 04-Aug-06 27-Oct-06 660 Nos. 100% 35 100.00 100.00 100.00 100.00 0.00PRE1343 Prepare/Submit/Approve of ELECTRICAL MTO 0.22 04-Aug-06 27-Nov-06 920 Nos. 100% 19 100.00 100.00 100.00 100.00 0.00PRE1344 Prepare/Submit/Approve of INSTRUMENT MTO 0.22 04-Aug-06 27-Nov-06 920 Nos. 100% 29 100.00 100.00 100.00 100.00 0.00PRE1345 Prepare/Submit/Approve of ARCHITECTURAL MTO 0.11 18-Oct-06 18-Dec-06 477 Nos. 100% 2 100.00 100.00 100.00 100.00 0.00PRE1346 Prepare/Submit/Approve of HVAC MTO 0.11 23-Nov-06 02-Jan-07 477 Nos. 100% 25 100.00 100.00 100.00 100.00 0.00 Construction Drawings 6.31 04-Aug-06 06-Aug-07 26,771 100.00 100.00 100.00 100.00 0.00

PRE1350 Prepare/Submit/Approve STRUCTURAL Shop Drawings 1.04 04-Aug-06 23-Feb-07 4,393 Nos. 100% 234 100.00 100.00 100.00 100.00 0.00- IFA Shop Drawings Nos. 25% 24 100.00- IFC Shop Drawings Nos. 25% 138 100.00- IFA Shop Drawings (NDT) Nos. 25% 36 100.00- IFC Shop Drawings (NDT) Nos. 25% 36 100.00

PRE1360 Prepare/Submit/Approve PIPING Shop Drawings 1.19 04-Aug-06 13-Mar-07 5,040 Nos. 100% 989 100.00 100.00 100.00 100.00 0.00- IFA Shop Drawings Nos. 50% 391 100.00- IFC Shop Drawings Nos. 50% 598 100.00

PRE1370 Prepare/Submit/Approve MECHANICAL Shop Drawings 0.64 02-Oct-06 02-Mar-07 2,717 Nos. 100% 107 100.00 100.00 100.00 100.00 0.00- IFA Shop Drawings Nos. 50% 40 100.00- IFC Shop Drawings Nos. 50% 67 100.00

PRE1380 Prepare/Submit/Approve ELECTRICAL Shop Drawings 0.86 18-Oct-06 02-Apr-07 3,650 Nos. 100% 694 100.00 100.00 100.00 100.00 0.00- IFA Shop Drawings Nos. 50% 347 100.00- IFC Shop Drawings Nos. 50% 347 100.00

PRE1390 Prepare/Submit/Approve INSTRUMENT Shop Drawings 0.82 18-Oct-06 07-Apr-07 3,491 Nos. 100% 1798 100.00 100.00 100.00 100.00 0.00- IFA Shop Drawings Nos. 50% 899 100.00- IFC Shop Drawings Nos. 50% 899 100.00

PRE1400 Prepare/Submit/Approve ARCHITECTURAL Shop Drawings 0.52 30-Dec-06 23-Apr-07 2,215 Nos. 100% 22 100.00 100.00 100.00 100.00 0.00- IFA Shop Drawings Nos. 50% 11 100.00

Submitted Approved20% 20%

Prepare Shop Dwg Submitted Approved

100% 100%100% 100%

100% 100%100% 100%

100% 100%100% 100%

100% 100%100% 100%

100% 100%100% 100%

90% 10%100% 100%

100% 100%Award Mobilized

100% 100%100% 100%

100% 100%100% 100%

100% 100%100% 100%

100% 100%100% 100%

100% 100%100% 100%

Tender Evaluation ApprovedPrepare Subcon Pkg40% 10%50%

70% 20% 10%1 1 1

1 1Prepare Submitted Approved

1 11 1

Submitted Accepted90% 10%

1 1 11 1 1

1 1 11 1 1

1 1 14 4 4

60% 20% 20%

15 151535

1535

1929225

1929225

234

989

107

694

241383636

391

40

22

899

11

899

391

234

989

107

694

1798

22

234

989

107

694

241383636

60%15

100%100%100%100%100%100%100%100%100%100%100%

Prepare MTO

15351929225

241383636

391598 598 598

40 4067 67 67

347 347 347347 347 347

899 89917981798

899 899

11 1122

2 of 22

Page 64: Full Version of SCDR-A Close-Out Report(Dated051107)

PROG. COD : 28-Sep-07

ACT ID ACTIVITY NAME MHRS WTG

PLANNED START

PLANNED FINISH MHRS BASIS OF

QTY (UNIT)LVL 4 WTG EST QTY EARLY

PLAN MID PLAN LATE PLAN ACTUAL VARPROGRESS MEASUREMENT

CUMM PROGRESS THIS WEEK

- IFC Shop Drawings Nos. 50% 11 100.00PRE1410 Prepare/Submit/Approve HVAC Shop Drawings 0.43 13-Dec-06 17-Mar-07 1,824 Nos. 100% 59 100.00 100.00 100.00 100.00 0.00PRE1420 Prepare/Submit/Approve AS-BUILT Drawings 0.55 29-Mar-07 06-Aug-07 2,349 Nos. 100% 2186 100.00 100.00 100.00 100.00 0.00

- As-built drawings for Structural + NDT Nos. 26% 174 100.00- As-built drawings for Piping Nos. 20% 598 100.00- As-built drawings for Mechanical Nos. 12% 90 100.00- As-built drawings for Electrical Nos. 15% 355 100.00- As-built drawings for Instrument Nos. 15% 899 100.00- As-built drawings for Architectural Nos. 5% 11 100.00- As-built drawings for HVAC Nos. 7% 59 100.00

PRE1720 Prepare/Submit/Approve SEAFASTENING Drawings 0.26 01-Mar-07 28-May-07 1,092 Nos. 100% 12 100.00 100.00 100.00 100.00 0.00 PROCUREMENT 8.30 07-Aug-06 23-Aug-07 35,196 100.00 100.00 100.00 100.00 0.00 Client Supply Materils 0.71 17-Aug-06 23-Aug-07 3,017 100.00 100.00 100.00 100.00 0.00

PRO1000 Rec'v/Accept Structural Steel : Type I and II Plates 0.04 17-Aug-06 05-Sep-06 180 Nos. 100% 34 100.00 100.00 100.00 100.00 0.00PRO1010 Rec'v/Accept Structural Steel : Type I and II Beams 0.04 17-Aug-06 05-Sep-06 180 Nos. 100% 175 100.00 100.00 100.00 100.00 0.00PRO1020 Rec'v/Accept Structural Steel : Type I and II Round Tubulars 0.04 17-Aug-06 05-Sep-06 180 Nos. 100% 71 100.00 100.00 100.00 100.00 0.00PRO1030 Rec'v/Accept All Ball Valves : Manual & Actuated Valves 2" (CS,Du 0.04 02-Apr-07 19-Apr-07 190 Nos. 100% 207 100.00 100.00 100.00 100.00 0.00PRO1040 Rec'v/Accept Motor Operated Valves 0.03 02-Apr-07 19-Apr-07 140 Nos. 100% 3 100.00 100.00 100.00 100.00 0.00PRO1050 Rec'v/Accept Distributed Control System (DCS) & Audio Visual Aid 0.05 04-Apr-07 21-Apr-07 200 Nos. 100% 90 100.00 100.00 100.00 100.00 0.00PRO1060 Rec'v/Accept IPS, FGS and Wellhead Control System (WHCS) 0.07 04-Apr-07 21-Apr-07 300 Nos. 100% 9 100.00 100.00 100.00 100.00 0.00PRO1070 Rec'v/Accept AC Uninterruptible Power Supply (UPS) 0.05 09-Apr-07 25-Apr-07 220 Nos. 100% 22 100.00 100.00 100.00 100.00 0.00PRO1080 Rec'v/Accept 400V Switchboard 0.05 09-Apr-07 25-Apr-07 200 Nos. 100% 8 100.00 100.00 100.00 100.00 0.00PRO1090 Rec'v/Accept Telecommunication Equipment 0.04 18-Apr-07 05-May-07 180 Nos. 100% 31 100.00 100.00 100.00 100.00 0.00PRO1100 Rec'v/Accept Wellhead Desander Skids 0.09 18-May-07 05-Jun-07 400 Nos. 100% 5 100.00 100.00 100.00 100.00 0.00PRO1110 Rec'v/Accept Wet Gas Metering Skid (Operational Metering) 0.05 01-Jun-07 19-Jun-07 200 Nos. 100% 2 100.00 100.00 100.00 100.00 0.00PRO1120 Rec'v/Accept 14" CS Pipeline (pipeline spools, bends, major & min 0.03 30-Jun-07 17-Jul-07 147 Nos. 100% 8 100.00 100.00 100.00 100.00 0.00PRO1130 Rec'v/Accept Seafastening Mat'l, Lifting Slings and Shackles 0.03 07-Aug-07 23-Aug-07 120 Nos. 100% 2 100.00 100.00 100.00 100.00 0.00PRO1140 Rec'v/Accept Fittings & Accessories for Subsea Cable Conection 0.04 03-Jul-07 20-Jul-07 180 Nos. 100% 2 100.00 100.00 100.00 100.00 0.00 MMHE Supply Materials 7.59 07-Aug-06 08-Aug-07 32,179 100.00 100.00 100.00 100.00 0.00 Purchase Request to Purchase Order 3.96 07-Aug-06 08-Feb-07 16,796 PR RFQ BCD TBE PO 100.00 100.00 100.00 100.00 0.00 Structural 0.75 11-Sep-06 19-Dec-06 3,167 30% 10% 10% 40% 10% 100.00 100.00 100.00 100.00 0.00PRO1600 PR/PO of Structural Tubulars 0.11 11-Sep-06 30-Oct-06 475 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00

- Secondary Pipes (Type III) Comt'd Qty 100% 1 1 1 1 1 1 100.00PRO1610 PR/PO of Structural Beams 0.11 15-Sep-06 06-Nov-06 470 Comt'd Qty 100% 2 2 2 2 2 2 100.00 100.00 100.00 100.00 0.00

- Secondary Beam (Type III) Comt'd Qty 50% 1 1 1 1 1 1 100.00- Monorail Beam Comt'd Qty 50% 1 1 1 1 1 1 100.00

PRO1620 PR/PO of Structural Plates 0.11 22-Sep-06 15-Nov-06 460 Comt'd Qty 50% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00- Deck Plating Comt'd Qty 50% 1 1 1 1 1 1 100.00

PRO1630 PR/PO of Ancillary Steel (grating, stair tread, etc.) 0.11 07-Oct-06 30-Nov-06 451 Comt'd Qty 100% 5 5 5 5 5 5 100.00 100.00 100.00 100.00 0.00- Grating Materials Comt'd Qty 20% 1 1 1 1 1 1 100.00- Handrail Materials Comt'd Qty 20% 1 1 1 1 1 1 100.00- Flatbars and Kickplates Round Bar Comt'd Qty 20% 1 1 1 1 1 1 100.00- Stair Materials Comt'd Qty 20% 1 1 1 1 1 1 100.00- T-6700 Structural Scope Materials Comt'd Qty 20% 1 1 1 1 1 1 100.00

PRO1640 PR/PO of Miscellaneous Sections (angles, chanels, SHS etc.) 0.12 29-Sep-06 24-Nov-06 526 Comt'd Qty 100% 2 2 2 2 2 2 100.00 100.00 100.00 100.00 0.00- Angles and Channels (Type III) Comt'd Qty 50% 1 1 1 1 1 1 100.00- Deck Drain Materials Comt'd Qty 50% 1 1 1 1 1 1 100.00

PRO1650 PR/PO of Fire/Blast Walls 0.07 16-Oct-06 11-Dec-06 300 Comt'd Qty 100% 3 3 3 3 3 3 100.00 100.00 100.00 100.00 0.00- Wall Platings & Wall Angular Support Comt'd Qty 33% 1 1 1 1 1 1 100.00- Wall Cladding Comt'd Qty 33% 1 1 1 1 1 1 100.00- Fire/Blast Walls Comt'd Qty 33% 1 1 1 1 1 1 100.00

PRO1660 PR/PO of Passive Fire Projection (PFP) 0.06 19-Oct-06 16-Dec-06 270 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO1670 PR/PO of All Remaining Structural Mat'l 0.05 23-Oct-06 19-Dec-06 215 Comt'd Qty 100% 2 2 2 2 2 2 100.00 100.00 100.00 100.00 0.00

- Temp. Support Materials Comt'd Qty 100% 2 2 2 2 2 2 100.00 Piping 0.84 07-Sep-06 27-Dec-06 3,544 30% 10% 10% 40% 10% 100.00 100.00 100.00 100.00 0.00PRO1690 PR/PO of Carbon Steel (CS) Pipes & Fitting 0.12 07-Sep-06 04-Nov-06 500 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00

- Carbon Steel Pipes Comt'd Qty 100% 1 1 1 1 1 1 100.00PRO1700 PR/PO of Stainless Steel (SS) Pipes & Fitting 0.10 11-Sep-06 11-Nov-06 420 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00

- SS and DSS Pipes Comt'd Qty 100% 1 1 1 1 1 1 100.00PRO1710 PR/PO of Duplex Stainless Steel (DSS) Pipes & Fitting 0.17 13-Sep-06 22-Nov-06 704 Comt'd Qty 100% 2 2 2 2 2 2 100.00 100.00 100.00 100.00 0.00

- Flange CS / Duplex / SS Comt'd Qty 50% 1 1 1 1 1 1 100.00- Fitting CS / Duplex / SS Comt'd Qty 50% 1 1 1 1 1 1 100.00

PRO1720 PR/PO of GRE Pipes & Fitting 0.08 22-Sep-06 11-Nov-06 360 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00- GRE Pipes & Fittings Comt'd Qty 100% 1 1 1 1 1 1 100.00

PRO1730 PR/PO of Valves 0.14 16-Sep-06 05-Dec-06 580 Comt'd Qty 100% 5 5 5 5 5 5 100.00 100.00 100.00 100.00 0.00- Ball Valves Comt'd Qty 20% 1 1 1 1 1 1 100.00- Ball Valves for GRE lines Comt'd Qty 20% 1 1 1 1 1 1 100.00- Globe, Gate & Check Valves Comt'd Qty 20% 1 1 1 1 1 1 100.00- Check Valves for GRE lines Comt'd Qty 20% 1 1 1 1 1 1 100.00- Double Block & Bleed Valve Comt'd Qty 20% 1 1 1 1 1 1 100.00

592186

11

12

592186

592186

12

Delivered to Site Accepted80% 20%

12

34 3417571

17571

315

2073909

315

2073909228

2822

228

2822

11 11

174 174 174598 598 598

90355 355 35590 90

899 899 89911 11 1159 59 59

3 of 22

Page 65: Full Version of SCDR-A Close-Out Report(Dated051107)

PROG. COD : 28-Sep-07

ACT ID ACTIVITY NAME MHRS WTG

PLANNED START

PLANNED FINISH MHRS BASIS OF

QTY (UNIT)LVL 4 WTG EST QTY EARLY

PLAN MID PLAN LATE PLAN ACTUAL VARPROGRESS MEASUREMENT

CUMM PROGRESS THIS WEEK

PRO1740 PR/PO of Piping Specialty Items 0.06 03-Oct-06 23-Nov-06 260 Comt'd Qty 80% 4 4 4 4 4 4 100.00 100.00 100.00 100.00 0.00- Gasket Comt'd Qty 20% 1 1 1 1 1 1 100.00- Studbolt with Nuts Comt'd Qty 20% 1 1 1 1 1 1 100.00- Pipe Support Mat'l Comt'd Qty 20% 1 1 1 1 1 1 100.00- Pipe Support - U-Bolts/Clamps Comt'd Qty 20% 1 1 1 1 1 1 100.00

PRO1750 PR/PO of Pipe Bends & Barred Tees 0.07 03-Oct-06 28-Nov-06 280 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00- Reduced Barred Tee Comt'd Qty 100% 1 1 1 1 1 1 100.00

PRO1760 PR/PO of Associated Fittings & Acc. for Launcher 0.06 18-Oct-06 18-Dec-06 260 Comt'd Qty 100% 5 5 5 5 5 5 100.00 100.00 100.00 100.00 0.00- Launcher (L-2900) & Receiver (L-2960) Comt'd Qty 20% 1 1 1 1 1 1 100.00- Pig Trap End Closure (Launcher Material) Comt'd Qty 20% 1 1 1 1 1 1 100.00- Eccentric Reducer (Launcher Material) Comt'd Qty 20% 1 1 1 1 1 1 100.00- Weldolet (Launcher Material) Comt'd Qty 20% 1 1 1 1 1 1 100.00- Welding Neck Flanges (Launcher Material) Comt'd Qty 20% 1 1 1 1 1 1 100.00

PRO1770 PR/PO of All Remaining Piping Mat'l 0.04 27-Oct-06 27-Dec-06 180 Comt'd Qty 100% 5 5 5 5 5 5 100.00 100.00 100.00 100.00 0.00- All Remaining Materials Comt'd Qty 100% 5 5 5 5 5 5 100.00

Mechanical 0.62 07-Aug-06 16-Nov-06 2,615 30% 10% 10% 40% 10% 100.00 100.00 100.00 100.00 0.00PRO1780 PR/PO of Flush Water Tank 0.04 12-Aug-06 30-Oct-06 160 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO1790 PR/PO of Fresh Water Tank 0.04 12-Aug-06 30-Oct-06 160 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO1800 PR/PO of Closed Drain Vessel 0.04 15-Aug-06 13-Oct-06 175 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO1810 PR/PO of Condensate Pod 0.04 15-Aug-06 11-Oct-06 150 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO1820 PR/PO of Diesel Transfer Pump 0.03 24-Aug-06 28-Oct-06 140 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO1830 PR/PO of Open Drain Caisson Pump 0.03 23-Aug-06 19-Oct-06 135 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO1840 PR/PO of Flush Water Pump 0.03 22-Aug-06 20-Oct-06 130 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO1850 PR/PO of Fresh Water Pump 0.03 22-Aug-06 20-Oct-06 130 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO1860 PR/PO of Closed Drain Transfer Pump 0.03 23-Aug-06 19-Oct-06 135 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO1870 PR/PO of All Remaining Pumps 0.03 26-Aug-06 06-Nov-06 120 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO1880 PR/PO of HP Vent Tip 0.03 17-Aug-06 03-Nov-06 140 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO1890 PR/PO of CO2 Vent Snuffing System 0.03 17-Aug-06 03-Nov-06 140 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO1900 PR/PO of Manual Operated Trolley Hoists 0.03 21-Aug-06 07-Oct-06 135 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO1910 PR/PO of Padestal Crane 0.07 07-Aug-06 02-Oct-06 280 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO1920 PR/PO of Swing Jib Cranes with Manual Operated Hoist 0.03 21-Aug-06 17-Oct-06 135 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO1930 PR/PO of Corrosion Inhibitor Injection Package 0.05 18-Aug-06 17-Oct-06 200 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO1940 PR/PO of All Remaining Mechanical Items 0.04 29-Aug-06 16-Nov-06 150 Comt'd Qty 100% 6 6 6 6 6 6 100.00 100.00 100.00 100.00 0.00

- Corrosion Probe and Coupon Assembly Comt'd Qty 17% 1 1 1 1 1 1 100.00- Chemical Injection and Sampling Conection Fitting Comt'd Qty 17% 1 1 1 1 1 1 100.00- Y-Type Strainers Comt'd Qty 17% 1 1 1 1 1 1 100.00- Spring Hangers Comt'd Qty 17% 1 1 1 1 1 1 100.00- Bird Screens Comt'd Qty 17% 1 1 1 1 1 1 100.00- Sight Glasses Comt'd Qty 17% 1 1 1 1 1 1 100.00

Electrical 0.60 12-Aug-06 09-Jan-07 2,530 30% 10% 10% 40% 10% 100.00 100.00 100.00 100.00 0.00PRO1960 PR/PO of Power Transformer 0.08 12-Aug-06 30-Oct-06 340 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO1970 PR/PO of 6.6KV Ring Main Unit 0.07 18-Aug-06 14-Nov-06 300 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO1980 PR/PO of LV Distribution Board 0.07 18-Aug-06 14-Nov-06 300 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO1990 PR/PO of Powered Navigational Aids System 0.04 18-Oct-06 29-Dec-06 160 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO2000 PR/PO of Cable Trays, Ladder & Accessories 0.05 11-Sep-06 14-Nov-06 200 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00

- Cable Ladder / Tray & Accessories Comt'd Qty 100% 1 1 1 1 1 1 100.00PRO2010 PR/PO of Electrical / Control Cables, Fitting & MCT's 0.07 29-Aug-06 08-Nov-06 300 Comt'd Qty 100% 2 2 2 2 2 2 100.00 100.00 100.00 100.00 0.00

- Cables (Power & Control, AC/DC UPS, Lighting & Small Power). Comt'd Qty 50% 1 1 1 1 1 1 100.00- Multicable Transit (MCT) & Accessories Comt'd Qty 50% 1 1 1 1 1 1 100.00

PRO2020 PR/PO of Junction Boxes and Control Panels 0.04 22-Sep-06 15-Dec-06 180 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00- Interposing Relay Panel Comt'd Qty 100% 1 1 1 1 1 1 100.00

PRO2030 PR/PO of Remote Control Units and Safety Switches 0.05 14-Oct-06 30-Dec-06 210 Comt'd Qty 100% 2 2 2 2 2 2 100.00 100.00 100.00 100.00 0.00- Socket, Plug & Switches Comt'd Qty 50% 1 1 1 1 1 1 100.00- Remote Control Station Comt'd Qty 50% 1 1 1 1 1 1 100.00

PRO2040 PR/PO of Light Fitting, Photocells Mounting and Accessories 0.07 29-Sep-06 21-Dec-06 300 Comt'd Qty 100% 4 4 4 4 4 4 100.00 100.00 100.00 100.00 0.00- Fluorescent, Exit Light & Floodlights Lighting Fixture Comt'd Qty 25% 1 1 1 1 1 1 100.00- Power & Lighting Junction Boxes Comt'd Qty 25% 1 1 1 1 1 1 100.00- Lighting Poles Comt'd Qty 25% 1 1 1 1 1 1 100.00- Beacon AOL Photocell Comt'd Qty 25% 1 1 1 1 1 1 100.00

PRO2050 PR/PO of Earthing Accessories 0.03 02-Nov-06 15-Dec-06 120 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO2060 PR/PO of All Other Electrical Items 0.03 10-Nov-06 09-Jan-07 120 Comt'd Qty 100% 2 2 2 2 2 2 100.00 100.00 100.00 100.00 0.00

- Electrical Steel Mat'l Comt'd Qty 100% 2 2 2 2 2 2 100.00 Instrument 0.90 21-Aug-06 19-Dec-06 3,837 30% 10% 10% 40% 10% 100.00 100.00 100.00 100.00 0.00PRO2070 PR/PO of Wellhead Control Panel 0.05 24-Aug-06 11-Nov-06 200 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO2080 PR/PO of Sand Monitoring System 0.03 13-Sep-06 17-Nov-06 122 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO2090 PR/PO of GPA/PAPA 0.04 07-Sep-06 11-Nov-06 150 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO2100 PR/PO of Restriction Orifice Plates 0.03 31-Oct-06 12-Dec-06 128 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO2110 PR/PO of Orifice Plates 0.03 31-Oct-06 12-Dec-06 128 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO2120 PR/PO of Ultrasonic Flowmeters 0.04 26-Aug-06 28-Oct-06 150 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO2130 PR/PO of Level Gauges (Reflex Type) 0.03 14-Oct-06 29-Nov-06 138 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO2140 PR/PO of Level Gauges (Using Pressure Gauge) 0.03 14-Oct-06 29-Nov-06 138 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00

4 of 22

Page 66: Full Version of SCDR-A Close-Out Report(Dated051107)

PROG. COD : 28-Sep-07

ACT ID ACTIVITY NAME MHRS WTG

PLANNED START

PLANNED FINISH MHRS BASIS OF

QTY (UNIT)LVL 4 WTG EST QTY EARLY

PLAN MID PLAN LATE PLAN ACTUAL VARPROGRESS MEASUREMENT

CUMM PROGRESS THIS WEEK

PRO2150 PR/PO of Pressure Gauges 0.03 20-Sep-06 14-Nov-06 145 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO2160 PR/PO of Choke Valves 0.07 29-Aug-06 08-Nov-06 300 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO2170 PR/PO of Pig Signallers 0.03 28-Oct-06 04-Dec-06 130 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO2180 PR/PO of IR Flame Detector 0.03 02-Nov-06 12-Dec-06 122 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO2190 PR/PO of IR Point Gas Detector 0.03 02-Nov-06 08-Dec-06 122 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO2200 PR/PO of IR Open Path Gas Detector 0.03 02-Nov-06 08-Dec-06 122 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO2210 PR/PO of Smoke Detector 0.03 02-Nov-06 08-Dec-06 122 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO2220 PR/PO of Hydrogen Gas Detector 0.03 02-Nov-06 08-Dec-06 122 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO2230 PR/PO of ESD Break Glass Station 0.03 08-Nov-06 11-Dec-06 122 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO2240 PR/PO of Acoustic Leak Detector 0.03 02-Nov-06 11-Dec-06 122 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO2250 PR/PO of Heat Detector 0.03 02-Nov-06 08-Dec-06 122 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO2260 PR/PO of Control, Ball and Operated Valves 0.05 21-Aug-06 07-Nov-06 220 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO2270 PR/PO of Ultra Sonic Flare Gas Meter 0.04 23-Aug-06 02-Nov-06 150 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO2280 PR/PO of Field Instrument & Mounting Stands & Supports etc. 0.03 16-Sep-06 08-Nov-06 140 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO2290 PR/PO of Cable Tray & Ladders 0.04 22-Sep-06 18-Nov-06 151 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO2300 PR/PO of Instrument Cable, Junction Boxes & MCT's 0.03 19-Sep-06 14-Nov-06 140 Comt'd Qty 100% 4 4 4 4 4 4 100.00 100.00 100.00 100.00 0.00

- Instrument Cables Comt'd Qty 25% 1 1 1 1 1 1 100.00- Cable Glands Comt'd Qty 25% 1 1 1 1 1 1 100.00- Junction Boxes Comt'd Qty 25% 1 1 1 1 1 1 100.00- Multicable Transit (MCT) & Accessories Comt'd Qty 25% 1 1 1 1 1 1 100.00

PRO2310 PR/PO of Instrument Tubing, Fittings & Valves 0.03 28-Sep-06 22-Nov-06 148 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO2320 PR/PO of All Remaining Instrumentation Items 0.04 10-Nov-06 19-Dec-06 183 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00 Architectural 0.08 24-Nov-06 06-Jan-07 352 30% 10% 10% 40% 10% 100.00 100.00 100.00 100.00 0.00PRO1680 PR/PO of Architectural Mat'l (floor/wall/ceiling panels, doors and w 0.08 24-Nov-06 06-Jan-07 352 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00

- Doors, Frames and Accessories Comt'd Qty 100% 1 1 1 1 1 1 100.00 HVAC 0.08 11-Dec-06 15-Jan-07 321 30% 10% 10% 40% 10% 100.00 100.00 100.00 100.00 0.00PRO1950 PR/PO of HVAC System Package 0.08 11-Dec-06 15-Jan-07 321 Comt'd Qty 100% 10 10 10 10 10 10 100.00 100.00 100.00 100.00 0.00 Safety 0.07 29-Nov-06 29-Jan-07 300 30% 10% 10% 40% 10% 100.00 100.00 100.00 100.00 0.00PRO2330 PR/PO of Safety Equipment and Fire Protection Equipment 0.05 02-Dec-06 29-Jan-07 200 Comt'd Qty 100% 15 15 15 15 15 15 100.00 100.00 100.00 100.00 0.00

- Flexible Hose and Hose Coupling Conection Comt'd Qty 7% 1 1 1 1 1 1 100.00- Hosereels Comt'd Qty 7% 1 1 1 1 1 1 100.00- Fire Extinguishers Comt'd Qty 7% 1 1 1 1 1 1 100.00- Liftraft Comt'd Qty 7% 1 1 1 1 1 1 100.00- Lifejackets Comt'd Qty 7% 1 1 1 1 1 1 100.00- Lifejacket Containers Comt'd Qty 7% 1 1 1 1 1 1 100.00- Knotted Rope Comt'd Qty 7% 1 1 1 1 1 1 100.00- Ring Life Buoy Comt'd Qty 7% 1 1 1 1 1 1 100.00- Safety Shower & Self-Contained Eyewash Station Comt'd Qty 7% 1 1 1 1 1 1 100.00- Helicopter Crash Box & Cabinet Comt'd Qty 7% 1 1 1 1 1 1 100.00- Fireman's Equipment Comt'd Qty 7% 1 1 1 1 1 1 100.00- First Aid Kit Comt'd Qty 7% 1 1 1 1 1 1 100.00- Smoke Hoods and Container Comt'd Qty 7% 1 1 1 1 1 1 100.00- Breathing Apparatus Set and Cabinet Comt'd Qty 7% 1 1 1 1 1 1 100.00- Firewater Monitor Comt'd Qty 7% 1 1 1 1 1 1 100.00

PRO2340 PR/PO of Safety Signs 0.02 29-Nov-06 04-Jan-07 100 Comt'd Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00- Safety Signs Comt'd Qty 100% 1 1 1 1 1 1 100.00

Others Materials 0.03 02-Dec-06 08-Feb-07 130 30% 10% 10% 40% 10% 100.00 100.00 100.00 100.00 0.00PRO2350 PR/PO of Any Other Materials not included above 0.03 02-Dec-06 08-Feb-07 130 Comt'd Qty 100% 10 10 10 10 10 10 100.00 100.00 100.00 100.00 0.00 Purchase Order to Delivery 0.00 03-Oct-06 23-Jul-07 - 0.00 0.00 0.00 #DIV/0! #DIV/0! Structural 0.00 30-Oct-06 04-Apr-07 - 0.00 0.00 0.00 #DIV/0! #DIV/0!PRO2360 PO to Del of Structural Tubulars 0.00 30-Oct-06 29-Nov-06 - Linear 100% 0.00 0.00 0.00 0.00PRO2370 PO to Del of Structural Beams 0.00 07-Nov-06 12-Dec-06 - Linear 100% 0.00 0.00 0.00 0.00PRO2380 PO to Del of Structural Plates 0.00 15-Nov-06 30-Dec-06 - Linear 100% 0.00 0.00 0.00 0.00PRO2390 PO to Del of Ancillary Steel (grating, stair tread, etc.) 0.00 30-Nov-06 27-Jan-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2400 PO to Del of Miscellaneous Sections (angles, chanels, SHS etc.) 0.00 24-Nov-06 10-Jan-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2410 PO to Del of Fire/Blast Walls 0.00 11-Dec-06 13-Mar-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2420 PO to Del of Passive Fire Projection (PFP) 0.00 16-Dec-06 04-Apr-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2430 PO to Del of All Remaining Structural Mat'l 0.00 19-Dec-06 14-Feb-07 - Linear 100% 0.00 0.00 0.00 0.00 Piping 0.00 06-Nov-06 30-May-07 - 0.00 0.00 0.00 #DIV/0! #DIV/0!PRO2450 PO to Del of Carbon Steel (CS) Pipes & Fitting 0.00 06-Nov-06 15-Jan-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2460 PO to Del of Stainless Steel (SS) Pipes & Fitting 0.00 11-Nov-06 13-Feb-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2470 PO to Del of Duplex Stainless Steel (DSS) Pipes & Fitting 0.00 22-Nov-06 26-May-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2480 PO to Del of GRE Pipes & Fitting 0.00 11-Nov-06 28-Feb-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2490 PO to Del of Valves 0.00 18-Dec-06 04-May-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2500 PO to Del of Piping Specialty Items 0.00 11-Dec-06 23-Mar-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2510 PO to Del of Pipe Bends & Barred Tees 0.00 19-Dec-06 30-May-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2520 PO to Del of Associated Fittings & Acc. for Launcher 0.00 05-Jan-07 27-Apr-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2530 PO to Del of All Remaining Piping Mat'l 0.00 27-Dec-06 12-Apr-07 - Linear 100% 0.00 0.00 0.00 0.00 Mechanical 0.00 03-Oct-06 23-Jul-07 - 0.00 0.00 0.00 #DIV/0! #DIV/0!PRO2540 PO to Del of Flush Water Tank 0.00 30-Oct-06 17-May-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2550 PO to Del of Fresh Water Tank 0.00 30-Oct-06 28-Apr-07 - Linear 100% 0.00 0.00 0.00 0.00

5 of 22

Page 67: Full Version of SCDR-A Close-Out Report(Dated051107)

PROG. COD : 28-Sep-07

ACT ID ACTIVITY NAME MHRS WTG

PLANNED START

PLANNED FINISH MHRS BASIS OF

QTY (UNIT)LVL 4 WTG EST QTY EARLY

PLAN MID PLAN LATE PLAN ACTUAL VARPROGRESS MEASUREMENT

CUMM PROGRESS THIS WEEK

PRO2560 PO to Del of Closed Drain Vessel 0.00 13-Oct-06 04-Jul-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2570 PO to Del of Condensate Pod 0.00 11-Oct-06 04-Jun-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2580 PO to Del of Diesel Transfer Pump 0.00 28-Oct-06 26-Jun-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2590 PO to Del of Open Drain Caisson Pump 0.00 19-Oct-06 30-May-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2600 PO to Del of Flush Water Pump 0.00 20-Oct-06 21-Jun-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2610 PO to Del of Fresh Water Pump 0.00 20-Oct-06 21-Jun-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2620 PO to Del of Closed Drain Transfer Pump 0.00 19-Oct-06 09-Jun-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2630 PO to Del of All Remaining Pumps 0.00 07-Nov-06 13-Jul-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2640 PO to Del of HP Vent Tip 0.00 03-Nov-06 01-Jul-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2650 PO to Del of CO2 Vent Snuffing System 0.00 03-Nov-06 01-Jul-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2660 PO to Del of Manual Operated Trolley Hoists 0.00 07-Oct-06 22-May-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2670 PO to Del of Padestal Crane 0.00 03-Oct-06 12-Jul-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2680 PO to Del of Swing Jib Cranes with Manual Operated Hoist 0.00 17-Oct-06 30-Apr-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2690 PO to Del of Corrosion Inhibitor Injection Package 0.00 17-Oct-06 14-Jun-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2700 PO to Del of All Remaining Mechanical Items 0.00 16-Nov-06 23-Jul-07 - Linear 100% 0.00 0.00 0.00 0.00 Electrical 0.00 30-Oct-06 10-Jul-07 - 0.00 0.00 0.00 #DIV/0! #DIV/0!PRO2720 PO to Del of Power Transformer 0.00 30-Oct-06 10-Jul-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2730 PO to Del of 6.6KV Ring Main Unit 0.00 14-Nov-06 14-Jun-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2740 PO to Del of LV Distribution Board 0.00 14-Nov-06 04-Apr-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2750 PO to Del of Powered Navigational Aids System 0.00 29-Dec-06 18-May-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2760 PO to Del of Cable Trays, Ladder & Accessories 0.00 14-Nov-06 15-Feb-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2770 PO to Del of Electrical / Control Cables, Fitting & MCT's 0.00 09-Nov-06 28-Mar-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2780 PO to Del of Junction Boxes and Control Panels 0.00 15-Dec-06 07-Apr-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2790 PO to Del of Remote Control Units and Safety Switches 0.00 30-Dec-06 25-Apr-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2800 PO to Del of Light Fitting, Photocells Mounting and Accessories 0.00 21-Dec-06 26-Mar-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2810 PO to Del of Earthing Accessories 0.00 15-Dec-06 13-Mar-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2820 PO to Del of All Other Electrical Items 0.00 10-Jan-07 22-May-07 - Linear 100% 0.00 0.00 0.00 0.00 Instrument 0.00 28-Oct-06 29-Jun-07 - 0.00 0.00 0.00 #DIV/0! #DIV/0!PRO2830 PO to Del of Wellhead Control Panel 0.00 11-Nov-06 03-Apr-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2840 PO to Del of Sand Monitoring System 0.00 17-Nov-06 20-Apr-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2850 PO to Del of GPA/PAPA 0.00 11-Nov-06 21-Mar-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2860 PO to Del of Restriction Orifice Plates 0.00 12-Dec-06 17-May-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2870 PO to Del of Orifice Plates 0.00 12-Dec-06 23-May-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2880 PO to Del of Ultrasonic Flowmeters 0.00 28-Oct-06 27-Feb-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2890 PO to Del of Level Gauges (Reflex Type) 0.00 29-Nov-06 09-Apr-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2900 PO to Del of Level Gauges (Using Pressure Gauge) 0.00 29-Nov-06 09-Apr-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2910 PO to Del of Pressure Gauges 0.00 14-Nov-06 06-Mar-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2920 PO to Del of Choke Valves 0.00 09-Nov-06 29-Jun-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2930 PO to Del of Pig Signallers 0.00 04-Dec-06 14-Mar-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2940 PO to Del of IR Flame Detector 0.00 12-Dec-06 28-Apr-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2950 PO to Del of IR Point Gas Detector 0.00 09-Dec-06 26-Apr-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2960 PO to Del of IR Open Path Gas Detector 0.00 09-Dec-06 26-Apr-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2970 PO to Del of Smoke Detector 0.00 09-Dec-06 26-Apr-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2980 PO to Del of Hydrogen Gas Detector 0.00 09-Dec-06 26-Apr-07 - Linear 100% 0.00 0.00 0.00 0.00PRO2990 PO to Del of ESD Break Glass Station 0.00 11-Dec-06 10-May-07 - Linear 100% 0.00 0.00 0.00 0.00PRO3000 PO to Del of Acoustic Leak Detector 0.00 11-Dec-06 27-Apr-07 - Linear 100% 0.00 0.00 0.00 0.00PRO3010 PO to Del of Heat Detector 0.00 09-Dec-06 26-Apr-07 - Linear 100% 0.00 0.00 0.00 0.00PRO3020 PO to Del of Control, Ball and Operated Valves 0.00 08-Nov-06 04-May-07 - Linear 100% 0.00 0.00 0.00 0.00PRO3030 PO to Del of Ultra Sonic Flare Gas Meter 0.00 02-Nov-06 26-Apr-07 - Linear 100% 0.00 0.00 0.00 0.00PRO3040 PO to Del of Field Instrument & Mounting Stands & Supports etc. 0.00 09-Nov-06 26-Mar-07 - Linear 100% 0.00 0.00 0.00 0.00PRO3050 PO to Del of Cable Tray & Ladders 0.00 18-Nov-06 07-Feb-07 - Linear 100% 0.00 0.00 0.00 0.00PRO3060 PO to Del of Instrument Cable, Junction Boxes & MCT's 0.00 14-Nov-06 16-Feb-07 - Linear 100% 0.00 0.00 0.00 0.00PRO3070 PO to Del of Instrument Tubing, Fittings & Valves 0.00 22-Nov-06 20-Mar-07 - Linear 100% 0.00 0.00 0.00 0.00PRO3080 PO to Del of All Remaining Instrumentation Items 0.00 19-Dec-06 13-Jun-07 - Linear 100% 0.00 0.00 0.00 0.00 Architectural 0.00 08-Jan-07 12-Mar-07 - 0.00 0.00 0.00 #DIV/0! #DIV/0!PRO2440 PO to Del of Architectural Mat'l (floor/wall/ceiling panels, doors an 0.00 08-Jan-07 12-Mar-07 - Linear 100% 0.00 0.00 0.00 0.00 HVAC 0.00 15-Jan-07 12-Mar-07 - 0.00 0.00 0.00 #DIV/0! #DIV/0!PRO2710 PO to Del of HVAC System Package 0.00 15-Jan-07 12-Mar-07 - Linear 100% 0.00 0.00 0.00 0.00 Safety 0.00 04-Jan-07 09-Jul-07 - 0.00 0.00 0.00 #DIV/0! #DIV/0!PRO3090 PO to Del of Safety Equipment and Fire Protection Equipment 0.00 29-Jan-07 09-Jul-07 - Linear 100% 0.00 0.00 0.00 0.00PRO3100 PO to Del of Safety Signs 0.00 04-Jan-07 21-May-07 - Linear 100% 0.00 0.00 0.00 0.00 Others Materials 0.00 08-Feb-07 16-Jul-07 - 0.00 0.00 0.00 #DIV/0! #DIV/0!PRO3110 PO to Del of Any Other Materials not included above 0.00 08-Feb-07 16-Jul-07 - Linear 100% 0.00 0.00 0.00 0.00 Materials Receiving Inspection 3.63 29-Nov-06 08-Aug-07 15,383 100.00 100.00 100.00 100.00 0.00 Structural 0.55 29-Nov-06 20-Apr-07 2,322 100.00 100.00 100.00 100.00 0.00PRO3120 Receive/Accept of Structural Tubulars 0.09 29-Nov-06 14-Dec-06 400 Nos. 100% 111 100.00 100.00 100.00 100.00 0.00

- Secondary Pipes Type III (PR #68) Nos. 100% 111 100.00PRO3130 Receive/Accept of Structural Beams 0.09 12-Dec-06 03-Jan-07 384 Nos. 100% 335 100.00 100.00 100.00 100.00 0.00

- Secondary Beam Type III (PR #66) Nos. 90% 329 100.00- Monorail Beam Type III (PR #67) Nos. 10% 6 100.00

PRO3140 Receive/Accept of Structural Plates 0.07 30-Dec-06 20-Jan-07 288 Nos. 100% 168 100.00 100.00 100.00 100.00 0.00- Deck Plating (PR #121) Nos. 100% 168 100.00

Delivered to Site Accepted80% 20%111 111111 111335 3353296

168168

3296

168168

6 of 22

Page 68: Full Version of SCDR-A Close-Out Report(Dated051107)

PROG. COD : 28-Sep-07

ACT ID ACTIVITY NAME MHRS WTG

PLANNED START

PLANNED FINISH MHRS BASIS OF

QTY (UNIT)LVL 4 WTG EST QTY EARLY

PLAN MID PLAN LATE PLAN ACTUAL VARPROGRESS MEASUREMENT

CUMM PROGRESS THIS WEEK

PRO3150 Receive/Accept of Ancillary Steel (grating, stair tread, etc.) 0.06 27-Jan-07 15-Feb-07 270 Nos. 100% 9449 100.00 100.00 100.00 100.00 0.00- Grating and Clips Materials (PR #112) Nos. 17% 7722 100.00- Handrail Materials (PR #129) Nos. 17% 554 100.00- Flatbars and Kickplates Round Bar (PR #130) Nos. 17% 143 100.00- Stair Tread (PR #131) Nos. 17% 716 100.00- T-6700 Structural Scope Materials (PR #134) Nos. 17% 34 100.00- Hex Bolt and Nuts (PR #129) Nos. 17% 280 100.00

PRO3160 Receive/Accept of Miscellaneous Sections (angles, chanels, SHS e 0.06 11-Jan-07 31-Jan-07 275 Nos. 100% 216 100.00 100.00 100.00 100.00 0.00- Channels Type III (PR #111) Nos. 25% 4 100.00- Angles Type III (PR #111) Nos. 25% 129 100.00- SHS (PR #111) Nos. 25% 15 100.00- Deck Drain Materials (PR #139) Nos. 25% 68 100.00

PRO3170 Receive/Accept of Fire/Blast Walls 0.06 13-Mar-07 03-Apr-07 240 Nos. 100% 423 100.00 100.00 100.00 100.00 0.00- Wall Platings & Angular Support CHL & AGL (PR #117) Nos. 40% 209 100.00- Wall Cladding (PR #197) Nos. 30% 140 100.00- Fire/Blast Walls (PR #179) Nos. 30% 74 100.00

PRO3180 Receive/Accept of Passive Fire Projection (PFP) 0.05 04-Apr-07 20-Apr-07 220 Nos. 100% 1 100.00 100.00 100.00 100.00 0.00PRO3190 Receive/Accept of All Remaining Structural Mat'l (PR #98/166/151/ 0.06 14-Feb-07 09-Mar-07 245 Nos. 100% 27 100.00 100.00 100.00 100.00 0.00 Piping 0.59 15-Jan-07 18-Jun-07 2,517 100.00 100.00 100.00 100.00 0.00PRO3210 Receive/Accept of Carbon Steel (CS) Pipes & Fitting 0.09 15-Jan-07 14-Feb-07 400 Nos. 100% 475 100.00 100.00 100.00 100.00 0.00

- Carbon Steel Pipes (PR #42) Nos. 60% 58 100.00- Flange CS (PR #56) Nos. 20% 168 100.00- Fitting CS (PR #59) Nos. 20% 249 100.00

PRO3220 Receive/Accept of Stainless Steel (SS) Pipes & Fitting 0.07 13-Feb-07 10-Mar-07 288 Nos. 100% 10034 100.00 100.00 100.00 100.00 0.00- SS Pipes (PR #52) Nos. 60% 93 100.00- Flange SS (PR #56) Nos. 10% 227 100.00- Fitting SS (PR #59) Nos. 10% 341 100.00- Gasket (PR #71) Nos. 5% 1166 100.00- Studbolt with Nuts (PR #78) Nos. 5% 7339 100.00- Pipe Support Mat'l (PR #79) Nos. 5% 155 100.00- Pipe Support - U-Bolts/Clamps (PR #142) Nos. 5% 713 100.00

PRO3230 Receive/Accept of Duplex Stainless Steel (DSS) Pipes & Fitting 0.10 17-May-07 07-Jun-07 410 Nos. 50% 1955 100.00 100.00 100.00 100.00 0.00- DSS Pipes (PR #52) Nos. 50% 904 100.00- Flange Duplex SS (PR #56) Nos. 25% 411 100.00- Fitting Duplex SS (PR #59) Nos. 25% 640 100.00

PRO3240 Receive/Accept of GRE Pipes & Fitting 0.06 28-Feb-07 26-Mar-07 270 Nos. 100% 1626 100.00 100.00 100.00 100.00 0.00- GRE Pipes & Fittings (PR #65) Nos. 100% 1626 100.00

PRO3250 Receive/Accept of Valves 0.10 04-May-07 31-May-07 420 Nos. 100% 116 100.00 100.00 100.00 100.00 0.00- Ball Valves (PR #32) Nos. 20% 5 100.00- Ball Valves for GRE lines (PR #33) Nos. 20% 3 100.00- Globe, Gate & Check Valves (PR #38) Nos. 20% 74 100.00- Check Valves for GRE lines (PR #39) Nos. 20% 3 100.00- Double Block & Bleed Valve (PR #41) Nos. 20% 31 100.00

PRO3260 Receive/Accept of Piping Specialty Items (PR #20&23) 0.04 23-Mar-07 14-Apr-07 154 Nos. 100% 45 100.00 100.00 100.00 100.00 0.00PRO3270 Receive/Accept of Pipe Bends & Barred Tees 0.04 30-May-07 18-Jun-07 175 Nos. 100% 1 100.00 100.00 100.00 100.00 0.00

- Reduced Barred Tee (PR #10) Nos. 100% 1 100.00PRO3280 Receive/Accept of Associated Fittings & Acc. for Launcher 0.04 27-Apr-07 17-May-07 190 Nos. 100% 45 100.00 100.00 100.00 100.00 0.00

- Pig Launcher & Receiver (PR #40) Nos. 20% 1 100.00- Pig Trap End Closure (Launcher Material) (PR #34) Nos. 20% 2 100.00- Eccentric Reducer (Launcher Material) (PR #35) Nos. 20% 2 100.00- Weldolet (Launcher Material) (PR #36) Nos. 20% 19 100.00- Welding Neck Flanges (Launcher Material) (PR #37) Nos. 20% 21 100.00

PRO3290 Receive/Accept of All Remaining Piping Mat'l 0.05 12-Apr-07 09-May-07 210 Nos. 100% 10 100.00 100.00 100.00 100.00 0.00 Mechanical 0.94 28-Apr-07 08-Aug-07 3,967 100.00 100.00 100.00 100.00 0.00PRO3300 Receive/Accept of Flush Water Tank 0.05 17-May-07 01-Jun-07 220 Nos. 100% 1 100.00 100.00 100.00 100.00 0.00PRO3310 Receive/Accept of Fresh Water Tank 0.06 28-Apr-07 12-May-07 240 Nos. 100% 1 100.00 100.00 100.00 100.00 0.00PRO3320 Receive/Accept of Closed Drain Vessel 0.10 04-Jul-07 17-Jul-07 420 Nos. 100% 1 100.00 100.00 100.00 100.00 0.00PRO3330 Receive/Accept of Condensate Pod 0.08 04-Jun-07 16-Jun-07 320 Nos. 100% 1 100.00 100.00 100.00 100.00 0.00PRO3340 Receive/Accept of Diesel Transfer Pump 0.04 26-Jun-07 07-Jul-07 175 Nos. 100% 1 100.00 100.00 100.00 100.00 0.00PRO3350 Receive/Accept of Open Drain Caisson Pump 0.04 30-May-07 13-Jun-07 180 Nos. 100% 1 100.00 100.00 100.00 100.00 0.00PRO3360 Receive/Accept of Flush Water Pump 0.04 21-Jun-07 03-Jul-07 150 Nos. 100% 2 100.00 100.00 100.00 100.00 0.00PRO3370 Receive/Accept of Fresh Water Pump 0.04 21-Jun-07 03-Jul-07 150 Nos. 100% 1 100.00 100.00 100.00 100.00 0.00PRO3380 Receive/Accept of Closed Drain Transfer Pump 0.04 09-Jun-07 25-Jun-07 180 Nos. 100% 1 100.00 100.00 100.00 100.00 0.00PRO3390 Receive/Accept of All Remaining Pumps 0.03 13-Jul-07 28-Jul-07 142 Nos. 100% 1 100.00 100.00 100.00 100.00 0.00PRO3400 Receive/Accept of HP Vent Tip 0.05 01-Jul-07 14-Jul-07 200 Nos. 100% 1 100.00 100.00 100.00 100.00 0.00PRO3410 Receive/Accept of CO2 Vent Snuffing System 0.04 01-Jul-07 13-Jul-07 150 Nos. 100% 1 100.00 100.00 100.00 100.00 0.00PRO3420 Receive/Accept of Manual Operated Trolley Hoists 0.03 23-May-07 09-Jun-07 120 Nos. 100% 4 100.00 100.00 100.00 100.00 0.00PRO3430 Receive/Accept of Padestal Crane 0.13 12-Jul-07 25-Jul-07 540 Nos. 100% 1 100.00 100.00 100.00 100.00 0.00PRO3440 Receive/Accept of Swing Jib Cranes with Manual Operated Hoist 0.05 30-Apr-07 17-May-07 210 Nos. 100% 2 100.00 100.00 100.00 100.00 0.00PRO3450 Receive/Accept of Corrosion Inhibitor Injection Package 0.11 14-Jun-07 28-Jun-07 450 Nos. 100% 1 100.00 100.00 100.00 100.00 0.00

227341 341

16261626116

53

15

94497722554143

68423209

71634

280216

1294

15

14074127

94497722554143

129

71634

280216

4

6842320914074127

80% 20%475 47558

10034

168 168249 249

93

1955

411640

1166

713

904

227

74331

11

45

45

122192110

58

1003493

1955

411640

16261626116

5374

1

33145

145122192110

80% 20%1 1111112111114121

1211

1111

1114121

11667339 7339155 155

904

713

7 of 22

Page 69: Full Version of SCDR-A Close-Out Report(Dated051107)

PROG. COD : 28-Sep-07

ACT ID ACTIVITY NAME MHRS WTG

PLANNED START

PLANNED FINISH MHRS BASIS OF

QTY (UNIT)LVL 4 WTG EST QTY EARLY

PLAN MID PLAN LATE PLAN ACTUAL VARPROGRESS MEASUREMENT

CUMM PROGRESS THIS WEEK

PRO3460 Receive/Accept of All Remaining Mechanical Items 0.03 23-Jul-07 08-Aug-07 120 Nos. 100% 32 100.00 100.00 100.00 100.00 0.00- Corrosion Probe and Coupon Assembly (PR #25) Nos. 17% 4 100.00- Chemical Injection and Sampling Conection Fitting (PR #21) Nos. 17% 14 100.00- Y-Type Strainers (PR #23) Nos. 17% 5 100.00- Spring Hangers (PR #26) Nos. 17% 5 100.00- Bug Screens (PR #27) Nos. 17% 3 100.00- Sight Glasses (PR #24) Nos. 17% 1 100.00

Electrical 0.51 15-Feb-07 19-Jul-07 2,147 100.00 100.00 100.00 100.00 0.00PRO3480 Receive/Accept of Power Transformer 0.09 10-Jul-07 19-Jul-07 400 Nos. 100% 1 100.00 100.00 100.00 100.00 0.00PRO3490 Receive/Accept of 6.6KV Ring Main Unit 0.08 14-Jun-07 01-Jul-07 360 Nos. 100% 1 100.00 100.00 100.00 100.00 0.00PRO3500 Receive/Accept of LV Distribution Board 0.04 04-Apr-07 23-Apr-07 175 Nos. 100% 8 100.00 100.00 100.00 100.00 0.00PRO3510 Receive/Accept of Powered Navigational Aids System 0.03 18-May-07 01-Jun-07 110 Nos. 100% 2 100.00 100.00 100.00 100.00 0.00PRO3520 Receive/Accept of Cable Trays, Ladder & Accessories 0.05 15-Feb-07 05-Mar-07 200 Nos. 100% 2669 100.00 100.00 100.00 100.00 0.00

- Cable Ladder & Accessories (PR #58 & #80) Nos. 35% 1711 100.00- Cable Tray & Accessories (PR #58) Nos. 35% 940 100.00- Cable Gland & Accessories (PR #53) Nos. 30% 18 100.00

PRO3530 Receive/Accept of Electrical / Control Cables, Fitting & MCT's 0.05 28-Mar-07 14-Apr-07 210 Nos. 100% 862 100.00 100.00 100.00 100.00 0.00- Cables (Pwr & Ctrl, AC/DC UPS, Lighting & Small Power) (PR #18) Nos. 50% 8 100.00- Multicable Transit (MCT) & Accessories (PR #116) Nos. 50% 854 100.00

PRO3540 Receive/Accept of Junction Boxes and Control Panels 0.03 07-Apr-07 25-Apr-07 140 Nos. 100% 3 100.00 100.00 100.00 100.00 0.00- Interposing Relay Panel (PR #17) Nos. 75% 2 100.00- Power Junction Boxes (PR #76) Nos. 25% 1 100.00

PRO3550 Receive/Accept of Remote Control Units and Safety Switches 0.03 25-Apr-07 14-May-07 130 Nos. 100% 68 100.00 100.00 100.00 100.00 0.00- Socket, Plug & Switches (PR #75) Nos. 50% 61 100.00- Remote Control Units (PR #114) Nos. 50% 7 100.00

PRO3560 Receive/Accept of Light Fitting, Photocells Mounting and Accesso 0.05 30-Mar-07 26-Apr-07 210 Nos. 100% 331 100.00 100.00 100.00 100.00 0.00- Fluorescent, Exit Light & Floodlights Lighting Fixture (PR #51) Nos. 50% 197 100.00- Lighting Junction Boxes (PR #76) Nos. 50% 134 100.00

PRO3570 Receive/Accept of Earthing Accessories 0.02 13-Mar-07 03-Apr-07 100 Nos. 100% 183 100.00 100.00 100.00 100.00 0.00- Earthing Cable & Cable Lug (PR #74) Nos. 100% 183 100.00

PRO3580 Receive/Accept of All Other Electrical Items 0.03 23-May-07 13-Jun-07 112 Nos. 100% 10 100.00 100.00 100.00 100.00 0.00 Instrument 0.82 07-Feb-07 18-Jul-07 3,460 100.00 100.00 100.00 100.00 0.00PRO3590 Receive/Accept of Wellhead Control Panel 0.14 03-Apr-07 25-Apr-07 600 Nos. 100% 1 100.00 100.00 100.00 100.00 0.00PRO3600 Receive/Accept of Sand Monitoring System 0.02 21-Apr-07 08-May-07 90 Nos. 100% 1 100.00 100.00 100.00 100.00 0.00PRO3610 Receive/Accept of GPA/PAPA 0.03 21-Mar-07 16-Apr-07 140 Nos. 100% 88 100.00 100.00 100.00 100.00 0.00PRO3620 Receive/Accept of Restriction Orifice Plates 0.01 17-May-07 02-Jun-07 60 Nos. 100% 13 100.00 100.00 100.00 100.00 0.00PRO3630 Receive/Accept of Orifice Plates 0.01 24-May-07 09-Jun-07 60 Nos. 100% 1 100.00 100.00 100.00 100.00 0.00PRO3640 Receive/Accept of Ultrasonic Flowmeters 0.03 27-Feb-07 19-Mar-07 140 Nos. 100% 1 100.00 100.00 100.00 100.00 0.00PRO3650 Receive/Accept of Level Gauges (Reflex Type) 0.02 09-Apr-07 27-Apr-07 100 Nos. 100% 5 100.00 100.00 100.00 100.00 0.00PRO3660 Receive/Accept of Level Gauges (Using Pressure Gauge) 0.02 09-Apr-07 26-Apr-07 100 Nos. 100% 2 100.00 100.00 100.00 100.00 0.00PRO3670 Receive/Accept of Pressure Gauges 0.02 06-Mar-07 24-Mar-07 70 Nos. 100% 18 100.00 100.00 100.00 100.00 0.00PRO3680 Receive/Accept of Choke Valves 0.08 29-Jun-07 18-Jul-07 320 Nos. 100% 5 100.00 100.00 100.00 100.00 0.00PRO3690 Receive/Accept of Pig Signallers 0.02 14-Mar-07 02-Apr-07 80 Nos. 100% 4 100.00 100.00 100.00 100.00 0.00PRO3700 Receive/Accept of IR Flame Detector 0.02 28-Apr-07 12-May-07 75 Nos. 100% 23 100.00 100.00 100.00 100.00 0.00PRO3710 Receive/Accept of IR Point Gas Detector 0.02 26-Apr-07 10-May-07 70 Nos. 100% 6 100.00 100.00 100.00 100.00 0.00PRO3720 Receive/Accept of IR Open Path Gas Detector 0.02 26-Apr-07 10-May-07 70 Nos. 100% 10 100.00 100.00 100.00 100.00 0.00PRO3730 Receive/Accept of Smoke Detector 0.02 26-Apr-07 09-May-07 70 Nos. 100% 27 100.00 100.00 100.00 100.00 0.00PRO3740 Receive/Accept of Hydrogen Gas Detector 0.02 26-Apr-07 12-May-07 70 Nos. 100% 2 100.00 100.00 100.00 100.00 0.00PRO3750 Receive/Accept of ESD Break Glass Station 0.01 10-May-07 24-May-07 60 Nos. 100% 9 100.00 100.00 100.00 100.00 0.00PRO3760 Receive/Accept of Acoustic Leak Detector 0.02 27-Apr-07 12-May-07 80 Nos. 100% 1 100.00 100.00 100.00 100.00 0.00PRO3770 Receive/Accept of Heat Detector 0.02 26-Apr-07 11-May-07 70 Nos. 100% 1 100.00 100.00 100.00 100.00 0.00PRO3780 Receive/Accept of Control, Ball and Operated Valves 0.08 04-May-07 24-May-07 340 Nos. 100% 16 100.00 100.00 100.00 100.00 0.00

- Ball Valves (PR #32 & 33) Nos. 50% 8 100.00- Operated Valves (PR #145) Nos. 50% 8 100.00

PRO3790 Receive/Accept of Ultra Sonic Flare Gas Meter 0.02 26-Apr-07 11-May-07 80 Nos. 100% 1 100.00 100.00 100.00 100.00 0.00PRO3800 Receive/Accept of Field Instrument & Mounting Stands & Supports 0.03 26-Mar-07 19-Apr-07 140 Nos. 100% 106 100.00 100.00 100.00 100.00 0.00PRO3810 Receive/Accept of Cable Tray & Ladders 0.04 07-Feb-07 28-Feb-07 180 Nos. 100% 2449 100.00 100.00 100.00 100.00 0.00

- Cable Ladder & Accessories (PR #58) Nos. 50% 1509 100.00- Cable Tray & Accessories (PR #58) Nos. 50% 940 100.00

PRO3820 Receive/Accept of Instrument Cable, Junction Boxes & MCT's 0.04 16-Feb-07 14-Mar-07 160 Nos. 100% 22774 100.00 100.00 100.00 100.00 0.00- Instrument Cables (PR #101) Nos. 26% 21647 100.00- Cable Glands (PR #148) Nos. 20% 568 100.00- Junction Boxes (PR #146) Nos. 20% 15 100.00- Multicable Transit (MCT) & Accessories (PR #153) Nos. 15% 259 100.00- Earthing Materials (PR #155) Nos. 19% 285 100.00

PRO3830 Receive/Accept of Instrument Tubing, Fittings & Valves 0.04 20-Mar-07 11-Apr-07 160 Nos. 100% 52 100.00 100.00 100.00 100.00 0.00- Instrument Materials (PR #144) Nos. 100% 52 100.00

PRO3840 Receive/Accept of All Remaining Instrumentation Items 0.02 13-Jun-07 03-Jul-07 75 Nos. 100% 10 100.00 100.00 100.00 100.00 0.00 Architectural 0.09 12-Mar-07 07-Apr-07 380 100.00 100.00 100.00 100.00 0.00PRO3200 Receive/Accept of Architectural Mat'l (floor/wall/ceiling panels, d 0.09 12-Mar-07 07-Apr-07 380 Nos. 100% 47129 100.00 100.00 100.00 100.00 0.00

- Doors, Frames and Accessories (PR #54) Nos. 18% 9 100.00

3241455

324145531

80% 20%

31

1 11 182

26691711

18862

885432

6861

1

7331197134

18862

8854

82

26691711

32

6861

1

7331197134

1 1

183

1080% 20%

183

10183 183

52185423610

259285

2449

2277421647568

940

15

940

2449

116

1106

116

1106

15259285

2277421647568

52

1080% 20%

52

1052 52

47129 471299 9

1

881311

1 1

291

131

1

940 940

272

52185

27

1509 1509

423610

88

9

8 88 8

8 of 22

Page 70: Full Version of SCDR-A Close-Out Report(Dated051107)

PROG. COD : 28-Sep-07

ACT ID ACTIVITY NAME MHRS WTG

PLANNED START

PLANNED FINISH MHRS BASIS OF

QTY (UNIT)LVL 4 WTG EST QTY EARLY

PLAN MID PLAN LATE PLAN ACTUAL VARPROGRESS MEASUREMENT

CUMM PROGRESS THIS WEEK

- Ceiling & TNF Panel Nos. 18% 750 100.00- Raise Floor Nos. 20% 400 100.00- Copper Coated Pin Nos. 5% 22000 100.00- Rockwool Nos. 16% 1200 100.00- Aluminium Foil Rolls 10% 20 100.00- Galvanize Speed Clip Nos. 4% 22000 100.00- Anti Skid Paint Nos. 9% 750 100.00

HVAC 0.05 12-Mar-07 02-Apr-07 220 100.00 100.00 100.00 100.00 0.00PRO3470 Receive/Accept of HVAC System Package 0.05 12-Mar-07 02-Apr-07 220 Unit 100% 60 100.00 100.00 100.00 100.00 0.00

- Condenser Fan & Motor Unit 12% 6 100.00- DX Coil Unit 10% 4 100.00- Compressor Unit 12% 6 100.00- Condenser Coil Unit 12% 6 100.00- Exhaust Fan & Motor Unit 11% 4 100.00- Motorized Damper Unit 11% 8 100.00- Duct Heater Unit 10% 3 100.00- HVAC Control Panel Unit 12% 3 100.00- Support Unit 10% 20 100.00

Safety 0.07 22-May-07 30-Jul-07 300 100.00 100.00 100.00 100.00 0.00PRO3850 Receive/Accept of Safety Equipment and Fire Protection Equipme 0.06 09-Jul-07 30-Jul-07 240 Nos. 100% 131 100.00 100.00 100.00 100.00 0.00

- Flexible Hose and Hose Coupling Conection (PR #20) Nos. 8% 40 100.00- Hosereels (PR #22) Nos. 8% 10 100.00- Fire Extinguishers (PR #88) Nos. 8% 33 100.00- David Liferaft and Safety Equipment (PR #93) Nos. 8% 3 100.00- Lifejacket (PR #92) Nos. 8% 3 100.00- Lifejacket Container (PR #92) Nos. 8% 3 100.00- Knotted Rope (PR #91) Nos. 8% 3 100.00- Ring Life Buoy (PR #94) Nos. 8% 20 100.00- Safety Shower & Self-Contained Eyewash Station (PR #95) Nos. 8% 9 100.00- First Aid Kit (PR #90) Nos. 8% 3 100.00- Smoke Hoods and Container (PR #97) Nos. 8% 2 100.00- Breathing Apparatus Set and Cabinet (PR #96) Nos. 8% 1 100.00- Firewater Monitor (PR #89) Nos. 7% 1 100.00

PRO3860 Receive/Accept of Safety Signs 0.01 22-May-07 04-Jun-07 60 Nos. 100% 120 100.00 100.00 100.00 100.00 0.00- Safety Signs (PR #107) Nos. 100% 120 100.00

Others Materials 0.02 16-Jul-07 31-Jul-07 70 100.00 100.00 100.00 100.00 0.00PRO3870 Receive/Accept of Any Other Materials not included above 0.02 16-Jul-07 31-Jul-07 70 Nos. 100 100.00 100.00 100.00 100.00 0.00 FABRICATION OF SCDR-A TOPSIDES 69.20 22-Sep-06 20-Aug-07 293,578 100.00 100.00 100.00 100.00 0.00 Structural 24.10 12-Oct-06 18-Jun-07 102,218 20% 30% Weld 40% Accept 10% 100.00 100.00 100.00 100.00 0.00

Fabrication 19.16 12-Oct-06 23-May-07 81,284 Total

Pieces Done % Total Joints Done % Done % Done %

100.00 100.00 100.00 100.00 0.00FAB1370 Fabricate and Arrange Temp. Supports 0.32 12-Oct-06 06-Dec-06 1,370 No. of Pcs 100% 22 22 100.00 22 22 100.00 22 100.00 22 100.00 100.00 100.00 100.00 100.00 0.00

- Fab. Skid Shoes W 30 x 132 Nos. 23% 6 6 100.00 6 6 100.00 6 100.00 6 100.00 100.00- Fab. Jacking Beam W 30 x 132 Nos. 23% 6 6 100.00 6 6 100.00 6 100.00 6 100.00 100.00- Fab. Transverse Jacking Beam W 36 x 210 Nos. 19% 2 2 100.00 2 2 100.00 2 100.00 2 100.00 100.00- Fab. Column 752 dia x 12.7 wt Nos. 15% 2 2 100.00 2 2 100.00 2 100.00 2 100.00 100.00- Fab. Temp. Column Support 1498 dia x 25.4 wt Nos. 10% 4 4 100.00 4 4 100.00 4 100.00 4 100.00 100.00- Fab. Temp. Column Support 1193.6 dia x 25.4 wt Nos. 10% 2 2 100.00 2 2 100.00 2 100.00 2 100.00 100.00

FAB1380 Fab/Assem Cellar Deck (In-Situ) 5.03 14-Nov-06 21-Feb-07 21,319 No. of Pcs 100% 1646 1646 100.00 2390 2390 100.00 2390 100.00 2390 100.00 100.00 100.00 100.00 100.00 0.00- Top Ring Plate 50mm Nos. 2% 7 7 100.00 14 14 100.00 14 100.00 14 100.00 100.00- Bottom Ring Plate 50mm Nos. 2% 7 7 100.00 14 14 100.00 14 100.00 14 100.00 100.00- Top Flange Plate Nos. 2% 4 4 100.00 8 8 100.00 8 100.00 8 100.00 100.00- Bottom Flange Plate Nos. 1% 1 1 100.00 2 2 100.00 2 100.00 2 100.00 100.00- Top Insert Plate Nos. 2% 2 2 100.00 4 4 100.00 4 100.00 4 100.00 100.00- W 36 x 210 Nos. 15% 28 28 100.00 67 67 100.00 67 100.00 67 100.00 100.00- W 24 x 94 Nos. 13% 15 15 100.00 32 32 100.00 32 100.00 32 100.00 100.00- W 24 x 68 Nos. 13% 99 99 100.00 200 200 100.00 200 100.00 200 100.00 100.00- W 18 x 50 Nos. 9% 36 36 100.00 72 72 100.00 72 100.00 72 100.00 100.00- W 12 x 35 Nos. 8% 82 82 100.00 164 164 100.00 164 100.00 164 100.00 100.00- W 8 x 15 Nos. 10% 424 424 100.00 848 848 100.00 848 100.00 848 100.00 100.00- Pipe 457 x 20.6 Nos. 2% 2 2 100.00 4 4 100.00 4 100.00 4 100.00 100.00- Ins. Plates / Gratings Nos. 7% 570 570 100.00 570 570 100.00 570 100.00 570 100.00 100.00- Stiffeners Nos. 5% 347 347 100.00 347 347 100.00 347 100.00 347 100.00 100.00- Transition Pieces (Cone 1219 x 1524 x 40 wt) Nos. 2% 4 4 100.00 8 8 100.00 8 100.00 8 100.00 100.00- Stabbing Guide (Cone 1444 x 500 x 30 wt) Nos. 3% 4 4 100.00 8 8 100.00 8 100.00 8 100.00 100.00- Stabbing Guide (Cone 1139 x 500 x 30 wt) Nos. 3% 2 2 100.00 4 4 100.00 4 100.00 4 100.00 100.00- Closure Plate 20mm x 480 dia Nos. 2% 6 6 100.00 12 12 100.00 12 100.00 12 100.00 100.00- Spacer Plate 3mm to 1444 dia Nos. 1% 4 4 100.00 8 8 100.00 8 100.00 8 100.00 100.00- Spacer Plate 3mm to 1139 dia Nos. 1% 2 2 100.00 4 4 100.00 4 100.00 4 100.00 100.00

20 20

750 750

750 750400 400

80% 20%60 60

80% 20%131 13140103333332093211

120120

40103333332093211

120120

Mark & Cut Fit-Up

80% 20%100 100

6 64 46 66 64 4

3 3

8 83 3

22000 22000

22000 22000

1200 120020 20

9 of 22

Page 71: Full Version of SCDR-A Close-Out Report(Dated051107)

PROG. COD : 28-Sep-07

ACT ID ACTIVITY NAME MHRS WTG

PLANNED START

PLANNED FINISH MHRS BASIS OF

QTY (UNIT)LVL 4 WTG EST QTY EARLY

PLAN MID PLAN LATE PLAN ACTUAL VARPROGRESS MEASUREMENT

CUMM PROGRESS THIS WEEK

FAB1390 Fabricate Columns, Diagonals & Braces 1.12 22-Dec-06 27-Feb-07 4,748 No. of Pcs 100% 97 97 100.00 194 194 100.00 194 100.00 194 100.00 100.00 100.00 100.00 100.00 0.00 Column - 1524 dia. x 50 wt Nos. 6% 2 2 100.00 4 4 100.00 4 100.00 4 100.00 100.00 Column - 1524 dia. x 40 wt Nos. 8% 4 4 100.00 8 8 100.00 8 100.00 8 100.00 100.00 Column - 1219 dia. x 40 wt Nos. 14% 10 10 100.00 20 20 100.00 20 100.00 20 100.00 100.00 Column - 1219 dia. x 25 wt Nos. 10% 10 10 100.00 20 20 100.00 20 100.00 20 100.00 100.00 Column - 813 dia. x 23 wt Nos. 5% 2 2 100.00 4 4 100.00 4 100.00 4 100.00 100.00 Column - 457 dia. x 16 wt Nos. 6% 8 8 100.00 16 16 100.00 16 100.00 16 100.00 100.00 Column - 356 dia. x 13 wt Nos. 5% 3 3 100.00 6 6 100.00 6 100.00 6 100.00 100.00 Column - 273 dia. x 13 wt Nos. 5% 3 3 100.00 6 6 100.00 6 100.00 6 100.00 100.00 Column - 219 dia. x 13 wt Nos. 3% 2 2 100.00 4 4 100.00 4 100.00 4 100.00 100.00 Column - 168 dia. x 08 wt Nos. 4% 6 6 100.00 12 12 100.00 12 100.00 12 100.00 100.00 Diagonal braces - 660 dia. x 25 wt Nos. 6% 8 8 100.00 16 16 100.00 16 100.00 16 100.00 100.00 Diagonal braces - 610 dia. x 25 wt Nos. 12% 26 26 100.00 52 52 100.00 52 100.00 52 100.00 100.00 Diagonal braces - 610 dia. x 20 wt Nos. 8% 6 6 100.00 12 12 100.00 12 100.00 12 100.00 100.00 Diagonal braces - 356 dia. x 13 wt Nos. 5% 4 4 100.00 8 8 100.00 8 100.00 8 100.00 100.00 Diagonal braces - 219 dia. x 13 wt Nos. 3% 3 3 100.00 6 6 100.00 6 100.00 6 100.00 100.00

FAB1400 Fabricate Main Deck 4.40 29-Dec-06 27-Mar-07 18,671 No. of Pcs 100% 1104 1030 93.30 1705 1626 95.37 1626 95.37 1626 95.37 100.00 100.00 100.00 100.00 0.00- Top Ring Plate 50mm Nos. 2% 4 4 100.00 8 8 100.00 8 100.00 8 100.00 100.00- Bottom Ring Plate 50mm Nos. 3% 6 6 100.00 12 12 100.00 12 100.00 12 100.00 100.00- Top Flange Plate Nos. 2% 3 3 100.00 6 6 100.00 6 100.00 6 100.00 100.00- Bottom Flange Plate Nos. 3% 7 7 100.00 14 14 100.00 14 100.00 14 100.00 100.00- Top Insert Plate Nos. 3% 20 20 100.00 40 40 100.00 40 100.00 40 100.00 100.00- W 36 x 210 Nos. 12% 29 29 100.00 58 58 100.00 58 100.00 58 100.00 100.00- W 24 x 94 Nos. 13% 39 39 100.00 78 78 100.00 78 100.00 78 100.00 100.00- W 24 x 68 Nos. 11% 70 70 100.00 140 140 100.00 140 100.00 140 100.00 100.00- W 18 x 50 Nos. 8% 20 20 100.00 40 40 100.00 40 100.00 40 100.00 100.00- W 12 x 35 Nos. 8% 23 23 100.00 46 46 100.00 46 100.00 46 100.00 100.00- W 10 x 45 Nos. 7% 9 9 100.00 18 18 100.00 18 100.00 18 100.00 100.00- W 10 x 22 Nos. 3% 4 4 100.00 8 8 100.00 8 100.00 8 100.00 100.00- W 8 x 15 Nos. 8% 240 240 100.00 480 480 100.00 480 100.00 480 100.00 100.00- Ins. Plates / Gratings Nos. 7% 87 87 100.00 87 87 100.00 87 100.00 87 100.00 100.00- Stiffeners Nos. 4% 347 347 100.00 347 347 100.00 347 100.00 347 100.00 100.00- Fab. Skid Beams Nos. 8% 196 122 62.24 323 244 75.54 244 75.54 244 75.54 100.00

- Flange Plate Nos. 1.5% 20 20 100.00 40 40 100.00 40 100.00 40 100.00 100.00- Stopper Plate Nos. 1.0% 2 2 100.00 4 4 100.00 4 100.00 4 100.00 100.00- Web Plate 38mm Nos. 1.5% 8 8 100.00 16 16 100.00 16 100.00 16 100.00 100.00- Ring Plate 50mm Nos. 1.5% 12 12 100.00 24 24 100.00 24 100.00 24 100.00 100.00- End Plate 38mm Nos. 0.5% 8 8 100.00 16 16 100.00 16 100.00 16 100.00 100.00- Cap Plate 38mm Nos. 0.5% 4 4 100.00 8 8 100.00 8 100.00 8 100.00 100.00- Pipe 1219 x 12 wt Nos. 0.5% 4 4 100.00 8 8 100.00 8 100.00 8 100.00 100.00- Stiffeners Plate Nos. 1.0% 64 64 100.00 128 128 100.00 128 100.00 128 100.00 100.00

FAB1410 Fabricate Mezzanine Deck 2.60 10-Jan-07 10-Mar-07 11,047 No. of Pcs 100% 878 878 100.00 1257 1257 100.00 1257 100.00 1257 100.00 100.00 100.00 100.00 100.00 0.00- W 24 x 68 Nos. 24% 56 56 100.00 112 112 100.00 112 100.00 112 100.00 100.00- W 18 x 50 Nos. 17% 30 30 100.00 60 60 100.00 60 100.00 60 100.00 100.00- W 12 x 35 Nos. 18% 43 43 100.00 86 86 100.00 86 100.00 86 100.00 100.00- W 8 x 15 Nos. 20% 150 150 100.00 300 300 100.00 300 100.00 300 100.00 100.00- Ins. Plates / Gratings Nos. 12% 499 499 100.00 499 499 100.00 499 100.00 499 100.00 100.00- Stiffeners Nos. 9% 100 100 100.00 200 200 100.00 200 100.00 200 100.00 100.00

FAB1420 Fabricate Stairways & Ladder 0.19 15-Feb-07 07-Apr-07 822 No. of Pcs 100% 29 29 100.00 29 29 100.00 29 100.00 29 100.00 100.00 100.00 100.00 100.00 0.00- Main Deck Nos. 30% 8 8 100.00 8 8 100.00 8 100.00 8 100.00 100.00- Cellar Deck Nos. 40% 12 12 100.00 12 12 100.00 12 100.00 12 100.00 100.00- Mezzanine Deck Nos. 16% 4 4 100.00 4 4 100.00 4 100.00 4 100.00 100.00- Wellhead Access Platform Nos. 9% 4 4 100.00 4 4 100.00 4 100.00 4 100.00 100.00- Intermediate Platform Nos. 5% 1 1 100.00 1 1 100.00 1 100.00 1 100.00 100.00

FAB1430 Fabricate Handrails 0.27 05-Feb-07 29-Mar-07 1,140 No. of Pcs 100% 187 187 100.00 187 187 100.00 187 100.00 187 100.00 100.00 100.00 100.00 100.00 0.00- Main Deck Nos. 35% 51 51 100.00 51 51 100.00 51 100.00 51 100.00 100.00- Cellar Deck Nos. 36% 70 70 100.00 70 70 100.00 70 100.00 70 100.00 100.00- Mezzanine Deck Nos. 13% 40 40 100.00 40 40 100.00 40 100.00 40 100.00 100.00- Wellhead Access Platform / Wing Deck Nos. 9% 14 14 100.00 14 14 100.00 14 100.00 14 100.00 100.00- Intermediate Platform Nos. 7% 12 12 100.00 12 12 100.00 12 100.00 12 100.00 100.00

FAB1440 Fabricate Framing for Switchgear, ILE Rooms, W.Shelter & Worksho 1.21 24-Jan-07 15-Mar-07 5,149 No. of Pcs 100% 152 152 100.00 197 197 100.00 197 100.00 197 100.00 100.00 100.00 100.00 100.00 0.00Roof Framing and Plating Nos. 40% 45 45 100.00 90 90 100.00 90 100.00 90 100.00 100.00

- W 18 x 50 Nos. 14% 10 10 100.00 20 20 100.00 20 100.00 20 100.00 100.00- W 14 x 38 Nos. 12% 20 20 100.00 40 40 100.00 40 100.00 40 100.00 100.00- W 12 x 35 Nos. 9% 5 5 100.00 10 10 100.00 10 100.00 10 100.00 100.00- Roof Plate 6mm Nos. 5% 10 10 100.00 20 20 100.00 20 100.00 20 100.00 100.00

Wall Framing and Plating Nos. 60% 107 107 100.00 107 107 100.00 107 100.00 107 100.00 100.00- W 8 x 28 Nos. 17% 20 20 100.00 20 20 100.00 20 100.00 20 100.00 100.00- Pipe 219 x 8 wt Nos. 9% 12 12 100.00 12 12 100.00 12 100.00 12 100.00 100.00

10 of 22

Page 72: Full Version of SCDR-A Close-Out Report(Dated051107)

PROG. COD : 28-Sep-07

ACT ID ACTIVITY NAME MHRS WTG

PLANNED START

PLANNED FINISH MHRS BASIS OF

QTY (UNIT)LVL 4 WTG EST QTY EARLY

PLAN MID PLAN LATE PLAN ACTUAL VARPROGRESS MEASUREMENT

CUMM PROGRESS THIS WEEK

- Channel 6 x 12 Nos. 11% 25 25 100.00 25 25 100.00 25 100.00 25 100.00 100.00- Angle 75 x 75 x 8 mm Nos. 10% 30 30 100.00 30 30 100.00 30 100.00 30 100.00 100.00- Wall Plt 4.5 mm & Blast Wall Nos. 13% 20 20 100.00 20 20 100.00 20 100.00 20 100.00 100.00

FAB1450 Fabricate Gratings 0.19 24-Feb-07 17-Apr-07 800 No. of Pcs 100% 187 187 100.00 187 187 100.00 187 100.00 187 100.00 100.00 100.00 100.00 100.00 0.00- Main Deck Nos. 17% 51 51 100.00 51 51 100.00 51 100.00 51 100.00 100.00- Cellar Deck Nos. 32% 70 70 100.00 70 70 100.00 70 100.00 70 100.00 100.00- Mezzanine Deck Nos. 16% 40 40 100.00 40 40 100.00 40 100.00 40 100.00 100.00- Wellhead Access Platform / Wing Deck Nos. 25% 14 14 100.00 14 14 100.00 14 100.00 14 100.00 100.00- Intermediate Platform Nos. 10% 12 12 100.00 12 12 100.00 12 100.00 12 100.00 100.00

FAB1460 Fabricate Vent Boom 1.12 09-Mar-07 10-May-07 4,747 No. of Pcs 100% 33 33 100.00 66 66 100.00 66 100.00 66 100.00 100.00 100.00 100.00 100.00 0.00- Pipe 406 dia x 13 wt Nos. 24% 2 2 100.00 4 4 100.00 4 100.00 4 100.00 100.00- Pipe 324 dia x 25.4 wt Nos. 20% 4 4 100.00 8 8 100.00 8 100.00 8 100.00 100.00- Pipe 324 dia x 10 wt Nos. 17% 3 3 100.00 6 6 100.00 6 100.00 6 100.00 100.00- Pipe 324 dia x 6 wt Nos. 15% 2 2 100.00 4 4 100.00 4 100.00 4 100.00 100.00- Pipe 273 dia x 6 wt Nos. 12% 12 12 100.00 24 24 100.00 24 100.00 24 100.00 100.00- Pipe 219 dia x 6 wt Nos. 12% 10 10 100.00 20 20 100.00 20 100.00 20 100.00 100.00

FAB1470 Fabricate Intermediate Platform 0.81 31-Jan-07 12-Mar-07 3,422 No. of Pcs 100% 153 153 100.00 306 306 100.00 306 100.00 306 100.00 100.00 100.00 100.00 100.00 0.00- W 12 x 35 Nos. 35% 43 43 100.00 86 86 100.00 86 100.00 86 100.00 100.00- W 8 x 15 Nos. 30% 60 60 100.00 120 120 100.00 120 100.00 120 100.00 100.00- Plt 10 mm / Grating Nos. 15% 4 4 100.00 8 8 100.00 8 100.00 8 100.00 100.00- Pipe Braces 141 x 7 wt Nos. 20% 46 46 100.00 92 92 100.00 92 100.00 92 100.00 100.00

FAB1510 Fabricate Lifting Padeyes 0.10 02-May-07 23-May-07 433 No. of Pcs 100% 52 52 100.00 72 72 100.00 72 100.00 72 100.00 100.00 100.00 100.00 100.00 0.00- Fab. Main Plate Nos. 47% 16 16 100.00 16 16 100.00 16 100.00 16 100.00 100.00- Fab. Check Plate Nos. 38% 16 16 100.00 16 16 100.00 16 100.00 16 100.00 100.00- Fab. Stiffener Plate Nos. 15% 20 20 100.00 40 40 100.00 40 100.00 40 100.00 100.00

FAB1540 Fabricate Wellhead Access Platform 1.56 18-Jan-07 06-Mar-07 6,609 No. of Pcs 100% 159 159 100.00 318 318 100.00 318 100.00 318 100.00 100.00 100.00 100.00 100.00 0.00- W 12 x 26 Nos. 45% 85 85 100.00 170 170 100.00 170 100.00 170 100.00 100.00- Channel 8 x 18.75 Nos. 33% 36 36 100.00 72 72 100.00 72 100.00 72 100.00 100.00- Pipe 114 x 6 wt Nos. 22% 38 38 100.00 76 76 100.00 76 100.00 76 100.00 100.00

FAB1760 Fabricate Crane Padestal and Boom Rest 0.24 02-Apr-07 02-May-07 1,004 No. of Pcs 100% 24 24 100.00 46 46 100.00 46 100.00 46 100.00 100.00 100.00 100.00 100.00 0.00 - Pipe 1524 dia x 50 wt (Pedestal Clumn) Nos. 28% 4 4 100.00 8 8 100.00 8 100.00 8 100.00 100.00 - Pipe 610 dia x 20 wt Nos. 17% 1 1 100.00 1 1 100.00 1 100.00 1 100.00 100.00 - Pipe 60 dia x 4 wt Nos. 15% 8 8 100.00 16 16 100.00 16 100.00 16 100.00 100.00 - W 12 x 53 Nos. 17% 1 1 100.00 1 1 100.00 1 100.00 1 100.00 100.00 - W 8 x 15 Nos. 10% 8 8 100.00 16 16 100.00 16 100.00 16 100.00 100.00 - Plt 12 mm (Closure) Nos. 13% 2 2 100.00 4 4 100.00 4 100.00 4 100.00 100.00

20% 30% Weld 40% Accept 10%

Installation 4.93 05-Feb-07 18-Jun-07 20,934 Total

Pieces Done % Total Joints Done % Done % Done % 100.00 100.00 100.00 100.00 0.00

FAB1480 Erect Column and Braces (on Cellar Deck) 0.83 05-Feb-07 27-Mar-07 3,520 No. of Pcs 100% 36 36 100.00 36 36 100.00 36 100.00 36 100.00 100.00 100.00 100.00 100.00 0.00- Erect Vertical Column Deck Leg at Row A1 Nos. 10% 1 1 100.00 1 1 100.00 1 100.00 1 100.00 100.00- Erect Vertical Column Deck Leg at Row A2 Nos. 10% 1 1 100.00 1 1 100.00 1 100.00 1 100.00 100.00- Erect Vertical Column Deck Leg at Row A3 Nos. 10% 1 1 100.00 1 1 100.00 1 100.00 1 100.00 100.00- Erect Vertical Column Deck Leg at Row B1 Nos. 10% 1 1 100.00 1 1 100.00 1 100.00 1 100.00 100.00- Erect Vertical Column Deck Leg at Row B2 Nos. 10% 1 1 100.00 1 1 100.00 1 100.00 1 100.00 100.00- Erect Vertical Column Deck Leg at Row B3 Nos. 10% 1 1 100.00 1 1 100.00 1 100.00 1 100.00 100.00- Erect Vertical & Herizontal Braces at Row A Nos. 13% 10 10 100.00 10 10 100.00 10 100.00 10 100.00 100.00- Erect Vertical & Herizontal Braces at Row B Nos. 13% 10 10 100.00 10 10 100.00 10 100.00 10 100.00 100.00- Erect Herizontal Braces at Row 1 Nos. 5% 2 2 100.00 2 2 100.00 2 100.00 2 100.00 100.00- Erect Herizontal Braces at Row 3 Nos. 5% 2 2 100.00 2 2 100.00 2 100.00 2 100.00 100.00- Erect Vertical & Herizontal Braces at Row 3a & 4 Nos. 4% 6 6 100.00 6 6 100.00 6 100.00 6 100.00 100.00

FAB1490 Erect Mezzanine Deck 0.79 27-Mar-07 23-Apr-07 3,342 Portion 100% 6 6 100.00 6 6 100.00 6 100.00 6 100.00 100.00 100.00 100.00 100.00 0.00FAB1500 Erect Main Deck 0.90 28-Apr-07 22-May-07 3,837 No. of Pcs 100% 2 2 100.00 2 2 100.00 2 100.00 2 100.00 100.00 100.00 100.00 100.00 0.00FAB1520 Install Handrails 0.21 10-Apr-07 09-May-07 890 No. of Pcs 100% 209 209 100.00 209 209 100.00 209 100.00 209 100.00 100.00 100.00 100.00 100.00 0.00

- Main Deck Nos. 33% 70 70 100.00 70 70 100.00 70 100.00 70 100.00 100.00- Cellar Deck Nos. 27% 51 51 100.00 51 51 100.00 51 100.00 51 100.00 100.00- Mezzanine Deck Nos. 21% 40 40 100.00 40 40 100.00 40 100.00 40 100.00 100.00- Wellhead Access Platform / Wing Deck Nos. 11% 28 28 100.00 28 28 100.00 28 100.00 28 100.00 100.00- Intermediate Platform Nos. 8% 20 20 100.00 20 20 100.00 20 100.00 20 100.00 100.00

FAB1530 Install Gratings 0.16 05-Apr-07 02-May-07 658 No. of Pcs 100% 1500 1500 100.00 1500 1500 100.00 1500 100.00 1500 100.00 100.00 100.00 100.00 100.00 0.00- Main Deck Nos. 5% 50 50 100.00 50 50 100.00 50 100.00 50 100.00 100.00- Cellar Deck Nos. 33% 514 514 100.00 514 514 100.00 514 100.00 514 100.00 100.00- Mezzanine Deck Nos. 28% 494 494 100.00 494 494 100.00 494 100.00 494 100.00 100.00- Wellhead Access Platform / Wing Deck Nos. 24% 369 369 100.00 369 369 100.00 369 100.00 369 100.00 100.00- Intermediate Platform Nos. 10% 73 73 100.00 73 73 100.00 73 100.00 73 100.00 100.00

FAB1550 Install Stairways & Ladder 0.19 18-Apr-07 16-May-07 786 No. of Pcs 100% 18 18 100.00 18 18 100.00 18 100.00 18 100.00 100.00 100.00 100.00 100.00 0.00- Main Deck Nos. 10% 2 2 100.00 2 2 100.00 2 100.00 2 100.00 100.00- Cellar Deck Nos. 45% 8 8 100.00 8 8 100.00 8 100.00 8 100.00 100.00- Mezzanine Deck Nos. 20% 4 4 100.00 4 4 100.00 4 100.00 4 100.00 100.00- Wellhead Access Platform / Wing Deck Nos. 15% 2 2 100.00 2 2 100.00 2 100.00 2 100.00 100.00

Lift / Position Fit-Up

11 of 22

Page 73: Full Version of SCDR-A Close-Out Report(Dated051107)

PROG. COD : 28-Sep-07

ACT ID ACTIVITY NAME MHRS WTG

PLANNED START

PLANNED FINISH MHRS BASIS OF

QTY (UNIT)LVL 4 WTG EST QTY EARLY

PLAN MID PLAN LATE PLAN ACTUAL VARPROGRESS MEASUREMENT

CUMM PROGRESS THIS WEEK

- Intermediate Platform Nos. 10% 2 2 100.00 2 2 100.00 2 100.00 2 100.00 100.00FAB1560 Install Framing for Switchgear, ILE Rooms, W.Shelter & Workshop 0.57 29-Mar-07 28-Apr-07 2,409 Rooms 100% 4 4 100.00 4 4 100.00 4 100.00 4 100.00 100.00 100.00 100.00 100.00 0.00

- Battery Room Room 22% 1 1 100.00 1 1 100.00 1 100.00 1 100.00 100.00- Switchgear Room Room 38% 1 1 100.00 1 1 100.00 1 100.00 1 100.00 100.00- Instrument Local Equipment Room 30% 1 1 100.00 1 1 100.00 1 100.00 1 100.00 100.00- Weather Shelter, Workshop and Blast Wall Room 10% 1 1 100.00 1 1 100.00 1 100.00 1 100.00 100.00

FAB1570 Erect Intermediate Platform 0.32 26-Mar-07 14-Apr-07 1,370 No. of Pcs 100% 3 3 100.00 3 3 100.00 3 100.00 3 100.00 100.00 100.00 100.00 100.00 0.00FAB1580 Install Vent Boom 0.08 01-Jun-07 18-Jun-07 342 No. of Pcs 100% 1 1 100.00 1 1 100.00 1 100.00 1 100.00 100.00 100.00 100.00 100.00 0.00FAB1590 Install Lifting Padeyes 0.14 24-May-07 14-Jun-07 606 No. of Pcs 100% 4 4 100.00 4 4 100.00 4 100.00 4 100.00 100.00 100.00 100.00 100.00 0.00FAB1740 Erect Wellhead Access Platform 0.54 20-Mar-07 11-Apr-07 2,283 No. of Pcs 100% 1 1 100.00 1 1 100.00 1 100.00 1 100.00 100.00 100.00 100.00 100.00 0.00FAB1750 Install Crane Padestal and Boom Rest 0.21 16-May-07 07-Jun-07 891 No. of Pcs 100% 3 3 100.00 3 3 100.00 3 100.00 3 100.00 100.00 100.00 100.00 100.00 0.00

- Install Crane Padestal Column Nos. 45% 1 1 100.00 1 1 100.00 1 100.00 1 100.00 100.00- Install Crane Adaptor Nos. 40% 1 1 100.00 1 1 100.00 1 100.00 1 100.00 100.00- Install Boom Rest Nos. 15% 1 1 100.00 1 1 100.00 1 100.00 1 100.00 100.00

Blasting/Painting 4.76 22-Sep-06 31-Jul-07 20,182 Prep B/P Accept 100.00 100.00 100.00 100.00 0.0010% 80% 10%

FAB1600 Auto Blast/Prime Structural Mat'l Type I and II 0.45 22-Sep-06 17-Nov-06 1,928 Nos 100% 280 280 280 280 100.00 100.00 100.00 100.00 0.00 - Beam 36 Nos 5% 45 45 45 45 100.00 - Beam 24 Nos 5% 105 105 105 105 100.00 - Beam 18 Nos 5% 25 25 25 25 100.00 - Pipe 1524 (Type I & II) Nos 5% 9 9 9 9 100.00 - Pipe 1219 (Type I & II) Nos 5% 13 13 13 13 100.00 - Pipe 610 (Type I) Nos 5% 24 24 24 24 100.00 - Pipe 457 (Type I) Nos 5% 4 4 4 4 100.00 - Pipe 356 (Type I) Nos 5% 5 5 5 5 100.00 - Pipe 273 (Type I) Nos 5% 10 10 10 10 100.00 - Pipe 660 (Type I) Nos 5% 6 6 6 6 100.00 - Plate 60 x 10 x 3.05 (Grade 355EMZ) Nos 5% 1 1 1 1 100.00 - Plate 50 x 10 x 3.05 (Grade 355EMZ) Nos 5% 5 5 5 5 100.00 - Plate 38 x 10 x 3.05 (Grade 355CZ) Nos 5% 1 1 1 1 100.00 - Plate 35 x 10 x 3.05 (Grade 355CZ) Nos 5% 2 2 2 2 100.00 - Plate 25 x 10 x 3.05 (Grade 355CZ) Nos 5% 1 1 1 1 100.00 - Plate 50 x 10 x 3.05 (Grade 355C) Nos 5% 3 3 3 3 100.00 - Plate 38 x 10 x 3.05 (Grade 355C) Nos 5% 5 5 5 5 100.00 - Plate 25 x 10 x 3.05 (Grade 355C) Nos 5% 6 6 6 6 100.00 - Plate 20 x 10 x 3.05 (Grade 355C) Nos 5% 5 5 5 5 100.00 - Plate 16 x 10 x 3.05 (Grade 355C) Nos 5% 4 4 4 4 100.00 - Plate 40 x 10 x 3.05 (Grade 355C) Nos 5% 1 1 1 1 100.00

Prep B/P 1st Coat 2nd Coat 3rd Coad Accept10% 20% 20% 20% 20% 10%

FAB1610 Blast/Paint Cellar Deck 0.54 27-Mar-07 28-Apr-07 2,279 SM 100% 5125 5125 5125 5125 5125 5125 5125 100.00 100.00 100.00 100.00 0.00Prep B/P Accept10% 80% 10%

FAB1620 Blast/Prime Structural Mat'l Type III 0.50 14-Dec-06 14-Mar-07 2,103 Nos. 100% 1693 1693 1693 1693 100.00 100.00 100.00 100.00 0.00- Secondary Pipes (Type III) Nos. 17% 129 129 129 129 100.00- Secondary Beam (Type III) Nos. 21% 373 373 373 373 100.00- Monorail Beam Nos. 3% 6 6 6 6 100.00- Deck Plating Nos. 15% 121 121 121 121 100.00- Handrail Materials Nos. 4% 187 187 187 187 100.00- Flatbars and Kickplates Round Bar Nos. 5% 129 129 129 129 100.00- Stair Tread Nos. 5% 338 338 338 338 100.00- Channels (Type III) Nos. 10% 108 108 108 108 100.00- Angles (Type III) Nos. 12% 202 202 202 202 100.00- SHS Nos. 8% 100 100 100 100 100.00

Prep B/P 1st Coat 2nd Coat Final Coat Accept10% 20% 20% 20% 20% 10%

FAB1630 Blast/Paint Pipe Supports 0.39 31-Jan-07 27-Mar-07 1,643 Nos. 100% 510 510 510 510 510 510 510 100.00 100.00 100.00 100.00 0.00FAB1640 Blast/Paint Mezzanine Deck 0.25 10-Mar-07 27-Mar-07 1,074 SM 100% 1297 1297 1297 1297 1297 1297 1297 100.00 100.00 100.00 100.00 0.00FAB1650 Blast/Paint Main Deck 0.44 27-Mar-07 26-Apr-07 1,855 SM 100% 4114 4114 4114 4114 4114 4114 4114 100.00 100.00 100.00 100.00 0.00FAB1660 Blast/Paint Electrical Supports 0.14 15-Mar-07 02-Apr-07 614 Nos. 100% 348 348 348 348 348 348 348 100.00 100.00 100.00 100.00 0.00FAB1670 Blast/Paint Framing for Switchgear, ILE Rooms, W.Shelter & Worksho 0.19 15-Mar-07 29-Mar-07 818 SM 100% 720 720 720 720 720 720 720 100.00 100.00 100.00 100.00 0.00FAB1680 Blast/Paint Instrument Supports 0.14 15-Mar-07 02-Apr-07 614 Nos. 100% 280 280 280 280 280 280 280 100.00 100.00 100.00 100.00 0.00FAB1690 Blast/Paint Stairways & Ladder 0.09 07-Apr-07 24-Apr-07 380 Nos. 100% 17 17 17 17 17 17 17 100.00 100.00 100.00 100.00 0.00FAB1700 Blast/Paint Handrails 0.10 02-Apr-07 19-Apr-07 409 Nos. 100% 175 175 175 175 175 175 175 100.00 100.00 100.00 100.00 0.00FAB1710 Blast/Paint Pipe Spools 0.41 28-Feb-07 11-Apr-07 1,738 Nos. 100% 137 137 137 137 137 137 137 100.00 100.00 100.00 100.00 0.00FAB1720 Blast/Paint Vent Boom 0.12 10-May-07 01-Jun-07 497 SM 100% 784 784 784 784 784 784 784 100.00 100.00 100.00 100.00 0.00FAB1730 Blast/Paint Lifting Padeyes 0.05 14-Jun-07 27-Jun-07 219 Nos. 100% 4 4 4 4 4 4 4 100.00 100.00 100.00 100.00 0.00FAB1770 Blast/Paint Crane Padestal and Boom Rest 0.06 02-May-07 16-May-07 263 SM 100% 180 180 180 180 180 180 180 100.00 100.00 100.00 100.00 0.00FAB1780 Blast/Paint Wellhead Access Platform 0.18 06-Mar-07 20-Mar-07 745 SM 100% 331 331 331 331 331 331 331 100.00 100.00 100.00 100.00 0.00FAB1790 Blast/Paint Intermediate Platform 0.12 12-Mar-07 26-Mar-07 511 SM 100% 481 481 481 481 481 481 481 100.00 100.00 100.00 100.00 0.00

12 of 22

Page 74: Full Version of SCDR-A Close-Out Report(Dated051107)

PROG. COD : 28-Sep-07

ACT ID ACTIVITY NAME MHRS WTG

PLANNED START

PLANNED FINISH MHRS BASIS OF

QTY (UNIT)LVL 4 WTG EST QTY EARLY

PLAN MID PLAN LATE PLAN ACTUAL VARPROGRESS MEASUREMENT

CUMM PROGRESS THIS WEEK

Touch-Up Accept90% 10%

FAB2110 Touch-Up Painting 0.23 11-Apr-07 31-Jul-07 986 SM 100% 2600 2600 2600 100.00 100.00 100.00 100.00 0.00PFP/BW Accept

90% 10%FAB2120 Apply Passive Fire Proofing 0.12 01-Jun-07 15-Jun-07 526 Pcs 100% 100 100 100 100.00 100.00 100.00 100.00 0.00FAB2130 Apply Fire/Blast Walls 0.23 10-May-07 01-Jun-07 980 Pcs 100% 10 10 10 100.00 100.00 100.00 100.00 0.00 Piping 15.04 13-Jan-07 15-Aug-07 63,793 20% 30% Weld 40% Accept 10% 100.00 100.00 100.00 100.00 0.00

Fabrication 5.38 13-Jan-07 31-Jul-07 22,831 Total Dia

Inch Done % Total Dia Inch Done % Done % Done %

100.00 100.00 100.00 100.00 0.00FAB2100 Fabricate Pipe Supports 0.67 13-Jan-07 28-Mar-07 2,830 Dia Inch 100% 510 510 100.00 555 555 100.00 555 100.00 555 100.00 100.00 100.00 100.00 100.00 0.00

- Sump Deck Dia Inch 11% 110 110 100.00 110 110 100.00 110 100.00 110 100.00 100.00 - Cellar Deck & Switchgear/LER Dia Inch 19% 90 90 100.00 90 90 100.00 90 100.00 90 100.00 100.00 - Mezzanine Deck Dia Inch 48% 200 200 100.00 245 245 100.00 245 100.00 245 100.00 100.00 - Main Deck Dia Inch 22% 110 110 100.00 110 110 100.00 110 100.00 110 100.00 100.00

FAB2630 Fabricate CS Pipe Spools 1.69 14-Feb-07 25-Apr-07 7,163 Dia Inch 100% 1796 1796 100.00 1796 1796 100.00 1796 100.00 1796 100.00 100.00 100.00 100.00 100.00 0.00 - Sump Deck Dia Inch 18% 330 330 100.00 330 330 100.00 330 100.00 330 100.00 100.00 - Mezzanine Deck Dia Inch 68% 1214 1214 100.00 1214 1214 100.00 1214 100.00 1214 100.00 100.00 - Cellar Deck Dia Inch 11% 198 198 100.00 198 198 100.00 198 100.00 198 100.00 100.00 - Main Deck Dia Inch 3% 54 54 100.00 54 54 100.00 54 100.00 54 100.00 100.00

FAB2840 Fabricate SS Pipe Spools 0.81 10-Mar-07 03-May-07 3,423 Dia Inch 100% 1300 1300 100.00 1300 1300 100.00 1300 100.00 1300 100.00 100.00 100.00 100.00 100.00 0.00 - Sump Deck Dia Inch 28% 357 357 100.00 357 357 100.00 357 100.00 357 100.00 100.00 - Cellar Deck & Switchgear/LER Dia Inch 21% 285 285 100.00 285 285 100.00 285 100.00 285 100.00 100.00 - Mezzanine Deck Dia Inch 31% 400 400 100.00 400 400 100.00 400 100.00 400 100.00 100.00 - Main Deck Dia Inch 20% 258 258 100.00 258 258 100.00 258 100.00 258 100.00 100.00

FAB2850 Fabricate DSS Pipe Spools 1.02 07-Jun-07 31-Jul-07 4,337 Dia Inch 100% 5985 5985 100.00 5985 5985 100.00 5985 100.00 5985 100.00 100.00 100.00 100.00 100.00 0.00 - Sump Deck Dia Inch 5% 477 477 100.00 477 477 100.00 477 100.00 477 100.00 100.00 - Cellar Deck & Switchgear/LER Dia Inch 17% 1027 1027 100.00 1027 1027 100.00 1027 100.00 1027 100.00 100.00 - Mezzanine Deck Dia Inch 78% 4481 4481 100.00 4481 4481 100.00 4481 100.00 4481 100.00 100.00

FAB2860 Fabricate GRE Pipe Spools 0.73 26-Mar-07 15-May-07 3,104 Dia Inch 100% 5876 5876 100.00 5876 5876 100.00 5876 100.00 5876 100.00 100.00 100.00 100.00 100.00 0.00 - Sump Deck Dia Inch 22% 1388 1388 100.00 1388 1388 100.00 1388 100.00 1388 100.00 100.00 - Cellar Deck & Switchgear/LER Dia Inch 20% 1137 1137 100.00 1137 1137 100.00 1137 100.00 1137 100.00 100.00 - Mezzanine Deck Dia Inch 40% 2326 2326 100.00 2326 2326 100.00 2326 100.00 2326 100.00 100.00 - Main Deck Dia Inch 18% 1025 1025 100.00 1025 1025 100.00 1025 100.00 1025 100.00 100.00

FAB2870 Fabricate Piping Specialty Items 0.47 14-Apr-07 28-May-07 1,974 Dia Inch 100% 620 620 100.00 620 620 100.00 620 100.00 620 100.00 100.00 100.00 100.00 100.00 0.0020% 30% Weld 40% Accept 10%

Installation 9.66 24-Jan-07 15-Aug-07 40,964 Total Dia

Inch Done % Total Dia Inch Done % Done % Done % 100.00 100.00 100.00 100.00 0.00

FAB2820 Install Pipe Supports Below Cellar Deck 0.59 24-Jan-07 12-Mar-07 2,510 Nos. 100% 203 203 100.00 203 203 100.00 203 100.00 203 100.00 100.00 100.00 100.00 100.00 0.00FAB2830 Install CS Pipe Spools 1.56 08-Mar-07 22-May-07 6,627 Nos. 100% 412 412 100.00 412 412 100.00 412 100.00 412 100.00 100.00 100.00 100.00 100.00 0.00

- Sump Deck Nos. 14% 57 57 100.00 57 57 100.00 57 100.00 57 100.00 100.00 - Mezzanine Deck Nos. 79% 325 325 100.00 325 325 100.00 325 100.00 325 100.00 100.00 - Cellar Deck Nos. 7% 30 30 100.00 30 30 100.00 30 100.00 30 100.00 100.00

FAB2880 Install SS Pipe Spools 0.90 06-Apr-07 14-May-07 3,798 Nos. 100% 302 302 100.00 302 302 100.00 302 100.00 302 100.00 100.00 100.00 100.00 100.00 0.00 - Sump Deck Nos. 12% 54 54 100.00 54 54 100.00 54 100.00 54 100.00 100.00 - Cellar Deck & Switchgear/LER Nos. 17% 65 65 100.00 65 65 100.00 65 100.00 65 100.00 100.00 - Mezzanine Deck Nos. 36% 100 100 100.00 100 100 100.00 100 100.00 100 100.00 100.00 - Main Deck Nos. 35% 83 83 100.00 83 83 100.00 83 100.00 83 100.00 100.00

FAB2890 Install DSS Pipe Spools 1.38 30-Jun-07 11-Aug-07 5,861 Nos. 100% 1150 1150 100.00 1150 1150 100.00 1150 100.00 1150 100.00 100.00 100.00 100.00 100.00 0.00 - Cellar Deck & Switchgear/LER Nos. 47% 193 193 100.00 193 193 100.00 193 100.00 193 100.00 100.00 - Mezzanine Deck Nos. 53% 957 957 100.00 957 957 100.00 957 100.00 957 100.00 100.00

FAB2900 Install GRE Pipe Spools 0.69 16-Apr-07 12-Jun-07 2,931 Nos. 100% 1762 1762 100.00 1762 1762 100.00 1762 100.00 1762 100.00 100.00 100.00 100.00 100.00 0.00 - Sump Deck Nos. 17% 293 293 100.00 293 293 100.00 293 100.00 293 100.00 100.00 - Cellar Deck & Switchgear/LER Nos. 21% 379 379 100.00 379 379 100.00 379 100.00 379 100.00 100.00 - Mezzanine Deck Nos. 44% 789 789 100.00 789 789 100.00 789 100.00 789 100.00 100.00 - Main Deck Nos. 18% 301 301 100.00 301 301 100.00 301 100.00 301 100.00 100.00

FAB2910 Install Piping Specialty Items 0.58 10-May-07 01-Jul-07 2,444 Nos. 100% 1 1 100.00 1 1 100.00 1 100.00 1 100.00 100.00 100.00 100.00 100.00 0.00FAB2920 Install Pipe Bends & Barred Tees 0.45 17-Jul-07 06-Aug-07 1,926 Nos. 100% 1 1 100.00 1 1 100.00 1 100.00 1 100.00 100.00 100.00 100.00 100.00 0.00FAB2930 Install Associated Fitting & Acc for Launcher 0.38 17-May-07 13-Jun-07 1,631 Nos. 100% 15 15 100.00 15 15 100.00 15 100.00 15 100.00 100.00 100.00 100.00 100.00 0.00

Install 90% Accept 10%Done % Done %

FAB2940 Valve Installation 0.92 21-May-07 13-Jul-07 3,896 Nos. 100% 187 Note; o/s 4 nos. Glove Valve (Monitor under punchlist ite 187 100.00 187 100.00 100.00 100.00 100.00 100.00 0.00LC / Flush 20% Hydrotest 60% Reinstate 10% Accept 10%

Total Pack Done % Done % Done % Done %

FAB2950 Hydrotest/Reinstatement 0.81 09-Jun-07 15-Aug-07 3,423 Lines 100% 102 102 100.00 102 100.00 102 100.00 102 100.00 100.00 100.00 100.00 100.00 0.00Insulation 90% Accept 10%

Total Lines Done % Done %

FAB2960 Pipe Insulation 0.58 09-Jul-07 06-Aug-07 2,445 Lines 100% 100 100 100.00 100 100.00 100.00 100.00 100.00 100.00 0.00

Mark & Cut Fit-Up

Lift / Position Fit-Up

13 of 22

Page 75: Full Version of SCDR-A Close-Out Report(Dated051107)

PROG. COD : 28-Sep-07

ACT ID ACTIVITY NAME MHRS WTG

PLANNED START

PLANNED FINISH MHRS BASIS OF

QTY (UNIT)LVL 4 WTG EST QTY EARLY

PLAN MID PLAN LATE PLAN ACTUAL VARPROGRESS MEASUREMENT

CUMM PROGRESS THIS WEEK

20% 30% Weld 40% Accept 10%Total

Pieces Done % Total Joints Done % Done % Done %

FAB2990 Install Pipe Supports Below Main Deck 0.82 27-Feb-07 25-Apr-07 3,470 Pcs 100% 307 307 100.00 307 307 100.00 307 100.00 307 100.00 100.00 100.00 100.00 100.00 0.00 Mechanical 5.48 15-Feb-07 20-Aug-07 23,253 20% 30% Weld 40% Accept 10% 100.00 100.00 100.00 100.00 0.00

Total Pieces Done % Total

Joints Done % Done % Done %

FAB2415 Fabricate Equipment Supports 0.20 15-Feb-07 06-Apr-07 858 Nos. 100% 58 58 100.00 58 58 100.00 58 100.00 58 100.00 100.00 100.00 100.00 100.00 0.00 - Flush Water Pump Nos. 10% 4 4 100.00 4 4 100.00 4 100.00 4 100.00 100.00 - Fresh Water Pump Nos. 10% 5 5 100.00 5 5 100.00 5 100.00 5 100.00 100.00 - Diesel Transfer Pump Nos. 12% 5 5 100.00 5 5 100.00 5 100.00 5 100.00 100.00 - Swing Jib Crane Nos. 23% 6 6 100.00 6 6 100.00 6 100.00 6 100.00 100.00 - Launcher & Receiver Nos. 21% 10 10 100.00 10 10 100.00 10 100.00 10 100.00 100.00 - Safety Shower & Eyewash Station Nos. 10% 6 6 100.00 6 6 100.00 6 100.00 6 100.00 100.00 - Fire Extinguisher Nos. 14% 22 22 100.00 22 22 100.00 22 100.00 22 100.00 100.00

20% 30% Weld 40% Accept 10%Total

Pieces Done % Total Joints Done % Done % Done %

FAB3070 Install Equipment Supports 0.27 28-Mar-07 23-May-07 1,140 Nos. 100% 76 76 100.00 76 76 100.00 76 100.00 76 100.00 100.00 100.00 100.00 100.00 0.00 - Flush Water Pump Nos. 10% 4 4 100.00 4 4 100.00 4 100.00 4 100.00 100.00 - Fresh Water Pump Nos. 10% 5 5 100.00 5 5 100.00 5 100.00 5 100.00 100.00 - Diesel Transfer Pump Nos. 12% 5 5 100.00 5 5 100.00 5 100.00 5 100.00 100.00 - Swing Jib Crane Nos. 23% 6 6 100.00 6 6 100.00 6 100.00 6 100.00 100.00 - Launcher & Receiver Nos. 21% 10 10 100.00 10 10 100.00 10 100.00 10 100.00 100.00 - Safety Shower & Eyewash Station Nos. 10% 4 4 100.00 4 4 100.00 4 100.00 4 100.00 100.00 - Fire Extinguisher Nos. 14% 42 42 100.00 42 42 100.00 42 100.00 42 100.00 100.00

Set Equip 60% Lvl & Fit 30% Accept 10%Done % Done % Done %

FAB3080 Install HP Vent Tip 0.21 14-Jul-07 02-Aug-07 912 Unit 100% 1 1 100.00 1 100.00 1 100.00 100.00 100.00 100.00 100.00 0.00FAB3090 Install Flush Water Pump 0.16 03-Jul-07 28-Jul-07 684 Unit 100% 2 2 100.00 2 100.00 2 100.00 100.00 100.00 100.00 100.00 0.00FAB3100 Install Fresh Water Pump 0.16 03-Jul-07 28-Jul-07 684 Unit 100% 1 1 100.00 1 100.00 1 100.00 100.00 100.00 100.00 100.00 0.00FAB3110 Install Corrosion Inhibitor Injection Package 0.31 28-Jun-07 13-Jul-07 1,300 Unit 100% 1 1 100.00 1 100.00 1 100.00 100.00 100.00 100.00 100.00 0.00FAB3120 Install Diesel Transfer Pump 0.29 07-Jul-07 31-Jul-07 1,233 Unit 100% 1 1 100.00 1 100.00 1 100.00 100.00 100.00 100.00 100.00 0.00FAB3130 Install Condensate Pod 0.24 16-Jun-07 03-Jul-07 1,031 Unit 100% 1 1 100.00 1 100.00 1 100.00 100.00 100.00 100.00 100.00 0.00FAB3140 Install Open Drain Caisson Pump 0.16 13-Jun-07 01-Jul-07 684 Unit 100% 1 1 100.00 1 100.00 1 100.00 100.00 100.00 100.00 100.00 0.00FAB3150 Install Closed Drain Transfer Pump 0.16 25-Jun-07 13-Jul-07 684 Unit 100% 1 1 100.00 1 100.00 1 100.00 100.00 100.00 100.00 100.00 0.00FAB3160 Install Manual Operated Trolley Hoists 0.32 09-Jun-07 25-Jun-07 1,367 Unit 100% 4 4 100.00 4 100.00 4 100.00 100.00 100.00 100.00 100.00 0.00FAB3170 Install CO2 Vent Snuffing System 0.27 13-Jul-07 02-Aug-07 1,130 Unit 100% 1 1 100.00 1 100.00 1 100.00 100.00 100.00 100.00 100.00 0.00FAB3180 Install Swing Jib Cranes with Manual Operated Hoist 0.32 23-May-07 14-Jun-07 1,368 Unit 100% 2 2 100.00 2 100.00 2 100.00 100.00 100.00 100.00 100.00 0.00FAB3190 Install Flush Water Tank 0.23 01-Jun-07 18-Jun-07 960 Unit 100% 1 1 100.00 1 100.00 1 100.00 100.00 100.00 100.00 100.00 0.00FAB3200 Install Fresh Water Tank 0.22 21-May-07 07-Jun-07 924 Unit 100% 1 1 100.00 1 100.00 1 100.00 100.00 100.00 100.00 100.00 0.00FAB3210 Install Closed Drain Vessel 0.26 17-Jul-07 07-Aug-07 1,106 Unit 100% 1 1 100.00 1 100.00 1 100.00 100.00 100.00 100.00 100.00 0.00FAB3220 Install All Remaining Pumps 0.24 28-Jul-07 11-Aug-07 1,034 Unit 100% 1 1 100.00 1 100.00 1 100.00 100.00 100.00 100.00 100.00 0.00FAB3230 Install Padestal Crane 0.59 25-Jul-07 10-Aug-07 2,507 Unit 100% 2 2 100.00 2 100.00 2 100.00 100.00 100.00 100.00 100.00 0.00

- Mechinery Deck Unit 80% 1 1 100.00 1 100.00 1 100.00 100.00 - Crane Boom & Mast Frame Unit 20% 1 1 100.00 1 100.00 1 100.00 100.00

FAB3240 Install All Remaining Mechanical Items 0.27 08-Aug-07 20-Aug-07 1,140 Nos. 100% 1 1 100.00 1 100.00 1 100.00 100.00 100.00 100.00 100.00 0.00 - Install Pig Launcher & Receiver Nos. 100% 1 1 100.00 1 100.00 1 100.00 100.00

FAB3300 Install Wellhead Desander Skids 0.59 05-Jun-07 28-Jun-07 2,507 Unit 100% 5 5 100.00 5 100.00 5 100.00 100.00 100.00 100.00 100.00 0.00 Electrical 6.61 28-Feb-07 03-Aug-07 28,038 20% 30% Weld 40% Accept 10% 100.00 100.00 100.00 100.00 0.00

Total Pieces Done % Total

Joints Done % Done % Done %

FAB2970 Fabricate Electrical Supports 0.47 28-Feb-07 06-Apr-07 1,996 Pcs 100% 592 592 100.00 592 592 100.00 592 100.00 592 100.00 100.00 100.00 100.00 100.00 0.00 - Cable Ladder Support Pcs 36% 199 199 100.00 199 199 100.00 199 100.00 199 100.00 100.00 - Lighting Support Pcs 30% 200 200 100.00 200 200 100.00 200 100.00 200 100.00 100.00 - Coaming/Plinth Support Pcs 12% 29 29 100.00 29 29 100.00 29 100.00 29 100.00 100.00 - JB/Socket/RCU Support Pcs 22% 164 164 100.00 164 164 100.00 164 100.00 164 100.00 100.00

20% 30% Weld 40% Accept 10%Total

Pieces Done % Total Joints Done % Done % Done %

FAB2980 Install Electrical Supports 0.48 26-Mar-07 05-May-07 2,040 Pcs 100% 582 582 100.00 582 582 100.00 582 100.00 582 100.00 100.00 100.00 100.00 100.00 0.00 - Cable Ladder Support Pcs 36% 199 199 100.00 199 199 100.00 199 100.00 199 100.00 100.00 - Lighting Support Pcs 30% 190 190 100.00 190 190 100.00 190 100.00 190 100.00 100.00 - RCU/MCT/Coaming/Saddles Support Pcs 12% 29 29 100.00 29 29 100.00 29 100.00 29 100.00 100.00 - Outlet Support Pcs 22% 164 164 100.00 164 164 100.00 164 100.00 164 100.00 100.00

Install 90% Accept 10%Done % Done %

FAB3250 Install Cable Trays, Ladder & Accessories 0.74 13-Apr-07 04-Jun-07 3,135 Mtrs 100% 785 785 100.00 785 100.00 100.00 100.00 100.00 100.00 0.00Install Cable Ladder Mtrs 47% 329 329 100.00 329 100.00 100.00

- Cellar Deck Mtrs 3% 20 20 100.00 20 100.00 100.00 - Mezzanine Deck Mtrs 16% 111 111 100.00 111 100.00 100.00 - Switchgear,LER,Battery,Welter Shelter & Transfomer Rooms Mtrs 28% 198 198 100.00 198 100.00 100.00

Lift / Position Fit-Up

Fit-Up

Fit-Up

Mark & Cut

Mark & Cut Fit-Up

Lift / Position

Fit-Up

Lift / Position

14 of 22

Page 76: Full Version of SCDR-A Close-Out Report(Dated051107)

PROG. COD : 28-Sep-07

ACT ID ACTIVITY NAME MHRS WTG

PLANNED START

PLANNED FINISH MHRS BASIS OF

QTY (UNIT)LVL 4 WTG EST QTY EARLY

PLAN MID PLAN LATE PLAN ACTUAL VARPROGRESS MEASUREMENT

CUMM PROGRESS THIS WEEK

Install Cable Tray Mtrs 53% 456 456 100.00 456 100.00 100.00 - Main Deck Mtrs 9% 78 78 100.00 78 100.00 100.00 - Cellar Deck Mtrs 19% 165 165 100.00 165 100.00 100.00 - Mezzanine Deck Mtrs 15% 132 132 100.00 132 100.00 100.00 - Switchgear,LER,Battery,Welter Shelter & Transfomer Rooms Mtrs 10% 81 81 100.00 81 100.00 100.00

FAB3260 Install Electrical / Control Cables, Fitting & MCT's 0.74 14-Apr-07 24-May-07 3,140 Mtrs 100% 22 22 100.00 22 100.00 100.00 100.00 100.00 100.00 0.00Install Electrical Coaming Mtrs 60% 13 13 100.00 13 100.00 100.00

- Cellar Deck Mtrs 32% 8 8 100.00 8 100.00 100.00 - Mezzanine Deck Mtrs 24% 4 4 100.00 4 100.00 100.00 - Main Deck Mtrs 4% 1 1 100.00 1 100.00 100.00

Install Electrical MCT's Nos. 40% 9 9 100.00 9 100.00 100.00 - Switchgear,LER,Battery,Welter Shelter & Transfomer Rooms Nos. 40% 9 9 100.00 9 100.00 100.00

FAB3270 Install Light Fitting, Photocells Mounting and Accessories 0.56 14-May-07 20-Jun-07 2,394 Nos. 100% 190 190 100.00 170 89.47 100.00 100.00 100.00 100.00 0.00Install Light Fitting Nos. 100% 190 190 100.00 170 89.47 100.00

- Intermediate Platform Nos. 10% 9 9 100.00 9 100.00 100.00 - Cellar Deck Nos. 56% 111 111 100.00 111 100.00 100.00 - Mezzanine Deck Nos. 27% 54 54 100.00 54 100.00 100.00 - Main Deck Nos. 7% 16 16 100.00 16 100.00 100.00

Pull/Lay 90% Accept 10%Done % Done %

FAB3280 Cable Pulling 0.92 02-May-07 15-Jun-07 3,907 Runs 100% 605 605 100.00 605 100.00 100.00 100.00 100.00 100.00 0.00Power Cable Runs 16% 12 12 100.00 12 100.00 100.00

- Cable @ RMU (RMU-7505) Runs 9% 8 8 100.00 8 100.00 100.00 - Cable @ 6.6 kv Transformer (TF-7501) Runs 7% 4 4 100.00 4 100.00 100.00

Control Cable Runs 51% 215 215 100.00 215 100.00 100.00 - Cable 400v @ Switchgear (SB-7505) Runs 11% 113 113 100.00 113 100.00 100.00 - Cable 230v @ AC UPS (LCPA-8955) Runs 9% 5 5 100.00 5 100.00 100.00 - Cable 230v @ AC UPS (UPS-7805) Runs 9% 33 33 100.00 33 100.00 100.00 - Cable 230v @ AC UPS (DB-7815) Runs 9% 53 53 100.00 53 100.00 100.00 - Cable HVAC @ Control Panel Runs 6% 7 7 100.00 7 100.00 100.00 - Cable MOV @ Distribution Board (DB-7745) Runs 7% 4 4 100.00 4 100.00 100.00

DC Runs 10% 20 20 100.00 20 100.00 100.00 - Cable 24V DC @ Distribution Board (DB-7925) Runs 10% 20 20 100.00 20 100.00 100.00

Lighting/small power cables Runs 23% 358 358 100.00 358 100.00 100.00 - Cable @ Indoor Lighting Distribution Board (Normal/Emergency DB-7725) Runs 6% 48 48 100.00 48 100.00 100.00 - Cable @ Outdoor Lighting Distribution Board (Normal DB-7735) Runs 6% 50 50 100.00 50 100.00 100.00 - Cable @ Small Power Distribution Board (DB-7715) Runs 7% 153 153 100.00 153 100.00 100.00 - Cable @ Outdoor Lighting Emergency (DB-7845) Runs 4% 107 107 100.00 107 100.00 100.00

Install 90% Accept 10%Done % Done %

FAB3290 Install Junction Boxes and Control Panels 0.49 11-May-07 14-Jun-07 2,096 Nos. 100% 119 119 100.00 119 100.00 100.00 100.00 100.00 100.00 0.00 - JB's Sump Deck Nos. 11% 13 13 100.00 13 100.00 100.00 - JB's Cellar Deck & Switchgear/LER Nos. 53% 63 63 100.00 63 100.00 100.00 - JB's Mezzanine Deck Nos. 26% 31 31 100.00 31 100.00 100.00 - JB's Main Deck Nos. 10% 12 12 100.00 12 100.00 100.00

Lvl & Fit 60% Hook-Up 30% Accept 10%Done % Done % Done %

FAB3310 Install Power Transformer 0.23 19-Jul-07 03-Aug-07 984 Nos. 100% 1 1 100 1 100.00 1 100.00 100.00 100.00 100.00 100.00 0.00FAB3320 Install 6.6KV Ring Main Unit 0.22 04-Jul-07 25-Jul-07 946 Nos. 100% 4 4 100 4 100.00 4 100.00 100.00 100.00 100.00 100.00 0.00

Install 90% Accept 10%Done % Done %

FAB3330 Install Remote Control Units and Safety Switches 0.27 01-Jun-07 30-Jun-07 1,140 Nos. 100% 17 17 100.00 17 100.00 100.00 100.00 100.00 100.00 0.00 - Sump Deck Nos. 5% 2 2 100.00 2 100.00 100.00 - Cellar Deck & Switchgear/LER Nos. 18% 8 8 100.00 8 100.00 100.00 - Mezzanine Deck Nos. 67% 3 3 100.00 3 100.00 100.00 - Main Deck Nos. 10% 4 4 100.00 4 100.00 100.00

Lvl & Fit 60% Hook-Up 30% Accept 10%Done % Done % Done %

FAB3340 Install LV Distribution Board 0.23 27-Apr-07 23-May-07 957 Nos. 100% 7 7 100 7 100.00 7 100.00 100.00 100.00 100.00 100.00 0.00 - Install Indoor Lighting Distribution Board (Normal/Emergency DB-7725) Nos. 10% 1 1 100 1 100.00 1 100.00 100.00 - Install Outdoor Lighting Distribution Board (Normal DB-7735) Nos. 12% 1 1 100 1 100.00 1 100.00 100.00 - Install Outdoor Lighting Emergency (DB-7845) Nos. 12% 1 1 100 1 100.00 1 100.00 100.00 - Install Small Power Distribution Board (DB-7715) Nos. 18% 1 1 100 1 100.00 1 100.00 100.00 - Install 24V DC Distribution Board (DB-7925) Nos. 17% 1 1 100 1 100.00 1 100.00 100.00 - Install 230V AC UPS Distribution Board (DB-7815) Nos. 17% 1 1 100 1 100.00 1 100.00 100.00 - Install MOV Distribution Board (DB-7745) Nos. 14% 1 1 100 1 100.00 1 100.00 100.00

Install 90% Accept 10%Done % Done %

FAB3350 Install Powered Navigational Aids System 0.17 27-Jun-07 17-Jul-07 717 Nos. 100% 2 2 100.00 2 100.00 100.00 100.00 100.00 100.00 0.00Glnd/Trmt 90% Accept 10%

Note :34 pcs RCU will plan to be install at Offshore due to late delivery. Tentative arrive at PG ETA 31/09/07 (Consider under punclist monitoring)

15 of 22

Page 77: Full Version of SCDR-A Close-Out Report(Dated051107)

PROG. COD : 28-Sep-07

ACT ID ACTIVITY NAME MHRS WTG

PLANNED START

PLANNED FINISH MHRS BASIS OF

QTY (UNIT)LVL 4 WTG EST QTY EARLY

PLAN MID PLAN LATE PLAN ACTUAL VARPROGRESS MEASUREMENT

CUMM PROGRESS THIS WEEK

Done % Done %FAB3360 Glanding & Termination 0.25 22-May-07 28-Jun-07 1,074 Nos. 100% 1210 1210 100.00 1210 100.00 100.00 100.00 100.00 100.00 0.00

Power Cable Nos. 16% 24 24 100.00 24 100.00 100.00 - Cable @ RMU (RMU-7505) Nos. 9% 16 16 100.00 16 100.00 100.00 - Cable @ 6.6 kv Transformer (TF-7501) Nos. 7% 8 8 100.00 8 100.00 100.00

Control Cable Nos. 51% 430 430 100.00 430 100.00 100.00 - Cable 400v @ Switchgear (SB-7505) Nos. 11% 226 226 100.00 226 100.00 100.00 - Cable 230v @ AC UPS (LCPA-8955) Nos. 9% 10 10 100.00 10 100.00 100.00 - Cable 230v @ AC UPS (UPS-7805) Nos. 9% 66 66 100.00 66 100.00 100.00 - Cable 230v @ AC UPS (DB-7815) Nos. 9% 106 106 100.00 106 100.00 100.00 - Cable HVAC @ Control Panel Nos. 6% 14 14 100.00 14 100.00 100.00 - Cable MOV @ Distribution Board (DB-7745) Nos. 7% 8 8 100.00 8 100.00 100.00

DC Nos. 10% 40 40 100.00 40 100.00 100.00 - Cable 24V DC @ Distribution Board (DB-7925) Nos. 10% 40 40 100.00 40 100.00 100.00

Lighting/small power cables Nos. 23% 716 716 100.00 716 100.00 100.00 - Cable @ Indoor Lighting Distribution Board (Normal/Emergency DB-7725) Nos. 6% 96 96 100.00 96 100.00 100.00 - Cable @ Outdoor Lighting Distribution Board (Normal DB-7735) Nos. 6% 100 100 100.00 100 100.00 100.00 - Cable @ Small Power Distribution Board (DB-7715) Nos. 7% 306 306 100.00 306 100.00 100.00 - Cable @ Outdoor Lighting Emergency (Normal DB-7845) Nos. 4% 214 214 100.00 214 100.00 100.00

Earthing 90% Accept 10%Done % Done %

FAB3370 Install Earthing Accessories 0.20 23-Apr-07 05-Jul-07 855 Nos. 100% 950 950 100.00 950 100.00 100.00 100.00 100.00 100.00 0.00Install 90% Accept 10%Done % Done %

FAB3380 Install All Other Electrical Items 0.13 13-Jun-07 20-Jul-07 569 Nos. 100% 1 1 100.00 1 100.00 100.00 100.00 100.00 100.00 0.00Lvl & Fit 60% Hook-Up 30% Accept 10%

Done % Done % Done %FAB3400 Install AC Uninterruptible Power Supply (UPS) 0.24 03-May-07 23-May-07 1,038 Nos. 100% 1 1 100.00 1 100.00 1 100.00 100.00 100.00 100.00 100.00 0.00FAB3750 Install 400V Switchboard 0.25 07-May-07 30-May-07 1,051 Nos. 100% 1 1 100.00 1 100.00 1 100.00 100.00 100.00 100.00 100.00 0.00 Instrument 7.32 28-Feb-07 08-Aug-07 31,040 20% 30% Weld 40% Accept 10% 100.00 100.00 100.00 100.00 0.00

Total Pieces Done % Total

Joints Done % Done % Done %

FAB3020 Fabricate Instrument Supports 0.33 28-Feb-07 03-Apr-07 1,404 Nos. 100% 523 523 100.00 523 523 100.00 523 100.00 523 100.00 100.00 100.00 100.00 100.00 0.00 - Cable Tray Support Nos. 64% 320 320 100.00 320 320 100.00 320 100.00 320 100.00 100.00 - Major Equipment / JB Nos. 3% 21 21 100.00 21 21 100.00 21 100.00 21 100.00 100.00 - Instrument Support Nos. 4% 20 20 100.00 20 20 100.00 20 100.00 20 100.00 100.00 - Fire & Gas Nos. 13% 73 73 100.00 73 73 100.00 73 100.00 73 100.00 100.00 - Telecom Nos. 2% 7 7 100.00 7 7 100.00 7 100.00 7 100.00 100.00 - AVA Nos. 2% 12 12 100.00 12 12 100.00 12 100.00 12 100.00 100.00 - GPA / PA Nos. 9% 48 48 100.00 48 48 100.00 48 100.00 48 100.00 100.00 - MCT / Coaming Nos. 3% 22 22 100.00 22 22 100.00 22 100.00 22 100.00 100.00

20% 30% Weld 40% Accept 10%Total

Pieces Done % Total Joints Done % Done % Done %

FAB3030 Install Instrument Supports 0.48 27-Mar-07 02-May-07 2,043 Nos. 100% 523 523 100.00 523 523 100.00 523 100.00 523 100.00 100.00 100.00 100.00 100.00 0.00 - Cable Ladder/Tray Support Nos. 64% 323 323 100.00 323 323 100.00 323 100.00 323 100.00 100.00 - Plint / JB Nos. 4% 21 21 100.00 21 21 100.00 21 100.00 21 100.00 100.00 - Fire & Gas Nos. 13% 66 66 100.00 66 66 100.00 66 100.00 66 100.00 100.00 - Telecom Nos. 1% 7 7 100.00 7 7 100.00 7 100.00 7 100.00 100.00 - AVA Nos. 2% 11 11 100.00 11 11 100.00 11 100.00 11 100.00 100.00 - GPA / PA Nos. 7% 43 43 100.00 43 43 100.00 43 100.00 43 100.00 100.00 - MCT / Coaming Nos. 4% 22 22 100.00 22 22 100.00 22 100.00 22 100.00 100.00 - Fusible Plug Nos. 5% 30 30 100.00 30 30 100.00 30 100.00 30 100.00 100.00

Calib'n 80% Accept 20%Done % Done %

FAB3040 Instrument Calibration 0.20 10-May-07 26-Jun-07 845 Nos. 100% 126 126 100.00 126 100.00 100.00 100.00 100.00 100.00 0.00- Flow Transmitter (FT) Nos. 10% 10 10 100.00 10 100.00 100.00- Level Transmitter (LT) Nos. 3% 5 5 100.00 5 100.00 100.00- IRCD (MOV) Nos. 8% 6 6 100.00 6 100.00 100.00- Pressure Regulator (PCV) Nos. 3% 1 1 100.00 1 100.00 100.00- Diff Pressure Transmitter (PDT) Nos. 4% 5 5 100.00 5 100.00 100.00- Pressure Gauge (PG) Nos. 21% 47 47 100.00 47 100.00 100.00- Pressure Relief Valve (PSV) Nos. 12% 12 12 100.00 12 100.00 100.00- Pressure Transmitter (PT) Nos. 6% 7 7 100.00 7 100.00 100.00- Pressure Vacuum Relief Valve (PVSV) Nos. 7% 4 4 100.00 4 100.00 100.00- Pressure Transmitter (PZT) Nos. 14% 13 13 100.00 13 100.00 100.00- Temperature Transmitter (TT) Nos. 4% 7 7 100.00 7 100.00 100.00- Actuated Ball Valve (UZV) Nos. 8% 9 9 100.00 9 100.00 100.00

Pull/Lay 90% Accept 10%Done % Done %

Fit-Up

Mark & Cut Fit-Up

Lift / Position

16 of 22

Page 78: Full Version of SCDR-A Close-Out Report(Dated051107)

PROG. COD : 28-Sep-07

ACT ID ACTIVITY NAME MHRS WTG

PLANNED START

PLANNED FINISH MHRS BASIS OF

QTY (UNIT)LVL 4 WTG EST QTY EARLY

PLAN MID PLAN LATE PLAN ACTUAL VARPROGRESS MEASUREMENT

CUMM PROGRESS THIS WEEK

FAB3050 Cable pulling 0.31 04-May-07 16-Jun-07 1,335 Mtrs 100% 13859 13859 100.00 13859 100.00 100.00 100.00 100.00 100.00 0.00 - DCS & IPS Mtrs 55% 7755 7755 100.00 7755 100.00 100.00 - GPA / PA Mtrs 13% 1860 1860 100.00 1860 100.00 100.00 - Telecom Mtrs 5% 665 665 100.00 665 100.00 100.00 - AVA Mtrs 7% 750 750 100.00 750 100.00 100.00 - FGS Mtrs 20% 2829 2829 100.00 2829 100.00 100.00

Glnd/Trmt 90% Accept 10%Done % Done %

FAB3060 Glanding & Termination 0.19 07-Jun-07 02-Jul-07 799 Nos. 100% 954 954 100.00 954 100.00 100.00 100.00 100.00 100.00 0.00 - DCS & IPS Nos. 48% 390 390 100.00 390 100.00 100.00 - GPA / PA Nos. 22% 196 196 100.00 196 100.00 100.00 - Telecom Nos. 2% 38 38 100.00 38 100.00 100.00 - AVA Nos. 4% 56 56 100.00 56 100.00 100.00 - FGS Nos. 24% 274 274 100.00 274 100.00 100.00

Install 90% Accept 10%Done % Done %

FAB3390 Install Cable Tray & Ladders 0.59 05-Apr-07 22-May-07 2,507 Mtrs 100% 467 467 100.00 467 100.00 100.00 100.00 100.00 100.00 0.00 - Install Cable Tray & Ladder Mtrs 85% 326 Note ; 15mtr under shiploose item will be instl at offshore 326 100.00 326 100.00 100.00 - Install Tubing Tray Mtrs 15% 141 141 100.00 141 100.00 100.00

FAB3410 Install Instrument Cable Junction Boxes & MCT's 0.39 16-May-07 27-Jun-07 1,675 Mtrs 100% 75 75 100.00 75 100.00 100.00 100.00 100.00 100.00 0.00Junction Boxes Nos. 80% 70 70 100.00 70 100.00 100.00

- Fire & Gas Nos. 12% 4 4 100.00 4 100.00 100.00- Telephone Nos. 10% 3 3 100.00 3 100.00 100.00- Instrument JB Nos. 20% 22 22 100.00 22 100.00 100.00- GPA / PA Nos. 33% 40 40 100.00 40 100.00 100.00- Fibre Optic Nos. 5% 1 1 100.00 1 100.00 100.00

MCT Nos. 20% 5 5 100.00 5 100.00 100.00Lvl & Fit 60% Hook-Up 30% Accept 10%

Done % Done % Done %FAB3420 Install Wellhead Control Panel 0.31 25-Apr-07 24-May-07 1,335 Nos. 100% 1 1 100.00 1 100.00 1 100.00 100.00 100.00 100.00 100.00 0.00

Fit-Up 50% Weld 40% Accept 10%Done % Done % Done %

FAB3430 Install Field Instrument & Mounting Stands & Supports etc. 0.44 08-May-07 28-May-07 1,880 Nos. 100% 184 184 100.00 184 100.00 184 100.00 100.00 100.00 100.00 100.00 0.00- Impulse Line Nos. 50% 26 26 100.00 26 100.00 26 100.00 100.00- Instrument Devices Nos. 50% 158 158 100.00 158 100.00 158 100.00 100.00

Install 90% Accept 10%Done % Done %

FAB3440 Install Sand Monitoring System 0.10 05-Jun-07 25-Jun-07 420 Nos. 100% 1 1 100.00 1 100.00 100.00 100.00 100.00 100.00 0.00FAB3450 Install Ultrasonic Flowmeters 0.10 18-May-07 05-Jun-07 420 Nos. 100% 1 1 100.00 1 100.00 100.00 100.00 100.00 100.00 0.00FAB3460 Install Pig Signallers 0.10 24-May-07 12-Jun-07 420 Nos. 100% 2 2 100.00 2 100.00 100.00 100.00 100.00 100.00 0.00FAB3470 Install Choke Valves 0.16 18-Jul-07 08-Aug-07 694 Nos. 100% 5 5 100.00 5 100.00 100.00 100.00 100.00 100.00 0.00FAB3480 Install GPA/PAPA 0.10 24-May-07 23-Jun-07 420 Nos. 100% 49 49 100.00 49 100.00 100.00 100.00 100.00 100.00 0.00

- Install Strobe Light Nos. 28% 16 16 100.00 16 100.00 100.00 - Install Outdoor Speaker Nos. 27% 18 18 100.00 18 100.00 100.00 - Install Indoor Speaker Nos. 14% 4 4 100.00 4 100.00 100.00 - Install Pushbutton Station Nos. 21% 9 9 100.00 9 100.00 100.00 - Install Sounder Nos. 10% 2 2 100.00 2 100.00 100.00

FAB3490 Install Control, Ball and Operated Valves 0.31 25-May-07 29-Jun-07 1,310 Nos. 100% 8 Note ; 1 no ball valve under shiploose items. 8 100.00 8 100.00 100.00 100.00 100.00 100.00 0.00FAB3500 Install Distributed Control System (DCS) and (AVA) 0.17 21-Apr-07 22-May-07 711 Nos. 100% 1 1 100.00 1 100.00 100.00 100.00 100.00 100.00 0.00FAB3510 Install ESD Break Glass Station 0.10 12-Jun-07 25-Jun-07 413 Nos. 100% 9 9 100.00 9 100.00 100.00 100.00 100.00 100.00 0.00FAB3520 Install IR Flame Detector 0.10 26-May-07 12-Jun-07 420 Nos. 100% 23 23 100.00 23 100.00 100.00 100.00 100.00 100.00 0.00FAB3530 Install IR Point Gas Detector 0.10 26-May-07 13-Jun-07 420 Nos. 100% 16 16 100.00 16 100.00 100.00 100.00 100.00 100.00 0.00FAB3540 Install IR Open Path Gas Detector 0.10 26-May-07 12-Jun-07 420 Nos. 100% 20 20 100.00 20 100.00 100.00 100.00 100.00 100.00 0.00FAB3550 Install Smoke Detector 0.10 30-May-07 14-Jun-07 420 Nos. 100% 27 27 100.00 27 100.00 100.00 100.00 100.00 100.00 0.00FAB3560 Install Hydrogen Gas Detector 0.10 30-May-07 12-Jun-07 420 Nos. 100% 2 2 100.00 2 100.00 100.00 100.00 100.00 100.00 0.00FAB3570 Install Acoustic Leak Detector 0.10 28-May-07 15-Jun-07 420 Nos. 100% 1 1 100.00 1 100.00 100.00 100.00 100.00 100.00 0.00FAB3580 Install Heat Detector 0.10 31-May-07 15-Jun-07 420 Nos. 100% 1 1 100.00 1 100.00 100.00 100.00 100.00 100.00 0.00FAB3590 Install Ultra Sonic Flare Gas Meter 0.10 22-May-07 12-Jun-07 420 Nos. 100% 1 1 100.00 1 100.00 100.00 100.00 100.00 100.00 0.00FAB3600 Install IPS System 0.20 21-Apr-07 14-May-07 858 Nos. 100% 1 1 100.00 1 100.00 100.00 100.00 100.00 100.00 0.00FAB3610 Install Restriction Orifice Plates 0.07 11-Jun-07 25-Jun-07 291 Nos. 100% 13 13 100.00 13 100.00 100.00 100.00 100.00 100.00 0.00FAB3620 Install Orifice Plates 0.07 18-Jun-07 01-Jul-07 291 Nos. 100% 1 1 100.00 1 100.00 100.00 100.00 100.00 100.00 0.00FAB3630 Install Instrument Tubing, Fittings & Valves 0.47 10-May-07 05-Jun-07 1,993 Mtrs. 100% 2073 2073 100.00 2073 100.00 100.00 100.00 100.00 100.00 0.00FAB3640 Install Level Gauges (Reflex Type) 0.10 21-May-07 06-Jun-07 420 Nos. 100% 5 5 100.00 5 100.00 100.00 100.00 100.00 100.00 0.00FAB3650 Install Level Gauges (Using Pressure Gauge) 0.10 18-May-07 04-Jun-07 420 Nos. 100% 2 2 100.00 2 100.00 100.00 100.00 100.00 100.00 0.00FAB3660 Install Pressure Gauges 0.10 19-May-07 06-Jun-07 420 Nos. 100% 1 1 100.00 1 100.00 100.00 100.00 100.00 100.00 0.00FAB3670 Install All Remaining Instrumentation Items 0.14 03-Jul-07 04-Aug-07 585 Nos. 100% 1 1 100.00 1 100.00 100.00 100.00 100.00 100.00 0.00FAB3710 Install F&G System 0.20 21-Apr-07 12-May-07 858 Nos. 100% 11 11 100.00 11 100.00 100.00 100.00 100.00 100.00 0.00FAB3720 Install Wellhead Control System (WHCS) 0.27 21-Apr-07 19-May-07 1,151 Nos. 100% 1 1 100.00 1 100.00 100.00 100.00 100.00 100.00 0.00FAB3730 Install Telecommunication Equipment 0.30 07-May-07 07-Jun-07 1,278 Nos. 100% 23 23 100.00 23 100.00 100.00 100.00 100.00 100.00 0.00

- Install Antena Nos. 40% 3 Note ; 1no antena under shiploose items. 3 100.00 3 100.00 100.00 - Install Outdoor Telephone Nos. 12% 3 3 100.00 3 100.00 100.00

Note ; 2 nos of Pig Signaller ETA 06/11/07, plan to install offshore.

Note ; 2 nos of Pig Signaller ETA 06/11/07, plan to install offshore.

17 of 22

Page 79: Full Version of SCDR-A Close-Out Report(Dated051107)

PROG. COD : 28-Sep-07

ACT ID ACTIVITY NAME MHRS WTG

PLANNED START

PLANNED FINISH MHRS BASIS OF

QTY (UNIT)LVL 4 WTG EST QTY EARLY

PLAN MID PLAN LATE PLAN ACTUAL VARPROGRESS MEASUREMENT

CUMM PROGRESS THIS WEEK

- Install Indoor Telephone Nos. 12% 5 5 100.00 5 100.00 100.00 - Install CCTV Nos. 36% 12 12 100.00 12 100.00 100.00

FAB3740 Install Wet Gas Metering Skid & Panel (Operational Metering) 0.11 19-Jun-07 09-Jul-07 484 Nos. 100% 2 2 100.00 2 100.00 100.00 100.00 100.00 100.00 0.00 Architectural 2.33 24-Mar-07 26-Jul-07 9,881 Mark&Cut 30% Install 60% Accept 10% 100.00 100.00 100.00 100.00 0.00

Done % Done % Done %FAB2760 Switchgear, Transformer Room & Battery Room 0.82 24-Mar-07 07-May-07 3,477 Pcs 100% 5110 5110 100.00 5110 100.00 5110 100.00 100.00 100.00 100.00 100.00 0.00

Fire Rated Doors Pcs 11% 10 10 100.00 10 100.00 10 100.00 100.00- Door Panels (Single & Double) Pcs 6% 5 5 100.00 5 100.00 5 100.00 100.00- Door Frame (Single & Double) Pcs 5% 5 5 100.00 5 100.00 5 100.00 100.00

Wall Finish (H15 Wall) Pcs 74% 4800 4800 100.00 4800 100.00 4800 100.00 100.00- 3mm dia. x 95 L.G. Copper Coated Pin Pcs 25% 2100 2100 100.00 2100 100.00 2100 100.00 100.00- Insulation Rockwool Pcs 16% 250 250 100.00 250 100.00 250 100.00 100.00- Aluminium Foil Pcs 10% 250 250 100.00 250 100.00 250 100.00 100.00- Galvanize M.S. Speed Clip Pcs 9% 2100 2100 100.00 2100 100.00 2100 100.00 100.00- 25mm TNF Wall Panel Pcs 14% 100 100 100.00 100 100.00 100 100.00 100.00

Floor and Cailing Finish Pcs 15% 300 300 100.00 300 100.00 300 100.00 100.00- Cailing Pcs 10% 100 100 100.00 100 100.00 100 100.00 100.00- Floor Pcs 5% 200 200 100.00 200 100.00 200 100.00 100.00

FAB2770 Instrument Local Equipment Room 1.01 21-Apr-07 04-Jul-07 4,273 Pcs 100% 4914 4914 100.00 4914 100.00 4914 100.00 100.00 100.00 100.00 100.00 0.00Fire Rated Doors Pcs 11% 4 4 100.00 4 100.00 4 100.00 100.00

- Door Panels (Single & Double) Pcs 6% 2 2 100.00 2 100.00 2 100.00 100.00- Door Frame (Single & Double) Pcs 5% 2 2 100.00 2 100.00 2 100.00 100.00

Wall Finish (AO Wall) Pcs 69% 4800 4800 100.00 4800 100.00 4800 100.00 100.00- 3mm dia. x 95 L.G. Copper Coated Pin Pcs 25% 2100 2100 100.00 2100 100.00 2100 100.00 100.00- Insulation Rockwool Pcs 16% 250 250 100.00 250 100.00 250 100.00 100.00- Aluminium Foil Pcs 10% 250 250 100.00 250 100.00 250 100.00 100.00- Galvanize M.S. Speed Clip Pcs 9% 2100 2100 100.00 2100 100.00 2100 100.00 100.00- 25mm TNF Wall Panel Pcs 9% 100 100 100.00 100 100.00 100 100.00 100.00

Cailing & Floor Finish Pcs 15% 100 100 100.00 100 100.00 100 100.00 100.00- Cailing & Steel Rise Floor Pcs 15% 100 100 100.00 100 100.00 100 100.00 100.00

Furnitures Pcs 5% 10 10 100.00 10 100.00 10 100.00 100.00- Computer Table Pcs 3% 5 5 100.00 5 100.00 5 100.00 100.00- Sitting Chair Pcs 2% 5 5 100.00 5 100.00 5 100.00 100.00

FAB2780 Weather Shelter & Workshop 0.50 21-Jun-07 26-Jul-07 2,131 Pcs 100% 2708 2708 100.00 2708 100.00 2708 100.00 100.00 100.00 100.00 100.00 0.00Fire Rated Doors Pcs 11% 4 4 100.00 4 100.00 4 100.00 100.00

- Door Panels (Double) Pcs 6% 2 2 100.00 2 100.00 2 100.00 100.00- Door Frame (Double) Pcs 5% 2 2 100.00 2 100.00 2 100.00 100.00

Wall Finish (H15 Wall) Pcs 69% 2600 2600 100.00 2600 100.00 2600 100.00 100.00- 3mm dia. x 95 L.G. Copper Coated Pin Pcs 15% 1100 1100 100.00 1100 100.00 1100 100.00 100.00- Insulation Rockwool Pcs 19% 150 150 100.00 150 100.00 150 100.00 100.00- Aluminium Foil Pcs 14% 150 150 100.00 150 100.00 150 100.00 100.00- Galvanize M.S. Speed Clip Pcs 12% 1100 1100 100.00 1100 100.00 1100 100.00 100.00- 25mm TNF Wall Panel Pcs 9% 100 100 100.00 100 100.00 100 100.00 100.00

Cailing & Floor Finish Pcs 15% 100 100 100.00 100 100.00 100 100.00 100.00- Cailing & Flooring w/ anti skid paint Pcs 15% 100 100 100.00 100 100.00 100 100.00 100.00

Furnitures Pcs 5% 4 4 100.00 4 100.00 4 100.00 100.00- Computer Table Pcs 3% 2 2 100.00 2 100.00 2 100.00 100.00- Sitting Chair Pcs 2% 2 2 100.00 2 100.00 2 100.00 100.00

HVAC 2.23 02-Apr-07 19-Jul-07 9,461 20% 30% Weld 40% Accept 10% 100.00 100.00 100.00 100.00 0.00Total

Pieces Done % Total Joints Done % Done % Done %

FAB2790 Switchgear, Transformer Room & Battery Room 0.78 02-Apr-07 12-May-07 3,295 Pcs 100% 615 615 100.00 615 615 100.00 615 100.00 615 100.00 100.00 100.00 100.00 100.00 0.00Fabrication Pcs 40% 363 363 100.00 363 363 100.00 363 100.00 363 100.00 100.00

Fab. Ducting Supports Pcs 4% 80 80 100.00 80 80 100.00 80 100.00 80 100.00 100.00Fab. Duct Penetration Pcs 2% 13 13 100.00 13 13 100.00 13 100.00 13 100.00 100.00Fab. Internal Duct Pcs 10% 100 100 100.00 100 100 100.00 100 100.00 100 100.00 100.00Fab. External Duct Pcs 2% 100 100 100.00 100 100 100.00 100 100.00 100 100.00 100.00Fab. AHU Pcs 4% 16 16 100.00 16 16 100.00 16 100.00 16 100.00 100.00Fab. ACCU Pcs 4% 16 16 100.00 16 16 100.00 16 100.00 16 100.00 100.00Fab. Duct Heater Pcs 2% 3 3 100.00 3 3 100.00 3 100.00 3 100.00 100.00Fab. Dumpers Pcs 2% 20 20 100.00 20 20 100.00 20 100.00 20 100.00 100.00Fab. Exhauts Fan Pcs 4% 4 4 100.00 4 4 100.00 4 100.00 4 100.00 100.00Fab. Control Panel Pcs 2% 1 1 100.00 1 1 100.00 1 100.00 1 100.00 100.00Fab. FAT Pcs 4% 10 10 100.00 10 10 100.00 10 100.00 10 100.00 100.00

Installation Pcs 60% 252 252 100.00 252 252 100.00 252 100.00 252 100.00 100.00Install Ducting Supports Pcs 6% 80 80 100.00 80 80 100.00 80 100.00 80 100.00 100.00Install Duct Penetration Pcs 6% 9 9 100.00 9 9 100.00 9 100.00 9 100.00 100.00Install Internal Duct Pcs 7% 37 37 100.00 37 37 100.00 37 100.00 37 100.00 100.00Install External Duct Pcs 7% 90 90 100.00 90 90 100.00 90 100.00 90 100.00 100.00

M&C / Lift Position Fit-Up

18 of 22

Page 80: Full Version of SCDR-A Close-Out Report(Dated051107)

PROG. COD : 28-Sep-07

ACT ID ACTIVITY NAME MHRS WTG

PLANNED START

PLANNED FINISH MHRS BASIS OF

QTY (UNIT)LVL 4 WTG EST QTY EARLY

PLAN MID PLAN LATE PLAN ACTUAL VARPROGRESS MEASUREMENT

CUMM PROGRESS THIS WEEK

Install AHU Pcs 8% 2 2 100.00 2 2 100.00 2 100.00 2 100.00 100.00Install ACCU Pcs 8% 2 2 100.00 2 2 100.00 2 100.00 2 100.00 100.00Install Duct Heater Pcs 4% 1 1 100.00 1 1 100.00 1 100.00 1 100.00 100.00Install Dumpers Pcs 4% 18 18 100.00 18 18 100.00 18 100.00 18 100.00 100.00Install Exhauts Fan Pcs 4% 4 4 100.00 4 4 100.00 4 100.00 4 100.00 100.00Install Control Panel Pcs 3% 1 1 100.00 1 1 100.00 1 100.00 1 100.00 100.00Install SS Drain Pipe Pcs 2% 2 2 100.00 2 2 100.00 2 100.00 2 100.00 100.00Install Jacketing Copper Pipe Pcs 1% 6 6 100.00 6 6 100.00 6 100.00 6 100.00 100.00

FAB2800 Instrument Local Equipment Room 1.01 30-Apr-07 26-Jun-07 4,273 Pcs 100% 111 111 100.00 111 111 100.00 111 100.00 111 100.00 100.00 100.00 100.00 100.00 0.00Install Ducting Supports Pcs 20% 80 80 100.00 80 80 100.00 80 100.00 80 100.00 100.00Install Duct Penetration Pcs 10% 2 2 100.00 2 2 100.00 2 100.00 2 100.00 100.00Install Internal Duct Pcs 20% 24 24 100.00 24 24 100.00 24 100.00 24 100.00 100.00Install External Duct Pcs 10% 1 1 100.00 1 1 100.00 1 100.00 1 100.00 100.00Install ACCU Pcs 20% 2 2 100.00 2 2 100.00 2 100.00 2 100.00 100.00Install Duct Heater Pcs 10% 1 1 100.00 1 1 100.00 1 100.00 1 100.00 100.00Install Dumpers Pcs 10% 1 1 100.00 1 1 100.00 1 100.00 1 100.00 100.00

FAB2810 Weather Shelter & Workshop 0.45 12-Jun-07 19-Jul-07 1,893 Pcs 100% 33 33 100.00 33 33 100.00 33 100.00 33 100.00 100.00 100.00 100.00 100.00 0.00Install Ducting Supports Pcs 20% 10 10 100.00 10 10 100.00 10 100.00 10 100.00 100.00Install Duct Penetration Pcs 20% 2 2 100.00 2 2 100.00 2 100.00 2 100.00 100.00Install Internal Duct Pcs 20% 14 14 100.00 14 14 100.00 14 100.00 14 100.00 100.00Install External Duct Pcs 20% 5 5 100.00 5 5 100.00 5 100.00 5 100.00 100.00Install Duct Heater Pcs 10% 1 1 100.00 1 1 100.00 1 100.00 1 100.00 100.00Install Dumpers Pcs 10% 1 1 100.00 1 1 100.00 1 100.00 1 100.00 100.00

Safety 0.67 04-Jun-07 15-Aug-07 2,850 Install 90% Accept 10% 100.00 100.00 100.00 100.00 0.00Done % Done %

FAB3680 Install of Safety Equipment and Fire Protection Equipment 0.50 30-Jul-07 15-Aug-07 2,138 Nos. 100% 186 186 100.00 186 100.00 100.00 100.00 100.00 100.00 0.00- Flexible Hose and Hose Coupling Conection Nos. 9% 40 40 100.00 40 100.00 100.00- Hosereels Nos. 8% 10 10 100.00 10 100.00 100.00- Fire Extinguishers Nos. 7% 33 33 100.00 33 100.00 100.00- Liftraft and Safety Equipment Nos. 18% 3 3 100.00 3 100.00 100.00- Lifejacket Nos. 7% 36 36 100.00 36 100.00 100.00- Lifejacket Container Nos. 7% 3 3 100.00 3 100.00 100.00- Knotted Rope Nos. 7% 3 3 100.00 3 100.00 100.00- Ring Life Buoy Nos. 7% 21 21 100.00 21 100.00 100.00- Safety Shower & Self-Contained Eyewash Station Nos. 10% 9 9 100.00 9 100.00 100.00- First Aid Kit Nos. 8% 3 3 100.00 3 100.00 100.00- Smoke Hoods and Container Nos. 7% 24 24 100.00 24 100.00 100.00- Breathing Apparatus Set and Cabinet Nos. 7% 1 1 100.00 1 100.00 100.00

FAB3690 Install of Safety Signs 0.17 04-Jun-07 20-Jun-07 712 Nos. 100% 95 95 100.00 95 100.00 100.00 100.00 100.00 100.00 0.00 Others Materials 0.67 31-Jul-07 16-Aug-07 2,850 Install 90% Accept 10% 100.00 100.00 100.00 100.00 0.00

Done % Done %FAB3700 Install of Any Other Materials not included above 0.67 31-Jul-07 16-Aug-07 2,850 Nos. 100% 100 100 100.00 100 100.00 100.00 100.00 100.00 100.00 0.00 ONSHORE PRE-COMMISSIONING 4.34 21-May-07 28-Aug-07 18,430 PreComm 90% Accept 10% 100.00 100.00 100.00 100.00 0.00

Done % Done %COM1010 Precom Lighting and Small Power 0.19 30-Jun-07 28-Jul-07 824 Sys 100% 100 100 100.00 100 100.00 100.00 100.00 100.00 100.00 0.00COM1020 Precom UPS System 0.26 08-Jun-07 06-Jul-07 1,094 Sys 100% 100 100 100.00 100 100.00 100.00 100.00 100.00 100.00 0.00COM1030 Precom Fresh Water System 0.10 28-Jul-07 17-Aug-07 426 Sys 100% 100 100 100.00 100 100.00 100.00 100.00 100.00 100.00 0.00COM1040 Precom Materials Handling 0.18 10-Aug-07 28-Aug-07 776 Sys 100% 100 100 100.00 100 100.00 100.00 100.00 100.00 100.00 0.00COM1050 Precom Electrical Power Generation & Distribution (EDG) 0.34 25-Jul-07 18-Aug-07 1,461 Sys 100% 100 100 100.00 100 100.00 100.00 100.00 100.00 100.00 0.00COM1060 Precom HVAC 0.31 26-Jun-07 28-Jul-07 1,327 Sys 100% 100 100 100.00 100 100.00 100.00 100.00 100.00 100.00 0.00COM1070 Precom IPS System 0.25 04-Jul-07 30-Jul-07 1,049 Sys 100% 100 100 100.00 100 100.00 100.00 100.00 100.00 100.00 0.00COM1080 Precom DCS and AVA System (Control System) 0.31 30-Jul-07 28-Aug-07 1,324 Sys 100% 100 100 100.00 100 100.00 100.00 100.00 100.00 100.00 0.00COM1090 Precom Fire and Gas System (F&G) 0.26 30-Jun-07 01-Aug-07 1,083 Sys 100% 100 100 100.00 100 100.00 100.00 100.00 100.00 100.00 0.00COM1100 Precom Wellhead Control System (WHCS) 0.29 28-Jun-07 30-Jul-07 1,223 Sys 100% 100 100 100.00 100 100.00 100.00 100.00 100.00 100.00 0.00COM1110 Precom GPA System 0.17 23-Jun-07 17-Jul-07 713 Sys 100% 100 100 100.00 100 100.00 100.00 100.00 100.00 100.00 0.00COM1120 Precom Telecomunication System 0.25 16-Jun-07 14-Jul-07 1,065 Sys 100% 100 100 100.00 100 100.00 100.00 100.00 100.00 100.00 0.00COM1130 Precom Earthing and Bonding System 0.26 21-May-07 22-Jun-07 1,100 Sys 100% 100 100 100.00 100 100.00 100.00 100.00 100.00 100.00 0.00COM1140 Precom Drain System 0.13 23-Jul-07 16-Aug-07 539 Sys 100% 100 100 100.00 100 100.00 100.00 100.00 100.00 100.00 0.00COM1150 Precom Vent System 0.17 02-Aug-07 18-Aug-07 731 Sys 100% 100 100 100.00 100 100.00 100.00 100.00 100.00 100.00 0.00COM1160 Precom Navigation Aid System 0.08 17-Jul-07 02-Aug-07 335 Sys 100% 100 100 100.00 100 100.00 100.00 100.00 100.00 100.00 0.00COM1170 Precom Diesel Fuel System 0.20 31-Jul-07 16-Aug-07 852 Sys 100% 100 100 100.00 100 100.00 100.00 100.00 100.00 100.00 0.00COM1180 Precom Corrosion Inhibitor Injection System 0.15 13-Jul-07 03-Aug-07 639 Sys 100% 100 100 100.00 100 100.00 100.00 100.00 100.00 100.00 0.00COM1190 Precom Gas and Condensate System 0.23 28-Jul-07 28-Aug-07 974 Sys 100% 100 100 100.00 100 100.00 100.00 100.00 100.00 100.00 0.00COM1200 Precom Sand Monitoring System 0.11 11-Jul-07 30-Jul-07 469 Sys 100% 100 100 100.00 100 100.00 100.00 100.00 100.00 100.00 0.00COM1210 Precom Flush Water System 0.10 28-Jul-07 16-Aug-07 426 Sys 100% 100 100 100.00 100 100.00 100.00 100.00 100.00 100.00 0.00 WEIGHING, LOADOUT & SEAFASTENING 2.09 02-Jul-07 04-Sep-07 8,862 Prep. 80% Accept 20% 100.00 100.00 100.00 100.00 0.00

Done % Done %CVE1000 Civil Engineering and Infrastructure Works 0.84 02-Jul-07 16-Aug-07 3,555 Comp. 100% 100 100 100.00 100 100.00 100.00 100.00 100.00 100.00 0.00LOA1000 Loadout Topsides 0.26 29-Aug-07 31-Aug-07 1,098 Comp. 100% 1 1 100.00 1 100.00 100.00 100.00 100.00 100.00 0.00LOA1010 Seafastening Topsides 0.50 31-Aug-07 04-Sep-07 2,109 Comp. 100% 4 4 100.00 4 100.00 100.00 100.00 100.00 100.00 0.00

Note ; 18 nos under shiploose items.

19 of 22

Page 81: Full Version of SCDR-A Close-Out Report(Dated051107)

PROG. COD : 28-Sep-07

ACT ID ACTIVITY NAME MHRS WTG

PLANNED START

PLANNED FINISH MHRS BASIS OF

QTY (UNIT)LVL 4 WTG EST QTY EARLY

PLAN MID PLAN LATE PLAN ACTUAL VARPROGRESS MEASUREMENT

CUMM PROGRESS THIS WEEK

WGH1000 1st Weighing of Topsides 0.25 02-Jul-07 06-Jul-07 1,050 Comp. 100% 1 1 100.00 1 100.00 100.00 100.00 100.00 100.00 0.00WGH1010 Final Weighing of Topsides 0.25 10-Aug-07 15-Aug-07 1,050 Comp. 100% 1 1 100.00 1 100.00 100.00 100.00 100.00 100.00 0.00 E11K-A SHIPLOOSE ITEMS 1.88 21-Aug-06 24-Jul-07 7,972 100.00 100.00 100.00 100.00 0.00 ENGINEERING 0.12 21-Aug-06 25-Jan-07 520 100.00 100.00 100.00 100.00 0.00

PRE1700 Prepare/Submit/Approve of MTO 0.03 21-Aug-06 25-Nov-06 140 Nos. 100% 26 100.00 100.00 100.00 100.00 0.00- Structural Nos. 18% 1 100.00- Piping Nos. 27% 7 100.00- Mechanical Nos. 19% 2 100.00- Electrical Nos. 19% 8 100.00- Instrument Nos. 17% 8 100.00

PRE1710 Prepare/Submit/Approve of Shop Drawings 0.09 03-Oct-06 25-Jan-07 380 Nos. 100% 934 100.00 100.00 100.00 100.00 0.00Structural Nos. 17% 20 100.00- IFA Shop Drawings Nos. 6 100.00- IFC Shop Drawings Nos. 14 100.00Piping Nos. 27% 254 100.00- IFA Shop Drawings Nos. 127 100.00- IFC Shop Drawings Nos. 127 100.00Mechanical Nos. 16% 16 100.00- IFA Shop Drawings Nos. 3 100.00- IFC Shop Drawings Nos. 13 100.00Electrical Nos. 19% 82 100.00- IFA Shop Drawings Nos. 41 100.00- IFC Shop Drawings Nos. 41 100.00Instrument Nos. 21% 190 100.00- IFA Shop Drawings Nos. 95 100.00- IFC Shop Drawings Nos. 95 100.00

PROCUREMENT 0.19 05-Oct-06 05-Jun-07 798 PR RFQ BCD TBE PO 100.00 100.00 100.00 100.00 0.00 Purchase Request to Purchase Order 0.07 05-Oct-06 22-Jan-07 300 30% 10% 10% 40% 10% 100.00 100.00 100.00 100.00 0.00PRO4440 PR/PO of Structural Matl's 0.01 08-Nov-06 03-Jan-07 30 Comp. Qty 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00PRO4450 PR/PO of Pipe Matl's 0.02 05-Oct-06 30-Nov-06 84 Comp. Qty 100% 6 6 6 6 6 6 100.00 100.00 100.00 100.00 0.00

- Ball, Globe, Gate & Check Valves (PR No.#62) Comp. Qty 21% 1 1 1 1 1 1 100.00- Pipes (PR No.#63) Comp. Qty 29% 1 1 1 1 1 1 100.00- Flange and Pipe Fitting (PR No.#64) Comp. Qty 19% 1 1 1 1 1 1 100.00- Gasket (PR No.#83) Comp. Qty 9% 1 1 1 1 1 1 100.00- Stud Bolt with Nuts (PR No.#136) Comp. Qty 8% 1 1 1 1 1 1 100.00- Pipe Supports Matl's (PR No.#103) Comp. Qty 14% 1 1 1 1 1 1 100.00

PRO4470 PR/PO of Mechanical Matl's 0.01 26-Oct-06 20-Dec-06 46 Comp. Qty 100% 6 6 6 6 6 6 100.00 100.00 100.00 100.00 0.00- Pig trap end closure Comp. Qty 22% 1 1 1 1 1 1 100.00- Eccentric Reducer Comp. Qty 17% 1 1 1 1 1 1 100.00- Weldolet Comp. Qty 12% 1 1 1 1 1 1 100.00- Welding Neck Flanges Comp. Qty 15% 1 1 1 1 1 1 100.00- Equal Barred Tee (PR No.#11) Comp. Qty 24% 1 1 1 1 1 1 100.00- Corrosion Monitoring System (PR No.#13) Comp. Qty 10% 1 1 1 1 1 1 100.00

PRO4490 PR/PO of Electrical Matl's 0.02 25-Nov-06 22-Jan-07 70 Comp. Qty 100% 7 7 7 7 7 7 100.00 100.00 100.00 100.00 0.00- Electrical Cables (PR No.#70) Comp. Qty 24% 1 1 1 1 1 1 100.00- Electrical Cable Gland (PR No.#73) Comp. Qty 20% 1 1 1 1 1 1 100.00- Electrical Earthing Matl's (PR No.#74) Comp. Qty 7% 1 1 1 1 1 1 100.00- Electrical Cable Ladder (PR No.#80) Comp. Qty 14% 1 1 1 1 1 1 100.00- Electrical HV Cable Termination (PR No.#69) Comp. Qty 12% 1 1 1 1 1 1 100.00- Electrical Cable Power (PR No.#72) Comp. Qty 14% 1 1 1 1 1 1 100.00- Electrical Steel Mat'l (PR No.#77) Comp. Qty 9% 1 1 1 1 1 1 100.00

PRO4500 PR/PO of Instrument Matl's 0.02 25-Nov-06 22-Jan-07 70 Comp. Qty 90% 7 7 7 7 7 7 100.00 100.00 100.00 100.00 0.00- Control Valve (PR No.#29) Comp. Qty 21% 1 1 1 1 1 1 100.00- Instrument Cables (PR No.#102) Comp. Qty 19% 1 1 1 1 1 1 100.00- Instrument Cables Glands (PR No.#149) Comp. Qty 15% 1 1 1 1 1 1 100.00- Instrument Hook-Up Matl's (PR No.#144) Comp. Qty 14% 1 1 1 1 1 1 100.00- Instrument Earthing Matl's (PR No.#156) Comp. Qty 7% 1 1 1 1 1 1 100.00- Instrument Steel Matl's (PR No.#158) Comp. Qty 9% 1 1 1 1 1 1 100.00- Instrument MCT & Misc. Items (PR No.#154) Comp. Qty 5% 1 1 1 1 1 1 100.00

Purchase Order to Delivery 0.04 30-Nov-06 24-May-07 174 100.00 100.00 100.00 100.00 0.00

PRO4460 PO to Del Structural Matl's 0.01 03-Jan-07 15-May-07 26 Linear 100% 100 100.00 100.00 100.00 100.00 0.00PRO4510 PO to Del Pipe Matl's 0.01 30-Nov-06 14-Apr-07 48 Linear 100% 100 100.00 100.00 100.00 100.00 0.00PRO4520 PO to Del Electrical Matl's 0.01 22-Jan-07 23-May-07 35 Linear 100% 100 100.00 100.00 100.00 100.00 0.00PRO4530 PO to Del Instrument Matl's 0.01 22-Jan-07 24-May-07 35 Linear 100% 100 100.00 100.00 100.00 100.00 0.00PRO4540 PO to Del Mechanical Matl's 0.01 20-Dec-06 19-May-07 30 Linear 100% 100 100.00 100.00 100.00 100.00 0.00 Materials Receiving Inspection 0.08 14-Apr-07 05-Jun-07 324 100.00 100.00 100.00 100.00 0.00

PRO4580 Receive/Accept of Structural Matl's 0.01 15-May-07 23-May-07 60 Nos. 100% 1 100.00 100.00 100.00 100.00 0.00

7

26

190

20

254

16

82

614

127

2

190

20

254

16

82

20

254

16

82

6

88

Expedite100%

100.00100.00100.00100.00100.00

180% 20%

1

934

Delivered to Site Accepted

17288

1

127

26

934

26

934

17288

Prep MTO / ShpDwg Submitted Approved60% 20% 20%

14614

127 127127 127

3 3 313 13 13

41 41 41

95 95 95

41 41 41

95 95 95190

20 of 22

Page 82: Full Version of SCDR-A Close-Out Report(Dated051107)

PROG. COD : 28-Sep-07

ACT ID ACTIVITY NAME MHRS WTG

PLANNED START

PLANNED FINISH MHRS BASIS OF

QTY (UNIT)LVL 4 WTG EST QTY EARLY

PLAN MID PLAN LATE PLAN ACTUAL VARPROGRESS MEASUREMENT

CUMM PROGRESS THIS WEEK

PRO4590 Receive/Accept of Pipe Matl's 0.02 14-Apr-07 04-May-07 98 Nos. 100% 1648 100.00 100.00 100.00 100.00 0.00- Ball, Globe, Gate & Check Valves (PR No.#62) Nos. 23% 25 100.00- Pipes (PR No.#63) Nos. 27% 108 100.00- Flange and Pipe Fitting (PR No.#64) Nos. 19% 212 100.00- Gasket (PR No.#83) Nos. 10% 128 100.00- Stud Bolt with Nuts (PR No.#136) Nos. 8% 1164 100.00- Pipe Supports Matl's (PR No.#103) Nos. 13% 11 100.00

PRO4600 Receive/Accept of Electrical Matl's 0.02 24-May-07 05-Jun-07 72 Nos. 100% 1012 100.00 100.00 100.00 100.00 0.00- Electrical Cables (PR No.#70) Nos. 24% 250 100.00- Electrical Cable Gland (PR No.#73) Nos. 20% 18 100.00- Electrical Earthing Matl's (PR No.#74) Nos. 7% 183 100.00- Electrical Cable Ladder (PR No.#80) Nos. 14% 222 100.00- Electrical HV Cable Termination (PR No.#69) Nos. 12% 2 100.00- Electrical Cable Power (PR No.#72) Nos. 14% 310 100.00- Electrical Steel Mat'l (PR No.#77) Nos. 9% 27 100.00

PRO4610 Receive/Accept of Instrument Matl's 0.02 25-May-07 05-Jun-07 70 Nos. 100% 1711 100.00 100.00 100.00 100.00 0.00- Control Valve (PR No.#29) Nos. 24% 1 100.00- Instrument Cables (PR No.#102) Nos. 20% 1478 100.00- Instrument Cables Glands (PR No.#149) Nos. 15% 54 100.00- Instrument Hook-Up Matl's (PR No.#144) Nos. 16% 52 100.00- Instrument Earthing Matl's (PR No.#156) Nos. 14% 10 100.00- Instrument Steel Matl's (PR No.#158) Nos. 7% 106 100.00- Instrument MCT & Misc. Items (PR No.#154) Nos. 4% 10 100.00

PRO4620 Receive/Accept of Mechanical Matl's 0.01 21-May-07 30-May-07 24 Nos. 100% 3 100.00 100.00 100.00 100.00 0.00- Equal Barred Tee (PR No.#11) Nos. 60% 1 100.00- Corrosion Monitoring System (PR No.#13) Nos. 40% 2 100.00

FABRICATION SHIPLOOSE ITEMS 1.57 04-May-07 24-Jul-07 6,654 100.00 100.00 100.00 100.00 0.00 Structural 0.19 24-May-07 05-Jul-07 801 20% 30% Weld 40% Accept 10% 100.00 100.00 100.00 100.00 0.00

Total Pieces Done % Total

Joints Done % Done % Done %

SHP1000 Fab. Misc Structural Members E11K-A 0.19 24-May-07 05-Jul-07 801 No. of Pcs 100% 100 100 100.00 100 100 100.00 100 100.00 100 100.00 100.00 100.00 100.00 100.00 0.00 Mechanical 0.05 30-May-07 04-Jul-07 200 20% 30% Weld 40% Accept 10% 100.00 100.00 100.00 100.00 0.00

Total Pieces Done % Total

Joints Done % Done % Done %

SHP1120 Fab. Mechanical Items 0.05 30-May-07 04-Jul-07 200 Pcs 100% 3 3 100.00 3 3 100.00 3 100.00 3 100.00 100.00 100.00 100.00 100.00 0.00 Piping 1.04 04-May-07 13-Jul-07 4,411 20% 30% Weld 40% Accept 10% 100.00 100.00 100.00 100.00 0.00

Total Dia Inch Done % Total Dia

Inch Done % Done % Done %

SHP1010 Fabricate Pipe Supports 0.18 04-May-07 11-Jun-07 751 Dia Inch 100% 33 33 100.00 33 33 100.00 33 100.00 33 100.00 100.00 100.00 100.00 100.00 0.00SHP1030 Fabricate CS Pipe Spools 0.28 04-May-07 07-Jun-07 1,200 Dia Inch 100% 495 495 100.00 495 495 100.00 495 100.00 495 100.00 100.00 100.00 100.00 100.00 0.00SHP1040 Testing & Preservation of Pipe Spools 0.04 16-Jun-07 06-Jul-07 160 Dia Inch 100% 11 11 100.00 11 11 100.00 11 100.00 11 100.00 100.00 100.00 100.00 100.00 0.00SHP1160 Fabricate Duplex Pipe Spools 0.33 26-May-07 21-Jun-07 1,401 Dia Inch 100% 803 803 100.00 803 803 100.00 803 100.00 803 100.00 100.00 100.00 100.00 100.00 0.00SHP1170 Fabricate SS Pipe Spools 0.14 13-Jun-07 01-Jul-07 599 Dia Inch 100% 100 100 100.00 100 100 100.00 100 100.00 100 100.00 100.00 100.00 100.00 100.00 0.00SHP1180 Fabricate GRE Pipe Spools 0.07 26-Jun-07 13-Jul-07 300 Dia Inch 100% 100 100 100.00 100 100 100.00 100 100.00 100 100.00 100.00 100.00 100.00 100.00 0.00 Electrical 0.11 05-Jun-07 11-Jul-07 480 20% 30% Weld 40% Accept 10% 100.00 100.00 100.00 100.00 0.00

Total Pieces Done % Total

Joints Done % Done % Done %

SHP1050 Fabricate Electrical Supports 0.07 05-Jun-07 29-Jun-07 300 Pcs 100% 2 2 100.00 2 2 100.00 2 100.00 2 100.00 100.00 100.00 100.00 100.00 0.00Handling 90% Accept 10%

Done % Done %SHP1140 Electrical Shiploose Items 0.04 21-Jun-07 11-Jul-07 180 Pcs 100% 7 7 100.00 7 100.00 100.00 100.00 100.00 100.00 0.00 Instrument 0.11 05-Jun-07 11-Jul-07 480 20% 30% Weld 40% Accept 10% 100.00 100.00 100.00 100.00 0.00

Total Pieces Done % Total

Joints Done % Done % Done %

SHP1060 Fabricate Instrument Supports 0.07 05-Jun-07 29-Jun-07 300 Pcs 100% 2 2 100.00 2 2 100.00 2 100.00 2 100.00 100.00 100.00 100.00 100.00 0.00Handling 90% Accept 10%

Done % Done %SHP1150 Instrument Shiploose Items 0.04 21-Jun-07 11-Jul-07 180 Pcs 100% 7 7 100.00 7 100.00 100.00 100.00 100.00 100.00 0.00 Blasting/Painting 0.07 11-Jun-07 24-Jul-07 282 Prep B/P 1st Coat 2nd Coat Accept 100.00 100.00 100.00 100.00 0.00

10% 30% 25% 25% 10%SHP1070 Blasting/Painting Pipe Supports 0.02 11-Jun-07 28-Jun-07 72 Pcs 100% 33 33 33 33 33 33 100.00 100.00 100.00 100.00 0.00SHP1080 Blasting/Painting Pipe Spools 0.02 06-Jul-07 24-Jul-07 70 Pcs 100% 100 100 100 100 100 100 100.00 100.00 100.00 100.00 0.00SHP1090 Blasting/Painting Electrical Supports 0.01 29-Jun-07 09-Jul-07 30 Pcs 100% 2 2 2 2 2 2 100.00 100.00 100.00 100.00 0.00SHP1100 Blasting/Painting Instrument Supports 0.01 29-Jun-07 09-Jul-07 30 Pcs 100% 2 2 2 2 2 2 100.00 100.00 100.00 100.00 0.00SHP1110 Blasting/Painting Structural Members 0.01 05-Jul-07 17-Jul-07 40 Pcs 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00SHP1130 Blasting/Painting Mechanical Items 0.01 04-Jul-07 13-Jul-07 40 Pcs 100% 1 1 1 1 1 1 100.00 100.00 100.00 100.00 0.00 LOADOUT & SEAFASTENING SHIPLOOSE 0.05 08-Aug-07 11-Aug-07 192 100.00 100.00 100.00 100.00 0.00

Prep/Chk Packing LO SF Accept30% 40% 10% 10% 10%

LOA1020 Loadout & Seafastening Shiploose Items 0.05 08-Aug-07 11-Aug-07 192 Compl 100% 100 100 100 100 100 100 100.00 100.00 100.00 100.00 0.00

106

231027

1

25018

183

12

1478545210

222

10

231027

1

12

1478545210

10610

25018

183222

116411

25

212128116411

108 108

Mark & Cut Fit-Up

25

Mark & Cut Fit-Up

Mark & Cut Fit-Up

Mark & Cut Fit-Up

Mark & Cut Fit-Up

1012

1711

3

1648

1012

1711

3

212128

1648

21 of 22

Page 83: Full Version of SCDR-A Close-Out Report(Dated051107)

PROG. COD : 28-Sep-07

ACT ID ACTIVITY NAME MHRS WTG

PLANNED START

PLANNED FINISH MHRS BASIS OF

QTY (UNIT)LVL 4 WTG EST QTY EARLY

PLAN MID PLAN LATE PLAN ACTUAL VARPROGRESS MEASUREMENT

CUMM PROGRESS THIS WEEK

SUMMARY of SCDR-A Topsides OALL WTG PRELIMINARIES 6.74 19-Jul-06 23-Aug-07 28,043 100.00 100.00 100.00 100.00 0.00 ENGINEERING 7.68 4-Aug-06 6-Aug-07 31,954 100.00 100.00 100.00 100.00 0.00 PROCUREMENT 8.46 7-Aug-06 23-Aug-07 35,196 100.00 100.00 100.00 100.00 0.00 FABRICATION OF SCDR-A TOPSIDES 70.56 22-Sep-06 20-Aug-07 293,578 100.00 100.00 100.00 100.00 0.00 ONSHORE PRE-COMMISSIONING 4.43 21-May-07 28-Aug-07 18,430 100.00 100.00 100.00 100.00 0.00 WEIGHING, LOADOUT & SEAFASTENING 2.13 2-Jul-07 4-Sep-07 8,862 100.00 100.00 100.00 100.00 0.00

OVERALL SCDR-A PROGRESS 100.00 416,065 100.00 100.00 100.00 100.00 0.00

SUMMARY of ENGINEERING Review Materials 16.22 4-Aug-06 2-Jan-07 5,183 100.00 100.00 100.00 100.00 0.00 Construction Drawings 83.78 4-Aug-06 6-Aug-07 26,771 100.00 100.00 100.00 100.00 0.00 Overall ENGINEERING Progress 100.00 4-Aug-06 6-Aug-07 31,954 100.00 100.00 100.00 100.00 0.00

SUMMARY of PROCUREMENT Client Supply Materils 8.57 17-Aug-06 23-Aug-07 3,017 100.00 100.00 100.00 100.00 0.00 MMHE Supply Materials 91.43 7-Aug-06 8-Aug-07 32,179 100.00 100.00 100.00 100.00 0.00 Purchase Request to Purchase Order 52.20 7-Aug-06 8-Feb-07 16,796 100.00 100.00 100.00 100.00 0.00 Purchase Order to Delivery 0.00 3-Oct-06 23-Jul-07 - 0.00 0.00 0.00 0.00 0.00 Materials Receiving Inspection 47.80 29-Nov-06 8-Aug-07 15,383 100.00 100.00 100.00 100.00 0.00 Overall PROCUREMENT Progress 100.00 7-Aug-06 23-Aug-07 35,196 100.00 100.00 100.00 100.00 0.00

SUMMARY of Fabrication SCDR-A Topsides Structural 34.82 12-Oct-06 18-Jun-07 102,218 100.00 100.00 100.00 100.00 0.00 Blasting/Painting 6.87 22-Sep-06 31-Jul-07 20,182 100.00 100.00 100.00 100.00 0.00 Piping 21.73 13-Jan-07 15-Aug-07 63,797 100.00 100.00 100.00 100.00 0.00 Mechanical 7.92 15-Feb-07 20-Aug-07 23,256 100.00 100.00 100.00 100.00 0.00 Electrical 9.55 28-Feb-07 3-Aug-07 28,038 100.00 100.00 100.00 100.00 0.00 Instrument 10.57 28-Feb-07 8-Aug-07 31,045 100.00 100.00 100.00 100.00 0.00 Architectural 3.37 24-Mar-07 26-Jul-07 9,882 100.00 100.00 100.00 100.00 0.00 HVAC 3.22 2-Apr-07 19-Jul-07 9,461 100.00 100.00 100.00 100.00 0.00 Safety 0.97 4-Jun-07 15-Aug-07 2,850 100.00 100.00 100.00 100.00 0.00 Others Materials 0.97 31-Jul-07 16-Aug-07 2,850 100.00 100.00 100.00 100.00 0.00

Overall Fabrication Progress 100.00 22-Sep-06 20-Aug-07 293,578 100.00 100.00 100.00 100.00 0.00

SUMMARY of E11K-A SHIPLOOSE ITEMS ENGINEERING 6.37 21-Aug-06 25-Jan-07 520 100.00 100.00 100.00 100.00 0.00 PROCUREMENT 9.78 5-Oct-06 5-Jun-07 798 100.00 100.00 100.00 100.00 0.00 FABRICATION 81.50 4-May-07 24-Jul-07 6,652 100.00 100.00 100.00 100.00 0.00 LOADOUT & SEAFASTENING SHIPLOOSE 2.35 8-Aug-07 11-Aug-07 192 100.00 100.00 100.00 100.00 0.00 Overall E11K-A SHIPLOOSE ITEMS Progress 100.00 30-Mar-14 5-Mar-15 8,164 100.00 100.00 100.00 100.00 0.00

22 of 22

Page 84: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items

Close-Out Report

Sarawak Shell Bhd.

APPENDIX 5 - PROJECT ORGANIZATION CHART

Page 85: Full Version of SCDR-A Close-Out Report(Dated051107)
Page 86: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items

Close-Out Report

Sarawak Shell Bhd.

APPENDIX 6 - SUBCONTRACTOR EVALUATION SHEET

Page 87: Full Version of SCDR-A Close-Out Report(Dated051107)

MALAYSIA MARINE AND HEAVY ENGINEERING SDN BHD

Page 1 / 1

SUBCONTRACTOR PERFORMANCE EVALUATION SUB-CONTRACT NO : 36006607 WORK DESCRIPTION : STRUCTURAL WORKS @ SCDR-A TOPSIDES SUB-CONTRACTOR : KEJUYUTERAAN WIJAYA SDN BHD NAME OF PROJECT/ JOB NO : SCDR-A TOPSIDES - 20066351C NAME OF RATER : ARNEL MENDOZA DESIGNATION : SCTRUCTURAL/ACHITECTURAL SUPERINTENDENT SIGNATURE : DATE OF RATING : August 13, 2007

NO. CRITERIA FOR EVALUATION RATING REMARKS

I FAMILIARITY/ COMPLIANCE WITH MMHE’S BASIC PRACTICES 4 Average

II FAMILIARITY/ COMPLIANCE WITH JOB SPECIFICATIONS 4 Average

III DETAILED ENGINEERING Economy of Design 3 Meets the desired standard of performance. Efficiency/ Correctness of Techniques 3 Meets the desired standard of performance. Technical Acceptability of Result 4 Average Quality of Personnel/ Supervisor 4 Average

IV ENGINEERING PRODUCTIVITY Work Output of Personal 4 Average Coordination of Various Disciplines

and Phases of Project Execution 4 Average

V PROCUREMENT ENGINEERING Selection of Materials/ Equipment 3 Meets the desired standard of performance.

VI MATERIAL PURCHASING Knowledge of Vendors 4 Average Sharpness of Buying 4 Average

VII SUBCONTRACTS Selection of Subcontractors 4 Average Personnel/ Supervision 4 Average

VIII EXPEDITING 4 Average IX BULK MATERIAL CONTROL 4 Average

X ESTIMATING, COST REPORTING & COST CONTROL. 4 Average

XI PLANNING/ SCHEDULING IN WORK 4 Average XII PROCESSING OF CHANGES IN WORK 4 Average XIII FIELD EFFICIENCY 4 Average

OVERALL RATING 4 Average, Few weaknesses. GENERAL COMMENTS: 1. Detail comments on subcontractor’s performance.

Management is short of comments that leads to unpleasant discussion.. 2. Any special factors that affected subcontractor’s performance on this project.

Submitted plan were just for compliance but not workable. 3. Any reservation on this subcontractor getting future MMHE work.

Recommend for future MMHE work.

Page 88: Full Version of SCDR-A Close-Out Report(Dated051107)

MALAYSIA MARINE AND HEAVY ENGINEERING SDN BHD

Page 1 / 1

SUBCONTRACTOR PERFORMANCE EVALUATION SUB-CONTRACT NO : 36007629 WORK DESCRIPTION : ARCHITECTURAL WORKS SUB-CONTRACTOR : ARROW PLATFORM (M) SDN BHD NAME OF PROJECT/ JOB NO : SCDR-A TOPSIDES - 20066351C NAME OF RATER : ARNEL MENDOZA DESIGNATION : SCTRUCTURAL/ACHITECTURAL SUPERINTENDENT SIGNATURE : DATE OF RATING : August 17, 2007

NO. CRITERIA FOR EVALUATION RATING REMARKS

I FAMILIARITY/ COMPLIANCE WITH MMHE’S BASIC PRACTICES 4 Average, with few weaknesses.

II FAMILIARITY/ COMPLIANCE WITH JOB SPECIFICATIONS 4 Average, with few weaknesses. III DETAILED ENGINEERING Economy of Design 4 Average, with few weaknesses. Efficiency/ Correctness of Techniques 4 Average, with few weaknesses. Technical Acceptability of Result 4 Average, with few weaknesses. Quality of Personnel/ Supervisor 4 Average, with few weaknesses.

IV ENGINEERING PRODUCTIVITY Work Output of Personal 4 Average, with few weaknesses. Coordination of Various Disciplines and Phases of

Project Execution 4 Average, with few weaknesses.

V PROCUREMENT ENGINEERING Selection of Materials/ Equipment 4 Average, with few weaknesses.

VI MATERIAL PURCHASING Knowledge of Vendors 5 Low Average, with some weaknesses Sharpness of Buying 5 Low Average, with some weaknesses

VII SUBCONTRACTS Selection of Subcontractors 4 Average, with few weaknesses. Personnel/ Supervision 4 Average, with few weaknesses.

VIII EXPEDITING 4 Average, with few weaknesses. IX BULK MATERIAL CONTROL 4 Average, with few weaknesses. X ESTIMATING, COST REPORTING & COST CONTROL. 4 Average, with few weaknesses. XI PLANNING/ SCHEDULING IN WORK 4 Average, with few weaknesses. XII PROCESSING OF CHANGES IN WORK 4 Average, with few weaknesses. XIII FIELD EFFICIENCY 4 Average, with few weaknesses.

OVERALL RATING 4 Average, Few weaknesses. GENERAL COMMENTS: 1. Detail comments on subcontractor’s performance.

They can perform the work but unable to meet the desired MMHE standard of performance.

2. Any special factors that affected subcontractor’s performance on this project. Expediting effort on submission of Vendor Data or on delivery of materials, failed to

expedite successfully. 3. Any reservation on this subcontractor getting future MMHE work.

Recommend for future MMHE work.

Page 89: Full Version of SCDR-A Close-Out Report(Dated051107)

MALAYSIA MARINE AND HEAVY ENGINEERING SDN BHD

Page 1 / 1

SUBCONTRACTOR PERFORMANCE EVALUATION SUB-CONTRACT NO : 36007625 WORK DESCRIPTION : FABRICATION & INSTALLATION OF PIPING WORKS SUB-CONTRACTOR : JURUNATURE SDN BHD NAME OF PROJECT/ JOB NO : SCDR-A TOPSIDES - 20066351C NAME OF RATER : MOHD SUBHA B. RI DESIGNATION : PIPING SUPERINTENDENT SIGNATURE : DATE OF RATING : August 18, 2007

NO. CRITERIA FOR EVALUATION RATING REMARKS

I FAMILIARITY/ COMPLIANCE WITH MMHE’S BASIC PRACTICES 3 Generally meets desired standard of performance.

II FAMILIARITY/ COMPLIANCE WITH JOB SPECIFICATIONS 3 Generally meets desired standard of performance.

III DETAILED ENGINEERING Economy of Design 3 Generally meets desired standard of performance. Efficiency/ Correctness of Techniques 3 Generally meets desired standard of performance. Technical Acceptability of Result 3 Generally meets desired standard of performance. Quality of Personnel/ Supervisor 3 Generally meets desired standard of performance.

IV ENGINEERING PRODUCTIVITY Work Output of Personal 2 Always meets desired standard of performance. Coordination of Various Disciplines and

Phases of Project Execution 2 Always meets desired standard of performance.

V PROCUREMENT ENGINEERING Selection of Materials/ Equipment 2 Always meets desired standard of performance.

VI MATERIAL PURCHASING Knowledge of Vendors 3 Generally meets desired standard of performance. Sharpness of Buying 3 Generally meets desired standard of performance.

VII SUBCONTRACTS Selection of Subcontractors 3 Generally meets desired standard of performance. Personnel/ Supervision 4 Average, low of supervision & monitoring.

VIII EXPEDITING 4 Average, with few weaknesses. IX BULK MATERIAL CONTROL 4 Average, with few weaknesses of monitoring.

X ESTIMATING, COST REPORTING & COST CONTROL. 3 Generally meets desired standard of performance.

XI PLANNING/ SCHEDULING IN WORK 4 Average, with few weaknesses. XII PROCESSING OF CHANGES IN WORK 3 Generally meets desired standard of performance. XIII FIELD EFFICIENCY 3 Generally meets desired standard of performance.

OVERALL RATING 3 Generally meets desired standard of performance. GENERAL COMMENTS: 1. Detail comments on subcontractor’s performance.

They can perform the work & meet the desired MMHE standard of performance. 2. Any special factors that affected subcontractor’s performance on this project.

Strong support to the Project Team. Meet the project schedule.

3. Any reservation on this subcontractor getting future MMHE work. Recommend for future MMHE work.

Page 90: Full Version of SCDR-A Close-Out Report(Dated051107)

MALAYSIA MARINE AND HEAVY ENGINEERING SDN BHD

Page 1 / 1

SUBCONTRACTOR PERFORMANCE EVALUATION SUB-CONTRACT NO : 36007624 WORK DESCRIPTION : FABRICATION & INSTALLATION OF GRE PIPES SUB-CONTRACTOR : AMERSTARND ENGINEERING SDN BHD NAME OF PROJECT/ JOB NO : SCDR-A TOPSIDES - 20066351C NAME OF RATER : MOHD SUBHA B. RI DESIGNATION : PIPING SUPERINTENDENT SIGNATURE : DATE OF RATING : August 18, 2007

NO. CRITERIA FOR EVALUATION RATING REMARKS

I FAMILIARITY/ COMPLIANCE WITH MMHE’S BASIC PRACTICES 4 Average, with few weaknesses.

II FAMILIARITY/ COMPLIANCE WITH JOB SPECIFICATIONS 4 Average, with few weaknesses. III DETAILED ENGINEERING Economy of Design 4 Average, with few weaknesses. Efficiency/ Correctness of Techniques 4 Average, with few weaknesses. Technical Acceptability of Result 4 Average, with few weaknesses. Quality of Personnel/ Supervisor 4 Average, with few weaknesses.

IV ENGINEERING PRODUCTIVITY Work Output of Personal 4 Average, with few weaknesses. Coordination of Various Disciplines and Phases of

Project Execution 4 Average, with few weaknesses.

V PROCUREMENT ENGINEERING

Selection of Materials/ Equipment 4 Average, with few weaknesses.

VI MATERIAL PURCHASING Knowledge of Vendors 4 Average, with few weaknesses. Sharpness of Buying 4 Average, with few weaknesses.

VII SUBCONTRACTS

Selection of Subcontractors 4 Average, with few weaknesses. Personnel/ Supervision 4 Average, with few weaknesses.

VIII EXPEDITING 4 Average, with few weaknesses.

IX BULK MATERIAL CONTROL 4 Average, with few weaknesses of monitoring.

X ESTIMATING, COST REPORTING & COST CONTROL. 4 Average, with few weaknesses. XI PLANNING/ SCHEDULING IN WORK 4 Average, with few weaknesses. XII PROCESSING OF CHANGES IN WORK 4 Average, with few weaknesses. XIII FIELD EFFICIENCY 4 Average, with few weaknesses.

OVERALL RATING 4 Average, with few weaknesses. GENERAL COMMENTS: 1. Detail comments on subcontractor’s performance.

They can perform the work but cannot meet the desired MMHE standard of performance.

2. Any special factors that affected subcontractor’s performance on this project. Strong support to the Project team. Meet the project schedule.

3. Any reservation on this subcontractor getting future MMHE work. Recommend for future MMHE work.

Page 91: Full Version of SCDR-A Close-Out Report(Dated051107)

MALAYSIA MARINE AND HEAVY ENGINEERING SDN BHD

Page 1 / 1

SUBCONTRACTOR PERFORMANCE EVALUATION SUB-CONTRACT NO : 36007625 WORK DESCRIPTION : MECHANICAL INSTALLATION WORKS SUB-CONTRACTOR : JURUNATURE SDN BHD NAME OF PROJECT/ JOB NO : SCDR-A TOPSIDES - 20066351 NAME OF RATER : ABD RAZAK ABU BAKAR DESIGNATION : MECHANICAL SUPERINTENDENT SIGNATURE : DATE OF RATING : August 17, 2007

NO. CRITERIA FOR EVALUATION RATING REMARKS

I FAMILIARITY/ COMPLIANCE WITH MMHE’S BASIC PRACTICES 3 Meets the desired standard of performance.

II FAMILIARITY/ COMPLIANCE WITH JOB SPECIFICATIONS 3 Performed work with less outside support.

III DETAILED ENGINEERING Economy of Design 3 Meets the desired standard of performance. Efficiency/ Correctness of Techniques 3 Meets the desired standard of performance. Technical Acceptability of Result 3 Meets the desired standard of performance. Quality of Personnel/ Supervisor 3 Meets the desired standard of performance.

IV ENGINEERING PRODUCTIVITY Work Output of Personal 2 Always exceed the desired standard of

performance. Coordination of Various Disciplines and Phases of

Project Execution 2 Always exceed the desired standard of performance.

V PROCUREMENT ENGINEERING Selection of Materials/ Equipment 3 Meets the desired standard of performance.

VI MATERIAL PURCHASING Knowledge of Vendors 3 Meets the desired standard of performance. Sharpness of Buying 3 Meets the desired standard of performance.

VII SUBCONTRACTS Selection of Subcontractors 3 Meets the desired standard of performance. Personnel/ Supervision 3 Meets the desired standard of performance.

VIII EXPEDITING 4 Average IX BULK MATERIAL CONTROL 3 Meets the desired standard of performance. X ESTIMATING, COST REPORTING & COST CONTROL. 4 Average

XI PLANNING/ SCHEDULING IN WORK 3 Meets the desired standard of performance. XII PROCESSING OF CHANGES IN WORK 3 Meets the desired standard of performance.

XIII FIELD EFFICIENCY 2 Always exceed the desired standard of performance.

OVERALL RATING 3 Meets the desired standard of performance. GENERAL COMMENTS: 1. Detail comments on subcontractor’s performance.

Performed works and meet the desired standard of performance. 2. Any special factors that affected subcontractor’s performance on this project.

Strong team personnel/supervision at site. All materials meet the delivery target/schedule.

3. Any reservation on this subcontractor getting future MMHE work. Recommend for future MMHE work.

Page 92: Full Version of SCDR-A Close-Out Report(Dated051107)

MALAYSIA MARINE AND HEAVY ENGINEERING SDN BHD

Page 1 / 1

SUBCONTRACTOR PERFORMANCE EVALUATION SUB-CONTRACT NO : 36007628 WORK DESCRIPTION : ELECTRICAL & INSTRUMENTATION WORKS SUB-CONTRACTOR : ASADRA (M) SDN BHD NAME OF PROJECT/ JOB NO : SCDR-A TOPSIDES - 20066351C NAME OF RATER : TEODORO D. FLORES DESIGNATION : ELECTRICAL / INSTRUMENTATION SUPERINTENDENT SIGNATURE : DATE OF RATING : August 10, 2007

NO. CRITERIA FOR EVALUATION RATING REMARKS

I FAMILIARITY/ COMPLIANCE WITH MMHE’S BASIC PRACTICES 4

Few weaknesses, can perform work but cannot meet the desired standard of performance.

II FAMILIARITY/ COMPLIANCE WITH JOB SPECIFICATIONS 7 Cannot perform work without outside support.

III DETAILED ENGINEERING Economy of Design 7 Unsatisfactory performance. Efficiency/ Correctness of Techniques 7 Unsatisfactory performance. Technical Acceptability of Result 6 Below average. Quality of Personnel/ Supervisor 4 Average, with few weaknesses.

IV ENGINEERING PRODUCTIVITY Work Output of Personal 5 Low average, with some weaknesses. Coordination of Various Disciplines and Phases of

Project Execution 4 Average, with few weaknesses.

V PROCUREMENT ENGINEERING Selection of Materials/ Equipment 4 Average, with few weaknesses.

VI MATERIAL PURCHASING Knowledge of Vendors 4 Average, with few weaknesses. Sharpness of Buying 4 Average, with few weaknesses.

VII SUBCONTRACTS Selection of Subcontractors 4 Average, with few weaknesses. Personnel/ Supervision 4 Average, with few weaknesses.

VIII EXPEDITING 4 Average, with few weaknesses. IX BULK MATERIAL CONTROL 4 Average, with few weaknesses. X ESTIMATING, COST REPORTING & COST CONTROL. 4 Average, with few weaknesses. XI PLANNING/ SCHEDULING IN WORK 4 Average, with few weaknesses. XII PROCESSING OF CHANGES IN WORK 4 Average, with few weaknesses. XIII FIELD EFFICIENCY 4 Average, with few weaknesses.

OVERALL RATING 6

Many weaknesses. Can perform work but cannot meet the desired standard of performance.

GENERAL COMMENTS: 1. Detail comments on subcontractor’s performance.

Many weaknesses. Can perform work but cannot meet the desired standard of performance.

2. Any special factors that affected subcontractor’s performance on this project. Delay in delivery of materials.

3. Any reservation on this subcontractor getting future MMHE work. Recommend for future MMHE work.

Page 93: Full Version of SCDR-A Close-Out Report(Dated051107)

MALAYSIA MARINE AND HEAVY ENGINEERING SDN BHD

Page 1 / 1

SUBCONTRACTOR PERFORMANCE EVALUATION SUB-CONTRACT NO : 36007627 WORK DESCRIPTION : BLASTING & PAINTING WORKS SUB-CONTRACTOR : BB TECH SERVICES SDN BHD NAME OF PROJECT/ JOB NO : SCDR-A TOPSIDES - 20066351C NAME OF RATER : SANUSI HANAFI DESIGNATION : BLASTING & PAINTING SUPERINTENDENT SIGNATURE : DATE OF RATING : August 18, 2007

NO. CRITERIA FOR EVALUATION RATING REMARKS

I FAMILIARITY/ COMPLIANCE WITH MMHE’S BASIC PRACTICES 4 Average, with few weaknesses.

II FAMILIARITY/ COMPLIANCE WITH JOB SPECIFICATIONS 4 Average, with few weaknesses. III DETAILED ENGINEERING Economy of Design 4 Average, with few weaknesses. Efficiency/ Correctness of Techniques 4 Average, with few weaknesses. Technical Acceptability of Result 4 Average, with few weaknesses. Quality of Personnel/ Supervisor 4 Average, with few weaknesses.

IV ENGINEERING PRODUCTIVITY Work Output of Personal 4 Average, with few weaknesses. Coordination of Various Disciplines and Phases of

Project Execution 4 Average, with few weaknesses.

V PROCUREMENT ENGINEERING Selection of Materials/ Equipment 4 Average, with few weaknesses.

VI MATERIAL PURCHASING Knowledge of Vendors 4 Average, with few weaknesses. Sharpness of Buying 4 Average, with few weaknesses.

VII SUBCONTRACTS Selection of Subcontractors 4 Average, with few weaknesses. Personnel/ Supervision 4 Average, with few weaknesses.

VIII EXPEDITING 4 Average, with few weaknesses. IX BULK MATERIAL CONTROL 4 Average, with few weaknesses. X ESTIMATING, COST REPORTING & COST CONTROL. 4 Average, with few weaknesses. XI PLANNING/ SCHEDULING IN WORK 4 Average, with few weaknesses. XII PROCESSING OF CHANGES IN WORK 4 Average, with few weaknesses. XIII FIELD EFFICIENCY 4 Average, with few weaknesses.

OVERALL RATING 4 Average, Few weaknesses. GENERAL COMMENTS: 1. Detail comments on subcontractor’s performance.

They can perform the work but unable to meet the desired MMHE standard of performance.

2. Any special factors that affected subcontractor’s performance on this project. Sometimes lack of manpower & equipment.

3. Any reservation on this subcontractor getting future MMHE work. Recommend for future MMHE work.

Page 94: Full Version of SCDR-A Close-Out Report(Dated051107)

MALAYSIA MARINE AND HEAVY ENGINEERING SDN BHD

Page 1 / 1

SUBCONTRACTOR PERFORMANCE EVALUATION SUB-CONTRACT NO : 36006616 WORK DESCRIPTION : HVAC SYSTEM FABRICATION & INSTALLATION SUB-CONTRACTOR : DYNAC SDN BHD NAME OF PROJECT/ JOB NO : SCDR-A TOPSIDES - 20066351C NAME OF RATER : ABD RAZAK ABU BAKAR DESIGNATION : MECHANICAL SUPERINTENDENT SIGNATURE : DATE OF RATING : August 17, 2007 NO. CRITERIA FOR EVALUATION RATING REMARKS

I FAMILIARITY/ COMPLIANCE WITH MMHE’S BASIC PRACTICES 4 Few weaknesses by meets the desired

standard of performance.

II FAMILIARITY/ COMPLIANCE WITH JOB SPECIFICATIONS 3 Performed work with less outside support.

III DETAILED ENGINEERING

Economy of Design 3 Meets the desired standard of performance.

Efficiency/ Correctness of Techniques 4 Average. Technical Acceptability of Result 4 Average.

Quality of Personnel/ Supervisor 3 Meets the desired standard of performance.

IV ENGINEERING PRODUCTIVITY Work Output of Personal 4 Average. Coordination of Various Disciplines and Phases of

Project Execution 4 Average.

V PROCUREMENT ENGINEERING Selection of Materials/ Equipment 4 Average.

VI MATERIAL PURCHASING Knowledge of Vendors 4 Average. Sharpness of Buying 4 Average.

VII SUBCONTRACTS Selection of Subcontractors 3 Meets the desired standard of

performance. Personnel/ Supervision 3 Meets the desired standard of

performance. VIII EXPEDITING 4 Average IX BULK MATERIAL CONTROL 4 Average.

X ESTIMATING, COST REPORTING & COST CONTROL. 3 Meets the desired standard of performance.

XI PLANNING/ SCHEDULING IN WORK 4 Average XII PROCESSING OF CHANGES IN WORK 4 Average

XIII FIELD EFFICIENCY 3 Meets the desired standard of performance.

OVERALL RATING 4 Average GENERAL COMMENTS: 1. Detail comments on subcontractor’s performance.

Meet the desired standard of performance, but needs to improve planning work schedule. 2. Any special factors that affected subcontractor’s performance on this project.

Shortage / less manpower working direct at site. Improve procurement of material schedule. Need improvement on Planning, Procurement & key personnel at site.

3. Any reservation on this subcontractor getting future MMHE work. Recommend for future MMHE work.

Page 95: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items

Close-Out Report

Sarawak Shell Bhd.

APPENDIX 7 - FABRICATION YARD

Page 96: Full Version of SCDR-A Close-Out Report(Dated051107)
Page 97: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items

Close-Out Report

Sarawak Shell Bhd.

APPENDIX 8 - RFQ / CO / VOP Log

Page 98: Full Version of SCDR-A Close-Out Report(Dated051107)

MALAYSIA MARINE AND HEAVY ENGINEERING SDN BHDENGINEERING AND CONSTRUCTION DIVISION

CHANGE ORDER (CO)/VARIATION ORDER (VO) REGISTER Date: 6-Nov-07

NO RFQ VOP CO VO DESCRIPTION CO AMOUNT VO AMOUNT REMARKSNO NO NO NO

1 NA 001 001 001 PPE For Fabrication : Use of Coverall 65,049.60 65,049.60 Closed2 NA NA 002 Training for SSB personnel 11,610.00 SSB to issue VO34567891011121314151617

TOTAL 76,659.60 65,049.60

CONTRACT TITLE : FABRICATION OF SCDR-A TOPSIDESCONTRACT NO : 591397

Page 99: Full Version of SCDR-A Close-Out Report(Dated051107)

CONTRACT SUM (RM)Date :

Approved Amount Rejected Amount

RM Estimated Amount RM

RM RM NO. DATE

A)

01

1st Order 12/04/2006 161,372.68 161,372.68 In Progress Approved2nd Order 03/08/2007 407,855.71 407,855.71 In Progress Approved3rd Order 04/11/2007 107,395.70 107,395.70 In Progress ApprovedTransportation charges 25/8/07 39,210.71 0.00 39,210.71 50% 19,605.36

715,834.80 676,624.09 19,605.36

Structural12/12/06 175,066.45 175,066.45 In Progress Approved

Electrical (Except for Cables)06/02/07 161,436.00 161,436.00 In Progress Approved

Electrical ( for Cables)18/05/07 60,480.00 60,480.00 In Progress Approved

Piping (includes Post AFC Rev. A1) 12/03/07 104,615.00 104,615.00 In Progress Approved

Pipe Supports27/03/07 1,793.22 1,793.22 In Progress Approved

Instrument 12/05/07 -40,709.00 -40,709.00 In Progress ApprovedMechanical 31/05/07 15,306.85 15,306.85 In Progress Approved

477,988.52 477,988.52 0.00

TOTAL PS 1,193,823.32 1,154,612.61 19,605.36

RFQ OR VO PROCESSING

PHYSICAL WORK STATUSRM

VARIATION ORDER (V.O)

VO NO

RFQ REPLY FROM MMHE

MALAYSIA MARINE AND HEAVY ENGINEERING SDN BHDENGINEERING AND CONSTRUCTION DIVISION

CONTRACT TITLE : FABRICATION OF SCDR-A TOPSIDESCONTRACT NO : 591397

REV. DATE ISSUED

REQUEST FOR QUOTATION /VARIATION ORDER PROPOSAL /CHANGE ORDER/VARIATION ORDER REGISTER

0-Jan-00

Pending Amount CHANGE ORDER (C.O)

COST ESTIMATE (RM) RM

STATUS

CO NO

Appendix 7

75,167,286.00

OTHER REMARKSREV. DATE ISSUED

% to recognize as sales

INVOICINGREQUEST FOR QUOTATION (RFQ)

RFQ NO DESCRIPTION

PROVISIONAL SUM (PS)

SUB-TOTAL PS - ITEM (9)

SUB-TOTAL PS - ITEM (5)

PROVISIONAL SUM - PART 3:SCHEDULE OF PRICE AND RATES;ITEM 5- AFB-AFC CHANGES

PROVISIONAL SUM-PART 3;SCHEDULE OF PRICES AND RATES;ITEM 9 - SUPPLY ADDITIONAL HOOK-UP MATERIALS, OFFSHORE COMMISSIONING SPARES, START-UP SPARES and 1 Year OPERATING SPARES

Page 100: Full Version of SCDR-A Close-Out Report(Dated051107)

CONTRACT SUM (RM)Date :

Approved Amount Rejected Amount

RM Estimated Amount RM

RM RM NO. DATE

RFQ OR VO PROCESSING

PHYSICAL WORK STATUSRM

VARIATION ORDER (V.O)

VO NO

RFQ REPLY FROM MMHE

MALAYSIA MARINE AND HEAVY ENGINEERING SDN BHDENGINEERING AND CONSTRUCTION DIVISION

CONTRACT TITLE : FABRICATION OF SCDR-A TOPSIDESCONTRACT NO : 591397

REV. DATE ISSUED

REQUEST FOR QUOTATION /VARIATION ORDER PROPOSAL /CHANGE ORDER/VARIATION ORDER REGISTER

0-Jan-00

Pending Amount CHANGE ORDER (C.O)

COST ESTIMATE (RM) RM

STATUS

CO NO

Appendix 7

75,167,286.00

OTHER REMARKSREV. DATE ISSUED

% to recognize as sales

INVOICINGREQUEST FOR QUOTATION (RFQ)

RFQ NO DESCRIPTION

B)02 40' Porta Cabin for Company

Commissioning TeamCompleted MMHE to Reply

03 2 nos of Antenna Mounting Stands

19/4/07

Refer to

Instrument AFB-

AFC changes

Incoporated in AFB/AFC change for Instrument

Completed

Approved

04 Supply 14" Hanger Flange & Flange below SDV for SCDR-A to E11K-A Pipeline

25/5/07

29/9/07

229,696.39 229,696.39

100% 229,696.39

Under Procurement

SSB to Reply

05 Offshore Pre-Drilled Scope of Works

10/08/07 On progressMMHE to Reply

06 Supply Fire Fighting Equipment

22/8/07 Under Procurement MMHE to Reply

07 Temporary Lighting 09/04/2007 Under Procurement MMHE to Reply

08 Supply and install quick release exhaust valve complete with tubings and fittings

4/9/07 Under Procurement

MMHE to Reply

09 Instrument materials for offshore Hook-up

Under Procurement MMHE to Reply

10 Rigging Gear for Sand Bin V-0410A/B

Under Procurement MMHE to Reply

NA Training for SSB personnel 11,610.00

02 11,610.00

On-going WGO pending issuance

TOTAL RFQ 229,696.39 11,610.00 229,696.39 229,696.39 0.00 11,610.00 0.00

C)

VOP 1: PPE For Fabrication : Use of Coverall 02/06/07 65,049.60 65,049.60 01 65,049.60 01 65,049.60

Completed Approved

VOP 2:Red Color Painting For Firewater Lines 08/05/07 23,662.62 23,662.62

CompletedRejected

VOP 3:Revised Sand Bin Leg Connection

16/05/07

Refer VOP

Register

Incoporated in AFB/AFC remeasurement for Mechanical

Incoporated in AFB/AFC remeasurement for Mechanical

Completed

Approved

VARIATION ORDER PROPOAL (VOP)

REQUEST FOR QUOTATION (RFQ)

Page 101: Full Version of SCDR-A Close-Out Report(Dated051107)

CONTRACT SUM (RM)Date :

Approved Amount Rejected Amount

RM Estimated Amount RM

RM RM NO. DATE

RFQ OR VO PROCESSING

PHYSICAL WORK STATUSRM

VARIATION ORDER (V.O)

VO NO

RFQ REPLY FROM MMHE

MALAYSIA MARINE AND HEAVY ENGINEERING SDN BHDENGINEERING AND CONSTRUCTION DIVISION

CONTRACT TITLE : FABRICATION OF SCDR-A TOPSIDESCONTRACT NO : 591397

REV. DATE ISSUED

REQUEST FOR QUOTATION /VARIATION ORDER PROPOSAL /CHANGE ORDER/VARIATION ORDER REGISTER

0-Jan-00

Pending Amount CHANGE ORDER (C.O)

COST ESTIMATE (RM) RM

STATUS

CO NO

Appendix 7

75,167,286.00

OTHER REMARKSREV. DATE ISSUED

% to recognize as sales

INVOICINGREQUEST FOR QUOTATION (RFQ)

RFQ NO DESCRIPTION

VOP 4:WHCP Accumulator Material Substitution From Bladder Type To Piston

16/05/07 278,351.00 278,351.00 70% 194,845.70

On-going

SSB to Reply

VOP 5:Vessel Vendor Change To VDP

12/05/07 15,091.00 15,091.00Completed

Rejected

VOP 6:Wellhead Control Panel - Additional ball Valve & Check

12/05/07 77,641.88 77,641.88 90% 69,877.69Completed

SSB to Reply

VOP 7:Additional Cantilever Beam for Blastwall support (STQ no. A-008),Additional steel works to infill the gaps (STQ no A-009),Additional wings plates (STQ no-045),Wiremesh Material Proposal

25/05/07 25,534.90 25,534.90 100% 25,534.90

Completed

Amount agreed by SSB. SSB to issue CO

VOP 8 :Additional AFC Rev A due to VDI(Desender) 09/06/07 24,309.74 24,309.74 100% 24,309.74

Completed Amount agreed by SSB. SSB to issue CO

VOP 9 :STQ-S-50;material substitution from 50mm thk to 60mm thk. (SSB supply)

15/06/07 12,483.87 12,483.87 50% 6,241.94Completed SSB to Reply

VOP 10 :First Fill - Chemical For Corrosion Inhibitor Skid 21/06/07 166,603.50 166,603.50 50% 83,301.75

On-going SSB to Reply

VOP 11 :Additional Flanges (as per STQ No. P-013 & P-019)

29/06/0722,977.00

22,977.00 80% 18,381.60On-going SSB to Reply

VOP 12 : Additional Switches

for toilet, STQ-E-013 18/07/07 1,473.001,473.00 50% 736.50

On-going SSB to Reply

VOP 13 :Additional Beacon,

STQ-E-008 & E-012 19/07/07 21,288.8821,288.88 80% 17,031.10

On-going SSB to Reply

VOP 14 :Fabricate and Install

Cageladder and Handrail 24/07/07 14,339.1816,127.56 80% 12,902.05

Completed MMHE to resubmit

VOP 15 :Additional 10mm

Thick Plate (S-055), Additional

Structural Support for Lift Raft

Along Platform (S-062), and

Fabricate and Install Deck

Drain (S-065)

28/07/07 4,937.46 4,937.46 90% 4,443.71

Completed SSB to Reply

VOP 16:Re-routing and

Change of Piping Material of

Portable Water Line to Toilet

1/8/07 3,191.48 3,191.48 90% 2,872.33

On-going SSB to Reply

VOP 17: Supply Ball Valves

on behalf of COMPANY13/8/2007 225,341.50 225,341.50 100% 225,341.50

On-going SSB to Reply

Page 102: Full Version of SCDR-A Close-Out Report(Dated051107)

CONTRACT SUM (RM)Date :

Approved Amount Rejected Amount

RM Estimated Amount RM

RM RM NO. DATE

RFQ OR VO PROCESSING

PHYSICAL WORK STATUSRM

VARIATION ORDER (V.O)

VO NO

RFQ REPLY FROM MMHE

MALAYSIA MARINE AND HEAVY ENGINEERING SDN BHDENGINEERING AND CONSTRUCTION DIVISION

CONTRACT TITLE : FABRICATION OF SCDR-A TOPSIDESCONTRACT NO : 591397

REV. DATE ISSUED

REQUEST FOR QUOTATION /VARIATION ORDER PROPOSAL /CHANGE ORDER/VARIATION ORDER REGISTER

0-Jan-00

Pending Amount CHANGE ORDER (C.O)

COST ESTIMATE (RM) RM

STATUS

CO NO

Appendix 7

75,167,286.00

OTHER REMARKSREV. DATE ISSUED

% to recognize as sales

INVOICINGREQUEST FOR QUOTATION (RFQ)

RFQ NO DESCRIPTION

VOP 18 :Lifebuoy Quantity (STQ No. M-027)

15/8/2007 1,397.50 1,397.50 90% 1,257.75On-going SSB to Reply

VOP 19 :IRP-7875 and IRP-7802 Rewiring - New Scope (STQ-E-031)

22/8/2007 6,450.00 6,450.00 90% 5,805.00On-going SSB to Reply

VOP 20 :Change of specification for Washdown Hose Reel

25/8/2007 7,839.98 7,839.98 90% 7,055.98On-going SSB to Reply

VOP 21 ;Storage of SSB Surplus Material

22/8/2007 29,095.00 29,095.00 90% 26,185.50Completed SSB to Reply

VOP 22)Cost Impact for STQ No. M-032 and STQ No. M-033

28/8/2007 38,524.94 38,524.94 90% 34,672.45SSB to Reply

VOP 23) SCDR-A Flame Detector - Isolator

7/9/07 28,487.50 28,487.50 90% 25,638.75SSB to Reply

VOP 24)AUX Power Supply

From UPS DB-7815 to TF-

7505 (STQ No. E-030)

7/9/07 750.00 750.00 90% 675.00

SSB to Reply

VOP 25)Additional Portable Eyewash Station (STQ No. E-035)

11/9/07 1,483.50 1,483.50 90% 1,335.15SSB to Reply

VOP 26) Additional 2 nos of

MCT and cable ladders due to

reroute of cable from RMU to

Transformer (STQ No. E-019)

14/9/2007 7,012.50 7,012.50 90% 6,311.25

SSB to Reply

VOP 27)Supply and Install Sunshade

10/04/2007 21,983.51 21,983.51 70% 15,388.46SSB to Reply

VOP 28)Cost Impact for STQ P-023 and S-069

10/05/2007 19,413.16 19,413.16 90% 17,471.84SSB to Reply

TOTAL VOP 1,144,714.20 65,049.60 1,042,699.36 79% 827,617.64 38,753.62 65,049.60 65,049.60

TOTAL PS+VOP + RFQ 1,374,410.59 76,659.60 1,272,395.75 85% 1,076,919.39 38,753.62 76,659.60 65,049.60

Page 103: Full Version of SCDR-A Close-Out Report(Dated051107)

CONTRACT TITLE : FABRICATION OF SCDR-A TOPSIDESCONTRACT NO : 591397REQUEST FOR QUOTATION REGISTER

Date : 20-Oct-2007

NO DESCRIPTION AMOUNT (RM) REMARKS

1 CONTRACT SUM 75,167,286.00 2 APPROVED PS 1,154,612.61 3 APPROVED RFQ/VOP 76,659.60 4 PS/RFQ/VOP pending approval 1,076,919.39 5 REVISED CONTRACT SUM(RM) 77,475,477.60

MALAYSIA MARINE AND HEAVY ENGINEERING SDN BHDENGINEERING AND CONSTRUCTION DIVISION

Page 104: Full Version of SCDR-A Close-Out Report(Dated051107)

Appendix 6

CONTRACT NO. : 591397CONTRACT TITLE : FABRICATION OF SCDR-A TOPSIDES Date 0-Jan-00

VOP No. DESCRIPTION DATEAMOUNT

SUBMITTED APPROVED REMARKSISSUED RM RM

001 PPE For Fabrication : Use of Coverall 20/12/06 65,049.60 65,049.60 Aproved CO-1/VO-1002 Red Color Painting For Firewater Lines 08/05/07 23,662.62 Rejected

003Revised Sand Bin Leg Connection

16/05/07 1,312.00 1,312.00Approved

Incoporated in AFB/AFC remeasurement for Mechanical

004 WHCP Accumulator Material Substitution From Bladder Type To Piston 16/05/07 278,351.00 SSB to Reply

005 Vessel Vendor Change To VDP 12/05/07 15,091.00 Rejected006 Wellhead Control Panel - Additional ball Valve & Check 12/05/07 77,641.88 SSB to Reply

007Additional Cantilever Beam for Blastwall support (STQ no. A-008),Additional steel works to infill the gaps (STQ no A-009),Additional wings plates (STQ no-045),Wiremesh Material Proposal

25/05/07 25,534.90 25,534.90Amount agreed in principle.SSB to issue CO

SSB to issue CO

008 Additional AFC Rev A due to VDI(Desender) 09/06/07 24,309.74 24,309.74Amount agreed in principle.SSB to issue CO

SSB to issue CO

009 STQ-S-50;material substitution from 50mm thk to 60mm thk. (SSB supply)

15/06/07 12,483.87 SSB to Reply

010 First Fill - Chemical For Corrosion Inhibitor Skid 21/06/07 166,603.50 SSB to Reply011 Additional Flanges (as per STQ No. P-013 & P-019) 29/06/07 22,977.00 SSB to Reply012 Additional Switches for toilet, STQ-E-013 18/07/07 1,473.00 SSB to Reply013 Additional Beacon, STQ-E-008 & E-012 19/07/07 21,288.88 SSB to Reply

014Fabricate and Install Cageladder and Handrail @battery Room, STQ-S-058 24/07/07 16,127.56 SSB to Reply

015Additional 10mm Thick Plate (S-055), Additional Structural Support for Lift Raft Along Platform (S-062), and Fabricate and Install Deck Drain (S-065)

28/07/07 4,937.46 SSB to Reply

016 Re-routing and Change of Piping Material of Portable Water Line to Toilet,STQ-P-21 08/01/2007 3,191.48 SSB to Reply

017 Supply Ball Valves on behalf of COMPANY 13/8/2007 225,341.50 SSB to Reply

018 Lifebuoy Quantity (STQ No. M-027) 15/8/2007 1,397.50 SSB to Reply

019 IRP-7875 and IRP-7802 Rewiring - New Scope (STQ-E-031) 22/8/2007 6,450.00 MMHE to resubmit

VARIATION ORDER PROPOSAL

VARIATION ORDER PROPOSAL (VOP) REGISTER

VOP PROCESSING

Page 105: Full Version of SCDR-A Close-Out Report(Dated051107)

VOP No. DESCRIPTION DATEAMOUNT

SUBMITTED APPROVED REMARKSISSUED RM RM

VARIATION ORDER PROPOSALVOP PROCESSING

020 Change of specification for Washdown Hose Reel 25/8/2007 7,839.98 SSB to Reply

021 Storage of SSB Surplus Material 22/8/2007 29,095.00 SSB to Reply

022 Cost Impact for STQ No. M-032 and STQ No. M-033 28/8/2007 38,524.94 SSB to Reply

023 SCDR-A Flame Detector - Isolator 09/07/2007 28,487.50 SSB to Reply

024 AUX Power Supply From UPS DB-7815 to TF-7505 (STQ No. E-030) 09/07/2007 750.00 SSB to Reply

025 Additional Portable Eyewash Station (STQ No. E-035) 09/11/2007 1,483.50 SSB to Reply026 Additional 2 nos of MCT and cable ladders due to reroute of cable from

RMU to Transformer (STQ No. E-019) 14/9/2007 7,012.50 SSB to Reply

027 Supply and Install Sunshade 10/04/2007 21,983.51 SSB to Reply028 Cost Impact for STQ P-023 and S-069 10/05/2007 19,413.16 SSB to Reply

TOTAL 1,147,814.58 116,206.24

Note :

MALAYSIA MARINE AND HEAVY ENGINEERING SDN. BHD.ENGINEERING AND CONSTRUCTION DIVISION

Page 106: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items

Close-Out Report

Sarawak Shell Bhd.

APPENDIX 9 - ERECTION SEQUENCE

Page 107: Full Version of SCDR-A Close-Out Report(Dated051107)
Page 108: Full Version of SCDR-A Close-Out Report(Dated051107)

SCDR-A Topsides & E11K-A Shiploose Items

Close-Out Report

Sarawak Shell Bhd.

APPENDIX 10 - PROGRESS PHOTOGRAPHS

Page 109: Full Version of SCDR-A Close-Out Report(Dated051107)

13-09-06 CLIENT SUPPLIED MATERIALS (‘I’ BEAM)

14-09-06 CLIENT SUPPLIED MATERIAL (STEEL PLATES)

15-09-06 CLIENT SUPPLIED MATERIALS ( TUBULARS)

Page 110: Full Version of SCDR-A Close-Out Report(Dated051107)

02-10-06 ‘I’ BEAM AUTO BLASTING

03-10-06 ‘I’ BEAM AFTER AUTO BLAST

04-10-06 ‘I’ BEAM SPRAY WITH DECK PRIMIER COATING

Page 111: Full Version of SCDR-A Close-Out Report(Dated051107)

08-10-06 STEEL PLATE COMPLETED BLAST & COATED WITH DECK PRIMIER

12-10-06 WITNESS THE FIRST CUT CEREMONY

14-10-06 AUTO BLASTING PAINTING OF TUBULAR IN PROGRESS

Page 112: Full Version of SCDR-A Close-Out Report(Dated051107)

01-11-06 DISPLAY PPE SIGN BOARD & FIRE FIGHTING EQUIPMENT @ SITE

09-11-06 GROUND BREAKING @ FAB.1

13-11-06 CELLAR DECK FRAMING MARKING CUTTING

Page 113: Full Version of SCDR-A Close-Out Report(Dated051107)

18-11-06 LAY SKID BASE ON PENNY WEIGHT @ SITE

20-11-06 ERECT TEMPORARY VERTICAL BRACES ON PENNY WEIGHTS @ SITE

27-11-06 ARRANGE MAIN DECK PANEL TEMP. SUPPORTS & PENNY WEIGHTS @ SITE IN PROGRESS

Page 114: Full Version of SCDR-A Close-Out Report(Dated051107)

01-12-06 LEG ROW A1 MARKING ON ELECTRICAL OPERATED ROLLER

02-12-06 WELDING ROW 3A,2A,B1 & A1 STABBING CONES IN PROGRESS

03-12-06 MAIN DECK PANEL SITE ASSEMBLY PREPARATION IN PROGRESS

Page 115: Full Version of SCDR-A Close-Out Report(Dated051107)

04-12-06 ERECT SCUFFOLDING ON MAIN DECK PANEL TEMPORARY SUPPORT

05-12-06 CELLAR DECK PANEL TEMPORARY SUPPORTS LEVELLING CHECK

06-12-06 CELLAR DECK PANEL 1ST PRIMARY FRAME LAYING

Page 116: Full Version of SCDR-A Close-Out Report(Dated051107)

07-12-06 MAIN DECK PRIMARY FRAME MARKING IN PROGRESS

08-12-06 TOP/BOTTOM FLANGE PLATES FITTING

09-12-06 STABBING COLUMN INTERNAL WELDING

Page 117: Full Version of SCDR-A Close-Out Report(Dated051107)

10-12-06 CELLAR DECK PANEL PRIMARY FRAMES ASSEMBLY

11-12-06 WELDING ROW B1 STABBING COLUMN IN PROGRESS

12-12-06 CELLAR DECK PANEL PRIMARY FRAMES ASSEMBLY

Page 118: Full Version of SCDR-A Close-Out Report(Dated051107)

13-12-06 CELLAR DECK PANEL PRIMARY FRAMES ASSEMBLY

14-12-06 ‘SAW’ STABBING COLUMN ROW B1

15-12-06 MAIN DECK PANEL ASSEMBLY SITE PREPARATION

Page 119: Full Version of SCDR-A Close-Out Report(Dated051107)

16-12-06 LEVELLING CHECK ON MAIN DECK PANEL TEMPORARY SUPPORTS

17-12-06 CELLAR DECK PANEL TOP & BOTTOM FLANGE PLATES FITTING IN SITU

18-12-06 MAIN DECK PRIMARY FRAME CUTTING

Page 120: Full Version of SCDR-A Close-Out Report(Dated051107)

19-12-06 COLUMN FIT-UP

20-12-06 CELLAR DECK PANEL ASSEMBLY IN PROGRESS

21-12-06 STUBBING CONE LINER FITTING

Page 121: Full Version of SCDR-A Close-Out Report(Dated051107)

23-12-06 FIT-UP MAIN DECK PANEL PRIMARY FRAME

22-12-06 CELLAR DECK PANEL ASSEMBLY

24-12-06 ‘UT’ & ‘MPI’ STUBBING COLUMN WELDING JOINT

Page 122: Full Version of SCDR-A Close-Out Report(Dated051107)

26-12-06 GAUGE STUBBING CONE COATING

27-12-06 CELLAR DECK PANEL ASSEMBLY IN PROGRESS

28-12-06 INSTALL STUBBING LEG @ ROW A3 ON CELLAR DECK

Page 123: Full Version of SCDR-A Close-Out Report(Dated051107)

29-12-06 INSTALL STUBBING LEG @ ROW A1

30-12-06 FABRICATING MAIN DECK SKID BEAMS

31-12-06 WELDING & VISUAL INSPECTION MAIN DECK PRIMARY FRAME

Page 124: Full Version of SCDR-A Close-Out Report(Dated051107)

01-01-07 AERIAL VIEW OF CELLAR DECK PANEL ASSEMBLY

02-01-07 FIT-UP MAIN DECK SKID BEAM TOP & BOTTOM FLANGE PLATE

03-01-07 MAIN COLUMN ROW A1 LIFTING LUG VISUAL INSPECTION

Page 125: Full Version of SCDR-A Close-Out Report(Dated051107)

06-01-07 MAIN COLUMN ROW B2 LIFTING LUG COMPLETED GRINDING

04-01-07 MEZZAININE DECK PANEL FRAMINGS ASSEMBLY

05-01-07 MAIN DECK PANEL FRAMINGS ASSEMBLY

Page 126: Full Version of SCDR-A Close-Out Report(Dated051107)

07-01-07 CELLAR DECK PANEL FRAME JOINTS WELDING IN PREPARATION

08-01-07 MAIN DECK SKID BEAM FLANGE PLATE STRONG BACK FITTING

09-01-07 ‘UT’ & ‘MPI’ ROW 2A STABBING COLUMN WELDING JOINT

Page 127: Full Version of SCDR-A Close-Out Report(Dated051107)

10-01-07 MAIN DECK PANEL ASSEMBLY IN PROGRESS

11-01-07 WELDING CELLAR DECK PANEL FRAME JOINTS IN PROGRESS

12-01-07 ‘SAW’ MAIN DECK SKID BEAM WELDING JOINT

Page 128: Full Version of SCDR-A Close-Out Report(Dated051107)

13-01-07 MAIN DECK PANEL PRIMARY/SECONDARY FRAME FITTING

14-01-07 ERECT VERTICAL BRACES ON CELLAR DECK @ ROW A4 & B4

15-01-07 DIAGONAL BRACE PROFILE MARKING & CUTTING

Page 129: Full Version of SCDR-A Close-Out Report(Dated051107)

16-01-07 HANDRAIL FABRICATION

17-01-07 CELLAR DECK PRIMARY FRAME WELDING JOINT VISUAL & ‘MPI’

18-01-07 ERECT STABBING COLUMN @ ROW A2

Page 130: Full Version of SCDR-A Close-Out Report(Dated051107)

19-01-07 ERECT MAIN COLUMN @ ROW A1

21-01-07 HANDRAILS JOINTS WELDING

20-01-07 FABRICATED HANDRAILS

Page 131: Full Version of SCDR-A Close-Out Report(Dated051107)

22-01-07 ERECT STABBING COLUMN @ ROW B2

23-01-07 ERECT 6 NOS. OF STABBING COLUMNS ON CELLAR DECK COMPLETED

24-01-07 ERECT CELLAR DECK FIRST DIAGONAL BRACE @ ROW A4

Page 132: Full Version of SCDR-A Close-Out Report(Dated051107)

25-01-07 CELLAR DECK VERTICAL BRACE FITTING

26-01-07 ERECT OTHERS DIAGONAL BRACES ON CELLAR DECK

27-01-07 CELLAR DECK SECONDARY FRAMES FITTING IN PROGRESS

Page 133: Full Version of SCDR-A Close-Out Report(Dated051107)

28-01-07 WELDING OF MEZZANINE DECK FRAMING IN PROGRESS

29-01-07 ERECT DIAGONAL BRACES BETWEEN ROW B1 & B2

30-01-07 ERECT DIAGONAL BRACES @ BETWEEN ROW A1 & A2

Page 134: Full Version of SCDR-A Close-Out Report(Dated051107)

02-02-07 SUB ASSEMBLE DIAGONAL BRACES

03-02-07 ERECT CELLAR DECK DIAGONAL BRACES @ BETWEEN ROW A2 & A3

05-02-07 ERECT CELLAR DECK DIAGONAL & VERTICAL BRACES IN PROGRESS

Page 135: Full Version of SCDR-A Close-Out Report(Dated051107)

06-02-07 CELLAR DECK DIAGONAL BRACES FITTING

07-02-07 ASSEMBLE SKID BEAM @ SITE

08-02-07 ERECT DIAGONAL BRACES BETWEEN ROW A3 & B3 COMPLETED

Page 136: Full Version of SCDR-A Close-Out Report(Dated051107)

12-02-07 CELLAR DECK DIAGONAL BRACES WELDING IN PROGRESS

11-02-07 WELDING CELLAR DECK TOP FLANGE PLATE

10-02-07 LIFTING & INSTALL CELLAR DECK PLATE

Page 137: Full Version of SCDR-A Close-Out Report(Dated051107)

13-02-07 WELLHEAD PLATFORM ASSEMBLY

14-02-07 RESCUE DRILL (HEAD COUNTING)

14-02-07 RESCUE DRILL (SAFETY PERSONNEL @ SITE)

Page 138: Full Version of SCDR-A Close-Out Report(Dated051107)

14-02-07 RESCUE DRILL

(VICTIM BRING DOWN FROM CELLAR DECK)

14-02-07 VICTIM ATTEND BY MEDICAL PESSONEL

14-02-07 REPORT TO CLIENT REPRESENTATIVES (SSB)

Page 139: Full Version of SCDR-A Close-Out Report(Dated051107)

14-02-07 BRIEFING BY CLIENT & MMHE SAFETY PERSONNEL

15-02-07 MEZZANINE DECK PANEL ASSEMBLY

16-02-07 MEZZANINE DECK PANEL FRAMINGS FITTING

Page 140: Full Version of SCDR-A Close-Out Report(Dated051107)

17-02-07 MAIN DECK SKID BEAM FITTING @ ROW B

18-02-07 MAIN DECK SKID BEAM FITTING @ ROW A

19-02-07 INSTALLING WELLHEAD PRATFORM VERTICAL BRACES

Page 141: Full Version of SCDR-A Close-Out Report(Dated051107)

20-02-07 MAIN DECK PANEL ROW B SKID BEAM FITTING

21-02-07 MAIN DECK PANEL ROW A SKID BEAM FITTING

22-02-07 MAIN DECK PANEL TOP FLANGE PLATE WELDING

Page 142: Full Version of SCDR-A Close-Out Report(Dated051107)

23-02-07 PIPE SUPPORTS MARKING

24-02-07 PIPE SUPPORT STRUCTURE GAS CUTTING

25-02-07 PIPE SUPPORT FABRICATION

Page 143: Full Version of SCDR-A Close-Out Report(Dated051107)

26-02-07 AN AERIAL VIEW OF CELLAR DECK PANEL

27-02-07 WELDING & GRINDING WELLHEAD PLTFORM STRUCTURE IN PROGRESS

28-02-07 STAIRWAY FABRICATION

Page 144: Full Version of SCDR-A Close-Out Report(Dated051107)

01-03-07 PIPE SUPPORTS MARKING (MECHANICAL)

03-03-07 WELLHEAD FRAMING JOINTS WELDING IN PROGRESS

02-03-07 INSTALLING DIAGONAL BRACES TRANVERSE BEAM @ BETWEEN ROW A2 & A3 ON CELLAR DECK

Page 145: Full Version of SCDR-A Close-Out Report(Dated051107)

04-03-07 MAIN DECK PANEL FRAMMING JOINTS

05-03-07 ‘MPI’ WELLHEAD PLATFORM FRAMING JOINTS

06-03-07 WELLHEAD GRATING CLIP SEATING

(STAINLESS STEEL)

Page 146: Full Version of SCDR-A Close-Out Report(Dated051107)

07-03-07 MAZZAININE DECK PANEL BLASTING IN PROGRESS

08-03-07 ASSEMBLY INTERMEDIATE PLATFORM IN-SITU

09-03-07 INSTALL MEZZANINE DECK GRATING CLIP SEATINGS

Page 147: Full Version of SCDR-A Close-Out Report(Dated051107)

10-03-07 FABRICATING MEZZAININE DECK GRATINGS

11-03-07 BLASTING & PAINTING WELLHEAD PANEL IN

12-03-07 ERECT SWITCHGEAR & INSTRUMENT LER STRUCTURE ON CELLAR DECK

Page 148: Full Version of SCDR-A Close-Out Report(Dated051107)

13-03-07 MEZZANINE DECK FRAMING (PARTIAL) COMPLETED WITH FINAL COATING

14-03-07 FIT & WELD CELLAR DECK GRATING GRIP SCREW BOSS (STAINLESS STEEL)

15-03-07 MARKING & CUTTING OF E&I SUPPORT SUB STRUCTURES IN PROGRESS

Page 149: Full Version of SCDR-A Close-Out Report(Dated051107)

17-03-07 ASSEMBLE INTERMEDIATE PLATFORM IN PROGRESS

16-03-07 LIFTING & ERECT WELLHEAD PANEL

18-03-07 ERECT SWITCHGEAR & INSTRUMENT LOCAL EQUIPMENT ROOM FRAME STRUCTURE

Page 150: Full Version of SCDR-A Close-Out Report(Dated051107)

19-03-07 FIT & WELD SWITCHGEAR & INSTRUMENT LER ROOM WALL PANEL IN PROGRESS

20-03-07 INSTALLING DECK PLATE ON MAIN DECK PANEL

21-03-07 PRECOATING FOR DESANDER & ACCUMULATOR

Page 151: Full Version of SCDR-A Close-Out Report(Dated051107)

22-03-07 ERECT THE 1ST PANEL OF MEZZANINE DECK

23-03-07 INTERMEDIATE PLATFORM FRAMING COMPLETED SPRAY WITH 2ND COATING

24-03-07 LIFTING & INSTALL DESANDER & INCCUMULATOR

Page 152: Full Version of SCDR-A Close-Out Report(Dated051107)

25-03-07 CELLAR DECK PANEL BETWEEN 2 & 3 COMPLETE FIT-UP

26-03-07 INSTALL 4 UNITS OF DESANDER & ACCUMULATIR ON CELLAR DECK

27-03-07 ERECT MEZZANINE DECK SUB PANEL @ BETWEEN ROW A2 & A3

Page 153: Full Version of SCDR-A Close-Out Report(Dated051107)

28-03-07 INSTALLING FINAL DIAGONAL BRACES ON ROW B

29-03-07 FABRICATING INTERMEDIATE HANDRAILS

30-03-07 INSTALLING HALF CUT PIPE ON SKID BEAM @ ROW B

Page 154: Full Version of SCDR-A Close-Out Report(Dated051107)

01-04-07 FABRICATING INTERMEDIATE PLATFORM GRATINGS

02-4-07 AERIAL VIEW OF SCDR-A PROJECT CELLAR & MEZZANINE DECK

03-04-07 ERECT MEZZANINE DECK PANEL @ BETWEEN ROW B2 & B3

Page 155: Full Version of SCDR-A Close-Out Report(Dated051107)

04-04-07 5 SETS OF DESANDER & ACCUMULATOR IN-PLACE ON CELLAR DECK

05-04-07 CELLAR DECK BETWEEN ROW 2 & 3 BLASTING & PAINTING TO 2ND COAT

06-04-07 WELDING DESANDER & ACCUMULATOR BASEMENT

Page 156: Full Version of SCDR-A Close-Out Report(Dated051107)

07-04-07 ‘TIG’ WELDING ON 14 INCHES RISER PIPE

09-03-07 WELDING SWITHGEAR & INSTRUMENT LOCAL ELECTRICAL ROOM WALL PANEL IN PROGRESS

10-04-07 ASSEMBLE ROW 3C VENT BOOM

Page 157: Full Version of SCDR-A Close-Out Report(Dated051107)

11-04-07 AERIAL VIEW OF SCDR-A TOPSIDES

12-04-07 FABRICATING E&I STANDS IN PROGRESS

13-04-07 BATTERY ROOM WALL PANEL FITTING & WELDING

Page 158: Full Version of SCDR-A Close-Out Report(Dated051107)

26-04-07 ‘MPI’ 2 INCHES CLOSED DRAIN PIPE SPOOL FLANGE WELDING JOINT

27-04-07 INSTALL ELECTRICAL CABLE TRAYS @ BELOW CELLAR DECK IN PROGRESS

28-04-07 INSTALLING 2 INCHES DIESEL FLUID & 3 INCHES PORATABLE WATER (SS) PIPELINE @ BELOW

CELLAR DECK

Page 159: Full Version of SCDR-A Close-Out Report(Dated051107)

29-04-07 INSTALLING 8 & 6 INCHES HAZARDOUS DRAIN (GRE) PIPELINES @ BELOW CELLAR DECK IN

PROGRESS

29-04-07 INSTALLING CELLAR DECK HANDRAILS, GRATINGS & STAIRWAYS

30-04-07 AIR HANDLING UNIT IN-PLACE

Page 160: Full Version of SCDR-A Close-Out Report(Dated051107)

16-04-07 GLASSFLAKE REIINFORCE EPOXY (GRE) PIPE SPOOL SUB ASSEMBLY

15-04-07 GLASSFLAKE REINFORCE EPOXY (GRE) PIPE & ELBOW FITTING

14-04-07 MACHINING GLASSFLAKE REINFORCE EPOXY (GRE) PIPE SPOOL

Page 161: Full Version of SCDR-A Close-Out Report(Dated051107)

17-04-07 INSTALLING 4 INCHES OPEN DRAIN @ BELOW CELLAR DECK IN PROGRESS

18-04-07 INSTRUMENT LOCAL ELECTRICAL ROOM EQUIPMENT SEATING

19-04-07 MARKING/CUTTING & GRINDING GRE PIPE SUPPORT SUB STRUCTURE

Page 162: Full Version of SCDR-A Close-Out Report(Dated051107)

20-04-07 FABRICATED 8 INCHES FIREWATER & HAZARDOUS DRAIN PIPE SPOOLS (GRE)

21-04-07 MAIN DECK PANEL BLASTING & PAINTING IN PROGRESS

22-04-07 ERECT VENT BOOM VERTICAL & DIAGONAL BRACES

Page 163: Full Version of SCDR-A Close-Out Report(Dated051107)

23-04-07 BATTERY ROOM EXTERNAL COAING

24-04-07 FABRICATED GRE PIPE CLAMPS

25-04-07 FABRICATING 6 x 5’’ HAZARDOUS DRAIN PIPE SPOOL (GRE)

Page 164: Full Version of SCDR-A Close-Out Report(Dated051107)

01-05-07 AN AERIAL VIEW OF SCDR-A PROJECT @ ERECTION SITE

02-05-07 MAIN DECK PANEL BALSTING & PAINTING IN PROGRESS

03-05-07 CRANE PEDESTAL COMPLETED WITH FINAL COAT

Page 165: Full Version of SCDR-A Close-Out Report(Dated051107)

04-05-07 ERECT MAIN DECK PANEL @ BETWEEN

ROW 3 & 4

06-05-07 RELOCATE VENT BOOM

05-05-07 ERECT MAIN DECK PANELS COMPLETED

Page 166: Full Version of SCDR-A Close-Out Report(Dated051107)

07-05-07 FABRICATING 8 INCHES PROCESS GAS PIPE SPOOLS

08-05-07 INSTALL CORROSIVE INHABITOR INJECTION PACKAGE IN-PLACE ON CELLAR DECK

09-05-07 INSTALLING 8 INCHES HARZARDOUS DRAIN (GRE) @ BELOW CELLAR DECK

Page 167: Full Version of SCDR-A Close-Out Report(Dated051107)

10-05-07 SCDR-A PROJECT 1ST QHSE DAY ADDRESS BY En’ MOHAMMAD ZAABA ABBAS (MMHE E&C GM)

10-05-07 ADDRESSING BY MISS TJITSKE MONSTER

(SSB TEAM LEADER)

10-05-07 LAUNCHING OF SCDR-A TOPSIDES PROJECT FIRST QSHE DAY SLOGAN ‘NOBODY GET HURT’ BY

MMHE CEO EN’ WAN YUSOFF

Page 168: Full Version of SCDR-A Close-Out Report(Dated051107)

10-05-07 SIGN ON THE PPE AWARENESS CAMPAIGN BY RESPECTIVE SUB CONTRACTORS

10-05-07 SOUVENIR FOR SUB CONTRACTOR REPRESENTATIVE & INDIVIDUAL PARTICIPANT

10-05-07 ROAD SAFETY CAMPAIGN & PPE SALE

Page 169: Full Version of SCDR-A Close-Out Report(Dated051107)

11-05-07 INSTALLING 8 INCHES HAZARDOUS VENT PIPELINE @ BELOW CELLAR DECK

12-05-07 VALVE BODY LEAKAGE HYDROTESTING

13-05-07 BATTERY ROOM EXTERNAL WALL COATING

Page 170: Full Version of SCDR-A Close-Out Report(Dated051107)

14-05-07 INSUALTION WORK @ BELOW SWITCHGEAR ROOM IN PROGRESS

15-05-07 GALVANISED DECK MOUNTED LIGHTING STANDS

16-05-07 ERECT CRANE PEDESTAL

Page 171: Full Version of SCDR-A Close-Out Report(Dated051107)

17-05-07 INSTALLING HANDRAILS ON MAIN DECK IN PROGRESS

18-05-07 INSTALL 2 INCHES CORROSIVE INHABITOR EXPANDABLE PIPE SUPPORT @ BELOW CELLAR DECK

19-05-07 INSTALL BATTERY RACKS & FLOOR TILE

Page 172: Full Version of SCDR-A Close-Out Report(Dated051107)

20-05-07 MAIN DECK FLUSH WATER TANK IN-PLACE

21-05-07 SWITCHGEAR ROOM DB-7815 (230 V AC UPS DISTRUTION BOARD) IN-PLACE

22-05-07 SWITCHGEAR ROOM AIR DUCTING WORK IN PROGRESS

Page 173: Full Version of SCDR-A Close-Out Report(Dated051107)

23-05-07 VENT BOOM BLASTING & PAINTING IN PROGRESS

24-05-07 INSTALLING 8 INCHES FIREWATER PIPELINES 2 BELOW CELLAR DECK

25-05-07 SWITCHGEAR ROOM IN/OUT DOOR LIGHTS SAMALL POWER DISTRIBUTION BOARD IN-PLACE

Page 174: Full Version of SCDR-A Close-Out Report(Dated051107)

27-05-07 SWITCHGEAR ROOM EMERGENCY OUTDOOR LIGHTING DISTRIBUTION BOARD

26-05-07 VENT BOOM FIRST COATING

28-05-07 SPRAY VENT BOOM FINAL COAT COMPLETED

Page 175: Full Version of SCDR-A Close-Out Report(Dated051107)

29-05-07 SPRAY FINAL COATING ON PEDESTAL CRANE BOOM REST IN PROGRESS

30-05-07 INSTALLING 6 INCHES HP FLARE PIPELINES ON VENT BOOM

31-05-07 PEDESTAL CRANE INTERMEDIATE LANDING

Page 176: Full Version of SCDR-A Close-Out Report(Dated051107)

01-06-07 CABLE PULLING @ BELOW CELLAR DECK IN PROGRESS

02-06-07 CABLE PULLING IN SWITCHGEAR ROOM

03-06-07 CABLE PULLING IN INSTRUMENT LOCAL EQUIPMENT ROOM

Page 177: Full Version of SCDR-A Close-Out Report(Dated051107)

04-06-07 CABLE PULLING @ BELOW MEZANINE DECK AHU AREA

05-06-07 INSTALLING CELLAR DECK GRATING

06-06-07 INSTALLING MAIN DECK INSTRUMENT EQUIPMENT

Page 178: Full Version of SCDR-A Close-Out Report(Dated051107)

07-06-07 ERECT PEDESTAL CRANE CONE ADAPTOR

08-06-07 INSTALL SAND BIN ON MAIN DECK IN-PLACE

09-06-07 ERECT PEDESTAL CRANE BOOM REST

Page 179: Full Version of SCDR-A Close-Out Report(Dated051107)

10-06-07 INSTALLING VENT BOOM PIPELINES

11-06-07 INSTALL AIR CONDITIONAL UNITS

12-06-07 INSTALLING CLOSED DRAIN VESSEL PIPELINES

Page 180: Full Version of SCDR-A Close-Out Report(Dated051107)

13-06-07 GAS LAUNCHER TO E-11K-A & PIPELINE

14-06-07 INSTALL DECK MOUNTED FLORESCENT LIGHTING STAND

15-06-07 INSTALLING SUSPENDED LIGHTING @ BELOW MEZZAININE DECK

Page 181: Full Version of SCDR-A Close-Out Report(Dated051107)

16-07-07 AN AERIAL VIEW OF VENT BOOM

17-06-07 INSTALL 8 INCHES OPEN DRAIN HAZARDOUS ON CLOSE DRAIN VESSEL

18-06-07 SWITCHGEAR ROOM CONTROL PANEL AOL (LCPA-8955) CABLE TERMINATION

Page 182: Full Version of SCDR-A Close-Out Report(Dated051107)

19-06-07 INSTALL SCDR-A TOPSIDES NAME PLATE

20-06-07 TRAIL-FIT MAIN DECK REMOVEABLE HATCHS

21-06-07 FLUSH WATER PUMPS (2 SETS) IN-PLACE ON MAIN DECK

Page 183: Full Version of SCDR-A Close-Out Report(Dated051107)

22-06-07 ERECT VENT BOOM

23-06-07 FABRICATED 8 INCHES PROCESS GAS PIPE SPOOLS (SS)

24-06-07 FABRICATED 2 INCHES VENT HP PIPE SPOOLS (SS)

Page 184: Full Version of SCDR-A Close-Out Report(Dated051107)

26-06-07 INSTALL BATTERY PACKAGES

25-06-07 INSTALLING CRANE SERVICE PLATFORM

27-06-07 SWITCHGEAR ROOM 230V AC UPS DISTRIBUTION BOARD CABLE TERMINATION

Page 185: Full Version of SCDR-A Close-Out Report(Dated051107)

28-06-07 INSTRUMENT LOCAL ELECTRICAL ROOM CABLE PULLING IN PROGRESS

29-06-07 INSTALLING 2 TON MONORAIL HOIST FOR LAUNCHER USAGE

30-06-07 SWITCHGEAR ROOM UPS TESTING & COMMISSIONING IN PROGRESS

Page 186: Full Version of SCDR-A Close-Out Report(Dated051107)

01-07-07 CABLE TRAYS EARTHING

02-07-07 BLAST WALL C/W PASSIVE FIRE PROTECTION COATING

03-07-07 RELOCATE PEDESTAL CRANE BOOM REST

Page 187: Full Version of SCDR-A Close-Out Report(Dated051107)

04-07-07 12 INCHES HARZARDOUS DRAIN & 4 INCHES FRESH WETER PIPE END BLINDS (GRE)

05-07-07 12 INCHES HARZARDOUS DRAIN & 4 INCHES FRESH WATER PIPELINE C/W EXPANABLE SUPPORTS

06-07-07 TRANSFORMER ROOM ENTRANCE WORK IN PROGRESS

Page 188: Full Version of SCDR-A Close-Out Report(Dated051107)

07-07-07 CELLAR DECK TOILET SPACE

08-07-07 MAIN DECK NAVIGATION LIGHTING

09-07-07 ERECT TEMPORARY SUPPORT FOR PEDESTAL CRANE BOOM

Page 189: Full Version of SCDR-A Close-Out Report(Dated051107)

11-07-07 INSTALLING FRESH WATER PUMP PIPELINES

12-07-07 CEMENTING WORK ON SWITCHGEAR ROOM IN PROGRESS

10-07-07 INSTALL PEDESTAL CRANE CONTROL TOWER IN-PLACE

Page 190: Full Version of SCDR-A Close-Out Report(Dated051107)

13-07-07 TOILET SPACE FLOORING

14-07-07 INSTALLING DIESEL TRANSFER PUMP PIPELINES

15-07-07 PASSIVE FIRE PROTECTION (PFP) BULKHEAD @ INSTRUMENT LOCAL ROOM,WEATHER SHELTER &

WORKSHOP AREA

Page 191: Full Version of SCDR-A Close-Out Report(Dated051107)

16-07-07 INSTALL CO2 VENT SNUFFING UNIT ON MAIN DECK IN-PLACE

17-07-07 PEDESTAL CRANE BOOM ASSEMBLY

18-07-07 ERECT PEDESTAL CRANE BOOM COMPLETED

Page 192: Full Version of SCDR-A Close-Out Report(Dated051107)

19-07-07 WELLHEAD PLATFORM & GRATING

20-07-07 PORTABLE WATER PIPELINE HYDROTESTING 24 BAR IN PROGRESS

21-07-07 ‘MPI’ TRANSFORMER & SWITCHGEAR AIR TIGHT DOOR WELDING JOINT

Page 193: Full Version of SCDR-A Close-Out Report(Dated051107)

22-07-07 INSTALL PEDESTAL CRANE STRING WIRE

23-07-07 INSTALLING WELLHEAD CONTROL PANEL HYDRAULIC TUBINGS

24-07-07 MAIN DECK BEACON LIGHTING & GENERALPLATFORM ALARM

Page 194: Full Version of SCDR-A Close-Out Report(Dated051107)

25-07-07 CABLE FASTENING

26-07-07 DECK TOILET BOWL FITTING

27-07-07 PEDESTAL CRANE BOOM ON TRIAL

Page 195: Full Version of SCDR-A Close-Out Report(Dated051107)

30-07-07 INSTALLING PIPELINE & VALVES BETWEEN FLUSH TANK & PUMP

31-07-07 WELLHEAD SERVICE PLATFORM MUD WALL

28-07-07 HYDROTESTING PORTABLE WATER PIPELINE TO 28 BAR PRESSURE @ BELOW CELLAR DECK

Page 196: Full Version of SCDR-A Close-Out Report(Dated051107)

01-08-07 ROW B MAIN COLUMNS FINAL COATING IN PROGRESS

02-08-07 INTERMEDIATE DECK POWER BLAST

03-08-07 CABLE GLANDING WORK ON INTERMEDIATE DECK JUNCTION BOX JB-FF-008 & SCDR-AZJBi-4510

Page 197: Full Version of SCDR-A Close-Out Report(Dated051107)

04-08-07 SWITCHGEAR ROOM PRE COMMISSIONING IN PROGRESS

05-08-07 MAIN DECK JUNCTION BOX SCDR-A ZJBI-4515 CABLE TERMINATION

06-08-08 WELDING LOADOUT LIFTING PADEYE

Page 198: Full Version of SCDR-A Close-Out Report(Dated051107)

07-08-08 DECK TOILET BOWL & WASH BASIN

08-08-07 WELLHEAD CONTROL PANEL PRE COMMISSIONING TEST

09-08-08 INSTALLING VENT TIP

Page 199: Full Version of SCDR-A Close-Out Report(Dated051107)

10-08-07 MAIN DECK FLUSH WATER PUMP TEMPERATURE & SPEED TEST

11-08-07 MUD WALL ENTRANCE

12-08-07 INSTALL FIRE DRILL HOSE ON MAIN DECK

Page 200: Full Version of SCDR-A Close-Out Report(Dated051107)

13-08-07 INSTALLING EQUIPMENT TRANSMITTERS ON PROCESS GAS PIPELINES

14-08-07 SWITCHGEAR ROOM SWITCH BOARD PRECOM.

15-08-07 SWITCHGEAR ROOM VCB POWER DISTRIBUTION CABLE TERMINATION

Page 201: Full Version of SCDR-A Close-Out Report(Dated051107)

16-08-07 INSTRUMENT LOCAL ELECTRICAL ROOM MULTI CABLE TRANSIT

17-08-07 WELDING LOAD OUT LIFTING PADEYE

18-08-07 SWITCHGEAR ROOM PRECOMMISSIONING IN PROGRESS

Page 202: Full Version of SCDR-A Close-Out Report(Dated051107)

19-08-07 INSTRUMENT LOCAL ELECTRICAL ROOM EQUIPMENT PRECOMMISSIONING

20-08-07 SC PRODUCTION MANIFOLD REINSTALLMENT 20 BAR HYDROTEST

21-08-07 FRESH WATER PUMP SUCTION STRAINER

Page 203: Full Version of SCDR-A Close-Out Report(Dated051107)

22-08-07 INSTRUMENT LOCAL ELECTRICAL ROOM PRECOM.

23-08-07 HVAC TESTING & COMMISSIONING

24-08-07 DESCUFFOLDING IN PROGRESS

Page 204: Full Version of SCDR-A Close-Out Report(Dated051107)

25-08-07 FRESH WATER PUMP ALIGNMENT WORK IN PROGRESS

26-08-07 MAIN DECK SAFETY APPLIANCES

27-08-07 SC PRODUCTION MANIFOLD PACKAGE (TP-PG-019A) HYDROTESTING 190 BAR

Page 205: Full Version of SCDR-A Close-Out Report(Dated051107)

28-08-07 MUSTER AREA SIGNBOARD @ CELLAR DECK

29-08-07 WELDING LOADOUT LIFTING PADEYE @ ROW 3A

30-08-07 BELOW CELLAR DECK DESCUFFOLDING IN PROGRESS

Page 206: Full Version of SCDR-A Close-Out Report(Dated051107)

01-09-08 LOADOUT PREPARATION (LIFTIG SHACKLES)

02-09-07 LOADOUT PREPARATION

(LIFTIG STRING WIRE)

03-09-07 INTERMEDIATE PLATFORM RADIATION SHIELD

Page 207: Full Version of SCDR-A Close-Out Report(Dated051107)

04-09-07 CELLAR DECK SC PRODUCTION MANIFOLD

05-09-07 CELLAR DECK 0.5 TON SWING JIG CRANE

06-09-07 ‘MPI’ LOADOUT LIFTING PADEYE WELDING JOINTS

Page 208: Full Version of SCDR-A Close-Out Report(Dated051107)

07-09-07 MEZZAININE DECK WELLHEAD MUD WALL

08-09-07 EASTERN KINGDOM ‘FLAT TOP BARGE’ARRIVED @ QUAY-1

09-09-07 ASIAN HERCULES ARRIVED @ QUAY 1

Page 209: Full Version of SCDR-A Close-Out Report(Dated051107)

10-09-07 INSTALLING GRILLEAGES ON EASTERN KINGDOM (FTB)

11-09-07 SCDR-A TOPSIDES MODULE COMPLETELY LIFT UP BY ASIAN HERCULES II (3200 MT)

11-09-07 SCDR-A TOPSIDES LOADOUT ONTO EASTERN KINGDOM (FLAT TOP BARGE)

Page 210: Full Version of SCDR-A Close-Out Report(Dated051107)

12-09-07 SEAFASTENING WORKS IN PROGRESS

13-09-07 WELDING SEAFASTENING STRUCTURES

14-09-07 PACK SHIPLOOSE ITEMS

Page 211: Full Version of SCDR-A Close-Out Report(Dated051107)

15-09-07 TEMPORARY WELD UP GRILLAGE & TOPSIDE STABBING CONE

16-09-07 ‘UT’ & ‘MPI’ SEAFASTENING STRUCTURE WELDING JOINTS

17-09-07 SHIPLOOSE (GRE PIPE SPOOLS) PACK IN CONTAINER

Page 212: Full Version of SCDR-A Close-Out Report(Dated051107)

18-09-07 SHIPLOOSE

(HANDRAILS & CONDUCTOR PILES)

19-09-07 SHIPLOOSE

(8’’ x 150’ x 5 LENGTHS/PACK x PP ROPE x BOTH END CANVAS EYE)

20-09-07 SEAFASTENING SWITCHGEAR ROOM EQUIPMENTS

Page 213: Full Version of SCDR-A Close-Out Report(Dated051107)

21-09-07 W/SHOP & SHELTER ROMM SEAFASTENING

22-09-07 DECK TOILET DECORATIONS

23-09-07 WING DECK SAFETY PASSAGE

Page 214: Full Version of SCDR-A Close-Out Report(Dated051107)

24-09-07 SHIPLOOSE IN CONTAINER ONBOARD OF THE BARGE

25-09-07 SHIPLOOSE

(PART OF INTERMEDIATE PLATFORM STRUCTURE)

26-09-07 OFF SHORE CONTAINER 4 NOS.

Page 215: Full Version of SCDR-A Close-Out Report(Dated051107)

27-09-07 SCDR-A TOPSIDES ON THE BARGE BEFORE SAILAWAY

27-09-07 SCDR-A TOPSIDES SAILAWAY