functional/budget specification ehn1 extension: infrastructure (wg2) mats wilhelmsson en/mef 4...

Download Functional/Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson EN/MEF 4 November 2015

If you can't read please download the document

Upload: arabella-hopkins

Post on 18-Jan-2018

218 views

Category:

Documents


0 download

DESCRIPTION

Work units - infrastructure PBS-IDTitleGroup IN.2.1Ventilation, heating and air-conditioningEN-CV IN.2.2Fluids- and water coolingEN-CV IN.2.3Electrical infrastructure and lightsEN-EL IN.2.4Counting roomsEN-MEF IN.2.5Gas networksEN-MEF ÎN.2.6Metal structures ΕΝ-MEF or GS (tbc) IN.2.7DoorsEN-MEF IN.2.8Alarms- and detectionGS-ASE IN.2.9Personnel accessGS-ASE IN.2.10IT-networksIT-CO IN.2.11Transport- and handlingEN-HE Total Project contingency (10%) Total request

TRANSCRIPT

Functional/Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson EN/MEF 4 November 2015 The project is devided in 4 parts: EHN1 North Wall dismantling (WG1) EHN1 extension building infrastructure (WG2) Extension of the H2 and H4 beam lines (WG3) Installation of detectors and associated infrastructure (WG4) Fuctional specification: Edms: Budget specification: Edms: Work units - infrastructure PBS-IDTitleGroup IN.2.1Ventilation, heating and air-conditioningEN-CV IN.2.2Fluids- and water coolingEN-CV IN.2.3Electrical infrastructure and lightsEN-EL IN.2.4Counting roomsEN-MEF IN.2.5Gas networksEN-MEF N.2.6Metal structures -MEF or GS (tbc) IN.2.7DoorsEN-MEF IN.2.8Alarms- and detectionGS-ASE IN.2.9Personnel accessGS-ASE IN.2.10IT-networksIT-CO IN.2.11Transport- and handlingEN-HE Total Project contingency (10%) Total request Cooling and Ventilation Jerome Rodary Building general ventilation: adding of 2 new ventilation units total flowrate: m3/h total heating power: kW Existing ventilation unit inside EHN1 building Fire fighting water hose Argon extraction unit Fluid networks Electric infrastructure - James Devine This work unit for electric infrastructure includes consolidation up-stream of EHN1, which must be done to connect the extension. The cost sharing (proposal) is based On the surface of the extention vs. existing hall. EL will need a consolidation budget (from NA Cons) of 1488 kCHF in addition to this sum. MEF-Items A full FTE from MEF for the project coordination during the whole project. Platform jura side Counting rooms Personnel access door with card reader Neutral gas panel MEF-Items GS-ASE M Dore, R Nunes, D Vaxelaire A safety hazard assessement with HSE is in progress IT networks Federico Lerda Transport & handling - R Rinaldesi / I Ruehl Note: the two 40 ton overhead cranes are renovated on the consolidation project Infrastructure items in WG2 - Summary Funding problem EL-infrastructure Thank you ! Direct stairs Stairs tower 1 Stairs tower 3 Stairs tower 2 Passerelle 1 Passerelle 2 Passerelle 3 Passerelle 4 Passerelle 5 Passerelle 6 Platform + passerelle 7 EHN1 extension Metallic structures Layout 14 th October 2015 H4 platform Unloading quay A exist = 14500m3 A ext = 3600 m3 Consider that after the phase one, the whole extension and half of the existing hall is renovated; the sharing is (for common items): 33.2 % (extension) and 66.8 % on consolidation)