further dissemination unlimited approved for public release; library/… · foundation for...

145
Approved for Public Release; Further Dissemination Unlimited

Upload: ngotram

Post on 10-Jul-2018

225 views

Category:

Documents


0 download

TRANSCRIPT

Approved for Public Release; Further Dissemination Unlimited

By Janis D. Aardal at 5:27 pm, Sep 21, 2012

Approved for Public Release; Further Dissemination Unlimited

h3310581
Typewritten Text
h3310581
Typewritten Text
h3310581
Typewritten Text
Volume 2
h3310581
Typewritten Text
h3310581
Typewritten Text
h3310581
Typewritten Text
h3310581
Typewritten Text
h3310581
Typewritten Text

This Page Intentionally Left Blank.

h3310581
Typewritten Text
HNF-53496 Revision 0 Volume 2
h3310581
Typewritten Text

2012 Facilities Master Plan Volume 2 – Appendices

h3310581
Typewritten Text
HNF-53496 Revision 0 Volume 2
h3310581
Typewritten Text

HNF-53496, VOL 2, REV 0

ii

This Page Intentionally Left Blank.

HNF-53496, VOL2, REV 0

A-i

APPENDIX A

SECTION 1.0 SUPPORT - INTRODUCTION

HNF-53496, VOL2, REV 0

A-ii

This Page Intentionally Left Blank.

HNF-53496, VOL2, REV 0

A-1

APPENDIX A

SECTION 1.0 SUPPORT - INTRODUCTION

Table A-1. Contractor Facility Management by Area. (Section 1.2)

Managing Contractor by Area

# of Facilities

Gross ft2

100 Area 37 118,670

CHPRC 26 76,646

WCH 11 42,024

200E 138 922,566

CHPRC 54 233,950

MSA 25 291,229

WRPS 60 397,387

200W 112 337,712

CHPRC 86 218,517

MSA 4 9,286

Other 1 9,240

WRPS 21 100,669

300 Area 14 66,985

MSA 2 24,520

Other 3 5,544

WCH 9 36,921

400 Area 10 95,377

CHPRC 3 29,294

MSA 7 66,083

600 Area 29 241,620

CHPRC 2 3,232

MSA 8 35,522

WCH 16 195,914

WRPS 3 6,952

Richland 23 556,152

CHPRC 1 94,127

MSA 14 278,302

Other 2 31,955

WCH 3 62,118

WRPS 3 89,650

Total 364 2,339,082

HNF-53496, VOL2, REV 0

A-2

Influencing Referenced Documents (see Section 1.7 of FMP)

The following briefly highlights key documents that influence the FMP.

2015 Vision Hanford Site Cleanup:

Hanford Site cleanup is performed in accordance with the Hanford Federal Facility Agreement

and Consent Order (Tri-Party Agreement or “TPA”), an agreement between DOE, the

Washington State Department of Ecology (Ecology), and the U.S. Environmental Protection

Agency (EPA). It provides an agreed plan and schedule to clean up the Site in accordance with

the Comprehensive Environmental Response, Compensation and

Liability Act of 1980 and the Resource Conservation and

Recovery Act of 19764. The 2015 Vision Hanford Site Cleanup

(“2015 Vision) provides a roadmap for finishing cleanup

activities within the River Corridor by 2015. The work includes

cleanup of the 300 Area and the 100 Area. Accomplishing this

vision:

Reduces the active site footprint through cleanup from 586 to 75 mi2;

At completion, shifts emphasis and resources to full-scale cleanup of the Central Plateau

(75 mi2);

Significantly reduces long-term mortgage costs;

Reduces costs by “right sizing” Hanford’s infrastructure through a Mission Support

contract; and

Minimizes potential injury to natural resources.

Infrastructure and Services Alignment Plan:

The Infrastructure and Services Alignment Plan (ISAP) is MSA’s

strategic, high-level plan for providing infrastructure systems and

services for the Hanford lifecycle (HFN-44238 Revision 2,

Infrastructure and Services Alignment Plan [ISAP]) . It is not

intended to address daily operations or provide detailed

implementation plans but to establish the strategic foundation for

providing the infrastructure systems and services needed to support

Hanford missions in the near and long-term. The elements,

requirements, and current condition assessments, provide the

foundation for determining “right-sized” solutions to maintain the

required capacity of the infrastructure systems throughout the Hanford lifecycle.

The ISAP addresses near- and long-term requirements to support DOE’s 2015 and 2020 Visions,

and the Hanford lifecycle. The ISAP focuses on involving OHC and its DOE counterparts in

defining its infrastructure and service requirements, and documenting the current condition of the

infrastructure systems and the equipment and facilities associated with our major services.

HNF-53496, VOL2, REV 0

A-3

The Forecast of Services and System Master Plans provide additional strategic and tactical

detail. These documents combined with their associated Project plans are the implementing

documents for the ISAP.

Central Plateau Area Management Plan:

HNF-49709, Central Plateau Area Management Plan (MSA

2011)(CPAMP) is an implementing document for DOE/EIS 0222 F,

1999, Final Hanford Comprehensive Land-Use Plan Environmental

Impact Statement (HCLUP EIS) and is also considered a Master Plan

subordinate to the ISAP. This first phase of the CPAMP is focused on

assembling all the disparate sub-area master plans, then looking for

gaps and overlaps. Future revisions of the CPAMP will fill the gaps

and fix the overlaps, and help environmental organizations identify

where further National Environmental Policy Act of 1969 (NEPA)

documentation is necessary.

Strategic Direction (see Section 1.7 of FMP)

The prime contracts, environmental decision documents, and resources listed in Section Error!

Reference source not found. provide valuable direction for out-year GPF planning. The

following listing contains a high level outline of strategy sources and assumptions affecting the

GPF planning in each of the geographical areas of the Hanford Site.

Ongoing Site funding reductions have resulted in personnel reductions, which in turn have

reduced facility occupancy rates in both government-owned and -leased space. Funding

reductions have also prompted contractors to carefully consider the merits of relocating staff

from the City of Richland locations, to underutilized facilities on the Central Plateau and then

terminating lease contracts for space in Richland.

WTP will start bringing operators on board for training by 2015. Many of the WTP operations

and support staff will require office accommodations. Between 2015 and 2019 (could slide up to

three years), up to 1,400 additional personnel will need office space, preferably in the southeast

corner of the 200 East Area.

HNF-53496, VOL2, REV 0

A-4

Emerging Studies and Planning Informatino (see Section 1.8 of FMP)

Business Case Analysis for Warehouse Consolidation Pilot Project:

The Business Case Analysis for Warehouse Consolidation Pilot Project summarizes the results

of a collaborative process, with support from CHPRC, MSA, and WRPS, that recommends

changes to the current methods of storing Site materials and equipment. If implemented, an

estimated $521K annually could be saved by CHPRC and WRPS operations, and an estimated

$1M could be saved from WCH operations. The gross square footage (GSF) consumed

associated with these facilities is also displayed in Figure A-1, Appendix A.

The projected savings will be achieved through excessing or relocating unneeded material and

equipment to sufficiently eliminate leased spaced, such as 45,000 ft2 of Energy Northwest-leased

space currently used by CHPRC and WRPS.

Figure A-1. Resulting Change of Warehouse Consolidation Recommendation (Section 1.8.1).

HNF-53496, VOL2, REV 0

A-5

Building 3790 Alternative Analysis:

DOE recently approved the Building 3790 Alternative Analysis (Letter CHPRC-1202718) to

vacate and transition the facility to WCH for decommissioning, thus avoiding major repair and

upgrade costs of up to $2.3 million. MSA is proceeding with actions to relocate the current

occupants to several locations in North Richland, and the Central Plateau (see Section Error!

Reference source not found.).

Hanford Fire Department Fire Station Realignment and Consolidation Plan:

The Hanford Fire Department Fire Station Realignment and Consolidation Plan (HNF-52686)

presents the general required activities, estimated costs, and a high-level schedule for the fire

station realignment and consolidation recommendations. As cleanup operations are completed,

active operations will shrink from the Site’s initial footprint down to ~75 mi2 centered on the

Central Plateau. This concentrated focus will require the Hanford Fire Department (HFD)

emergency response to hazardous materials events, technical rescue incidents, emergency

medical situations, and fire alarms to adapt to the changing work locations, conditions, and

worker population.

Timely emergency responses rely on fire station infrastructure and location. The realignment

and consolidation plan provides an approach to implement the study’s recommendations. The

plan activities follow baseline assumptions and recommendations included in HNF-51581

(Hanford Fire Department − Fire Station Infrastructure and Deployment Evaluation), plus an

alternative option and baseline schedule for an “Accelerated Closure Schedule”, which includes:

Design and Construct a Central Plateau East Fire Station and build a new 5-bay

equipment storage building at the current 200 Area Fire Station.

Renovate and upgrade the 200 Area Fire Station.

Closure of the 100, 300, and 400 Area Fire Stations.

2012 Hanford Site Sustainability Plan:

The purpose of the Hanford Site Sustainability Plan (MSA 2012, HSSP) is to promote economic,

environmental, and social sustainability for the Hanford Site, and support the long-term success

of its missions. The HSSP includes findings of the 2007 FMP. The seven overall goals are to:

1. Achieve measurable and verifiable energy, water, petroleum

fuel, and GHG emissions reductions.

2. Achieve responsible use and disposal of materials and

resources.

3. Achieve high-performance building design and operations.

4. Support cost-effective facilities, utilities, services, and

program management.

HNF-53496, VOL2, REV 0

A-6

5. Explore potential use of onsite renewable energy.

6. Engage our employees so that they take personal responsibility for creating and using

sustainable practices and principles.

7. Support future sustainability projects such as energy initiative proposals that would

locate associated projects on the Hanford Site.

Water Systems Strategic Vision:

MSA is charged with supporting Site-wide footprint reduction, while

continuing to provide clean, reliable, and cost-effective water supplies

to the Site. To facilitate this responsibility, the Water System Strategic

Vision 2015 and Beyond (MSA 2012) was developed to offer

engineering solutions for the Site-wide water utility system throughout

the end of the cleanup mission. As cleanup progresses, water services

continually will be refocused to support needs in areas of new

construction, while other water service areas are closed because of

worker relocation, facility demolition, and responses to footprint

reduction.

Draft 300/400 Area Long-Term Electrical Service Study:

Another emerging study is the 300/400 Area Long-Term Electrical Service Study, currently

underway. This study evaluates and identifies the 300 Area and 400 Area current and long-term

electrical needs, keeping pace with the Hanford mission power requirements. While this study

does not identify utilization of specific GPFs, it assesses the condition of various substations and

their ability to meet long-term electrical need. The final report will discuss proposed upgrades

and replacements for each recommended option, define screening criteria, and explain

advantages and disadvantages, risks, lifecycle costs, and other information. The anticipated

publication date is early FY2013.

MSA Fleet Services Facility Out-Year Plan:

The Fleet Services Facility Out-Year Plan is a proposed engineering study that would evaluate

Fleet Services current and future customer base consistent with the Site Mission and out year

planning and determine when consolidation to the central plateau should be completed. This

engineering study is on hold, and the publication date is not known. When published, the plan

would include:

400 area demolition schedule which could affect fleet facilities in the 400 area.

Additional facilities required.

Provide potential facility options.

Provide ROM cost estimates for facility options.

HNF-53496, VOL2, REV 0

A-7

Identify cost and service impacts to south area customers if all services move to the

central plateau

Define contractual conditions for make/buy alternatives

Hanford Telecommunications and Information Technology Facility Consolidation Study:

The Hanford Telecommunications and Information Technology Facility Consolidation Study,

will determine the feasibility of reducing the number of buildings owned and utilized by MSA,

and managed by (LMSI) to support the telecommunication and information technology

infrastructure across the Site. Twenty-three buildings across the site house Hanford’s

telecommunications and information technology core infrastructure. Consolidation plans include

relocating equipment to optimal facilities, demolishing facilities as vacated, and reducing the

number of buildings to 12 by FY2015. The draft study is anticipated to be published in

fall 2012.

HNF-53496, VOL2, REV 0

A-8

This Page Intentionally Left Blank.

HNF-53496, VOL2, REV 0

B-i

APPENDIX B

SECTION 3.0 SUPPORT – LONG-TERM VISION

HNF-53496, VOL2, REV 0

B-ii

This Page Intentionally Left Blank.

HNF-53496, VOL2, REV 0

B-1

APPENDIX B

SECTION 3.0 SUPPORT – LONG-TERM VISION

Installation costs for each new building category (office, warehouse, and shop) were estimated

from typical construction costs, within that specific category, as stated in R.S. Means Square

Foot Cost Database (2012).

Site work and utilities costs were based on 30% (as an allowance) of the building construction

costs. Adders were applied to the building, site work and utilities to reflect an average cost for an

MSA Basic Ordering Agreement (BOA) subcontractor to perform the work. Adders include:

General Requirements (20%), OH&P (26.5%), Bond & Insurance (3%) and B&O tax (0.48%).

Additional MSA support cost where applied, based on the average BOAs estimated cost, to cover

Engineering/Design (10%), PM/CM/Contract Management (9%), Project Closeout (1%), Other

Project Costs (5%).

Table B-1. Contractor-Planned D&D Activities. (Section 3.1.4)

Year Planned D&D Offices Shop Warehouse

# of Fac. Gross ft2 # of Fac. Gross ft2 # of Fac. Gross ft2

CHPRC 18 44,484

2012 1 2,772

2014 3 6,696

2015 1 9,240

2016 5 7,560

2017 2 5,280

2018 6 12,936

MSA 2 20,648 1 20,866

2012 1 18,800

2013 1 1,848 1 20,866

WCH 12 53,393 1 12,000

2012 3 17,292 1 12,000

2013 8 13,452

2014 1 22,649

WRPS 1 1,344

2013 1 1,344

Total 33 119,869 1 20,866 1 12,000

This Page Intentionally Left Blank.

HNF-53496, VOL2, REV 0

B-2

Table B-2. Facilities at End-of-Life. (Section 3.2).

Projects Managed by Contractor

Project Mission End Dates

2015 2017 2020 2022 2040 2047 2048 2049 2050 N/A Total

CHPRC 9 0 6 1 7 36 6 10 9 9 11

CHPRC Landlord 8 4 1 5 36 6 9 4 3 8

Engineering, Projects & Construction

General Office Space

PFP Project 2

Sludge Treatment Project 1

Soil & Groundwater Remediation 1

Surveillance and Maintenance 1 1 2

Waste & Fuels 1 3 6 2

MSA 1 9 0 0 0 0 0 7 0 0 0

General Office Space 1 7 1

General Shop Space 1 3

General Warehouse 1 3

Other 7 10 1 8 0 0 0 0 0 0 0

General Office Space 4 8 1

General Warehouse 7

VIT Plant 3 2 1

WCH 18 20 7 9 7 36 6 17 9 9 11

D&D End of Contract 1 1

ERDF End of Contract 17 19 7 9 7 36 6 17 9 9 11

WRPS 8 0 6 1 5 36 6 9 4 3 8

200E Tank Farms 8 4 1 5 36 6 9 4 3 8

200W Tank Farms

WTP Operations

Total 43 39 20 19 19 108 18 43 22 21 30

HNF-53496, VOL2, REV 0

C-i

APPENDIX C

SECTION 4.0 SUPPORT – DATA ACQUISITION

HNF-53496, VOL2, REV 0

C-ii

This Page Intentionally Left Blank

HNF-53496, VOL2, REV 0

C-1

APPENDIX C

SECTION 4.0 SUPPORT – DATA ACQUISITION

Consolidating Existing Facility Databases (see Section 4.1)_

FIMS: The Facilities Information Management System (FIMS) is the "corporate" real property

database for the Department of Energy (fimsinfo.doe.gov). The DOE Headquarters (HQ)

utilizes FIMS as a tool that assist in managing corporate physical assets. FIMS is the DOE's

corporate real property database for real property as required by DOE O 430.1B, Real Property

Asset Management.

DOE CAS: Based on the Condition Assessment Survey (CAS) Program, Deficiency Standards

& Inspections Methods Manual, or “CAS Manual” (DOE 2011), CAS inspections provide DOE

with overall assessments of its facilities, and the surveys provide data used by Facility

Information FIMS to identify deferred maintenance costs. At the Hanford Site, a modified

Hanford-specific CAS is used to assess the current material condition of its facilities, structures,

systems and equipment by reporting maintenance deficiencies. Table C-1 in this Appendix

summarizes condition items of most concern to the Hanford Site.

Care-Taker: Care-Taker maintains the official site list for facilities and manages the office

space for MSA’s Occupancy Pool (www3.rl.gov/care/OUO.asp). CareTaker is used for

billing organizations for the space they occupy. Caretaker identifies specific facility information

such as Building Identification, Assigned Project, Location Address, Building Manager, and

Building Administrator, and several other information fields to adequately describe building

characteristics.

Site Structure List: Land and Facilities Management supports site cleanup for DOE by

maintaining a set of cleanup objects that should be scheduled and budgeted through their life-

cycle to final disposition. Monitoring the disposition of cleanup objects is one of the metrics for

determining cleanup progress.

The FMP data set was developed by integrating information four the key sources noted above

and serves as the baseline data for the Facility Master Plan.

HNF-53496 Revision 0

C-2

Table C-1. DOE Standard System Design Life Table. (Section 4.1)

System/ Component

Item Description

Hanfo

rd A

dju

ste

d L

ife

*

CA

S L

ifecycle

Woo

d-f

ram

e H

ouse

Dura

bili

ty &

Dis

aste

r Is

sues

Confe

rence,

266

4

US

DA

Fore

st

Serv

ice

Sta

te o

f W

isconsin

Cost m

ode

ling L

imite

d *

AT

D Insp

ectio

n

Chart

ere

d Institu

tion

of

Build

ing S

erv

ices

US

De

part

ment

of H

ousin

g

and U

rban D

evelo

pm

ent

Nationa

l A

ssocia

tion o

f

Hom

e B

uild

ers

Expected Life in Years

HVAC Central air 20 15 15 15 16 11.5 15 15 15

Window-mounted units 15 10 10 15 12.5 10

Forced air, heat pump (permanent facilities)

20 15 15 16 16

Forced air, heat pump (trailers) 15 12

Unit Heater, Electric 20 20 13 25 12 10

Roofing Asphalt shingle 20 20 15 20 30 22.5

Metal 50 50 20 40

Built-up roof (BUR)

(membrane)

20 20 12 15 30

Building Structure

Wood framed 65 50 51.6 69

Concrete (pre-cast) 90 75 87.2 81

Steel 90 75 77.3 83

CMU/masonry 90 75 77.5

Mobile trailer 30 30

Footnote:

* Adjusted for Hanford Conditions.

HNF-53496 Revision 0

C-3

Data Calls & Workshops (see Section 4.2)

On May 8, 2012, MSA L&FM forwarded an introductory correspondence to facility

management representatives of each prime contractor to announce the 2012 Facility Master Plan

(FMP) project. The introduction was forwarded by email and included the following text:

Email Date: May 8, 2012 Subject: 2012 Facility Master Plan Introduction

Greetings Managers,

Mission Support Alliance - Land and Facilities Management (L&FM), working on behalf of

DOE-RL, is kicking off efforts to develop a site-wide facility master plan. The 2012 Facility

Master Plan (FMP) is intended to be a comprehensive facility planning tool which compares

site-wide general purpose facility assets with long term programmatic cleanup and operating

requirements. The FMP is a key element of the Mission Support Alliance’s Infrastructure

Services and Alignment Plan (ISAP). MSA will be interfacing with DOE contractors over the

next 5 months exchanging information and formulating recommendations.

Shortly, Facility Managers will receive correspondence requesting review of your organization’s

general purpose facilities. Accordingly, an EXCEL data set will be attached which contains

information for facilities assigned to each Facility Manager. In addition to the data set, a web-

link will be provided which links to a short facility questionnaire. The questionnaire was

designed to assess your program’s current and future general purpose facility needs. Facility

Managers will be asked to review the data set and complete the questionnaire. MSA L&FM will

compile the responses and review the information with the Facility Managers to ensure general

purpose facility current and future requirements will be fulfilled. If you have any questions,

please contact David Havens (FMP Project Lead) of my staff.

We appreciate you taking time out of your busy day.

Thank you in advance,

Clark Stolle,

Manager, MSA Land and Facility Management

HNF-53496 Revision 0

C-4

On May 8, 2012, the FMP Team requested participation from the WRPS Facility Managers to

collaborate on building an accurate utilization database facilities. This request was forwarded as

an email, shown below.

Email Date: May 8, 2012 Subject: 2012 Facility Master Plan Data Call Announcement - WRPS Facilities

WRPS Facility Managers,

As announced earlier, Mission Support Alliance-Land and Facilities Management

(L&FM) is developing the 2012 Facility Master Plan (FMP). The FMP is intended to

be a comprehensive facility planning tool which compares site-wide general purpose

facility assets with long-term programmatic and operational cleanup requirements. As

part of the FMP data acquisition phase, MSA-L&FM needs your input to maintain

accurate facility information and to identify additional facility requirements.

You are receiving this email because you are one of the assigned Facility Managers

for DOE owned or leased facilities at the Hanford Site. MSA received feedback from

CHPRC, MSA, WCH and WRPS indicating that one Facility Manager will respond to

facility inquiries on behalf of their respective company. The Facility Manager

respondents are as follows:

• CHPRC: Rick Dahlin

• MSA: Clark Stolle – MSA General Occupancy Facilities

• LMSI: Roy Nearing – MSA IT Facilities

• MSA: Steve Shupe – MSA Shops

• MSA: John Horton/Jim Chandler-MSA Warehouses

• WCH: Connie Krull

• WRPS: Monte Farner/James Devere

Over the next couple weeks, Dave Havens, of my staff, will schedule one-on-one

workshops to assist with reviewing the attached data set and responding to the below

questionnaire as outlined in the following steps:

Step 1: Attached to this correspondence is a data set (Microsoft Excel format)

which includes general purpose facility information assigned to your company.

Please review the attached facility dataset, correct as appropriate, and bring any

noted changes to the upcoming scheduled workshop.

Step 2: A web-link is provided to access a facility questionnaire. Your answers to

the questionnaire are critical to assess existing facility’s effectiveness compared to

programmatic current and future clean-up requirements. Please click on the web-

link (http://msasp.rl.gov/sil/flm/SitePages/Facility%20Master%20Plan.aspx ) to

access and review the on-line facility questionnaire. L&FM will assist you with

the questionnaire responses during the upcoming scheduled workshop.

HNF-53496 Revision 0

C-5

When complete, L&FM will compile the information. We will work with the

designated company representatives to address fulfilling your organization’s current

and future requirements. If you have any questions, please contact Dave Havens

(FMP Project Lead) of my staff. We appreciate you taking the time to support this

effort. Your input is vital for Hanford facility planning purposes.

Thank you again for your participation,

Clark Stolle,

Manager, MSA Land and Facility Management

Following these communications, workshops were held with facility managers and subject

matter experts (SMEs). The survey questions discussed and summarized in Section 4.2 were

reviewed during the workshops, although follow-up communications were requested to fill any

gaps in information. The complete set of questions asked during the workshops are included in

Table C-2 in this Appendix. Responses are summarizes in Table C-3.

After the workshops, MSA L&FM returned revised spreadsheets to the facility managers for

their review and editing. These review request emails were forwarded on June 11, 2012, MSA

L&FM. An example of that review request is presented below.

Email Date: June 11, 2012

Subject: Facility Master Plan - WRPS-Rev1 (6-5-2012) .xlsx

Monte and James,

Attached is the updated general purpose facility data set revised from our last workshop. There

are a few fields still to be completed as we discussed in the workshop. Specifically, we need

“Forecasted Vacate Date” [column O], “Current Utilization” [column S], plus the

contamination fields (Y/N response) of Asbestos [column V], Beryllium [column W] and Other

Contamination [column X] fields filled out. If you don’t have any contaminated facilities, just

state so on your reply and we will fill in those fields accordingly. We also don’t have any data

for MO-158. So if you can provide some “intel” on this trailer, that would be great. We are

planning to have the data back from all contractors by the end of the week where we will start

compiling the data. If you are interested, we’ll send you a copy of the compiled data set for your

use.

Thanks again for your participation, you’ve been great!

David Havens PMP, RCDD

Facility Master Plan Lead

MSA Land and Facility Management

509.376.9770 office

509.438.6055 cell

HNF-53496 Revision 0

C-6

Table C-2. Online Automated Survey Questions. (Section 4.2)

Subject Matter Expert Survey Questions

1 of 10. When reviewing your assigned facilities, is there an existing facility that does not meet your group’s current cleanup mission requirements?

1.1a. What is the Facility ID/Number that presently does not meet your group’s current clean-up requirement?

1.1b. Why doesn’t the identified facility meet your current clean-up requirement?

1.1b2. Please Explain

1.1c. What facility type would better meet your group’s current cleanup requirements, please select the new facility type.

1.1d. What area would this facility need to be located?

1.1e. What would be the size of the facility (square footage)?

1.1f. Briefly explain the facility configuration or condition changes that would better meet your group's clean-up requirements

1.2. Is there another existing facility that does not meet your group’s current cleanup requirements? Note: a. If the response entered is “yes”, the survey loops back around to the same questions as asked in 1.1a through 1.2, until the

response entered is “no”. b. If the response entered is “no”, then the user is transitioned to Question 2 of 10. c. If a “yes” response is entered more than four times, then the survey redirects the user to continue additional entries for Question 1

by clicking on the “Question 1” button on the survey home page.

2 of 10. When reviewing your assigned facilities, are there additional facility requirements that are not being met by the assigned existing facilities?

2.1a. What type of facility would be required to meet your group’s additional facility requirements (current period of time)?

2.1b. How much additional space (square footage) is needed to meet the additional facility space noted above?

2.1c. What area would the additional space required to be located?

2.1d. What is the reason for the additional space? Note: Entering a response of “yes” cycles the user through Questions 2.1a through 2.1d for a total of 10 facility entries. The user is

then transitioned to Question 2.2.

2.2. Are there additional facility requirements beyond the above noted requirements that are not being met by your existing facilities?

3 of 10. When reviewing your assigned facilities, are there forecasted facility requirements that are not currently being met by the existing assigned facilities?

3.1a. What year would the additional facility assets by required?

3.1b. What is the facility type that would be required?

3.1c. What is the size of the forecasted facility (in terms of square feet)?

3.1d. What area would the forecasted facility need to be located?

3.1e. What is the reason for the required space? Note: Entering a response of “yes” cycles the user through Questions 3.1a through 3.1e for a total of 10 facility entries. The user is

then transitioned to Question 3.10f.

3.10f. If there are additional forecasted facility requirements that are not currently being met by the existing assigned facilities, Please fill out the additional entries using the Question #1 Button on the introduction page.

4 of 10. When reviewing your assigned facilities, are there facilities that are not currently being fully utilized?

4.1a. What is the Facility ID?

4.1b. What is the estimated percentage of the facility being underutilized (%)?

4.1c. Can the underutilized space be made available for other DOE contractors?

4.1d. What is the reason for the space availability?

4.1d. Are there other facilities that are not currently being fully utilized? Note: Entering a response of “yes” cycles the user through Questions 4.1a through 4.1d for a total of five facility entries. The user is

then transitioned to Question 4.5e.

4.5e. Are there other facilities that are not currently being fully utilized? If so please add them by clicking on the Additional Question 4 on the introduction page. Please complete this questionnaire first.

5 of 10. When reviewing your assigned facilities, is there any facility that is forecasted not to be fully utilized in the future?

5.1a. What is the Facility ID?

5.1b. What is the estimated percentage of the forecasted underutilized (%)?

5.1c. How much space (in terms of square footage) will be available due to the forecasted changes?

5.1d. What year is the forecasted underutilized space expected to occur?

5.1e. What is the reason for the forecasted underutilization? Note: Entering a response of “yes” cycles the user through Questions 5.1a through 5.1e for a total of five facility entries. The user is

then transitioned to Question 5.5f.

5.5f. Is there another facility in addition to the facility noted above? If so please add them by clicking on the Additional Question 5 on the introduction page. Please complete this questionnaire first.

HNF-53496 Revision 0

C-7

6 of 10. Do you have any existing facilities that have major deficiencies? A deficiency is defined as a single or combined set of elements that will cost at least $50K (total cost) to resolve, replace or initiate new action.

6.1a. Facility ID:

6.1b. Deficiency Description:

6.1c. Select the category that best applies to

6.1d. Graded Priority:

7 of 10. Do you have any facilities containing asbestos?

7.1a. Please enter the Facility ID:

7.5b. Do you have any facilities containing asbestos? Please fill out the additional entries using the Question #7 Button

8 of 10. Do you have any facilities containing Beryllium?

8.1a. Please enter the Facility ID containing Beryllium:

9 of 10. Do you have any facilities containing other contamination?

9.1a. Please enter the Facility ID containing other contamination:

9.1b. What other type of contamination (chemical, radiation, mold, etc.)?

9.5c. Do you have another facility containing other contamination? Please fill out the additional entries using the Question #9 Button

Table C-3. Responses to Online Automated Questionnaire. (Section 4.2)

Questions Facility Managers Ostrander

MSA Krull WCH

Horton MSA

Farner WRPS

Dahlin CHPRC

1 of 10 When reviewing your assigned facilities, is there an existing facility that does not meet your group’s current cleanup mission requirements?

No No Yes Yes No

1.1a. What is the Facility ID/Number that presently does not meet your group’s current cleanup requirement?

- - MO315 639 CULLOM -

1.1b. Why doesn’t the identified facility meet your current clean-up requirement?

- - Facility too small

Consolidate One System engineers in one location

-

1.1b2. Please Explain - - - Relocate ~100 people to support One System WRPS engineering.

-

1.1c. What facility type would better meet your group’s current cleanup requirements, please select the new facility type.

- - - Office -

1.1d. What area would this facility need to be located?

- - - - -

1.1e. What would be the size of the facility (square footage)?

- - Unspecified. 22886 -

1.1f Briefly explain the facility configuration or condition changes that would better meet your group's clean-up requirements.

- - - - -

1.2 Is there another existing facility that does not meet your group’s current cleanup requirements?

No No No No No

2 of 10 When reviewing your assigned facilities, are there additional facility requirements that are not being met by the assigned existing facilities?

Yes No No Yes No

2.1a. What type of facility would be required to meet your group’s additional facility requirements

Warehouse - - Office -

HNF-53496 Revision 0

C-8

Table C-3. Responses to Online Automated Questionnaire. (Section 4.2)

Questions Facility Managers Ostrander

MSA Krull WCH

Horton MSA

Farner WRPS

Dahlin CHPRC

(current period of time)?

2.1b. How much additional space (square footage) is needed to meet the additional facility space noted above?

5000 - - 37000 -

2.1c. What area would the additional space required to be located?

200E - - 200E -

2.1d. What is the reason for the additional space?

Need larger, permanent storage structure to protect materials and equipment (replace CONEX Boxes).

- - WTP-WRPS Trailer Village is needed for 2018 WTP commissioning for ~200 people. Trailer number/sizes is TBD (see Larry Walker).

-

2.2: Are there additional facility requirements beyond the above noted requirements that are not being met by your existing facilities?

Yes - - Yes -

2.2a What type of facility is required to meet additional group’s requirements?

Fenced Shop Complex Area

- - Office -

2.2b How much additional space (square footage) is needed to meet the additional facility space noted above?

0 - - 11088 -

2.2c What area would the additional space required to be located?

200E - - 200E -

2.2d What is the reason for the additional space?

Security fencing needed from 4th/Baltimore to 3rd/Atlanta.

- - One System needs mobile office complex on Buffalo Ave. to support AX/AY tank farms. Need six 2x trailers at Buffalo to move workers closer to field work: two 2x trailers in 2013; four 2x trailers in 2015. Relocate 2750E workers to these trailers (~1,848 sq ft total).

-

2.3 Are there additional facility requirements beyond the above noted requirements that are not being met by your existing facilities??

Yes - - Yes -

2.3a What type of facility is required to meet additional group’s requirements?

Garage - - Warehouse -

2.3b How much additional space (square footage) is needed to meet the additional facility space noted above?

600 - - 10000 -

2.3c What area would the additional space required to be located?

200E - - 200E -

2.3d What is the reason for the additional space?

Additional space is needed to store the Paint Stripe Machine.

- - 272AW needs a new facility with a concrete flooring system to support the storage of

-

HNF-53496 Revision 0

C-9

Table C-3. Responses to Online Automated Questionnaire. (Section 4.2)

Questions Facility Managers Ostrander

MSA Krull WCH

Horton MSA

Farner WRPS

Dahlin CHPRC

80 to 100 file cabinets.

2.4 Are there additional facility requirements beyond the above noted requirements that are not being met by your existing facilities?

Yes - - No -

2.4a What type of facility is required to meet additional group’s requirements?

Gas Recovery Shelter

- - - -

2.4b How much additional space (square footage) is needed to meet the additional facility space noted above?

800 - - - -

2.4c What area would the additional space required to be located?

200E - - - -

2.4d What is the reason for the additional space?

More space needed for refrigerant gas recovery from excess equipment.

- - - -

2.5 Are there additional facility requirements beyond the above noted requirements that are not being met by your existing facilities?

No No No No No

3 of 10. When reviewing your assigned facilities, are there forecasted facility requirements that are not currently being met by the existing assigned facilities?

No No No No No

4 of 10. When reviewing your assigned facilities, are there facilities that are not currently being fully utilized?

No No No No Yes

4.1 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.1a What is the Facility ID? - - - - 1713H

4.1b What is the estimated percentage of the facility being under utilization (%)?

- - - - 40

4.1c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.1d What is the reason for the space availability?

- - - - S&GW is using for storage, needs <100% of facility.

4.2 Are there other facilities that are not currently being fully utilized?

- - - - Yes

4.2a What is the Facility ID? - - - - 440

4.2b What is the estimated percentage of the facility being under utilization(%)?

- - - - 100

4.2c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.2d What is the reason for the space availability?

- - - - Temporary waste storage use only. To be made available at end of contract in 2018.

4.3 Are there other facilities that are - - - - Yes

HNF-53496 Revision 0

C-10

Table C-3. Responses to Online Automated Questionnaire. (Section 4.2)

Questions Facility Managers Ostrander

MSA Krull WCH

Horton MSA

Farner WRPS

Dahlin CHPRC

not currently being fully utilized?

4.3a What is the Facility ID? - - - - 4732B

4.3b What is the estimated percentage of the facility being under utilization (%)?

- - - - 30

4.3c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.3d What is the reason for the space availability?

- - - - Building has electrical deficiencies. Site rock samples are stored here. Contamination has been confirmed.

4.4 Are there other facilities that are not currently being fully utilized?

- - - - Yes

4.4a What is the Facility ID? - - - - MO029

4.4b What is the estimated percentage of the facility being under utilization (%)?

- - - - 100

4.4c Can the underutilized space be made available for other DOE contractors?

- - - - No

4.4d What is the reason for the space availability?

- - - - End of Life FY2012. Can be made ready for D4.

4.5 Are there other facilities that are not currently being fully utilized?

- - - - Yes

4.5a What is the Facility ID? - - - - MO031

4.5b What is the estimated percentage of the facility being under utilization (%)?

- - - - 50

4.5c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.5d What is the reason for the space availability?

- - - - End of life 2016.

4.6 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.6a What is the Facility ID? - - - - MO1106

4.6b What is the estimated percentage of the facility being under utilization (%)?

- - - - 50

4.6c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.6d What is the reason for the space availability?

- - - - Available through end of contract.

4.7 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.7a What is the Facility ID? - - - - MO054

4.7b What is the estimated percentage of the facility being under utilization (%)?

- - - - 50

4.7c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.7d What is the reason for the - - - - End of life 2017. Has

HNF-53496 Revision 0

C-11

Table C-3. Responses to Online Automated Questionnaire. (Section 4.2)

Questions Facility Managers Ostrander

MSA Krull WCH

Horton MSA

Farner WRPS

Dahlin CHPRC

space availability? leaking and mold issues.

4.8 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.8a What is the Facility ID? - - - - MO2101

4.8b What is the estimated percentage of the facility being under utilization (%)?

- - - - 40

4.8c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.8d What is the reason for the space availability?

- - - - Candidate for consolidation and re-use at end of PFP Mission, 2017.

4.9 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.9a What is the Facility ID? - - - - MO2102

4.9b What is the estimated percentage of the facility being under utilization (%)?

- - - - 40

4.9c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.9d What is the reason for the space availability?

- - - - Candidate for consolidation and re-use at end of PFP Mission, 2017.

4.10 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.10a What is the Facility ID? - - - - MO2103

4.10b What is the estimated percentage of the facility being under utilization (%)?

- - - - 40

4.10c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.10d What is the reason for the space availability?

- - - - Candidate for consolidation and re-use at end of PFP Mission, 2017.

4.11 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.11a What is the Facility ID? - - - - MO2104

4.11b What is the estimated percentage of the facility being under utilization (%)?

- - - - 40

4.11c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.11d What is the reason for the space availability?

- - - - Candidate for consolidation and re-use at end of PFP Mission, 2017.

4.12 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.12a What is the Facility ID? - - - - MO2105

HNF-53496 Revision 0

C-12

Table C-3. Responses to Online Automated Questionnaire. (Section 4.2)

Questions Facility Managers Ostrander

MSA Krull WCH

Horton MSA

Farner WRPS

Dahlin CHPRC

4.12b What is the estimated percentage of the facility being under utilization (%)?

- - - - 40

4.12c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.12d What is the reason for the space availability?

- - - - Candidate for consolidation and re-use at end of PFP Mission, 2017.

4.13 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.13a What is the Facility ID? - - - - MO2106

4.13b What is the estimated percentage of the facility being under utilization (%)?

- - - - 40

4.13c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.13d What is the reason for the space availability?

- - - - Candidate for consolidation and re-use at end of PFP Mission, 2017.

4.14 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.14a What is the Facility ID? - - - - MO2107

4.14b What is the estimated percentage of the facility being under utilization (%)?

- - - - 40

4.14c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.14d What is the reason for the space availability?

- - - - Candidate for consolidation and re-use at end of PFP Mission, 2017.

4.15 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.15a What is the Facility ID? - - - - MO2159

4.15b What is the estimated percentage of the facility being under utilization (%)?

- - - - 40

4.15c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.15d What is the reason for the space availability?

- - - - At WRAP. Startup processing TBD. End of contract.

4.16 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.16a What is the Facility ID? - - - - MO1260

4.16b What is the estimated percentage of the facility being under utilization (%)?

- - - - 40

4.16c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

HNF-53496 Revision 0

C-13

Table C-3. Responses to Online Automated Questionnaire. (Section 4.2)

Questions Facility Managers Ostrander

MSA Krull WCH

Horton MSA

Farner WRPS

Dahlin CHPRC

4.16d What is the reason for the space availability?

- - - - End of contract 2018, will transfer to Waste & Fuels.

4.17 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.17a What is the Facility ID? - - - - MO2161

4.17b What is the estimated percentage of the facility being under utilization (%)?

- - - - 40

4.17c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.17d What is the reason for the space availability?

- - - - End of contract, will go back to Waste and Fuels.

4.18 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.18a What is the Facility ID? - - - - MO2162

4.18b What is the estimated percentage of the facility being under utilization (%)?

- - - - 40

4.18c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.18d What is the reason for the space availability?

- - - - End of contract 2018.

4.19 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.19a What is the Facility ID? - - - - MO294

4.19b What is the estimated percentage of the facility being under utilization (%)?

- - - - 50

4.19c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.19d What is the reason for the space availability?

- - - - Available through end of contract.

4.20 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.20a What is the Facility ID? - - - - MO2221

4.20b What is the estimated percentage of the facility being under utilization (%)?

- - - - 50

4.20c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.20d What is the reason for the space availability?

- - - - Available to end of contract. CHPRC consolidation candidate, X-ARRA facilities may be available in FY2013.

4.21 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.21a What is the Facility ID? - - - - MO2222

4.21b What is the estimated percentage of the facility being

- - - - 50

HNF-53496 Revision 0

C-14

Table C-3. Responses to Online Automated Questionnaire. (Section 4.2)

Questions Facility Managers Ostrander

MSA Krull WCH

Horton MSA

Farner WRPS

Dahlin CHPRC

under utilization (%)?

4.21c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.21d What is the reason for the space availability?

- - - - Available to end of contract. CHPRC consolidation candidate, X-ARRA facilities may be available in FY2013.

4.22 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.22a What is the Facility ID? - - - - MO2223

4.22b What is the estimated percentage of the facility being under utilization (%)?

- - - - 50

4.22c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.22d What is the reason for the space availability?

- - - - Available to end of contract. CHPRC consolidation candidate, X-ARRA facilities may be available in FY2013.

4.23 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.23a What is the Facility ID? - - - - MO2224

4.23b What is the estimated percentage of the facility being under utilization (%)?

- - - - 50

4.23c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.23d What is the reason for the space availability?

- - - - Available to end of contract. CHPRC consolidation candidate, X-ARRA facilities may be available in FY2013.

4.24 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.24a What is the Facility ID? - - - - MO2225

4.24b What is the estimated percentage of the facility being under utilization (%)?

- - - - 50

4.24c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.24d What is the reason for the space availability?

- - - - Available to end of contract. CHPRC consolidation candidate, X-ARRA facilities may be available in FY2013.

4.25 Are there any facilities that are not currently being fully utilized?

- - - - Yes

HNF-53496 Revision 0

C-15

Table C-3. Responses to Online Automated Questionnaire. (Section 4.2)

Questions Facility Managers Ostrander

MSA Krull WCH

Horton MSA

Farner WRPS

Dahlin CHPRC

4.25a What is the Facility ID? - - - - MO2226

4.25b What is the estimated percentage of the facility being under utilization (%)?

- - - - 50

4.25c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.25d What is the reason for the space availability?

- - - - Available to end of contract. CHPRC consolidation candidate, X-ARRA facilities may be available in FY2013.

4.26 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.26a What is the Facility ID? - - - - MO2227

4.26b What is the estimated percentage of the facility being under utilization (%)?

- - - - 50

4.26c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.26d What is the reason for the space availability?

- - - - Available to end of contract. CHPRC consolidation candidate, X-ARRA facilities may be available in FY2013.

4.27 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.27a What is the Facility ID? - - - - MO2228

4.27b What is the estimated percentage of the facility being under utilization (%)?

- - - - 50

4.27c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.27d What is the reason for the space availability?

- - - - Available to end of contract. CHPRC consolidation candidate, X-ARRA facilities may be available in FY2013.

4.28 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.28a What is the Facility ID? - - - - MO2229

4.28b What is the estimated percentage of the facility being under utilization (%)?

- - - - 50

4.28c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.28d What is the reason for the space availability?

- - - - Available to end of contract. CHPRC consolidation candidate, X-ARRA facilities may be

HNF-53496 Revision 0

C-16

Table C-3. Responses to Online Automated Questionnaire. (Section 4.2)

Questions Facility Managers Ostrander

MSA Krull WCH

Horton MSA

Farner WRPS

Dahlin CHPRC

available in FY2013.

4.29 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.29a What is the Facility ID? - - - - MO223

4.29b What is the estimated percentage of the facility being under utilization (%)?

- - - - 50

4.29c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.29d What is the reason for the space availability?

- - - - Available to end of contract. CHPRC consolidation candidate, X-ARRA facilities may be available in FY2013.

4.30 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.30a What is the Facility ID? - - - - MO248

4.30b What is the estimated percentage of the facility being under utilization (%)?

- - - - 100

4.30c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.30d What is the reason for the space availability?

- - - - End of Life. Don't know when facility will be used again, when Burial Ground retrieval starts. Rick to validate.

4.31 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.31a What is the Facility ID? - - - - MO249

4.31b What is the estimated percentage of the facility being under utilization (%)?

- - - - 50

4.31c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.31d What is the reason for the space availability?

- - - - Candidate for consolidation and re-use at end of PFP Mission.

4.32 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.32a What is the Facility ID? - - - - MO254

4.32b What is the estimated percentage of the facility being under utilization (%)?

- - - - 30

4.32c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.32d What is the reason for the space availability?

- - - - Will be used beyond end of contract.

4.33 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.33a What is the Facility ID? - - - - MO277

HNF-53496 Revision 0

C-17

Table C-3. Responses to Online Automated Questionnaire. (Section 4.2)

Questions Facility Managers Ostrander

MSA Krull WCH

Horton MSA

Farner WRPS

Dahlin CHPRC

4.33b What is the estimated percentage of the facility being under utilization (%)?

- - - - 30

4.33c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.33d What is the reason for the space availability?

- - - - Candidate for consolidation and re-use at end of PFP Mission.

4.34 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.34a What is the Facility ID? - - - - MO277

4.34b What is the estimated percentage of the facility being under utilization (%)?

- - - - 50

4.34c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.34d What is the reason for the space availability?

- - - - Available through end of contract.

4.35 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.35a What is the Facility ID? - - - - MO278

4.35b What is the estimated percentage of the facility being under utilization (%)?

- - - - 70

4.35c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.35d What is the reason for the space availability?

- - - - Available through end of contract.

4.36 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.36a What is the Facility ID? - - - - MO281

4.36b What is the estimated percentage of the facility being under utilization (%)?

- - - - 50

4.36c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.36d What is the reason for the space availability?

- - - - Available through end of contract.

4.37 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.37a What is the Facility ID? - - - - MO285

4.37b What is the estimated percentage of the facility being under utilization (%)?

- - - - 100

4.37c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.37d What is the reason for the space availability?

- - - - Available through end of contract. MSA.

4.38 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.38a What is the Facility ID? - - - - MO287

HNF-53496 Revision 0

C-18

Table C-3. Responses to Online Automated Questionnaire. (Section 4.2)

Questions Facility Managers Ostrander

MSA Krull WCH

Horton MSA

Farner WRPS

Dahlin CHPRC

4.38b What is the estimated percentage of the facility being under utilization (%)?

- - - - 90

4.38c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.38d What is the reason for the space availability?

- - - - Available through end of contract.

4.39 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.39a What is the Facility ID? - - - - MO293

4.39b What is the estimated percentage of the facility being under utilization (%)?

- - - - 80

4.39c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.39d What is the reason for the space availability?

- - - - Short-term availability. Scheduled for D4 in FY2014.

4.40 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.40a What is the Facility ID? - - - - MO410

4.40b What is the estimated percentage of the facility being under utilization (%)?

- - - - 90

4.40c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.40d What is the reason for the space availability?

- - - - Occupancy/use will follow B-Plant schedule. Unoccupied currently. Used for some storage.

4.41 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.41a What is the Facility ID? - - - - MO413

4.41b What is the estimated percentage of the facility being under utilization (%)?

- - - - 100

4.41c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.41d What is the reason for the space availability?

- - - - Available for transfer now for re-use.

4.42 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.42a What is the Facility ID? - - - - MO438

4.42b What is the estimated percentage of the facility being under utilization (%)?

- - - - 40

4.42c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.42d What is the reason for the space availability?

- - - - TBD.

4.43 Are there any facilities that are - - - - Yes

HNF-53496 Revision 0

C-19

Table C-3. Responses to Online Automated Questionnaire. (Section 4.2)

Questions Facility Managers Ostrander

MSA Krull WCH

Horton MSA

Farner WRPS

Dahlin CHPRC

not currently being fully utilized?

4.43a What is the Facility ID? - - - - MO442

4.43b What is the estimated percentage of the facility being under utilization (%)?

- - - - 50

4.43c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.43d What is the reason for the space availability?

- - - - D4 at end of project in 2014.

4.44 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.44a What is the Facility ID? - - - - MO500

4.44b What is the estimated percentage of the facility being under utilization (%)?

- - - - 30

4.44c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.44d What is the reason for the space availability?

- - - - Use past end of contract. 100-K Area D4.

4.45 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.45a What is the Facility ID? - - - - MO720

4.45b What is the estimated percentage of the facility being under utilization (%)?

- - - - 60

4.45c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.45d What is the reason for the space availability?

- - - - Available through end of contract.

4.46 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.46a What is the Facility ID? - - - - MO723

4.46b What is the estimated percentage of the facility being under utilization (%)?

- - - - 10

4.46c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.46d What is the reason for the space availability?

- - - - Used for storing cannisters.

4.47 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.47a What is the Facility ID? - - - - MO743

4.47b What is the estimated percentage of the facility being under utilization (%)?

- - - - 50

4.47c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.47d What is the reason for the space availability?

- - - - Use through end of contract.

4.48 Are there any facilities that are not currently being fully utilized?

- - - - Yes

HNF-53496 Revision 0

C-20

Table C-3. Responses to Online Automated Questionnaire. (Section 4.2)

Questions Facility Managers Ostrander

MSA Krull WCH

Horton MSA

Farner WRPS

Dahlin CHPRC

4.48a What is the Facility ID? - - - - MO760

4.48b What is the estimated percentage of the facility being under utilization (%)?

- - - - 90

4.48c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.48d What is the reason for the space availability?

- - - - Use through end of contract.

4.49 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.49a What is the Facility ID? - - - - MO892

4.49b What is the estimated percentage of the facility being under utilization (%)?

- - - - 100

4.49c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.49d What is the reason for the space availability?

- - - - Will follow T-Plan schedule.

4.50 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.50a What is the Facility ID? - - - - MO1107

4.50b What is the estimated percentage of the facility being under utilization (%)?

- - - - 50

4.50c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.50d What is the reason for the space availability?

- - - - Available through end of contract.

4.51 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.51a What is the Facility ID? - - - - MO1108

4.51b What is the estimated percentage of the facility being under utilization (%)?

- - - - 50

4.51c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.51d What is the reason for the space availability?

- - - - Available through end of FY2013.

4.52 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.52a What is the Facility ID? - - - - MO2129

4.52b What is the estimated percentage of the facility being under utilization (%)?

- - - - 50

4.52c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.52d What is the reason for the space availability?

- - - - Available through end of FY2013.

4.53 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.53a What is the Facility ID? - - - - MO2132

4.53b What is the estimated - - - - 50

HNF-53496 Revision 0

C-21

Table C-3. Responses to Online Automated Questionnaire. (Section 4.2)

Questions Facility Managers Ostrander

MSA Krull WCH

Horton MSA

Farner WRPS

Dahlin CHPRC

percentage of the facility being under utilization (%)?

4.53c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.53d What is the reason for the space availability?

- - - - Available through end of FY2013.

4.54 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.54a What is the Facility ID? - - - - MO2142

4.54b What is the estimated percentage of the facility being under utilization (%)?

- - - - 50

4.54c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.54d What is the reason for the space availability?

- - - - Available through end of FY2013.

4.55 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.55a What is the Facility ID? - - - - MO2143

4.55b What is the estimated percentage of the facility being under utilization (%)?

- - - - 50

4.55c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.55d What is the reason for the space availability?

- - - - Available through end of FY2013.

4.56 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.56a What is the Facility ID? - - - - MO2158

4.56b What is the estimated percentage of the facility being under utilization (%)?

- - - - 100

4.56c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.56d What is the reason for the space availability?

- - - - WRPS transfer.

4.57 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.57a What is the Facility ID? - - - - MO2165

4.57b What is the estimated percentage of the facility being under utilization (%)?

- - - - 50

4.57c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.57d What is the reason for the space availability?

- - - - Potentially available for use beyond end of contract.

4.58 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.58a What is the Facility ID? - - - - MO2166

4.58b What is the estimated percentage of the facility being

- - - - 50

HNF-53496 Revision 0

C-22

Table C-3. Responses to Online Automated Questionnaire. (Section 4.2)

Questions Facility Managers Ostrander

MSA Krull WCH

Horton MSA

Farner WRPS

Dahlin CHPRC

under utilization (%)?

4.58c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.58d What is the reason for the space availability?

- - - - Potentially available for use beyond end of contract.

4.59 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.59a What is the Facility ID? - - - - MO032

4.59b What is the estimated percentage of the facility being under utilization (%)?

- - - - 40

4.59c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.59d What is the reason for the space availability?

- - - - End of life 2016.

4.60 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.60a What is the Facility ID? - - - - MO2232

4.60b What is the estimated percentage of the facility being under utilization (%)?

- - - - 50

4.60c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.60d What is the reason for the space availability?

- - - - Available to end of contract. CHPRC consolidation candidate, X-ARRA facilities may be available in FY2013.

4.61 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.61a What is the Facility ID? - - - - MO917

4.61b What is the estimated percentage of the facility being under utilization (%)?

- - - - 90

4.61c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.61d What is the reason for the space availability?

- - - - D4 at end of project, 2017.

4.80 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.80a What is the Facility ID? - - - - MO2210

4.80b What is the estimated percentage of the facility being under utilization (%)?

- - - - 40

4.80c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.80d What is the reason for the space availability?

- - - - Facility will be used beyond end of contract. Connected to sewer.

4.81 Are there any facilities that are - - - - Yes

HNF-53496 Revision 0

C-23

Table C-3. Responses to Online Automated Questionnaire. (Section 4.2)

Questions Facility Managers Ostrander

MSA Krull WCH

Horton MSA

Farner WRPS

Dahlin CHPRC

not currently being fully utilized?

4.81a What is the Facility ID? - - - - MO2232

4.81b What is the estimated percentage of the facility being under utilization (%)?

- - - - 50

4.81c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.81d What is the reason for the space availability?

- - - - Facility is available through end of contract. CHPRC consolidation candidate. X-ARRA facilities may be available by FY2012.

4.82 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.82a What is the Facility ID? - - - - MO365

4.82b What is the estimated percentage of the facility being under utilization (%)?

- - - - 80

4.82c Can the underutilized space be made available for other DOE contractors?

- - - - No

4.82d What is the reason for the space availability?

- - - - At end of life.

4.83 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.83a What is the Facility ID? - - - - 2713W

4.83b What is the estimated percentage of the facility being under utilization (%)?

- - - - 100

4.83c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.83d What is the reason for the space availability?

- - - - Being transferred to S&M

4.84 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.84a What is the Facility ID? - - - - MO2218

4.84b What is the estimated percentage of the facility being under utilization (%)?

- - - - 50

4.84c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.84d What is the reason for the space availability?

- - - - Available to end of contract. CHPRC consolidation candidate, X-ARRA facilities may be available in FY2013.

4.85 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.85a What is the Facility ID? - - - - MO2233

4.85b What is the estimated percentage of the facility being

- - - - 50

HNF-53496 Revision 0

C-24

Table C-3. Responses to Online Automated Questionnaire. (Section 4.2)

Questions Facility Managers Ostrander

MSA Krull WCH

Horton MSA

Farner WRPS

Dahlin CHPRC

under utilization (%)?

4.85c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.85d What is the reason for the space availability?

- - - - Facility is available through end of contract. CHPRC consolidation candidate. X-ARRA facilities may be available by FY2012.

4.86 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.86a What is the Facility ID? - - - - MO369

4.86b What is the estimated percentage of the facility being under utilization (%)?

- - - - 80

4.86c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.86d What is the reason for the space availability?

- - - - Occupancy/use will follow T-Plant schedule, >2018.

4.87 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.87a What is the Facility ID? - - - - 2420STVCN

4.87b What is the estimated percentage of the facility being under utilization (%)?

- - - - 40

4.87c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.87d What is the reason for the space availability?

- - - - First floor available for reutilization through end of contract.

4.88 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.88a What is the Facility ID? - - - - MO2219

4.88b What is the estimated percentage of the facility being under utilization (%)?

- - - - 50

4.88c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.88d What is the reason for the space availability?

- - - - Available to end of contract. CHPRC consolidation candidate, X-ARRA facilities may be available in FY2013.

4.89 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.89a What is the Facility ID? - - - - MO234

4.89b What is the estimated percentage of the facility being under utilization (%)?

- - - - 100

4.89c Can the underutilized space - - - - Yes

HNF-53496 Revision 0

C-25

Table C-3. Responses to Online Automated Questionnaire. (Section 4.2)

Questions Facility Managers Ostrander

MSA Krull WCH

Horton MSA

Farner WRPS

Dahlin CHPRC

be made available for other DOE contractors?

4.89d What is the reason for the space availability?

- - - - Candidate for re-use.

4.90 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.90a What is the Facility ID? - - - - MO407

4.90b What is the estimated percentage of the facility being under utilization (%)?

- - - - 100

4.90c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.90d What is the reason for the space availability?

- - - - Will transfer to WRPS in 2012/

4.91 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.91a What is the Facility ID? - - - - MO1106

4.91b What is the estimated percentage of the facility being under utilization (%)?

- - - - 50

4.91c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.91d What is the reason for the space availability?

- - - - Available through end of contract.

4.92 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.92a What is the Facility ID? - - - - MO2220

4.92b What is the estimated percentage of the facility being under utilization (%)?

- - - - 50

4.92c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.92d What is the reason for the space availability?

- - - - Available to end of contract. CHPRC consolidation candidate, X-ARRA facilities may be available in FY2013.

4.93 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.93a What is the Facility ID? - - - - MO247

4.93b What is the estimated percentage of the facility being under utilization (%)?

- - - - 100

4.93c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.93d What is the reason for the space availability?

- - - - Candidate for re-use.

4.94 Are there any facilities that are not currently being fully utilized?

- - - - Yes

4.94a What is the Facility ID? - - - - MO408

4.94b What is the estimated percentage of the facility being

- - - - 90

HNF-53496 Revision 0

C-26

Table C-3. Responses to Online Automated Questionnaire. (Section 4.2)

Questions Facility Managers Ostrander

MSA Krull WCH

Horton MSA

Farner WRPS

Dahlin CHPRC

under utilization (%)?

4.94c Can the underutilized space be made available for other DOE contractors?

- - - - Yes

4.94d What is the reason for the space availability?

- - - - Occupancy/use will follow B-Plant schedule. Unoccupied currently. Used for some storage.

4.95 Are there any facilities that are not currently being fully utilized?

No No No No No

5 of 10. When reviewing your assigned facilities, is there any facility that is forecasted not to be fully utilized in the future?

No Yes No Yes No

5.1a. What is the Facility ID? - Most WCH Facilities - MO636 -

5.1b. What is the estimated percentage of the forecasted under utilization (%)?

- 100 - 100 -

5.1c. How much space (in terms of square footage) will be available due to the forecasted changes?

- N/A - 672 -

5.1d. What year is the forecasted underutilized space expected to occur?

- 2013 - 2012 -

5.1e. What is the reason for the forecasted under utilization?

- Most WCH facilities are anticipated to be demolished and removed in FY2012 or FY2013. These facilities have no future value.

- The building is vacant. MO636 will be relocated to 200E or 200W, near 732/733. Funding is needed.

-

5.2 Is there another facility in addition to the facility noted above?

- Yes - Yes -

5.2a What is the Facility ID? - 6251 - 639 Cullum -

5.2b What is the estimated percentage of the forecasted under utilization (%)?

- 100 - 100 -

5.2c How much space (in terms of square footage) will be available due to the forecasted changes?

- N/A - 18097 -

5.2d What year is the forecasted underutilized space expected to occur?

- 2015 - 2012 -

5.2e What is the reason for the forecasted under utilization?

- Near-term demolition is not scheduled. In 2015, all ERDF facilities will be transferred with scope of work to CHPRC.

- To be vacated at the end of FY2012. Personnel will be moved to PONA, 2425 Stevens.

-

5.3 Is there another facility in addition to the facility noted above?

- Yes - Yes -

5.3a What is the Facility ID? - 6260 - MO407

5.3b What is the estimated percentage of the forecasted under utilization (%)?

- 100 - 100

5.3c How much space (in terms of - N/A - 4620

HNF-53496 Revision 0

C-27

Table C-3. Responses to Online Automated Questionnaire. (Section 4.2)

Questions Facility Managers Ostrander

MSA Krull WCH

Horton MSA

Farner WRPS

Dahlin CHPRC

square footage) will be available due to the forecasted changes?

5.3d What year is the forecasted underutilized space expected to occur?

- 2015 - 2013

5.3e What is the reason for the forecasted under utilization?

- Near-term demolition is not scheduled. In 2015, all ERDF facilities will be transferred with scope of work to CHPRC.

- Being transferred from CHPRC to WRPS.

5.4 Is there another facility in addition to the facility noted above?

- Yes - Yes

5.4a What is the Facility ID? - 6618D - MO037 -

5.4b What is the estimated percentage of the forecasted under utilization (%)?

- 100 - 100 -

5.4c How much space (in terms of square footage) will be available due to the forecasted changes?

- N/A - 5544 -

5.4d What year is the forecasted underutilized space expected to occur?

- 2015 - 2013 -

5.4e What is the reason for the forecasted under utilization?

- Near-term demolition is not scheduled. In 2015, all ERDF facilities will be transferred with scope of work to CHPRC.

- Will be vacated by FY2013.

-

5.5 Is there another facility in addition to the facility noted above?

- Yes - Yes -

5.5a What is the Facility ID? - MO607 - MO409 -

5.5b What is the estimated percentage of the forecasted under utilization (%)?

- 100 - 100 -

5.5c How much space (in terms of square footage) will be available due to the forecasted changes?

- N/A - 3696 -

5.5d What year is the forecasted underutilized space expected to occur?

- 2015 - 2012 -

5.5e What is the reason for the forecasted under utilization?

- Near-term demolition is not scheduled. Facility will transfer to PRC in 2015.

- Already vacated. -

5.6 Is there another facility in addition to the facility noted above?

- Yes - Yes -

5.6a What is the Facility ID? - MO622 - MO919 -

5.6b What is the estimated percentage of the forecasted under utilization (%)?

- 100 - 100 -

5.6c How much space (in terms of square footage) will be available due to the forecasted changes?

- N/A - 1,344 -

5.6d What year is the forecasted underutilized space expected to occur?

- 2015 - 2013 -

HNF-53496 Revision 0

C-28

Table C-3. Responses to Online Automated Questionnaire. (Section 4.2)

Questions Facility Managers Ostrander

MSA Krull WCH

Horton MSA

Farner WRPS

Dahlin CHPRC

5.6e What is the reason for the forecasted under utilization?

- Near-term demolition is not scheduled. Facility will transfer to PRC in 2015.

- To be vacated in FY2013.

-

5.7 Is there another facility in addition to the facility noted above?

- Yes - Yes -

5.7a What is the Facility ID? - MO623 - MO997 -

5.7b What is the estimated percentage of the forecasted under utilization (%)?

- 100 - 100 -

5.7c How much space (in terms of square footage) will be available due to the forecasted changes?

- N/A - 1,344 -

5.7d What year is the forecasted underutilized space expected to occur?

- 2015 - 2012 -

5.7e What is the reason for the forecasted under utilization?

- Near-term demolition is not scheduled. Facility will transfer to PRC in 2015.

- Being swapped for a trailer from PRC's Trailer Fleet.

-

5.8 Is there another facility in addition to the facility noted above?

- Yes - Yes -

5.8a What is the Facility ID? - MO096 - Many WRPS Facilities -

5.8b What is the estimated percentage of the forecasted under utilization (%)?

- 100 - 100 -

5.8c How much space (in terms of square footage) will be available due to the forecasted changes?

- N/A - N/A -

5.8d What year is the forecasted underutilized space expected to occur?

- 2015 - 2013 -

5.8e What is the reason for the forecasted under utilization?

- Near-term demolition is not scheduled. Leased month-to-month.

- Many WRPS facilities are anticipated to be demolished and removed in FY2012 or FY2013. These facilities have no future value.

-

5.9 Is there another facility in addition to the facility noted above?

- Yes - No -

5.9a What is the Facility ID? - MO6114 - - -

5.9b What is the estimated percentage of the forecasted under utilization (%)?

- 100 - - -

5.9c How much space (in terms of square footage) will be available due to the forecasted changes?

- N/A - - -

5.9d What year is the forecasted underutilized space expected to occur?

- 2014 - - -

5.9e What is the reason for the forecasted under utilization?

- Utilized at 618-10 Burial Ground. Scheduled for demolition/removal in FY2014.

- - -

5.10 Is there another facility in - Yes - - -

HNF-53496 Revision 0

C-29

Table C-3. Responses to Online Automated Questionnaire. (Section 4.2)

Questions Facility Managers Ostrander

MSA Krull WCH

Horton MSA

Farner WRPS

Dahlin CHPRC

addition to the facility noted above?

5.10a What is the Facility ID? - 2620FERMI - - -

5.10b What is the estimated percentage of the forecasted under utilization (%)?

- 100 - - -

5.10c How much space (in terms of square footage) will be available due to the forecasted changes?

- N/A - - -

5.10d What year is the forecasted underutilized space expected to occur?

- 2014 - - -

5.10e What is the reason for the forecasted under utilization?

- In first of three, 1-year lease options.

- - -

5.11 Is there another facility in addition to the facility noted above?

- Yes - - -

5.11a What is the Facility ID? - 1812TD - - -

5.11b What is the estimated percentage of the forecasted under utilization (%)?

- 100 - - -

5.11c How much space (in terms of square footage) will be available due to the forecasted changes?

- N/A - - -

5.11d What year is the forecasted underutilized space expected to occur?

- 2014 - - -

5.11e What is the reason for the forecasted under utilization?

- In first of three, 1-year lease options.

- - -

5.12 Is there another facility in addition to the facility noted above?

- Yes - - -

5.12a What is the Facility ID? - 1060 - - -

5.12b What is the estimated percentage of the forecasted under utilization (%)?

- 100 - - -

5.12c How much space (in terms of square footage) will be available due to the forecasted changes?

- N/A - - -

5.12d What year is the forecasted underutilized space expected to occur?

- 2015 - - -

5.12e What is the reason for the forecasted under utilization?

- Actual disposition date is TBD. First of three, 1-yr lease options. PNNL leases 2/3 of the facility.

- - -

5.13 Is there another facility in addition to the facility noted above?

- Yes - - -

5.13a What is the Facility ID? - 6250 - - -

5.13b What is the estimated percentage of the forecasted under utilization (%)?

- 100 - - -

5.13c How much space (in terms of square footage) will be available due to the forecasted changes?

- 13718 - - -

5.13d What year is the forecasted underutilized space expected to occur?

- 2015 - - -

5.13e What is the reason for the - All ERDF facilities will - - -

HNF-53496 Revision 0

C-30

Table C-3. Responses to Online Automated Questionnaire. (Section 4.2)

Questions Facility Managers Ostrander

MSA Krull WCH

Horton MSA

Farner WRPS

Dahlin CHPRC

forecasted under utilization? transfer with work scope to DOE in 2015.

5.14 Is there another facility in addition to the facility noted above?

No No No No No

6 of 10. Do you have any existing facilities that have major deficiencies? A deficiency is defined as a single or combined set of elements that will cost at least $50K (total cost) to resolve, replace or initiate new action.

Yes No No Yes No

6.1a. Facility ID: 274E - - 2750E -

6.1b. Deficiency Description: ACM siding requires periodic maintenance. Needs appropriate future D&D management.

- - Needs new plumbing (reliability project).

-

6.1c. Select the category that best applies to

Industrial Safety - - Infrastructure -

6.1d. Graded Priority: Medium - Problem is serious but can be managed with administrative controls

- - Medium - Problem is serious but can be managed with administrative controls.

-

6.2 Is there another facility with major deficiencies in addition to the one noted above?

Yes - - Yes -

6.2a Facility ID: 2719EA - - MO-493 -

6.2b Deficiency Description: Needs new roof, AC system, and siding.

- - Remodel & replace current 4-x trailer (2,880 ft2).

-

6.2c Select the category that best applies to

Infrastructure - - Infrastructure -

6.2d Graded Priority Medium - Problem is serious but can be managed with administrative controls

- - Medium-Problem is serious but can be managed with administrative controls.

-

6.3 Is there another facility with major deficiencies in addition to the one noted above?

Yes - - Yes -

6.3a Facility ID: 2715EF - - 9 unidentified 2x trailer. -

6.3b Deficiency Description: Shop space is not insulated. Portable heaters are required in winter. No cooling system is installed for summer facility use.

- - Nine 2-wide trailers will be completely renovated and reset their current construction date and lifecycle upon completion. The nine trailers are unidentified.

-

6.3c Select the category that best applies to

Infrastructure - - Infrastructure -

6.3d Graded Priority: Low - Problem is a concern but is not serious

- - Medium - Problem is serious but can be managed with administrative controls

-

6.4 Is there another facility with No - - Yes -

HNF-53496 Revision 0

C-31

Table C-3. Responses to Online Automated Questionnaire. (Section 4.2)

Questions Facility Managers Ostrander

MSA Krull WCH

Horton MSA

Farner WRPS

Dahlin CHPRC

major deficiencies in addition to the one noted above?

6.4a Facility ID: - - - MO493 -

6.4b Deficiency Description: - - - Will be remodeled for $1.2M.

-

6.4c Does the deficiency create a Safety or Operational Productivity Impact?

- - - Infrastructure -

6.4d Graded Priority: - - - Medium - Problem is serious but can be managed with administrative controls.

-

7 of 10. Do you have any facilities containing asbestos?

Yes No No Yes No

7.1a. Please enter the Facility ID: 274E 2750E

7.2 Do you have any facilities containing asbestos?

No No No No No

8 of 10. Do you have any facilities containing Beryllium?

No No No No No

9 of 10. Do you have any facilities containing other contamination?

No No No No No

HNF-53496 Revision 0

C-32

Section 4.3 – Field Tours - Condition Assessment Surveys

Field Tour 1: WRPS General Purpose Facilities

Date: August 10, 2012

Host: James Devere

FMP Team Attendees: Cal Rinne and Dave Havens

Cal Rinne and Dave Havens met with James Devere to perform a walk-down a sampling of

WRPS general purpose facilities. These facilities represented a mixture of general purpose

facilities which are of interest to the FMP Project Team and subject to facility analysis in the

Facility Master Plan. The FMP Team requested WRPS facilitate a field tour in order to gain an

overall perspective of WRPS facilities. It was requested that the tour include the following

facilities:

Facilities Visited:

The FMP Team reviewed facilities noting condition and utilization. Below are notes taken from

the facility tour:

2750E: WRPS Office Building

• Constructed: 1980.

• Size: 100,333 ft2.

• Facility Type: Office

• General Description:

2-Story Building.

Concrete structure with metal

support framing.

4 Large Wings containing cubicles and permanent office space.

• Long-term plans: Long-term office space used for duration of Tank Operations Contract.

• August 10, 2012 Utilization:

A-Wing 100%

B-Wing 100%

C-Wing 100%

D-Wing 60% (under renovation)

Utilization Notes: Three quarters of 2750E have been renovated. WRPS currently is

completing renovations to the D-Wing 2nd floor- South. When complete, WRPS will

consolidate ~ 25 engineering staff from 274AW and several older trailers, for better

use and more efficient centralized operations.

HNF-53496 Revision 0

C-33

Recently Renovated Trailers: Two in FY11; seven trailers renovated in FY12; and one

planned in FY13)

• Constructed: ~1990.

• Size: Between 1,848 and 2,880 ft2.

• Facility Type: Offices.

• AW-Farms (MO282, MO283,MO 284, and MO511) plus C-Farms trailers (MO525 and

MO531 in FY11) are complete.

• MO266, MO267, and MO493 are being renovated.

• Long-term Plans: Plans to utilize for 200E SST and DST Retrieval programs through

2047.

• August 10th Utilization: 100% where renovations are complete. WRPS is shuffling

workers to accommodate renovation activities. Trailers MO-266, 267 and 493 will return

to 100% utilization following renovations.

Forecasted FY13 Planned Renovations:

• 274AW FY13:

Construction Date: 1990s

Size: Between 1,848– 9,240 ft2

Facility Type: Offices

Long-term Plans: Long-term plans to utilize trailers for 200E SST and DST Retrieval

projects through 2047

August 10th Utilization: 100 %

HNF-53496 Revision 0

C-34

• C-Farm Facilities: C-Farm Facilities previously were used by construction staff. These

include MO377 (D&D begun in 2009, but not completed), MO919, MO272, and MO421

(D&D to ERDF).

Constructed: ~1974.

Size: Between 924 and 1344 ft2.

Facility Type: Office.

Long-term Plans: These facilities are past end-of-life and are no longer economical

to repair. WRPS plans to offer these trailers to MSA but MSA isn’t expected to

accept them. Instead, WRPS anticipates gaining authorization transfer these trailers

to ERDF for disposal.

August 10, 2012, Utilization: 100%, occupants will be relocated in October 2012.

• New Trailers: One new triple-wide and one new double-wide trailer (200 East Tank

Farms) are being set up for use by American Electric Incorporated, which will provide

electrical support for 200 East Tank Farms upcoming projects.

HNF-53496 Revision 0

C-35

• 2704HV: This facility was not visited but

was reported. Renovated by replacing

carpet and ceiling (tile and lighting)

Constructed: 1994.

Size: 126,679 ft2.

Facility Type: Office/Shop.

Long-term Plans: Long-term plans are

to support Tank Farms Operations through the cleanup mission end date.

August 10, 2012, Utilization (reported): 100 %.

200 West Tank Farms: These were not visited but reported. Facilities in the 200 West

Area, reported to be long-term facilities, were constructed or renovated with ARRA funds

last year. The facilities are:

222S – renovated with ARRA funds.

2713S – constructed with ARRA funds.

2705S – constructed with ARRA funds.

277S – storage facility constructed with ARRA funds.

HNF-53496 Revision 0

C-36

Field Tour 2: CHPRC Unsecured Core Area

Date: June 12, 2012

Host: Rick Dahlin

FMP Team Attendees: Cal Rinne and Dave Havens

Cal Rinne and Dave Havens visited the 200E Unsecured Core Area where Rick Dahlin hosted a

walk-through of CHPRC facilities. These facilities were constructed during 2010-2011 with

American Reinvestment and Recovery Act (ARRA) funding. The buildings serve CHPRC as the

centralized location for Soil and Groundwater Remediation Project and Engineering, Projects

and Construction operations supporting the Central Plateau. 35 structures were added during

ARRA in the Unsecured Core Area and directly west of MO285 below the core area. The four

shop/storage buildings were selected for review due to the permanent nature of the facilities and

their potential for beneficial reuse. Other facilities were randomly selected for the field visit to

show examples of the range of structures throughout the core area. Rick noted that the CHPRC is

in the middle of major consolidation efforts and planning for the compression of occupancy

following the most current round of Workforce Restructuring scheduled for September 2012.

Therefore, this report reflects utilization status both at the time of the June 12, 2012 field visit

and a follow update based upon field reports dated August 6, 2012 as well as CHPRC’s

projections for continued utilization. All current plans for utilization of these facilities hinge on

an overall company occupancy master plan that will not be completed until mid October 2012.

Since the initial walkthrough, several facilities in the Unsecured Core have been transferred to

the Sludge Treatment Project at 100K and redeployed to other Hanford Contractors.

Facilities Visited:

The FMP Team reviewed facilities noting condition and utilization. Below are notes taken from

the facility tour:

2269E: EPC Shop for Building Trades workers

Constructed in 2011

15,450 ft2

Warehouse Shop

Large Storage Rooms

Large Craft Shops

Long-term Warehouse Storage

June 6, 2012, Utilization: ~66%

August 6, 2012, Utilization: 66%

Utilization Notes - 1/3 of 2269E is a dedicated lunch room/all employees meeting

area that has served up to 250 Building Trades craft and EPC employees depending

on fluctuations in Construction activities.

HNF-53496 Revision 0

C-37

Utilization Projection – CHPRC is in process of converting the lunch room/all

employees meeting area into dedicated warehousing space to support vacating leased

space at Energy Northwest.

2610E: Engineering Projects and Construction (EPC) Heavy Assembly Shop for

Construction

Constructed in 2011

15,450 ft2

Large High Bay Area

Large Shop Rooms

June 6, 2012, Utilization: 100%

August 6, 2012, Utilization:

100%

Utilization Notes – 2610E

provides shop space for general construction fabrication and shared space with other

CHPRC Projects requiring shop space.

Utilization Projections – CHPRC intends to retain 2610E throughout the duration of

the CHPRC contract.

2611E: Soil & Groundwater Warehouse

Constructed in 2011

15,450 ft2

Warehouse Shop

Large Storage Rooms

Long-term Warehouse Storage

Exempted from Warehouse

Study

June 6, 2012, Utilization: 60%

August 6, 2012, Utilization: 100%

Utilization Notes – Full utilization has been achieved following the consolidation and

relocation of outside storage into the 2611E lay down yard.

Utilization Projection – This facility will remain with the Soils and Groundwater

Remediation Project for the duration of its mission.

2268E: Soil and Groundwater Shop

Constructed in 2011

15,450 ft2

Large High Bay Area

Large Shop Rooms

HNF-53496 Revision 0

C-38

June 6th Utilization: 100%

August 6th Utilization: 100%

Utilization Notes – 2268E

maintains a 300 person

capacity meeting area that is

used for all employee

meetings and the CHPRC

PZAC. CHPRC anticipates a

new occupant on the first floor of 2420 Stevens in RCHN in FY13 which would

eliminate the only other large conference space available and divert all large scale

meetings to 2268E.

Utilization Projection - This facility will remain with the Soils and Groundwater

Remediation Project for the duration of its mission.

MO2215: Office Trailer - W of MO285

Acquired in 2011

Office Space

5W Trailer

3,600 ft2

June 6, 2012, Utilization: 100%

August 6, 2012, Utilization:

100%

Utilization Notes – MO2215,

2216 and the two adjoining

restrooms facilities were occupied by the Soil and Groundwater Remediation Project

in October of 2011, consolidating occupants from MO285 and MO277. This

consolidation resulted in vacating MO285 for transfer to the MSA.

Utilization Projection - This facility will remain with the Soils and Groundwater

Remediation Project for the duration of its mission.

MO2216: Office Trailer - W of MO285

Acquired in 2010

Office Space

5W Trailer

3,600 ft2

June 6, 2012, Utilization: 100%

August 6, 2012, Utilization: 100%

Utilization Notes – MO2215,

2216 and the two adjoining

HNF-53496 Revision 0

C-39

restrooms facilities were occupied by the Soil and Groundwater Remediation Project

in October of 2011, consolidating occupants from MO285 and MO277. This

consolidation resulted in vacating MO285 for transfer to the MSA.

Utilization Projection - This facility will remain with the Soils and Groundwater

Remediation Project for the duration of its mission.

MO2332: Restroom Trailer - SW of MO285

Acquired in 2010

Restroom

360 ft2

June 6th Utilization: In

service/fully utilized

August 6th Utilization:

In-service/fully utilized

MO2232: Exempt Office Trailer - SW of MO285

Acquired in 2010

5W Trailer

Office Space

3,600 ft2

June 6th Utilization: 12%

August 6th Utilization: 12%

Utilization Notes – Facility serves

as current HQ for EPC operations.

Utilization Projection - This

facility is a candidate for consolidation of other groups within the Unsecured Core or

for transfer to 300 Area in CY13 based on an inquiry from DOE-RL

MO2233: Exempt Office Trailer - SW of MO285

Acquired in 2010

5W Trailer

Office Space

3,600 ft2

Consolidation candidate

June 6t, 2012, Utilization: 21%

August 6th Utilization: 21%

Utilization Notes – Facility

serves as current HQ for EPC

operations.

HNF-53496 Revision 0

C-40

Utilization Projection - This facility is a candidate for consolidation of other groups

within the Unsecured Core or for transfer to 300 Area in CY13 based on an inquiry

from DOE-RL

MO2234: Engineering Projects and Construction Trailer - SW of MO285

Acquired in 2010

2W Trailer

Office Space

1,792 ft2

June 6, 2012, Utilization:

100%

August 6, 2012, Utilization:

100%

Utilization Notes – Facility

serves as a dedicated

conference/Meeting/POD for EPC operations.

Utilization Projection - This facility is a candidate for consolidation of other groups

or reutilization pending final configuration and utilization of MO2232/2233.

MO285: Mobile Office - W of

2753E

Acquired in 1993

12W Trailer

Office Space

11,088 ft2

Plans to vacate and

consolidate current occupants

into MO2215 and MO2216

Transfer candidate, plans to

transfer to MSA

June 6, 2012, Utilization: <50%

August 6th Utilization: Vacant, Pending transfer to MSA.

HNF-53496 Revision 0

C-41

MO2220: Mobile Office – E of 2269E

Acquired in 2010

4W Trailer

2,880 ft2

Only office in UCA that contains

restrooms.

If available, would backfill with

Groundwater people

June 6, 2012, Utilization:

7 people; 33%

August 6, 2012, Utilization: 7 people; 33%

Utilization Notes – Currently occupied by FFS Construction Execution.

Utilization Projection - This facility is a candidate for consolidation of other groups

or reutilization pending changes in the structure and staffing of EPC.

HNF-53496 Revision 0

C-i

This Page Intentionally Left Blank.

HNF-53496 Revision 0

D-i

APPENDIX D

SECTION 5.0 SUPPORT – FACILITY ANALYSIS CRITERIA

HNF-53496 Revision 0

D-ii

This Page Intentionally Left Blank.

HNF-53496, VOL2, REV 0

D-1

APPENDIX D

SECTION 5.0 SUPPORT – FACILITY ANALYSIS CRITERIA

Table D-1. Facilities at End-of-Life. (Section 5.2.2)

Projects Managed by Contractor

Project Mission End Dates

2015 2017 2020 2022 2040 2047 2048 2049 2050 N/A Total

CHPRC 9 0 6 1 7 36 6 10 9 9 11

CHPRC Landlord 8 4 1 5 36 6 9 4 3 8

Engineering, Projects & Construction

General Office Space

PFP Project 2

Sludge Treatment Project 1

Soil & Groundwater Remediation 1

Surveillance and Maintenance 1 1 2

Waste & Fuels 1 3 6 2

MSA 1 9 0 0 0 0 0 7 0 0 0

General Office Space 1 7 1

General Shop Space 1 3

General Warehouse 1 3

Other 7 10 1 8 0 0 0 0 0 0 0

General Office Space 4 8 1

General Warehouse 7

VIT Plant 3 2 1

WCH 18 20 7 9 7 36 6 17 9 9 11

D&D End of Contract 1 1

ERDF End of Contract 17 19 7 9 7 36 6 17 9 9 11

WRPS 8 0 6 1 5 36 6 9 4 3 8

200E Tank Farms 8 4 1 5 36 6 9 4 3 8

200W Tank Farms

WTP Operations

Total 43 39 20 19 19 108 18 43 22 21 30

HNF-53496, VOL2, REV 0

D-2

Table D-2. Site-Wide Potential Facility Transfer Candidates. (Section 5.4)

Year Fac. Is Available

Offices Shop Storage/Warehouse

# of Fac. ft2 # of Fac. ft2 # of Fac. ft2

Early Release 43 96,832 5 23,833 5 48,364

2012 5 25,872

MO234 1 9,240

MO408 1 2,772

MO409 1 3,696

MO410 1 2,772

MO413 1 7,392

2013 6 10,488

MO1101 1 1,440

MO1103 1 1,440

MO1112 1 2,880

MO2218 1 1,440

MO2219 1 1,440

MO253 1 1,848

2014 3 4,320

MO2151 1 1,440

MO2221 1 1,440

MO2231 1 1,440

2016 2 5,294

440 1 1,254

4713C 1 4,040

2018 29 56,152 1 2,160

MO2101 1 1,792

MO2102 1 1,792

MO2103 1 1,440

MO2104 1 1,792

MO2105 1 1,792

MO2106 1 1,440

MO2107 1 1,440

MO2108 1 1,440

MO2109 1 1,440

MO2110 1 1,440

MO2111 1 1,440

MO2112 1 1,792

MO2113 1 1,440

MO2114 1 1,792

MO2115 1 1,792

MO2116 1 1,440

MO2117 1 1,792

MO2118 1 1,440

MO2119 1 1,440

MO2120 1 1,440

MO2121 1 1,440

MO2122 1 1,792

HNF-53496, VOL2, REV 0

D-3

Table D-2. Site-Wide Potential Facility Transfer Candidates. (Section 5.4)

Year Fac. Is Available

Offices Shop Storage/Warehouse

# of Fac. ft2 # of Fac. ft2 # of Fac. ft2

MO2123 1 1,792

MO2124 1 2,160

MO2220 1 2,880

MO247 1 1,848

MO248 1 1,848

MO249 1 1,848

MO250 1 1,848

MO273 1 9,240

2020 4 21,673 3 43,070

272B 1 1,788

4704N 1 8,070

4722C 1 4,080

4732A 1 15,000

4732C 1 20,000

4734B 1 7,713

4734C 1 8,092

Consolidation 7 26,308

2012 1 4,620

MO407 1 4,620

2013 6 21,688

MO2232 1 3,600

MO235 1 1,848

MO252 1 1,848

MO285 1 11,088

MO290 1 1,848

MO388 1 1,456

Grand Total 50 123,140 5 23,833 5 48,364

HNF-53496, VOL2, REV 0

D-4

This Page Left Intentionally Blank.

HNF-53496, VOL2, REV 0

E-i

APPENDIX E

SECTION 6.1 SUPPORT - CHPRC PROFILE

HNF-53496, VOL2, REV 0

E-ii

This Page Left Intentionally Blank.

HNF-53496, VOL2, REV 0

E-1

APPENDIX E

SECTION 6.1 SUPPORT - CHPRC PROFILE

Table E-1. CHPRC Facility Supply/Demand Projection. (Section 6.1.2)

Office Shop Warehouse Office Shop Warehouse Office Shop Warehouse

Year # of Fac Gross ft2 # of Fac Gross ft2 # of Fac Gross ft2 Gross ft2 Gross ft2 Gross ft2 Gross ft2 Gross ft2 Gross ft2 Gross ft2 Gross ft2 Gross ft2

2012 145 508,699 14 55,190 13 91,877 8,440 3,990 560 31,008 4,350 $1,383,517,620 0.000244 337,921 486,131 50,840 91,877

2013 0 48,892 1,296 $1,268,041,999 0.000244 309,716 437,239 49,544 91,877

2014 11,016 $1,085,129,128 0.000244 265,040 426,223 49,544 91,877

2015 25,146 35,748 9,240 $1,041,395,313 0.000244 254,358 442,129 49,544 91,877

2016 28,456 1,440 5,294 $997,661,498 0.000244 243,677 413,673 48,104 86,583

2017 5,280 $953,927,683 0.000244 232,995 408,393 48,104 86,583

2018 71,152 2,160 $910,193,868 0.000244 222,313 337,241 45,944 86,583

2019 $910,193,868 0.000244 222,313 337,241 45,944 86,583

2020 6,520 3,228 $895,525,630 0.000244 218,730 330,721 42,716 86,583

2025 10,164 861 2,037 $3,918,522,931 0.000244 191,418 320,557 41,855 84,546

2030 $2,393,156,308 0.000244 116,905 320,557 41,855 84,546

2035 24,000 $2,074,076,990 0.000244 101,318 320,557 41,855 60,546

2040 30,992 5,145 6,420 $2,200,638,619 0.000244 107,500 289,565 36,710 54,126

2045 $2,200,638,619 0.000244 107,500 289,565 36,710 54,126

2050 33,264 3,360 $1,401,874,640 0.000244 68,481 256,301 33,350 54,126

Budget Ratio Projected ft2

170,778

Office Shop Warehouse

Current Unutilized Office Space

Current Facilities Planned Future Facility Acquisition Forecasted Release of Facilities Forecasted Future SF Demand Available Facilities

HNF-53496, VOL2, REV 0

E-2

Table E-2. CHPRC Current and Future End-of-Life Facilities. (Section 6.1.3)

End of Facility

Lifecycle

Offices Shop Storage/Warehouse

# of Fac.

Gross ft2

Forecasted Release Date

# of Fac.

Gross ft2

Forecasted Release Date

# of Fac.

Gross ft2

Forecasted Release

Date

2004 -- -- -- 1 1,296 -- -- -- --

MO354 -- -- -- -- 1,296 2013 -- -- --

2006 1 1,344 -- -- -- -- -- -- --

MO906 -- 1,344 2036 -- -- -- -- -- --

2007 1 624 -- -- -- -- -- -- --

MO223 -- 624 2018 -- -- -- -- -- --

2009 1 1,848 -- 1 4,350 -- -- -- --

2713W -- -- -- -- 4,350 2012 -- -- --

MO369 -- 1,848 2036 -- -- -- -- -- --

2010 1 1,344 -- -- -- -- -- -- --

MO892 -- 1,344 2036 -- -- -- -- -- --

2011 1 4,620 -- -- -- -- -- -- --

MO400 -- 4,620 2021 -- -- -- -- -- --

2015 1 1,848 -- -- -- -- -- -- --

MO232 -- 1,848 2021 -- -- -- -- -- --

2020 2 3,696 -- -- -- -- -- -- --

MO251 -- 1,848 2021 -- -- -- -- -- --

MO254 -- 1,848 2037 -- -- -- -- -- --

2022 4 46,200 -- -- -- -- -- -- --

MO277 -- 14,784 2050 -- -- -- -- -- --

MO281 -- 14,784 2047 -- -- -- -- -- --

MO720 -- 14,784 2047 -- -- -- -- -- --

MO723 -- 1,848 2051 -- -- -- -- -- --

2023 6 27,216 -- 1 3,360 -- -- -- --

MO285 -- 11,088 2050 -- -- -- -- -- --

MO287 -- 11,088 2036 -- -- -- -- -- --

MO433 -- 1,848 2036 -- -- -- -- -- --

MO434 -- 1,848 2037 -- -- -- -- -- --

MO444 -- 672 2035 -- -- -- -- -- --

MO446 -- 672 2035 -- -- -- -- -- --

MO743 -- -- -- -- 3,360 2047 -- -- --

2024 2 3,696 -- -- -- -- -- -- --

MO437 -- 1,848 2047 -- -- -- -- -- --

MO438 -- 1,848 2047 -- -- -- -- -- --

2026 1 14,784 -- -- -- -- -- -- --

MO294 -- 14,784 2050 -- -- -- -- -- --

2037 1 1,792 -- -- -- -- -- -- --

MO645 -- 1,792 2050 -- -- -- -- -- --

2038 2 3,584 -- -- -- -- -- -- --

HNF-53496, VOL2, REV 0

E-3

Table E-2. CHPRC Current and Future End-of-Life Facilities. (Section 6.1.3)

End of Facility

Lifecycle

Offices Shop Storage/Warehouse

# of Fac.

Gross ft2

Forecasted Release Date

# of Fac.

Gross ft2

Forecasted Release Date

# of Fac.

Gross ft2

Forecasted Release

Date

MO2210 -- 1,792 2050 -- -- -- -- -- --

MO644 -- 1,792 2050 -- -- -- -- -- --

2039 -- -- -- -- -- -- 1 13,674 --

1713H -- -- -- -- -- -- -- 13,674 2050

Total 24 112,596 -- 3 9,006 -- 1 13,674 --

Table E-3. CHPRC Roof Replacement List. (Section 6.1.4)

Facility ID Roof Type Roof SF Roof Replacement

Cost

Roof Installation

Date

Roof Replacement

Date

Building Roof Age

(years)

High Risk $988,837

1713H Membrane 13,674 $89,523 1949 1969 63

2704Z Membrane 3,924 $33,678 1949 1969 63

MO015 Composite Shingle 672 $18,662 1976 1996 36

MO016 Membrane 672 $18,662 1976 1996 36

MO017 Membrane 672 $18,662 1976 1996 36

MO906 Membrane 1,344 $22,325 1976 1996 36

MO014 Membrane 924 $20,036 1977 1997 35

MO031 Membrane 2,772 $30,107 1978 1998 34

MO032 Membrane 2,772 $30,107 1978 1998 34

MO223 Membrane 624 $18,401 1978 1998 34

MO939 Membrane 672 $18,662 1978 1998 34

MO369 Membrane 1,848 $25,072 1979 1999 33

MO892 Membrane 1,344 $22,325 1980 2000 32

MO400 Membrane 4,620 $40,179 1981 2001 31

MO232 Membrane 1,848 $25,072 1985 2005 27

MO247 Membrane 1,848 $25,072 1990 2010 22

MO248 Membrane 1,848 $25,072 1990 2010 22

MO249 Membrane 1,848 $25,072 1990 2010 22

MO250 Membrane 1,848 $25,072 1990 2010 22

MO251 Membrane 1,848 $25,072 1990 2010 22

MO254 Membrane 1,848 $25,072 1990 2010 22

MO264 Membrane 1,848 $25,072 1990 2010 22

MO273 Membrane 9,240 $65,358 1990 2010 22

MO269 Membrane 1,848 $25,072 1991 2011 21

MO277 Membrane 14,784 $95,573 1992 2012 20

HNF-53496, VOL2, REV 0

E-4

Table E-3. CHPRC Roof Replacement List. (Section 6.1.4)

Facility ID Roof Type Roof SF Roof Replacement

Cost

Roof Installation

Date

Roof Replacement

Date

Building Roof Age

(years)

MO428 Membrane 1,848 $25,072 1992 2012 20

MO429 Membrane 1,848 $25,072 1992 2012 20

MO433 Membrane 1,848 $25,072 1992 2012 20

MO720 Membrane 14,784 $95,573 1992 2012 20

MO723 Membrane 1,848 $25,072 1992 2012 20

At Risk $536,960

278WA Membrane 1,848 $25,072 1993 2013 19

MO287 Membrane 11,088 $75,430 1993 2013 19

MO432 Membrane 1,848 $25,072 1993 2013 19

MO434 Membrane 1,848 $25,072 1993 2013 19

MO444 Membrane 672 $18,662 1993 2013 19

MO446 Membrane 672 $18,662 1993 2013 19

MO743 Membrane 3,360 $33,312 1993 2013 19

MO970 Membrane 3,360 $33,312 1993 2013 19

MO971 Membrane 3,360 $33,312 1993 2013 19

MO285 Membrane 11,088 $75,430 1994 2014 18

MO437 Membrane 1,848 $25,072 1994 2014 18

MO438 Membrane 1,848 $25,072 1994 2014 18

272B Metal 1,788 $27,909 1965 2015 47

MO294 Membrane 14,784 $95,573 1995 2015 17

Low Risk $3,208,598

2120WB Membrane 2,700 $29,715 1996 2016 16

2727W Metal 2,352 $31,981 1968 2018 44

2740W Membrane 11,088 $75,430 1998 2018 14

MO2123 Composite Shingle 1,792 $23,530 1998 2018 14

272BB Metal 861 $21,216 1970 2020 42

MO760 Composite Shingle 1,440 $21,854 2000 2020 12

272BA Metal 986 $22,119 1971 2021 41

MO2105 Composite Shingle 1,792 $23,530 2001 2021 11

MO2108 Composite Shingle 1,440 $21,854 2001 2021 11

MO2109 Composite Shingle 1,440 $21,854 2001 2021 11

MO2111 Composite Shingle 1,440 $21,854 2001 2021 11

MO2122 Composite Shingle 1,792 $23,530 2001 2021 11

MO917 Composite Shingle 1,584 $22,540 2001 2021 11

MO2102 Composite Shingle 1,792 $23,530 2002 2022 10

MO2117 Composite Shingle 1,792 $23,530 2002 2022 10

2753E Membrane 14,982 $96,652 2003 2023 9

MO2231 Composite Shingle 1,440 $21,854 2003 2023 9

MO2103 Composite Shingle 1,440 $21,854 2004 2024 8

HNF-53496, VOL2, REV 0

E-5

Table E-3. CHPRC Roof Replacement List. (Section 6.1.4)

Facility ID Roof Type Roof SF Roof Replacement

Cost

Roof Installation

Date

Roof Replacement

Date

Building Roof Age

(years)

MO2106 Composite Shingle 1,440 $21,854 2004 2024 8

MO2112 Composite Shingle 1,792 $23,530 2004 2024 8

MO2101 Composite Shingle 1,792 $23,530 2005 2025 7

MO2104 Composite Shingle 1,792 $23,530 2005 2025 7

MO2107 Composite Shingle 1,440 $21,854 2005 2025 7

MO2114 Composite Shingle 1,792 $23,530 2005 2025 7

MO2115 Composite Shingle 1,792 $23,530 2005 2025 7

MO1115 Composite Shingle 1,792 $23,530 2006 2026 6

MO2100 Composite Shingle 1,440 $21,854 2007 2027 5

MO2110 Composite Shingle 1,440 $21,854 2007 2027 5

MO2220 Composite Shingle 2,880 $28,709 2007 2027 5

MO1114 Composite Shingle 1,440 $21,854 2008 2028 4

MO2210 Composite Shingle 1,792 $23,530 2008 2028 4

MO644 Composite Shingle 1,792 $23,530 2008 2028 4

MO645 Composite Shingle 1,792 $23,530 2008 2028 4

MO1113 Composite Shingle 1,440 $21,854 2009 2029 3

MO2113 Composite Shingle 1,440 $21,854 2009 2029 3

MO2116 Composite Shingle 1,440 $21,854 2009 2029 3

MO2118 Composite Shingle 1,440 $21,854 2009 2029 3

MO2119 Composite Shingle 1,440 $21,854 2009 2029 3

MO2120 Composite Shingle 1,440 $21,854 2009 2029 3

MO2121 Composite Shingle 1,440 $21,854 2009 2029 3

MO2151 Composite Shingle 1,440 $21,854 2009 2029 3

MO2211 Composite Shingle 1,792 $23,530 2009 2029 3

MO2212 Composite Shingle 1,792 $23,530 2009 2029 3

MO2213 Composite Shingle 1,792 $23,530 2009 2029 3

MO2214 Composite Shingle 1,792 $23,530 2009 2029 3

MO2221 Composite Shingle 1,440 $21,854 2009 2029 3

MO2222 Composite Shingle 1,440 $21,854 2009 2029 3

MO2223 Composite Shingle 1,440 $21,854 2009 2029 3

MO2224 Composite Shingle 1,440 $21,854 2009 2029 3

MO2225 Composite Shingle 1,440 $21,854 2009 2029 3

MO2226 Composite Shingle 1,440 $21,854 2009 2029 3

MO2227 Composite Shingle 1,440 $21,854 2009 2029 3

MO2228 Composite Shingle 1,440 $21,854 2009 2029 3

MO2229 Composite Shingle 1,440 $21,854 2009 2029 3

MO2233 Composite Shingle 3,600 $34,620 2009 2029 3

MO1116 Composite Shingle 1,440 $21,854 2010 2030 2

MO1123 Composite Shingle 1,440 $21,854 2010 2030 2

MO2124 Composite Shingle 2,160 $25,282 2010 2030 2

HNF-53496, VOL2, REV 0

E-6

Table E-3. CHPRC Roof Replacement List. (Section 6.1.4)

Facility ID Roof Type Roof SF Roof Replacement

Cost

Roof Installation

Date

Roof Replacement

Date

Building Roof Age

(years)

MO2159 Composite Shingle 1,792 $23,530 2010 2030 2

MO2160 Membrane 1,440 $21,854 2010 2030 2

MO2161 Composite Shingle 1,440 $21,854 2010 2030 2

MO2162 Composite Shingle 1,440 $21,854 2010 2030 2

MO2215 Composite Shingle 3,600 $34,620 2010 2030 2

MO2216 Composite Shingle 3,600 $34,620 2010 2030 2

MO2234 Composite Shingle 1,792 $23,530 2010 2030 2

MO6110 Composite Shingle 1,792 $23,530 2010 2030 2

273W Metal 6,000 $58,320 1981 2031 31

MO148 Membrane 1,848 $23,796 2011 2031 1

2715T Metal 602 $19,346 1982 2032 30

MO054 Metal 3,696 $41,685 1982 2032 30

MO278 Composite Shingle 9,240 $65,358 2012 2032 0

4732B Metal 24,000 $173,280 1983 2033 29

4713C Metal 4,040 $44,169 1984 2034 28

211BA Metal 1,008 $22,278 1991 2041 21

242AL11 Metal 1,200 $23,664 1991 2041 21

440 Metal 1,254 $24,054 1992 2042 20

MO281 Metal 14,784 $106,740 1992 2042 20

2701HV Metal 2,160 $30,595 1993 2043 19

MO442 Metal 1,848 $28,343 1994 2044 18

2025EA Metal 10,250 $89,005 1995 2045 17

MO293 Metal 9,240 $81,713 1995 2045 17

2620W Metal 4,065 $44,349 1996 2046 16

MO500 Metal 14,784 $106,740 1999 2049 13

272HV Metal 3,668 $41,483 2001 2051 11

2405W Metal 3,720 $41,858 2010 2060 2

2611E Metal 15,450 $111,549 2010 2060 2

2268E Metal 15,450 $111,549 2011 2061 1

2269E Metal 15,450 $111,549 2011 2061 1

2610E Metal 15,450 $111,549 2011 2061 1

293W Metal 1,080 $22,798 2011 2061 1

Total 474,610 $4,734,396

Footnote: List Excludes Facilities Identified With a Release Date of 2012 and 2013

HNF-53496, VOL2, REV 0

E-7

Table E-4. CHPRC HVAC Replacement List. (Section 6.1.4)

Facility ID

HVAC Type Gross SF HVAC Size (BTU)

HVAC Replacement

Cost

HVAC Installation

Date

HVAC Replacement

Date

HVAC Age

High Risk $3,750,468

1713H Unit Heaters, Electric 13,674 120 $43,707 1949 1969 63

2704Z Forced Air, Heat Pump 3,924 10 $77,359 1949 1969 63

272B Unit Heaters, Electric 1,788 16 $18,754 1960 1980 52

2715T Unit Heaters, Electric 602 5 $16,264 1965 1985 47

272BB Wall Mount HVAC 861 2 $20,635 1970 1985 42

2727W Unit Heaters, Electric 2,352 21 $19,938 1968 1988 44

MO015 Forced Air, Heat Pump 672 2 $25,679 1976 1991 36

MO016 Forced Air, Heat Pump 672 2 $25,679 1976 1991 36

MO017 Forced Air, Heat Pump 672 2 $25,679 1976 1991 36

MO906 Forced Air, Heat Pump 1,344 3 $36,358 1976 1991 36

MO031 Forced Air, Heat Pump 2,772 7 $59,052 1978 1993 34

MO032 Forced Air, Heat Pump 2,772 7 $59,052 1978 1993 34

MO223 Forced Air, Heat Pump 624 2 $24,916 1978 1993 34

MO939 Forced Air, Heat Pump 672 2 $25,679 1978 1993 34

MO369 Forced Air, Heat Pump 1,848 5 $44,368 1979 1994 33

MO892 Forced Air, Heat Pump 1,344 3 $36,358 1980 1995 32

MO400 Forced Air, Heat Pump 4,620 12 $88,420 1981 1996 31

272BA Wall Mount HVAC 986 2 $21,453 1982 1997 30

MO054 Forced Air, Heat Pump 3,696 9 $73,736 1982 1997 30

MO232 Forced Air, Heat Pump 1,848 5 $44,368 1985 2000 27

4732B Unit Heaters, Electric 24,000 211 $65,385 1983 2003 29

4713C Unit Heaters, Electric 4,040 36 $23,482 1984 2004 28

MO247 Forced Air, Heat Pump 1,848 5 $44,368 1990 2005 22

MO248 Forced Air, Heat Pump 1,848 5 $44,368 1990 2005 22

MO249 Forced Air, Heat Pump 1,848 5 $44,368 1990 2005 22

HNF-53496, VOL2, REV 0

E-8

Table E-4. CHPRC HVAC Replacement List. (Section 6.1.4)

Facility ID

HVAC Type Gross SF HVAC Size (BTU)

HVAC Replacement

Cost

HVAC Installation

Date

HVAC Replacement

Date

HVAC Age

MO250 Forced Air, Heat Pump 1,848 5 $44,368 1990 2005 22

MO251 Forced Air, Heat Pump 1,848 5 $44,368 1990 2005 22

MO254 Forced Air, Heat Pump 1,848 5 $44,368 1990 2005 22

MO264 Forced Air, Heat Pump 1,848 5 $44,368 1990 2005 22

MO273 Forced Air, Heat Pump 9,240 23 $146,839 1990 2005 22

211BA Wall Mount HVAC 1,051 3 $21,878 1991 2006 21

2753E Forced Air, Heat Pump 14,982 37 $238,089 1986 2006 26

MO269 Forced Air, Heat Pump 1,848 5 $44,368 1991 2006 21

MO277 Forced Air, Heat Pump 14,784 37 $234,943 1992 2007 20

MO281 Forced Air, Heat Pump 14,784 37 $234,943 1992 2007 20

MO428 Forced Air, Heat Pump 1,848 5 $44,368 1992 2007 20

MO429 Forced Air, Heat Pump 1,848 5 $44,368 1992 2007 20

MO432 Forced Air, Heat Pump 1,848 5 $44,368 1992 2007 20

MO433 Forced Air, Heat Pump 1,848 5 $44,368 1992 2007 20

MO720 Forced Air, Heat Pump 14,784 37 $234,943 1992 2007 20

MO723 Forced Air, Heat Pump 1,848 5 $44,368 1992 2007 20

MO287 Forced Air, Heat Pump 11,088 28 $176,207 1993 2008 19

MO434 Forced Air, Heat Pump 1,848 5 $44,368 1993 2008 19

MO444 Forced Air, Heat Pump 672 2 $25,679 1993 2008 19

MO446 Forced Air, Heat Pump 672 2 $25,679 1993 2008 19

MO743 Forced Air, Heat Pump 3,360 8 $68,396 1993 2008 19

MO970 Forced Air, Heat Pump 3,360 8 $68,396 1993 2008 19

MO971 Forced Air, Heat Pump 3,360 8 $68,396 1993 2008 19

MO285 Forced Air, Heat Pump 11,088 28 $176,207 1994 2009 18

MO437 Forced Air, Heat Pump 1,848 5 $44,368 1994 2009 18

MO438 Forced Air, Heat Pump 1,848 5 $44,368 1994 2009 18

HNF-53496, VOL2, REV 0

E-9

Table E-4. CHPRC HVAC Replacement List. (Section 6.1.4)

Facility ID

HVAC Type Gross SF HVAC Size (BTU)

HVAC Replacement

Cost

HVAC Installation

Date

HVAC Replacement

Date

HVAC Age

MO442 Forced Air, Heat Pump 1,848 5 $44,368 1994 2009 18

MO293 Forced Air, Heat Pump 9,240 23 $146,839 1995 2010 17

MO294 Forced Air, Heat Pump 14,784 37 $234,943 1995 2010 17

242AL11 Unit Heaters, Electric 1,200 11 $17,519 1991 2011 21

At Risk $572,888

2701HV Forced Air, Heat Pump 2,160 5 $49,326 1993 2013 19

278WA Forced Air, Heat Pump 1,848 5 $44,368 1993 2013 19

MO2123 Forced Air, Heat Pump 1,792 4 $43,478 1998 2013 14

MO500 Forced Air, Heat Pump 14,784 37 $234,943 1999 2014 13

2025EA Forced Air, Heat Pump 10,250 26 $162,890 1995 2015 17

MO760 Forced Air, Heat Pump 1,440 4 $37,884 2000 2015 12

Low Risk $4,063,562

2620W Forced Air, Heat Pump 4,065 10 $79,600 1996 2016 16

MO2105 Forced Air, Heat Pump 1,792 4 $43,478 2001 2016 11

MO2108 Forced Air, Heat Pump 1,440 4 $37,884 2001 2016 11

MO2109 Forced Air, Heat Pump 1,440 4 $37,884 2001 2016 11

MO2111 Forced Air, Heat Pump 1,440 4 $37,884 2001 2016 11

MO2122 Forced Air, Heat Pump 1,792 4 $43,478 2001 2016 11

MO917 Forced Air, Heat Pump 1,584 4 $40,172 2001 2016 11

MO2102 Forced Air, Heat Pump 1,792 4 $43,478 2002 2017 10

MO2117 Forced Air, Heat Pump 1,792 4 $43,478 2002 2017 10

2740W Forced Air, Heat Pump 11,088 28 $176,207 1998 2018 14

MO014 Forced Air, Heat Pump 924 2 $29,684 2003 2018 9

MO2231 Forced Air, Heat Pump 1,440 4 $37,884 2003 2018 9

MO2103 Forced Air, Heat Pump 1,440 4 $37,884 2004 2019 8

MO2106 Forced Air, Heat Pump 1,440 4 $37,884 2004 2019 8

HNF-53496, VOL2, REV 0

E-10

Table E-4. CHPRC HVAC Replacement List. (Section 6.1.4)

Facility ID

HVAC Type Gross SF HVAC Size (BTU)

HVAC Replacement

Cost

HVAC Installation

Date

HVAC Replacement

Date

HVAC Age

MO2112 Forced Air, Heat Pump 1,792 4 $43,478 2004 2019 8

MO2101 Forced Air, Heat Pump 1,792 4 $43,478 2005 2020 7

MO2104 Forced Air, Heat Pump 1,792 4 $43,478 2005 2020 7

MO2107 Forced Air, Heat Pump 1,440 4 $37,884 2005 2020 7

MO2114 Forced Air, Heat Pump 1,792 4 $43,478 2005 2020 7

MO2115 Forced Air, Heat Pump 1,792 4 $43,478 2005 2020 7

272HV Forced Air, Heat Pump 3,668 9 $73,291 2001 2021 11

MO1115 Forced Air, Heat Pump 1,792 4 $43,478 2006 2021 6

MO2100 Forced Air, Heat Pump 1,440 4 $24,424 2007 2022 5

MO2110 Forced Air, Heat Pump 1,440 4 $37,884 2007 2022 5

MO2220 Forced Air, Heat Pump 2,880 7 $60,768 2007 2022 5

MO1114 Forced Air, Heat Pump 1,440 4 $37,884 2008 2023 4

MO2210 Forced Air, Heat Pump 1,792 4 $43,478 2008 2023 4

MO644 Forced Air, Heat Pump 1,792 4 $43,478 2008 2023 4

MO645 Forced Air, Heat Pump 1,792 4 $43,478 2008 2023 4

MO1113 Forced Air, Heat Pump 1,440 4 $37,884 2009 2024 3

MO2113 Forced Air, Heat Pump 1,440 4 $37,884 2009 2024 3

MO2116 Forced Air, Heat Pump 1,440 4 $37,884 2009 2024 3

MO2118 Forced Air, Heat Pump 1,440 4 $37,884 2009 2024 3

MO2119 Forced Air, Heat Pump 1,440 4 $37,884 2009 2024 3

MO2120 Forced Air, Heat Pump 1,440 4 $37,884 2009 2024 3

MO2121 Forced Air, Heat Pump 1,440 4 $37,884 2009 2024 3

MO2151 Forced Air, Heat Pump 1,440 4 $37,884 2009 2024 3

MO2211 Forced Air, Heat Pump 1,792 4 $43,478 2009 2024 3

MO2212 Forced Air, Heat Pump 1,792 4 $43,478 2009 2024 3

MO2213 Forced Air, Heat Pump 1,792 4 $43,478 2009 2024 3

HNF-53496, VOL2, REV 0

E-11

Table E-4. CHPRC HVAC Replacement List. (Section 6.1.4)

Facility ID

HVAC Type Gross SF HVAC Size (BTU)

HVAC Replacement

Cost

HVAC Installation

Date

HVAC Replacement

Date

HVAC Age

MO2214 Forced Air, Heat Pump 1,792 4 $43,478 2009 2024 3

MO2221 Forced Air, Heat Pump 1,440 4 $37,884 2009 2024 3

MO2222 Forced Air, Heat Pump 1,440 4 $37,884 2009 2024 3

MO2223 Forced Air, Heat Pump 1,440 4 $37,884 2009 2024 3

MO2224 Forced Air, Heat Pump 1,440 4 $37,884 2009 2024 3

MO2225 Forced Air, Heat Pump 1,440 4 $37,884 2009 2024 3

MO2226 Forced Air, Heat Pump 1,440 4 $37,884 2009 2024 3

MO2227 Forced Air, Heat Pump 1,440 4 $37,884 2009 2024 3

MO2228 Forced Air, Heat Pump 1,440 4 $37,884 2009 2024 3

MO2229 Forced Air, Heat Pump 1,440 4 $37,884 2009 2024 3

MO2233 Forced Air, Heat Pump 3,600 9 $72,210 2009 2024 3

293W Wall Mount HVAC 1,080 3 $22,068 2010 2025 2

MO1116 Forced Air, Heat Pump 1,440 4 $37,884 2010 2025 2

MO1123 Forced Air, Heat Pump 1,440 4 $37,884 2010 2025 2

MO2124 Forced Air, Heat Pump 2,160 5 $49,326 2010 2025 2

MO2159 Forced Air, Heat Pump 1,792 4 $43,478 2010 2025 2

MO2160 Forced Air, Heat Pump 1,440 4 $37,884 2010 2025 2

MO2161 Forced Air, Heat Pump 1,440 4 $37,884 2010 2025 2

MO2162 Forced Air, Heat Pump 1,440 4 $37,884 2010 2025 2

MO2215 Forced Air, Heat Pump 3,600 9 $72,210 2010 2025 2

MO2216 Forced Air, Heat Pump 3,600 9 $72,210 2010 2025 2

MO2234 Forced Air, Heat Pump 1,792 4 $43,478 2010 2025 2

MO6110 Forced Air, Heat Pump 1,792 4 $43,478 2010 2025 2

MO148 Forced Air, Heat Pump 1,848 5 $44,368 2011 2026 1

MO278 Forced Air, Heat Pump 9,240 23 $146,839 2012 2027 0

2405W Forced Air, Heat Pump 3,720 9 $74,117 2010 2030 2

HNF-53496, VOL2, REV 0

E-12

Table E-4. CHPRC HVAC Replacement List. (Section 6.1.4)

Facility ID

HVAC Type Gross SF HVAC Size (BTU)

HVAC Replacement

Cost

HVAC Installation

Date

HVAC Replacement

Date

HVAC Age

2611E Forced Air, Heat Pump 15,450 39 $245,526 2010 2030 2

2268E Forced Air, Heat Pump 15,450 39 $245,526 2011 2031 1

2269E Forced Air, Heat Pump 15,450 39 $245,526 2011 2031 1

2610E Forced Air, Heat Pump 15,450 39 $245,526 2011 2031 1

Total 464,699 1,462 $8,386,918 Footnote: List Excludes Facilities Identified With a Release Date of 2012 and 2013

HNF-53496, VOL2, REV 0

E-13

Table E-5. CHPRC Potential Facility Transfer Candidate. (Section 6.1.7)

Year Fac. Is Available Offices Shop Storage/Warehouse

# of Fac. Gross ft2 # of Fac. Gross ft2 # of Fac. Gross ft2

Early Release

2012 4 22,176

MO234 1 9,240

MO408 1 2,772

MO410 1 2,772

MO413 1 7,392

2013 5 8,640

MO1101 1 1,440

MO1103 1 1,440

MO1112 1 2,880

MO2218 1 1,440

MO2219 1 1,440

2014 3 4,320

MO2151 1 1,440

MO2221 1 1,440

MO2231 1 1,440

2016 2 5,294

440 1 1,254

4713C 1 4,040

2018 29 56,152 1 2,160

MO2101 1 1,792

MO2102 1 1,792

MO2103 1 1,440

MO2104 1 1,792

MO2105 1 1,792

MO2106 1 1,440

MO2107 1 1,440

MO2108 1 1,440

MO2109 1 1,440

MO2110 1 1,440

MO2111 1 1,440

MO2112 1 1,792

MO2113 1 1,440

MO2114 1 1,792

MO2115 1 1,792

MO2116 1 1,440

MO2117 1 1,792

MO2118 1 1,440

MO2119 1 1,440

MO2120 1 1,440

HNF-53496, VOL2, REV 0

E-14

Table E-5. CHPRC Potential Facility Transfer Candidate. (Section 6.1.7)

MO2121 1 1,440

MO2122 1 1,792

MO2123 1 1,792

MO2124 1 2,160

MO2220 1 2,880

MO247 1 1,848

MO248 1 1,848

MO249 1 1,848

MO250 1 1,848

MO273 1 9,240

2020 1 1,788

272B 1 1,788

Consolidation

2012 1 4,620

MO407 1 4,620

2013 2 14,688

MO2232 1 3,600

MO285 1 11,088

Total 44 110,596 2 3,948 2 5,294

Table E-6. CHPRC Current Facility Utilization. (Section 6.1.9)

Fac. ID by Utilization

Range

Offices Shop Storage/Warehouse

# of Fac.

ft2 % Utilized

# of Fac.

ft2 % Utilized

# of Fac.

ft2 % Utilized

50% or Less 24 80,554 1 1,680 2 12,193

440 1 1,254 0%

1713H 1 10,939 20%

MO2220 1 1,930 33%

MO2221 1 1,008 30%

MO2222 1 1,008 30%

MO2223 1 1,008 30%

MO2224 1 1,008 30%

MO2225 1 1,008 30%

MO2226 1 1,008 30%

MO2227 1 1,008 30%

MO2228 1 1,008 30%

MO2229 1 1,008 30%

MO223 1 312 50%

MO2233 1 2,844 21%

MO247 1 1,848 0%

MO248 1 1,848 0%

HNF-53496, VOL2, REV 0

E-15

Table E-6. CHPRC Current Facility Utilization. (Section 6.1.9)

Fac. ID by Utilization

Range

Offices Shop Storage/Warehouse

# of Fac.

ft2 % Utilized

# of Fac.

ft2 % Utilized

# of Fac.

ft2 % Utilized

MO277 1 7,392 50%

MO278 1 6,468 30%

MO281 1 7,392 50%

MO285 1 11,088 0%

MO287 1 9,979 10%

MO294 1 7,392 50%

MO369 1 1,478 20%

MO720 1 8,870 40%

MO743 1 1,680 50%

MO760 1 1,296 10%

MO892 1 1,344 0%

50% - 90% 7 4,064 2 5,829 1 7,200

2269E 1 5,253 66%

4732B 1 7,200 70%

MO2159 1 717 60%

MO2160 1 576 60%

MO2161 1 576 60%

MO2162 1 576 60%

MO2210 1 717 60%

MO254 1 554 70%

MO438 1 739 60%

MO723 1 185 90%

90% - 100% 46 0 9 0 10 0

2025EA 1 0 100%

211BA 1 0 100%

2120WB 1 0 100%

2268E 1 0 100%

2405W 1 0 100%

242AL11 1 0 100%

2610E 1 0 100%

2611E 1 0 100%

2620W 1 0 100%

2701HV 1 0 100%

2704Z 1 0 100%

2715T 1 0 100%

2727W 1 0 100%

272B 1 0 100%

272BA 1 0 100%

272BB 1 0 100%

272HV 1 0 100%

HNF-53496, VOL2, REV 0

E-16

Table E-6. CHPRC Current Facility Utilization. (Section 6.1.9)

Fac. ID by Utilization

Range

Offices Shop Storage/Warehouse

# of Fac.

ft2 % Utilized

# of Fac.

ft2 % Utilized

# of Fac.

ft2 % Utilized

273W 1 0 100%

2740W 1 0 100%

2753E 1 0 100%

278WA 1 0 100%

293W 1 0 100%

4713C 1 0 100%

MO014 1 0 100%

MO015 1 0 100%

MO016 1 0 100%

MO017 1 0 100%

MO1113 1 0 100%

MO1114 1 0 100%

MO1115 1 0 100%

MO1116 1 0 100%

MO1123 1 0 100%

MO148 1 0 100%

MO2100 1 0 100%

MO2124 1 0 100%

MO2151 1 0 100%

MO2211 1 0 100%

MO2212 1 0 100%

MO2213 1 0 100%

MO2214 1 0 100%

MO2215 1 0 100%

MO2216 1 0 100%

MO2231 1 0 100%

MO2234 1 0 100%

MO232 1 0 100%

MO250 1 0 100%

MO251 1 0 100%

MO264 1 0 100%

MO269 1 0 100%

MO400 1 0 100%

MO428 1 0 100%

MO429 1 0 100%

MO432 1 0 100%

MO433 1 0 100%

MO434 1 0 100%

MO437 1 0 100%

MO444 1 0 100%

HNF-53496, VOL2, REV 0

E-17

Table E-6. CHPRC Current Facility Utilization. (Section 6.1.9)

Fac. ID by Utilization

Range

Offices Shop Storage/Warehouse

# of Fac.

ft2 % Utilized

# of Fac.

ft2 % Utilized

# of Fac.

ft2 % Utilized

MO446 1 0 100%

MO6110 1 0 100%

MO644 1 0 100%

MO645 1 0 100%

MO906 1 0 100%

MO939 1 0 100%

MO970 1 0 100%

MO971 1 0 100%

Grand Total 77 84,618 12 7,509 13 19,393

HNF-53496, VOL2, REV 0

E-18

This Page Intentionally Left Blank.

HNF-53496, VOL2, REV 0

F-i

APPENDIX F

SECTION 6.2 SUPPORT - MSA PROFILE

HNF-53496, VOL2, REV 0

F-ii

This Page Intentionally Left Blank.

HNF-53496, VOL2, REV 0

F-1

APPENDIX F

SECTION 6.2 SUPPORT - MSA PROFILE

Table F-1. MSA Supply/demand Projections. (Section 6.1.1)

Office Shop Warehouse Office Shop Warehouse Office Shop Warehouse

Year # of Fac Gross ft2 # of Fac Gross ft

2 # of Fac Gross ft2

Gross ft2

Gross ft2

Gross ft2

Gross ft2

Gross ft2

Gross ft2

Gross ft2

Gross ft2

Gross ft2

2012 31 369,009 18 128,186 10 207,747 16,900 5,000 18,800 $121,723,443 0.00271 330,168 350,209 128,186 207,747

2013 18,088 24,856 560 $124,523,393 0.00271 337,763 332,121 103,330 207,187

2014 $140,708,437 0.00271 381,664 332,121 103,330 207,187

2015 $128,691,930 0.00271 349,070 332,121 103,330 207,187

2016 17,600 4,080 $124,493,472 0.00271 337,682 332,121 99,250 207,187

2017 $120,295,014 0.00271 326,293 332,121 99,250 207,187

2018 $116,096,556 0.00271 314,905 332,121 99,250 207,187

2019 $111,898,098 0.00271 303,517 332,121 99,250 207,187

2020 6,000 500 6,000 3,128 19,885 43,070 $107,699,640 0.00271 292,129 334,993 79,365 164,117

2025 $538,498,201 0.00271 292,129 334,993 79,365 164,117

2030 $532,451,767 0.00271 288,849 334,993 79,365 164,117

2035 $380,631,608 0.00271 206,488 334,993 79,365 164,117

2040 $246,843,516 0.00271 133,910 334,993 79,365 164,117

2045 $246,843,516 0.00271 133,910 334,993 79,365 164,117

2050 $243,420,979 0.00271 132,053 334,993 79,365 164,117

Office Shop Warehouse Budget Ratio Projected ft2

Current Unutilized Office Space

38,841

Current Facilities Planned Future Facility Acquisition Forecasted Release of Facilities Forecasted Future SF Demand Available Facilities

HNF-53496, VOL2, REV 0

F-2

Table F-2. MSA Current and Future End-of-Life Facilities. (Section 6.2.3)

End of Facility

Lifecycle Offices Shop Warehouse

# of Fac.

Gross ft

2

Forecasted Release

Date

# of Fac.

Gross ft

2

Forecasted Release

Date

# of Fac.

Gross ft

2

Forecasted Release

Date

2005 1 560 2013

MO315 1 560 2013

2009 2 7,802 4063

274E 1 3,812 2050

275W 1 3,990 2013

2011 1 3,128 2020

4707 1 3,128 2020

2013 1 11,088 2050

MO414 1 11,088 2050

2020 2 3,696 4100

MO256 1 1,848 2050

MO257 1 1,848 2050

2021 1 1,848 2050

MO722 1 1,848 2050

2022 1 14,784 2050

MO276 1 14,784 2050

2023 2 20,328 4100

MO280 1 9,240 2050

MO286 1 11,088 2050

2024 1 9,240 2050

MO292 1 9,240 2050

2026 1 1,742 2050

6293 1 1,742 2050

2043 1 33,128 2050 1 33,128 2050 1 96,000 2050

2101M Office 1 33,128 2050

2101M Warehouse

1 96,000 2050

2101M Shop 1 33,128 2050

Grand Total 10 97,134 20470 4 42,778 8163 2 96,560 4063

HNF-53496, VOL2, REV 0

F-3

Table F-3. MSA Roof Replacement List. (Section 6.2.4)

Facility ID Roof Type

Roof SF Roof Replacement

Cost

Roof Installation

Date

Roof Replacement

Date

Building's Roof Age

High Risk $850,105

275W 3,990 $36,746 1936 1956 76

4707 3,128 $29,889 1946 1966 66

274E 3,812 $35,775 1946 1966 66

712 10,433 $71,860 1949 1969 63

MO315 560 $18,052 1975 1995 37

3790 18,000 $113,100 1981 2001 31

2719EA 1,885 $25,273 1981 2001 31

622F 3,200 $38,104 1951 2001 61

2751E 14,982 $96,652 1984 2004 28

MO414 11,088 $75,430 1984 2004 28

MO235 1,848 $25,072 1986 2006 26

MO388 1,456 $22,935 1986 2006 26

MO252 1,848 $25,072 1990 2010 22

MO253 1,848 $25,072 1990 2010 22

MO257 1,848 $25,072 1990 2010 22

MO276 14,784 $95,573 1992 2012 20

MO280 9,240 $65,358 1992 2012 20

MO722 1,848 $25,072 1992 2012 20

At Risk $1,094,848

712B 1,848 $25,072 1993 2013 19

MO256 1,848 $25,072 1993 2013 19

MO290 1,848 $25,072 1993 2013 19

2101M 161,256 $878,845 1994 2014 18

MO286 11,088 $75,430 1994 2014 18

MO292 9,240 $65,358 1994 2014 18

Low Risk $1,229,611

6293 1,742 $24,494 1996 2016 16

4732C 20,000 $144,400 1971 2021 41

4734B 7,713 $70,688 1971 2021 41

4734C 8,092 $73,424 1971 2021 41

4704N 8,070 $73,265 1973 2023 39

4722C 4,080 $44,458 1975 2025 37

4732A 15,000 $108,300 1975 2025 37

3220 5,720 $46,174 2009 2029 3

2724WB 1,600 $26,552 1979 2029 33

2230E 1,447 $25,447 1980 2030 32

2715ED 600 $19,332 1980 2030 32

HNF-53496, VOL2, REV 0

F-4

Table F-3. MSA Roof Replacement List. (Section 6.2.4)

Facility ID Roof Type

Roof SF Roof Replacement

Cost

Roof Installation

Date

Roof Replacement

Date

Building's Roof Age

273E 6,000 $58,320 1981 2031 31

2715EC 1,021 $22,372 1982 2032 30

2721EA 3,767 $42,198 1984 2034 28

2711E 7,110 $66,334 1985 2035 27

6290 8,660 $77,525 1989 2039 23

2711EA 4,443 $47,078 1991 2041 21

2711EB 4,494 $47,447 1995 2045 17

275E-BA 458 $18,307 1997 2047 15

2266E 26,800 $193,496 2006 2056 6

Total $4,932,254 Footnote: List Excludes Facilities Identified With a Release Date of 2012 and 2013

HNF-53496, VOL2, REV 0

F-5

Table F-4. MSA HVAC Replacement List. (Section 6.2.4)

Facility ID HVAC Type Gross SF HVAC Size

(BTU)

HVAC Replacement

Cost

HVAC Installation

Date

HVAC Replacement

Date

HVAC Age

High Risk 232,677 924 $2,569,597

4707 Forced Air, Heat Pump 3,128 8 $64,709 1946 1966 66

4734B Forced Air, Heat Pump 7,713 19 $122,572 1971 1991 41

4734C Unit Heaters, Electric 8,092 71 $31,988 1971 1991 41

4704N Unit Heaters, Electric 8,070 71 $31,942 1973 1993 39

4722C Forced Air, Heat Pump 4,080 10 $79,838 1975 1995 37

4732A Unit Heaters, Electric 15,000 132 $46,491 1978 1998 34

2724WB Unit Heaters, Electric 1,600 14 $18,359 1979 1999 33

MO414 Forced Air, Heat Pump 11,088 28 $176,207 1984 1999 28

2715ED Unit Heaters, Electric 600 5 $16,260 1980 2000 32

2719EA Forced Air, Heat Pump 1,885 5 $44,956 1981 2001 31

2101M - Office Central HVAC 33,128 83 $232,477 1982 2002 30

2101M - Shop Central HVAC 33,128 83 $232,477 1982 2002 30

4732C Unit Heaters, Electric 20,000 176 $56,988 1982 2002 30

622F Forced Air, Heat Pump 3,200 8 $65,853 1982 2002 30

2715EC Unit Heaters, Electric 1,021 9 $17,143 1983 2003 29

2751E Forced Air, Heat Pump 14,982 37 $238,089 1984 2004 28

2711E Forced Air, Heat Pump 7,406 19 $117,694 1985 2005 27

MO257 Forced Air, Heat Pump 1,848 5 $44,368 1990 2005 22

MO276 Forced Air, Heat Pump 14,784 37 $234,943 1992 2007 20

MO280 Forced Air, Heat Pump 9,240 23 $146,839 1992 2007 20

MO722 Forced Air, Heat Pump 1,848 4.62 $44,368 1992 2007 20

MO256 Forced Air, Heat Pump 1,848 5 $44,368 1993 2008 19

6290 Forced Air, Heat Pump 8,660 22 $137,622 1989 2009 23

MO286 Forced Air, Heat Pump 11,088 28 $176,207 1994 2009 18

MO292 Forced Air, Heat Pump 9,240 23 $146,839 1994 2009 18

274E Forced Air, Heat Pump 3,812 10 $75,579 1992 2012 20

HNF-53496, VOL2, REV 0

F-6

Table F-4. MSA HVAC Replacement List. (Section 6.2.4)

Facility ID HVAC Type Gross SF HVAC Size

(BTU)

HVAC Replacement

Cost

HVAC Installation

Date

HVAC Replacement

Date

HVAC Age

At Risk 106,214 294 $1,655,936

3220 Forced Air, Heat Pump 5,720 14 $105,900 1993 2013 19

2711EB Unit Heaters, Electric 4,494 40 $24,435 1993 2013 19

2101M - Warehouse Forced Air, Heat Pump 96,000 240 $1,525,601 1994 2014 18

Low Risk 47,412 151 $684,902

6293 Forced Air, Heat Pump 1,742 4 $42,683 1996 2016 16

2711EA Unit Heaters, Electric 4,582 40 $24,619 1996 2016 16

2721EA Wall Mount HVAC 7,638 19 $64,988 2002 2017 10

275E-BA Unit Heaters, Electric 650 6 $16,365 2010 2025 2

2266E Forced Air, Heat Pump 26,800 67 $425,897 2006 2026 6

273E Forced Air, Heat Pump 6,000 15 $110,350 2007 2027 5

Grand Total 391,562 1,379 $4,986,014

Footnote: List Excludes Facilities Identified With a Release Date of 2012 and 2013

HNF-53496, VOL2, REV 0

F-7

Table F-5. MSA Potential Facility Transfer Candidates. (Section 6.2.6)

Year Fac. Is Available Offices Shop Warehouse

# of Fac. Gross ft2 # of Fac. Gross ft2 # of Fac. Gross ft2

Early Release 2 4,976 3 19,885 3 43,070

2013 1 1,848

MO253 1 1,848

2020 3 19,885 3 43,070

4704N 1 8,070

4722C 1 4,080

4732A 1 15,000

4732C 1 20,000

4734B 1 7,713

4734C 1 8,092

Consolidation 4 7,000

2013 4 7,000

MO235 1 1,848

MO252 1 1,848

MO290 1 1,848

MO388 1 1,456

Total 5 8,848 3 19,885 3 43,070

Table F-6. MSA Current Facility Utilization. (Section 6.2.8)

Fac. ID by Utilization

Range

Offices Shop Storage/Warehouse

# of Fac.

ft2 % Utilized # of

Fac. ft

2 %

Utilized # of Fac.

ft2 %

Utilized

50% or Less 1 7,263

4704N 1 7,263 10%

50% - 90% 1 313

4707 1 313 90%

90% - 100% 11 0 9 0 7 0

3220 1 0 95%

6290 1 0 100%

6293 1 0 100%

2101M - Office 1 0 100%

2101M - Shop 1 0 100%

2101M - Warehouse 1 0 100%

2230E 1 0 100%

2266E 1 0 100% 0

2715EC 1 0 100%

2715ED 1 0 100%

2719EA 1 0 100%

HNF-53496, VOL2, REV 0

F-8

Table F-6. MSA Current Facility Utilization. (Section 6.2.8)

Fac. ID by Utilization

Range

Offices Shop Storage/Warehouse

# of Fac.

ft2 % Utilized # of

Fac. ft

2 %

Utilized # of Fac.

ft2 %

Utilized

2724WB 1 0 100%

274E 1 0 100%

2751E 1 0 96%

275E-BA 1 0 100%

4722C 1 0 100%

4732A 1 0 100%

4732C 1 0 100%

4734B 1 0 100%

4734C 1 0 100%

622F 1 0 100%

MO256 1 0 100%

MO257 1 0 100%

MO276 1 0 93%

MO292 1 0 100%

MO414 1 0 93%

MO722 1 0 100%

More Than 100% 5 7,552

2711E 1 1,481 120%

2711EA 1 916 120%

2711EB 1 899 120%

2721EA 1 3,055 140%

273E 1 1,200 120%

Total 12 3,009 14 7,552 8 7,263

HNF-53496, VOL2, REV 0

G-i

APPENDIX G

SECTION 6.3 SUPPORT - WRPS PROFILE

HNF-53496, VOL2, REV 0

G-ii

This Page Intentionally Left Blank.

HNF-53496, VOL2, REV 0

G-1

APPENDIX G

SECTION 6.3 SUPPORT - WRPS PROFILE

Table G-1. WRPS Supply/Demand Projections. (6.3.2)

Office Shop Storage/Warehouse Office Shop Storage/Warehouse Office Shop Storage/Warehouse

Year # of Fac Gross ft2 # of Fac Gross ft

2 # of Fac Gross ft2

Gross ft2

Gross ft2

Gross ft2

Gross ft2

Gross ft2

Gross ft2

Gross ft2

Gross ft2

Gross ft2

2012 72 527,616 8 25,522 7 41,520 10,000 5,760 $484,920,000 0.00109 527,616 521,856 25,522 41,520 508,676

2013 3,690 26,425 $516,390,000 0.00109 561,857 499,121 25,522 41,520 504,980

2014 $666,600,000 0.00109 725,292 499,121 25,522 41,520 504,980

2015 7,380 1,848 $841,030,000 0.00109 915,081 504,653 25,522 41,520 504,980

2016 $1,087,680,000 0.00109 1,183,448 504,653 25,522 41,520 504,980

2017 $1,316,060,000 0.00109 1,431,936 504,653 25,522 41,520 504,980

2018 140,000 $1,417,350,000 0.00109 1,542,144 644,653 25,522 41,520 504,980

2019 100,000 $1,693,070,000 0.00109 1,842,141 744,653 25,522 41,520 504,980

2020 $1,279,230,000 0.00109 1,391,863 744,653 25,522 41,520 504,980

2025 $6,812,540,000 0.00109 1,482,473 744,653 25,522 41,520 482,180

2030 $8,016,880,000 0.00109 1,744,549 744,653 25,522 41,520 480,116

2035 $9,417,880,000 0.00109 2,049,420 744,653 25,522 41,520 479,192

2040 $10,666,050,000 0.00109 2,321,034 744,653 25,522 41,520 432,872

2045 $8,780,350,000 0.00109 1,910,688 744,653 25,522 41,520 414,686

2050 $3,028,410,000 0.00109 659,011 744,653 25,522 41,520 414,686

Available Facilities

Office Shop Storage/Warehouse

Forecasted Future SF DemandCurrent Facilities Planned Future Facility Acquisition Forecasted Release of Facilities

Budget Ratio Projected ft2

HNF-53496, VOL2, REV 0

G-2

Table G-2. WRPS Current and Future End of Life Facilities. (Section 6.3.3)

End of Facility Lifecycle

Offices Shop Warehouse

# of Fac.

Gross ft2 Forecasted

Release Date

# of Fac.

Gross ft2

Forecasted Release

Date

# of Fac

.

Gross ft2

Forecasted Release

Date

2004 1 1,344

MO919 1 1,344 2012

2007 1 720

MO211 1 720 2012

2008 1 1,848

MO027 1 1,848 2047

2009 3 15,532

2704S 1 8,140 2047

MO037 1 5,544 2013

MO041 1 1,848 2015

2021 1 2,880

MO850 1 2,880 2049

2022 3 5,136

MO724 1 1,848 2049

MO725 1 1,848 2049

MO733 1 1,440 2049

2023 3 5,544

MO732 1 1,848 2049

MO734 1 1,848 2049

MO979 1 1,848 2049

2024 1 9,240

MO291 1 9,240 2047

2027 2 1,392

MO633 1 720 2049

MO636 1 672 2047

2030 1 672

MO637 1 672 2049

2034 1 6,384

2713WB 1 6,384 2047

2035 1 924

MO575 1 924 2049

2039 10 23,040

MO2241 1 1,440 2049

MO2242 1 1,440 2049

MO588 1 3,600 2049

MO589 1 3,600 2049

MO590 1 3,600 2049

MO591 1 3,600 2049

HNF-53496, VOL2, REV 0

G-3

Table G-2. WRPS Current and Future End of Life Facilities. (Section 6.3.3)

End of Facility Lifecycle

Offices Shop Warehouse

# of Fac.

Gross ft2 Forecasted

Release Date

# of Fac.

Gross ft2

Forecasted Release

Date

# of Fac

.

Gross ft2

Forecasted Release

Date

MO592 1 1,440 2049

MO593 1 1,440 2049

MO594 1 1,440 2049

MO595 1 1,440 2049

2040 12 23,280

MO149 1 1,440 2049

MO150 1 1,440 2049

MO151 1 1,440 2049

MO2240 1 1,440 2049

MO2243 1 1,440 2049

MO533 1 960 2049

MO577 1 3,600 2049

MO578 1 1,440 2049

MO596 1 3,600 2049

MO597 1 3,600 2049

MO598 1 1,440 2049

MO599 1 1,440 2049

2042 10 16,320

MO266 1 1,848 2049

MO267 1 1,848 2049

MO282 1 1,848 2049

MO283 1 1,848 2049

MO284 1 1,848 2049

MO493 1 2,880 2049

MO511 1 1,680 2049

MO524 1 924 2049

MO525 1 924 2049

MO531 1 672 2049

2043 1 1,848

MO268 1 1,848 2049

Grand Total 50 107,872 2 8,232

HNF-53496, VOL2, REV 0

G-4

Table G-3. WRPS Roof Replacement List. (Section 6.3.4)

Facility ID Roof Type Roof ft2 Roof Replacement Cost

Roof Installation Date

Roof Replacement Date

Building's Roof Age

High Risk 67,968 $468,445

2704S Composite Shingle 8,140 $53,746 1949 1969 63

2713WB Metal 6,384 $61,092 1944 1994 68

MO027 Membrane 1,848 $25,072 1978 1998 34

MO041 Membrane 1,848 $25,072 1979 1999 33

2750E Membrane 33,446 $182,281 1980 2000 32

2752E Membrane 14,982 $96,652 1985 2005 27

2707SX Metal 1,320 $24,530 1960 2010 52

At Risk 130,538 $741,432

MO979 Membrane 1,848 $25,072 1993 2013 19

2704HV Membrane 126,842 $691,289 1994 2014 18

278AW Membrane 1,848 $25,072 1994 2014 18

Low Risk 219,353 $2,270,511

2727WA Metal 2,400 $32,328 1968 2018 44

672 Composite Shingle 2,005 $24,544 2002 2022 10

674 Composite Shingle 947 $19,508 2002 2022 10

2716S Metal 1,720 $27,418 1972 2022 40

272S Metal 8,600 $77,092 1975 2025 37

MO575 Membrane 924 $20,036 2005 2025 7

MO637 Membrane 672 $18,662 2005 2025 7

MO2241 Composite Shingle 1,440 $21,854 2009 2029 3

MO2242 Composite Shingle 1,440 $21,854 2009 2029 3

MO588 Membrane 3,600 $34,620 2009 2029 3

MO589 Membrane 3,600 $34,620 2009 2029 3

MO590 Membrane 3,600 $34,620 2009 2029 3

MO591 Membrane 3,600 $34,620 2009 2029 3

HNF-53496, VOL2, REV 0

G-5

Table G-3. WRPS Roof Replacement List. (Section 6.3.4)

Facility ID Roof Type Roof ft2 Roof Replacement Cost

Roof Installation Date

Roof Replacement Date

Building's Roof Age

MO592 Composite Shingle 1,440 $21,854 2009 2029 3

MO593 Composite Shingle 1,440 $21,854 2009 2029 3

MO594 Composite Shingle 1,440 $21,854 2009 2029 3

MO595 Composite Shingle 1,440 $21,854 2009 2029 3

242AC Metal 960 $21,931 1980 2030 32

MO149 Composite Shingle 1,440 $21,854 2010 2030 2

MO150 Composite Shingle 1,440 $21,854 2010 2030 2

MO151 Composite Shingle 1,440 $21,854 2010 2030 2

MO2240 Composite Shingle 1,440 $21,854 2010 2030 2

MO2243 Composite Shingle 1,440 $21,854 2010 2030 2

MO533 Composite Shingle 960 $19,570 2010 2030 2

MO577 Composite Shingle 3,600 $32,136 2010 2030 2

MO578 Composite Shingle 1,440 $21,854 2010 2030 2

MO596 Composite Shingle 3,600 $32,136 2010 2030 2

MO597 Membrane 3,600 $34,620 2010 2030 2

MO598 Composite Shingle 1,440 $21,854 2010 2030 2

MO599 Composite Shingle 1,440 $21,854 2010 2030 2

274AW Membrane 9,240 $65,358 2011 2031 1

MO493 Composite Shingle 2,880 $28,709 2011 2031 1

MO524 Membrane 924 $20,036 2011 2031 1

MO525 Composite Shingle 924 $19,398 2011 2031 1

MO636 Membrane 672 $18,662 2011 2031 1

MO724 Membrane 1,848 $25,072 2011 2031 1

MO725 Membrane 1,848 $25,072 2011 2031 1

MO732 Membrane 1,848 $25,072 2011 2031 1

MO733 Membrane 1,440 $22,848 2011 2031 1

MO734 Membrane 1,848 $25,072 2011 2031 1

HNF-53496, VOL2, REV 0

G-6

Table G-3. WRPS Roof Replacement List. (Section 6.3.4)

Facility ID Roof Type Roof ft2 Roof Replacement Cost

Roof Installation Date

Roof Replacement Date

Building's Roof Age

MO850 Membrane 2,880 $30,696 2011 2031 1

MO266 Membrane 1,848 $25,072 2012 2032 0

MO268 Membrane 1,848 $25,072 2012 2032 0

MO282 Membrane 1,848 $25,072 2012 2032 0

MO283 Membrane 1,848 $25,072 2012 2032 0

MO284 Membrane 1,848 $25,072 2012 2032 0

MO291 Membrane 9,240 $65,358 2012 2032 0

MO511 Membrane 1,680 $24,156 2012 2032 0

MO531 Composite Shingle 672 $18,199 2012 2032 0

272WA Metal 15,541 $112,206 1985 2035 27

277A Metal 3,200 $38,104 1994 2044 18

2101HV #N/A 15,000 $108,300 1996 2046 16

2715AW Metal 2,400 $32,328 1996 2046 16

2715WA Metal 2,400 $32,328 1996 2046 16

MO633 Metal 720 $20,198 1997 2047 15

TC272HV Metal 810 $20,848 1999 2049 13

611 Metal 4,000 $43,880 2003 2053 9

2705S Metal 2,880 $35,794 2009 2059 3

218A Metal 10,000 $87,200 2011 2061 1

227S Metal 6,000 $58,320 2011 2061 1

2713S Metal 17,600 $127,072 2011 2061 1

272AW Metal 25,222 $182,103 2011 2061 1

MO267 Metal 1,848 $28,343 2012 2062 0

Total 417,859 $3,480,388

HNF-53496, VOL2, REV 0

G-7

Table G-4. WRPS HVAC Replacement List. (Section 6.3.4)

Facility ID HVAC Type Gross ft2 HVAC Size (BTU)

HVAC Replacement

Cost

HVAC Installation

Date

HVAC Replacement

Date

HVAC Age

High Risk 105,035 318 $1,656,544

2713WB Unit Heaters, Electric 6,384 56 $28,402 1944 1964 68

2707SX Forced Air, Heat Pump 1,320 3 $35,977 1960 1980 52

2727WA Unit Heaters, Electric 2,400 21 $20,039 1968 1988 44

2716S Forced Air, Heat Pump 1,720 4 $42,334 1972 1992 40

MO027 Forced Air, Heat Pump 1,848 5 $44,368 1978 1993 34

MO041 Forced Air, Heat Pump 1,848 5 $44,368 1,979 1,994 33

272S Forced Air, Heat Pump 8,600 22 $136,668 1975 1995 37

242AC Forced Air, Heat Pump 960 2 $30,256 1980 2000 32

272AW Forced Air, Heat Pump 25,222 63 $400,820 1980 2000 32

272WA Forced Air, Heat Pump 15,541 39 $246,973 1985 2005 27

MO850 Forced Air, Heat Pump 2,880 7 $60,768 1991 2006 21

MO724 Forced Air, Heat Pump 1,848 5 $44,368 1992 2007 20

MO725 Forced Air, Heat Pump 1,848 5 $44,368 1992 2007 20

MO733 Forced Air, Heat Pump 1,440 4 $37,884 1992 2007 20

MO734 Forced Air, Heat Pump 1,848 5 $44,368 1992 2007 20

MO732 Forced Air, Heat Pump 1,848 5 $44,368 1993 2008 19

MO979 Forced Air, Heat Pump 1,848 5 $44,368 1993 2008 19

MO291 Forced Air, Heat Pump 9,240 23 $146,839 1994 2009 18

2101HV Wall Mount HVAC 15,000 38 $113,170 1996 2011 16

MO633 Forced Air, Heat Pump 720 2 $26,442 1997 2012 15

MO636 Forced Air, Heat Pump 672 2 $19,398 1997 2012 15

At Risk 150,080 375 $2,422,451

2704S Forced Air, Heat Pump 8,140 20 $129,358 1993 2013 19

2704HV Forced Air, Heat Pump 126,842 317 $2,015,732 1994 2014 18

274AW Forced Air, Heat Pump 9,240 23 $146,839 1994 2014 18

277A Forced Air, Heat Pump 3,200 8 $65,853 1994 2014 18

HNF-53496, VOL2, REV 0

G-8

Table G-4. WRPS HVAC Replacement List. (Section 6.3.4)

Facility ID HVAC Type Gross ft2 HVAC Size (BTU)

HVAC Replacement

Cost

HVAC Installation

Date

HVAC Replacement

Date

HVAC Age

278AW Forced Air, Heat Pump 1,848 5 $44,368 1994 2014 18

TC272HV Wall Mount HVAC 810 2 $20,301 1999 2014 13

Low Risk 229,637 599 $4,196,555

2715AW Forced Air, Heat Pump 2,400 6 $53,140 1996 2016 16

2715WA Forced Air, Heat Pump 2,400 6 $53,140 1996 2016 16

672 Wall Mount HVAC 2,005 5 $28,122 2002 2017 10

674 Wall Mount HVAC 947 2 $21,198 2002 2017 10

MO575 Forced Air, Heat Pump 924 2 $29,684 2005 2020 7

MO637 Forced Air, Heat Pump 672 2 $25,679 2005 2020 7

611 Unit Heaters, Electric 4,000 35 $23,398 2003 2023 9

MO2241 Forced Air, Heat Pump 1,440 4 $37,884 2009 2024 3

MO2242 Forced Air, Heat Pump 1,440 4 $37,884 2009 2024 3

MO588 Forced Air, Heat Pump 3,600 9 $72,210 2009 2024 3

MO589 Forced Air, Heat Pump 3,600 9 $72,210 2009 2024 3

MO590 Forced Air, Heat Pump 3,600 9 $72,210 2009 2024 3

MO591 Forced Air, Heat Pump 3,600 9 $72,210 2009 2024 3

MO592 Forced Air, Heat Pump 1,440 4 $37,884 2009 2024 3

MO593 Forced Air, Heat Pump 1,440 4 $37,884 2009 2024 3

MO594 Forced Air, Heat Pump 1,440 4 $37,884 2009 2024 3

MO595 Forced Air, Heat Pump 1,440 4 $37,884 2009 2024 3

MO149 Forced Air, Heat Pump 1,440 4 $37,884 2010 2025 2

MO150 Forced Air, Heat Pump 1,440 4 $37,884 2010 2025 2

MO151 Forced Air, Heat Pump 1,440 4 $37,884 2010 2025 2

MO2240 Forced Air, Heat Pump 1,440 4 $37,884 2010 2025 2

MO2243 Forced Air, Heat Pump 1,440 4 $37,884 2010 2025 2

MO533 Forced Air, Heat Pump 960 2 $30,256 2010 2025 2

MO577 Forced Air, Heat Pump 3,600 9 $72,210 2010 2025 2

HNF-53496, VOL2, REV 0

G-9

Table G-4. WRPS HVAC Replacement List. (Section 6.3.4)

Facility ID HVAC Type Gross ft2 HVAC Size (BTU)

HVAC Replacement

Cost

HVAC Installation

Date

HVAC Replacement

Date

HVAC Age

MO578 Forced Air, Heat Pump 1,440 4 $37,884 2010 2025 2

MO596 Forced Air, Heat Pump 3,600 9 $72,210 2010 2025 2

MO597 Forced Air, Heat Pump 3,600 9 $72,210 2010 2025 2

MO598 Forced Air, Heat Pump 1,440 4 $37,884 2010 2025 2

MO599 Forced Air, Heat Pump 1,440 4 $37,884 2010 2025 2

MO524 Forced Air, Heat Pump 924 2 $29,684 2011 2026 1

MO525 Forced Air, Heat Pump 924 2 $29,684 2011 2026 1

MO531 Forced Air, Heat Pump 672 2 $25,679 2011 2026 1

MO266 Forced Air, Heat Pump 1,848 5 $44,368 2012 2027 0

MO267 Forced Air, Heat Pump 1,848 5 $44,368 2012 2027 0

MO268 Forced Air, Heat Pump 1,848 5 $44,368 2012 2027 0

MO282 Forced Air, Heat Pump 1,848 5 $44,368 2012 2027 0

MO283 Forced Air, Heat Pump 1,848 5 $44,368 2012 2027 0

MO284 Forced Air, Heat Pump 1,848 5 $44,368 2012 2027 0

MO493 Forced Air, Heat Pump 2,880 7 $60,768 2012 2027 0

MO511 Forced Air, Heat Pump 1,680 4 $41,698 2012 2027 0

2705S Forced Air, Heat Pump 2,880 7 $60,768 2009 2029 3

218A Forced Air, Heat Pump 10,000 25 $158,917 2011 2031 1

227S Forced Air, Heat Pump 6,000 15 $110,350 2011 2031 1

2713S Forced Air, Heat Pump 17,600 44 $279,693 2011 2031 1

2750E Forced Air, Heat Pump 100,339 251 $1,594,555 2011 2031 1

2752E Forced Air, Heat Pump 14,982 37 $238,089 2011 2031 1

Total 484,752 1,292 $8,275,551

HNF-53496, VOL2, REV 0

G-10

Table G-5. Potential Facility Transfer Candidate List. (Section 6.3.6)

Year Fac. Is Available Offices Shop Warehouse

# of Fac. Gross SF # of Fac. Gross SF # of Fac. Gross SF

Early Release 1 3,696

2012 1 3,696

MO409 1 3,696

Total 1 3,696

Table G-6. WRPS Current Utilization. (Section 6.3.8)

Fac. ID by Utilization Range

Offices Shop Storage/Warehouse

# of Fac.

ft2 % Utilized

# of Fac.

ft2 % Utilized

# of Fac.

ft2 % Utilized

50% or Less 1 672 1 3,192

2713WB 1 3,192 50%

MO636 1 672 0%

90% - 100% 57 24,933 7 0 7 0

611 1 0 100%

672 1 0 100%

674 1 0 100%

2101HV 1 0 100%

218A 1 0 100%

227S 1 0 100%

242AC 1 0 100%

2704HV 1 8,879 93%

2704S 1 0 100%

2705S 1 0 100%

2707SX 1 0 100%

2713S 1 0 100%

2715AW 1 0 100%

2715WA 1 0 100%

2716S 1 0 100%

2727WA 1 0 100%

272AW 1 0 100%

272S 1 0 100%

272WA 1 0 100%

274AW 1 0 100%

2750E 1 16,054 84%

2752E 1 0 100%

277A 1 0 100%

278AW 1 0 100%

HNF-53496, VOL2, REV 0

G-11

Table G-6. WRPS Current Utilization. (Section 6.3.8)

Fac. ID by Utilization Range

Offices Shop Storage/Warehouse

# of Fac.

ft2 % Utilized

# of Fac.

ft2 % Utilized

# of Fac.

ft2 % Utilized

MO027 1 0 100%

MO041 1 0 100%

MO149 1 0 100%

MO150 1 0 100%

MO151 1 0 100%

MO2240 1 0 100%

MO2241 1 0 100%

MO2242 1 0 100%

MO2243 1 0 100%

MO266 1 0 100%

MO267 1 0 100%

MO268 1 0 100%

MO282 1 0 100%

MO283 1 0 100%

MO284 1 0 100%

MO291 1 0 100%

MO493 1 0 100%

MO511 1 0 100%

MO524 1 0 100%

MO525 1 0 100%

MO531 1 0 100%

MO533 1 0 100%

MO575 1 0 100%

MO577 1 0 100%

MO578 1 0 100%

MO588 1 0 100%

MO589 1 0 100%

MO590 1 0 100%

MO591 1 0 100%

MO592 1 0 100%

MO593 1 0 100%

MO594 1 0 100%

MO595 1 0 100%

MO596 1 0 100%

MO597 1 0 100%

MO598 1 0 100%

MO599 1 0 100%

MO633 1 0 100%

MO637 1 0 100%

MO724 1 0 100%

HNF-53496, VOL2, REV 0

G-12

Table G-6. WRPS Current Utilization. (Section 6.3.8)

Fac. ID by Utilization Range

Offices Shop Storage/Warehouse

# of Fac.

ft2 % Utilized

# of Fac.

ft2 % Utilized

# of Fac.

ft2 % Utilized

MO725 1 0 100%

MO732 1 0 100%

MO733 1 0 100%

MO734 1 0 100%

MO850 1 0 100%

MO979 1 0 100%

TC272HV 1 0 100%

Grand Total 58 25,605 8 3,192 7 0

HNF-53496, VOL2, REV 0

H-i

APPENDIX H

SECTION 8.0 - ATLAS OF GENERAL-PURPOSE FACILITIES

HNF-53496, VOL2, REV 0

H-ii

This Page Intentionally Left Blank.

HNF-53496, VOL2, REV 0

H-1

APPENDIX H

SECTION 8.0 SUPPORT - ATLAS OF GENERAL-PURPOSE FACILITIES

HNF-53496, VOL2, REV 0

H-2

HNF-53496, VOL2, REV 0

H-3

HNF-53496, VOL2, REV 0

H-4

HNF-53496, VOL2, REV 0

H-5

HNF-53496, VOL2, REV 0

H-6

HNF-53496, VOL2, REV 0

H-7

HNF-53496, VOL2, REV 0

H-8

HNF-53496, VOL2, REV 0

H-9

HNF-53496, VOL2, REV 0

H-10

HNF-53496, VOL2, REV 0

H-11

HNF-53496, VOL2, REV 0

H-12

HNF-53496, VOL2, REV 0

H-13

HNF-53496, VOL2, REV 0

H-14

HNF-53496, VOL2, REV 0

H-15

HNF-53496, VOL2, REV 0

H-16

HNF-53496, VOL2, REV 0

H-17

HNF-53496, VOL2, REV 0

H-18

HNF-53496, VOL2, REV 0

H-19

HNF-53496, VOL2, REV 0

H-20

HNF-53496, VOL2, REV 0

H-21

HNF-53496, VOL2, REV 0

H-22

HNF-53496, VOL2, REV 0

H-23

HNF-53496, VOL2, REV 0

H-24

HNF-53496, VOL2, REV 0

H-25

HNF-53496, VOL2, REV 0

H-26

HNF-53496, VOL2, REV 0

H-27

HNF-53496, VOL2, REV 0

H-28

HNF-53496, VOL2, REV 0

H-29