fy16 budget discussion - metromedia.metro.net/board/items/2015/05_may/20150508sbaitem6.pdf ·...
TRANSCRIPT
FY16 Budget Discussion May 2015 Service Councils
Metro is Everywhere
Metro is a lot more than buses and trains.
Anyone who has boarded a bus or a train, driven on the freeway, used the toll roads, stopped at a traffic signal, or ridden a bike in Los Angeles County is a Metro customer.
Whether you are shopping, running errands, or going to work via bus, train, car, bike, or even on foot…
you are going Metro!
2
Transportation Means Mobility
> Building new transportation infrastructure, including Metro rail, freeways, toll roads and regional rail
> Funding of improvements at the city/local level, such as traffic signals and road improvements
> Funding for transit operators, Metrolink and Access Services
> Bicycle and pedestrian programs and projects
Operation of buses and trains represents only ¼ of Metro’s total budget:
3
The Entire Region Contributes to Metro Residents and visitors to LA County provide about ¾ of Metro’s annual funding:
> Each of Metro’s sales tax measures, by law, has restrictions on its uses
> Portion of funds are reserved for distribution to local communities
> Pays for improvements and investments in traffic signals, local buses, road improvements, and other mobility projects throughout the county
> About 145 different colors of money each with specific restrictions
Sales Tax, 49%
Fares, Tolls, Advertising &
Other, 8%
Bond Proceeds & Carryover,
20%
Grants, 23%
4
General Planning & Programming
Mobility Needs Assessment & Conceptual Planning
> Long Range Transportation Plan Mobility needs of LA County over the next 30 years
> Short Range Transportation Plan Focused look at first 10 years of LRTP
> Systemwide and Subregional Planning What are the local mobility needs? > Regional Short Range Transit Plan
How should we adjust the existing transit network over the next 5 years?
TRANSIT, HIGHWAYS, LOCAL STREETS AND ROADS > Bus Rapid Transit Corridors Identifying heavily travelled routes/segments for higher speed bus service > First/Last Mile
Access to bus/rail to reach your final destination (door-to-door) > Active Transportation: Bicycle and Pedestrian Programs
Non-motorized mobility alternatives > Street Improvements
5
Planning
Engineering
Construction
Operations/ Maintenance
Metro Projects Life Cycle
FY16 budget represents the annual slice of each project
Ongoing System
Evaluation/ Needs
Assessment
Projects are multi-year and in different phases of development
6
Budget Development Timeline
FY16 Budget Development
Budget Parameters
Outreach at Service Council Meetings
Capital Program - Estimated $2B
Operating Budget - Estimated $1.5B
Subsidy Budget - Estimated $1.4B
Workforce (FTEs)
Public Budget Forum Public Hearing
and Board Review
Develop FY16 Proposed Budget
DEC14 JAN15 FEB15 MAR15 APR15 MAY15 JUN15
7
FY16 Proposed Budget: $5.56 Billion
Subsidy Funding Programs, $1.4B
(25%)
Congestion Management, $93.9M (2%)
Metro Operation, $1.5B (26%)
Debt Service, $328.7M (6%)
Capital, $2.1B (38%)
General Planning & Programming, $172.8M (3%)
Where is the money going?
Capital Funding mandated through Ordinance > Transit Capital Specific Projects > Highway Projects > Metrolink
Subsidy Funding mandated by Ordinance to be allocated to > Transit Operators > 88 cities and unincorporated areas > Local Agencies
Debt Service > Cannot default on debt obligations
Congestion Management > ExpressLanes, Freeway Service Patrol, Call Box, Vanpools
Metro Operations > Maintaining the current level of service $1.5B > Funding allocated is mandated by Ordinance to operations and maintenance of bus/rail > $360M for State of Good Repair
General Planning & Programming > Identify regional mobility needs and solutions
8
Planning and Engineering
HIGHWAY PROJECTS > I-605 Corridor “Hot Spots” > I-5 North Capacity Enhancements (SR-14 to Kern County Line) > I-710 South and Early Action Projects > SR-710 North Gap Closure > SR-138 Capacity Enhancements > High Desert Corridor > Arroyo Verdugo Operational Improvements > South Bay Ramp & Interchange Operational Improvements > Countywide Soundwall Projects
Projects under Planning/Engineering in FY16
TRANSIT PROJECTS > East San Fernando Valley Transit Corridor > Airport Metro Connector > South Bay Metro Green Line Extension > West Santa Ana Branch > Eastside Extension Phase II
9
Construction
HIGHWAY PROJECTS > Countywide Soundwall Improvements > I-5 North/South Capacity Improvements > Alameda Corridor East Grade Separations Phase II > Las Virgenes/Malibu Operational Improvements > Arroyo Verdugo Operational Improvements > I-5 Carmenita Road Interchange Improvement > I-405, I-110, I-105 and SR-91 Ramp and Interchange Improvements in South Bay
Projects under construction in FY16
TRANSIT PROJECTS > Expo Line Phase II to Santa Monica (Opening in FY16) > Gold Line Eastside Extension to Azusa (Opening in FY16) > Westside Purple Line Extension Section 1 (La Cienega) > Crenshaw/LAX Transit Project > Regional Connector
10
Other Capital Projects
FY16 Asset Maintenance, Asset Improvements, and Safety & Security
> Patsaouras Plaza Busway Station > Universal City Pedestrian Bridge > Orange Line to Red Line Pedestrian Underpass > Security Kiosks at Metro Red Line Stations > Purchase new buses and rail vehicles > Blue Line Station refurbishments and vehicle overhauls > Red Line Heavy Rail vehicle overhauls > Improvements and maintenance projects across all rail lines > Elevator/Escalator modernizations at Civic Center and Pershing Square
11
Other Initiatives
Sustainability
GREENER FLEETS > Nation’s first and largest CNG Fleet GREENER BUILDINGS AND DEVELOPMENTS > Uses 33% less electricity and 50% less water GREENER POWER > One of the largest solar installations in the transit industry GREENER COMMUTES > Partnerships to increase transit, carpooling, vanpooling, walking, biking and car-sharing GREENER TRANSPORTATION CORRIDORS > Integrated Transitway, Bikeway and Landscaped Pathway GREENER OPERATIONS > Continuous improvement and positive impact on environment, employees and customers
12
Other Initiatives
Technology
FARE PAYMENT IMPROVEMENTS > NEW easier to use TVM screens with more languages > More TVMs systemwide > Faster auto-loads on TAP cards > Mobile app
SECURITY IMPROVEMENTS > Cameras on rail vehicles and stations > Video screens on board buses
WI-FI > Pilot program to on the Silver Line and Red Line will also enhance security by enabling real-time access to the video surveillance system
COUNTYWIDE SIGNAL PRIORITY PROJECT > Implementation will improve traffic by moving bus patrons faster
13
Other Initiatives
Seamless regional transit system
NOW 26 TRANSIT AGENCIES ON TAP > Local operators will be TAP Enabled > EZ Transit Pass on TAP
Access AVTA Baldwin Park Burbank Carson Compton Culver City Foothill Gardena
Glendale Huntington Park LA County LADOT LAWA Long Beach Metro Metrolink Montebello
Monterey Park Norwalk Palos Verdes Pasadena Redondo Beach Santa Clarita Santa Monica Torrance
14
Congestion Management
Freeway Operations
> ExpressLanes - Toll operations > Caltrans Operations and Maintenance > California Highway Patrol (CHP) > Freeway Service Patrol > Call Box Program > Regional Integration of Intelligent Transportation System
OTHER CORRIDOR FUNDED SERVICES > Bus service enhancement (Metro, Foothill Transit, Gardena Transit, Torrance Transit) > Harbor/Gateway Transit Center to Dodger Stadium Express Bus > Marketing and Outreach > Professional services contracts to support existing and evaluate new ExpressLanes
15
Subsidy Funding Passed to Cities
Public Transit Dial-A-Ride Paratransit Shuttle Service
Fare Subsidy Programs Youth and Senior Recreational Transit Taxi subsidies
Bus Stop Improvements/Maintenance Bus Shelters
Safety Improvements Transit Center Parking
Bikeways, Bike trails, lanes, boulevards Bicycle parking and lockers Citywide Bikeshare programs
About 20% goes to cities to improve transit and mobility (Local Return Money)
16
Subsidy Funding Passed to Cities
Many projects are underway by each of the cities to improve transit and mobility
Pedestrian Improvements Crosswalk programs Traffic signals near schools Safe Routes to school
Street Repair and Maintenance Street Lighting Projects Street Improvement Projects Pavement Rehab Streetscape Improvements Traffic Signal Enhancements & Installations Traffic Signal Synchronization
17
Subsidy Funding Passed to Partner Agencies
Metro allocates funding to regional operators throughout Los Angeles County
18
Subsidy Assistance Programs
> RIDER RELIEF TRANSPORTATION PROGRAM (RRTP) Coupons to low-income transit riders through non- profit agencies > IMMEDIATE NEEDS TRANSPORTATION PROGRAM (INTP) Tokens and taxi vouchers to low-income persons who have a transportation need for basic medical, shelter/housing and job search needs > SUPPORT FOR HOMELESS RE-ENTRY PROGRAM (SHORE) Tokens through a network of homeless shelters to individuals and families at approved social service agencies
Rider fare subsidies of $10.5M
19
Metro Operations
NEW RAIL SERVICE > Expo Line Phase II to Santa Monica > Gold Line Eastside Extension to Azusa
What’s Happening in FY16?
NEWER FLEET > Purchasing 78 new light rail cars > Purchasing 350 new buses
IMPROVE BUS NETWORK > Maintain 7.06 million annual revenue service hours > Full year implementation of Valley-Westside Express > Evaluate options for a Gold Line-Orange Line Express > Wilshire BRT – Bus Only Lanes and All Door Boarding Pilot > Establish framework for a systemwide “Frequent Bus Network”
MAINTAIN BUS AND RAIL INFRASTRUCTURE > Bus and rail component overhaul and midlife service > Ensure bus/rail safety and service reliability > Focus on older Blue and Red rail lines
20
FY16 Proposed Budget
Restrictions and mandated uses of funds
Subsidy Funding & Programs
Congestion Management
Metro Operation
Debt Service
Capital
General Planning &
Programming
Capital Funding mandated through Ordinance > Transit Capital Specific Projects > Highway Projects > Regional Rail (Metrolink)
Subsidy Funding mandated by Ordinance to be allocated to > Transit Operators > 88 cities and unincorporated areas > Local Agencies
Debt Service > Cannot default on debt obligations
Congestion Management > Portion of monies must be reinvested in the corridor
Metro Operations > Maintaining the current level of service $1.5B > Funding allocated is mandated by Ordinance to operations and maintenance of bus/rail > $360M for State of Good Repair
21
General Planning & Programming > Identify regional mobility needs and solutions
Per the Ordinances, Oversight Committees have been established to ensure that monies are used in compliance with what taxpayers and voters approved. > Measure R Independent Taxpayers Oversight Committee > Prop A & C Independent Citizen’s Advisory and Oversight Committee
Financial Oversight
There is oversight over every dollar we collect and spend…
> Comprehensive Annual Financial Report > Single Audit for federal expenditures > Prop A & C Audit > Measure R Audit > STA > TDA > FTA Triennial Audit
> NTD Audits > FTA IPERA > FEMA > Prop 1B > STIP > ATU > Sales Tax Audit by State Board of Equalization
All these audits determine Metro’s compliance with funding requirements
22
> Opening Expo II to Santa Monica & Gold Line Foothill Ext. > New bus and rail vehicles > Safety & Security > Transit Service Quality > Maintaining our assets > Maintaining bus service levels > Delivery of rail and highway projects > Bicycle and Pedestrian Programs > Technology Enhancements > New initiatives (First/Last Mile)
FY16 Budget Priorities
These are our priorities—but what are yours?
Highlight of programs that improve mobility in LA County
23
> Proposed budget available online by May 5th > Public Hearing May 20th > Service Councils > Citizen Advisory Councils > Social Media (Twitter/Facebook/The Source/El Pasajero) > Podcasts > Visit us at: www.metro.net > Email us: [email protected]
Public Engagement in Budget We want your input… GET INVOLVED!
COMING SOON: > Interactive online tool > Winter Budget Public Forum for FY17 Budget
24
Key topics Synopsis
Transit Service • Highland Avenue in Hollywood does not have a bus; this service should be added • Crenshaw construction causes inconveniences because the bus detours do not have adequate numbers of
temporary stops • Buses that do not go directly to North Hollywood Station run more frequently than those that do go directly to
North Hollywood Station, and this is inconvenient for those trying to connect to the Orange/Red Line • Existence of short lines makes it inconvenient to travel the longer route because headways are longer;
example given was #2 line going east to downtown • Bus service to Beach & La Habra in La Habra ends too early • Valley Express Bus at peak times is always 15-20 minutes late; changes from the 761/233 combination to the
734/234 seems to have actually decreased service • Van Nuys Boulevard service should not go on the I-405 and is always 20-40 minutes late • Rail and Orange Line service runs longer than buses, which is inconvenient
Technology • TPIS screens are not accurate; for example, the screens show regular scheduled arrival times for the Blue Line on the weekends although there is construction that causes known delays
• Improve the communication of service alerts to Metro customers (i.e. add alerts on new bus cameras) • Expand TAP program to be used for goods purchase, similar to Visa or MasterCard
Safety & Security
• Complaints about lack of LASD presence and ineffectiveness of law enforcement • Find ways to control fare evasion
Budget Public Forum Comments Comments Related to Transit Service
25
26