TAYLOR YARD G2 RIVER PARK
TECHNICAL ADVISORY STAKEHOLDER COMMITTEE
COMMUNITY LEADERSHIP COMMITTEE
September 6, 2018
http://lariver.org/G2
http://www.tayloryardg2.com/
G2 TAYLOR YARD
RIVER PARK
1
Pre-Design Update
![Page 2: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/2.jpg)
AGENDAWelcome and Introductions
Project Update
Community Workshop and Survey Results
Update on Site Assessment
Water Quality Improvement Opportunities
Preliminary Design Concepts
Next Steps
G2 TAYLOR YARD
RIVER PARK
2
Pre-Design Update
![Page 3: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/3.jpg)
G2 TAYLOR YARD
RIVER PARK
Project Management Team
Michael Affeldt
Director, LARiverWorks
Arturo Chavez
Senior Advisor
Gary Lee Moore, PE, ENV SP
City Engineer
Deborah Weintraub, AIA, LEEDAP
Chief Deputy City Engineer
Christopher Johnson, PE, GE
Program Manager
Katie Doherty, PE
Project Manager
3
Pre-Design Update
![Page 4: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/4.jpg)
Project Partners
G2 TAYLOR YARD
RIVER PARK
California Departm ent of Toxic
Substances Control
4
Pre-Design Update
![Page 5: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/5.jpg)
G2PRIME CONSULTANT
Project Managem ent /
Leadership
Arch itectureUrban Design & Landscape
Arch itectureMed iterranean Landscape
Arch itecture
Econom ic
Developm ent
& Financing
Hydrology &
Hydraulics/
Inspect ions
Public
Engagem ent
Water
Quality
Civil Engineering
Botany, Biology &
Natural Habitat
Public
Engagem entPublic
Engagem ent
Environm ental
Docum entat ion
Soil Sam pling
Managem ent
City of Los Angeles
Bureau of Engineering
TAYLOR YARD
RIVER PARK
![Page 6: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/6.jpg)
3
TAYLOR YARDG2 LOCATIONMILE 25 OF THE LARIVER
6
![Page 7: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/7.jpg)
Project Development and
Activities in 2018
EXISTING
ARBOR Study
Concept
Jan Public Meetings
Feb Community Survey
Mar Internal Pre-Design Workshops
April Geophysical Survey,Groundwater Monitoring
May Begin Site Assessments
June Mayor’s Briefing
July Site Assessment Ongoing
August Site Assessment Ongoing
![Page 8: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/8.jpg)
AGENDAWelcome and Introductions
Project Update
Community Workshop and Survey Results
Update on Site Assessment
Water Quality Improvement Opportunities
Preliminary Design Concepts
Next Steps
G2 TAYLOR YARD
RIVER PARK
8
![Page 9: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/9.jpg)
Community Site Tour and
Workshop January 2018
9
![Page 10: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/10.jpg)
Community Workshop Table Comments
10
![Page 11: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/11.jpg)
Community Survey ResultsEXISTING
ARBOR Study
Concept
Over 1300 Respondents!
Key Findings:
• Nature - Respondents have a highinterest in natural components; openspace; trails and habitat.
• Recreation - Outdoor recreationincluding walking / jogging and cyclingranked high, both as activities
• LA River - 84% reported having visitedthe River. Strong interest in Riverinteraction and education.
• Consistent Results - Communitypriorities among the public are largelyconsistent with those of thecommunity immediately surroundingthe G2 parcel.
11
11
![Page 12: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/12.jpg)
Community Survey ResultsEXISTING
ARBOR Study
Concept
Favorite Park Features
Respondents were asked to selecttheir top three:
64% - access to nature
53% - walking and hiking trails
35% - scenic views
12
![Page 13: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/13.jpg)
Natural Space/Wildlife Habitat
Features preferred:
40%- River Access
40% - Trails
33% - Enjoying Nature/Habitat
13
![Page 14: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/14.jpg)
Activities/Recreational Elements
ARBOR Study
Concept
Park features preferred:
60%- Walking/Running/Jogging
40% - Children’sNature/Adventure Play
38% - Meadow andPicnicking
14
![Page 15: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/15.jpg)
AGENDAWelcome and Introductions
Project Update
Community Workshop and Survey Results
Update on Site Assessment
Water Quality Improvement Opportunities
Preliminary Design Concepts
Next Steps
G2 TAYLOR YARD
RIVER PARK
15
![Page 16: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/16.jpg)
Rail Operations - Equipment
Maintenance and Fueling:
• Early 1900’s – 2006
• Former facilities:-Diesel and machine shop
-Roundhouse, turntables
-Underground and aboveground
storage tanks
-Industrial wastewater treatment
plant
• Materials previously onsite:-Diesel and gasoline fuel
-Various oils, greases, acids, paints
and thinners
-Pesticides and herbicides
-Lead
-Cleaning and chlorinated solvents
Taylor Yard – Site Use and Environmental History
Aerial Photo of Historical Rail Operations (c 1994)
16
Diesel ShopService Tracks Machine Shop
![Page 17: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/17.jpg)
17
2018 Site Investigation (Began Summer 2018) “What are we
investigating?”
![Page 18: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/18.jpg)
2018 Site Investigation (Began Summer
2018) “What are we investigating?”
GROUNDWATER SAMPLING:
• 22 samples from 16 monitoring wells
SOIL GAS SAMPLING:
• 228 sample locations
• 452 total samples
SOIL SAMPLING:
• 78 locations
• 645 total samples
EXCAVATION TEST PITS:
• 23 pit and trench excavations
18
Direct Push Equipment
for Soil Sampling
Mobile Laboratory for
Soil Gas Analysis
18
![Page 19: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/19.jpg)
Site Assessment: “What Are We Looking For?”
• Petroleum hydrocarbons(TPH)
• Metals
• Volatile Organic Compounds(VOCs)
• Semi-volatile organiccompounds (SVOCs)
• Pesticides/herbicides
• Polychlorinated Biphenyls(PCBs)
Split Spoon
Sampler
Showing TPH
Contamination
Field
Notebooks
Split Spoon Sampler
Showing Soil
Stratification
19
![Page 20: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/20.jpg)
Solution may include a combination of
alternatives to achieve appropriate
residential/ecological standards:
• Risk assessment for groundwater, soil and soilgas
• Groundwater: extraction/in-situ treatment intargeted areas
• Soil: excavation; engineered cap/paving(temporary or permanent)
• Soil gas: extraction/venting; vapor mitigationsystem
• Phytoremediation
Site Design Implications: “What Is The Remedy?”
20
![Page 21: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/21.jpg)
AGENDAWelcome and Introductions
Project Update
Community Workshop and Survey Results
Update on Site Assessment
Water Quality Improvement Opportunities
Preliminary Design Concepts
Next Steps
G2 TAYLOR YARD
RIVER PARK
21
![Page 22: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/22.jpg)
Water Quality Improvement Opportunities
• Regulatory Framework
• Tributary Watersheds
• Treatment Alternatives
• Infiltration
• Conclusion
G2 TAYLOR YARD
RIVER PARK
22
![Page 23: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/23.jpg)
G2 TAYLOR YARD
RIVER PARK
Regulatory Framework
• National PollutantDischarge EliminationSystem Permit
• Beneficial Uses
• Impaired Water Bodies
• Pollutants of Concern
• Total Maximum DailyLoad
23Taylor Yard
![Page 24: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/24.jpg)
Watersheds
Draining Near
Taylor Yard G2
Parcel
Totalapproximatetributarywatershed of4,263 acres
EXISTING
ARBOR Study
Concept
![Page 25: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/25.jpg)
• Project 480
• Eagle Rock Drain
• City UPRC Drain29901
• City Drain 1805
Storm Drains
Relevant to
Taylor Yard
Parcel G2
EXISTING
ARBOR Study
Concept
![Page 26: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/26.jpg)
Land Use in Drainage Subareas Tributary to G2G2 TAYLOR YARD
RIVER PARK
26
Land Use Area in Acres Percent Impervious
Single Family Residential 2,266 41%
Vacant 1,006 2%
Multi-Family Residential 355 69%
Commercial 242 94%
Education 149 61%
Industrial 123 73%
Transportation 122 91%
Total 4,263 -
![Page 27: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/27.jpg)
Stormwater Quality Treatment StrategyG2 TAYLOR YARD
RIVER PARK
27
Hydrodynamic
Trash Removal
Unit
Sedimentation
Pond
Treatment
Stream*
Trash √ √
Ammonia √
Copper √ √
Toxicity √ √
Indicator
Bacteria
√
Nutrients (Algae) √
*Treatment Stream: Swales, Dry Creek, Bioretention, Wetlands
![Page 28: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/28.jpg)
Treatment Area
Exhibit
Onsite Flow Only
EXISTING
ARBOR Study
Concept
Onsite + Eagle Rock
• Onsite stormwater
runoff drains by
gravity to “dry”
creek.
• Dry creek is lined
to prevent
infiltration into
underlying soils.
• Treated runoff
discharged to
River via outfall
structure
• No pumping.
![Page 29: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/29.jpg)
EXISTING
ARBOR Study
Concept
Onsite + Eagle Rock
Onsite + UPRC
(Wet Weather)
+ Eagle Rock
(Dry Weather)
Treatment Area
Exhibit
(Recommended)
• Drain on-site surface
stormwater runoff by
gravity to “dry” creek
and detention pond.
• Drain flows (4 cfs)
pumped by solar
pumps into dry creek
• Creek and pond lined
to prevent infiltration.
• Treated runoff
discharged to River via
outfall structure.
29
![Page 30: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/30.jpg)
EXISTING
ARBOR Study
Concept
Onsite + Eagle Rock
Onsite + UPRC
Wet Weather
(85th Percentile)
+
Eagle Rock Wet
Weather (85th
Percentile)
Stormwater
management
system utilizes ~41
of the 42 acre site.
Treatment Area
Exhibit for Wet
Weather Flows
30
![Page 31: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/31.jpg)
Stormwater
Infiltration – Not
Recommended
EXISTING
ARBOR Study
Concept
San Fernando Valley Super Fund Site
• Volatile Organic Compounds
• trichloroethylene (TCE)
• perchloroethylene (PCE)
• carbon tetrachloride
• 1,2-dichloroethane
• cis-1,2-dichloroethene
• 1-dichloroethane
• Metals
• Chromium
• Pesticides
• AtrazineTaylor Yard
31
Pollock
Treatment
Plant
![Page 32: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/32.jpg)
G2 TAYLOR YARD
RIVER PARK
Water Management - Conclusions• G2 site provides significant space for multiple benefits
including: river access, stormwater management, habitatrestoration, active and passive recreation, public health,
• All onsite stormwater is managed.
• Infiltration of stormwater is not recommended due to historicalgroundwater contamination.
• Significant offsite dry weather runoff is also managed.
• Managing significant amounts of offsite wet weatherstormwater is expensive and reduces use of G2 site for otheruses.
• Contaminated soils will be remediated.
• Groundwater quality is improving.
32
![Page 33: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/33.jpg)
AGENDAWelcome and Introductions
Project Update
Community Workshop and Survey Results
Update on Site Assessment
Water Quality Improvement Opportunities
Preliminary Design Concepts
Next Steps
G2 TAYLOR YARD
RIVER PARK
33
![Page 34: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/34.jpg)
G2 TAYLOR YARD
RIVER PARK
34
Concept Pre-design Considerations
The Taylor Yard G2 River Park Project is set apart from other open space projects in scale and complexity. Many layers have been
analyzed, from urban constraints and habitat, to natural systems like hydrology, to providing a base for inserting circulation and
programs. After the City and the consulting design team went through a process to determine project goals, and establishing the
guidelines and direction of the project, a set of site design constraints and opportunities were developed.
The following diagrams depict three initial approaches to several pre-design investigations based on the site’s constraints and
opportunities, and the location of major community-driven programming features. The constraints are fundamental to the
design as they often guide circulation and the location of programs. Site constraints include soil health and remediation, utilities
and associated right of ways, the potential for high speed rail, the new Taylor Yard Pedestrian Bridge laydown area, access to the
site, potential development, stormwater feature location, river hydrology and ARBOR setbacks, and site phasing.
While we are still waiting for soil results and are in negotiations with rail and LADWP regarding the high-voltage powerlines
currently located onsite, we have begun the preliminary siting of: 1) circulation including connecting to the neighborhoods and
providing access to the river, 2) stormwater features, 3) how and where to set back the river, and 4) community-driven programs
such as the location of an amphitheater, a river museum, and restoration areas, among others.
While we have begun to forge an understanding of the proposed spatial arrangement, park program and activities, constraints,
opportunities and overall site aesthetic, it is important to understand that these diagrams are considered pre-design approaches.
Spatial disposition could change based on input from stakeholders including associated agencies.
![Page 35: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/35.jpg)
G2 TAYLOR YARD
RIVER PARK
Preliminary SiteDesign Concepts Soft Edge
• Project Goals
• Public Input
• Community Survey
• Technical ConstraintsIsland
Three Islands
35
![Page 36: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/36.jpg)
36
![Page 37: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/37.jpg)
37
![Page 38: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/38.jpg)
38
![Page 39: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/39.jpg)
39
![Page 40: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/40.jpg)
40
![Page 41: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/41.jpg)
41
![Page 42: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/42.jpg)
42
![Page 43: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/43.jpg)
43
![Page 44: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/44.jpg)
G2 TAYLOR YARD
RIVER PARK
Next Steps
• September 2018 - Finalize Soil Testing
• November 2018 - Site Assessment Report of Findings
• December 2018 - Draft Remedial Action Plan
• Q1 2019• Recommended Alternative
• Public Meeting to Review Recommended Alternative
44
![Page 45: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/45.jpg)
2017 2018 2019 2020 2021
Meetings
Project Kick-off
Quarterly TASC and CLC Meetings
Public Meetings
Work Plan (Authorized)
Develop Preliminary Design Concepts
Refine Design Concept
Prepare Implementation Plan
Soil Quality Analysis
Develop Soil Sampling Work Plans
Soil Sampling
Prepare Soil Quality Report
Prepare Soil Response Plan
Next Tasks (Pending)
Environmental Review
Detailed Design - Interim Uses
Construction (Possibly Phased) - Interim
Uses
Potential Programming
As needed1 2 3 4 5
TAYLOR YARD G2 RIVER PARK - Project Schedule
Meeting
Number
Meeting Topics
1 Kick-off and background
2Design concept alternatives and Preliminary assessment
results
3 Recommended alternative
4 & 5 Project status updates
![Page 46: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,](https://reader035.vdocuments.net/reader035/viewer/2022080719/5f797014a1ffb748fa478348/html5/thumbnails/46.jpg)
INCLUSIVE
INSPIRATIONAL
RESILIENT
UNIQUELY LOS ANGELES
PEOPLE
WATER
HABITAT
CONNECTIVI TY
SOIL
HISTORY
AN OPPORTUNITY FOR INNOVATIVE
OPEN SPACE DESIGN
THANK YOU!