Page 1: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

TAYLOR YARD G2 RIVER PARK

TECHNICAL ADVISORY STAKEHOLDER COMMITTEE

COMMUNITY LEADERSHIP COMMITTEE

September 6, 2018

http://lariver.org/G2

http://www.tayloryardg2.com/

G2 TAYLOR YARD

RIVER PARK

1

Pre-Design Update

Page 2: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

AGENDAWelcome and Introductions

Project Update

Community Workshop and Survey Results

Update on Site Assessment

Water Quality Improvement Opportunities

Preliminary Design Concepts

Next Steps

G2 TAYLOR YARD

RIVER PARK

2

Pre-Design Update

Page 3: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

G2 TAYLOR YARD

RIVER PARK

Project Management Team

Michael Affeldt

Director, LARiverWorks

Arturo Chavez

Senior Advisor

Gary Lee Moore, PE, ENV SP

City Engineer

Deborah Weintraub, AIA, LEEDAP

Chief Deputy City Engineer

Christopher Johnson, PE, GE

Program Manager

Katie Doherty, PE

Project Manager

3

Pre-Design Update

Page 4: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

Project Partners

G2 TAYLOR YARD

RIVER PARK

California Departm ent of Toxic

Substances Control

4

Pre-Design Update

Page 5: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

G2PRIME CONSULTANT

Project Managem ent /

Leadership

Arch itectureUrban Design & Landscape

Arch itectureMed iterranean Landscape

Arch itecture

Econom ic

Developm ent

& Financing

Hydrology &

Hydraulics/

Inspect ions

Public

Engagem ent

Water

Quality

Civil Engineering

Botany, Biology &

Natural Habitat

Public

Engagem entPublic

Engagem ent

Environm ental

Docum entat ion

Soil Sam pling

Managem ent

City of Los Angeles

Bureau of Engineering

TAYLOR YARD

RIVER PARK

Page 6: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

3

TAYLOR YARDG2 LOCATIONMILE 25 OF THE LARIVER

6

Page 7: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

Project Development and

Activities in 2018

EXISTING

ARBOR Study

Concept

Jan Public Meetings

Feb Community Survey

Mar Internal Pre-Design Workshops

April Geophysical Survey,Groundwater Monitoring

May Begin Site Assessments

June Mayor’s Briefing

July Site Assessment Ongoing

August Site Assessment Ongoing

Page 8: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

AGENDAWelcome and Introductions

Project Update

Community Workshop and Survey Results

Update on Site Assessment

Water Quality Improvement Opportunities

Preliminary Design Concepts

Next Steps

G2 TAYLOR YARD

RIVER PARK

8

Page 9: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

Community Site Tour and

Workshop January 2018

9

Page 10: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

Community Workshop Table Comments

10

Page 11: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

Community Survey ResultsEXISTING

ARBOR Study

Concept

Over 1300 Respondents!

Key Findings:

• Nature - Respondents have a highinterest in natural components; openspace; trails and habitat.

• Recreation - Outdoor recreationincluding walking / jogging and cyclingranked high, both as activities

• LA River - 84% reported having visitedthe River. Strong interest in Riverinteraction and education.

• Consistent Results - Communitypriorities among the public are largelyconsistent with those of thecommunity immediately surroundingthe G2 parcel.

11

11

Page 12: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

Community Survey ResultsEXISTING

ARBOR Study

Concept

Favorite Park Features

Respondents were asked to selecttheir top three:

64% - access to nature

53% - walking and hiking trails

35% - scenic views

12

Page 13: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

Natural Space/Wildlife Habitat

Features preferred:

40%- River Access

40% - Trails

33% - Enjoying Nature/Habitat

13

Page 14: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

Activities/Recreational Elements

ARBOR Study

Concept

Park features preferred:

60%- Walking/Running/Jogging

40% - Children’sNature/Adventure Play

38% - Meadow andPicnicking

14

Page 15: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

AGENDAWelcome and Introductions

Project Update

Community Workshop and Survey Results

Update on Site Assessment

Water Quality Improvement Opportunities

Preliminary Design Concepts

Next Steps

G2 TAYLOR YARD

RIVER PARK

15

Page 16: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

Rail Operations - Equipment

Maintenance and Fueling:

• Early 1900’s – 2006

• Former facilities:-Diesel and machine shop

-Roundhouse, turntables

-Underground and aboveground

storage tanks

-Industrial wastewater treatment

plant

• Materials previously onsite:-Diesel and gasoline fuel

-Various oils, greases, acids, paints

and thinners

-Pesticides and herbicides

-Lead

-Cleaning and chlorinated solvents

Taylor Yard – Site Use and Environmental History

Aerial Photo of Historical Rail Operations (c 1994)

16

Diesel ShopService Tracks Machine Shop

Page 17: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

17

2018 Site Investigation (Began Summer 2018) “What are we

investigating?”

Page 18: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

2018 Site Investigation (Began Summer

2018) “What are we investigating?”

GROUNDWATER SAMPLING:

• 22 samples from 16 monitoring wells

SOIL GAS SAMPLING:

• 228 sample locations

• 452 total samples

SOIL SAMPLING:

• 78 locations

• 645 total samples

EXCAVATION TEST PITS:

• 23 pit and trench excavations

18

Direct Push Equipment

for Soil Sampling

Mobile Laboratory for

Soil Gas Analysis

18

Page 19: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

Site Assessment: “What Are We Looking For?”

• Petroleum hydrocarbons(TPH)

• Metals

• Volatile Organic Compounds(VOCs)

• Semi-volatile organiccompounds (SVOCs)

• Pesticides/herbicides

• Polychlorinated Biphenyls(PCBs)

Split Spoon

Sampler

Showing TPH

Contamination

Field

Notebooks

Split Spoon Sampler

Showing Soil

Stratification

19

Page 20: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

Solution may include a combination of

alternatives to achieve appropriate

residential/ecological standards:

• Risk assessment for groundwater, soil and soilgas

• Groundwater: extraction/in-situ treatment intargeted areas

• Soil: excavation; engineered cap/paving(temporary or permanent)

• Soil gas: extraction/venting; vapor mitigationsystem

• Phytoremediation

Site Design Implications: “What Is The Remedy?”

20

Page 21: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

AGENDAWelcome and Introductions

Project Update

Community Workshop and Survey Results

Update on Site Assessment

Water Quality Improvement Opportunities

Preliminary Design Concepts

Next Steps

G2 TAYLOR YARD

RIVER PARK

21

Page 22: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

Water Quality Improvement Opportunities

• Regulatory Framework

• Tributary Watersheds

• Treatment Alternatives

• Infiltration

• Conclusion

G2 TAYLOR YARD

RIVER PARK

22

Page 23: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

G2 TAYLOR YARD

RIVER PARK

Regulatory Framework

• National PollutantDischarge EliminationSystem Permit

• Beneficial Uses

• Impaired Water Bodies

• Pollutants of Concern

• Total Maximum DailyLoad

23Taylor Yard

Page 24: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

Watersheds

Draining Near

Taylor Yard G2

Parcel

Totalapproximatetributarywatershed of4,263 acres

EXISTING

ARBOR Study

Concept

Page 25: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

• Project 480

• Eagle Rock Drain

• City UPRC Drain29901

• City Drain 1805

Storm Drains

Relevant to

Taylor Yard

Parcel G2

EXISTING

ARBOR Study

Concept

Page 26: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

Land Use in Drainage Subareas Tributary to G2G2 TAYLOR YARD

RIVER PARK

26

Land Use Area in Acres Percent Impervious

Single Family Residential 2,266 41%

Vacant 1,006 2%

Multi-Family Residential 355 69%

Commercial 242 94%

Education 149 61%

Industrial 123 73%

Transportation 122 91%

Total 4,263 -

Page 27: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

Stormwater Quality Treatment StrategyG2 TAYLOR YARD

RIVER PARK

27

Hydrodynamic

Trash Removal

Unit

Sedimentation

Pond

Treatment

Stream*

Trash √ √

Ammonia √

Copper √ √

Toxicity √ √

Indicator

Bacteria

Nutrients (Algae) √

*Treatment Stream: Swales, Dry Creek, Bioretention, Wetlands

Page 28: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

Treatment Area

Exhibit

Onsite Flow Only

EXISTING

ARBOR Study

Concept

Onsite + Eagle Rock

• Onsite stormwater

runoff drains by

gravity to “dry”

creek.

• Dry creek is lined

to prevent

infiltration into

underlying soils.

• Treated runoff

discharged to

River via outfall

structure

• No pumping.

Page 29: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

EXISTING

ARBOR Study

Concept

Onsite + Eagle Rock

Onsite + UPRC

(Wet Weather)

+ Eagle Rock

(Dry Weather)

Treatment Area

Exhibit

(Recommended)

• Drain on-site surface

stormwater runoff by

gravity to “dry” creek

and detention pond.

• Drain flows (4 cfs)

pumped by solar

pumps into dry creek

• Creek and pond lined

to prevent infiltration.

• Treated runoff

discharged to River via

outfall structure.

29

Page 30: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

EXISTING

ARBOR Study

Concept

Onsite + Eagle Rock

Onsite + UPRC

Wet Weather

(85th Percentile)

+

Eagle Rock Wet

Weather (85th

Percentile)

Stormwater

management

system utilizes ~41

of the 42 acre site.

Treatment Area

Exhibit for Wet

Weather Flows

30

Page 31: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

Stormwater

Infiltration – Not

Recommended

EXISTING

ARBOR Study

Concept

San Fernando Valley Super Fund Site

• Volatile Organic Compounds

• trichloroethylene (TCE)

• perchloroethylene (PCE)

• carbon tetrachloride

• 1,2-dichloroethane

• cis-1,2-dichloroethene

• 1-dichloroethane

• Metals

• Chromium

• Pesticides

• AtrazineTaylor Yard

31

Pollock

Treatment

Plant

Page 32: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

G2 TAYLOR YARD

RIVER PARK

Water Management - Conclusions• G2 site provides significant space for multiple benefits

including: river access, stormwater management, habitatrestoration, active and passive recreation, public health,

• All onsite stormwater is managed.

• Infiltration of stormwater is not recommended due to historicalgroundwater contamination.

• Significant offsite dry weather runoff is also managed.

• Managing significant amounts of offsite wet weatherstormwater is expensive and reduces use of G2 site for otheruses.

• Contaminated soils will be remediated.

• Groundwater quality is improving.

32

Page 33: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

AGENDAWelcome and Introductions

Project Update

Community Workshop and Survey Results

Update on Site Assessment

Water Quality Improvement Opportunities

Preliminary Design Concepts

Next Steps

G2 TAYLOR YARD

RIVER PARK

33

Page 34: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

G2 TAYLOR YARD

RIVER PARK

34

Concept Pre-design Considerations

The Taylor Yard G2 River Park Project is set apart from other open space projects in scale and complexity. Many layers have been

analyzed, from urban constraints and habitat, to natural systems like hydrology, to providing a base for inserting circulation and

programs. After the City and the consulting design team went through a process to determine project goals, and establishing the

guidelines and direction of the project, a set of site design constraints and opportunities were developed.

The following diagrams depict three initial approaches to several pre-design investigations based on the site’s constraints and

opportunities, and the location of major community-driven programming features. The constraints are fundamental to the

design as they often guide circulation and the location of programs. Site constraints include soil health and remediation, utilities

and associated right of ways, the potential for high speed rail, the new Taylor Yard Pedestrian Bridge laydown area, access to the

site, potential development, stormwater feature location, river hydrology and ARBOR setbacks, and site phasing.

While we are still waiting for soil results and are in negotiations with rail and LADWP regarding the high-voltage powerlines

currently located onsite, we have begun the preliminary siting of: 1) circulation including connecting to the neighborhoods and

providing access to the river, 2) stormwater features, 3) how and where to set back the river, and 4) community-driven programs

such as the location of an amphitheater, a river museum, and restoration areas, among others.

While we have begun to forge an understanding of the proposed spatial arrangement, park program and activities, constraints,

opportunities and overall site aesthetic, it is important to understand that these diagrams are considered pre-design approaches.

Spatial disposition could change based on input from stakeholders including associated agencies.

Page 35: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

G2 TAYLOR YARD

RIVER PARK

Preliminary SiteDesign Concepts Soft Edge

• Project Goals

• Public Input

• Community Survey

• Technical ConstraintsIsland

Three Islands

35

Page 36: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

36

Page 37: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

37

Page 38: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

38

Page 39: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

39

Page 40: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

40

Page 41: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

41

Page 42: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

42

Page 43: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

43

Page 44: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

G2 TAYLOR YARD

RIVER PARK

Next Steps

• September 2018 - Finalize Soil Testing

• November 2018 - Site Assessment Report of Findings

• December 2018 - Draft Remedial Action Plan

• Q1 2019• Recommended Alternative

• Public Meeting to Review Recommended Alternative

44

Page 45: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

2017 2018 2019 2020 2021

Meetings

Project Kick-off

Quarterly TASC and CLC Meetings

Public Meetings

Work Plan (Authorized)

Develop Preliminary Design Concepts

Refine Design Concept

Prepare Implementation Plan

Soil Quality Analysis

Develop Soil Sampling Work Plans

Soil Sampling

Prepare Soil Quality Report

Prepare Soil Response Plan

Next Tasks (Pending)

Environmental Review

Detailed Design - Interim Uses

Construction (Possibly Phased) - Interim

Uses

Potential Programming

As needed1 2 3 4 5

TAYLOR YARD G2 RIVER PARK - Project Schedule

Meeting

Number

Meeting Topics

1 Kick-off and background

2Design concept alternatives and Preliminary assessment

results

3 Recommended alternative

4 & 5 Project status updates

Page 46: G2 RIVER PARK Pre-Design Updateboe-tydp-d7-prod.psatnegmr3.us-west-2.elasticbeanstalk.com/sites... · Materials previously onsite:-Diesel and gasoline fuel-Various oils, greases,

INCLUSIVE

INSPIRATIONAL

RESILIENT

UNIQUELY LOS ANGELES

PEOPLE

WATER

HABITAT

CONNECTIVI TY

SOIL

HISTORY

AN OPPORTUNITY FOR INNOVATIVE

OPEN SPACE DESIGN

THANK YOU!