(i) Infrastructure
Infrastructure - components Rural Infrastructure and Urban
Infrastructure Infrastructure in India
Not covered in any of the Modules of Draughts Man Civil or the Architectural Draughtsmanship of NCVT
ii. Masonry
Technical terms Tools & Uses Construction materials Building components Mortar and concrete curing Safety measures
Contents are elaborate in the TP01/TT01 (weeks 2-5) in Architectural Draughtsmanship
Syllabus Under Draughtsman Ship Civil in TP01/TT01 under weeks 4 - 6 and 9-10 covers this exhaustively
As such there is no gap but contents of AICTE can be Elaborated so that there is no lapses.
iii. Bar bending Not covered under Architectural Draughtsman ship
No gap but AICTE
Technical terms Tools& uses Types of steels Ties and bending methods Slab reinforcement - one way slab and
Two way slab
Coverage under TP02/TT02 of Civil Draughtsman ship
contents can be elaborated so that important practical aspects are left out during skill imparting.
iv. Plumbing & Sanitation
Technical terms , necessity Advantages and Disadvantages Basic materials for Plumbing and
Sanitation
Covered in Draughtsman ship under TP02/TT02 in weeks 18,19 and 20
No gap and needs elaboration of contents or explicitly contents can be quoted
v. Painting
Technical terms , necessity Basics of White washing, Colour
washing and painting
Covered in Workshop Science and Calculation under week 15 of Architectural Draughtsmanship TP01/TT01
Covered in Workshop Science and Calculation under week 15 of Civil Draughtsmanship TP01/TT01 4 and 6
No gap and needs elaboration/explicitly contents can be mentioned
vi. Soft skills No such topics in NCVT Syllabus Contents to
be taught/learnt can be detailed in AICTE Scheme.
LEVEL 2Infra structure
Infrastructure Development - an overview
Infra structure development in India Infrastructure Management
Covered as mentioned in the Level 1
ii. Masonry
Setting and marking Transfer of levels Brick masonry and types Quantity estimation of different
components of single room buildings curing and curing methods Safety measures
Covered in Weeks 09 and 10 of TP01/TT01 of NCVT of Draughtsman Civil
Estimation is covered in TP04/TT04 Weeks 17,18, and 19 using software
AICTE Contents can also include basics as well as use of softwares and contents can be elaborated.
iii. Bar bending Covered in TP02.TT02 Weeks 12,13, and 14. AICTE
Slab reinforcement -revision Lintel and sunshade reinforcement Column and footing reinforcement Reinforcement for beams
Part is also covered in Weeks 19 to 21 of TP03/TP04
contents covers more details and basics of these may be taught first.
iv. Plumbing & Sanitation
Basic materials for Plumbing and Sanitaion
GI Pipe marking, cutting threading, jointing
PVC -Pipe marking, cutting threading, jointing
v. Welding Fundamentals fundamentals , safety measures
vi. Roads fundamental/classification of roads,
cross drainage works
Plumbing and Services are covered in weeks 18 to 20 of TP02/TT02.of Draughtsman Civil.
Welding part is not covered in both Architectural/Civil D-Ship
Roads are covered in TP03/TP03 of Draughtsman Civil under weeks 5 to 8 as well as 17 and 18 weeks
Contents of Introduction of Bridges may also be incorporated in AICCTE contents otherwise there is no gap.
Level III
Infrastructure
Infrastructure investment, Economic growth, Poverty alleviation
Infrastructure sector wise growths Deficiency of infra sector in India
ii. Masonry
Stone masonry Fixing of doors and windows
No coverage of anything on Infrastructure Details of Plastering/Stone
masonry/Estimation are covered in the TP01/TT01 (weeks 9,10) of D-Civil
Details of Bar bending Topic/Plumbing and Sanitation are already given in the above Levels
Formwork detailing/Drawing are explicitly incorporated in NCVT Syllabus
No gap as such but contents are modularised over previous levels.
Contents of Soft skills of AICTE part can be spelt out as in NCVT
Plastering and pointing Quantity estimation of Two bed room
house Safety measures
iii. Bar bending
Reinforcements for Columns & footings, one way slabs and two slabs & beams - revision
Reinforcement for Staircase
iv. Plumbing and Sanitation
Building Services, sump, principal of overhead tank, types of valves and uses
Water meter connection Water closets, urinals, flush tank Septic tank and soak pits Solid Waste and Liquid Waste -
Recycling and Reuse
v. form work
formwork- material importance of form formwork
vi. Electrical House wiring
Electrical Graphical symbols and signs Do & Don’ts in electric field Types of wires used in wiring systems of wiring ISI rules for house wiring fixing of sockets and switches types of Electric circuits and
Drawing of Electrical Wiring/Symbols is not covered in D-ship Civil.
GBT is not taught in NCVT Soft skills part is not covered
lab practices/Calculations
connections(Lights and Fans) Electrical measuring equipments Safety Measures
vii. Roads
Types of Roads
viii. Green Building Technology
Renewable energy, non-Renewable energy and Green building technologies
ix. Soft skills
LEVEL 4
i. Infrastructure
Urbanisation and Economic growth in India
Basics of financing infrastructure
ii. Electrical house wiring
AC Single phase motor AC Three phase motor Connection of single phase motor with
suitable motors Connection of three phase motors with
DOL starter Submersible pumps Transformers -types and working
principles
Topics of
the Electrical House wiring,
Welding, Renewable Energy are not explicitly covered.
Topics of Estimation are as mentioned in the above level but contents does not carry them
Visit to substation s- 11KV and 33 KV safety measures
iii. Painting
Types of paints Preparation of surface Wall lapum ,Wall painting Wood surface polishing , varnishing
iv. Assistant works supervisor
Measurement length, Width, depth in MKS, FPS system
Menstruation - area, Volumes of different shapes
Drawing - conventional symbols Drawing by Manual or AutoCAD Reading of drawing - Plan, Elevation,
cross section, different elements Surveying - Leveling Roads -Types Bridges - Components Stores- Receipts and issues Site visit safety measures
v. Welding
types ,safety measures
vi. Renewable energy
Solar energy and wind energy
vii. Basics of Interiors
to next level.
Welding is not covered in any of the Topics of NCVT
Soft skills contents shall be spelt out explicitly.
viii. Soft skills
LEVEL 5
I Engineering Drawing
ii. Methods of surveying
iii. Any one Building Construction or Road or Culverts / Minor Bridges
Building ConstructionSoil investigation Building drawingSub structureSuperstructureFloorings, finishing etc. estimationConstruction materials and tests
EquipmentWorkmanship
RoadsSoil investigation, Design of Roads: Highways (Flexible and Rigid) and rural Roads High embankments and Retaining wallsConstruction and maintenance of RoadsConstruction materials and testsQuantity Estimation
Drawing part is spread over various semesters in the NCVT syllabus.
Surveying is dealt in weeks 1 to 16 of TP04/TT04 in a detailed level and all other aspects of Roads / Building Construction / Culverts and Bridges are speared over TP02/TT02, TP03/TT03 and TP04/TT04 (weeks 2 – 16 ) of D-Civil of NCVT.
No gap and all contents are modularized over different levels.
Conducting test for materialEquipment, workmanship
Culverts /Minor BridgesSelection of site, Hydraulic dataSoil investigationSub structureSuperstructureConstruction materials and testsQuantity EstimationConstructionEquipment, Workmanship
LEVEL VI
Surveying
ii. Any one - Building Construction or Roads or Culverts / Minor Bridges
other than already studied in level 5
iii. Cross Drainage Works
Cross Drainage Works for Roads
iv. AutoCAD 1
Building ConstructionSoil investigationBuilding drawingSub structure
Surveying is dealt in weeks 1 to 16 of TP04/TT04 in a detailed level and all other aspects of Roads/Building Construction/Culverts and Bridges are speared over TP02/TT02, TP03/TT03 and TP04/TT04 (weeks 2-16 )of D-Civil of NCVT.
No gap and details of skills to be attained is to be spelt out explicitly
SuperstructureFloorings, finishing etc. estimationConstruction materials and tests
EquipmentWorkmanship
RoadsSoil investigation, Design of Roads: Highways (Flexible and Rigid) and rural Roads High embankments and Retaining wallsConstruction and maintenance of RoadsConstruction materials and testsQuantity EstimationConducting test for materialEquipment, workmanship
Culverts /Minor BridgesSelection of site, Hydraulic dataSoil investigationSub structureSuperstructureConstruction materials and testsQuantity EstimationConstructionEquipment, Workmanship
LEVEL VIISurveying
ii. Auto CAD 2
iii. Any subject or combination of the
AUTOCAD is taught in Week 21 of the TP04/TT04 at the introductory level
Bridges, Water supply, Irrigation Structures, Sanitary Engg are covered in the weeks 1 to 18 in detail in TP03/TT03
Steel Structures are taught in TP02/TT02
No gap but contents can be elaborated and explicit.
following subjects totaling 600 or more hrs
a) Any one
Building Construction or Roads or Culverts /Minor Bridges other than already studied in level 5 or level 6
b) Major bridges
Including Alignment and GeometrySoil investigationScaffolding and Form workSub structureSuperstructureConstruction materials and testsQuantity EstimationStudy of bearingsConstruction, Load testEquipment, Workmanship
c) Steel structures
Fundamentals of design of steel structres : merits and demerits , loads, structural sections
Joints: Bolts, Rivets, Welded jointsColumn bases, ColumnsBeamsTrusses – construction
d) Pre-stressed bridges
Materials used and their properties-concrete, high strength steel-
weeks 15,16, and 18 PSC/Retrofitting of Bridges & Bldgs are not
topics under the NCVT Syllabus of D-civil and Architecture Civil.
Specifications I.S. Code provisions-Losses in pre stressing.Cable profile – Anchorage Zones.Construction / Methods of pre stressing
and observationEquipment, workmanshipConducting tests for materials and Load testsMaterials used and their properties-concrete, high strength steel-Specifications I.S. Code provisions-Losses in pre stressing.
e) Water supply
Sources of waterWater demandQuality of water and testing Water supply system: collection and
treatment, conveyance and distributionSystems of supplyWater sump and Over head tank etc.
f) Sanitary Engineering
SewageSystems of sewage disposalsTypes of Sewers and AppurtenancesMethods of disposal of solid wastes and
sanitation, Sewage treatment plantsConstruction Rural sanitation
g) Irrigation structures
Earthen Dams: selection of site, ayacut
assessmentTypes of Earthen Dams, Methods of Construction, Causes of failure, Design Criteria, selecting a suitablepreliminary section for an earthen Dam, Determination of line of seepage or phreatic line in Earthen Dam , stability of u/s and d/sslopes, seepage control in Earthen
Dam, Design of filters, slope protection Hydraulic structures for canals:Canal falls – necessity, locations, various types and description of each type, Head regulator, sluices and cross regulator- location, construction
h) Repairs and Rehabilitation of buildings
Causes of deteriorationEvaluation TestsConstruction Chemicals Specification For execution of Repairs Techniques for repairs of Rehabilitation
i) Repairs and Rehabilitation of Bridges
Causes of deteriorationEvaluation TestsConstruction Chemicals Specification For execution of Repairs Techniques for repairs of Rehabilitation