Sector: Specialization: Le ve l AICTE Content NCVT Contents Gap (if any) (i) Infrastructure Infrastructure - components Rural Infrastructure and Urban Infrastructure Infrastructure in India Not covered in any of the Modules of Draughts Man Civil or the Architectural Draughtsmanship of NCVT ii. Masonry Technical terms Tools & Uses Construction materials Building components Contents are elaborate in the TP01/TT01 (weeks 2-5) in Architectural Draughtsmanship Syllabus Under Draughtsman Ship Civil in TP01/TT01 under weeks 4 - 6 and 9-10 covers this As such there is no gap but contents of AICTE can be Elaborat

Upload: vageesha-shantha-veerabhadra-swamy

Post on 01-Feb-2016

18 views

Category:

Documents


1 download

DESCRIPTION

gap

TRANSCRIPT

Page 1: Gap Analysis Report

Sector:

Specialization:

Le

vel

AICTE Content NCVT Contents Gap (if any)

(i) Infrastructure

Infrastructure - components Rural Infrastructure and Urban

Infrastructure Infrastructure in India

Not covered in any of the Modules of Draughts Man Civil or the Architectural Draughtsmanship of NCVT

ii. Masonry

Technical terms Tools & Uses Construction materials Building components Mortar and concrete curing Safety measures

Contents are elaborate in the TP01/TT01 (weeks 2-5) in Architectural Draughtsmanship

Syllabus Under Draughtsman Ship Civil in TP01/TT01 under weeks 4 - 6 and 9-10 covers this exhaustively

As such there is no gap but contents of AICTE can be Elaborated so that there is no lapses.

iii. Bar bending Not covered under Architectural Draughtsman ship

No gap but AICTE

Page 2: Gap Analysis Report

Technical terms Tools& uses Types of steels Ties and bending methods Slab reinforcement - one way slab and

Two way slab

Coverage under TP02/TT02 of Civil Draughtsman ship

contents can be elaborated so that important practical aspects are left out during skill imparting.

iv. Plumbing & Sanitation

Technical terms , necessity Advantages and Disadvantages Basic materials for Plumbing and

Sanitation

Covered in Draughtsman ship under TP02/TT02 in weeks 18,19 and 20

No gap and needs elaboration of contents or explicitly contents can be quoted

v. Painting

Technical terms , necessity Basics of White washing, Colour

washing and painting

Covered in Workshop Science and Calculation under week 15 of Architectural Draughtsmanship TP01/TT01

Covered in Workshop Science and Calculation under week 15 of Civil Draughtsmanship TP01/TT01 4 and 6

No gap and needs elaboration/explicitly contents can be mentioned

Page 3: Gap Analysis Report

vi. Soft skills No such topics in NCVT Syllabus Contents to

be taught/learnt can be detailed in AICTE Scheme.

LEVEL 2Infra structure

Infrastructure Development - an overview

Infra structure development in India Infrastructure Management

Covered as mentioned in the Level 1

ii. Masonry

Setting and marking Transfer of levels Brick masonry and types Quantity estimation of different

components of single room buildings curing and curing methods Safety measures

Covered in Weeks 09 and 10 of TP01/TT01 of NCVT of Draughtsman Civil

Estimation is covered in TP04/TT04 Weeks 17,18, and 19 using software

AICTE Contents can also include basics as well as use of softwares and contents can be elaborated.

iii. Bar bending Covered in TP02.TT02 Weeks 12,13, and 14. AICTE

Page 4: Gap Analysis Report

Slab reinforcement -revision Lintel and sunshade reinforcement Column and footing reinforcement Reinforcement for beams

Part is also covered in Weeks 19 to 21 of TP03/TP04

contents covers more details and basics of these may be taught first.

iv. Plumbing & Sanitation

Basic materials for Plumbing and Sanitaion

GI Pipe marking, cutting threading, jointing

PVC -Pipe marking, cutting threading, jointing

v. Welding Fundamentals fundamentals , safety measures

vi. Roads fundamental/classification of roads,

cross drainage works

Plumbing and Services are covered in weeks 18 to 20 of TP02/TT02.of Draughtsman Civil.

Welding part is not covered in both Architectural/Civil D-Ship

Roads are covered in TP03/TP03 of Draughtsman Civil under weeks 5 to 8 as well as 17 and 18 weeks

Contents of Introduction of Bridges may also be incorporated in AICCTE contents otherwise there is no gap.

Page 5: Gap Analysis Report
Page 6: Gap Analysis Report

Level III

Infrastructure

Infrastructure investment, Economic growth, Poverty alleviation

Infrastructure sector wise growths Deficiency of infra sector in India

ii. Masonry

Stone masonry Fixing of doors and windows

No coverage of anything on Infrastructure Details of Plastering/Stone

masonry/Estimation are covered in the TP01/TT01 (weeks 9,10) of D-Civil

Details of Bar bending Topic/Plumbing and Sanitation are already given in the above Levels

Formwork detailing/Drawing are explicitly incorporated in NCVT Syllabus

No gap as such but contents are modularised over previous levels.

Contents of Soft skills of AICTE part can be spelt out as in NCVT

Page 7: Gap Analysis Report

Plastering and pointing Quantity estimation of Two bed room

house Safety measures

iii. Bar bending

Reinforcements for Columns & footings, one way slabs and two slabs & beams - revision

Reinforcement for Staircase

iv. Plumbing and Sanitation

Building Services, sump, principal of overhead tank, types of valves and uses

Water meter connection Water closets, urinals, flush tank Septic tank and soak pits Solid Waste and Liquid Waste -

Recycling and Reuse

v. form work

formwork- material importance of form formwork

vi. Electrical House wiring

Electrical Graphical symbols and signs Do & Don’ts in electric field Types of wires used in wiring systems of wiring ISI rules for house wiring fixing of sockets and switches types of Electric circuits and

Drawing of Electrical Wiring/Symbols is not covered in D-ship Civil.

GBT is not taught in NCVT Soft skills part is not covered

lab practices/Calculations

Page 8: Gap Analysis Report

connections(Lights and Fans) Electrical measuring equipments Safety Measures

vii. Roads

Types of Roads

viii. Green Building Technology

Renewable energy, non-Renewable energy and Green building technologies

ix. Soft skills

LEVEL 4

i. Infrastructure

Urbanisation and Economic growth in India

Basics of financing infrastructure

ii. Electrical house wiring

AC Single phase motor AC Three phase motor Connection of single phase motor with

suitable motors Connection of three phase motors with

DOL starter Submersible pumps Transformers -types and working

principles

Topics of

the Electrical House wiring,

Welding, Renewable Energy are not explicitly covered.

Topics of Estimation are as mentioned in the above level but contents does not carry them

Page 9: Gap Analysis Report

Visit to substation s- 11KV and 33 KV safety measures

iii. Painting

Types of paints Preparation of surface Wall lapum ,Wall painting Wood surface polishing , varnishing

iv. Assistant works supervisor

Measurement length, Width, depth in MKS, FPS system

Menstruation - area, Volumes of different shapes

Drawing - conventional symbols Drawing by Manual or AutoCAD Reading of drawing - Plan, Elevation,

cross section, different elements Surveying - Leveling Roads -Types Bridges - Components Stores- Receipts and issues Site visit safety measures

v. Welding

types ,safety measures

vi. Renewable energy

Solar energy and wind energy

vii. Basics of Interiors

to next level.

Welding is not covered in any of the Topics of NCVT

Soft skills contents shall be spelt out explicitly.

Page 10: Gap Analysis Report

viii. Soft skills

LEVEL 5

I Engineering Drawing

ii. Methods of surveying

iii. Any one Building Construction or Road or Culverts / Minor Bridges

Building ConstructionSoil investigation Building drawingSub structureSuperstructureFloorings, finishing etc. estimationConstruction materials and tests

EquipmentWorkmanship

RoadsSoil investigation, Design of Roads: Highways (Flexible and Rigid) and rural Roads High embankments and Retaining wallsConstruction and maintenance of RoadsConstruction materials and testsQuantity Estimation

Drawing part is spread over various semesters in the NCVT syllabus.

Surveying is dealt in weeks 1 to 16 of TP04/TT04 in a detailed level and all other aspects of Roads / Building Construction / Culverts and Bridges are speared over TP02/TT02, TP03/TT03 and TP04/TT04 (weeks 2 – 16 ) of D-Civil of NCVT.

No gap and all contents are modularized over different levels.

Page 11: Gap Analysis Report

Conducting test for materialEquipment, workmanship

Culverts /Minor BridgesSelection of site, Hydraulic dataSoil investigationSub structureSuperstructureConstruction materials and testsQuantity EstimationConstructionEquipment, Workmanship

LEVEL VI

Surveying

ii. Any one - Building Construction or Roads or Culverts / Minor Bridges

other than already studied in level 5

iii. Cross Drainage Works

Cross Drainage Works for Roads

iv. AutoCAD 1

Building ConstructionSoil investigationBuilding drawingSub structure

Surveying is dealt in weeks 1 to 16 of TP04/TT04 in a detailed level and all other aspects of Roads/Building Construction/Culverts and Bridges are speared over TP02/TT02, TP03/TT03 and TP04/TT04 (weeks 2-16 )of D-Civil of NCVT.

No gap and details of skills to be attained is to be spelt out explicitly

Page 12: Gap Analysis Report

SuperstructureFloorings, finishing etc. estimationConstruction materials and tests

EquipmentWorkmanship

RoadsSoil investigation, Design of Roads: Highways (Flexible and Rigid) and rural Roads High embankments and Retaining wallsConstruction and maintenance of RoadsConstruction materials and testsQuantity EstimationConducting test for materialEquipment, workmanship

Culverts /Minor BridgesSelection of site, Hydraulic dataSoil investigationSub structureSuperstructureConstruction materials and testsQuantity EstimationConstructionEquipment, Workmanship

LEVEL VIISurveying

ii. Auto CAD 2

iii. Any subject or combination of the

AUTOCAD is taught in Week 21 of the TP04/TT04 at the introductory level

Bridges, Water supply, Irrigation Structures, Sanitary Engg are covered in the weeks 1 to 18 in detail in TP03/TT03

Steel Structures are taught in TP02/TT02

No gap but contents can be elaborated and explicit.

Page 13: Gap Analysis Report

following subjects totaling 600 or more hrs

a) Any one

Building Construction or Roads or Culverts /Minor Bridges other than already studied in level 5 or level 6

b) Major bridges

Including Alignment and GeometrySoil investigationScaffolding and Form workSub structureSuperstructureConstruction materials and testsQuantity EstimationStudy of bearingsConstruction, Load testEquipment, Workmanship

c) Steel structures

Fundamentals of design of steel structres : merits and demerits , loads, structural sections

Joints: Bolts, Rivets, Welded jointsColumn bases, ColumnsBeamsTrusses – construction

d) Pre-stressed bridges

Materials used and their properties-concrete, high strength steel-

weeks 15,16, and 18 PSC/Retrofitting of Bridges & Bldgs are not

topics under the NCVT Syllabus of D-civil and Architecture Civil.

Page 14: Gap Analysis Report

Specifications I.S. Code provisions-Losses in pre stressing.Cable profile – Anchorage Zones.Construction / Methods of pre stressing

and observationEquipment, workmanshipConducting tests for materials and Load testsMaterials used and their properties-concrete, high strength steel-Specifications I.S. Code provisions-Losses in pre stressing.

e) Water supply

Sources of waterWater demandQuality of water and testing Water supply system: collection and

treatment, conveyance and distributionSystems of supplyWater sump and Over head tank etc.

f) Sanitary Engineering

SewageSystems of sewage disposalsTypes of Sewers and AppurtenancesMethods of disposal of solid wastes and

sanitation, Sewage treatment plantsConstruction Rural sanitation

g) Irrigation structures

Earthen Dams: selection of site, ayacut

Page 15: Gap Analysis Report

assessmentTypes of Earthen Dams, Methods of Construction, Causes of failure, Design Criteria, selecting a suitablepreliminary section for an earthen Dam, Determination of line of seepage or phreatic line in Earthen Dam , stability of u/s and d/sslopes, seepage control in Earthen

Dam, Design of filters, slope protection Hydraulic structures for canals:Canal falls – necessity, locations, various types and description of each type, Head regulator, sluices and cross regulator- location, construction

h) Repairs and Rehabilitation of buildings

Causes of deteriorationEvaluation TestsConstruction Chemicals Specification For execution of Repairs Techniques for repairs of Rehabilitation

i) Repairs and Rehabilitation of Bridges

Causes of deteriorationEvaluation TestsConstruction Chemicals Specification For execution of Repairs Techniques for repairs of Rehabilitation

Page 16: Gap Analysis Report