gas turbine engine project materials joint test protocol document principally prepared by jerry...
TRANSCRIPT
Gas Turbine Engine ProjectGas Turbine Engine ProjectMaterials Joint Test ProtocolMaterials Joint Test Protocol
Document Principally Prepared ByDocument Principally Prepared By
Jerry SchellJerry Schell
GE Aircraft EnginesGE Aircraft Engines
Additional Input From GTE OEMsAdditional Input From GTE OEMs
and DoD Repair Depotsand DoD Repair Depots
Component AlloysComponent AlloysSeven alloys selected for technical evaluationSeven alloys selected for technical evaluationIN718, INC901, AM355, A286, 17-4PH, 4340, 9310IN718, INC901, AM355, A286, 17-4PH, 4340, 9310
Nominal Compositions in Weight % of Parent Metal Alloys Selected For Materials Joint Test ProtocolAlloy AMS
SpecNi(+Co)
Cr Fe Mo Nb+Ta Ti Al C Mn Cu Si B,other
IN718 5663 50-55 19.0 19.0 3.0 5.1 0.9 0.50 0.08 0.35max
0.75max
0.45max
0.006max
IN901 56605661
41-44 13.5 35.0 6.0 ---- 2.7 0.25 0.05 ---- ---- ---- 0.01
AM355 5743 4.5 15.5 75.5 2.9 ---- ---- ----- 0.13 0.85 ---- 0.5 0.1 NitA286 5731 26.0 15.0 52.7 1.3 ---- 2.1 0.3 0.04 1.5 ---- 0.7 0.005,
0.3 V17-4PH 5355 4.1 16.0 76.4 ---- 0.28 ---- ---- ---- ----- 3.2 ---- ----4340 6415 1.75 0.8 95.8 0.25 ---- ---- ---- 0.40 0.70 ---- 0.3 ----9310 6260
62653.25 1.2 94.1 0.12 ---- ---- ---- 0.10 0.55 0.35
max0.3 ----
Coating Compositions to beCoating Compositions to beInvestigated in ProjectInvestigated in Project
HVOF ProcessHVOF Process Air Plasma Spray ProcessAir Plasma Spray Process
WC/17CoWC/17Co WC/17CoWC/17Co
CrCr33CC22/(20)NiCr/(20)NiCr Co/28Mo/8Cr/2Si*Co/28Mo/8Cr/2Si*
Co/28Mo/8Cr/2Si*Co/28Mo/8Cr/2Si*
Co/28Mo/17Cr/3Si**Co/28Mo/17Cr/3Si**
* Tribaloy 400* Tribaloy 400
** Tribaloy 800** Tribaloy 800
Materials JTP StructureMaterials JTP Structure
FIVE MAJOR TASKS:FIVE MAJOR TASKS:1. Spray process optimizations1. Spray process optimizations
2. Fatigue2. Fatigue
3. Wear and friction3. Wear and friction
Fretting tests, carbon seal testsFretting tests, carbon seal tests
4. Corrosion tests4. Corrosion tests
5. Producibility tests5. Producibility tests
- Stripability- Stripability - Grindability- Grindability
- Assembly/Disassembly- Assembly/Disassembly
(This item could potentially be removed from JTP(This item could potentially be removed from JTP
Current Status of Materials JTPCurrent Status of Materials JTP
Jerry Schell completed coatings optimization Jerry Schell completed coatings optimization work on HVOF Tribaloy 400 and Tribaloy 800 at work on HVOF Tribaloy 400 and Tribaloy 800 at Hitemco in October 2001Hitemco in October 2001
Hitemco has initiated deposition of T400, T800 Hitemco has initiated deposition of T400, T800 and WC/Co (optimized in landing gear project) and WC/Co (optimized in landing gear project) onto 350 fatigue couponsonto 350 fatigue coupons
Southwest United Industries to initiate Southwest United Industries to initiate deposition of hard chrome onto 162 fatigue deposition of hard chrome onto 162 fatigue coupons in early Marchcoupons in early March
Remaining fatigue coupons have been Remaining fatigue coupons have been fabricated; deposition awaiting optimization fabricated; deposition awaiting optimization studiesstudies
IssuesIssues
Navy provided additional comments to MJTP in August 2001Navy provided additional comments to MJTP in August 2001 Jerry Schell assigned to special Navy project to implement Jerry Schell assigned to special Navy project to implement
PVD coatings onto turbine blades in T64 engine in November; PVD coatings onto turbine blades in T64 engine in November; expected to run through March 2002expected to run through March 2002
Current ActionsCurrent Actions Discussion held with Jerry Schell to address issues raised by Discussion held with Jerry Schell to address issues raised by
Navy; another draft of MJTP to be prepared by late FebruaryNavy; another draft of MJTP to be prepared by late February Meeting to resolve all outstanding issues and finalize MJTP Meeting to resolve all outstanding issues and finalize MJTP
was held on 19 February before HCAT Meetingwas held on 19 February before HCAT Meeting No-cost extension to contract with GEAE issued by Geo-No-cost extension to contract with GEAE issued by Geo-
CentersCenters
Should have extensive materials test results by time Should have extensive materials test results by time of August/September HCAT meetingof August/September HCAT meeting