GC Pre-Qualification BRIEFING
A359 FAA NextGen / ATC Tower Space Consolidation Project Boston Logan International Airport East Boston, MA October 18, 2017
![Page 2: GC Pre-Qualification BRIEFING FAA NextGen / ATC Tower ... · – Build out of approximately 6,150 SQFT, one level, – New light weight construction supported by existing structure](https://reader034.vdocuments.net/reader034/viewer/2022052006/60199ef949e1c131e43502e2/html5/thumbnails/2.jpg)
• Create new space to consolidate FAA program – Build out of approximately 6,150 SQFT, one level, – New light weight construction supported by existing structure – Central Garage, Level 4
• Facility Scope – Office areas and associated work areas, – Create new space for relocation of existing simulator training equipment, – Create new space for relocation of existing FAA telecommunication equipment, – Support areas, building systems areas and storage.
• Construction Requirements – 2 phases –
• Phase 1 build-out for relocated FAA telecommunication equipment • Phase 2 build-out remaining areas.
– All existing operations, security and communication systems must remain operational through construction.
– Phase 1 is anticipated to be an expedited design process with fast pace delivery
A359 FAA NextGen/ATC Tower Space Consolidation Project PROJECT SCOPE
![Page 3: GC Pre-Qualification BRIEFING FAA NextGen / ATC Tower ... · – Build out of approximately 6,150 SQFT, one level, – New light weight construction supported by existing structure](https://reader034.vdocuments.net/reader034/viewer/2022052006/60199ef949e1c131e43502e2/html5/thumbnails/3.jpg)
Site Location
A359 FAA NextGen/ATC Tower Space Consolidation Project
![Page 4: GC Pre-Qualification BRIEFING FAA NextGen / ATC Tower ... · – Build out of approximately 6,150 SQFT, one level, – New light weight construction supported by existing structure](https://reader034.vdocuments.net/reader034/viewer/2022052006/60199ef949e1c131e43502e2/html5/thumbnails/4.jpg)
A359 FAA NextGen/ATC Tower Space Consolidation Project PLANNING DIAGRAM
Central Garage Level 4
![Page 5: GC Pre-Qualification BRIEFING FAA NextGen / ATC Tower ... · – Build out of approximately 6,150 SQFT, one level, – New light weight construction supported by existing structure](https://reader034.vdocuments.net/reader034/viewer/2022052006/60199ef949e1c131e43502e2/html5/thumbnails/5.jpg)
• Contractors agree to follow BIM and Lean Construction approaches as defined in Massport BIM Guidelines found at www.massport.com
• Cover letter • All Application Schedules identified in RFQ • One (1) original and five (5) bound copies of Qualification
Submittals
• Due: 12:00 noon on Friday, 3 November 2017
A359 FAA NextGen/ATC Tower Space Consolidation Project RFQ Submission Requirements Highlights
![Page 6: GC Pre-Qualification BRIEFING FAA NextGen / ATC Tower ... · – Build out of approximately 6,150 SQFT, one level, – New light weight construction supported by existing structure](https://reader034.vdocuments.net/reader034/viewer/2022052006/60199ef949e1c131e43502e2/html5/thumbnails/6.jpg)
Questions are to be sent via email to: [email protected]
Questions due:
Friday, October 27, 2017, 12:00 noon
Official answers will be published: Friday, October 30, 2017 (Estimated)
Solicitation: Close Date/Submission Deadline
Friday, November 3, 2017, 12:00 noon
A359 FAA NextGen/ATC Tower Space Consolidation Project Schedule Milestones
![Page 7: GC Pre-Qualification BRIEFING FAA NextGen / ATC Tower ... · – Build out of approximately 6,150 SQFT, one level, – New light weight construction supported by existing structure](https://reader034.vdocuments.net/reader034/viewer/2022052006/60199ef949e1c131e43502e2/html5/thumbnails/7.jpg)
Questions?
A359 FAA NextGen/ATC Tower Space Consolidation Project