Page 1: GE ADGT Products

Imagination at work

Fast, Flexible Power Aeroderivative Gas Turbines

© 2014 General Electric Company – All rights reserved

James DiCampli

Pangyo, South Korea

July 9, 2014

Page 2: GE ADGT Products

With a tradition built on the world’s most trusted jet engines, GE's aeroderivative gas turbines offer power

output ranging from 18 to 100 MW and the ability to

utilize a variety of fuels. From fast starts and load

following to get on the grid quickly, to high availability

and reliability to keep units online, we tailor products and services to meet our customer demands.

Products

LMS100 PA/PB

LM6000 PA/PC/PD/PF/PG/PH

LM2500/LM2500+/G4

TM2500/TM2500+

Services

Aeroderivative gas turbines

2 © 2014 General Electric Company – All rights reserved

Page 5: GE ADGT Products

LM2500/TM2500 Capability

Nine models with ISO capabilities between 18–34 MW

and up to 41% thermal efficiency

Experience

• 1,231 units installed … >67M operating hours

• Fleet leader engine with >236k hours

Benefits

• Compact and versatile package

• Experience on a wide range of fuels

• 15ppm and dual fuel DLE options

• Well established in industrial cogeneration,

oil and gas, and marine industries

5 © 2014 General Electric Company – All rights reserved

Page 6: GE ADGT Products

LM6000 Capability

Five models with ISO capabilities from 44-58 MW

and up to 41% thermal efficiency

Experience

• >900 units installed … >28M operating hours

• Fleet leader engine with >115k hours

Benefits

• FlexAero CC, responsive … 140MW @ +54% eff.

• Up to 90% net plant efficiency in CHP

• Dual fuel DLE … capable of 15ppm NOx

• Wide range of fuels - including non-standard …

i.e. ethanol, bio diesel, coal bed methane…

• Fast power deployment … 10-12 months

6

© 2014 General Electric Company – All rights reserved

Page 7: GE ADGT Products

Capability

Two models with ISO capabilities from 100-116 MW at

44.5% efficiency

Experience

• >300,000 operating hours

• 51 units installed

Benefits

• 44.5% Simple Cycle, 53% Combined Cycle Efficiency

• >50 MW/min ramp rate

• High part-power efficiency … 36% @ 50% power

• Load following and cycling capabilities

• Dry Low Emissions technology (LMS100 PB)

• Dual-fuel standard combustion technology (LMS100

PA)

LMS100

7 © 2014 General Electric Company – All rights reserved

Page 8: GE ADGT Products

+10% more

power

Introducing the LMS100 PA+ The 116 MW machine

Capability

116 MWe at 44.5% efficiency at ISO

Benefits

•Significantly lower $/kW

•Unparalleled simple-cycle efficiency

•50MW/min ramp rate

•High part-power efficiency

•Load following and cycling capabilities without maintenance penalties

8 © 2014 General Electric Company – All rights reserved

Page 9: GE ADGT Products

LM1

60

0

LM2

50

0/+

LM6

00

0

LMS

10

0 Control technology

Water injection

25ppm NOx (gas fuel)

42ppm NOx (liquid fuel)

Steam Injection

25ppm NOx (gas fuel)

+15ppm NOx (gas fuel)

Dry Low Emissions

15ppm NOx (gas fuel)

25ppm NOx (gas fuel)

65ppm NOx (liquid fuel)

100ppm NOx (liquid fuel)

Dual Fuel DLE

Single Annular Combustor

Triple Annular Combustor

P P P P

P

P P P P

P P P P

P In development

P P P

P

P

P

P

P P

P

Emissions Capabilities

With SCR/COR systems achieving BACT emissions across load range

© Copyright 2014 General Electric Company. All rights reserved. Subject to restrictions on cover page

Page 10: GE ADGT Products

LM25/TM25 Proven Reliability and Enhanced Flexibility

© Copyright 2014 General Electric Company. All rights reserved. Subject to restrictions on cover page

Page 11: GE ADGT Products

34 MW 41%

23.8 MW 38%

31.4 MW 41%

LM2500+

LM2500 Fleet 68+

Million Hours LM2500+G4

16 - 18MW 34%

LM2500

LM1800e

LM2500 Family… Flexible Power

Page 12: GE ADGT Products

Gas Turbine + Package

LM2500 Availability and Reliability

Source: ORAP® ; All rights to Underlying Data Reserved: SPS®

Gas Generator and Package Set

50th percentile unit (median)

All data represents 12 month period

*2013 data through May

• Aircraft engine & LM family experience

• Extensive development testing

• Every engine is factory full-load tested

• Lease engine and rotable component availability

• Aircraft engine maintenance philosophy

GG Pkg BOP

SCP

Page 13: GE ADGT Products

LM1800e Gas Turbine • Rated from 16.5 to 18 MW

• Extended maintenance intervals

• Annual BSI

• Hot section life increased to 40k hours

• Overhaul life increased to 80k hours

• Efficiency 34.5%

• DLE or SAC combustor

• Simplified gas turbine

• Mw Control

• Monitor

• Fuel System

• Consistent power generation over life of the product

Page 14: GE ADGT Products

LM1800e Package Layout

Base Scope Total Solutions

Air Filter - Combustion Only

(shown for reference only – supplier design not complete)

Off-base enclosure

Brush generator

(62-170ER)

Generator lube oil module

Air cooled generator

Vent exhaust & silencer

Stand alone water

wash cart

On-Base Aux. module (TLO/Hyd. Start/TGP)

On-base inlet plenum

Positive pressure

ventilation fans

Page 15: GE ADGT Products

LM1800e

• Simplified and standardized package to meet industrial power needs in the 16 to 18 megawatt range

• Outstanding reliability and best-in-class efficiency

• Reduced maintenance … Hot section overall in 40K+ Hrs & complete overhaul in 80K+ Hrs

Page 16: GE ADGT Products

Imagination at work

GE’s TM2500+ SOLUTION OFFERS FAST, MOBILE AND FLEXIBLE POWER Power whenever and wherever it’s needed

Page 17: GE ADGT Products

The TM2500+ solution can be deployed more than 6 times faster than other technologies

17

TM2500+ mobile gas

turbine Gas turbines Combined cycle

Customers may immediately generate incremental electricity revenue $ millions in

electricity revenue

~ 16 MONTHS ~ 6 MONTHS ~ 1 MONTH*

*Note: The TM2500+ can be in commercial operation approximately 30 days after an order is placed, but these times may vary based on project location, site readiness, permitting process, and other variables

Page 18: GE ADGT Products

TM2500+ Technology Overview

Equipped with LM2500+ aeroderivative GT

– Proven technology, over 42 million operational hours

23-31 MW on wheels

37% SC efficiency

Dual frequency - 50 or 60 Hz operation

Liquid (#2 diesel and jet fuel) and/or gas fuel (natural gas and COG)

Ambient temperature operational range from -39oC to 50oC

Installation in days

Global availability

Turnkey solutions including O&M

Fast start - zero to 100% in 10 minutes

Modular mechanical and electrical BOP

Remote monitoring & diagnostics - available

Key Highlights TM2500+ Layout

a product of ecomagination

Page 19: GE ADGT Products

TM2500+ Design

Switchgear

Transportation

Stinger

Exhaust

Stack

Inlet Filter

Assembly

Inlet

Plenum LM2500+ Generator

Generator Inlet

& Exhaust

Trailer

Gooseneck

Transportation

Jeep

Control Room &

Battery Room

Hydraulic

Starter

Fuel/Water

Pumps

Lube Oil

Coolers

Turbine Enclosure

Fire Suppression

Auxiliary Trailer

Main Trailer

Page 20: GE ADGT Products

LM6000 More Power, Higher Efficiency

© Copyright 2014 General Electric Company. All rights reserved. Subject to restrictions on cover page

Page 21: GE ADGT Products

Variable

Bleed Valves

14 Stage

High Pressure

Compressor

2 Stage

High Pressure

Turbine

Variable

Stator Vanes

5 Stage

Low Pressure

Compressor

5 Stage

Low Pressure

Turbine

Variable Inlet

Guide Vanes

LM6000 gas turbine

Cold End

Output Shaft

Hot End

Output Shaft

Combustor

(DLE shown)

21 © 2014 General Electric Company – All rights reserved

Page 22: GE ADGT Products

LM6000 fleet … …Over 1150 gas turbines shipped… … more than 900 installed units

22 © 2014 General Electric Company – All rights reserved

Page 23: GE ADGT Products

LM6000… Setting the industry standard

LM6000 has 10x more operating experience

0

200

400

600

800

1000

1200

LM6000 HD AD

1161

221

103

Data through December 2013

Source: McCoy Power Reports, Manufacturer websites, press releases and publications

Units shipped

0

5

10

15

20

25

30

LM6000 HD AD

28.2

2.75

1

Operating Hours, MM

23 © 2014 General Electric Company – All rights reserved

Page 24: GE ADGT Products

Availability and reliability Consistent World-Class Results

• Aircraft engine & LM family experience

• Extensive development testing

• Every engine is factory full-load tested

• Lease engine and rotable component availability

• Aircraft engine maintenance philosophy

• Gas turbine generator set

• 50th percentile unit • 333 units reporting as of Sept 2013

99.7 99.8 99.8 99.9

97.8 97.9 98.2 98.3

90

92

94

96

98

100

Reliability Availability

Dec-10 Dec-11 Dec-12 Sept-13

Source: ORAP® ; All rights to Underlying Data Reserved: SPS®

24 © 2014 General Electric Company – All rights reserved

Page 25: GE ADGT Products

LM6000… More power

130

114

142

115

12

11

10

15

PH

PF

PG

PC

50

45

55

45

7

5

5

6

PH

PF

PG

PC

Simple Cycle 2x1 Combined Cycle

SAC

DLE

SPRINT

SC, no losses, Avg. Engine CC, Net Efficiency, 2.5/12” losses, Avg. Engine

Increased Power with DLE and enhanced Sprint

© Copyright 2014 General Electric Company. All rights reserved. Subject to restrictions on cover page

+10% more power

Page 26: GE ADGT Products

LM6000… Best in Class Efficiency

55

54

52

51

PH

PF

PG

PC

Combined Cycle Efficiency

42

41

40

40

PH

PF

PG

PC

Simple Cycle Efficiency

SC, 0/0 losses, Avg. engine CC, Net Efficiency, 2.5/12” losses

© Copyright 2014 General Electric Company. All rights reserved. Subject to restrictions on cover page

Page 27: GE ADGT Products

Water

& Air

Manifolds

Sprint® = Spray Intercooling

SPRINT®

Nozzles

Atomized water at the inlet of the compression sections to improve output

27 © 2014 General Electric Company – All rights reserved

Going to Next generation Sprint system to increase Power

Page 28: GE ADGT Products

LM6000 package … designed for ease of maintenance

Reliability & Maintainability Improvements Increasing MTBFO to 6000 hrs Horizontal offset gearbox Direct drive fans vs belt-driven Aerosol fire system Distributed I/O

Cost Reduction Reduced footprint to lower

transportation and manufacturing costs

28 © 2014 General Electric Company – All rights reserved

Page 29: GE ADGT Products

LMS100 More Power, More Flexibility, Lower Emissions

Page 30: GE ADGT Products

Djubga, Russia – 1st LMS100PB’s

Commercial Operation Date, October 31st , 2013

100%/99.5% Reliability through the Winter Olympic Games

Most efficient simple cycle gas turbine in the world

Page 31: GE ADGT Products

Proven technologies integrated in a 3-shaft 100+ MW gas turbine package

MS6001FA Low Pressure

Compressor (LPC) Aeroderivative Intermediate Pressure

Turbine (IPT)

Frame derivative Exhaust Diffuser

Aeroderivative Power Turbine (LPT)

Frame derivative Power Turbine Shaft

Intercooler

System

CF6-80C2 High Pressure

Compressor (HPC)

CF6-80E High Pressure Turbine (HPT)

Aeroderivative Single Annular or DLE Combustor

31 © 2014 General Electric Company – All rights reserved

Page 32: GE ADGT Products

VBV Silencer

VBV System

Cooling Water Skid

The intercooler is key to LMS100 performance Enables high mass flow, high pressure ratio & hot-day power retention

392 deg F

(200 deg C)

56 psi

(3.9 bar)

95 deg F

(35 deg C)

55 psi

(3.8 bar)

32 © 2014 General Electric Company – All rights reserved

Page 33: GE ADGT Products

LMS100 Mechanical Drive (LNG/F-LNG)

Train 1, String B

Propane Compressor

Main Refrigerant Compressor

LMS100 Package High efficiency Free power turbine High starting torque

Hot-day power capability Ease of maintenance Dry low emissions

With >100MW at the shaft , the LMS100 is the largest GT in the world with a free power turbine

Page 34: GE ADGT Products

34 GE Energy: PowenGEN Asia 2010

GE LMS100® Wind Firming (case study available) Ramp rate – ~50MW/min (~150MW/min emergency)

Fast-start –~10min starts to full power

Start/stop – Multiple starts/day w/ no maintenance penalty (1000 starts/yr in PJM)

High part load efficiency – ~40% efficient at 50% of full load

Deeper turndown – Low minimum load ideal for load following

Modular maintenance philosophy – High availability due to fast component change out

Synchronous condenser operation for grid support

Additional Value • Ability to provide both energy & grid ancillary services

• Deferral in T&D investment (site closer to load)

• Reduced line losses (site closer to load)

• Blackstart/restoration

Delivery of more wind power, displacement of less efficient , higher

cost generation results in lower variable cost and lower emissions

Page 35: GE ADGT Products

Applications Peaking, Cycling Duty CHP/Combined Cycle

Page 36: GE ADGT Products

Title or Job Number | XX

Month 201X

36

Algeria faces a drastic need for more power,

particularly during the hot summer months when

there is close to 10 percent annual growth in

electricity demand

480 MW of on-demand power for Algeria

36

The opportunity Grid stability … Algeria’s power

generation investment plan to add

12 gigawatts of power by 2017

The GE solution Twenty-Four (24) Trailer Mounted

TM2500+ aeroderivative gas turbine

generator sets

The TM2500+ gas turbine generator

sets produce more than 480

megawatts of power for the

northern districts of M’Sila and

Fkirina.

• Services - Site Mgmt., EHS,

Security

• Spare Parts including Hot Sections

and GTs

• Pulse filtration kit (2014)

Page 37: GE ADGT Products

Title or Job Number | XX

Month 201X

37

Summer peak power needs due to the influx of

2 million tourists to the Greek island of Rhodes

23 MW for peak shaving in 10 days for Greece

37

The opportunity Provide fast, reliable power for more than 2 million tourists that visit the island every summer

The GE solution

One (1) Trailer Mounted

TM2500+ aeroderivative gas turbine generator set The TM2500+ gas turbine generator package was commissioned within 10 days of arrival and was ready to provide a fast, permanent source of power generation. • 23 MW power generation

• 35% efficiency

• Liquid Fuel

• Water Injection for lower NOx

levels

Page 38: GE ADGT Products

Aeroderivative Flexibility © 2014 General Electric Company - All rights reserved

Page 39: GE ADGT Products

Colorado – Simple and Combined Cycle Application

(2) LMS100’s in SC + (4) LM6000’s in CC

• 200MW satisfies peaking demands (44% SC efficiency)

• 200MW operates at base load (52% CC efficiency)

2 x LMS100

4 x LM6000

Page 40: GE ADGT Products

LM6000 … Superior in CC daily dispatch mode, reaching full load in less than 45 mins

0

5

10

15

20

25

30

35

40

45

13:34 13:38 13:42 13:46 13:50 13:54 13:58 14:02 14:06 14:10 14:14 14:18

0

2000

4000

6000

8000

10000

12000

MW HP Rotor Speed LP Rotor Speed LP Turb Inlet Temp ºC

LM6000 CC power plant in Gorizia, Italy

Page 41: GE ADGT Products

LM6000 … Compact footprint reduces I&C costs

LM6000 unit installed in Pouch Terminal, Staten island

150ft/46m 300ft/

92m

Residential area

Shopping center

LM6000

Page 42: GE ADGT Products

Texas Medical Center in Houston

6,500 hospital beds

900 bassinets

$1B of medical research

5.5 million patient visits

8 hospitals

8 colleges/universities

Total Plant Capacity

122,000 tons chilled water

850,000 PPH steam

61MW power generation

82% energy efficiency

Substantial environmental benefits

New LM6000-PC … for additional CHP

LM6000 providing CHP to critical infrastructure

© Copyright 2011 General Electric Company. All Rights Reserved. Subject to restrictions on cover page

Page 43: GE ADGT Products

8 x LMS100

> 400 MW/min

6 x LMS100

> 300 MW/min

5 x LMS100

> 250 MW/min

1,000 MW/min

Regulation Up

or

Regulation Down

Page 44: GE ADGT Products