How GEIP helps you
Modernization Process
7/27/2019 GE-IP Modernization Process
http://slidepdf.com/reader/full/ge-ip-modernization-process 2/8
2 /Modernization Process/2/15/2012
WHO WHY HOW
• End Users
• OEM’s• Solution Providers
1. Perform Assessment− Understand Legacy Systems
2. Analyse Product Lifecycle
− Proof of Concept
3. Propose Solution
−
Align Priorities with CustomerNeeds
4. Implement Migration Solution
− Validate Assumptions & Execute
Assess Propose
Implement
Analyze
1 3
2
4
• Impending threat of unscheduled downtime
• Legacy architecture cannot
support new IT to improve
productivity, safety, and
security
• Older system cannot respond
to rapid shifts in customer
demand
• Existing system does not
provide advanced visibility to
potential disruptions or
breakdown
• Legacy system cannot beexpanded cost effectively to
meet capacity requirements
• Not cost effective to support
legacy system because of
spare parts availability
7/27/2019 GE-IP Modernization Process
http://slidepdf.com/reader/full/ge-ip-modernization-process 3/8
3 /Modernization Process/2/15/2012
Perform AssessmentUnderstand Legacy
System
Identify Risk
ProposeSolution
Align Priorities with
Customer Needs
Mitigate Risk
Implement
Migration
SolutionValidate Assumptions
Execute
Remove Risk
AnalyzeProduct
LifecycleProof of Concept
Quantify Risk1 3
2
4
How GEIP helps you modernize
7/27/2019 GE-IP Modernization Process
http://slidepdf.com/reader/full/ge-ip-modernization-process 4/8
4 /Modernization Process/2/15/2012
Perform
AssessmentUnderstand
Legacy System
Identify Risk
1Perform
AssessmentUnderstand
Legacy System
Identify Risk
1How to identify
Assess - Site Survey
Identify Risks• Hot, Warm or Cold Change
out• Effects on Program
Intellectual Property• Phased or Full SystemsChange out
• Field Wiring
Suggest Actions with Dates• Spares, priorities, etc.
• Share other successes
7/27/2019 GE-IP Modernization Process
http://slidepdf.com/reader/full/ge-ip-modernization-process 5/8
5 /Modernization Process/2/15/2012
• Compile specific modernization planusing standard available GEIP productsand services that enable CustomersIntellectual Property to be maintained.
• Plan Will Ensure Reduced Risk− Downtime
− Utilize high % existing architecture− Proven Modernization Technology− Utilize Specialists
Analyze
Product LifecycleProof of Concept
Quantify Risk
2How to quantifyActive – Mature - Discontinued
Customer Specific Solutions
7/27/2019 GE-IP Modernization Process
http://slidepdf.com/reader/full/ge-ip-modernization-process 6/8
Controller: Series 90-70
Distributed Network
- Genius Bus
Controller: PAC RX7i
Modules
- Genius
- Field Control
- VersaMax
Planned approach to Modernization for• Controllers• Networks• Local and Remote I/O
Replace Discontinued products AND
maintain Integrity of your installation
Propose
Solution Align Priorities with
Customer Needs
Mitigate Risk
3How to Mitigate – Phase 1Available Now
Upgrade Today
GEIP – Options for Customers
Proposed Configuration
Original Configuration
7/27/2019 GE-IP Modernization Process
http://slidepdf.com/reader/full/ge-ip-modernization-process 7/8
7 /Modernization Process/2/15/2012
• Project management
• System design, engineering andcommissioning.
• Factory Acceptance Testing (FAT)
• Site Acceptance Testing (SAT)
• Field Services availability for
ongoing system upgrades, repairand future development
• Sourced products (Other GE andThird parties)
• Utilize SP Migration Package towork with your local SP’s and EndUser’s
• GEIP can supply products andtraining for your own technical
staff to deploy.
Deployment optionsImplement
Migration SolutionValidate Assumptions
Execute
Remove Risk
4
GEIP Delivered Solution
Partner with SP
Purchase Product Only
7/27/2019 GE-IP Modernization Process
http://slidepdf.com/reader/full/ge-ip-modernization-process 8/8
8 /Modernization Process/2/15/2012
Initiate the first step forward in
modernization
Perform
Assessment
Propose
Solution
Implement Migration
Solution
Analyze ProductLifecycle
31
2
4