generator

8
Month : Feb 10 - March 12 Date || Time 18/2/15 || 15 00 100 2094.7 240 filled 40448 9/2/15 || 10 0 100 2097.2 40484 40448 80.71 20/2/15 || 10 00 100 2103.8 40535 40484 80.71 20/2/15 || 16 15 100 2106 132 40553 40535 80.71 23/2/15 || 10 00 100 2122.8 40614 40553 80.71 23/2/15 || 17 15 100 2125.8 filled=240 40643 40614 80.71 24/2/15 || 10 15 100 2129.1 288 40662 40643 80.71 24/2/15 || 16 15 100 2131.3 85 55 / 30 fille 240 40683 40662 80.71 5/2/15 || 10 1 100 2135 50 135 80.71 Generator Size (KVA) Generator Running (hrs) Diesel Consumption (litres) Residual Diesel in tank (litres) Units consumed / day KWH Reading of meter (current) KWH reading of meter (previous) Diesel Rate (PKR)

Upload: 0307ali

Post on 13-Sep-2015

6 views

Category:

Documents


5 download

DESCRIPTION

This is a sample excel sheet for recording generator data.

TRANSCRIPT

Sheet1Month : Feb 10 - March 12Date || TimeGenerator Size (KVA)Generator Running (hrs)Diesel Consumption (litres)Residual Diesel in tank (litres)Units consumed / dayKWH Reading of meter (current)KWH reading of meter (previous)Diesel Rate (PKR)KWH / Liter (Units / liter)18/2/15 || 15 001002094.7240 filled4044819/2/15 || 10 001002097.2404844044880.7120/2/15 || 10 001002103.8405354048480.7120/2/15 || 16 151002106132405534053580.7123/2/15 || 10 001002122.8406144055380.7123/2/15 || 17 151002125.8filled=240406434061480.7124/2/15 || 10 151002129.1288406624064380.7124/2/15 || 16 151002131.385155 / 30 filled240406834066280.712.8625/2/15 || 10 1510021355013580.71

Sheet2Date || TimeFull Load Current (Amperes)Estimated Power (KW)Avg. Usage / dayAvg. Usage / MonthUnits consumed / dayUnits consumed / month

17/2/15 || 16 0088555-6 hours~ 260