geotechnica 2015 - nader saffari london underground
TRANSCRIPT
-
8/18/2019 Geotechnica 2015 - Nader Saffari London Underground
1/34
Geotechnica 2015
Is Innovation the Key to Step Change forthe Geotechnical Industry
Dr Nader Saffari – London Underground
-
8/18/2019 Geotechnica 2015 - Nader Saffari London Underground
2/34
Contents
1. Introduction to LU
2. Ground Investigation
3. Innovation
4. Conclusions
-
8/18/2019 Geotechnica 2015 - Nader Saffari London Underground
3/34
1. Introduction to LU
The LU Network consists of approximately 463 km of track route of
which 239 km is supported by earth structures.
4 million passenger journeys per day.
During its daily peak services 540 trains run across 11 lines and 270
stations.
Capital investment programme amounting to £1.6 billion per annum inorder to increase the system's capacity by 35%.
Night tube - 24-hour service on Friday and Saturday nights
commencing September this year.
Less time available for engineering activity on the operational railway
Growing reliance on non-intrusive techniques & smart technology.
-
8/18/2019 Geotechnica 2015 - Nader Saffari London Underground
4/34
Asset Management
Inspection
Assessment
Remedial
Works
Monitoring
Maintenance
Cyclic
MeasurementData capture
Reporting
Investigation Analysis
Report
Classification
Instrumentation
Remote data
Groundwater
Movement
Weather
Design
Construction
Routine
Heavy
Risk Assessment
Service Loss
Safety Risk
STRATA
-
8/18/2019 Geotechnica 2015 - Nader Saffari London Underground
5/34
Geology and Ground Conditions
Terrace gravels
Alluvium
London Clay
Lambeth group
Chalk & overlying superficials
Fill derived from above
Ash
-
8/18/2019 Geotechnica 2015 - Nader Saffari London Underground
6/34
2. Ground Investigations
Life extension of existing network, e.g.
Earth Structures
Tunnels, etc.
-
8/18/2019 Geotechnica 2015 - Nader Saffari London Underground
7/34
Earth Structures
-
8/18/2019 Geotechnica 2015 - Nader Saffari London Underground
8/34
Tunnels - Lambeth Group Sand Channels
The water flow can carry substantial quantities of
sand into the tunnel potentially causing operationalproblems and structural concerns
-
8/18/2019 Geotechnica 2015 - Nader Saffari London Underground
9/34
2. Ground Investigations
Growing/improving the existing network, e.g.
Victoria Station Upgrade
Bond Street
Cooling the Tube
-
8/18/2019 Geotechnica 2015 - Nader Saffari London Underground
10/34
Terrace Gravel
Made Ground
Alluvium
London
Clay
Challenging Ground Conditions - VSU
-
8/18/2019 Geotechnica 2015 - Nader Saffari London Underground
11/34
Cooling the Tube
Mid tunnel
ventilation
Borehole
cooling
-
8/18/2019 Geotechnica 2015 - Nader Saffari London Underground
12/34
2. Ground Investigations
Extending the Network, e.g.
Northern Line Extension
Croxley Rail Link
Crossrail 2
-
8/18/2019 Geotechnica 2015 - Nader Saffari London Underground
13/34
Northern Line Extension
13
Note – Temporary shafts
have been removed from
the project scope
-
8/18/2019 Geotechnica 2015 - Nader Saffari London Underground
14/34
GI on Northern Line Extension
-
8/18/2019 Geotechnica 2015 - Nader Saffari London Underground
15/34
2. Ground Investigation - Challenges
Access
Space
Steep slopes
Underground
Safety
-
8/18/2019 Geotechnica 2015 - Nader Saffari London Underground
16/34
GI on or Near Track
-
8/18/2019 Geotechnica 2015 - Nader Saffari London Underground
17/34
Windowless sampling
-
8/18/2019 Geotechnica 2015 - Nader Saffari London Underground
18/34
2. Ground Investigation - Objectives
Geological – Stratigraphy
–Faulting
– Sand bands
– Chalk types and structure
Hydrological and hydro-geological GW Rainfall & SMD
Geotechnical design parameters
How much of the above data already exists(somewhere?)
Targeted investigation?
-
8/18/2019 Geotechnica 2015 - Nader Saffari London Underground
19/34
2. Ground Investigation - Quality
Specification
Equipment
Skills & experience
Supervision
Data collection
Data management
Effective use of data
Team collaboration & engagement
-
8/18/2019 Geotechnica 2015 - Nader Saffari London Underground
20/34
2. Ground Investigation - Quality
Major projects
Usually receive more attention
Routine
Often quality is compromised
Quality cost money
what is the reward? Cost saving by optimising design?
EC7?
-
8/18/2019 Geotechnica 2015 - Nader Saffari London Underground
21/34
3. Innovation
Before
Now
-
8/18/2019 Geotechnica 2015 - Nader Saffari London Underground
22/34
3. Innovation
Before
Now
-
8/18/2019 Geotechnica 2015 - Nader Saffari London Underground
23/34
3. Innovation – Remote sensing
Satellite Technology – Transport InfrastructureManagement (TIM), new generation of asset monitoring
LiDAR
Laser Scanner
Drones
-
8/18/2019 Geotechnica 2015 - Nader Saffari London Underground
24/34
3. Innovation - Laser Scanner
-
8/18/2019 Geotechnica 2015 - Nader Saffari London Underground
25/34
Mapping of Chalk Cuttings - Abseiling
-
8/18/2019 Geotechnica 2015 - Nader Saffari London Underground
26/34
Mapping of Chalk Cuttings – Laser Scanner
-
8/18/2019 Geotechnica 2015 - Nader Saffari London Underground
27/34
Mapping of Chalk Cuttings – Laser Scanner
-
8/18/2019 Geotechnica 2015 - Nader Saffari London Underground
28/34
3. Innovation - Data Management
Data collection &reporting
LU database & GIS
Data sharing
3D geology
BIM
-
8/18/2019 Geotechnica 2015 - Nader Saffari London Underground
29/34
3. Innovation – Remote sensing
A 6ft wide drone searches Amersham
Station roof tops for any cracks or signs
of dampness
Satellite technology, Transport Infrastructure Management (TIM)
-
8/18/2019 Geotechnica 2015 - Nader Saffari London Underground
30/34
3. Innovation in Monitoring
UtterBerry - GE Award 2015
Shape Accel Array (SAA)
Standard inclinometer
-
8/18/2019 Geotechnica 2015 - Nader Saffari London Underground
31/34
3. Innovation - Analytical
L
H
0.7 L
Made Ground
Cutting Material(depth ofWeathered Clay)
Underlying Material
Weakened BasalLayer (refer to text
for appropriatelocation)
0.15H to 0.2H
-
8/18/2019 Geotechnica 2015 - Nader Saffari London Underground
32/34
3. Innovation
GI ?
-
8/18/2019 Geotechnica 2015 - Nader Saffari London Underground
33/34
3. Innovation - GI
Identify areas in need of innovation
What are the drivers
What are the barriers
Cost
Is there a business case?
-
8/18/2019 Geotechnica 2015 - Nader Saffari London Underground
34/34
4. Conclusions
LU is involved in a capital investment programme in order to
increase the system's capacity by 35%.
There is a growing reliance on non-intrusive techniques & smart
technology.
GI plays a key role in the design, construction and management
of assets on LU Network.
The industry has made significant advances in the development
of smart infrastructure and construction over the years.
Innovation in ground investigation is required to meet the
challenges ahead.