GEOTECHNICAL REPORT OF PONDS AND CYPRESS CANAL REALIGNMENT
VANDERBILT BEACH ROAD EXTENSION PROJECT NAPLES, COLLIER COUNTY, FLORIDA
Ardaman & Associates, Inc.
CORPORATE HEADQUARTERS
8008 S. Orange Avenue, Orlando, FL 32809 - Phone: (407) 855-3860 Fax: (407) 859-8121
Branch Office Locations
Florida: Bartow, Cocoa, Fort Myers, Miami, Orlando, Port St. Lucie, Sarasota, Tallahassee, Tampa, West Palm Beach
Louisiana: Baton Rouge, Monroe, New Orleans, Shreveport
MEMBERS:
ASTM International American Concrete Institute
Geoprofessional Business Association Society of American Military Engineers
American Council of Engineering Companies
9970 Bavaria Road, Fort Myers, Florida 33913 Phone: (239) 768-6600 Fax: (239) 768-0409
Louisiana: Baton Rouge, Monroe, New Orleans, Shreveport
Florida: Bartow, Cocoa, Fort Myers, Miami, Orlando, Port St. Lucie, Sarasota, Tallahassee, Tampa, W. Palm Beach
Ardaman & Associates, Inc.
Geotechnical, Environmental and Materials Consultants
November 11, 2019 File No. 19-33-4548
TO: Jacobs 5801 Pelican Bay Boulevard Suite 505 Naples, FL 34108 Attention: Mr. Bill Gramer, P.E. VIA: [email protected] SUBJECT: Geotechnical Report of Ponds and Cypress Canal Realignment Borings Vanderbilt Beach Road Extension Project Naples, Collier County, Florida Gentlemen:
We have completed our field exploration and laboratory testing programs for the pond and canal
realignment borings for the Vanderbilt Beach Road Extension project in Naples, Collier County, FL.
Our services included the following tasks:
1. Conducted 22 continuous Standard Penetration Test (SPT) borings advanced to a depth
of 20 feet and labeled B-1 through B-23: 14 SPT borings were performed at locations within or near to the proposed pond sites, and 8 SPT borings were performed at select locations along the Cypress Canal realignment. Boring B-12 was not drilled because it was inaccessible. Boring B-8 was previously drilled for SFWMD for the Relocation of Cypress Weir #1 project.
2. Conducted an in-situ permeability test adjacent to each of the 14 pond borings to provide
an estimate of the hydraulic conductivity.
3. Performed laboratory tests including material moisture content, Atterberg limits, sieve analysis and organic content on selected samples to aid in soil classification.
4. Estimated the seasonal high groundwater table at each boring location.
The results of the SPT borings locations are summarized on the attached Report of Core Borings
sheets presented as Sheet Nos. 1 through 3 and individual boring logs. Each boring was located
by first plotting the borings within the pond area using Google Earth Pro and then determining the
latitude and longitude coordinates. A hand-held GPS unit was then used to locate each boring in
the field. The project surveyor (RWA Engineering) located each boring using State Plane
coordinates and determined the ground elevation (NAVD 88). The State Plane coordinates were
Geotechnical Report of Ponds and Cypress Canal Realignment Vanderbilt Beach Road Extension Project, Naples, Collier County, FL File No. 19-33-4548 - 2 -
Ardaman & Associates, Inc.
converted to latitude and longitude, which are provided on the Report of Core Borings Sheets and
boring logs along with the ground elevation at each boring location.
Laboratory tests consisting of natural moisture content (AASHTO T-265) Atterberg limits
(AASHTO T-89), sieve analysis (AASHTO T-88) and organic content (FM 1 T-267) are
summarized on the soil profiles adjacent to the depths from where the samples were recovered.
The results are also summarized in graphical form on Table 4.
Seasonal High Groundwater Table
The seasonal high groundwater table at each boring location was estimated by reviewing the
Collier County Soil Survey as published by the United States Department of Agriculture (USDA)
Natural Resource Conservation Service. Table 1 is a summary of the USDA Soil Survey
information listing the USDA map symbols and soil names at each boring location. Table 2 is a
summary of the seasonal high groundwater table estimates for each boring location.
Hydraulic Conductivity of Site Soils
We measured the hydraulic conductivity at each pond boring location by performing in-situ
permeability tests. Each test typically consisted of inserting 10 feet of 2-inch diameter PVC screen
and 5 feet of PVC riser into a nominal 4-inch diameter hole formed using steel casing. The
annulus was packed with silica sand to just above the screened section as the steel casing was
withdrawn. Each piezometer was installed to depths ranging from 12 to 16 feet; therefore, the
permeability test is a measure of the coefficient of hydraulic conductivity averaged over the soils
(or rock) from depths ranging from 2 to 12 feet and 4 to 16 feet. The constant head method was
used to perform each test. The results are summarized in Table 3.
General Soil Stratigraphy
The results of the borings are presented on the Report of Core Borings Sheets – Sheet Nos. 1
through 3 and on the attached boring logs. Soil stratification is based on an examination of the
recovered soil samples, the laboratory testing and interpretation of field boring logs by a
geotechnical engineer. The actual transition between strata may be gradual. In some cases,
small variations in properties, not considered pertinent to the engineering evaluation, may have
been abbreviated for clarity.
The profiles represent the conditions at the boring locations only, and variations may occur
between the borings. The following soil descriptions and AASHTO Soil Classifications were used.
Geotechnical Report of Ponds and Cypress Canal Realignment Vanderbilt Beach Road Extension Project, Naples, Collier County, FL File No. 19-33-4548 - 3 -
Ardaman & Associates, Inc.
Soil Stratum Descriptions and AASHTO Classifications
Stratum Soil Description AASHTO Soil Classification
1 Gray Gravelly SAND to Sandy GRAVEL, trace to some silt A-1-a/A-1-b
2 Brown to Dark Brown SAND A-3
3 Gray to Dark Brown Silty SAND, trace to some gravel A-2-4
4 Brown Clayey SAND, trace gravel A-2-6
5 Gray very Silty SAND, trace to some gravel A-4
6 Soft LIMESTONE - -
7 Hard LIMESTONE - -
Project Soil Suitability Material use should be completed in accordance with FDOT Standard Plans, Indices 120-001
and 120-002. Materials directly beneath the base should be select materials. The following
summarizes the generalized use or non-use of the soils that will most likely be encountered at the
proposed pond locations:
1. The materials from Strata 1 and 2 are Select (A-1-a/A-1-b/A-3) materials and appear
satisfactory for use in the embankment when utilized in accordance with Standard
Plans, Index 120-001.
2. The material from Stratum 3 is Select (A-2-4) material and appears satisfactory for use
in the embankment when utilized in accordance with Standard Plans, Index 120-001.
However, this material is likely to retain excess moisture and may be difficult to dry
and compact. It should be used in the embankment above the water level existing at
the time of construction. This material may not be used in the subgrade portion of the
roadbed due to its organic content.
3. The materials from Strata 4 and 5 are Plastic (A-2-6/A-4) materials and shall be
removed in accordance with Standard Plans, Index 120-002. They may be placed
above the existing water level (at the time of construction) to within 4 feet of the
proposed base. They should be placed uniformly in the lower portion of the
embankment for some distance along the project rather than full depth for short
distances.
Geotechnical Report of Ponds and Cypress Canal Realignment Vanderbilt Beach Road Extension Project, Naples, Collier County, FL File No. 19-33-4548 - 4 -
Ardaman & Associates, Inc.
4. The material from Strata 6 and 7 are Natural Limestone Formations. Special tools and
equipment will be required to excavate and/or dewater this material.
If you have any questions about this report, please contact this office. Very truly yours, Ardaman & Associates, Inc. Florida Certificate of Authorization No. 00005950
Ethan H. Drew, E.I. Project Engineer Gary A. Drew, P.E. Vice President/Principal Engineer FL License No. 35504
EHD/GAD/cmb
This document has been digitally signed and sealed by on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
ATTACHMENTS
TABLE 1 – SUMMARY OF USDA SOIL SURVEY TABLE 2 – SUMMARY OF SEASONAL HIGH GROUNDWATER TABLE ESTIMATES TABLE 3 – SUMMARY OF PERMEABILITY TESTS FOR POND BORINGS TABLE 4 – SUMMARY OF LABORATORY TEST RESULTS FIGURES 1A THROUGH 1F - BORING LOCATION PLAN REPORT OF CORE BORINGS SHEET NOS. 1 THROUGH 3 BORING LOGS – B-1 THROUGH B-23
Depth
(inches)USCS AASHTO
Permeability
(in./hr.)
Depth
(feet)Months
Uncoated
SteelConcrete
0 – 57 SP, SP-SM A-3 6.0 – 20 5.1 – 8.4
57 – 62 SM, SC-SM A-2-4 0.6 – 2.0 5.1 – 8.4
62 --- ---
0 – 32 SP, SP-SM A-3 6.0 – 20 5.11 – 7.8
32 – 54 SM, SC-SM, SC A-2-4, A-2-6 0.2 – 6.0 6.6 – 7.8
54 --- ---
0 – 14 SP-SM, SM A-3, A-2-4 6.0 – 20 6.1 – 7.3
14 – 18 SP-SM, SM A-3, A-2-4 6.0 – 20 6.1 – 7.3
18 – 24 SC-SM, SC A-2-4, A-2-6 0.6 – 2.0 7.4 – 8.4
24 - 30 SM, SC-SM A-2-4 0.6 – 6.0 7.4 – 8.4
30 --- ---
0 – 6 SP, SP-SM A-3 6.0 – 20 3.6 – 6.0
6 – 35 SP, SP-SM A-3 6.0 – 20 3.6 – 6.0
35 – 49 SP-SM, SM A-3, A-2-4 0.6 – 2.0 3.6 – 6.0
49 - 80 SP, SP-SM A-3 6.0 – 20 3.6 – 6.0
0 – 3 SP, SP-SM A-3 6.0 – 20 5.1 – 6.5
3 – 12 SP, SP-SM A-3, A-2-4 6.0 – 20 5.6 – 8.4
12 --- ---
0 – 30 SP, SP-SM A-3 6.0 – 20 5.6 – 6.5
30 – 55 SM, SC-SM, SC A-2-4, A-2-6 0.06 – 0.2 6.6 – 7.8
55 --- ---
0 – 35 SP, SP-SM A-3 6.0 – 20 3.6 – 7.3
35 – 50 SP-SM, SM A-3, A-2-4 0.2 – 6.0 3.6 – 7.3
50 – 80 SC-SM, SC A-2-4, A-2-6 < 0.2 6.1 – 8.4
0 – 6 SP, SP-SM A-3 6.0 – 20 5.1 – 7.8
6 – 32 SP, SP-SM A-3 6.0 – 20 5.1 – 7.8
32 – 54 SM, SC-SM, SC A-2-4, A-2-6 0.6 - 6.0 6.6 – 7.8
54 --- ---
0 – 4 SP, SP-SM A-3, A-2-4 6.0 – 20 5.1 – 8.4
4 – 26 SP, SP-SM A-3, A-2-4 6.0 – 20 5.1 – 8.4
26 – 30 SC, SC-SM A-4, A-6 0.6 – 2.0 5.1 – 8.4
30 --- ---
0 – 3 SP-SM A-3, A-2-4 6.0 – 20 5.1 – 7.3
3 – 12 SP-SM A-3, A-2-4 6.0 – 20 5.6 – 8.4
12 --- ---
0 – 4 SP-SM A-3, A-2-4 6.0 – 20 5.6 – 7.3
4 – 26 SP-SM, SM A-3, A-2-4 6.0 – 20 6.6 – 8.4
26 – 30 SC, SC-SM A-2-4, A-4 0.6 – 2.0 6.6 – 8.4
30 --- ---
(21)
Boca fine sand
(16)
Oldsmar fine sand
0.5 – 1.5 Jun – Feb High Moderate
Unweathered Bedrock
Weathered Bedrock
Unweathered Bedrock
(49)
Hallendale fine sand0 – 1.0 Jun – Oct High Low
Weathered Bedrock
0 – 1.0 Jun – Feb Moderate High
(18)
Riviera fine sand
limestone substrate
0 – 1.0 Jun – Nov High Moderate
High Low
(7)
Immokalee fine sand0 – 1.0 Jun – Nov High High
Weathered Bedrock
(11)
Hallandale fine sand0 – 1.0 Jun – Nov
(6)
Riviera, limestone substrate+2 – 1.0 Jun – Feb
TABLE 1
SUMMARY OF USDA SOIL SURVEY FOR
PROPOSED PONDS AND CYPRESS CANAL REALIGNMENT
VANDERBILT BEACH ROAD EXTENSION PROJECT
NAPLES, COLLIER COUNTY, FLORIDA
ARDAMAN FILE NO: 19-33-4548
0 – 1.0 Jun – Nov High Low
USDA Map Symbol
And Soil Name
(14)
Pineda fine sand
limestone substrate
(2)
Halopaw fine sand,
limestone substrate
0 – 1.0 Jun – Nov High
Soil Classification
pH
Seasonal High Water
Table
Weathered Bedrock
Weathered Bedrock
Risk of Corrosion
Moderate
High High
Copeland fine sand 0 – 1.0 Jul – Feb High Low
Weathered Bedrock
Boca fine sand 0 – 1.0 Jun – Oct High Moderate
Weathered Bedrock
TABLE 2 SUMMARY OF SEASONAL HIGH GROUNDWATER TABLE ESTIMATES
Boring Number (1)
Boring Depth (3)
(feet)
Date Recorded
Approximate Ground
Elevation (2)
(feet, NGVD)
Measured Groundwater Table
USDA Soil Survey Estimated SHGWT(5)
Depth(3)
(feet)
Map Symbol
Estimated SHGWT(4) Depth(3)
(feet)
Depth(3)
(feet) Elevation
(feet, NAVD88)
B-1 20 7/9/19 10.3 2.5 2 0 – 1.0 1.0 9.3
B-2 20 7/5/19 12.2 3.5 7 0 – 1.0 2.0 10.2
B-3 20 7/5/19 11.6 3.5 2 0 – 1.0 2.5 9.1
B-4 20 7/1/19 12.2 5.5 2 0 – 1.0 4.5 7.7
B-5 20 7/1/19 10.1 4.0 2 0 – 1.0 3.0 7.1
B-6 20 7/1/19 12.0 5.5 16 0 – 1.0 4.5 7.5
B-7 20 7/1/19 12.0 3.0 11 0 – 1.0 2.0 10.0
B-8 20 3/1/19 12.0 4.0 11 0 – 1.0 2.0 10.0
B-9 20 7/2/19 11.9 3.5 11 0 – 1.0 2.5 9.4
B-10 20 7/2/19 12.3 5.0 18 0 – 1.0 4.0 8.3
B-11 20 7/2/19 10.0 2.0 18 0 – 1.0 1.0 9.0
B-12 NOT DRILLED 49 0 – 1.0
B-13 20 7/2/19 12.2 5.0 49 0 – 1.0 4.0 8.2
B-14 20 7/8/19 12.1 3.0 6 0 - 1.0 2.0 10.1
B-15 20 7/8/19 11.6 4.5 11 0 – 1.0 1.5 10.1
B-16 20 7/9/19 11.5 2.0 11 0 – 1.0 1.0 10.5
B-17 20 7/10/19 12.8 3.0 21 0.5 – 1.0 2.5 10.3
B-18 20 7/10/19 13.2 4.0 21 0.5 – 1.0 3.0 10.2
B-19 20 7/18/19 11.5 3.0 14 0 – 1.0 2.0 9.5
B-20 20 7/29/19 12.4 5.75 18 0 – 1.0 4.5 7.9
B-21 20 7/29/19 12.3 3.5 14 0 – 1.0 2.5 9.8
B-22 20 8/14/19 10.8 3.0 6 0 – 1.0 2.5 8.3
B-23 20 8/14/19 10.9 3.5 6 0 – 1.0 2.5 8.4
(1) For boring locations see Figures 1A through 1F.
(2) Ground elevations surveyed by RWA Engineering.
(3) Depth below existing grades at time of drilling
(4) Seasonal high groundwater table depth reported in the Collier County, Florida USDA Soil Survey
(5) SHGWT: Seasonal high groundwater table estimated based on soil stratigraphy, measured groundwater levels from the borings,
the Collier County, Florida USDA Soil Survey information and past experience with similar soil conditions
BORING NO.
HYDRAULIC
CONDUCTIVITY SOIL/ROCK TYPE IN SCREENED ZONE
B-1 42.6 ft/day 2.5' - 3.5' Clayey Sand (A-2-6)
3.5' - 8.5' Hard Limestone
8.5' - 10.5' Soft Limestone
10.5' - 13.5' Silty Gravelly Sand/Sandy Gravel (A-1-a/A-1-b)
B-2 5.2 ft/day 3.5' - 6.0' Fine Sand (A-3)
6.0' - 15.0' Hard Limestone
B-3 5.4 ft/day 3.0' - 7.5' Fine Sand (A-3)
7.5' - 15.0' Silty Sand (A-2-4)
B-14 14.7 ft/day 3.0' - 4.0' Clayey Sand (A-2-6)
4.0' - 9.0' Hard Limestone
9.0' - 13.5' Silty Gravelly Sand/Sandy Gravel (A-1-a/A-1-b)
13.5' - 15.0' Silty Sand (A-2-4)
B-15 15.9 ft/day 3.5' - 4.5' Clayey Sand (A-2-6)
4.5' - 11.0' Hard Limestone
11.0' - 15.0' Soft Limestone
B-16 >50 ft/day 3.5' - 5.0' Hard Limestone
5.0' - 10.5' Silty Sand (A-3/A-2-4)
10.5' - 13.5' Silty Gravelly Sand/Sandy Gravel (A-1-a/A-1-b)
B-17 46.6 ft/day 3.5' - 8.5' Hard Limestone
8.5' - 16.0' Silty Gravelly Sand/Sandy Gravel (A-1-a/A-1-b)
B-18 48.6 ft/day 3.0' - 8.5' Hard Limestone
8.5' - 12.0' Soft Limestone
12.0' - 15.5' Silty Gravelly Sand/Sandy Gravel (A-1-a/A-1-b)
B-19 5.6 ft/day 3.0' - 8.5' Soft Limestone
8.5' - 13.0' Hard Limestone
B-20 20.3 ft/day 5.5' - 6.0' Very Silty Sand (A-4)
6.0' - 16.0' Hard Limestone
B-21 49.2 ft/day 2.0' - 3.0' Clayey Sand (A-2-6)
3.0' - 12' Silty Gravelly Sand/Sandy Gravel (A-1-a/A-1-b)
B-22 0.8 ft/day 3.5' - 4.5' Silty Sand (A-2-4)
4.5' - 13.0' Hard Limestone
13.0' - 15.5' Silty Gravelly Sand/Sandy Gravel (A-1-a/A-1-b)
B-23 3.0 ft/day 3.0' - 6.0' Silty Clayey Sand (A-2-4)
6.0' - 9.0' Silty Sand (A-2-4)
9.0' - 11.5' Silty Gravelly Sand/Sandy Gravel (A-1-a/A-1-b)
11.5 - 13.5' Hard Limestone
TABLE 3
SUMMARY OF PERMEABILITY TESTS FOR POND BORINGS
PROPOSED PONDS AND CYPRESS CANAL REALIGNMENT
VANDERBILT BEACH ROAD EXTENSION PROJECT
NAPLES, COLLIER COUNTY, FLORIDA
ARDAMAN FILE NO: 19-33-4548
3/4-in. 1/2-in. 3/8-in. #4 #10 #40 #60 #100 #200 LL PI
N 2614'35.26” W 81°41'5.71” B-1 3 4 97 97 96 93 90 84 73 45 23 - - - - 20 A-2-6 - - -
N 2614'35.26” W 81°41'5.71” B-1 16 1 91 69 59 44 34 27 23 14 8.0 NP NP 15 A-1-a - - -
N 2614'40.53” W 81°40'17.19” B-2 4 2 - - - - - - - - - - - - - - - - - - NP NP 13 A-3 2.4
N 2614'39.03” W 81°41'13.07” B-3 4 2 100 100 100 100 100 95 66 18 3.0 NP NP 5 A-3 - - -
N 2614'39.03” W 81°41'13.07” B-3 11.5 3 100 100 100 100 98 91 71 33 17 NP NP 19 A-2-4 - - -
N 2614'36.38” W 81°40'10.03” B-4 4 2 100 100 100 100 97 93 62 15 3.5 NP NP 13 A-3 - - -
N 2614'36.38” W 81°40'10.03” B-4 17.5 1 76 67 53 36 24 15 13 10 7.6 NP NP 14 A-1-a - - -
N 2614'34.92” W 81°39'55.41” B-5 14.5 1 70 65 62 53 42 31 27 20 14 NP NP 14 A-1-b - - -
N 2614'35.38” W 81°39'41.02” B-6 17.5 1 94 88 79 68 59 47 43 35 23 NP NP 24 A-1-b - - -
N 2614'35.91” W 81°39'26.17” B-7 2.5 2 100 100 100 100 100 96 73 22 3.9 NP NP 10 A-3 - - -
N 2614'35.91” W 81°39'26.17” B-7 11.5 1 70 62 53 46 40 33 30 25 16 NP NP 24 A-1-b - - -
N 2614'37.92” W 81°38'57.13” B-9 2 2 100 100 100 100 100 96 74 26 5.8 NP NP 12 A-3 - - -
N 2614'37.92” W 81°38'57.13” B-9 16 1 97 90 86 69 46 26 22 16 11 NP NP 14 A-1-a - - -
N 2614'38.38” W 81°38'42.69” B-10 2.5 2 100 100 100 100 100 95 71 23 3.3 NP NP 10 A-3 - - -
N 2614'38.38” W 81°38'42.69” B-10 14.5 5 100 91 82 70 62 53 49 42 36 - - - - 21 A-4 - - -
N 2614'39.08” W 81°38'28.52” B-11 11.5 5 100 93 86 77 71 63 61 51 42 - - - - 20 A-4 - - -
N 2614'41.32” W 81°38'14.15” B-13 0.5 2 - - - - - - - - - - - - - - - - - - NP NP 11 A-3 2.7
N 2614'45.00” W 81°39'8.91” B-14 3.5 4 100 100 100 100 100 96 78 38 16 - - - - 22 A-2-6 - - -
N 2614'45.00” W 81°39'8.91” B-14 14.5 3 89 78 74 60 50 45 43 37 32 NP NP 16 A-2-4 - - -
N 2614'43.08” W 81°38'3.16” B-15 1 2 - - - - - - - - - - - - - - - - - - NP NP 10 A-3 2.7
N 2615'5.88” W 81°37'11.16” B-16 7 3 86 82 80 74 69 61 51 28 10.2 NP NP 19 A-2-4 - - -
N 2615'5.88” W 81°37'11.16” B-16 11.5 1 63 50 45 38 32 27 25 17 8.8 NP NP 18 A-1-a - - -
N 2615'7.27” W 81°34'55.63” B-22 2.5 3 100 100 100 99 97 93 78 47 30 - - - - - - 15 A-2-4 3.4
N 2614'54.69” W 81°34'48.52” B-23 2.5 3 23 6 23 A-2-4 - - -
N 2614'54.69” W 81°34'48.52” B-23 4 3 100 100 100 100 100 95 74 36 20 - - - - - - 24 A-2-4 3.5
N 2614'54.69” W 81°34'48.52” B-23 10 1 100 93 87 72 57 39 28 22 18 NP NP 13 A-1-b - - -
AASHTO
CLASS.
ORGANIC
CONTENT
(%)
Percent Passing
U.S. STANDARD SIEVES
TABLE 4
SUMMARY OF LABORATORY TEST RESULTS
PROPOSED PONDS AND CYPRESS CANAL REALIGNMENT
VANDERBILT BEACH ROAD EXTENSION PROJECT
NAPLES, COLLIER COUNTY, FLORIDA
ARDAMAN FILE NO: 19-33-4548
ATTERBERG
LIMITSSTRATUM
NO.
DEPTH
(FEET)
BORING
NO.LONGITUDELATITUDE
MOISTURE
CONTENT
(%)
Ponds and Cypress Canal Realignment
Vanderbilt Beach Road Extension Project
Naples, Collier County, Florida
Drawn By: ED Checked By: Date:GD 10/7/19
File No.: Approved By: Figure No:19-33-4548 1A
FIGURE 1A
BORING LOCATION PLANSOURCE: AERIAL OVERLAYS PROVIDED BY JACOBS
Ardaman & Associates, Inc.
Geotechnical, Environmentaland Materials Consultants
GD
= SPT Boring
B-1
B-2
B-3
Ponds and Cypress Canal Realignment
Vanderbilt Beach Road Extension Project
Naples, Collier County, Florida
Drawn By: ED Checked By: Date:GD 10/7/19
File No.: Approved By: Figure No:19-33-4548 1B
FIGURE 1B
BORING LOCATION PLANSOURCE: AERIAL OVERLAYS PROVIDED BY JACOBS
Ardaman & Associates, Inc.
Geotechnical, Environmentaland Materials Consultants
GD
= SPT Boring
B-4 B-5 B-6 B-7 B-8
Ponds and Cypress Canal Realignment
Vanderbilt Beach Road Extension Project
Naples, Collier County, Florida
Drawn By: ED Checked By: Date:GD 10/7/19
File No.: Approved By: Figure No:19-33-4548 1C
FIGURE 1C
BORING LOCATION PLANSOURCE: AERIAL OVERLAYS PROVIDED BY JACOBS
Ardaman & Associates, Inc.
Geotechnical, Environmentaland Materials Consultants
GD
= SPT Boring
B-8
B-9 B-10B-11
B-12B-13
= SPT Boring Not Performed
Ponds and Cypress Canal Realignment
Vanderbilt Beach Road Extension Project
Naples, Collier County, Florida
Drawn By: ED Checked By: Date:GD 10/7/19
File No.: Approved By: Figure No:19-33-4548 1D
FIGURE 1D
BORING LOCATION PLANSOURCE: AERIAL OVERLAYS PROVIDED BY JACOBS
Ardaman & Associates, Inc.
Geotechnical, Environmentaland Materials Consultants
GD
= SPT Boring
B-14
B-15
B-16
Ponds and Cypress Canal Realignment
Vanderbilt Beach Road Extension Project
Naples, Collier County, Florida
Drawn By: ED Checked By: Date:GD 10/7/19
File No.: Approved By: Figure No:19-33-4548 1E
FIGURE 1E
BORING LOCATION PLANSOURCE: AERIAL OVERLAYS PROVIDED BY JACOBS
Ardaman & Associates, Inc.
Geotechnical, Environmentaland Materials Consultants
GD
= SPT Boring
B-17
B-18
B-19
B-20 B-21
Ponds and Cypress Canal Realignment
Vanderbilt Beach Road Extension Project
Naples, Collier County, Florida
Drawn By: ED Checked By: Date:GD 10/7/19
File No.: Approved By: Figure No:19-33-4548 1F
FIGURE 1F
BORING LOCATION PLANSOURCE: AERIAL OVERLAYS PROVIDED BY JACOBS
Ardaman & Associates, Inc.
Geotechnical, Environmentaland Materials Consultants
GD
= SPT Boring
B-22
B-23
ENGINEER OF RECORD:
9970 BAVARIA ROAD
GARY A. DREW, P.E. #35504
ARDAMAN AND ASSOCIATES, INC.
FORT MYERS, FLORIDA 33913
CERTIFICATE OF AUTHORIZATION 5950
RIGHAMMERDRILLER
DATEELEV.LONG.
LAT.BOR #
RIGHAMMERDRILLER
DATEELEV.LONG.
LAT.BOR #
RIGHAMMERDRILLER
DATEELEV.LONG.
LAT.BOR #
RIGHAMMERDRILLER
DATEELEV.LONG.
LAT.BOR #
RIGHAMMERDRILLER
DATEELEV.LONG.
LAT.BOR #
RIGHAMMERDRILLER
DATEELEV.LONG.
LAT.BOR #
RIGHAMMERDRILLER
DATEELEV.LONG.
LAT.BOR #
RIGHAMMERDRILLER
DATEELEV.LONG.
LAT.BOR #
N
2
4
7
6
1
4
9
50/0"
3
1
1
5
14
26
at Elev. -9.2ft
Boring Terminated
N
2
7
1
4
6
9
6
50/0"
50/3"
15
6
at Elev. -7.3ft
Boring Terminated
N
2
3
2
6
10
9
7
3
3
6
7
1
1
3
2
at Elev. -7.9ft
Boring Terminated
N
2
7
1
3
17
7
6
50/0"
50/1"
19
10
18
2
at Elev. -7.3ft
Boring Terminated
15 15
10 10
5 5
0 0
-5 -5
-10 -10
N
2
6
7
6
1
19
60
50/0"
60
12
7
8
5
7
at Elev. -9.4ft
Boring Terminated
N
2
7
6
7
1
3
50/0"
50/2"
50/1"
5
50/2"
6
12
6
8
N
2
7
1
3
1
10
6
50/0"
50/2"
50/0"
3
17
10
2
1
13
11
at Elev. -9.0ft
Boring Terminated
N
2
4
7
6
1
4
12
50/0"
50/0"
22
9
8
9
7
0
1
15 15
10 10
5 5
0 0
-5 -5
-10 -10
Ele
vatio
n (f
eet,
NA
VD
88)
Ele
vatio
n (f
eet,
NA
VD
88)
Ele
vatio
n (f
eet,
NA
VD
88)
Ele
vatio
n (f
eet,
NA
VD
88)
CME-55AUTOLOCKLEY7/9/201910.3'W81° 41' 5.61"N26° 14' 35.36" B-1
CME-55AUTOLOCKLEY7/5/201912.2'W81° 40' 17.09"N26° 14' 40.75" B-2
CME-55AUTOLOCKLEY7/5/201911.6'W81° 40' 12.67"N26° 14' 38.98" B-3
CME-55AUTOLOCKLEY7/1/201912.2'W81° 40' 10.02"N26° 14' 36.89" B-4
CME-55AUTOLOCKLEY7/1/201910.1'W81° 39' 55.54"N26° 14' 34.78" B-5
CME-55AUTOLOCKLEY7/1/201912.0'W81° 39' 40.95"N26° 14' 35.66" B-6
CME-55AUTOLOCKLEY7/1/201912.0'W81° 39' 26.17"N26° 14' 35.88" B-7
CME-55AUTOLOCKLEY3/1/201912.0'W81° 39' 14.34"N26° 14' 36.08" B-8
at Elev. -9.0ft
Boring Terminated
at Elev. -9.0ft
Boring Terminated
30 - 50
10 - 30
4 - 10
Very Loose
Medium Dense
Loose
Very Dense
Dense
2 - 4
4 - 8
Very Stiff
Stiff
Firm
Soft
Very Soft
Consistency
Relative Density
Hard
Safety Hammer
SPT N-Value
Automatic Hammer
SPT N-Value
Less than 3
Greater than 50
Less than 4
Safety Hammer Automatic Hammer
SPT N-Value SPT N-Value
Less than 2 Less than 1
8 - 15
Greater than 30
3 - 6
1 - 3
GRANULAR MATERIALS
SILTS AND CLAYS
Blows/Foot
3 - 8
8 - 24
24 - 40
Greater than 40
Blows/Foot
Blows/Foot Blows/Foot
15 - 30
Greater than 24
12 - 24
6 - 12
LEGEND:
7
6
5
4
3
2
1
OC
MC
LL
PI
-200
HA
Hard LIMESTONE
Soft LIMESTONE
Gray very Silty SAND, trace to some gravel (A-4)
Brown Clayey SAND, trace gravel (A-2-6)
Gray to Dark Brown Silty SAND, trace to some gravel (A-2-4)
Brown to Dark Brown SAND (A-3)
Gray Gravelly SAND to Sandy GRAVEL, trace to some silt (A-1-a/A-1-b)
expressed or implied by this drawing.soil consistency between or outside boring locations isNo warranty as to the subsurface condition, strata depth or
drilling.at the time oflogs shown represent subsurface conditions within the boreholenorthing/eastings provided by the project surveyor. The boringGeographical GPS coordinate locations were determined from
of blows for 4 inches of penetration. WOH Weight of Hammer.12" penetration (unless otherwise noted). 50/4" NumberNumbers to the left of borings indicate SPT values for
porous and will be difficult to dewater.techniques and specialized equipment. Limestone/caprock is difficult and will require non conventional construction Excavations into and/or through limestone/caprock will be borings. This material is rock and is located in shallow depths. Weathered limestone/caprock was encountered within the NOTES:
MC=20
-200=23
MC=15
-200=8
MC=5
-200=3
MC=19
-200=17
MC=13
-200=3.5
MC=14
-200=7.6
MC=14
-200=14
MC=24
-200=23
MC=10
-200=3.9
MC=24
-200=16
MC=13
OC=2.4
= HW Temporary Steel Casing
= Percent Organic Content
= Percent Moisture Content
= Liquid Limit
= Plasticity Index
= Percent Passing the No. 200 Standard Sieve
= Loss if Drilling Fluid Circulation
= Hand Auger
= Estimated Seasonal High Groundwater Table
= Water Table existing at time of boring
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
ROAD NO. COUNTY FINANCIAL PROJECT ID
REVISIONS
DATE BY DESCRIPTION DATE BY DESCRIPTION
COLLIER 1
REPORT OF CORE BORINGS FOR CANAL AND PONDS
ADRZAL 1/18/17 12:00 G:\FDOT_PROJECTS...17-51-9041...\CAD\RDGRO01.DGN
GROWTH MANAGMENT DEPARTMENT
COLLIER COUNTY
VANDERBILT BEACH ROAD EXTENSION
RIGHAMMERDRILLER
DATEELEV.LONG.
LAT.BOR #
RIGHAMMERDRILLER
DATEELEV.LONG.
LAT.BOR #
RIGHAMMERDRILLER
DATEELEV.LONG.
LAT.BOR #
RIGHAMMERDRILLER
DATEELEV.LONG.
LAT.BOR #
RIGHAMMERDRILLER
DATEELEV.LONG.
LAT.BOR #
RIGHAMMERDRILLER
DATEELEV.LONG.
LAT.BOR #
RIGHAMMERDRILLER
DATEELEV.LONG.
LAT.BOR #
RIGHAMMERDRILLER
DATEELEV.LONG.
LAT.BOR #
N
2
7
6
1
12
50/0"
50/2"
16
10
3
3
17
22
at Elev. -7.6ft
Boring Terminated
15 15
10 10
5 5
0 0
-5 -5
-10 -10
N
7
4
7
1
3
1
50/0"
50/0"
50/0"
4
12
16
7
10
11
14
at Elev. -7.4ft
Boring Terminated
N
2
7
4
7
6
1
8
50/0"
6
50/0"
50/6"
7
22
14
12
23
at Elev. -7.9ft
Boring Terminated
N
2
7
3
1
4
50/0"
5
1
9
2
12
2
19
13
27
N
2
4
7
1
3
9
50/0"
10
22
5
4
12
28
11
at Elev. -6.7ft
Boring Terminated
15 15
10 10
5 5
0 0
-5 -5
-10 -10
ENGINEER OF RECORD:
9970 BAVARIA ROAD
GARY A. DREW, P.E. #35504
ARDAMAN AND ASSOCIATES, INC.
FORT MYERS, FLORIDA 33913
CERTIFICATE OF AUTHORIZATION 5950
N
2
7
1
5
1
9
14
20
50/0"
8
33
29
2
6
15
21
at Elev. -7.2ft
Boring Terminated
N
7
1
5
3
1
50/0"
50/0"
14
9
6
5
1
8
18
at Elev. -9.5ft
Boring Terminated
N
2
6
3
7
1
50/0"
35
10
2
1
2
49
50/0"
28
at Elev. -7.3ft
Boring Terminated
Ele
vatio
n (f
eet,
NA
VD
88)
Ele
vatio
n (f
eet,
NA
VD
88)
Ele
vatio
n (f
eet,
NA
VD
88)
Ele
vatio
n (f
eet,
NA
VD
88)
CME-55AUTOLOCKLEY7/2/201911.9'W81° 38' 57.50"N26° 14' 37.95" B-9
CME-55AUTOLOCKLEY7/10/201912.8'W81° 36' 28.07"N26° 15' 1.34" B-17
CME-55AUTOLOCKLEY7/9/201911.5'W81° 37' 10.88"N26° 15' 5.67" B-16
CME-55AUTOLOCKLEY7/8/201911.6'W81° 38' 2.96"N26° 14' 42.84" B-15
CME-55AUTOLOCKLEY7/8/201912.1'W81° 39' 9.12"N26° 14' 45.04" B-14
7
CME-55AUTOLOCKLEY7/2/201912.3'W81° 38' 42.68"N26° 14' 38.40" B-10
CME-55AUTOLOCKLEY7/2/201910.0'W81° 38' 28.62"N26° 14' 39.07" B-11
CME-55AUTOLOCKLEY7/2/201912.2'W81° 38' 14.13"N26° 14' 41.26" B-13
30 - 50
10 - 30
4 - 10
Very Loose
Medium Dense
Loose
Very Dense
Dense
2 - 4
4 - 8
Very Stiff
Stiff
Firm
Soft
Very Soft
Consistency
Relative Density
Hard
Safety Hammer
SPT N-Value
Automatic Hammer
SPT N-Value
Less than 3
Greater than 50
Less than 4
Safety Hammer Automatic Hammer
SPT N-Value SPT N-Value
Less than 2 Less than 1
8 - 15
Greater than 30
3 - 6
1 - 3
GRANULAR MATERIALS
SILTS AND CLAYS
Blows/Foot
3 - 8
8 - 24
24 - 40
Greater than 40
Blows/Foot
Blows/Foot Blows/Foot
15 - 30
Greater than 24
12 - 24
6 - 12
LEGEND:
7
6
5
4
3
2
1
OC
MC
LL
PI
-200
HA
Hard LIMESTONE
Soft LIMESTONE
Gray very Silty SAND, trace to some gravel (A-4)
Brown Clayey SAND, trace gravel (A-2-6)
Gray to Dark Brown Silty SAND, trace to some gravel (A-2-4)
Brown to Dark Brown SAND (A-3)
Gray Gravelly SAND to Sandy GRAVEL, trace to some silt (A-1-a/A-1-b)
expressed or implied by this drawing.soil consistency between or outside boring locations isNo warranty as to the subsurface condition, strata depth or
drilling.at the time oflogs shown represent subsurface conditions within the boreholenorthing/eastings provided by the project surveyor. The boringGeographical GPS coordinate locations were determined from
of blows for 4 inches of penetration. WOH Weight of Hammer.12" penetration (unless otherwise noted). 50/4" NumberNumbers to the left of borings indicate SPT values for
porous and will be difficult to dewater.techniques and specialized equipment. Limestone/caprock is difficult and will require non conventional construction Excavations into and/or through limestone/caprock will be borings. This material is rock and is located in shallow depths. Weathered limestone/caprock was encountered within the NOTES:
MC=12
-200=5.8
MC=14
-200=11
MC=10
-200=3.3
MC=21
-200=36 MC=20
-200=42
MC=11
OC=2.7
MC=22
-200=16
MC=16
-200=32
MC=19
-200=10
MC=18
-200=8.8
MC=10
OC=2.7
at Elev. -8.0ft
Boring Terminated
= HW Temporary Steel Casing
= Percent Organic Content
= Percent Moisture Content
= Liquid Limit
= Plasticity Index
= Percent Passing the No. 200 Standard Sieve
= Loss if Drilling Fluid Circulation
= Hand Auger
= Estimated Seasonal High Groundwater Table
= Water Table existing at time of boring
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
ROAD NO. COUNTY FINANCIAL PROJECT ID
REVISIONS
DATE BY DESCRIPTION DATE BY DESCRIPTION
COLLIER 2
REPORT OF CORE BORINGS FOR CANAL AND PONDS
ADRZAL 1/18/17 12:00 G:\FDOT_PROJECTS...17-51-9041...\CAD\RDGRO01.DGN
GROWTH MANAGMENT DEPARTMENT
COLLIER COUNTY
VANDERBILT BEACH ROAD EXTENSION
RIGHAMMERDRILLER
DATEELEV.LONG.
LAT.BOR #
RIGHAMMERDRILLER
DATEELEV.LONG.
LAT.BOR #
RIGHAMMERDRILLER
DATEELEV.LONG.
LAT.BOR #
RIGHAMMERDRILLER
DATEELEV.LONG.
LAT.BOR #
RIGHAMMERDRILLER
DATEELEV.LONG.
LAT.BOR #
RIGHAMMERDRILLER
DATEELEV.LONG.
LAT.BOR #
N
2
7
6
1
4
50/0"
58
1
0
11
21
16
17
12
at Elev. -6.3ft
Boring Terminated
N
2
6
7
6
10
37
41
20
50/0"
50/2"
77
65
102
N
2
4
5
7
4
50/3"
50/5"
50/2"
40
64
50/1"
50/1"
50/2"
27
at Elev. -7.1ft
Boring Terminated
N
2
4
1
7
9
13
10
16
34
3
50/5'
50/3"
50/2"
50/1"
50/0"
50/1"
at Elev. -7.2ft
Boring Terminated
15 15
10 10
5 5
0 0
-5 -5
-10 -10
N
3
7
1
3
16
7
6
50/0"
50/0"
19
16
11
11
at Elev. -8.7ft
Boring Terminated
N
3
3
3
1
7
1
8
5
3
5
15
36
38
64
20
19
30
at Elev. -8.6ft
Boring Terminated
15 15
10 10
5 5
0 0
-5 -5
-10 -10
ENGINEER OF RECORD:
9970 BAVARIA ROAD
GARY A. DREW, P.E. #35504
ARDAMAN AND ASSOCIATES, INC.
FORT MYERS, FLORIDA 33913
CERTIFICATE OF AUTHORIZATION 5950
Ele
vatio
n (f
eet,
NA
VD
88)
Ele
vatio
n (f
eet,
NA
VD
88)
Ele
vatio
n (f
eet,
NA
VD
88)
Ele
vatio
n (f
eet,
NA
VD
88)
CME-55AUTOLOCKLEY7/29/201912.3'W81° 35' 47.24"N26° 14' 53.93" B-21
CME-55AUTOLOCKLEY7/29/201912.4'W81° 36' 1.13"N26° 14' 53.74" B-20
CME-55AUTOLOCKLEY7/18/201911.5'W81° 36' 9.07"N26° 15' 6.48" B-19
CME-55AUTOLOCKLEY7/10/201913.2'W81° 36' 30.87"N26° 14' 58.29" B-18
CME-55AUTOLOCKLEY8/14/201910.9'W81° 34'48.39 "N26° 14' 54.65" B-23
CME-55AUTOLOCKLEY8/14/201910.8'W81° 34' 55.64"N26° 15' 7.31" B-22
at Elev. -8.0ft
Boring Terminated
HAHA
30 - 50
10 - 30
4 - 10
Very Loose
Medium Dense
Loose
Very Dense
Dense
2 - 4
4 - 8
Very Stiff
Stiff
Firm
Soft
Very Soft
Consistency
Relative Density
Hard
Safety Hammer
SPT N-Value
Automatic Hammer
SPT N-Value
Less than 3
Greater than 50
Less than 4
Safety Hammer Automatic Hammer
SPT N-Value SPT N-Value
Less than 2 Less than 1
8 - 15
Greater than 30
3 - 6
1 - 3
GRANULAR MATERIALS
SILTS AND CLAYS
Blows/Foot
3 - 8
8 - 24
24 - 40
Greater than 40
Blows/Foot
Blows/Foot Blows/Foot
15 - 30
Greater than 24
12 - 24
6 - 12
LEGEND:
7
6
5
4
3
2
1
OC
MC
LL
PI
-200
HA
Hard LIMESTONE
Soft LIMESTONE
Gray very Silty SAND, trace to some gravel (A-4)
Brown Clayey SAND, trace gravel (A-2-6)
Gray to Dark Brown Silty SAND, trace to some gravel (A-2-4)
Brown to Dark Brown SAND (A-3)
Gray Gravelly SAND to Sandy GRAVEL, trace to some silt (A-1-a/A-1-b)
expressed or implied by this drawing.soil consistency between or outside boring locations isNo warranty as to the subsurface condition, strata depth or
drilling.at the time oflogs shown represent subsurface conditions within the boreholenorthing/eastings provided by the project surveyor. The boringGeographical GPS coordinate locations were determined from
of blows for 4 inches of penetration. WOH Weight of Hammer.12" penetration (unless otherwise noted). 50/4" NumberNumbers to the left of borings indicate SPT values for
porous and will be difficult to dewater.techniques and specialized equipment. Limestone/caprock is difficult and will require non conventional construction Excavations into and/or through limestone/caprock will be borings. This material is rock and is located in shallow depths. Weathered limestone/caprock was encountered within the NOTES:
OC=3.4
MC=15
-200=30
PI=6
LL=23
MC=23
MC=24
-200=20
OC=3.5
MC=13
-200=18
= HW Temporary Steel Casing
= Percent Organic Content
= Percent Moisture Content
= Liquid Limit
= Plasticity Index
= Percent Passing the No. 200 Standard Sieve
= Loss if Drilling Fluid Circulation
= Hand Auger
= Estimated Seasonal High Groundwater Table
= Water Table existing at time of boring
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
ROAD NO. COUNTY FINANCIAL PROJECT ID
REVISIONS
DATE BY DESCRIPTION DATE BY DESCRIPTION
COLLIER 3
REPORT OF CORE BORINGS FOR CANAL AND PONDS
ADRZAL 1/18/17 12:00 G:\FDOT_PROJECTS...17-51-9041...\CAD\RDGRO01.DGN
GROWTH MANAGMENT DEPARTMENT
COLLIER COUNTY
VANDERBILT BEACH ROAD EXTENSION
0
5
10
15
20
25
30
35
1- 1- 3
4- 5- 4
2- 50/0"-
C- U- T
C- U- T
C- U- T
C- U- T
4- 2- 1
1- 0- 1
1- 0- 1
1- 2- 3
5- 7- 7
18- 15- 11
4
9
50/0"
CUT
CUT
CUT
CUT
3
1
1
5
14
26
1
2
3
4
5
6
7
8
9
A-3
A-2-6
A-1-b
Brown to dark brown SAND. (Stratum 2)
Brown Clayey SAND, trace gravel. (Stratum4)Hard LIMESTONE. (Stratum 7)
Soft LIMESTONE. (Stratum 6)
Gray Gravelly SAND to Sandy GRAVEL,trace to some silt. (Stratum 1)
TERMINATED AT 19.5'
15 feet of HW casing installedto stabilize borehole.
20
15
23
8.0
BORING LOCATION: SEE BORING LOCATION PLAN (FIGURE 1A) CLIENT: JACOBS
LATITUDE: N 26°14'35.36" LONGITUDE: W 81°41'5.61" PROJECT: PROPOSED PONDS & CYPRESS CANAL REALIGNMENTVANDERBILT BEACH ROAD EXTENSION PROJECTDATE DRILLED: 9-JUL-19 STA: OFF:
GROUND SURFACE ELEVATION: 10.3'NAVD88 TIME: LOCATION: NAPLES, COLLIER COUNTY, FLORIDA
WATER TABLE DEPTH (ft): 2.5' DATE: 9-JUL-19 DRILL CREW: LOCKLEY / CENTENO LOGGED BY: E. DREW, E.I.
DRILL MAKE & MODEL: CME-55 W/AUTO BIT: 3-7/8" TRICONE ROLLER DRILLING RODS: NW
DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: SUNNY & HOT
PAGE 1 OF
REVIEWED BY: GARY A. DREW, P.E. FILE NO: 19-33-4548 BORING NO.: B-1
DE
PT
H, F
T.
BLOWS
SP
T N
-VA
LU
E
SA
MP
LE
NO
.
GR
AP
HIC
LO
G
AA
SH
TO
SOIL DESCRIPTION REMARKS
% W
AT
ER
CO
NT
EN
TP
ER
CE
NT
FIN
ES
% O
RG
AN
ICC
ON
TE
NT
LIQ
UID
LIM
IT
PL
AS
T. I
ND
EX
1
0
5
10
15
20
25
30
35
1- 2- 2
1- 3- 3
3- 4- 5
7- 4- 2
50/0"- -
C- U- T
C- U- T
C- U- T
C- U- T
50/3"- -
C- U- T
21- 10- 5
3- 2- 4
4
6
9
6
50/0"
CUT
CUT
CUT
CUT
50/3"
CUT
15
6
1
2
3
4
5
6
7
A-3
A-1-b
Brown to dark brown SAND. (Stratum 2)
Hard LIMESTONE. (Stratum 7)
Gray Gravelly SAND to Sandy GRAVEL,trace to some silt. (Stratum 1)
TERMINATED AT 19.5'
13 2.4
BORING LOCATION: SEE BORING LOCATION PLAN (FIGURE 1A) CLIENT: JACOBS
LATITUDE: N 26°14'40.75" LONGITUDE: W 81°40'17.09" PROJECT: PROPOSED PONDS & CYPRESS CANAL REALIGNMENTVANDERBILT BEACH ROAD EXTENSION PROJECTDATE DRILLED: 5-JUL-19 STA: OFF:
GROUND SURFACE ELEVATION: 12.2'NAVD88 TIME: LOCATION: NAPLES, COLLIER COUNTY, FLORIDA
WATER TABLE DEPTH (ft): 3.5' DATE: 5-JUL-19 DRILL CREW: LOCKLEY / CENTENO LOGGED BY: E. DREW, E.I.
DRILL MAKE & MODEL: CME-55 W/AUTO BIT: 3-7/8" TRICONE ROLLER DRILLING RODS: NW
DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: SUNNY & HOT
PAGE 1 OF
REVIEWED BY: GARY A. DREW, P.E. FILE NO: 19-33-4548 BORING NO.: B-2
DE
PT
H, F
T.
BLOWS
SP
T N
-VA
LU
E
SA
MP
LE
NO
.
GR
AP
HIC
LO
G
AA
SH
TO
SOIL DESCRIPTION REMARKS
% W
AT
ER
CO
NT
EN
TP
ER
CE
NT
FIN
ES
% O
RG
AN
ICC
ON
TE
NT
LIQ
UID
LIM
IT
PL
AS
T. I
ND
EX
1
0
5
10
15
20
25
30
35
1- 1- 1
1- 2- 4
5- 5- 5
5- 6- 3
3- 3- 4
3- 2- 1
1- 1- 2
1- 3- 3
3- 3- 4
2- 1- 0
1- 0- 1
1- 1- 2
1- 1- 1
2
6
10
9
7
3
3
6
7
1
1
3
2
1
2
3
4
5
6
7
8
9
10
11
12
A-3
A-2-4
Brown to dark brown SAND. (Stratum 2)
Gray Silty SAND, trace gravel. (Stratum 3)
TERMINATED AT 19.5'
5
19
3.0
17
BORING LOCATION: SEE BORING LOCATION PLAN (FIGURE 1A) CLIENT: JACOBS
LATITUDE: N 26°14'38.98" LONGITUDE: W 81°40'12.67" PROJECT: PROPOSED PONDS & CYPRESS CANAL REALIGNMENTVANDERBILT BEACH ROAD EXTENSION PROJECTDATE DRILLED: 5-JUL-19 STA: OFF:
GROUND SURFACE ELEVATION: 11.6'NAVD88 TIME: LOCATION: NAPLES, COLLIER COUNTY, FLORIDA
WATER TABLE DEPTH (ft): 3.5' DATE: 5-JUL-19 DRILL CREW: LOCKLEY / CENTENO LOGGED BY: E. DREW, E.I.
DRILL MAKE & MODEL: CME-55 W/AUTO BIT: 3-7/8" TRICONE ROLLER DRILLING RODS: NW
DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: SUNNY & HOT
PAGE 1 OF
REVIEWED BY: GARY A. DREW, P.E. FILE NO: 19-33-4548 BORING NO.: B-3
DE
PT
H, F
T.
BLOWS
SP
T N
-VA
LU
E
SA
MP
LE
NO
.
GR
AP
HIC
LO
G
AA
SH
TO
SOIL DESCRIPTION REMARKS
% W
AT
ER
CO
NT
EN
TP
ER
CE
NT
FIN
ES
% O
RG
AN
ICC
ON
TE
NT
LIQ
UID
LIM
IT
PL
AS
T. I
ND
EX
1
0
5
10
15
20
25
30
35
12- 10- 7
3- 4- 3
2- 3- 3
1- 50/0"-
C- U- T
C- U- T
C- U- T
30- 50/1"-
C- U- T
8- 11- 8
10- 6- 4
10- 10- 8
7- 1- 1
17
7
6
50/0"
CUT
CUT
CUT
50/1"
CUT
19
10
18
2
1
2
3
4
5
6
7
8
9
A-3
A-1-b
A-2-4
Brown to dark brown SAND. (Stratum 2)
Hard LIMESTONE. (Stratum 7)
Gray Gravelly SAND to Sandy GRAVEL,trace to some silt. (Stratum 1)
Gray Silty SAND, some gravel. (Stratum 3)
TERMINATED AT 19.5'
13
14
3.5
7.6
BORING LOCATION: SEE BORING LOCATION PLAN (FIGURE 1B) CLIENT: JACOBS
LATITUDE: N 26°14'36.89" LONGITUDE: W 81°40'10.02" PROJECT: PROPOSED PONDS & CYPRESS CANAL REALIGNMENTVANDERBILT BEACH ROAD EXTENSION PROJECTDATE DRILLED: 1-JUL-19 STA: OFF:
GROUND SURFACE ELEVATION: 12.2'NAVD88 TIME: LOCATION: NAPLES, COLLIER COUNTY, FLORIDA
WATER TABLE DEPTH (ft): 5.5' DATE: 1-JUL-19 DRILL CREW: LOCKLEY / CENTENO LOGGED BY: E. DREW, E.I.
DRILL MAKE & MODEL: CME-55 W/AUTO BIT: 3-7/8" TRICONE ROLLER DRILLING RODS: NW
DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: SUNNY & HOT
PAGE 1 OF
REVIEWED BY: GARY A. DREW, P.E. FILE NO: 19-33-4548 BORING NO.: B-4
DE
PT
H, F
T.
BLOWS
SP
T N
-VA
LU
E
SA
MP
LE
NO
.
GR
AP
HIC
LO
G
AA
SH
TO
SOIL DESCRIPTION REMARKS
% W
AT
ER
CO
NT
EN
TP
ER
CE
NT
FIN
ES
% O
RG
AN
ICC
ON
TE
NT
LIQ
UID
LIM
IT
PL
AS
T. I
ND
EX
1
0
5
10
15
20
25
30
35
1- 4- 15
19- 10- 50
C- U- T
C- U- T
14- 50/0"-
C- U- T
C- U- T
20- 31- 29
7- 6- 6
6- 4- 3
3- 3- 5
3- 3- 2
2- 3- 4
19
60
CUT
CUT
50/0"
CUT
CUT
60
12
7
8
5
7
1
2
3
4
5
6
7
8
9
A-3
A-1-b
Brown to dark brown SAND. (Stratum 2)
Soft LIMESTONE. (Stratum 6)
Hard LIMESTONE. (Stratum 7)
Soft Limestone. (Stratum 6)
Gray Gravelly SAND to Sandy GRAVEL,trace to some silt. (Stratum 1)
TERMINATED AT 19.5'
14 14
BORING LOCATION: SEE BORING LOCATION PLAN (FIGURE 1B) CLIENT: JACOBS
LATITUDE: N 26°14'34.78" LONGITUDE: W 81°39'55.54" PROJECT: PROPOSED PONDS & CYPRESS CANAL REALIGNMENTVANDERBILT BEACH ROAD EXTENSION PROJECTDATE DRILLED: 1-JUL-19 STA: OFF:
GROUND SURFACE ELEVATION: 10.1'NAVD88 TIME: LOCATION: NAPLES, COLLIER COUNTY, FLORIDA
WATER TABLE DEPTH (ft): 4.0' DATE: 1-JUL-19 DRILL CREW: LOCKLEY / CENTENO LOGGED BY: E. DREW, E.I.
DRILL MAKE & MODEL: CME-55 W/AUTO BIT: 3-7/8" TRICONE ROLLER DRILLING RODS: NW
DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: SUNNY & HOT
PAGE 1 OF
REVIEWED BY: GARY A. DREW, P.E. FILE NO: 19-33-4548 BORING NO.: B-5
DE
PT
H, F
T.
BLOWS
SP
T N
-VA
LU
E
SA
MP
LE
NO
.
GR
AP
HIC
LO
G
AA
SH
TO
SOIL DESCRIPTION REMARKS
% W
AT
ER
CO
NT
EN
TP
ER
CE
NT
FIN
ES
% O
RG
AN
ICC
ON
TE
NT
LIQ
UID
LIM
IT
PL
AS
T. I
ND
EX
1
0
5
10
15
20
25
30
35
4- 17- 50/0"
C- U- T
1- 50/2"-
C- U- T
50/1"- -
C- U- T
C- U- T
9- 3- 2
3- 50/2"-
C- U- T
7- 3- 3
4- 8- 4
1- 4- 2
3- 3- 5
50/0"
CUT
50/2"
CUT
50/1"
CUT
CUT
5
50/2"
CUT
6
12
6
8
1
2
3
4
5
6
7
8
A-3
A-1-b
A-2-4
Brown to dark brown SAND. (Stratum 2)
Hard LIMESTONE. (Stratum 7)
Soft LIMESTONE. (Stratum 6)
Hard LIMESTONE. (Stratum 7)
Gray Gravelly SAND to Sandy GRAVEL,trace to some silt. (Stratum 1)
Gray Silty SAND, some gravel. (Stratum 3)
TERMINATED AT 21.0'
Loss of drilling fluid circulationat 8'
24 23
BORING LOCATION: SEE BORING LOCATION PLAN (FIGURE 1B) CLIENT: JACOBS
LATITUDE: N 26°14'35.66" LONGITUDE: W 81°39'40.95" PROJECT: PROPOSED PONDS & CYPRESS CANAL REALIGNMENTVANDERBILT BEACH ROAD EXTENSION PROJECTDATE DRILLED: 1-JUL-19 STA: OFF:
GROUND SURFACE ELEVATION: 12.0'NAVD88 TIME: LOCATION: NAPLES, COLLIER COUNTY, FLORIDA
WATER TABLE DEPTH (ft): 5.5' DATE: 1-JUL-19 DRILL CREW: LOCKLEY / CENTENO LOGGED BY: E. DREW, E.I.
DRILL MAKE & MODEL: CME-55 W/AUTO BIT: 3-7/8" TRICONE ROLLER DRILLING RODS: NW
DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: SUNNY & HOT
PAGE 1 OF
REVIEWED BY: GARY A. DREW, P.E. FILE NO: 19-33-4548 BORING NO.: B-6
DE
PT
H, F
T.
BLOWS
SP
T N
-VA
LU
E
SA
MP
LE
NO
.
GR
AP
HIC
LO
G
AA
SH
TO
SOIL DESCRIPTION REMARKS
% W
AT
ER
CO
NT
EN
TP
ER
CE
NT
FIN
ES
% O
RG
AN
ICC
ON
TE
NT
LIQ
UID
LIM
IT
PL
AS
T. I
ND
EX
1
0
5
10
15
20
25
30
35
2- 4- 6
3- 3- 3
5- 10- 50/0"
C- U- T
50/2"- -
C- U- T
50/0"- -
1- 2- 1
16- 10- 7
4- 6- 4
2- 1- 1
1- 0- 1
1- 6- 7
4- 8- 3
10
6
50/0"
CUT
50/2"
CUT
50/0"
3
17
10
2
1
13
11
1
2
3
4
5
6
7
8
9
10
11
12
A-3
A-1-b
A-2-4
A-1-b
Brown to dark brown SAND. (Stratum 2)
Hard LIMESTONE. (Stratum 7)
Gray Gravelly SAND to Sandy GRAVEL,trace to some silt. (Stratum 1)
Gray Silty SAND, some gravel. (Stratum 3)
Gray Gravelly SAND to Sandy GRAVEL,trace to some silt. (Stratum 1)
TERMINATED AT 21.0'
10
24
3.9
16
BORING LOCATION: SEE BORING LOCATION PLAN (FIGURE 1B) CLIENT: JACOBS
LATITUDE: N 26°14'35.88" LONGITUDE: W 81°39'26.17" PROJECT: PROPOSED PONDS & CYPRESS CANAL REALIGNMENTVANDERBILT BEACH ROAD EXTENSION PROJECTDATE DRILLED: 1-JUL-19 STA: OFF:
GROUND SURFACE ELEVATION: 12.0'NAVD88 TIME: LOCATION: NAPLES, COLLIER COUNTY, FLORIDA
WATER TABLE DEPTH (ft): 3.0' DATE: 1-JUL-19 DRILL CREW: LOCKLEY / CENTENO LOGGED BY: E. DREW, E.I.
DRILL MAKE & MODEL: CME-55 W/AUTO BIT: 3-7/8" TRICONE ROLLER DRILLING RODS: NW
DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: SUNNY & HOT
PAGE 1 OF
REVIEWED BY: GARY A. DREW, P.E. FILE NO: 19-33-4548 BORING NO.: B-7
DE
PT
H, F
T.
BLOWS
SP
T N
-VA
LU
E
SA
MP
LE
NO
.
GR
AP
HIC
LO
G
AA
SH
TO
SOIL DESCRIPTION REMARKS
% W
AT
ER
CO
NT
EN
TP
ER
CE
NT
FIN
ES
% O
RG
AN
ICC
ON
TE
NT
LIQ
UID
LIM
IT
PL
AS
T. I
ND
EX
1
0
5
10
15
20
25
30
35
1- 2- 2
2- 2- 10
50/0"- -
C- U- T
C- U- T
C- U- T
50/0"- -
4- 14- 8
5- 5- 4
4- 2- 6
6- 3- 6
3- 3- 4
1- 0- 0
4- 1- 0
4
12
50/0"
CUT
CUT
CUT
50/0"
22
9
8
9
7
0
1
1
2
3
4
5
6
7
8
A-3
A-2-6
A-1-b
Brown to dark brown SAND. (Stratum 2)
Brown Clayey SAND, trace gravel. (Stratum4)Hard LIMESTONE. (Stratum 7)
Soft Limestone. (Stratum 6)
Gray Gravelly SAND to Sandy GRAVEL,trace to some silt. (Stratum 1)
TERMINATED AT 21.0'
This boring originally performedfor the SFWMD Relocation ofCypress Weir #1 project
BORING LOCATION: SEE BORING LOCATION PLAN (FIGURE 1B) CLIENT: JACOBS
LATITUDE: N 26°14'36.08" LONGITUDE: W 81°39'14.34" PROJECT: PROPOSED PONDS & CYPRESS CANAL REALIGNMENTVANDERBILT BEACH ROAD EXTENSION PROJECTDATE DRILLED: 1-MAR-19 STA: OFF:
GROUND SURFACE ELEVATION: +12' NAVD88 TIME: LOCATION: NAPLES, COLLIER COUNTY, FLORIDA
WATER TABLE DEPTH (ft): 4.0' DATE: 1-MAR-19 DRILL CREW: LOCKLEY / EICHORN LOGGED BY: M. ELMORE,
DRILL MAKE & MODEL: MOBILE B-57 W/AUTO BIT: 3-7/8" DIA. DRAG DRILLING RODS: NW
DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: SUN
PAGE 1 OF
REVIEWED BY: GARY A. DREW, P.E. FILE NO: 19-33-4548 BORING NO.: B-8
DE
PT
H, F
T.
BLOWS
SP
T N
-VA
LU
E
SA
MP
LE
NO
.
GR
AP
HIC
LO
G
AA
SH
TO
SOIL DESCRIPTION REMARKS
% W
AT
ER
CO
NT
EN
TP
ER
CE
NT
FIN
ES
% O
RG
AN
ICC
ON
TE
NT
LIQ
UID
LIM
IT
PL
AS
T. I
ND
EX
1
0
5
10
15
20
25
30
35
11- 5- 7
5- 5- 50/0"
C- U- T
C- U- T
42- 17- 50/2"
C- U- T
C- U- T
7- 8- 8
6- 5- 5
4- 2- 1
1- 1- 2
4- 8- 9
10- 11- 11
12
50/0"
CUT
CUT
50/2"
CUT
CUT
16
10
3
3
17
22
1
2
3
4
5
6
7
8
9
A-3
A-1-b
Brown to dark brown SAND. (Stratum 2)
Hard LIMESTONE. (Stratum 7)
Soft LIMESTONE. (Stratum 6)
Gray Gravelly SAND to Sandy GRAVEL,trace to some silt. (Stratum 1)
TERMINATED AT 19.5'
12
14
5.8
11
BORING LOCATION: SEE BORING LOCATION PLAN (FIGURE 1C) CLIENT: JACOBS
LATITUDE: N 26°14'37.95" LONGITUDE: W 81°38'57.50" PROJECT: PROPOSED PONDS & CYPRESS CANAL REALIGNMENTVANDERBILT BEACH ROAD EXTENSION PROJECTDATE DRILLED: 2-JUL-19 STA: OFF:
GROUND SURFACE ELEVATION: 11.9'NAVD88 TIME: LOCATION: NAPLES, COLLIER COUNTY, FLORIDA
WATER TABLE DEPTH (ft): 3.5' DATE: 2-JUL-19 DRILL CREW: LOCKLEY / CENTENO LOGGED BY: E. DREW, E.I.
DRILL MAKE & MODEL: CME-55 W/AUTO BIT: 3-7/8" TRICONE ROLLER DRILLING RODS: NW
DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: SUNNY & HOT
PAGE 1 OF
REVIEWED BY: GARY A. DREW, P.E. FILE NO: 19-33-4548 BORING NO.: B-9
DE
PT
H, F
T.
BLOWS
SP
T N
-VA
LU
E
SA
MP
LE
NO
.
GR
AP
HIC
LO
G
AA
SH
TO
SOIL DESCRIPTION REMARKS
% W
AT
ER
CO
NT
EN
TP
ER
CE
NT
FIN
ES
% O
RG
AN
ICC
ON
TE
NT
LIQ
UID
LIM
IT
PL
AS
T. I
ND
EX
1
0
5
10
15
20
25
30
35
3- 3- 6
5- 6- 8
9- 10- 10
50/0"- -
C- U- T
C- U- T
7- 4- 4
6- 20- 13
9- 19- 10
6- 1- 1
2- 2- 4
5- 7- 8
6- 11- 10
9
14
20
50/0"
CUT
CUT
8
33
29
2
6
15
21
1
2
3
4
5
6
7
8
9
10
A-3
A-1-b
A-4
A-1-b
Brown to dark brown SAND. (Stratum 2)
Hard LIMESTONE. (Stratum 7)
Gray Gravelly SAND to Sandy GRAVEL,trace to some silt. (Stratum 1)
Gray very Silty SAND, trace to some gravel.(Stratum 5)
Gray Gravelly SAND to Sandy GRAVEL,trace to some silt. (Stratum 1)
TERMINATED AT 19.5'
10
21
3.3
36
BORING LOCATION: SEE BORING LOCATION PLAN (FIGURE 1C) CLIENT: JACOBS
LATITUDE: N 26°14'38.40" LONGITUDE: W 81°38'42.68" PROJECT: PROPOSED PONDS & CYPRESS CANAL REALIGNMENTVANDERBILT BEACH ROAD EXTENSION PROJECTDATE DRILLED: 2-JUL-19 STA: OFF:
GROUND SURFACE ELEVATION: 12.3'NAVD88 TIME: LOCATION: NAPLES, COLLIER COUNTY, FLORIDA
WATER TABLE DEPTH (ft): 5.0' DATE: 2-JUL-19 DRILL CREW: LOCKLEY / CENTENO LOGGED BY: E. DREW, E.I.
DRILL MAKE & MODEL: CME-55 W/AUTO BIT: 3-7/8" TRICONE ROLLER DRILLING RODS: NW
DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: SUNNY & HOT
PAGE 1 OF
REVIEWED BY: GARY A. DREW, P.E. FILE NO: 19-33-4548 BORING NO.: B-10
DE
PT
H, F
T.
BLOWS
SP
T N
-VA
LU
E
SA
MP
LE
NO
.
GR
AP
HIC
LO
G
AA
SH
TO
SOIL DESCRIPTION REMARKS
% W
AT
ER
CO
NT
EN
TP
ER
CE
NT
FIN
ES
% O
RG
AN
ICC
ON
TE
NT
LIQ
UID
LIM
IT
PL
AS
T. I
ND
EX
1
0
5
10
15
20
25
30
35
2- 50/0"-
C- U- T
14- 50/0"-
C- U- T
C- U- T
C- U- T
15- 8- 6
5- 4- 5
4- 3- 3
3- 4- 1
1- 0- 1
2- 3- 5
7- 7- 11
50/0"
CUT
50/0"
CUT
CUT
CUT
14
9
6
5
1
8
18
1
2
3
4
5
6
7
8
9
A-1-b
A-4
A-2-4
A-1-b
Hard LIMESTONE. (Stratum 7)
Gray Gravelly SAND to Sandy GRAVEL,trace to some silt. (Stratum 1)
Light gray very Silty SAND, trace to somegravel. (Stratum 5)
Light gray Silty SAND, some gravel. (Stratum3)
Gray Gravelly SAND to Sandy GRAVEL,trace to some silt. (Stratum 1)
TERMINATED AT 19.5'
20 42
BORING LOCATION: SEE BORING LOCATION PLAN (FIGURE 1C) CLIENT: JACOBS
LATITUDE: N 26°14'39.07" LONGITUDE: W 81°38'28.62" PROJECT: PROPOSED PONDS & CYPRESS CANAL REALIGNMENTVANDERBILT BEACH ROAD EXTENSION PROJECTDATE DRILLED: 2-JUL-19 STA: OFF:
GROUND SURFACE ELEVATION: 10.0'NAVD88 TIME: LOCATION: NAPLES, COLLIER COUNTY, FLORIDA
WATER TABLE DEPTH (ft): 2.0' DATE: 2-JUL-19 DRILL CREW: LOCKLEY / CENTENO LOGGED BY: E. DREW, E.I.
DRILL MAKE & MODEL: CME-55 W/AUTO BIT: 3-7/8" TRICONE ROLLER DRILLING RODS: NW
DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: SUNNY AND HOT
PAGE 1 OF
REVIEWED BY: GARY A. DREW, P.E. FILE NO: 19-33-4548 BORING NO.: B-11
DE
PT
H, F
T.
BLOWS
SP
T N
-VA
LU
E
SA
MP
LE
NO
.
GR
AP
HIC
LO
G
AA
SH
TO
SOIL DESCRIPTION REMARKS
% W
AT
ER
CO
NT
EN
TP
ER
CE
NT
FIN
ES
% O
RG
AN
ICC
ON
TE
NT
LIQ
UID
LIM
IT
PL
AS
T. I
ND
EX
1
0
5
10
15
20
25
30
35
18- 6- 50/0"
C- U- T
C- U- T
C- U- T
15- 20- 15
9- 6- 4
2- 1- 1
1- 0- 1
1- 0- 2
3- 13- 36
50/0"- -
13- 10- 18
50/0"
CUT
CUT
CUT
35
10
2
1
2
49
50/0"
28
1
2
3
4
5
6
7
8
A-3
A-2-4
A-1-b
Brown to dark brown SAND. (Stratum 2)
Hard LIMESTONE. (Stratum 7)
Soft LIMESTONE. (Stratum 6)
Light gray Silty SAND, some gravel. (Stratum3)
Hard LIMESTONE. (Stratum 7)
Gray Gravelly SAND to Sandy GRAVEL,trace to some silt. (Stratum 1)TERMINATED AT 19.5'
11 2.7
BORING LOCATION: SEE BORING LOCATION PLAN (FIGURE 1C) CLIENT: JACOBS
LATITUDE: N 26°14'41.26" LONGITUDE: W 81°38'14.13" PROJECT: PROPOSED PONDS & CYPRESS CANAL REALIGNMENTVANDERBILT BEACH ROAD EXTENSION PROJECTDATE DRILLED: 2-JUL-19 STA: OFF:
GROUND SURFACE ELEVATION: 12.2'NAVD88 TIME: LOCATION: NAPLES, COLLIER COUNTY, FLORIDA
WATER TABLE DEPTH (ft): 5.0' DATE: 2-JUL-19 DRILL CREW: LOCKLEY / CENTENO LOGGED BY: E. DREW, E.I.
DRILL MAKE & MODEL: CME-55 W/AUTO BIT: 3-7/8" TRICONE ROLLER DRILLING RODS: NW
DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: SUNNY AND HOT
PAGE 1 OF
REVIEWED BY: GARY A. DREW, P.E. FILE NO: 19-33-4548 BORING NO.: B-13
DE
PT
H, F
T.
BLOWS
SP
T N
-VA
LU
E
SA
MP
LE
NO
.
GR
AP
HIC
LO
G
AA
SH
TO
SOIL DESCRIPTION REMARKS
% W
AT
ER
CO
NT
EN
TP
ER
CE
NT
FIN
ES
% O
RG
AN
ICC
ON
TE
NT
LIQ
UID
LIM
IT
PL
AS
T. I
ND
EX
1
0
5
10
15
20
25
30
35
21- 50/0"-
C- U- T
2- 4- 50/0"
C- U- T
30- 50/0"-
C- U- T
2- 2- 2
2- 6- 6
7- 10- 6
5- 5- 2
1- 6- 4
3- 6- 5
7- 8- 6
50/0"
CUT
50/0"
CUT
50/0"
CUT
4
12
16
7
10
11
14
1
2
3
4
5
6
7
8
9
10
A-2-6
A-1-b
A-2-4
A-1-b
Hard LIMESTONE. (Stratum 7)
Brown Clayey SAND, trace gravel. (Stratum4)Hard LIMESTONE. (Stratum 7)
Gray Gravelly SAND to Sandy GRAVEL,trace to some silt. (Stratum 1)
Gray Silty SAND, some gravel. (Stratum 3)
Gray Gravelly SAND to Sandy GRAVEL,trace to some silt. (Stratum 1)
TERMINATED AT 19.5'
15 feet of HW casing installedto stabilize borehole.
22
16
16
32
BORING LOCATION: SEE BORING LOCATION PLAN (FIGURE 1D) CLIENT: JACOBS
LATITUDE: N 26°14'45.04" LONGITUDE: W 81°39'9.12" PROJECT: PROPOSED PONDS & CYPRESS CANAL REALIGNMENTVANDERBILT BEACH ROAD EXTENSION PROJECTDATE DRILLED: 8-JUL-19 STA: OFF:
GROUND SURFACE ELEVATION: 12.1'NAVD88 TIME: LOCATION: NAPLES, COLLIER COUNTY, FLORIDA
WATER TABLE DEPTH (ft): 3.0' DATE: 8-JUL-19 DRILL CREW: LOCKLEY / CENTENO LOGGED BY: E. DREW, E.I.
DRILL MAKE & MODEL: CME-55 W/AUTO BIT: 3-7/8" TRICONE ROLLER DRILLING RODS: NW
DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: SUNNY & HOT
PAGE 1 OF
REVIEWED BY: GARY A. DREW, P.E. FILE NO: 19-33-4548 BORING NO.: B-14
DE
PT
H, F
T.
BLOWS
SP
T N
-VA
LU
E
SA
MP
LE
NO
.
GR
AP
HIC
LO
G
AA
SH
TO
SOIL DESCRIPTION REMARKS
% W
AT
ER
CO
NT
EN
TP
ER
CE
NT
FIN
ES
% O
RG
AN
ICC
ON
TE
NT
LIQ
UID
LIM
IT
PL
AS
T. I
ND
EX
1
0
5
10
15
20
25
30
35
7- 4- 4
50/0"- -
5- 3- 3
50/0"- -
C- U- T
C- U- T
50/6"- -
C- U- T
2- 2- 5
6- 11- 11
8- 7- 7
4- 5- 7
8- 10- 13
8
50/0"
6
50/0"
CUT
CUT
50/6"
CUT
7
22
14
12
23
1
2
3
4
5
6
7
8
A-3
A-2-6
A-1-b
Brown to dark brown SAND. (Stratum 2)
Hard LIMESTONE. (Stratum 7)
Brown Clayey SAND, trace gravel. (Stratum4)
Hard LIMESTONE. (Stratum 7)
Soft LIMESTONE. (Stratum 6)
Gray Gravelly SAND to Sandy GRAVEL,trace to some silt. (Stratum 1)
TERMINATED AT 19.5'
10 2.7
BORING LOCATION: SEE BORING LOCATION PLAN (FIGURE 1D) CLIENT: JACOBS
LATITUDE: N 26°14'42.84" LONGITUDE: W 81°38'2.96" PROJECT: PROPOSED PONDS & CYPRESS CANAL REALIGNMENTVANDERBILT BEACH ROAD EXTENSION PROJECTDATE DRILLED: 8-JUL-19 STA: OFF:
GROUND SURFACE ELEVATION: 11.6'NAVD88 TIME: LOCATION: NAPLES, COLLIER COUNTY, FLORIDA
WATER TABLE DEPTH (ft): 4.5' DATE: 8-JUL-19 DRILL CREW: LOCKLEY / CENTENO LOGGED BY: E. DREW, E.I.
DRILL MAKE & MODEL: CME-55 W/AUTO BIT: 3-7/8" TRICONE ROLLER DRILLING RODS: NW
DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: SUNNY & HOT
PAGE 1 OF
REVIEWED BY: GARY A. DREW, P.E. FILE NO: 19-33-4548 BORING NO.: B-15
DE
PT
H, F
T.
BLOWS
SP
T N
-VA
LU
E
SA
MP
LE
NO
.
GR
AP
HIC
LO
G
AA
SH
TO
SOIL DESCRIPTION REMARKS
% W
AT
ER
CO
NT
EN
TP
ER
CE
NT
FIN
ES
% O
RG
AN
ICC
ON
TE
NT
LIQ
UID
LIM
IT
PL
AS
T. I
ND
EX
1
0
5
10
15
20
25
30
35
2- 2- 2
2- 15- 50/0"
C- U- T
C- U- T
6- 4- 1
1- 0- 1
1- 7- 2
1- 1- 1
4- 8- 4
2- 1- 1
10- 14- 5
3- 3- 10
11- 14- 13
4
50/0"
CUT
CUT
5
1
9
2
12
2
19
13
27
1
2
3
4
5
6
7
8
9
10
11
A-3
A-2-4
A-1-b
Brown to dark brown SAND. (Stratum 2)
Hard LIMESTONE. (Stratum 7)
Gray Silty SAND, some gravel. (Stratum 3)
Gray Gravelly SAND to Sandy GRAVEL,trace to some silt. (Stratum 1)
TERMINATED AT 19.5'
15 feet of HW casing installedto stabilize borehole.
19
18
10
8.8
BORING LOCATION: SEE BORING LOCATION PLAN (FIGURE 1D) CLIENT: JACOBS
LATITUDE: N 26°15'5.67" LONGITUDE: W 81°37'10.88" PROJECT: PROPOSED PONDS & CYPRESS CANAL REALIGNMENTVANDERBILT BEACH ROAD EXTENSION PROJECTDATE DRILLED: 9-JUL-19 STA: OFF:
GROUND SURFACE ELEVATION: 11.5'NAVD88 TIME: LOCATION: NAPLES, COLLIER COUNTY, FLORIDA
WATER TABLE DEPTH (ft): 2.0' DATE: 9-JUL-19 DRILL CREW: LOCKLEY / CENTENO LOGGED BY: E. DREW, E.I.
DRILL MAKE & MODEL: CME-55 W/AUTO BIT: 3-7/8" TRICONE ROLLER DRILLING RODS: NW
DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: SUNNY & HOT
PAGE 1 OF
REVIEWED BY: GARY A. DREW, P.E. FILE NO: 19-33-4548 BORING NO.: B-16
DE
PT
H, F
T.
BLOWS
SP
T N
-VA
LU
E
SA
MP
LE
NO
.
GR
AP
HIC
LO
G
AA
SH
TO
SOIL DESCRIPTION REMARKS
% W
AT
ER
CO
NT
EN
TP
ER
CE
NT
FIN
ES
% O
RG
AN
ICC
ON
TE
NT
LIQ
UID
LIM
IT
PL
AS
T. I
ND
EX
1
0
5
10
15
20
25
30
35
4- 1- 2
3- 3- 6
50/0"- -
C- U- T
C- U- T
C- U- T
3- 4- 6
5- 16- 6
3- 2- 3
2- 1- 3
2- 4- 8
9- 17- 11
6- 4- 7
3
9
50/0"
CUT
CUT
CUT
10
22
5
4
12
28
11
1
2
3
4
5
6
7
8
9
A-3
A-2-6
A-1-b
Brown to dark brown SAND. (Stratum 2)
Brown Clayey SAND, trace gravel. (Stratum4)Hard LIMESTONE. (Stratum 7)
Gray Gravelly SAND to Sandy GRAVEL,trace to some silt. (Stratum 1)
TERMINATED AT 19.5'
15 feet of HW casing installedto stabilize borehole.
BORING LOCATION: SEE BORING LOCATION PLAN (FIGURE 1E) CLIENT: JACOBS
LATITUDE: N 26°15'1.34" LONGITUDE: W 81°36'28.07" PROJECT: PROPOSED PONDS & CYPRESS CANAL REALIGNMENTVANDERBILT BEACH ROAD EXTENSION PROJECTDATE DRILLED: 10-JUL-19 STA: OFF:
GROUND SURFACE ELEVATION: 12.8'NAVD88 TIME: LOCATION: NAPLES, COLLIER COUNTY, FLORIDA
WATER TABLE DEPTH (ft): 3.0' DATE: 10-JUL-19 DRILL CREW: LOCKLEY / CENTENO LOGGED BY: E. DREW, E.I.
DRILL MAKE & MODEL: CME-55 W/AUTO BIT: 3-7/8" TRICONE ROLLER DRILLING RODS: NW
DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: SUNNY & HOT
PAGE 1 OF
REVIEWED BY: GARY A. DREW, P.E. FILE NO: 19-33-4548 BORING NO.: B-17
DE
PT
H, F
T.
BLOWS
SP
T N
-VA
LU
E
SA
MP
LE
NO
.
GR
AP
HIC
LO
G
AA
SH
TO
SOIL DESCRIPTION REMARKS
% W
AT
ER
CO
NT
EN
TP
ER
CE
NT
FIN
ES
% O
RG
AN
ICC
ON
TE
NT
LIQ
UID
LIM
IT
PL
AS
T. I
ND
EX
1
0
5
10
15
20
25
30
35
1- 2- 2
3- 50/0"-
C- U- T
10- 8- 50
C- U- T
C- U- T
1- 1- 0
1- 0- 0
1- 2- 9
9- 10- 11
13- 12- 4
7- 8- 9
9- 6- 6
4
50/0"
CUT
58
CUT
CUT
1
0
11
21
16
17
12
1
2
3
4
5
6
7
8
9
10
A-3
A-1-b
Brown to dark brown SAND. (Stratum 2)
Hard LIMESTONE. (Stratum 7)
Soft LIMESTONE. (Stratum 6)
Gray Gravelly SAND to Sandy GRAVEL,trace to some silt. (Stratum 1)
TERMINATED AT 19.5'
15 feet of HW casing installedto stabilize borehole.
BORING LOCATION: SEE BORING LOCATION PLAN (FIGURE 1E) CLIENT: JACOBS
LATITUDE: N 26°14'58.29" LONGITUDE: W 81°36'30.87" PROJECT: PROPOSED PONDS & CYPRESS CANAL REALIGNMENTVANDERBILT BEACH ROAD EXTENSION PROJECTDATE DRILLED: 10-JUL-19 STA: OFF:
GROUND SURFACE ELEVATION: 13.2'NAVD88 TIME: LOCATION: NAPLES, COLLIER COUNTY, FLORIDA
WATER TABLE DEPTH (ft): 4.0' DATE: 10-JUL-19 DRILL CREW: LOCKLEY / CENTENO LOGGED BY: E. DREW, E.I.
DRILL MAKE & MODEL: CME-55 W/AUTO BIT: 3-7/8" TRICONE ROLLER DRILLING RODS: NW
DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: SUNNY & HOT
PAGE 1 OF
REVIEWED BY: GARY A. DREW, P.E. FILE NO: 19-33-4548 BORING NO.: B-18
DE
PT
H, F
T.
BLOWS
SP
T N
-VA
LU
E
SA
MP
LE
NO
.
GR
AP
HIC
LO
G
AA
SH
TO
SOIL DESCRIPTION REMARKS
% W
AT
ER
CO
NT
EN
TP
ER
CE
NT
FIN
ES
% O
RG
AN
ICC
ON
TE
NT
LIQ
UID
LIM
IT
PL
AS
T. I
ND
EX
1
0
5
10
15
20
25
30
35
1- 2- 4
63- 5- 5
1- 10- 27
16- 23- 18
14- 15- 5
12- 6- 50/0"
C- U- T
C- U- T
C- U- T
50/2"- -
51- 33- 44
43- 29- 36
40- 52- 50
6
10
37
41
20
50/0"
CUT
CUT
CUT
50/2"
77
65
102
1
2
3
4
5
6
7
8
9
A-3 Brown to dark brown SAND. (Stratum 2)
Soft LIMESTONE. (Stratum 6)
Hard LIMESTONE. (Stratum 7)
TERMINATED AT 19.5'
15 feet of HW casing installedto stabilize borehole.
BORING LOCATION: SEE BORING LOCATION PLAN (FIGURE 1E) CLIENT: JACOBS
LATITUDE: N 26°15'6.48" LONGITUDE: W 81°36'9.07" PROJECT: PROPOSED PONDS & CYPRESS CANAL REALIGNMENTVANDERBILT BEACH ROAD EXTENSION PROJECTDATE DRILLED: 18-JUL-19 STA: OFF:
GROUND SURFACE ELEVATION: 11.5'NAVD88 TIME: LOCATION: NAPLES, COLLIER COUNTY, FLORIDA
WATER TABLE DEPTH (ft): 3.0' DATE: 18-JUL-19 DRILL CREW: LOCKLEY / CENTENO LOGGED BY: E. DREW, E.I.
DRILL MAKE & MODEL: CME-55 W/AUTO BIT: 3-7/8" TRICONE ROLLER DRILLING RODS: NW
DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: SUNNY & HOT
PAGE 1 OF
REVIEWED BY: GARY A. DREW, P.E. FILE NO: 19-33-4548 BORING NO.: B-19
DE
PT
H, F
T.
BLOWS
SP
T N
-VA
LU
E
SA
MP
LE
NO
.
GR
AP
HIC
LO
G
AA
SH
TO
SOIL DESCRIPTION REMARKS
% W
AT
ER
CO
NT
EN
TP
ER
CE
NT
FIN
ES
% O
RG
AN
ICC
ON
TE
NT
LIQ
UID
LIM
IT
PL
AS
T. I
ND
EX
1
0
5
10
15
20
25
30
35
2- 2- 2
50/3"- -
16- 34- 50/5"
50/2"- -
5- 5- 35
14- 19- 45
50/1"- -
50/1"- -
50/2"- -
28- 16- 11
4
50/3"
50/5"
50/2"
40
64
50/1"
50/1"
50/2"
27
6
7
8
9
10
11
12
13
14
15
A-3
A-2-6
A-4
Brown to dark brown SAND. (Stratum 2)
Brown Clayey SAND, trace gravel. (Stratum4)Gray very Silty SAND, trace to some gravel.(Stratum 5)Hard LIMESTONE. (Stratum 7)
TERMINATED AT 19.5'
Hand augered to 4.5 feet
BORING LOCATION: SEE BORING LOCATION PLAN (FIGURE 1E) CLIENT: JACOBS
LATITUDE: N26°14'53.74" LONGITUDE: W81°36'1.13" PROJECT: PROPOSED PONDS & CYPRESS CANAL REALIGNMENTVANDERBILT BEACH ROAD EXTENSION PROJECTDATE DRILLED: 29-JUL-19 STA: OFF:
GROUND SURFACE ELEVATION: 12.4'NAVD88 TIME: LOCATION: NAPLES, COLLIER COUNTY, FLORIDA
WATER TABLE DEPTH (ft): 5.75' DATE: 29-JUL-19 DRILL CREW: D. PEACE / CENTENO LOGGED BY: E. DREW, E.I.
DRILL MAKE & MODEL: CME-45 W/AUTO BIT: 2-15/16" TRICONE ROLLER DRILLING RODS: AW
DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: SUNNY & HOT
PAGE 1 OF
REVIEWED BY: GARY A. DREW, P.E. FILE NO: 19-33-4548 BORING NO.: B-20
DE
PT
H, F
T.
BLOWS
SP
T N
-VA
LU
E
SA
MP
LE
NO
.
GR
AP
HIC
LO
G
AA
SH
TO
SOIL DESCRIPTION REMARKS
% W
AT
ER
CO
NT
EN
TP
ER
CE
NT
FIN
ES
% O
RG
AN
ICC
ON
TE
NT
LIQ
UID
LIM
IT
PL
AS
T. I
ND
EX
1
0
5
10
15
20
25
30
35
- - 9
9- 7- 6
6- 5- 5
5- 3- 13
12- 17- 17
3- 1- 2
2- 3- 50/5"
50/3"- -
50/2"- -
50/1"- -
50/0"- -
50/1"- -
9
13
10
16
34
3
50/5"
50/3"
50/2"
50/1"
50/0"
50/1"
1
4
5
6
7
8
9
10
11
12
13
14
15
A-3
A-2-6
A-1-b
Brown to dark brown SAND. (Stratum 2)
Brown Clayey SAND, trace gravel. (Stratum4)Gray Gravelly SAND to Sandy GRAVEL,trace to some silt. (Stratum 1)
Hard LIMESTONE. (Stratum 7)
TERMINATED AT 19.5'
Hand augered to 2.5 feet
Loss of drilling fluid circulationat 9.5'
BORING LOCATION: SEE BORING LOCATION PLAN (FIGURE 1E) CLIENT: JACOBS
LATITUDE: N26°14'53.93" LONGITUDE: W81°35'47.24" PROJECT: PROPOSED PONDS & CYPRESS CANAL REALIGNMENTVANDERBILT BEACH ROAD EXTENSION PROJECTDATE DRILLED: 29-JUL-19 STA: OFF:
GROUND SURFACE ELEVATION: 12.3'NAVD88 TIME: LOCATION: NAPLES, COLLIER COUNTY, FLORIDA
WATER TABLE DEPTH (ft): 3.5' DATE: 29-JUL-19 DRILL CREW: D. PEACE / CENTENO LOGGED BY: E. DREW, E.I.
DRILL MAKE & MODEL: CME-45 W/AUTO BIT: 2-15/16" TRICONE ROLLER DRILLING RODS: AW
DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: SUNNY & HOT
PAGE 1 OF
REVIEWED BY: GARY A. DREW, P.E. FILE NO: 19-33-4548 BORING NO.: B-21
DE
PT
H, F
T.
BLOWS
SP
T N
-VA
LU
E
SA
MP
LE
NO
.
GR
AP
HIC
LO
G
AA
SH
TO
SOIL DESCRIPTION REMARKS
% W
AT
ER
CO
NT
EN
TP
ER
CE
NT
FIN
ES
% O
RG
AN
ICC
ON
TE
NT
LIQ
UID
LIM
IT
PL
AS
T. I
ND
EX
1
0
5
10
15
20
25
30
35
6- 10- 6
7- 4- 3
3- 3- 3
50/0"- -
C- U- T
C- U- T
50/0"- -
C- U- T
C- U- T
6- 8- 11
6- 7- 9
7- 6- 5
4- 5- 6
16
7
6
50/0"
CUT
CUT
50/0"
CUT
CUT
19
16
11
11
1
2
3
4
5
6
7
A-2-4
A-1-b
A-2-4
Dark brown Silty SAND, some gravel.(Stratum 3)
Hard LIMESTONE. (Stratum 7)
Gray Gravelly SAND to Sandy GRAVEL,trace to some silt. (Stratum 1)
Gray Silty SAND, some gravel. (Stratum 3)
TERMINATED AT 19.5'
15 30 3.4
BORING LOCATION: SEE BORING LOCATION PLAN (FIGURE 1F) CLIENT: JACOBS
LATITUDE: N26°15'7.31" LONGITUDE: W81°34'55.64" PROJECT: PROPOSED PONDS & CYPRESS CANAL REALIGNMENTVANDERBILT BEACH ROAD EXTENSION PROJECTDATE DRILLED: 14-AUG-19 STA: OFF:
GROUND SURFACE ELEVATION: 10.8'NAVD88 TIME: LOCATION: NAPLES, COLLIER COUNTY, FLORIDA
WATER TABLE DEPTH (ft): 3.5' DATE: 14-AUG-19 DRILL CREW: LOCKLEY / CENTENO LOGGED BY: E. DREW, E.I.
DRILL MAKE & MODEL: MOBILE B-57 W/AUTO BIT: 3-7/8" TRICONE ROLLER DRILLING RODS: NW
DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: SUNNY & HOT
PAGE 1 OF
REVIEWED BY: GARY A. DREW, P.E. FILE NO: 19-33-4548 BORING NO.: B-22
DE
PT
H, F
T.
BLOWS
SP
T N
-VA
LU
E
SA
MP
LE
NO
.
GR
AP
HIC
LO
G
AA
SH
TO
SOIL DESCRIPTION REMARKS
% W
AT
ER
CO
NT
EN
TP
ER
CE
NT
FIN
ES
% O
RG
AN
ICC
ON
TE
NT
LIQ
UID
LIM
IT
PL
AS
T. I
ND
EX
1
0
5
10
15
20
25
30
35
7- 6- 2
2- 2- 3
2- 1- 2
1- 1- 4
4- 9- 6
7- 11- 25
36- 13- 25
19- 14- 50
C- U- T
C- U- T
8- 10- 10
16- 15- 4
10- 14- 16
8
5
3
5
15
36
38
64
CUT
CUT
20
19
30
1
2
3
4
5
6
7
8
9
10
11
A-2-4
A-2-4
A-2-4
A-1-b
A-1-b
Gray Silty SAND, some gravel. (Stratum 3)
Dark brown Silty Clayey SAND, trace gravel.(Stratum 3)
Gray Silty SAND, some gravel. (Stratum 3)
Gray Gravelly SAND to Sandy GRAVEL,trace to some silt. (Stratum 1)
Hard LIMESTONE. (Stratum 7)
Gray Gravelly SAND to Sandy GRAVEL,trace to some silt. (Stratum 1)
TERMINATED AT 19.5'
23
24
13
20
18
3.5
23 6
BORING LOCATION: SEE BORING LOCATION PLAN (FIGURE 1F) CLIENT: JACOBS
LATITUDE: N26°14'54.65" LONGITUDE: W81°34'48.39" PROJECT: PROPOSED PONDS & CYPRESS CANAL REALIGNMENTVANDERBILT BEACH ROAD EXTENSION PROJECTDATE DRILLED: 14-AUG-19 STA: OFF:
GROUND SURFACE ELEVATION: 10.9'NAVD88 TIME: LOCATION: NAPLES, COLLIER COUNTY, FLORIDA
WATER TABLE DEPTH (ft): 3.0' DATE: 14-AUG-19 DRILL CREW: LOCKLEY / CENTENO LOGGED BY: E. DREW, E.I.
DRILL MAKE & MODEL: MOBILE B-57 W/AUTO BIT: 3-7/8" TRICONE ROLLER DRILLING RODS: NW
DRILLING METHOD: ROTARY WASH WITH DRILLING FLUID WEATHER CONDITIONS: SUNNY & HOT
PAGE 1 OF
REVIEWED BY: GARY A. DREW, P.E. FILE NO: 19-33-4548 BORING NO.: B-23
DE
PT
H, F
T.
BLOWS
SP
T N
-VA
LU
E
SA
MP
LE
NO
.
GR
AP
HIC
LO
G
AA
SH
TO
SOIL DESCRIPTION REMARKS
% W
AT
ER
CO
NT
EN
TP
ER
CE
NT
FIN
ES
% O
RG
AN
ICC
ON
TE
NT
LIQ
UID
LIM
IT
PL
AS
T. I
ND
EX
1
SOIL BORING, SAMPLING AND TESTING METHODS
STANDARD PENETRATION TEST
The Standard Penetration Test (SPT) is a widely accepted method of in-situ testing of foundation
soils (ASTM D-1586). A 2-foot (0.6 m) long, 2-inch (50 mm) O.D. split-barrel sampler attached to
the end of a string of drilling rods is driven 18 inches (0.45 m) into the ground by successive blows
of a 140-pound (63.5 Kg) hammer freely dropping 30 inches (0.76 m). The number of blows needed
for each 6 inches (0.15 m) of penetration is recorded. The sum of the blows required for penetration
of the second and third 6-inch (0.15 m) increments penetration constitutes the test result or N-
value. After the test, the sampler is extracted from the ground and opened to allow visual description
of the retained soil sample. The N-value has been empirically correlated with various soil properties
allowing a conservative estimate of the behavior of soils under load. The following tables relate N-
values to a qualitative description of soil density and, for cohesive soils, an approximate unconfined
compressive strength (Qu):
Cohesionless Soils: N-Value N-ValueSafety Hammer Auto Hammer Description Relative Density_______
< 4 < 3 Very loose 0 - 15%
4 - 10 3 - 8 Loose 15 - 35%
10 - 30 8 - 24 Medium dense 35 - 65%
30 - 50 24 - 40 Dense 65 - 85%
> 50 > 40 Very dense 85 - 100%
Cohesive Soils: N-Value N-Value Unconfined CompressiveSafety Hammer Auto Hammer Description Strength, Qu ______
< 2 < 1 Very soft < 0.25 tsf (25 kPa)
2 - 4 1 - 3 Soft 0.25 - 0.50 tsf (25 - 50 kPa)
4 - 8 3 - 6 Firm 0.50 - 1.0 tsf (50 - 100 kPa)
8 - 15 6 - 12 Stiff 1.0 - 2.0 tsf (100 - 200 kPa)
15 - 30 12 - 24 Very stiff 2.0 - 4.0 tsf (200 - 400 kPa)
> 30 > 24 Hard > 4.0 tsf (400 kPa)
The tests are usually performed at 5-foot (1.5 m) intervals. However, more frequent or continuous
testing is done by our firm through depths where a more accurate definition of the soils is required.
The test holes are advanced to the test elevations by rotary drilling with a cutting bit, using
circulating fluid to remove the cuttings and hold the fine grains in suspension. The circulating fluid,
which is bentonitic drilling mud, is also used to keep the hole open below the water table by
maintaining an excess hydrostatic pressure inside the hole. In some soil deposits, particularly highly
pervious ones, flush-coupled casing must be driven to just above the testing depth to keep the hole
open and/or prevent the loss of circulating fluid. After completion of a test boring, the hole is kept
open until a steady state groundwater level is recorded. The hole is then sealed by backfilling with
neat cement.
Representative split-spoon samples from each sampling interval and from different strata are
brought to our laboratory in air-tight jars for classification and testing, if necessary. Afterwards,
the samples are discarded unless prior arrangements have been made.
POWER AUGER BORINGS
Auger borings are used when a relatively large, continuous sampling of soil strata close to the
ground surface is desired. A 4-inch (100 mm) diameter, continuous flight, helical auger with a
cutting head at its end is screwed into the ground in 5-foot (1.5 m) sections. It is powered by the
rotary drill rig. The sample is recovered by withdrawing the auger out of the ground withoutrotating it. The soil sample so obtained, is described and representative samples put in bags orjars and returned to the laboratory for classification and testing, if necessary.
HAND AUGER BORINGS
Hand auger borings are used, if soil conditions are favorable, when the soil strata are to bedetermined within a shallow (approximately 5-foot [1.5 m]) depth or when access is not availableto power drilling equipment. A 3-inch (75 mm) diameter hand bucket auger with a cutting headis simultaneously turned and pressed into the ground. The bucket auger is retrieved atapproximately 6-inch (0.15 m) intervals and its contents emptied for inspection. Sometimes post-hole diggers are used, especially in the upper 3 feet (1 m) or so. The soil sample obtained isdescribed and representative samples put in bags or jars and transported to the laboratory forclassification and testing, if necessary.
UNDISTURBED SAMPLING
Undisturbed sampling implies the recovery of soil samples in a state as close to their naturalcondition as possible. Complete preservation of in-situ conditions cannot be realized; however,with careful handling and proper sampling techniques, disturbance during sampling can beminimized for most geotechnical engineering purposes. Testing of undisturbed samples gives amore accurate estimate of in-situ behavior than is possible with disturbed samples.
Normally, we obtain undisturbed samples by pushing a 2.875-inch (73 mm) I.D., thin wall seamlesssteel tube 24 inches (0.6 m) into the soil with a single stroke of a hydraulic ram. The sampler, whichis a Shelby tube, is 30 (0.8 m) inches long. After the sampler is retrieved, the ends are sealed in thefield and it is transported to our laboratory for visual description and testing, as needed. Undisturbedsampling is noted on the boring logs as thus "U-".
LABORATORY TEST METHODS
Soil samples returned to our laboratory are looked at again by a geotechnical engineer orgeotechnician to obtain more accurate descriptions of the soil strata. Laboratory testing isperformed on selected samples as deemed necessary to aid in soil classification and to help defineengineering properties of the soils. The test results are presented on the soil boring logs at thedepths at which the respective sample was recovered, except that grain-size distributions orselected other test results may be presented on separate tables, figures or plates as discussed inthis report, the results of which will be located in an Appendix. The soil descriptions shown on thelogs are based upon visual-manual procedures in accordance with local practice. Soil classificationis in general accordance with AASHTO M-145 or ASTM D-3282: The Classification of Soils andSoil Aggregate Mixtures for Highway Construction Purposes and is also based on visual-manualprocedures. Following is a list of abbreviations that may appear in the Remarks column on theboring logs indicating additional laboratory testing was performed, the results of which will usuallybe located in an Appendix.
DD: Unit Weight/Classification of Undisturbed "Shelby Tube" samples
PP: Pocket Penetrometer reading on cohesive samples in tons per sq. ft. (tsf)
k: Hydraulic Conductivity
Qu: Unconfined Compression Strength; ASTM D-2166
UU: Unconsolidated-Undrained Triaxial Test; ASTM D 2850
Consol: One-Dimensional Consolidation test performed on subsample from undisturbedsample; ASTM D-2435
THE PROJECT SOIL DESCRIPTION PROCEDURE FOR SOUTHWEST FLORIDA (1)For use with the AASHTO M-145 or ASTM D 3282 soil classification system onlyCLASSIFICATION OF SOILS AND SOIL-AGGREGATE MIXTURES FOR HIGHWAY
CONSTRUCTION PURPOSES
BROKEN ROCK/COBBLES/BOULDERS: >3" (75 mm)
GRAVEL/STONE: 3" (75 mm) to #10 (2 mm) sieve
Descriptive adjectives:
0 - 5% -- no mention of gravel or stone in description
5 - 15% -- trace
15 - 29% -- some
30 - 49% -- gravelly (shell, limerock, cemented sands)
SANDS
COARSE SAND: #10 (2 mm) to #40 (425 µm)
FINE SAND: #40 (425 µm) TO #200 (75 µm)
Descriptive adjectives:
0 - 5% -- no mention of sand in description
5 - 15% -- trace
15 - 29% -- some
30 - 49% -- sandy
SILT/CLAY: < #200 (75 µm) sieve
SILTY OR SILT: PI < 4
SILTY CLAYEY OR SILTY CLAY: 4 ≤ PI ≤ 10
CLAYEY OR CLAY: PI > 10
Descriptive adjectives:
< 5% -- clean (no mention of silt or clay in description)
5 - 15% -- slightly
16 - 35% -- clayey, silty, or silty clayey
36 - 49% -- very
ORGANIC SOILS/HIGHLY ORGANIC MATTEROrganic Content Descriptive adjectives Classification0 – 2.5% no mention of organics See above
in description
2.6 – 5% slightly organic See above
5 – 20% organic A-8
20 – 75% highly organic or "Muck" A-8≥ 75% "Peat" A-8
ROCK CLASSIFICATIONHard Limestone or Caprock – N-values >50 bpf
Soft Weathered Limestone – N values <50 bpf
__________________________________________
(1) This soil description procedure was developed specifically for projects in southwest Florida where the AASHTOsoil classification is used because it is believed that the terminology will be better understood as a result of localpractice. It is not intended to supplant other visual-manual classification procedures for description andidentification of soils such as ASTM D2488. By Gary A. Drew, P.E. (Revised 2016)