1 Geothermal Heat Pumps For School Applications John A. Shonder Oak Ridge National Laboratory Rebuild America Geothermal Workshop March 5, 2002 Concord, NH

Upload: sonya-foley

Post on 31-Dec-2015

46 views

Category:

Documents


3 download

DESCRIPTION

Geothermal Heat Pumps For School Applications. John A. Shonder Oak Ridge National Laboratory. Rebuild America Geothermal Workshop March 5, 2002 Concord, NH. Mission of the U.S. Department of Energy's Federal Energy Management Program (FEMP). - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Geothermal Heat Pumps For School Applications

1

Geothermal Heat PumpsFor School Applications

John A. Shonder

Oak Ridge National Laboratory

Rebuild America Geothermal WorkshopMarch 5, 2002Concord, NH

Page 2: Geothermal Heat Pumps For School Applications

2

Mission of the U.S. Department of Energy's Federal Energy Management Program (FEMP) Reduce the cost of government by

advancing energy efficiency, water conservation, and the use of renewable energy sources, and by helping agencies manage their utility costs.

FEMP relies on ORNL and other national labs to carry out its programs and provide expert assistance to federal agencies working to reduce their energy use and costs.

Page 3: Geothermal Heat Pumps For School Applications

3

Executive Order 13123

Through life-cycle cost-effective measures, each agency shall reduce energy consumption per gross square foot of its facilities, excluding facilities covered in section 203 of this order, by 30 percent by 2005 and 35 percent by 2010 relative to 1985.

GHP is one technology being used to meet these goals

Page 4: Geothermal Heat Pumps For School Applications

4

ORNL is the home of FEMP’s GHP Core Team

Mission: Provide support and technical assistance to Federal agencies developing and implementing GHP projects

Also, to develop "tools of the trade" to make GHP technology just as easy for Federal facilities to procure and install as more conventional equipment.

Page 5: Geothermal Heat Pumps For School Applications

5

Presentation outline

Why GHPs are popular for school applications

Basics of GHP operation and performance GHP system configurations Site characterization Design of GHP systems

Page 6: Geothermal Heat Pumps For School Applications

6

Presentation outline

Construction costs Maintenance costs Advantages and disadvantages of GHPs Case study of the Maxey Elementary

School in Lincoln, Nebraska

Page 7: Geothermal Heat Pumps For School Applications

7

Some reasons why GHPs are popular for schools

Reduced energy use and energy costs One of the most efficient HVAC technologies

available

Reduced maintenance costs Modular, residential-sized units No complicated controls required

Lower life cycle cost Saves money for school district

Page 8: Geothermal Heat Pumps For School Applications

8

Some other reasons…

No outdoor equipment Improved aesthetics Reduced vandalism

Quiet operation Reduced mechanical room space Individual room control Low source energy use and low air

pollutant emissions – green technology

Page 9: Geothermal Heat Pumps For School Applications

9

According to EPA, in 2000, geothermal heat pumps were installed in 450 schools in 30 states (undoubtedly more by now)

http://www.epa.gov/globalwarming/publications/outreach/technology/geothermalheatpumps.pdf

Page 10: Geothermal Heat Pumps For School Applications

10

The technology goes by many different names

Ground source heat pumps (GSHP) Ground coupled heat pumps (GCHP) Geothermal heat pumps (GHP) GeoExchange (GX?) Earth energy systems

Page 11: Geothermal Heat Pumps For School Applications

11

Why GHPs are more efficient than other HVAC equipment

GHPs exchange heat with the earth, rather than with ambient air

Earth provides a much better heat exchange medium Stable temperature year-round Generally cooler than ambient air when

cooling is needed, and warmer than ambient air when heating is needed

Page 12: Geothermal Heat Pumps For School Applications

12

Deep earth (and groundwater) temperatures in the U.S.

Page 13: Geothermal Heat Pumps For School Applications

13

Capacity of a typical 4-ton geothermal heat pump vs. EWT

0

10

20

30

40

50

60

20 30 40 50 60 70 80 90 100

Entering water temperature (°F)

Cap

acit

y (k

Btu

/hr)

Heating capacity

Cooling capacity

Page 14: Geothermal Heat Pumps For School Applications

14

Efficiency of a typical 4 ton GHP as a function of EWT

0

1

2

3

4

5

6

20 30 40 50 60 70 80 90 100

Entering water temperature (°F)

Hea

tin

g C

OP

0

5

10

15

20

25

Co

oli

ng

EE

R

Page 15: Geothermal Heat Pumps For School Applications

15

Basics of GHP operation

Compressor

Water-to-refrigerant coil

Air-to-refrigerant coil

Expansion valve

FanAir filter

Air inlet (Return + OA)

Conditioned air (Supply)

Heat recovery coil

Reversing valve

Page 16: Geothermal Heat Pumps For School Applications

16

GHP System options

Page 17: Geothermal Heat Pumps For School Applications

200 Ft.

20 Ft.

25 Ft.

4 Ft.

One heat pump on its own ground loop

Page 18: Geothermal Heat Pumps For School Applications

18

Ground loops can be vertical or horizontal

                                         

    

Generally requires 1500-3000 ft2 land area per ton

Page 19: Geothermal Heat Pumps For School Applications

19

HeatPump

HeatPump

HeatPump

HeatPump

DPSignal Wire to Drive

Transducer

Variable Speed DrivePump

PurgeValves

Aux.Pump

Interior PipeHeaders

A

A

HeatPump

Commercial system: multiple GHPs on a common loop

Page 20: Geothermal Heat Pumps For School Applications

HDPE u-tubes in vertical bores.

Common loop conditioned byvertical ground heat exchanger

Generally requires 250-300 ft2 of land area per ton

Page 21: Geothermal Heat Pumps For School Applications

21

Productionwell pump

River orother surface

body

Optionalinjection well

Plate heat exchanger

AA

Common loop conditioned by groundwater

Generally requires wells with flow of 2-3 gpm/ton

Page 22: Geothermal Heat Pumps For School Applications

22

L ake

H D P E C o ils w ithU V P ro tection inL oos e B undles

A

A

Common loop conditioned by surface water (closed loop)

Typically 15 tons/acre (depth15-20 ft) or as high as 85 tons/acre for well stratified deep lakes

Page 23: Geothermal Heat Pumps For School Applications

23

Common loop conditioned by surface water (open loop)

AA

Plate heat exchanger

Water intake

Water dischargePump

More suited to warm climates, or cooling-only applications

Page 24: Geothermal Heat Pumps For School Applications

24

Single or common loop conditioned by standing column well

submersible pump

perforated intake

discharge

sleeve

formation

soil

A Aoptional bleed

Page 25: Geothermal Heat Pumps For School Applications

25

Other methods of conditioning a single or common loop

Wastewater streams Community loop Potable water supplies (where allowed) Hybrid systems:

condition with 2 or more of above condition with 1 or more of above and

outdoor air

Page 26: Geothermal Heat Pumps For School Applications

26

Many ways to configure indoor equipment as well

Each room has its own air-to-water heat pump

One heat pump serving several rooms Water-to-water heat pumps provide hot

and/or chilled water to coils (2-pipe or 4-pipe systems) or console units

Outdoor air pretreatment (see below)

Page 27: Geothermal Heat Pumps For School Applications

27

Site Characterization: evaluation of site’s geology, hydrogeology, and other characteristics Presence or absence of water

Determines whether groundwater or surface water heat pumps can be used

Depth to water Affects drilling costs for open loop GWHP

Water (or soil/rock) temperature Affects required flow rate (open loop GWHP) or

heat exchanger length (closed loop systems)

Page 28: Geothermal Heat Pumps For School Applications

28

Site Characterization (continued)

Depth to rock Influences drilling cost, borefield layout

(closed loop) Rock type

Affects thermal conductivity Affects drilling costs Influences feasibility of certain system types

Nature and thickness of unconsolidated materials overlying the rock. Affects drilling costs

Page 29: Geothermal Heat Pumps For School Applications

29

Other important site characteristics

Land area available Planned or current land use (e.g. parking

lot, playground, tennis court, etc.) Location of underground utilities State regulatory climate

Can impact every aspect of the design

Page 30: Geothermal Heat Pumps For School Applications

30

Sources of information for site characterization

State water regulatory agency State geology department Well completion reports from nearby water

wells Geologic and hydrologic maps U.S. Geological Survey Local experience

Page 31: Geothermal Heat Pumps For School Applications

31

Once the system type is decided, further tests are often required

Vertical loop: Thermal Conductivity Test Measures deep earth temperature as well Important for loop field design

Open loop: Well Test Water flow Water quality (including chemistry)

Page 32: Geothermal Heat Pumps For School Applications

32

Design of GHP Systems (inside the building)

Outdoor air treatment is a primary aspect of design Schools have high ventilation air requirements During peak heating conditions, unheated OA

mixed with RA results in low (<55 °F) entering air temperature to heat pump

Manufacturers do not recommend operation at such low EATs (and occupants may complain that system is “blowing cold air”)

Page 33: Geothermal Heat Pumps For School Applications

33

Several ways of treating outdoor air

Dedicated water-to-water heat pump supplying OA preheat coil

Sensible heat recovery unit to absorb heat from exhaust air

Conventional heat source (gas boiler, electric resistance, etc.)

Each method has advantages and disadvantages in terms of first costs and operating costs

Page 34: Geothermal Heat Pumps For School Applications

34

Many aspects of GHP design are similar to the design of any conventional HVAC system Determine peak heating and peak cooling

load for each zone of the building Select heat pumps to meet design loads

(remember that capacity depends on EWT) Heat pumps should be located with due

consideration for serviceability Size ventilation system components:

ductwork, fans, preheating coils, etc.

Page 35: Geothermal Heat Pumps For School Applications

35

Retrofits: Existing equipment influences cost-effectiveness of various GHP designs Central/terminal systems (ductwork or no) Water loop for two- or four-pipe system? If

so, potential for re-use as GHP water loop What space is available in zones for

individual heat pumps? Above dropped ceiling horizontal units Mechanical closets vertical units Through-wall PTAC units & perimeter

console units

Page 36: Geothermal Heat Pumps For School Applications

36

Three basic configurations of geothermal heat pumps

vertical

horizontal

console

Page 37: Geothermal Heat Pumps For School Applications

37

Outside the building: borefield sizing (for vertical bore systems)

Decide on borehole and u-tube size, grouting Determine ground properties from in situ test Design borefield layout (rows columns,

spacing) Determine whether antifreeze is required Select design EWT Enter all information (including loads) into

borefield design program – iterate if necessary Design exterior headers

Page 38: Geothermal Heat Pumps For School Applications

38

A number of programs available to design ground heat exchanger

Page 39: Geothermal Heat Pumps For School Applications

39

Design packages ORNL has tested

GchpCalc (www.geokiss.com) GlhePro (www.igshpa.org) RightLoop (www.wrightsoft.com) GS2000 (Caneta Research)

Page 40: Geothermal Heat Pumps For School Applications

Design programs have greatly improved since 1996

Page 41: Geothermal Heat Pumps For School Applications

41

Important considerations for design of groundwater heat pumps

Groundwater availability, quality and temperature

Required flow Water disposal method Design of plate heat exchanger

Page 42: Geothermal Heat Pumps For School Applications

42

Other system types have their own idiosyncrasies

Open and closed loop surface water heat pumps

Standing column wells

Page 43: Geothermal Heat Pumps For School Applications

43

Pumping/Piping Subsystem is another key design element

Follow Kavanaugh’s “grading” system for vertical bore systems

Pump hp/100 tons Grade5 A -- Excellent5-7.5 B -- Good7.5-10 C -- Mediocre10-15 D -- Poor>15 F -- Bad

Page 44: Geothermal Heat Pumps For School Applications

44

Ways of minimizing pumping power (closed loop systems)

Water flow rate <3 gpm per ton peak block load

Minimize pipe friction Operate pumps within 5% of max

efficiency Avoid excessive antifreeze

Page 45: Geothermal Heat Pumps For School Applications

45

GHPs should also be considered for domestic water heating

A heat pump is the most efficient technology for water heating

Can use dedicated water-to-water heat pump, or desuperheaters on selected heat pumps supplementing conventional DHW

In cooling-dominated applications, can reduce required bore length and system costs

Page 46: Geothermal Heat Pumps For School Applications

46

Resources for GHP Designers Ground-Source Heat Pumps: Design of Geothermal

Systems for Commercial and Institutional Buildings, Kavanaugh and Rafferty (ASHRAE, 1997)

Commercial/Institutional Ground Source Heat Pump Engineering Manual. Caneta Research. (ASHRAE, 1995)

Closed Loop/Ground Source Heat Pump Systems: Installation Guide (IGSHPA)

Learning from Experiences with Commercial/Institutional Heat Pump Systems in Cold Climates, Caneta Research. (CADDET, 2000)

Chapter 31: Geothermal Energy. 1999 HVAC Applications Handbook (ASHRAE)

Page 47: Geothermal Heat Pumps For School Applications

47

Problem: Lack of construction-cost-estimating guide for GHP family

RS-Means is the industry standard Referenced by HVAC cost-estimating software Does not include some GHP family members

Available GHP cost data are largely anecdotal — important factors are unknown Type of estimate — preliminary, per square foot,

bidder price, etc. Scope — whether costs for site work, design,

electrical, demolition, controls, etc., are included

Page 48: Geothermal Heat Pumps For School Applications

Solution: HVAC Construction- and Maintenance-Cost Database

Page 49: Geothermal Heat Pumps For School Applications

49

Installed Cost of Commercial Vertical Bore GHP Projects(new construction)

$0

$500

$1,000

$1,500

$2,000

$2,500

$3,000

0 50,000 100,000 150,000 200,000

Conditioned area (square feet)

Inst

alle

d c

ost

(th

ou

san

ds

[200

1])

mean cost:

$14.61/ft2 (± 6%)

Construction Cost Database

Page 50: Geothermal Heat Pumps For School Applications

50

Installed Cost of Commercial Vertical Bore GHP Projects(new construction)

$0

$500

$1,000

$1,500

$2,000

$2,500

$3,000

$3,500

0 100 200 300 400 500 600

Installed capacity (tons)

Inst

alle

d c

ost

(th

ou

san

ds

[200

1])

mean cost:$5109/ton (± 14%)

Construction Cost Database

Page 51: Geothermal Heat Pumps For School Applications

51

Summary for Vertical Bore:

Commercial New Construction $14.61 per square foot (± 6%)

Commercial Retrofit $11.50 per square foot (wide variation due to

small dataset)

Large Residential Retrofits $3,312 per ton (wide variation due to small

dataset)

Page 52: Geothermal Heat Pumps For School Applications

52

Groundwater heat pumps

$3000-$5000 per ton for well water systems (open loop and standing column well)

Page 53: Geothermal Heat Pumps For School Applications

53

Optimizing the Cost/Benefit Ratio of GHP Projects

In vertical bore projects, minimize bore length by using industry-standard borefield design program

Perform thermal conductivity test Avoid complex control systems

Page 54: Geothermal Heat Pumps For School Applications

54

Available Maintenance Cost DataGHP/Conventional HVAC

SourceASHRAE Handbook

Caneta/ASHRAEMEANS

(Army CERL)ORNL

Date Reported 1986 1998 mid-70's 1999/2000

HVAC System Types

80's conventional,

no GHPGHP

70's conventional

GHP, ACC/GHWB, WCC/GHWB

# of Bldgs 342 25 task-based 20

Bldg Types CommercialSchools,

Commercial, Residential

Military Schools

Age of Bldgs or Systems

2-25 years 1-15 years n/a 2-32 years

Avg. Ann. Maint. Cost per

Sq Ft32¢/ft2 9.3 - 10.9¢/ft2 n/a

9.27¢/ft2 (GHP), 8.75¢/ft2

(ACC/GHWB), 18.71 ¢/ft2

(WCC/GHWB)

Page 55: Geothermal Heat Pumps For School Applications

55

Estimating energy use of GHP systems (as required by LEED, ASHRAE 90.1)

DOE-2 (PowerDOE, etc.) Fairly good model, includes ground loops

Trane Trace Can be used, but no ground loop model

TRNSYS Contains sophisticated ground loop model, but

somewhat difficult to use Trane System Analyzer

Includes GHP, but not an hourly program

Page 56: Geothermal Heat Pumps For School Applications

56

Web sites with information on GHPs

www.ornl.gov/femp www.eren.doe.gov/femp/financing/espc/ghpresou

rces.html www.igshpa.okstate.edu/ www.ghpc.org http://geoheat.oit.edu/ www.geokiss.com http://www.alliantenergygeothermal.com/ A Google search on the term “geothermal heat

pump” turns up other interesting links

Page 57: Geothermal Heat Pumps For School Applications

57

Advantages of GHPs

High efficiency Lower energy consumption Lower energy cost

Low maintenance cost Low life cycle cost No outdoor equipment Greater occupant comfort

Page 58: Geothermal Heat Pumps For School Applications

58

Disadvantages of GHP

First cost can be higher than for conventional systems

Not all system types feasible in all locations

Limited pool of designers