7 ; 7 7 r . 44 4111. -7 GLENDALE BL - HYPERION AVE COMPLEX OF BRIDGES IMPROVEMENT PROJECT ENGINEERING BUREAU OF ENGINEERING Bridge Improvement Division June 3, 2015 rririnin C.:Tv Or LOS ANGELES GLENDALE BL HYPERION AVE COMPLEX OF BRIDGES IMPROVEMENT PROJECT ENGINEERING 7 11 71111T1 CITY OF LOS ANGELES BUREAU OF ENGINEERING Bridge Improvement Division June 3, 2015

Upload: tranhanh

Post on 10-Mar-2018

220 views

Category:

Documents


2 download

TRANSCRIPT

7;77 r.44 • •

4111.-7

GLENDALE BL - HYPERION AVE COMPLEX OF BRIDGES IMPROVEMENT PROJECT

ENGINEERING BUREAU OF ENGINEERING Bridge Improvement Division

June 3, 2015

rririnin C.:Tv Or LOS ANGELES

GLENDALE BL HYPERION AVE COMPLEX OFBRIDGES IMPROVEMENT PROJECT

ENGINEERING

71171111T1CITY OF LOS ANGELES

BUREAU OF ENGINEERINGBridge Improvement Division

June 3, 2015

GLENDALE BL - HYPERION AVE COMPLEX OF BRIDGES IMPROVEMENT PROJECT

rirdirriisl LaS_AANGELES

GLENDALE BL HYPERION AVE COMPLEX OFBRIDGES IMPROVEMENT PROJECT

GLENDALE BL — HYPERION AVE COMPLEX OF BRIDGES IMPROVEMENT PROJECT

Project Limits

Glendale BI - Southbound Gienfeliz BI

Hyperion Ave Glendale BI - Northbound

ENGINEERING

71111111 III

CITY OF LOS ANGELES.

GLENDALE BL — HYPERION AVE COMPLEX OFBRIDGES IMPROVEMENT PROJECT

Project LimitsEttrick St

Waverly Dr

ENGINEERING

Glendale BI - Southbound

Hyperion Ave

Glenfeliz BI

511141t7 kik". .

• 4'1111 4 16.4.

Glendale BI - Northbound

GLENDALE BL - HYPERION AVE COMPLEX OF BRIDGES IMPROVEMENT PROJECT

Needs and Deficiencies • Bridges are seismically deficient — Caltrans Bridge Evaluation -

Category 1 Bridges

• Glendale Boulevard Bridges over the LA River has substandard

sidewalks, no bike lanes

• 1-5 Off-Ramp

• LA River Bike Path Access only from Glendale BI Southbound

• Historic restoration needed

• Hyperion Ave — No continuous, ADA-compliant sidewalks through

entire project area, no bike lanes

ENGINEERING

4

GLENDALE BL HYPERION AVE COMPLEX OF

BRIDGES IMPROVEMENT PROJECT

Needs and Deficiencies• Bridges are seismically deficient — Caltrans Bridge Evaluation -

Category 1 Bridges

• Glendale Boulevard Bridges over the LA River has substandardsidewalks, no bike lanes

• 1-5 Off-Ramp

• LA River Bike Path Access only from Glendale BI Southbound

• Historic restoration needed

• Hyperion Ave — No continuous, ADA-compliant sidewalks throughentire project area, no bike lanes

ENGINEERING

minimCITY OF LOS ANGELES

4

1 11111

11011111 11111111 11111041 11

filll ENGINEERING

11111111P 5

GLENDALE BL HYPERION AVE COMPLEX OF BRIDGES IMPROVEMENT PROJECT

Seismic Strengthening

GLENDALE BL HYPERION AVE COMPLEX OFBRIDGES IMPROVEMENT PROJECT

Seismic Strengthening

1111111101111111111111111111111‘41it,1111111111TPENGINEERING

rirrIPTICITY OF LOS ANGELES

Widen by 8 feet

Widen by 8 feet

6

ENGINEERING IYME

MITI ICI

IGELE 5

GLENDALE BL HYPERION AVE COMPLEX OF BRIDGES IMPROVEMENT PROJECT

Glendale BI Widening

GLENDALE BL HYPERION AVE COMPLEX OF

BRIDGES IMPROVEMENT PROJECT

Glendale BI Widening

k1171\

ENGINEERINGME111=MIIMMIli

Min.1111

CITY OF LOS ANGELES

Widen by 8 feet

6

Widen by 8 feet

BRIDGES IMPROVEMENT PROJECT

Proposed Realigned 1-5 Northbound Off Ramp &

LA River Bike Path Access

GLENDALE BL HYPERION AVE COMPLEX OF

BRIDGES IMPROVEMENT PROJECT

Proposed Realigned 1-5 Northbound Off Ramp &

LA River Bike Path Access

£ Part f 71*-0.

a PM 4 P(R 7

PER 7

GLENDALE BL HYPERION AVE COMPLEX OF BRIDGES IMPROVEMENT PROJECT

Proposed Pedestrian Bridge over LA River

fawn; EP g a!ra 2 rara 44IW 4

i••02EME MMI".."1"1"1""N"Illiai""" ft1 MUIV1,7

_,-(0

.APPROA. OL

ViDGE ELEVATION

REP r'(cJ PIER

,cP BRIDGE L.YOui

Vertkd Nesp., Awe, ts,

;7„

.• • .441.4 ; arr.g /Pt. P.

crud. 5'441

V's.. St.* St. Roi..;

*9 •

LO,•. rep

T.. Ste. &Am Mem Typ

~fby 9J (New*, Ifte•

i I

P.I7;!ETPIAIJ PP.r IF A

e

8

SEC7ION ;//' 1.-e•

ENGINEERING

rrrifriln CITY OF LOS ANGELES

1

1.101,441,11e1

GLENDALE BL HYPERION AVE COMPLEX OFBRIDGES IMPROVEMENT PROJECT

Proposed Pedestrian Bridge over LA River

g M. 2

ARLII14,7 Mr.

.r. •

PUT

E S

Pk7?

wS'ool

i'TCe Slm413CO.4 Seely 4.4...• •e TO ----a

rufse Sins 1Wip

IMO

5fipcc._ELEyi LmQri,

.___GINISaftIVE.11.113ALOBIDGE w.

MIR

Wrked NowndPap fp

. DePing

'71rD"' •

6lon, an,"

•ek. SEC710r1

ENGINEERING

CITY OF LOS ANGELES

*Pro-4PCfeppal Epp

PEA 4

BPIDGE LA, 0",.'1

FICA

P4DEFTRIA1 PP'r

e

151

VS U

IIIMOI• /FEU

PE

8

GLENDALE BL HYPERION AVE COMPLEX OF BRIDGES IMPROVEMENT PROJECT

Proposed Infiltration Basin at Sunnynook Park

LAD, • 111

GLENDALE BL HYPERION AVE COMPLEX OFBRIDGES IMPROVEMENT PROJECT

Proposed Infiltration Basin at Sunnynook Park

1-013111

ENGINEERING11i111111

7111 III

CITY OF LOS ANGELE9

1929 Balustrades

Proposed Balustrades

ENGINEERING

GLENDALE BL — HYPERION AVE COMPLEX OF BRIDGES IMPROVEMENT PROJECT

Historic Restoration

GLENDALE BL HYPERION AVE COMPLEX OFBRIDGES IMPROVEMENT PROJECT

CtTY OF LOS ANGELES

I

Existing 2-ft curb

ENGINEERING

Fr In C•F 1_3S A%GEL

11

Existing 2-ft curb

GLENDALE BL HYPERION AVE COMPLEX OF

BRIDGES IMPROVEMENT PROJECT Existing Conditions/Safety Concerns

GLENDALE BL HYPERION AVE COMPLEX OF

BRIDGES IMPROVEMENT PROJECTExisting Conditions/Safety Concerns

ENGINEERING

PrIrT11111CITY OF LOS ANGELES

11

GLENDALE BL — HYPERION AVE COMPLEX OF

BRIDGES IMPROVEMENT PROJECT

Pedestrian Volumes — March 2014

12-hour pedestrian volumes

• 82 pedestrians on west side + 24 pedestrian on east side

• Total = 106 pedestrians in 12 hours

• Higher volume of pedestrians on the west side ENGINEERING

Mil!T1M lc ANGELES

12

GLENDALE BL HYPERION AVE COMPLEX OFBRIDGES IMPROVEMENT PROJECT

Pedestrian Volumes March 2014

ENGINEERING

MIT10111CITY OF LOS ANGELES

12-hour pedestrian volumes

• 82 pedestrians on west side + 24 pedestrian on east side

• Total = 106 pedestrians in 12 hours

• Higher volume of pedestrians on the west side

12

GLENDALE BL HYPERION AVE COMPLEX OF BRIDGES IMPROVEMENT PROJECT

Bicyclists Volumes — March 2014

#

Wrong-way roe g (possibly on sidewalk)

NB Bicyclists

12-hour bicyclists volumes

• 49 bicyclists on west side + 36 bicyclists on east side

• Total = 85 bicyclists in 12 hours 4441-*1.1Fr{-7,I,

" 4)-111111D • irri

ENGINEERING

111

13 CITY •IV:r=itLES

GLENDALE BL HYPERION AVE COMPLEX OFBRIDGES IMPROVEMENT PROJECT

Bicyclists Volumes — March 2014

ENGINEERING•11111011i1

r9rPirni III

CITY OF LOS ANGELES

Wrong-way riding(possibly on sidewalk)

NB Bicyclists

12-hour bicyclists volumes

• 49 bicyclists on west side + 36 bicyclists on east side

• Total = 85 bicyclists in 12 hours

mg. Wrong-way ridingMa. (possibly on sidewalk)

13

GLENDALE BL — HYPERION AVE COMPLEX OF BRIDGES IMPROVEMENT PROJECT

Comparison of 12-Hour Volumes on Hyperion Ave

West side Hyperion Ave -Volumes

East side Hyperion Ave -Volumes

Total Volumes

Pedestrian

82

24

106

Bicyclists

49

36

85

Vehicles

9,973

9,025 18,998

Source of Information: Transmittal #1, Appendix F, Traffic Studies, Technical Memorandum #1, Appendices A & B

14

ENGINEERING 171171111,1

GLENDALE BL HYPERION AVE COMPLEX OF

BRIDGES IMPROVEMENT PROJECT

Comparison of 12-Hour Volumes on Hyperion Ave

West sideHyperion Ave -

Volumes

East sideHyperion Ave -

Volumes

Total Volumes

Pedestrian

Bicyclists

82

49

24

36

106

85

Vehicles 9,973 9,025 18,998

ENGINEERING

7711711111!TY OF LOS ANGELES!

Source of Information: Transmittal #1, Appendix F, Traffic

Studies, Technical Memorandum #1, Appendices A & B

14

GLENDALE BL HYPERION AVE COMPLEX OF BRIDGES IMPROVEMENT PROJECT

CEQA Environmental Review

• Initial Study/Mitigated Negative Declaration (IS/MND)

prepared in 2013. Findings:

• Biological Resources

• Historic Resources

• Archaelogical Resources

• Traffic

• IS/MND circulated for public review and comment in fall

2013 (extended).

• A community workshop and a public hearing were held

in September and October 2013.

ENGINEERING

15 CITY OF LO ANCALES

GLENDALE BL HYPERION AVE COMPLEX OF

BRIDGES IMPROVEMENT PROJECT

CEQA Environmental Review

• Initial Study/Mitigated Negative Declaration (IS/MND)

prepared in 2013. Findings:

• Biological Resources

• Historic Resources

• Archaelogical Resources

• Traffic

• IS/MND circulated for public review and comment in fall

2013 (extended).

• A community workshop and a public hearing were held

ENGINEERING11•••••••••••

17111111 ►►►

CITY OF LOS ANGELES

in September and October 2013.

15

ENGINEERING

CITY OF = 7.

III 16

14.5' 11'

69'

.1-1" BRIDGE

1 1' 1.6

BRIDGE -I

NORTHBOUND

CONCRE BARRIER

TE CONCRETE

1.51±

HISTORIC REPLICA RAIL

I

HYPERION AVENUE VIADUCT OVER 1-5, RIVERSIDE DRIVE AND L.A. RIVER (LOOKING NORTH)

NO SCALE

1.5'±

HISTORIC REPLICA RAIL

7' SIDEWALK

PIPE RAIUNG

•..3.71,

1.5' 14.5'

SOUTHBOUND

BARRIER TE

GLENDALE BL — HYPERION AVE COMPLEX OF BRIDGES IMPROVEMENT PROJECT

Published IS/MND Cross Section for Hyperion Ave

• Four vehicular traffic lanes with shoulders, sidewalk on west

side, continuous concrete median barrier (Public Hearing

held October 28,2013)

GLENDALE BL HYPERION AVE COMPLEX OF

BRIDGES IMPROVEMENT PROJECT

Published IS/MND Cross Section for Hyperion Ave

• Four vehicular traffic lanes with shoulders, sidewalk on westside, continuous concrete median barrier (Public Hearingheld October 28,2013)

1.5'±

HISTORICREPLICA RAIL

ENGINEERING

Mme. III

CITY OF LOS ANGELES

7' SIDEWALK

PRANCING

1.5' 14.5'

69'

.1-1* BRIDGE

1'

11' 1.5' C. 11' 14.5' 1.51±

SOUTHBOUND

BRIDGE

BARRIERc,Q_NCREET

NORTHBOUND

BACONCRRIERRETE

BARRIER

HYPERION AVENUE VIADUCT OVER I-5, RIVERSIDE DRIVE AND L.A. RIVER(LOOKING NORTH)

NO SCALE

16

AO,

HISTORICREPLICA RAIL

TRAVEL LANES SHARED USE PATH

GLENDALE BL — HYPERION AVE COMPLEX OF BRIDGES IMPROVEMENT PROJECT

Citizens Advisory Committee (CAC) • A Citizens Advisory Committee was formed and five meetings were

held between December 2013 and December 2014.

• During this time, four design options for the Hyperion Ave segment were considered:

• Four vehicular traffic lanes, shared-use paths on both sides for pedestrians and bicyclists (Exhibit 1A, Transmittal 3)

69'±

-REPLICA RAILING CRASH EXHIBIT 7

BARRIER CRASH

BARRIER

REPLICA 1.5'± RAILING

S 1.5' •

8' 11' 10 5' 4' 10 5' 8'

SHARED TRAVEL LANES MEDIAN USE PATH

17

ENGINEERING'

GLENDALE BL HYPERION AVE COMPLEX OFBRIDGES IMPROVEMENT PROJECT

Citizens Advisory Committee (CAC)• A Citizens Advisory Committee was formed and five meetings were

held between December 2013 and December 2014.

• During this time, four design options for the Hyperion Ave segmentwere considered:

• Four vehicular traffic lanes, shared -use paths on both sidesfor pedestrians and bicyclists (Exhibit 1A, Transmittal 3)

ENGINEERING

CITY OF LOS ANGELES

1.5'tCRASH ZAHIBE::

BARRIER

69'±

REPLICARAILING• 1.

8' 11' 10 5'

SHARED TRAVEL LANESUSE PATH

MEDIAN

REPLICA CRASH

BARRIER RAILING 1

10.5' 11' 8'

TRAVEL LANES SHAREDUSE PATH

1.5'±

17

GLENDALE BL — HYPERION AVE COMPLEX OF BRIDGES IMPROVEMENT PROJECT

Citizens Advisory Committee (CAC)

• Four vehicular traffic lanes, sidewalks on west side only,

bike lanes both sides (Exhibit 1, Transmittal 3)

SIDEWALK L

BIKE LANE

CRASH BARRIER

N.B. TRAVEL LANE #1 N.B. TRAVEL LANE # 2 BIKE LANE CRASH

BARRIER

GLENDALE BL — HYPERION AVE COMPLEX OFBRIDGES IMPROVEMENT PROJECT

Citizens Advisory Committee (CAC)

• Four vehicular traffic lanes, sidewalks on west side only,bike lanes both sides (Exhibit 1, Transmittal 3)

1.5'

.I.

5,— 5'

'SIDEWALK [ BIKE LANE

CRASHBARRIER

11'

S.B. TRAVEL LANE # 2

69'±

BRIDGE\

11'

S.B. TRAVEL LANE # 1

11'(aglIrtia ) N.B. TRAVEL LANE #1

18

1.5'1

1.5'

11' 5'

N.B. TRAVEL LANE # 2 BIKE LANECRA

mt:as:2M

GLENDALE BL — HYPERION AVE COMPLEX OF BRIDGES IMPROVEMENT PROJECT

Citizens Advisory Committee (CAC)

• Three vehicular traffic lanes (one lane northbound, two lanes southbound),

sidewalk on west side only, bike lanes both sides, bike lane buffer both sides (Exhibit 2, Transmittal 3)

CLB RIDGE

11' 6' , 12' 3' S.B. TRAVEL LANE # 1 r .,.,p,,T,4„,, N.B. TRAVEL LANE # 1 91.1F.FR

7' SIDEWALK

5' BIKE LANE

GLENDALE BL — HYPERION AVE COMPLEX OFBRIDGES IMPROVEMENT PROJECT

Citizens Advisory Committee (CAC)

• Three vehicular traffic lanes (one lane northbound, two lanes southbound),sidewalk on west side only, bike lanes both sides, bike lane buffer both sides(Exhibit 2, Transmittal 3)

1.5'±

1.5'

7' 5' SIDEWALK L BIKE LANE

CRASHBARRIER

3' 1'BUFFER

69'±

EXHIBIT 2CLBR11:?GE

11'S.B. TRAVEL LANE $1 2 S.B. TRAVEL LANE #

19

12'N.B. TRAVEL LANE # 1

3'BUFFER

1.5'

5'BIKE LANE

CRASHBARRIER

69±

BUFFER

BIKE LANES I SIDEWAL CRASH

BARRIER

:1.1 ' 11'

-REPLICA RACING EXHIB IT RERL ICA

RAIL INC 1.51#

SIDEWALK BIKE LANE S.B. TRAVEL LANE # 2 CRASH

BARRIER BUFFER

CLBRIOG E

I' •

S.B . TRAVEL LANE

• iNlegiDAVR; N.B. TRAVEL LANE #1

GLENDALE BL — HYPERION AVE COMPLEX OF BRIDGES IMPROVEMENT PROJECT

Citizens Advisory Committee (CAC)

• Three vehicular traffic lanes (one lane northbound, two lanes southbound),

sidewalks on both sides, bike lanes both sides, bike lane buffer both sides (Exhibit 3, Transmittal 3)

20

GLENDALE BL HYPERION AVE COMPLEX OFBRIDGES IMPROVEMENT PROJECT

Citizens Advisory Committee (CAC)

• Three vehicular traffic lanes (one lane northbound, two lanes southbound),sidewalks on both sides, bike lanes both sides, bike lane buffer both sides(Exhibit 3, Transmittal 3) , • . .

, .

5' 5' 2'

SIDEWALK BIKE LANE

CRASHBARRIER BUFFER

BIKE LANE SIDEWALKCRASH

BUFFER BARRIER

GLENDALE BL HYPERION AVE COMPLEX OF BRIDGES IMPROVEMENT PROJECT

Traffic Studies — Level of Service (LOS) Illustration

GLENDALE BL HYPERION AVE COMPLEX OF

BRIDGES IMPROVEMENT PROJECT

Traffic Studies — Level of Service (LOS) Illustration

LOS C

LOS E

LOS D

LOS F21

GLENDALE BL — HYPERION AVE COMPLEX OF BRIDGES IMPROVEMENT PROJECT

Traffic Studies — Level of Service (LOS) on Hyperion Ave

2014 Volumes, 4 Lanes (Existing)

2014 Volumes, 3 Lanes

2040 Volumes, 4 Lanes

2040 Volumes, 3 Lanes

Northbound AM A

D

B

C

D

Northbound PM B E

• In 2014 evening peak hour, the bridge LOS is currently B.

• It would go to D immediately if the road was reduced to one

northbound lane.

• In 2040, it would go to LOS E.

• From a CEQA perspective, this would be a significant impact.

22

GLENDALE BL HYPERION AVE COMPLEX OF

BRIDGES IMPROVEMENT PROJECT

Traffic Studies — Level of Service (LOS) on Hyperion Ave

2014 Volumes, 4

Lanes (Existing)

2014 Volumes,

3 Lanes

2040 Volumes,

4 Lanes

2040 Volumes,

3 Lanes

Northbound AM A B

Northbound PM B D E

• In 2014 evening peak hour, the bridge LOS is currently B.• It would go to D immediately if the road was reduced to one

northbound lane.• In 2040, it would go to LOS E.• From a CEQA perspective, this would be a significant impact.

-4 2

22

69'i

1.5±

CURB

iv 10' 4' 10' _L S.B.IDEWALK 3' THICK TRAVEL LANE * 2 S.B. TRAVEL LANE N 1 MEDIAN N.B. TRAVEL LANE #1 N.B. 'TRAVEL LANE 2

BIZNE

ENGINEERING

23

. • AF.11-ELE'S

GLENDALE BL HYPERION AVE COMPLEX OF BRIDGES IMPROVEMENT PROJECT

Recommended Option— 4 Vehicular Lanes, 2

Bike Lanes, ADA-Compliant Sidewalk

HYPERION AVENUE BRIDGE OVER 1-5, RIVERSIDE DRIVE AND LA RIVER (LOOKING NORTH)

GLENDALE BL HYPERION AVE COMPLEX OFBRIDGES IMPROVEMENT PROJECT

Recommended Option— 4 Vehicular Lanes, 2Bike. Lanes, ADA-Compliant Sidewalk

HYPERION AVENUE BRIDGE OVER 1-5, RIVERSIDE DRIVE AND LA RIVER (LOOKING NORTH)

1.5".1

V CURB

69't

v 117 _ 4' 10' 11' J a' I NSIDEWALK B3 HatiK S.B. TRAVEL LANE * 2 S.B. TRAVEL LANE N 1 MEDIAN N.B. TRAVEL LANE #1 N.B. TRAVEL LANE 2 wig \1' BARRIER

BIKE LANE

ENGINEERING

ririrrig III

CITY OF LOS ANGELES23

GLENDALE BL HYPERION AVE COMPLEX OF BRIDGES IMPROVEMENT PROJECT

Recommended Option for Hyperion Ave

• The Recommended Option offers flexibility of converting to other

roadway options if the transportation conditions warrant it in the

future.

• The daily low count of pedestrians on Hyperion Ave would not warrant

sidewalks on both sides by reducing one traffic lane at this time.

• An ADA-compliant sidewalk will be implemented on the west side of

Hyperion Ave.

• Designated bike lanes will be implemented on Hyperion Ave.

ENGINEERING

rirrignin

24 • - r OF LC5 ANGELES

GLENDALE BL HYPERION AVE COMPLEX OF

BRIDGES IMPROVEMENT PROJECT

Recommended Option for Hyperion Ave. . . - : . . • . . ,

The Recommended Option offers flexibility of converting to otherroadway options if the transportation conditions warrant it in thefuture.

The daily low count of pedestrians on Hyperion Ave would not warrantsidewalks on both sides by reducing one traffic lane at this time.

An ADA-compliant sidewalk will be implemented on the west side of

Designated bike lanes will be implemented on Hyperion Ave..e4X9/7",

ENGINEERING

25

GLENDALE BL — HYPERION AVE COMPLEX OF BRIDGES IMPROVEMENT PROJECT

CEQA Environmental Review

• The Recommended Option, which most closely resembles Exhibit 1, is to

maintain the original 4-lane configuration of the circulated IS/MND, as

modified to include: (1) addition of bicycle lanes to Hyperion Ave, and (2)

elimination of a continuous, concrete median barrier.

• These project revisions do not create new significant impacts and do not

change effectiveness of mitigation measures, thus no recirculation of the

2013 IS/WIND is required for approval of the Recommended Option.

GLENDALE BL HYPERION AVE COMPLEX OF

BRIDGES IMPROVEMENT PROJECT

CEQA Environmental Review

• The Recommended Option, which most closely resembles Exhibit 1, is tomaintain the original 4-lane configuration of the circulated IS/MND, asmodified to include: (1) addition of bicycle lanes to Hyperion Ave, and (2)elimination of a continuous, concrete median barrier.

• These project revisions do not create new significant impacts and do not

change effectiveness of mitigation measures, thus no recirculation of the2013 IS/MND is required for approval of the Recommended Option.

ENGINEERING

CITY OF LOS ANGELES25

GLENDALE BL — HYPERION AVE COMPLEX OF BRIDGES IMPROVEMENT PROJECT

CEQA Environmental Review

• The 2013 IS/MND did not include an alternative with three vehicle lanes.

Approval of such an alternative would require additional CEQA review (at

minimum revision and recirculation of an IS/MND and if any potentially

significant impact could not be mitigated to less than significant, an

Environmental Impact Report would be required).

• Additionally, since the close of the public review period, over 400

comments, petitions, and survey results have also been received and

considered by City staff. No new environmental impacts that have not

already been addressed were included.

26

GLENDALE BL HYPERION AVE COMPLEX OF

BRIDGES IMPROVEMENT PROJECT

CEQA Environmental Review.. •

• The 2013 IS/MND did not include an alternative with three vehicle lanes.Approval of such an alternative would require additional CEQA review (atminimum revision and recirculation of an IS/MND and if any potentiallysignificant impact could not be mitigated to less than significant, anEnvironmental Impact Report would be required).

• Additionally, since the close of the public review period, over 400comments, petitions, and survey results have also been received andconsidered by City staff. No new environmental impacts that have notalready been addressed were included.

. :.. ... . ; . .

. . . . .

, .......

26

ENGINEERING

CiTY OF LO5. ANGELEL.,

GLENDALE BL HYPERION AVE COMPLEX OF BRIDGES IMPROVEMENT PROJECT

Anticipated Schedule/Funds Lapsing

Project Phase/Milestones Anticipated by

End Environmental Phase (CEQA Adoption June 30, 2015 by City Council)

Start Final Design July 1, 2015

End Final Design

June 30, 2017

• Final design funds allocated by Caltrans are set to lapse by June 30,

2017.

• With the above anticipated schedule, which includes the CEQA

approval by June 30, 2015, this project is on track to use allocated

federal funds before it lapses.

• Further delays may result in loss of funds. 27

GLENDALE BL HYPERION AVE COMPLEX OF

BRIDGES IMPROVEMENT PROJECT

Anticipated Schedule/Funds Lapsing

Project Phase/Milestones Anticipated by

End Environmental Phase (CEQA Adoptionby City Council)

Start Final Design

End Final Design

June 30, 2015

July 1, 2015

June 30, 2017

ENGINEERING

7971111nCITY OF LOS ANGELES

• Final design funds allocated by Caltrans are set to lapse by June 30,2017.

• With the above anticipated schedule, which includes the CEQA

approval by June 30, 2015, this project is on track to use allocated

federal funds before it lapses.

• Further delays may result in loss of funds.27

ENGINEERING

Mir1111111 C T..r.!•;LES

GLENDALE BL — HYPERION AVE COMPLEX OF BRIDGES IMPROVEMENT PROJECT

Focus on the Overall Project • This $50 million project is predominantly funded by the Federal

Highway Bridge Program, State Proposition 1B, and Metro Call for Projects.

• Many years of collaboration with Caltrans/FHWA, along with support of

elected officials and community groups, to receive funding on the

following components that are typically not part of a bridge

improvement project:

• 1-5 Realignment

• Bike access from northbound Glendale BI to LA River Bike Path

• Pedestrian bridge across the LA River

• Infiltration Basin

• Further delays in completing the design of the project will jeopardize

the overall project. 1111111

28

GLENDALE BL HYPERION AVE COMPLEX OF

BRIDGES IMPROVEMENT PROJECTFocus on the Overall Project

• This $50 million project is predominantly funded by the FederalHighway Bridge Program, State Proposition 1B, and Metro Call forProjects.

• Many years of collaboration with Caltrans/FHWA, along with support ofelected officials and community groups, to receive funding on thefollowing components that are typically not part of a bridgeimprovement project:

. •:,..,...';',,..„ ,,:,:,,,,,,,:1-5 Realignment ... ' ,•

.. ........... :,...; ........... , ...,..„.„ . : . : ,.„.„ . ,..„... . ........... . . .. . ... . „....„ . . ..„,.„„ . ,.• Bike access from northbound Glendale BI to LA River Bike Path

• Pedestrian bridge across the LA River

• Infiltration Basin

• Further delays in completing the design of the project will jeopardize

ENGINEERING

CITY OF LOS ANGELES

the overall project.

28

GLENDALE BL HYPERION AVE COMPLEX OF BRIDGES IMPROVEMENT PROJECT

End of Presentation

ENGINEERIIMG ?Tor

ri

,Ds

GLENDALE BL HYPERION AVE COMPLEX OFBRIDGES IMPROVEMENT PROJECT

End of Presentation